22B0104B-1 REV.pdf
PDF 6 MB Posted
- Solicitation number
- N4008422B0104
About this file
This solicitation requests proposals to provide an air conditioning system and related electrical work at rooms 113 and 115 of Building 2053 located at U.S. Fleet Activities in Yokosuka, Japan. The contractor shall furnish all labor, materials, tools, and equipment to install new A/C units, ductwork, wiring, and controls. Incidental work includes temporary facilities and environmental protections.
The Navy seeks a contractor to complete the work within 180 calendar days of award including mail delivery periods. Proposals are due within 15 days of solicitation and the contractor must obtain all required permits and approvals. The work site is an occupied building so the contractor must coordinate work to minimize disruptions. Insurance, bonds, and other standard contracting documents are required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMEMD 0002.pdf | ||
| AMEND 0001.pdf | ||
| 22B0104C_NOTICE.pdf | ||
| 22B0104B-2.pdf | ||
| 22B0104A.pdf | ||
| 22B0104D PPI Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Provide A/C System at Room 113 and 115, Bldg 2053 eProject No. 1666474
TABLE OF CONTENTS PAGE 1
TABLE OF CONTENTS
DIVISION 01 – GENERAL REQUIREMENTS
01 11 00.00 33 SUMMARY OF WORK
01 14 00.00 33 WORK RESTRICTIONS
01 20 00.00 33 PRICE AND PAYMENT PROCEDURES
01 30 00.00 33 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 33 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 16.00 33 CONSTRUCTION PROGRESS SCHEDULES
01 33 00.00 33 SUBMITTAL PROCEDURES
01 35 26.00 33 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 01.00 33 QUALITY CONTROL (QC) MINOR CONSTRUCTION
01 50 00.00 33 TEMPORARY FACILITIES AND CONTROLS
01 57 19.00 33 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 33 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00.00 33 PROJECT IDENTIFICATION
01 74 19.00 33 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00.00 33 CLOSEOUT SUBMITTALS
01 78 23.00 33 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00.00 33 DEMOLITION
02 82 16.00 33 ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS
(FOR STATIONS LOCATED IN JAPAN)
02 83 00.00 33 LEAD REMEDIATION
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 16.00 33 INSULATION
DIVISION 09 – FINISHES
09 22 00.00 33 METAL SUPPORT ASSEMBLIES
09 51 00.00 33 ACOUSTICAL CEILINGS
09 90 00.00 33 PAINTS AND COATINGS
DIVISION 23 – HEATING, VENTILATION, AND AIR CONDITIONING
23 00 00.00 33 HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 03 00.00 33 BASIC MECHANICAL MATERIALS AND METHODS
23 07 00.00 33 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 31 13.00 33 METAL DUCTS
DIVISION 26 – ELECTRICAL
26 00 00.00 33 BASIC ELECTRICAL MATERIALS AND METHODS
26 11 16.00 33 CUBICLE TYPE UNIT SUBSTATIONS
26 20 00.00 33 INTERIOR DISTRIBUTION SYSTEM
26 51 00.00 33 INTERIOR LIGHTING
Provide A/C System at Room 113 and 115, Bldg eProject No. 1666474
SECTION 01 11 00.00 33 Page 1
SECTION 01 11 00.00 33
SUMMARY OF WORK
08/20
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following must be submitted in accordance with Section 01 33 00.00 33 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Utility Outage Requests; G (CME)
Utility Connection Requests; G (CME)
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work includes providing A/C system including electrical system, and incidental related works, as described on plans and specifications. Related work is defined as temporary work and relevant work which is required to accomplish this project. This work does not include unforeseen site conditions.
1.2.1.1 Manage and dispose of Asbestos Containing Materials (ACM)
Existing material known to contain asbestos are existing as described in
Section 02 41 00.00 33 DEMOLITION. The Contractor must manage and dispose of the ACM in accordance with applicable codes, rules, and regulations, and
Section 02 82 16.00 33 ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS.
1.2.1.2 Manage and dispose of lead (Material Containing Lead/Paint with
Lead (MCL/PWL)), Cadmium and Chromium (VI)
Existing material known to contain lead (MCL/PWL), cadmium, chromium (VI) are existing as described in Section 02 41 00.00 33 DEMOLITION. The
Contractor must manage and dispose of the lead (MCL/PWL), cadmium, chromium
(VI) in accordance with applicable codes, rules, and regulations, and
Section 02 83 00.00 33 LEAD REMEDIATION.
1.2.2 Location
SECTION 01 11 00.00 33 Page 2
The work must be located at the U.S. FLEET ACTIVITIES, YOKOSUKA, JAPAN, approximately as indicated. The exact location will be shown by the
Contracting Officer.
1.3 CONTRACT DRAWINGS
The following drawings accompany this specification and are a part thereof.
Index of Contract Drawings:
NAVFAC DRAWING NO. TITLE
1725417 TITLE SHEET, GENERAL NOTES AND SYMBOLS
1725418 SCOPE OF WORK, INTERIOR FINISH SCHEDULE AND KEY
PLAN
1725419 FLOOR PLAN AND CEILING PLAN
1725420 SECTIONS
1725421 TYPICAL DETAILS
1725422 GENERAL DESCRIPTION OF WORK AND KEY PLAN
1725423 REMOVAL FLOOR PLAN FOR VENTILATION SYSTEM
1725424 FLOOR PALN FOR HVAC SYSTEM
1725425 SECTIONS AND ELEVATION
1725426 EQUIPMENT SCHEDULE AND DETAILS
1725427 GENERAL DESCRIPTION OF WORK, NOTES, ABBREVIATIONS,
LEGEND
1725428 FEEDER AND HVAC WIRING PLAN
1725429 LIGHTING WIRING PLAN
1725430 REMOVAL PANELBOARD SCHEDULE "P-2"
1725431 REMOVAL SEQUENCE CONTROL FOR "P-2"
1725432 PANELBOARD SCHEDULE "P-2"
1725433 SEQUENCE CONTROL FOR "P-2"
1.4 PROJECT SCHEDULE AND TIME CONSTRAINTS
1.4.1 Commencement, and Completion of Work
The Contractor must be required to complete the entire work, ready for use, not later than 180 calendar days, including the mailing period, after the date of Award. The mailing period includes the days for mailing of the
Notice of Award and the submission of the required bonds, Certificate of
Insurance, and pre-construction activities. The time for completion must include final clean-up of the premises.
1.5 OCCUPANCY OF PREMISES
Building(s) will be occupied during performance of work under this Contract.
Occupancy notifications will be posted in a prominent location in the work area.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.6 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
SECTION 01 11 00.00 33 Page 3
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
c. Unless otherwise specified or indicated, existing objects which interfere to accomplish new work must be removed temporarily and reinstall them upon completion of the work.
d. Do not make opening at structural element without approval from 1st grade licensed architect (“1 kyu Kenchiku-shi”) of Government.
1.7 ON-SITE PERMITS
1.7.1 Utility Outage Requests and Utility Connection Requests
Work must be scheduled to hold outages to a minimum. Restrictions to utility outage and/or Government operation are/is specified in section 01 14
00.00 33 WORK RESTRICTIONS.
Utility outages and connections required during the prosecution of work that affect existing systems must be arranged for at the convenience of the
Government.
Contracting Officer may permit utility outages at his/her discretion.
Requests for utility outages and connections must be made in writing to the
Contracting Officer at least 15 calendar days in advance of the time required. Each request must state the system involved, area involved, approximate duration of outage, and the nature of work involved.
1.7.2 Burning Permits
Burning of trash or rubbish is not permitted on project site.
1.8 CONCILIATION CLAUSE
a. Any disagreement arising under this contract which is not resolved by the parties to this contract may be submitted to the U.S.-Japan Joint
Committee for Conciliation in accordance with paragraph 10, Article
XVIII, of the Status of Forces Agreement under Article VI, of the
Treaty of Mutual Cooperation and Security between Japan and the
United States of America.
b. Recourse to the Joint Committee for Conciliation for resolving disputes is available in addition to the procedures set forth in the
Contract Disputes Act of 1978 and the Disputes Clause of this contract, 52.233-1. A request for conciliation by the Joint Committee, however, must not toll the time periods allowed under the Contract
Disputes Act for appealing a contracting officer’s final decision to either the Armed Services Board of Contract Appeals or U.S. Court of
Federal Claims.
SECTION 01 11 00.00 33 Page 4
c. Upon filing a request for conciliation with the Joint Committee, the
Contractor must immediately notify the Contracting Officer in writing of the request.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 EXISTING CONDITIONS
Before beginning any work, survey the site and examine the drawings and specifications to determine the extent of the work.
-- End of Section --
SECTION 01 14 00.00 33 Page 1
SECTION 01 14 00.00 33
WORK RESTRICTIONS
approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following
SD-01 Preconstruction Submittals:
List of Contact Personnel; G (CME)
Vehicle list; G (CME)
Employee List for Secured Area; G (CME)
1.2 SPECIAL SCHEDULING REQUIREMENTS
a. Permission to interrupt any Activity roads, and/or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
b. The Government will perform normal operation at building/area where not scheduled to Contractor’s work during the entire construction period.
Conduct construction so as to cause the least possible interference with normal operations of the activity.
c. The Contractor must complete on-site work for each room as follows.
Working order of each room must be under the direction of the
Room : Completion Date:
114 30 calendar days
Other room 45 calendar days
1.3 CONTRACTOR ACCESS AND USE OF PREMISES
1.3.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including access, safety, environment, fire, traffic and security regulations. Provide written "General
Authorization to Work on Base" to the Security Office. Keep within the limits of the work and avenues of ingress and egress. To minimize traffic
SECTION 01 14 00.00 33 Page 2 congestion, delivery of materials must be outside of peak traffic hours
(6:30 to 8:00 a.m. and 3:30 to 5:00 p.m.) unless otherwise approved by the
Contracting Officer. Ensure allowable maximum vehicle length to carry in elongated material via the Contracting officer. Wear safety gears (such as hard hats, high visibility vest) with the Contractor's name prominently displayed, in construction site and designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry.
The Contractor's equipment must be conspicuously marked for identification.
1.3.1.1 Force Protection
All vehicles, hand carried items, and persons are subject to searches upon entering and/or exiting U.S. Military installations and at any time while on the U.S. military installations. Random searches are conducted at all gates, during increased security or force protection conditions (FPCONs)
1.3.1.2 Subcontractors and Personnel Contacts
Within 15 days after the date of Award, submit a list of contact personnel of the Contractor and subcontractors including the names, job titles, addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.3.1.3 Vehicle List
Submit an original list of vehicles to be utilized at the work site with the following information for each vehicle:
a. Make
b. Year
c. Model
d. License number
e. Registered owner
f. Current BASE pass expiration date.
1.3.1.4 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installations under the cognizance of the Government except in designated smoking areas.
This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.3.2 Working Hours
The project site will be available during regular working hours established by the Contracting Officer, between 8:00 a.m. and 4:45 p.m., Monday through
Friday, excluding all U.S. legal holidays.
SECTION 01 14 00.00 33 Page 3
1.3.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
If the Contractor desires to carry on work outside regular hours, including
Saturdays, Sundays, and Government holidays, submit a written justification giving the benefit to the Government, specific dates, hours, location, type of work to be performed, contract number and project title for approval, and submit request outside regular hours 96 hours in advance of the date the work will start. During periods of darkness, light the different parts of the work in an approved manner. All work outside of regular hours is subject to approval by the Contracting Officer. All work outside of regular hours must be able to demonstrate a benefit to the Government. The
Contractor must attach a Safety Brief and the Activity Hazard Analysis (AHA) for work that will be done outside regular working hours. The Safety Brief will be signed by the employees performing the work and submitted to the
Government’s Representative.
1.3.4 Occupied and Existing Building
a. The Contractor must be working in an existing building which is occupied.
Do not enter the building without prior approval of the Contracting
Officer.
b. The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.
c. Provide dust covers or protective enclosures to protect existing work that remains and Government material located in the construction area during the construction period.
d. Construction smell, such as paint, adhesive, asphalt, or chemicals, must be controlled to prevent emission to occupied area.
e. Do not interrupt occupant’s access to entrance during construction. The
Contractor must provide temporary covering, partition, watch man and other protections if necessary for secure occupant/resident safety and convenience. The Contractor must provide 15 days advance notice to the
Contracting Officer of scheduled work for each entrance.
1.3.5 Utility Cutovers and Interruptions
This project will not permit interruptions to any utility services and the
Government’s regular operations, except the following items and restriction items specified herein before;
a. The Government will allow to the Contractor the utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and
Government holidays. Conform to procedures required in the paragraph
"Work Outside Regular Hours."
b. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work, or permit such operation to the contractor. The Contractor must
SECTION 01 14 00.00 33 Page 4 notify the Contracting Officer giving reasonable advance notice when such operation is required.
1.3.6 Restrictions on Equipment
1.3.6.1 Restrictions on Radio Transmitter Equipment
Conform to the restrictions and procedures for the use of radio transmitting equipment, as directed. Do not use transmitters without prior approval.
1.3.6.2 Prohibition of Radiographic Operations on NAVFAC Projects
No radiographic operations including radiographical tests are allowed on
NAVFAC projects. This includes machine and equipment that produce ionizing radiation such as industrial x-ray machines, particle accelerators, electron microscopes, laboratory analytical devices, and all other equipment capable of producing ionizing radiation.
1.4 SECURITY REQUIREMENTS
Contract Clause "FAR 52.204-2, Security Requirements and Alternate II," "FAC
5252.236-9301, Special Working Conditions and Entry to Work Area," and the following apply:
1.4.1 Security area requirement
Bldg.2053 are secured areas. The Contractor must comply with the following security requirements.
1.4.2 Escort for Bldg.2053
For entrance to and work inside the Bldg.2053, the Government personnel will provide escort services. The Contractor will not be allowed to enter the
Bldg.2053 without escort service.
There is no limit to the number of people that one person may escort, but personnel requiring escorts must have an escort present at all times while on the Bldg.2053.
1.4.3 Areas Not Covered by Contract
Contractor personnel will not be permitted to enter buildings, spaces, and areas not covered by this contract except on prior approval of the department/office/shop having jurisdiction of the areas. Coordinate action with the Contracting officer to obtain such entry approval.
1.4.4 Access to Unclassified Information
Access to unclassified conversion, or repair technology and related technical information manuals, documents, drawings, plans, specifications, and other unclassified information is restricted to official need-to-know basis, designated by physical markings to show the appropriate control designations. Handle, control, and safeguard to prevent oral, visual, and documentary disclosure to the public, to foreign sources, and to personnel not having an official need-to-know. Return this information upon completion of contracted work, except when specific retention authorization is granted by the Contracting Officer's Security Representative.
SECTION 01 14 00.00 33 Page 5
1.4.5 Photographs
Unofficial photograph is prohibited in the secured areas. When operationally required, submit a written request containing specific justification and details to the Security Officer prior to release.
1.4.6 Employee List for Secured Area
A list of all employees to be engaged in the performance of work must be furnished to the Security Department.
SECTION 01 20 00.00 33 Page 1
SECTION 01 20 00.00 33
PRICE AND PAYMENT PROCEDURES
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. The latest version of the publication at time of award must be used.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EP-1110-1-8 Construction Equipment Ownership and
Operating Expense Schedule, Vol 1-12
1.2 SUBMITTALS
approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following
Schedule of Prices; G (CME)
1.3 SCHEDULE OF PRICES
1.3.1 Data Required
Within 15 calendar days of notice of award, prepare and deliver to the
Contracting Officer a Schedule of Prices (construction contract) as directed by the Contracting Officer. Provide a detailed breakdown of the contract price, giving quantities for each of the various kinds of work, unit prices, and extended prices. Costs must be summarized and totals provided for each construction category.
1.3.2 Schedule Instructions
Payments will not be made until the Schedule of Prices has been submitted to and accepted by the Contracting Officer. Identify the cost for site work, SECTION 01 20 00.00 33 Page 2 and include incidental work to the 1.5 m (5 ft) line. Identify costs for the building(s), and include work out to the 1.5 m (5 ft) line. Work out to the
1.5 m (5 ft) line must include construction encompassed within a theoretical line 1.5 m (5 ft) from the face of exterior walls and must include attendant construction, such as pad mounted HVAC cooling equipment, cooling towers, and transformers placed beyond the 1.5 m (5 ft) line.
1.4 CONTRACT MODIFICATIONS
In conjunction with the Contract Clause "DFARS 252.236-7000, Modification
Proposals-Price Breakdown," and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, equipment use rates must be based upon the applicable provisions of the EP-1110-1-8.
1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT
1.5.1 Content of Invoice
Requests for payment will be processed in accordance with the Contract
Clause FAR 52.232-27 Prompt Payment for Construction Contracts and FAR
52.232-5 Payments Under Fixed-Price Construction Contracts. The requests for payment shall include the documents listed below.
a. The Contractor's invoice, on NAVFAC Form 7300/30 furnished by the
Government, showing in summary form, the basis for arriving at the amount of the invoice. Form 7300/30 shall include certification by
Contractor and Quality Control (QC) Manager.
b. The Estimate for Voucher/ Contract Performance Statement on NAVFAC Form
4330/54 furnished by the Government, showing in detail: the estimated cost, percentage of completion, and value of completed performance for each of the construction categories stated in this contract. Use NAVFAC
Form 43300/54 on NAVFAC contracts when a Monthly Estimate for Voucher is required.
c. Updated Project Schedule and reports required by the contract
d. Contractor Safety Self Evaluation Checklist
e. Other supporting documents as requested
f. Updated copy of submittal register.
g. Invoices not completed in accordance with contract requirements will be returned to the Contractor for correction of the deficiencies.
h. Monthly Work-hour report
i. Solid Waste Disposal Report
1.5.2 Submission of Invoices
Submit invoices in accordance with the Contract Clauses “DFARS 252.232-7003
Electronic Submission of Payment Requests and Receiving Reports” and “DFARS
252.232-7006 Wide Area Workflow Payment Instructions”. The documents listed in paragraph titled "Content of Invoice" above must be provided in their
SECTION 01 20 00.00 33 Page 3 entirety as an attachment in Wide Area Work Flow (WAWF) for each invoice submitted. The maximum size of each WAWF attachment is two megabytes, but there are no limits on the number of attachments. If a document cannot be attached in WAWF due to system or size restriction it must be provided as instructed by the Contracting Officer.
1.5.3 Invoice Frequency
Contractors must invoice monthly for all work completed in accordance with contract requirements during the preceding month. First/Final invoices should only be utilized when the job size is sufficiently small that multiple invoicing must be construed to conflict with paragraph 1.6, “PAYMENT TO THE CONTRACTOR”, or its subparagraphs
1.5.4 Final Invoice
a. A final invoice must be accompanied by the certification required by
DFARS 252.247.7023 TRANSPORTATION OF SUPPLIES BY SEA, and the
Contractor's Final Release. If the Contractor is incorporated, the Final
Release must contain the corporate seal. An officer of the corporation must sign and the corporate secretary must certify the Final Release.
b. For final invoices being submitted via WAWF or as instructed by the
Contracting Officer, the original Contractor's Final Release Form and required certification of Transportation of Supplies by Sea must be provided directly to the respective Contracting Officer prior to submission of the final invoice. Once receipt of the original Final
Release Form and required certification of Transportation of Supplies by
Sea has been confirmed by the Contracting Officer, the Contractor must then submit final invoice and attach a copy of the Final Release Form and required certification of Transportation of Supplies by Sea in WAWF or as instructed by the Contracting Officer.
c. Final invoices not accompanied by the Contractor's Final Release and required certification of Transportation of Supplies by Sea will be considered incomplete and will be returned to the Contractor.
1.6 PAYMENTS TO THE CONTRACTOR
Payments will be made on submission of itemized requests by the Contractor which comply with the requirements of this section, and will be subject to reduction for overpayments or increase for underpayments made on previous payments to the Contractor.
1.6.1 Obligation of Government Payments
The obligation of the Government to make payments required under the provisions of this contract will, at the discretion of the Contracting
Officer, be subject to reductions and suspensions permitted under the FAR and agency regulations including the following in accordance with FAR
32.503-6 Suspension or Reduction of Payments:
a. Reasonable deductions due to defects in material or workmanship;
b. Claims which the Government may have against the Contractor under or in connection with this contract;
SECTION 01 20 00.00 33 Page 4
c. Unless otherwise adjusted, repayment to the Government upon demand for overpayments made to the Contractor; and
d. Failure to provide up to date record drawings not current as stated in
Contract Clause "NFAS 5252.236-9310, Record Drawings."
1.6.2 Payment for Onsite and Offsite Materials
Progress payments may be made to the contractor for materials delivered on the site, for materials stored off construction sites, or materials that are in transit to the construction sites under the following conditions:
a. FAR 52.232-5(b) Payments Under Fixed Price Construction Contracts.
b. Materials delivered on the site but not installed, including completed preparatory work, and off-site materials to be considered for progress payment must be major high cost, long lead, special order, or specialty items, not susceptible to deterioration or physical damage in storage or in transit to the construction site. Examples of materials acceptable for payment consideration include, but are not limited to, structural steel, non-magnetic steel, non-magnetic aggregate, equipment, machinery, large pipe and fittings, precast/prestressed concrete products, plastic lumber (e.g., fender piles/curbs) and high-voltage electrical cable.
Materials not acceptable for payment include consumable materials such as nails, fasteners, conduits, gypsum board, glass, insulation, and wall coverings.
c. Materials to be considered for progress payment prior to installation must be specifically and separately identified in the Contractor's estimates of work submitted for the Contracting Officer's approval in accordance with Schedule of Prices requirement of this contract.
Requests for progress payment consideration for such items must be supported by documents establishing their value and that the title requirements of the clause at FAR 52.232-5 have been met.
d. Materials are adequately insured and protected from theft and exposure.
e. Provide a written consent from the surety company with each payment request for offsite materials.
f. Materials to be considered for progress payments prior to installation must be stored either in Hawaii, Guam, Puerto Rico, or the Continental
United States. Other locations are subject to written approval of the
SECTION 01 20 00.00 33 Page 5
SECTION 01 30 00.00 33 Page 1
SECTION 01 30 00.00 33
ADMINISTRATIVE REQUIREMENTS
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. The latest version of the publication at time of award must be used.
Ministry of Land, Infrastructure, Transport and Tourism, GOVERNMENT
OF JAPAN (KOKUDO KOTSU-SHO)
Public Building Construction Photography Procedure (“Eizen Koji Shashin
Satsuei Yoryo”)
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 Safety and Health Requirements Manual approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following
Certificate of Insurance; G (Contract Specialist)
Progress and completion pictures;
Limited Authorization for Use of Hardcopy Data and Electronic Data; G
(CME)
1.3 PROGRESS AND COMPLETION PICTURES
Photographically document site conditions prior to start of construction operations. Provide monthly, and within one month of the completion of work, digital photographs, 1600x1200x24 bit true color minimum resolution in
JPEG file format showing the sequence and progress of work. Take a minimum of 20 digital photographs each week throughout the entire project in accordance with Public Building Construction Photography Procedure (“Eizen
Koji Shashin Satsuei Yoryo”), except specified herein. Submit with the monthly invoice two sets of digital photographs each set on a separate CD-R, SECTION 01 30 00.00 33 Page 2 cumulative of all photos to date. Indicate photographs demonstrating environmental procedures.
1.4 MINIMUM INSURANCE REQUIREMENTS
Provide the minimum insurance coverage required by FAR 28.307-2 Liability, during the entire period of performance under this contract. Provide other insurance coverage as required by Japanese law.
1.5 FIRST TIER CONTRACTOR REQUIREMENTS FOR ASBESTOS CONTAINING MATERIALS
Accomplish all contract requirements of Section 02 82 16.00 33 ENGINEERING
CONTROL OF ASBESTOS CONTAINING MATERIALS assigned to the, Private Qualified
Person, directly with a first tier subcontractor.
1.6 SUPERVISION
1.6.1 Minimum Communication Requirements
Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of contract work. In addition, if a Quality Control (QC) representative is required on the contract, then that individual must also have fluent English communication skills.
1.6.2 Superintendent Qualifications
The project superintendent must have a minimum of 10 years experience in construction with at least 5 of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. The qualification requirements for the alternate superintendent are the same as for the project superintendent. The Contracting Officer may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.
For routine projects where the superintendent is permitted to also serve as the Quality Control (QC) Manager as established in Section 01 45 00.00 33
QUALITY CONTROL, the superintendent must have qualifications in accordance with that section.
1.6.2.1 Duties
The project superintendent is primarily responsible for managing and coordinating day-to-day production and schedule adherence on the project.
The superintendent is required to attend NAVFAC Red Zone meetings, partnering meetings, and quality control meetings. The superintendent or qualified alternative must be on-site at all times during the performance of this contract until the work is completed and accepted.
1.6.3 Non-Compliance Actions
The Project Superintendent is subject to removal by the Contracting Officer for non-compliance with requirements specified in the contract and for failure to manage the project to insure timely completion. Furthermore, the
../Word/01%2045%2000.00%2020.doc
SECTION 01 30 00.00 33 Page 3
Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders is acceptable as the subject of claim for extension of time for excess costs or damages by the Contractor.
1.7 PERFORMANCE EVALUATION
Contractor’s performance will be evaluated using the contractor performance evaluation report entry system located on the website http://www.cpars.gov On-line training for Contractor’s personnel is available on the website.
Prior to commencement of work, the Contractor is required to provide the government with the name, phone number and e-mail address of the
“Contractor’s Representative” that will be responsible for receipt and review of draft performance evaluations prepared by the government. It is the Contractor’s responsibility to keep this contact information current.
After contractor performance evaluation is completed, it will be placed in the Federal Government’s Past Performance Information Retrieval System
(PPIRS) for use by source selection officials when considering contractors for award of new contracts.
1.8 INTERPRETER
The Contractor must furnish the service of an interpreter on the job. This interpreter must have strong knowledge of the English language in terms of writing, listening, speaking and reading skills. Interpreter's English skills must also be well suited to the construction industry. If at any time the Contracting Officer feels the Contractor's interpreter is unable to perform the duties required of him/her, the Contracting Officer will ask for his/her immediate replacement. When the QC manager or the project superintendent talks with the Government representative, on-site or off-site, they must be accompanied by their interpreter.
1.9 PRECONSTRUCTION MEETING
After award of the contract but prior to commencement of any work at the site, meet with the Contracting Officer to discuss and develop a mutual understanding relative to the administration of the value engineering and safety program, preparation of the schedule of prices or earned value report, shop drawings, and other submittals, scheduling programming, and prosecution of the work. Major subcontractors who will engage in the work must also attend.
1.10 FACILITY TURNOVER PLANNING MEETINGS (NAVFAC RED ZONE - NRZ)
Meet with the Government to identify strategies to ensure the project is carried to expeditious closure and turnover to the Client. Start the turnover process at the Pre-Construction Conference meeting with a discussion of the NAVFAC Red Zone (NRZ) process and convene at regularly scheduled NRZ Meetings. Include the following in the facility Turnover effort:
1.10.1 NRZ Checklist
a. Contracting Officer's Technical Representative (COTR) will provide the
Contractor a copy of the NRZ Checklist template prior to 75 percent completion.
http://www.cpars.gov/cparsmain.htm
SECTION 01 30 00.00 33 Page 4
b. Prior to 75 percent completion add/delete critical activities to the NRZ
Checklist template as necessary to match the project scope, and schedule critical activities and insert planned completion dates in the NRZ checklist for each critical activity. Present the NRZ Checklist to COTR and review during a regularly scheduled QC Meeting.
1.10.2 Meetings
a. Upon Government acceptance of the NRZ Checklist, the Project
Superintendent is required to lead regular NRZ Meetings beginning at approximately 75 percent project completion, or three to six months prior to Beneficial Occupancy Date (BOD), whichever comes first.
b. The Contracting Officer will determine the frequency of the meetings, which is expected to increase as the project completion draws nearer.
c. Using the NRZ Checklist as a Plan of Action and Milestones (POAM) and basis for discussion, review upcoming critical activities and strategies to ensure work is completed on time.
d. Coordinate with the COTR any upcoming activities that require Government involvement.
e. Maintain the NRZ Checklist by documenting the actual completion dates as work is completed and update the NRZ Checklist with revised planned completion dates as necessary to match progress. Distribute copies of the current NRZ Checklist to attendees at each NRZ Meeting.
1.11 PARTNERING
To most effectively accomplish this contract, the Government requires the formation of a cohesive partnership within the Project Team whose members are from the Government, the Contractor and their Subcontractors. Key personnel from the Supported Command, the End User (who will occupy the facility), NAVFAC (Echelon III and IV), the Navy and Marine Corps
Region/Installation, the Contractor and Subcontractors, and the Designer of
Record will be invited to participate in the Partnering process. The
Partnership will draw on the strength of each organization in an effort to achieve a project that is without any safety mishaps, conforms to the
Contract, and stays within budget and on schedule.
The Contracting Officer will provide Information on the Partnering Process and a list of key and optional personnel who should attend the Partnering meeting.
1.11.1 Informal Partnering
The Contracting Officer will organize the Partnering Sessions with key personnel of the project team, including Contractor personnel and Government personnel.
The Initial Partnering session should be a part of the Pre-Construction
Meeting. Partnering sessions will be held at a location agreed to by the
Contracting Officer and the Contractor (typically a conference room provided by the Contracting Officer or the Contractor). The Initial Informal
Partnering Session will be conducted and facilitated using electronic media
(a video and accompanying forms) provided by the Contracting Officer. The
SECTION 01 30 00.00 33 Page 5
Partners will determine the frequency of the follow-on sessions, at no more than 3 to six month intervals.
1.12 LIMITED AUTHORIZATION FOR USE OF HARDCOPY DATA AND ELECTRONIC DATA
The Contractor must sign the “Limited Authorization for Use of Hardcopy
Data” and/or the “Limited Authorization for Use of Electronic Data” attached end of this section, before the AUTOCAD files/request documents are released to the Contractor.
1.13 ELECTRONIC MAIL (E-MAIL) ADDRESS
Establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments in Microsoft, Adobe
Acrobat, and other similar formats. Within 10 days after contract award, the
Contractor must provide the Contracting Officer a single (only one) e-mail address for electronic communications from the Contracting Officer related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The
Contracting Officer may also use email to notify the Contractor of base access conditions when emergency conditions warrant, such as hurricanes, terrorist threats, etc. Multiple email address will not be allowed.
It is the Contractor's responsibility to make timely distribution of all
Contracting Officer initiated e-mail with its own organization including field office(s). The Contractor must promptly notify the Contracting
Officer, in writing, of any changes to this email address.
SECTION 01 30 00.00 33 Attachment Page 1
CUI//FEDCON[when filled in]
NAVFAC Red Zone (NRZ) Checklist/POAM
The NRZ Checklist/POAM is a tool to track the status of critical activities required for BOD to help ensure their timely completion to prevent delays with the facility acceptance and turnover.
The critical activities are organized by section according to the responsible party (i.e. Contractor, Client, and NAVFAC)
Critical items missing from this list should be added as necessary to ensure the list is comprehensive. Likewise, unnecessary items should be deleted.
Any critical items left off the NRZ Checklist that are later identified after initial NRZ meeting is conducted should be added immediately so their progress can be tracked.
A copy of the NRZ Checklist/POAM must be maintained in the contract file.
Section 1
Contractor Responsibility Critical Activities
Point of
Contact
Sched
Comp
Date
Actual
Comp
Date
Notes
A. Required for Facility Delivery:
Final Electrical Connections
Final Water Connections
Final Gas Connections
Critical System Start-up:
System:
System:
DALT (duct leakage) Testing
TABS (air balancing) Testing
ACATS (controls) Testing
Electrical Systems Testing
Generator Testing
Superchlorination of potable water systems
Plumbing/backflow Testing
Elevator Testing
Boiler Testing
Crane Testing
Fire Alarm/Sprinkler Testing
Keying Plan Meeting
Deliver Lockset Cores
NMCI Connections/IT Systems Testing
IDS & SCIF Testing
Telecommunications Connections & Test
Final Commissioning
System Training of Government Personnel
System:
System:
Pre-Warranty Conference
Contractor’s Pre Final Punch List Complete
Pre Final Inspection
Punch List
Final Inspection
BOD/Use and Possession
SECTION 01 30 00.00 33 Attachment Page 2
Contractor Responsibility Critical Activities
Point of
Contact
Sched
Comp
Date
Actual
Comp
Date
Notes
B. Required for Contract Close-out:
Delivery of O&M Manuals
Delivery of Product Warranties
LEED Documentation
Energy & Sustainability Record Card
Site Restoration
Final Landscaping
Spare Parts, Extra Stock, Special Tools, etc
As-Built Drawings
Final Demobilization and Clean-up
Temp Construction Fence Removed
Project Close-out Meeting
Complete DD1354
Close-out Storm Water Permit
2nd Season TABS
Section 2
Client Responsibility Critical Activities
Point of
Contact
Sched
Comp
Date
Actual
Comp
Date
Notes
A. Required for Facility Delivery:
Keying Plan Meeting
Telecommunication install
Mod service contracts for
Phone/Utilities/ Custodial/Grounds
NMCI Installations or other networks
GFE status/delivery schedule (GFCI, GFGI)
Client provided equipment SELF installed
Client provided equipment KTR installed
Intrusion Detection Systems Test
Secure Network Installations
Attend Training
B. Required for Contract Close-out:
Planned User Move-in
Ribbon-cutting ceremony
SECTION 01 30 00.00 33 Attachment Page 3
Section 3
NAVFAC Responsibility Critical Activities
Point of
Contact
Sched
Comp
Date
Actual
Comp
Date
Notes
A. Required for Facility Delivery:
Coordinate Final Utility Connections
Generator Performance Verification
Transformer Performance Verification
DALT Verification
1st Season TABs Verification
ACATS Performance Verification
Elevator Certification
Crane Certification
Boiler Certification
Fire Alarm/Sprinkler Test
IDS & SCIF Test
Keying plan to contractor
Locket Cores installed
Training Coordinated/Scheduled with FMS
O&Ms to FMS
Client walk-thru Inspection
Pre-Final Inspection
Final Inspection
BOD/Use and Possession
B. Required for Contract Close-out:
BOD Letter to Contractor
Acceptance Letter to Client
DD 1354 Signed & turned over to RPAO
Closeout permits (e.g., NPDES)
Contractor Evaluations (CCASS) Complete
Finalize Outstanding Contract Mods
Process recycled/recovered materials report
BOD (A) entered into eContracts
Inform PM of BOD
Assist PM with AE Evaluation (ACASS)
Warranty documentation to FMS
As-Builts to FMS
2nd Season TABs Report Review
Annual Elevator Maintenance Complete
SECTION 01 30 00.00 33 Attachment Page 4
SECTION 01 30 00.00 33 Attachment Page 5
SECTION 01 31 23.13 33 Page 1
SECTION 01 31 23.13 33
ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT MANAGEMENT SYSTEM
01/22
1.1 CONTRACT ADMINISTRATION
Utilize the Naval Facilities Engineering Command's (NAVFAC's) Electronic
Construction and Facility Support Contract Management System (eCMS) for the transfer, sharing and management of electronic technical submittals and documents. The web-based eCMS is the designated means of transferring technical documents between the Contractor and the Government. Paper media or e-mail submission, including originals or copies, of the documents identified in Table 1 are not permitted, except where eCMS is unavailable, non-functional or specifically requested in addition to electronic submission. When specifically requested to provide documents outside of eCMS, upload all final project documentation (e.g. documents that are signed and/or adjudicated by the Government) mentioned in Table 1 into the subject eCMS document management folders that are associated with that document type. Include the identification number of the document, type of document;
the name/subject or title; and for daily reports the date (day of work) with format YYYY/MM/DD in the filename. For example for RFI’s
0011_RFI_Roof_Leaking.doc; For submittals
0032a_Submittals_Light_Fixture.pdf; For Daily Reports
0132_Daily_Report_20190504.xls. Contact the Contracting Officer's
Representative (COR) regarding availability of eCMS training and reference materials.
1.2 USER PRIVILEGES
The Contractor will be provided access to eCMS. All technical submittals and documents must be transmitted to the Government via the COR. Project roles and system roles will be established to control each user's menu, application, and software privileges, including the ability to create, edit, or delete objects.
1.3 SUBMITTALS
approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following
List of Contractor’s Personnel; G (CME)
1.4 SYSTEM REQUIREMENTS AND CONNECTIVITY
SECTION 01 31 23.13 33 Page 2
1.4.1 General
The eCMS requires a web-browser (platform-neutral) and Internet connection.
Obtain from an approved vendor an External Certification Authority (ECA), Primary Key Infrastructure (PKI) certificate, or other similar digital identification to support two-factor authentication and access to eCMS.
Provide and maintain computer hardware and software for the eCMS access throughout the duration of the contract for all Contractor-designated users.
Provide connectivity, speed, bandwidth, and access to the Internet to ensure adequate functionality. Neither upgrading of the Contractor's computer system nor delays associated from the usage of the eCMS will be justification or grounds for a time extension or cost adjustment to the
Contract.
1.4.2 Contractor Personnel List
Within 20 calendar days of contract award, provide to the Contracting
Officer a list of Contractor's personnel who will have the responsibility for the transfer, sharing and management of electronic technical submittals and documents and will require access to the eCMS. Project personnel roles to be filled in the eCMS include the Contractor's Superintendent, Quality
Control (QC) Manager, and Site Safety and Health Officer (SSHO). Personnel must be capable of electronic document management. Notify the COR immediately of any personnel changes to the project. The Contracting Officer reserves the right to perform a security check on all potential users.
Provide the following information:
First Name
Last Name
E-mail Address
Office Address
Project Role (e.g. Project Manager, QC Manager, Superintendent)
1.5 SECURITY CLASSIFICATION
In accordance with Department of Navy guidance, all military construction contract data are unclassified, unless specified otherwise by a properly designated Original Classification Authority (OCA) and in accordance with an established Security Classification Guide (SCG). Refer to the project's OCA when questions arise about the proper classification of information.
The eCMS must only be used for the transaction of unclassified information associated with construction projects. In conformance with the Freedom of
Information Act (FOIA), DoD INSTRUCTION 5200.48 CONTROLLED UNCLASSIFIED
INFORMATION (CUI), and DoD requirements, any unclassified project documentation uploaded into the eCMS must be designated either "U -
UNCLASSIFIED" (U) or "CUI - CONTROLLED UNCLASSIFIED INFORMATION"
(CUI).
1.6 ECMS UTILIZATION
Establish, maintain, and update data and documentation in the eCMS throughout the duration of the contract.
Personally Identifiable Information (PII) transmittal is not permitted in the eCMS.
SECTION 01 31 23.13 33 Page 3
1.6.1 Information Security Classification/Identification
The eCMS must be used for the transmittal of the following documents. This requirement supersedes conflicting requirements in other sections), however, submittal review times in Section 01 33 00.00 33 SUBMITTAL PROCEDURES remain applicable. Table 1 - Project Documentation Types provides the appropriate U and FOUO designations for various types of project documents. Construction documents requiring FOUO status must be marked accordingly. Apply the appropriate markings before any document is uploaded into eCMS. Markings are not required on U documents.
Table 1 also identifies which eCMS application is to be used in the transmittal of data (these are subject to change based on the latest software configuration). If a designated application is not functional within 4 hours of initial attempt, defer to the Submittal application and submit the required data as an uploaded portable document (e.g. PDF), word processor, spreadsheet, drawing, or other appropriate format. Hard copy or e-mail submission of these items is acceptable only if eCMS is documented to be not available or not functional or specifically requested in addition to electronic submission. After uploading documents to the Submittal application, transmit the submittals and attachments to the COR via the
Transmittal application. For Submittals, select the following:
Preparation by = Contractor personnel assigned to prepare the submittal
Approval by = Contracting Officer Representative (COR)
Returned by = Design Lead/Manager
Forwarded to = Contractor project manager
Table 1 - Project Documentation Types
SUBJECT/NAME DESIG REMARKS ECMS APPLICATION
As-Built Drawings U Locations of sensitive areas must be labeled as either "Controlled
Area" or "Restricted Area" and may be shown on unclassified documents with the approval from Site
Security Manager
Submittals and
Transmittals
Building
Information
Modeling (BIM)
U 1. Locations of sensitive areas must be labeled as either
"Controlled Area" or "Restricted
Area" and may be shown on unclassified documents with the approval from Site Security Manager
2. Design reviews will be performed in existing "Dr Checks"
Submittals and
Transmittals
Construction
Permits
U Refer to rules of the issuing activity, state or jurisdiction
Submittals and
Transmittals
SECTION 01 31 23.13 33 Page 4
Construction
Schedules
(Activities and
Milestones)
U After the schedule submittal is approved by the COR, import the schedule file into the scheduling application, and select "Approve" to establish a new schedule baseline
Submittals, Transmittals and
Scheduling App
Construction
Schedules (Cost-
Loaded)
CUI After the schedule submittal is approved by the COR, import the schedule file into the scheduling application, and select "Approve" to establish a new schedule baseline
Submittals, Transmittals and
Scheduling App
Construction
Schedules (3-Week
Lookahead)
U Import the schedule file into the scheduling application, and select
"Approve" to establish a new schedule baseline
Scheduling App
DD 1354 Transfer of
Real Property
U Submittals and
Transmittals
Daily Production
Reports
CUI Provide weather conditions, crew size, man-hours, equipment, and materials information
Daily Report
Daily Quality
Control (QC)
Reports
CUI Provide QC Phase, Definable
Features of Work
Identify visitors
Daily Report
Designs and
Specifications
U 1. Locations of sensitive areas…
This is the start of the file's text. The full file is on GovTribe.