22438 ProjectStatement.pdf
PDF 269 KB Posted
- Solicitation number
- RFP - 171 - 220000003206
- Issued by
- Luce County, Michigan
About this file
This document is a Project Statement from the State of Michigan Department of Technology, Management and Budget (DTMB) for Professional Architectural and Engineering Services for infrastructure upgrades and modernization at Muskallonge State Park and Tahquamenon Falls State Park. The projects are funded through the American Rescue Plan Act (ARPA) and include renovating stairways, replacing buildings, reconstructing and paving roads, evaluating and replacing sanitary systems, upgrading electrical and water systems, and modernizing entrance and parking areas. The proposal is due on October 27, 2022 at 2:00pm ET. A mandatory pre-proposal meeting will be held on October 5, 2022 with site visits to both parks. The successful Professional Service Contractor (PSC) will be responsible for providing all Phase 100 through 700 services, including planning, design, permitting, bidding, and construction administration. The projects must have funds obligated by December 2024 and spent by December 2026.
The PSC proposal shall include reimbursable costs for required services such as permitting, sludge testing, surveying, soil borings, and archeological services. The PSC is asked to provide an opinion on the potential value added by including a Construction Manager. All projects are subject to prevailing wages under the Governor's administrative rule or the Davis Bacon Act. Preference is given to the purchase of American-made goods, products, and materials.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0427 (R 02/22)
PROJECT STATEMENT
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration
Design and Construction Division 3111 West St. Joseph Street
Lansing, Michigan 48909
FILE NUMBER
751/22031.ABG
PROPOSAL DUE DATE
Thursday, October 27, 2022 at 2:00pm ET
CLIENT AGENCY
Department of Natural Resources – Parks and Recreation Division
PROJECT NAME AND LOCATION
Muskallonge State Park and Tahquamenon Fall State Park – American Rescue Plan Act (ARPA) Infrastructure Upgrades and Modernization PROJECT ADDRESS (if applicable) Muskallonge State Park, 30042 County Road 407, Newberry, MI 49868 Tahquamenon Falls State Park, 41382 W M-123, Paradise, MI 49768
CLIENT AGENCY CONTACT
Keith Cheli chelik@michigan.gov
TELEPHONE NUMBER
989-370-1907
DTMB - DCD PROJECT DIRECTOR
Alan Goschka, Project Director; goschkaa@michigan.gov
TELEPHONE NUMBER
517-388-3489
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION:
A MANDATORY PRE-PROPOSAL MEETING will be conducted by the Issuing Office for this Request for Proposal On Site starting at the Muskallonge State Park Headquarters, 30042 County Road 407, Newberry, MI 49868 at 9:00am on Wednesday, October 5, 2022. Anticipated time at Muskallonge will be 2-3 hours.
The group will then travel to the Tahquamenon Upper Falls, which is approximately a 50 minute drive.
Following the Tahquamenon Upper Falls the group will travel to the Tahquamenon Lower Falls which is approximately a 5 minute drive and then the group will travel to the Tahquamenon State Park Rivermouth Campgrounds, 32130 W South River Road, Paradise, MI 49768 which is approximately a 20 minute drive.
Anticipated time at Tahquamenon will be 3-4 hours.
Note: There is a lot to see and get through for the mandatory walk-through inspection for the day, which does not allow dedicated time for lunch, so please plan accordingly and bring a sack lunch along with you to eat while traveling between the parks.
MANDATORY (Check box if Mandatory)
LEIN Check (Department of Corrections ONLY) All contractor / vendor representatives attending Preproposal Walk Through Meeting must submit a Vendor / Contractor LEIN Request form five business days prior to the meeting date (See the attached Vendor/Contractor LEIN Request Form). Send the LEIN Request form, filled and signed, by email to Daniel T. Smith at email address: smithD76@michigan.gov .
The email “Subject” must include (facility name, project name, date and time of Pre-Proposal Walk Through Meeting).
COVID 19 Precautions:
1. Depending on project location, individuals may be required to wear masks to attend any meetings and for a firm to be eligible to submit proposals / quotations / bids. Bring and be prepared to wear a mask if required upon arrival. Requirements may change at any time and any updated guidance must be followed.
mailto:chelik@michigan.gov mailto:chelik@michigan.gov mailto:smithD76@michigan.gov
PROJECT DESCRIPTION/SERVICES REQUESTED
Provide a PSC Proposal (Technical and Cost) for all required Professional Architectural and Engineering Services in compliance with the State of Michigan, Department of Technology Management and Budget DTMB Project Statement Form (DMB427), DTMB ISID Billable Rate Professional Services Contract and the DTMB 430 RFP Billable Rate Form (DMB 430) and DTMB Facilities Administration, Design and Construction Division policies and procedures for the development of Contract Bid Documents and Construction Administration. The technical portion shall be concise, include personnel resumes. A proposed schedule for design, bidding and construction must be included.
Project Statement:
ARPA is an unprecedented statewide infrastructure investment that provides a $250 million investment in Michigan State Park Infrastructure. Eleven projects are being targeted in this request for proposals with four projects located at Muskallonge Lake State Park and seven projects at Tahquamenon Falls State Park. The projects as described below are intended to be awarded to one professional service contactor (PSC) for planning, design, and construction services. ARPA funding requires that all project funds be obligated by December of 2024 and spent by December of 2026. The successful PSC will be responsible for providing guidance on how to coordinate and schedule design and construction in a manner that will allow the project team to meet the outlined deadlines. MDNR PRD typically prefers to minimize construction during the primary use seasons between Memorial Day and Labor Day to limit impact to visitor services and revenue. However, the agency recognizes the need to consider the possibility for campground or partial campground closures during these timeframes to allow for efficient work completion, cost effectiveness and practical applications. The agency is exploring the possibility of engaging with a construction manager as an additional team member to provide assistance during planning and design and to lead project during construction. The PSC shall prepare Phase 100 through 700 service proposals as needed based on the assumption that a construction manager will not be included. If construction manager services are added, the PSC proposal services contract shall be reduced as appropriate.
Muskallonge Lake State Park:
The DNR Parks and Recreation Division (PRD) Muskallonge Lake State Park is located 28 miles northwest of Newberry in Luce County. The 217-acre park is situated between the shores of Lake Superior and Muskallonge Lake and the area is well known for its forests, lakes and streams. Muskallonge Lake State Park was the former site of Deer Park, a lumbering town in the late 1880s, and prior to its lumbering history, an Indian encampment. Muskallonge Lake was a mill pond for millions of white pine logs that were brought to it by railroad lines. The park provides unique visitor experience and access to a “perched” inland all sports lake and the shores of Lake Superior. See attached park map.
Projects and Background Information:
Renovate stairway to Lake Superior
A very popular visitor amenity at the park is accessing the Lake Superior shoreline for campers and day users alike. Historically the primary access point was the Lake Superior stairway. Approximately 5 years ago during the advent of near record high great lakes water levels the shoreline and base of the stairway structure was completely compromised which resulted in the closure of the stairway. Not long before the high water impact, DNR PRD implemented a significant improvement at the Lake Superior overlook that included an ADA overlook and interpretive feature, gravel parking lot, vault toilet and access route along a former service drive through the previous US Coast Guard lifesaving station ruins and out to the Lake Superior shoreline. The campground pedestrian access was relocated from the former stairway to connect with the Lake Superior overlook site. The current access to Lake Superior along the former service drive at the overlook receives heavy public use, is not ADA compliant, but does provide a more desirable point of access, and a single point of access to the Lake Superior shoreline. As such, DNR PRD desires to design and implement a barrier free ADA compliant ramp system that will provide universal access for all visitors and a uniquely improved access experience. Cultural resource and archeological features will be a point of consideration during design and construction. At the toe of the hill the ramp system may transition to a crushed stone, ADA compliant pathway to the top of the foredune at Lake Superior that provides close shoreline proximity experience and possible transition to an ADA track chair for a shoreline adventure.
The scope of work shall include a minimum of two schematic designs for the new proposed access improvement. The access route design shall take into consideration preservation of unique hillside landforms, specimen trees and high-quality natural features and cultural resources and may require a Phase 1 archeological survey be performed by the PSC.
Replace West campground toilet/shower building with standard PRD plan
The west section of the campground has a toilet shower building and campsite utilities. The existing toilet shower building has exceeded the useful visitor service and operational life expectancy and has been slated for replacement. The existing building will be replaced in the existing building footprint location using the Parks and Recreation Division (PRD) standard toilet shower plan (see attached floor plans and elevations for reference) to include ADA walkways and 3- 5 vehicle parking spaces, one being ADA van accessible. A building hazardous material survey has been completed and will be provided to the successful consultant.
The desired project shall include a building which meets ADA, considers LEED, and meets EGLE Campground requirements as well as LARA code requirements.
Reconstruct and Pave campground Road System
The park and campground road system has outlived its functional life and is proposed to be reconstructed and paved with 3 inches of HMA. The campground road system was crushed and reshaped in 2017 while the primary park and boating access site ingress egress and sanitation station asphalt was left in place but in a rapidly deteriorating condition. All campground ADA campsites shall be considered in surface improvements either with HMA, concrete or enhanced limestone fines. Definition and possible redesign of the campground contact station parking and campground registration parking area, with ADA designated spaces shall be included. Paving of the day use area parking shall be included in the paving improvement plan with approximately 12 parking spaces including one ADA van accessible space and two parallel RV spaces. The existing Lake Superior Overlook and Access parking lot will also be included in the paving plan. No major road system realignment is expected but road system curve and turning radii should be reviewed and adjusted to the extent feasible, within the limits of existing infrastructure, to accommodate modern recreational vehicles. Site drainage should also be considered to solve some existing drainage challenges but to not create new problems with proposed improvements. Road improvements shall extend through the park boating access site and include the existing paved parking since this area is a functional turnaround point for all park users in addition to providing access to Muskallonge Lake. (see attached 2015 MDOT road scoping document)
Evaluate for replacement or modernization campground sanitary distribution system, lift station, and sewage lagoon
The existing sanitary system is original park infrastructure and is reaching the end of its functional design life. A conditional assessment for upgrade or replacement of the sanitary infrastructure shall be completed.
The assessment shall include the existing sanitary distribution lines that serve two toilet shower buildings, sanitation station and connection to the lift station, the lift station and wastewater lagoon. The park contact station has its own septic system and does not need to be included in the assessment. The lagoon assessment shall include a lagoon sludge analysis. The assessment shall take into consideration and provide an analysis of the existing lagoon capacity. Several years ago, MDNR PRD assumed administration and improvement of the agency state forest campground program. The state forest campground use has increased considerably and with a high number of campgrounds in proximity of Muskallonge Lake State Park and no RV dump stations closer than the City of Newberry, MDNR PRD has allowed state forest campground users to utilize the state park sanitation station for water and sewer service for a nominal fee. With the increased sewer deposits at the sanitation station the existing sewage lagoon system has been nearing or exceeding its capacity.
The assessment shall provide a calculation of the EGLE campground requirements for the wastewater lagoon system to serve just the current state park campground and secondly an assessment and calculation that includes the service provided for the surrounding state forest campground. The comparative assessment shall include a cost comparison to determine the return on investment, actual state forest campground dumping fee that provide a “break even” investment should dumping service be continued and a basis to make a more fully informed business decision whether to continue to or limit this service from a financial and public service perspective.
Tahquamenon Falls State Park
The DNR Parks and Recreation Division (PRD) Tahquamenon Falls State Park encompasses close to 52,000 acres stretching over 13 miles. Most of this is undeveloped woodland without roads, buildings, or power lines. The centerpiece of the park, and the very reason for its existence, is the Tahquamenon River with its waterfalls. It is the second largest of Michigan's state parks. Bordering on Lake Superior, most of the park is located within Chippewa County, with the western section of the park extending into Luce County. Over 600,000 people visit the park each year. The upper falls at the Tahquamenon Falls State Park is the largest waterfall viewing experience within the park and one of the primary visitor attractions year-round. At the lower falls campground and day use viewing area are several sets of cascading waterfalls move around an island within the Tahquamenon River. The Rivermouth unit provides a quiet combination of modern and rustic camping along the Tahquamenon River near the mouth of the river with boating access to Lake Superior. See attached park map.
Projects and Background Information:
Modernize the brink overlook stairs, and viewing platform at the upper falls
The upper falls Brink stairway is an elaborate timber, 96 step stairway, platform, and boardwalk structure.
The structures allow visitors to descend along a wooded embankment that terminates at the upper falls brink observation platform that provides a unique, up-close view of the upper falls. This original infrastructure is showing its age with rotting timber, worn metal tread plates, and settling components.
Some of the footings along the stairway and observation platforms have failed. As a result, there has been structural heaving and shifting that has allowed the system to move out of square, become unlevel, and misaligned. The stairway is not barrier free and does not provide universal access to the main viewing area.
The scope of work requires a baseline conditional assessment of the existing stairway and viewing platform for current LARA construction code compliance, structural integrity and cost for upgrade and repair as an option for improvement. The preferred alternative is to design and implement a barrier free ADA compliant ramp switch back system that will provide universal access for all visitors and a uniquely improved access experience. The ramp system shall incorporate enough spacing between switch backs to preserve a forest canopy and forest walk experience. Switch back landings should include occasional larger platform resting areas with seating for resting at locations that will provide a unique forest canopy view or view of the upper falls.
The scope of work shall include a minimum of two schematic designs for the new proposed access improvement. The access route design shall take into consideration preservation of unique hillside landforms, specimen trees and high-quality natural features. 3D walkthrough images and views are encouraged to assist in depicting the proposed route experiences.
http://en.wikipedia.org/wiki/List_of_Michigan_state_parks http://en.wikipedia.org/wiki/Lake_Superior http://en.wikipedia.org/wiki/Chippewa_County,_Michigan http://en.wikipedia.org/wiki/Luce_County,_Michigan http://en.wikipedia.org/wiki/Luce_County,_Michigan
Upgrade Upper Falls wastewater lagoon
The wastewater sewage lagoon that services a year-round toilet building at the upper falls unit has been experiencing high lagoon volume conditions during the winter months that create lagoon over topping risk and necessitate emergency wastewater release conditions. DNR PRD has commissioned a Phase 400 water and wastewater report to evaluate the existing toilet building and related well and wastewater infrastructure. The report evaluated existing conditions and use metrics to understand and identify possible solutions to address the situation and provided recommendations that would reduce the wastewater outflow and or water infiltration to the existing lagoon system including possible expansion of the lagoon system to increase wastewater capacity.
The scope of service shall include a technical review of the existing Phase 400 study for validation of the study finding and recommendations and or to recommend alternate analysis or wastewater reduction solutions to mitigate the lagoon capacity issue. Once an option is chosen, the design shall progress into Phase 500, 600 and 700 services.
Replace/upgrade campground electric system and camp site improvements at Portage Lower Falls Campground
The Portage campground at the lower falls is located on and near the banks of the Tahquamenon River and is adjacent to the popular lower falls day use area and provides modern camping amenities with 188 campsites. Approximately 5% of the campsites meet base level ADA requirements and include paved campsite surfaces. The park electric distribution system provides shared 20/30 amp pedestals with limited 50 amp pedestals and experiences multiple seasonal disruptions and visitor conflicts requiring park staff and agency major maintenance and contracted repairs. This system has exceeded the intended design life and needs to be addressed to provide reliable visitor and operational service.
The scope of service shall include but not be limited to the following items:
• Electric system analysis and recommendations for upgrades including planning, design, permitting and contract document preparation including construction oversight
• Electrical services and new Switchboard Panels shall be sized to accommodate connected electrical loads and to meet the minimum quantity (20%) of 50A camper pedestals will be installed to meet current L A R A c o de requirements. New electrical feed and electric panel will be installed to the toilet shower building if required.
• Increase the electrical service and distribution panel capacity for campground to meet current code requirement. I nc l ud e Surge Protection Devices to protect against voltage spikes, transients, lightning strikes and to aid in protecting camper owned electronic equipment will be installed in each distribution panel.
• All feeders to camper pedestals and camp buildings will be installed in conduit to meet current installation practices and to provide a more maintenance friendly system for future use.
• Site Improvements shall include PSC review and upgrade of existing ADA designated campsites sites for compliance with ADA standards and MDNR PRD guidelines, as necessary.
• Additional Electrical Considerations
1. All campground electric system conductors are intended to be aluminum unless market conditions suggest that it is less expensive to use copper.
2. All new electric distribution conduit and conductors shall be directionally bored to minimize environmental impact and campsite restoration.
3. All conduit and conductors are desired to be installed a minimum of 30 inches below grade.
Replace/improve well and water distribution system at Lower Falls and Hemlock campground
The Hemlock campground contains the primary well house and two wells that provide water service for the lower fall’s campgrounds, day use facilities, sanitation station and contact station. Providing reliable water from the two on site wells has become unreliable. The Hemlock water distribution system servicing the campground, toilet shower building, campground jug fillers (drinking fountains) sanitation station and contact station requires replacement. Water service is directed adjacent to and down the lower falls day use and Portage campground vehicular access to provide water service to the lower unit. This line is PVC and does appear to require replacement. Near the entrance to the Portage campground the water service line enters a water pressure reducing pit that includes mechanical equipment that allows for regulation and adjustment of water pressure to facilities in the lower unit. The water pressure reducing system is difficult to access and provide adjustments.
The scope of service shall include but not be limited to the following items:
• Water distribution and well analysis and recommendations for upgrades including planning, design, permitting and contract document preparation.
• Replacement of Hemlock campground water distribution lines, including service lines to the sanitation station and contact station.
• Removal, relocation, and upgrade of campground jug fillers.
• Connection to existing well house and upgrade of well house controls as necessary to provide intended water distribution improvements.
• Evaluate pressure reducing system for redesign and upgrade at base of hill providing water service to the lower falls Portage campground, park store and bathroom building.
• All new distribution lines shall be directly bored to minimize environmental impact and campsite restoration.
Replace/renovate Lower Falls Hemlock Campground toilet/shower building with standard PRD plan
The lower falls Hemlock Campground has a year-round campground with modern toilet shower building and campsite utilities. There are 88 campsites. The existing toilet shower building has exceeded the useful visitor service and operational life expectancy and has been slated for replacement. The existing building will be replaced with the existing building footprint location using the Parks and Recreation Division (PRD) standard toilet shower plan (see attached floor plans and elevations for reference) to include ADA walkways and 3- 5 vehicle parking spaces, one being ADA van accessible. A building hazardous material survey has been completed and will be provided to the successful consultant.
The desired project improvement shall meet ADA, considers LEED, and meets EGLE Campground requirements as well as LARA building code requirements.
Modernize Upper and Lower Falls entrance and parking areas by completing a phase 100 study to address peak visitor use vehicle congestion, vehicle stacking and back up challenges.
During peak use periods the upper falls and lower falls vehicle entry points reach over capacity that results in significant traffic back ups on to M-123 in both directions that can extend for over a mile. The traffic back up length exceeds the existing M-123 turn lanes and passing lanes which is compounded by narrow road shoulders and deep ditches. The situation creates grid lock on M-123 which can limit emergency vehicle access, creates long public delay, public frustration and in general unsafe conditions.
At the upper falls the primary parking lot is day use traffic only and vehicular congestion appears to stem from a lack of parking capacity within the existing parking lot during peak use visitation. Solutions for improvements must consider maintaining a natural and wilderness experience that Tahquamenon Falls State Park provides including minimizing over investment and development of surface parking that may be only utilized during peak use timeframes.
The MDOT and Newberry Transportation Service Center has jurisdiction on M-123 and will be a partner in this effort.
The phase 100 study at the upper falls shall include but not be limited to the following items:
• Assist in evaluation of the existing parking lot system and traffic patterns for determination on the number of additional parking spaces that may be required or and for techniques that may be able to be implemented to manage peak use traffic more effectively.
• Analysis of the existing parking lot configuration for possible improvements to increase parking capacity, and visitor safety, and or traffic management.
• Evaluate adjacent undeveloped areas in parking area for possible parking expansion opportunities and provide a minimum of two conceptual improvement plan options.
• It is possible that an offsite parking facility may be considered at the park headquarters that could incorporate a pedestrian trail network to the upper and lower falls and or a shuttle system. The location at the park headquarters may also include a future park orientation center for enhanced visitor services.
At the lower falls unit, visitor traffic includes day use traffic, incoming campers that need to register for their stay at the two campgrounds, and campers that are returning to the campgrounds from day use activities outside of the lower fall’s unit. There is limit on site vehicle stacking at the lower fall’s unit contact station with a single lane point of entry. Vehicle traffic will quickly back up on the park entrance road and then back up onto M-123 in both directions creating the same issues as identified at the upper fall’s unit.
The MDOT and Newberry Transportation Service Center has jurisdiction on M-123 and will be a partner in this effort.
The phase 100 study at the lower falls shall include but not be limited to the following items:
• Evaluation of the existing parking entry/exit area including parking lot system, turnaround, and campground entrance/exit infrastructure and traffic patterns for modernization, redesign and or techniques that may be able to be implemented to manage peak use traffic more effectively.
• Design shall include a minimum of two conceptual designs that demonstrate possible redevelopment improvement that solve the problem.
• As noted above, it is possible that an offsite parking facility may be considered at the park headquarters that could incorporate a pedestrian trail network to the upper and lower falls and or a shuttle system. The location at the park headquarters may also include a future park orientation center for enhanced visitor services which may provide a degree of relief to help solve the problem and provide a more progressive and appropriate long-term solution.
Modernize Rivermouth maintenance building and employee bathrooms
The Rivermouth campground unit is approximately 18 miles from the park headquarters and provides modern and rustic camping on the banks of the Tahquamenon River and includes a public boating access site. The current operational facility is comprised of a small aging garage that includes a makeshift employee break area with no running water. Staff use a vault toilet for bathroom facilities. The Rivermouth unit does not currently provide year-round visitor services.
The scope of work shall include design and development of a simple but modern operational maintenance building with an approximate target square footage of 2,500 square feet. The building shall include two, 10 foot wide, 12-foot tall overhead doors, unheated storage/equipment bays with an approximate 30-foot depth. A minimum of one heated unisex bathroom, heated employee break room, and heated work bench area shall be included. Windows for natural daylighting, low maintenance exterior treatments including metal roofing, metal siding or a rustic, low maintenance treatment, and a 3-foot-tall concrete block foundation shall be considered. A single pitch roof towards the back of the building will protect the garage bay doors from winter snow and ice slide and minimize operational snow and ice removal efforts. Water service is anticipated to be provided from the adjacent campground well house with sewer service from a proposed septic field. Heating will be electric, or propane based on cost efficiencies. Electric service exists on the site and runs through the operational area via an overhead power line. It is desired to coordinate with the utility provider, as part of this improvement, to place the overhead powerlines underground within the primary operational use area (from utility pole to utility pole). Related operational amenities such as overhead electric drop cords in the shop bays, generous electric outlets, logical low level storage areas, and common sense building operational elements shall be included for improvement consideration.
PSC proposals:
Interested bidders shall provide a complete PSC Proposal for all required Professional Services for all proposed park improvements. The consulting services shall be in compliance with the State of Michigan, Department of Management and Budget Contract for Professional Services and DMB Facilities Administration, Design and Construction Division policies and procedures (DMB 430) for the development of Contract Bid Documents and Construction Administration. Proposals shall include Phase 100 – 700 services as required to produce selected improvement plans including advantages and disadvantages of options, option cost comparisons, and comparative life cycle considerations with a professional recommendation for consideration.
PSC services shall include but are not limited to:
• All Phase 100 through Phase 700 services to develop complete, assessment, planning, design, permitting, contract document development, bidding, administration, and construction oversight.
• Preparation and submission of all required permit applications and permit application fees including but not limited to EGLE, LARA, EGLE Campground Unit, and SESC shall be included.
• The PSC shall be responsible for gathering and verifying all base information required for the proper design of the projects, including but not limited to topographical surveying and soil borings with geotechnical report.
• Providing 50% and Final (100%) estimates of construction costs for Phase 300, 400 and 500 development plans.
• Submittal of 50% and 90% contract documents for owner review for design Phases 300, 400 and 500, posting of bidding documents on the State of Michigan procurement website (SIGMA-VSS), Best Value Bid Evaluation, PSC Recommendation of Contract Award and Contract Administration.
• PSC construction inspection shall be at a minimum of one day per week, as the basis for PSC construction inspection costs. DTMB and MDNR PRD will evaluate the quantity of construction projects underway at any given point and the complexity of construction projects for addition or deletion of required daily inspections based on the PSC daily estimate for construction inspection.
The PSC shall provide a daily cost rate for construction inspection.
• Maintaining an inclusive, transparent, and informative relationship with DTMB and DNR-PRD.
PSC data collection, testing and permitting:
All data collection and testing required to verify the site conditions for the proper design is to be identified in the PSC Technical proposal, and the costs of testing are to be itemized in the PSC Cost proposal as reimbursements. The PSC shall indicate in their proposal any testing requirements other than those identified as indicated below. Thhee pprrooppoossaall rreeiimmbbuurrssaabbllee lliinnee--iitteemm ccoossttss ffoorr rreeqquuiirreedd sseerrvviicceess sshhaallll bbee iiddeennttiiffiieedd ffoorr eeaacchh pprroojjeecctt aass nneecceessssaarryy ttoo ccoommpplleettee tthhee ddeessiirreedd pprroojjeecctt wwoorrkk,, eexxaammpplleess iinncclluuddee bbuutt aarree nnoott lliimmiitteedd ttoo::
-- EEGGLLEE ppeerrmmiittttiinngg -- LLAARRAA ppllaann rreevviieeww ssuubbmmiissssiioonn aanndd ffeeeess -- SSlluuddggee tteessttiinngg aanndd aannaallyyssiiss -- WWeellll tteessttiinngg -- TTooppooggrraapphhiicc SSuurrvveeyy -- MMDDOOTT ppeerrmmiittttiinngg -- SSooiill bboorriinnggss -- WWeettllaanndd aasssseessssmmeenntt -- PPhhaassee 11 aarrcchheeoollooggiiccaall sseerrvviicceess aass rreeqquuiirreedd ((aa ppeerrmmiitt iiss rreeqquuiirreedd ffoorr SSttaattee llaannddss)) -- UUttiilliittyy CCoommppaannyy aalllloowwaannccee
AAddddiittiioonnaall IInnffoorrmmaattiioonn AAvvaaiillaabbllee ttoo tthhee ssuucccceessssffuull PPSSCC::
•• CCuurrrreenntt bbuuiillddiinngg ooppeerraattiioonn aanndd mmaaiinntteennaannccee mmaannuuaall •• WWeellll llooggss •• EExxiissttiinngg iinnffrraassttrruuccttuurree ddeessiiggnn ppllaannss aanndd oorr aass--bbuuiilltt iinnffoorrmmaattiioonn..
•• AAnnnnuuaall vviissiittoorr uussee ddaattaa aass rreeqquuiirreedd •• MMDDNNRR PPRRDD ssttaannddaarrdd ttooiilleett sshhoowweerr bbuuiillddiinngg ppllaannss •• MMuusskkaalllloonnggee LLaakkee SSttaattee PPaarrkk 22001155 MMDDOOTT aasssseessssmmeenntt •• TTaahhqquuaammeennoonn FFaallllss SSPP PPoorrttaaggee CCaammppggrroouunndd ssiittee ooccccuuppaannccyy ddaattee •• TTaahhqquuaammeennoonn FFaallllss SSPP UUppppeerr FFaallllss PPhhaassee 440000 WWaatteerr aanndd WWaasstteewwaatteerr AAnnaallyyssiiss
PPrroojjeecctt SScchheedduullee::
•• TThhee PPSSCC sshhaallll pprroovviiddee aa sscchheedduullee ooff pprrooppoosseedd ccoommpplleettiioonn ddaatteess ffoorr tthhee pprrooppoosseedd PPhhaassee 110000 tthhrroouugghh 770000 wwoorrkk.. SSiittee aasssseessssmmeenntt aanndd ddaattaa ccoolllleeccttiioonn wwoorrkk ccaann bbeeggiinn aass ssoooonn aass ppoossssiibbllee aafftteerr ccoonnttrraacctt iiss aawwaarrddeedd aanndd aapppprroovveedd bbyy DDTTMMBB..,, aannttiicciippaattee eeaarrllyy ttoo mmiidd--NNoovveemmbbeerr..
• Provide a bi-weekly progress summary email to the project team briefly documenting the prior two week’s progress by the PSC and display the initial project schedule and current schedule status.
•• A graphic bar chart schedule (in weeks) indicating the PSC’s proposed timeline for services based on a proposed PSC contract start date. For scheduling purposes, assume fourteen (14) calendar days each of Owner review for 50% and 90% submissions.
•• Clear documentation of the number of meetings proposed during each Phase, indicating whether the meetings are proposed to be on-site, face to face, by telephone, or in specific electronic format.
While some project team meetings may be considered in the form of computer-based meetings (e.g., GoToMeetings, Teams, Zoom, etc.), key review meetings shall be in person. For all meetings being held for document review, all required review information shall be submitted electronically and in hard copy formats ten (10) days prior to the meetings. At a minimum, meetings will be required at key project intervals including the project planning kick off meeting, 50% reviews and 90% reviews.
AAddddiittiioonnaall RReeqquuiirreemmeennttss
• The PSC proposal shall include a statement and opinion on the potential for value (or not) added to the outlined scope of work, planning design and construction process if a construction manager is commissioned by DTMB and MDNR PRD. The statement should note whether the PSC has worked on projects with a construction manager or not and if so whether the project was or is comparable to the work described. The statement should outline how the construction manager would add value and at what point in the planning, design and construction process the construction manager would be included for the best impact. Outline potential negative results and or lessons learned from previous project experiences with construction managers.
• All vendors need to have a Unique Entity Identifier (UEI) number registered in SIGMA
• All projects are subject to prevailing wages under the Governor’s administrative rule in 2021. In the event of rescission of this rule, ARPA projects are still subject to prevailing wages under the Davis Bacon Act.
• Buy American Preference: As appropriate and consistent with the law, the non-federal entity should, to the greatest extent practicable under a federal award, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products).
ATTACHMENTS:
1. Muskallonge State Park map
2. Tahquamenon Falls State Park map
3. MDNR PRD Standard Toilet Shower Building Plans
4. 2015 Muskallonge MDOT Road Scoping Report
Please NOTE:
• Proposal responses MUST be uploaded to SIGMA VSS. Please enter the total cost for all phases as bid amount.
• Please remember that individual attachments can be no larger than 6mb.
• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance. They can be reached by telephone at 888.734.9749 or by email at sigma-procurement-helpdesk@michigan.gov
• Please notify the Office of Design and Construction if you are having SIGMA VSS issues. Include your SIGMA ticket number in an email to our contract specialists, Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov ).
• You may be asked to email your proposal. Emailed submissions will require DCD approval and will be handled on a case-by-case basis. Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.
NIGP CODES
90607, 90610, 90644, 90656, 90658, 90680, 90682, 90692, 90694, 92507, 92517, 92519, 92531, 92567, 92583, 92586, 92586, 92588, 92595, 92596, 92597, 90924, 90976
DESIRED SCHEDULE OF WORK
Funding needs to be assigned by December 2024 with funding spent by December 2026.
ACCEPTING RFP QUESTIONS UNTIL:
Please do not submit online questions via VSS. ALL questions should be emailed to Alan Goschka, AIA at goschkaa@michgian.gov no later than Monday, October 17, 2022 at 3:00pm Eastern Time (ET).
REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DCH, EGLE, DNR, and MIOSHA), and any other local regulations and standards that may apply.
This form is required to be a part of the professional service contract. (Authority: 1984 PA 431) Attachment(s) mailto:sigma-procurement-helpdesk@michigan.gov mailto:WatrosA@michigan.gov mailto:KleinD4@michigan.gov
File details come from the government source that posted it. Updated .