22269_Addendum1_Final.pdf

PDF 1 MB Posted

Attached to
472/22269. SMD; Handlon / Bellamy Creek - Paving Imprvmnts
Solicitation number
RFP - 171 - 220000002995
Issued by
Ionia County, Michigan

About this file

This document is an Addendum to a Request for Proposal (RFP) issued by the Michigan Department of Technology, Management and Budget (DTMB) for paving improvement projects at the Bellamy Creek and Handlon Correctional Facilities. The RFP provides clarifications and modifications to the original solicitation, including information about a pre-proposal walk-through meeting, requirements for topographic surveys and geotechnical investigations, availability of existing site drawings, and restrictions on the use of drones. The RFP also outlines specific requirements for the paving improvements at the Handlon Correctional Facility, including expanding existing parking lots and paving a gravel parking area. Additionally, the RFP indicates that the selected Professional Services Contractor (PSC) will be required to provide Phase 600 and 700 typical services, and coordinate with MDOC to attend both on-site and virtual meetings.

The RFP also provides details on the project's file numbers (472/22269.SMD and 472/22329.SMD), the jurisdictions involved (Ionia County), the proposal due date (September 29, 2022), and the project director (Scott DeKorte). The RFP does not appear to include any information about pricing terms, set-asides, incumbents, funding requirements or sources, or contract term and renewal options.

View the file

Other files

File Type Posted
SAMPLE Billable Rate Contract (Rev 220207).pdf PDF
LEIN Request 22269.pdf PDF
Project Statement 22269.pdf PDF
RFP Billable Rate 22269.pdf PDF
LEIN Request 22329.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 RFP (Rev 6/16)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

REQUEST FOR PROPOSAL ADDENDUM NO. 1

This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals. Addenda will be numbered by the Project Director and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL PROPOSERS

DATE ISSUED

9/23/2022

PROJECT NAME

Bellamy Creek / Handlon Correctional Facilities – Paving Improvement Projects

FILE NUMBER

472/22269.SMD and 472/22329.SMD

PROJECT DIRECTOR

Scott DeKorte

PROPOSAL DUE DATE:

9/29/2022

ADDENDUM ITEMS: (attach additional sheets and drawings if required)

1. Pre-proposal walk through Meeting Attendance Record (Appended)

2. Topographic Survey: PSC shall include an allowance of $15,000.00 for a survey of each site. Exact extents / limits of any existing topo surveys are unknown at this point. Existing surveys may be in CAD. Site access for obtaining surveys shall be coordinated with each facility.

3. Geotechnical: PSC shall include an allowance of $7,5000.00 for soil borings / report for each site. Anticipated need of 10 borings per site scattered throughout each property.

4. Existing Drawings: Existing overall site plans for each site do exist in CAD. Existing storm drainage / utility / etc. drawings for each site do exist but are most likely in a .PDF format. MDOC will share all drawings with the awarded PSC.

5. Drone Usage: Utilization of drones to obtain topo information will not be authorized at this time.

6. Phase 600 and 700 typical services will be required of the PSC for this project. Indicate within your proposal number of anticipated meetings both on site and virtually.

7. Additional coordination with outside agencies (i.e. MDOT) is not anticipated at this time.

8. Handlon Correctional – Additional Front Lot Parking Area Directions:

a. Existing trees and grass island in center of parking lots to remain.

b. Expand middle (immediately west of grass island) parking lot to the south as originally discussed.

c. Expand west (upper) parking lot to the south approximately the same distance as the middle parking lot.

d. Pave west half of the west (upper) parking lot which is currently gravel to the existing light poles.

e. Expand east parking lot to the east as required to secure three double loaded rows for parking.

f. Pave existing gravel parking lot at maintenance building.

9. Bellamy Creek – Additional Site Work Drawing (handed out at meeting) Appended.

APPROVED BY:

Scott DeKorte – Project Director

DATE: 09/23/2022