CONSTRUCTION AND MAINTENANCE OF HYDROLOGIC IMPROVEMENTS AND ROADS
Solicitation number
ITB-05718
Issued by
Seminole County, Bay Pines CDP, Florida

About this file

This document is an Invitation to Bid (ITB) issued by the Suwannee River Water Management District (District) located in Florida. The District is seeking bids from firms to provide construction and maintenance services for the District's hydrologic improvements and roads. Services may include road patching, grading, culvert installation, low-water crossings installation, water control structure maintenance, parking area construction, excavation, hauling, demolition, road mowing, tree removal, and land clearing. The initial contract will be for three years through September 30, 2026, with the potential for two subsequent one-year renewals. Bids are due by July 6, 2023, and the anticipated contract start date is October 1, 2023. The District will award the contract to the qualified, responsive bidder with the lowest total bid costs, provided they meet the minimum qualifications. Bidders must demonstrate experience with similar forestry-related road and hydrological projects, have the required equipment, and employ trained personnel. The contract will include provisions for hourly equipment rates, supervisor and labor rates, and potential increases up to 5% annually.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUWANNEE RIVER WATER MANAGEMENT DISTRICT

INVITATION TO BID

ITB NO. 22/23-020 OPS

CONSTRUCTION AND MAINTENANCE OF

HYDROLOGIC IMPROVEMENTS AND ROADS

Table of Contents

Section Title Page 1 Introduction 2 2 Proposed Schedule 2 3 Instructions to Bidders 3 4 Key Points 4 5 Scope of Work 8 6 Bid Response Forms 11

Suwannee River Water Management District

9225 CR 49

Live Oak, FL 32060 386.362.1001

386.362.1056 (Fax)

1.800.226.1066 (Florida only) www.mysuwanneeriver.com http://www.mysuwanneeriver.com/

SECTION 1 –INTRODUCTION

The Suwannee River Water Management District (District) manages approximately 160,000 acres in North-Central Florida for the protection of floodplains and their associated habitats. On these lands are many miles of forest roads and hydrological facilities that require maintenance and installation. The District is requesting bids from firms (also referred to as Contractor or Bidder) that can provide construction and maintenance of hydrologic improvements and roads.

Contractor services will include but are not limited to, filling and grading, culvert installation, low-water crossings installation, water control structures maintenance, parking area construction, excavation, backhoe, hauling, demolition, road mowing, and land clearing. Services may also include the repair or installation of erosion control barriers at recreation sites, signage, kiosks, fences, and gates. If engineering and permitting is needed, the District must obtain this prior to the Contractor commencing work.

The initial contract shall be for a period of three years through September 30, 2026, with the potential for two subsequent one-year renewals based upon the prior year’s performance by the Contractor, the same terms, and conditions (or terms more favorable to the District), and mutual agreement of the District and the Contractor.

Most District roads can be reviewed at the Bidder’s convenience. Most gates should be open.

However, if gates are closed or you need assistance locating a road, please contact William Irby, Project Manager, at 386.688.2381 or william.irby@srwmd.org. More details are provided in the Scope of Work.

SECTION 2 - PROPOSED SCHEDULE

June 20, 2023 Release of Invitation to Bid (ITB) June 27, 2023 Written questions due by 4:00 pm June 29, 2023 Questions with answers posted on the District website by 5:00 pm

July 6, 2023 Bid Packages due prior to 10:00 a.m. Opening will occur at this time.*

August 8, 2023 Request for Governing Board authorization of contract.*

October 1, 2023 Anticipated start date.

* Denotes a public meeting. All meetings will be held at District Headquarters in Live Oak, Florida, and all times denote local time.

SECTION 3 - INSTRUCTIONS TO BIDDERS

Delivery of Bid Packages:

1. Bid Packages shall be submitted electronically through DemandStar.

https://www.demandstar.com/app/agencies/florida/suwannee-river-water-management-district/procurement

For articles and videos to assist you through the DemandStar registry and uploading of documents visit the DemandStar business support page at -https://network.demandstar.com/business-support/

Bid Packages are to be uploaded to the platform no later than 10:00 a.m. July 6, 2023.

Packages received after this time, for any reason, will be rejected.

Questions: To provide equal opportunity and ensure the same information is provided to all Bidders, any questions should be submitted by email to Sharon Hingson at Sharon.Hingson@srwmd.org on or before June 27, 2023 by 4:00 p.m. The questions with answers will be posted on the District website www.mysuwanneeriver.com , and DemandStar on June 29, 2023 by 5:00 p.m. District staff are not authorized to orally interpret the meaning of the specification or other agreement documents, or correct any apparent ambiguity, inconsistency, or error therein.

Delivery of Bid: The bid package must be submitted electronically through Demand Star.

https://www.demandstar.com/app/agencies/florida/suwannee-river-water-management-district/procurement

It is the obligation of the Bidder to ensure that it has reviewed all amendments, addenda, and all questions and answers to this ITB as posted on the District website to ensure that the Bidder responds to the most current information available for the ITB.

QUALIFICATIONS OF BIDDERS - *TO SUBMIT WITH BID PACKAGE*

Each Bidder shall submit the following documentation listed under Paragraphs ‘a’ - ‘e’ with the Bid package. Failure on the part of the Bidder to include this information with the Bid package shall render the Bid non-responsive. Only responsive Bids will be considered by District for these services.

The minimum requirements necessary to meet the qualifications for this Bid are as follows:

A. Bidders are required to fill out the BID RESPONSE forms provided in SECTION 6 of this document. Bidders are required to list projects that can be view/visited by District staff.

B. On the Similar Projects Forms in SECTION-6, Bidders must be able to document a history of work experience (without the use of Sub-Contractors) that meets the following criteria:

• Bidders must list a minimum of one example of culvert installations and low-water crossing installation preformed within last three (3) years,

• Bidders must list a minimum of one example of forest road grading within the last three

(3) months, https://www.demandstar.com/app/agencies/florida/suwannee-river-water-management-district/procurement https://www.demandstar.com/app/agencies/florida/suwannee-river-water-management-district/procurement https://network.demandstar.com/business-support/ mailto:Ashley.Spivey@srwmd.org http://www.mysuwanneeriver.com/ https://www.demandstar.com/app/agencies/florida/suwannee-river-water-management-district/procurement https://www.demandstar.com/app/agencies/florida/suwannee-river-water-management-district/procurement

• Bidders must list a minimum of one example of forest road patching within the last six (6) months.

C. Bidders must have at least one medium (75-150hp) wheel loader or one medium (75-125hp) track loader, one standard excavator, one D-4 or D-6/equivalent bulldozer, one 12’-14’ blade grader, and one 18 cy capacity dump truck. The year, make, model, and number of pieces of equipment available to conduct the work must be listed on the Equipment List in SECTION-6.

D. Bidders must have the ability to download and utilize the District Arc-GIS collector application for the purposes of viewing work site locations and work order assignments.

E. The company contacts listed on the Similar Projects Forms in SECTION-6 will be used as the Bidder’s work/client references. For this reason, Bidders should list the contacts that have the most knowledge of the individual projects that were completed.

F. At the District’s request, Contractor must be able to provide two (2) work crews simultaneously at different assigned locations throughout the District. The Contractor must be able to provide between one and four operators per crew and is determined by the need/requirement of the task.

Irrespective of the minimum qualifications stated above, the District may make such investigations as it deems necessary to determine the ability of the Bidder to perform required work. The District reserves the right to reject any Bid if the evidence submitted by the Bidder fails to satisfy the District. The Bidder must prove they are qualified to complete the work in a manner acceptable to the District within the specified time period.

SECTION 4 – KEY POINTS

Selection of Contractor:

The District is seeking Bidders that can provide all the staff, equipment, and experience needed to complete various types of roads and hydrological maintenance and construction services.

Based on the information requested, Bidders are expected to possess credentials including:

1. Work experience completing forestry-related road/hydrological projects.

2. Positive references confirming work quality and the Bidders ability to complete similar forestry-related road/hydrological projects.

3. Must possess fully functioning, required equipment. The required equipment list can be found in Section 3, line “C”, and in Section 6, BID FEE SCEDULE/EQUIPMENT LIST.

4. The Contractor must employ an adequate number of properly licensed, trained, and experienced personnel to maintain two (2) working crews if needed to complete assigned work.

5. At the District request, Contractor must be able to provide two (2) work crews simultaneously at different assigned locations throughout the District.

Award of Contract The Contract will be awarded to the qualified, responsive bidder with the lowest total bid costs, provided the bidder( meets the minimum requirements necessary to meet the qualifications required for this Bid, and who can demonstrate they can provide all the staff, equipment, and experience needed as referenced in the Selection of Contractor Section.

Challenge of Solicitation Process:

If a potential Bidder protests any provisions of this ITB, a notice of intent to protest shall be filed with the District in writing within 72 hours after the posting of the ITB on the District’s website.

“Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes shall constitute a waiver of proceedings under Chapter 120 of Florida Statutes.”

Challenge of District’s Intent to Award Contract:

If a Bidder intends to protest District’s intent to award contract, the notice of intent to protest must be filed in writing within 72 hours after posting of a notice of intent to award contract and the Bidder shall file a formal written protest within ten (10) days after filing of notice of intent to protest. Any Bidder who files a formal written protest pursuant to Chapter 28-110, Florida Administrative Code, and Section 120.57(3), Florida Statutes, shall post with the District at the time of filing the formal written protest, a bond pursuant to Section 287.042(2)(c), Florida Statutes (2014).

Failure to file a notice of intent to protest or failure to file a formal written protest within the time prescribed in Chapter 28-110, Florida Administrative Code, and Section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. More specifically, “Failure to file a protest within the time prescribed in Section 120.57(3) Florida Statutes shall constitute a waiver of proceedings under Chapter 120 of Florida Statutes.”

Americans with Disabilities Act: The District does not discriminate upon the basis of any individual’s disability status. This nondiscrimination policy involves every aspect of the District’s functions including one’s access to, participation, employment, or treatment in its programs or activities. Anyone requiring reasonable accommodation as provided for in the Americans with Disabilities Act should contact Sharon Hingson, Contracts & Procurement Coordinator, at

386.362.1001 or 800.226.1066 (Florida only).

Minority Business Enterprises: The District recognizes fair and open competition as a basic tenet of public procurement. Bidders doing business with the District are prohibited from discriminating on the basis of race, color, creed, national origin, handicap, age, or sex. The District encourages participation by minority business enterprises. Whenever two or more service providers are ranked equally, a minority business enterprise shall be given preference in the award process.

Veteran’s Preference: In the absence of minority business enterprise, whenever two or more service providers are ranked equally, a veteran-owned business enterprise shall be given preference in the award process.

ADA Compliance: For all electronic deliverables due under the contract resulting from this Contract, Vendor must ensure that those deliverables and all supporting documents are accessible according to 282.603 Florida Statutes and Section 508 of the Rehabilitation Act of 1973 relating to the creation and use of electronic documents. This requirement applies to editable formats, such as Microsoft Word, as well as portable document formats (PDF).

Drug Free Workplace Act: The selected Bidder shall certify that it has established a drug free workplace.

Public Entity Crime: Section 287.133(2)(a), Florida Statutes, states “A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in s.287.017 for CATEGORY TWO for a period of 36 months from the date of being placed on the convicted vendor list.”

Insurance Requirements: If awarded, Bidders shall represent and guarantee that all employees, agents, servants or representatives of the Bidder, and all employees, agents, servants, or representatives of subcontractors are covered by workers' compensation insurance.

Prior to entering into contract with the District, Bidder agrees to furnish the District certificates of insurance on all insurance, naming District as additional insured for items 2 and 3 below, providing evidence that Bidder has in full force and effect the following minimum insurance with insurers authorized to do business in the State of Florida:

1) Workers' compensation insurance as required above;

2) Motor vehicular liability insurance with limits of not less than $1,000,000 combined single limit which insurance shall be applicable to any and all vehicles utilized by Bidder to provide the services requested by District;

3) General liability insurance for all services rendered by Bidder for the requested services with a minimum of $1,000,000 personal and advertising injury and $1,000,000 general aggregate.

The certificate of insurance shall also provide that District shall be notified in writing by the carrier at least 30 days prior to any cancellation of said insurance.

Rejection of Responses: The District reserves the right to reject any and all bid packages submitted in response to the District invitation. District also reserves the right to waive any minor deviations in an otherwise valid Bidder.

Bidders to this solicitation or persons acting on their behalf may not contact, between the release of the solicitation and the end of the 72-business hour period following the agency posting the notice of intended award, any employee or officer of the District concerning any aspect of this solicitation, except in writing as indicated above.

Violation of this provision may be grounds for rejecting a response.

Renewal of Contract: The initial contract shall be for a period of three years with the potential for two subsequent one-year renewals based upon Contractor performance, the District’s availability of funding, the same terms and conditions or terms more favorable to the District, and mutual agreement of the District and the Contractor. Billable rates during the first year of the contract will be based on rates identified in the contract Fee Schedule. Rates may increase after this point by no more than 5% annually as determined by the District in its sole discretion.

The contractor shall provide a written request for any increase and such request shall be subject to the District’s written approval in accordance with the District’s Signature Authority. Any changes to this Fee Schedule, including any increases to the billable rates, must be approved through a formal written contract amendment signed by both parties.

Permits, Best Management Practices, Regulations, Come Clean Leave Clean, and Listed Species:

1. Obtaining Environmental Permits or Notices will be the responsibility of the District.

Environmental Permits and Notices must be at the site with the Contractor or Contractor Representative and available for review during all operations under which the Permit or Notice was obtained. All permits and regulations regarding equipment operations, equipment transport, and material transporting must be identified and obtained by the Contractor prior to commencing any operations on District lands.

2. Contractor hereby agrees to use good forestry practices and further agrees to abide by the best management practices (BMPs) as outlined in the Florida Forest Service publication, Silviculture Best Management Practices, as well as other requirements of the State of Florida. Contractor shall have up to four (4) days following Notification, but no more than eight (8) days, after the completion of any of work (whichever date is earlier), to bring the tract into full compliance with all the terms of this Contract, including the completion of necessary BMPs work. Damages arising out of the failure to exercise BMPs shall be limited to the expenses incurred by any party which carries out remedial measures reasonably required to bring the site in question into compliance with the applicable BMPs as set out above.

3. Ecological Issues – District has no knowledge of the presence of threatened, endangered or protected species on any of the areas on which any of the projects are located, or District has indicated to Contractor the presence and location of said species to the best of District’s knowledge as shown on the” Project Map” (which will be prepared for each Work Order).

District does not warrant that such threatened, endangered, or protected species are not present, and Contractor is advised that nothing in the contract relieves Contractor of its responsibility to act within the law should the presence of such threatened, endangered or protected species become known to Contractor or to any other party who advises Contractor of the presence of such species. (“…to the knowledge of the District…”, shall only include to the knowledge of William Irby (386.688.2381 or wwi@srwmd.org) or a specified District Representative.) Contractor and Contractor’s Representatives shall use caution and shall avoid negatively impacting gopher tortoises or gopher tortoise burrows encountered on the tract or as shown on the Project Map. District may flag out areas with rare species and remove the area(s) from the project area if these species are found during operations.

4. Come Clean, Leave Clean - Non-native, invasive weed infestations are found throughout the United States. Contractors working on behalf of the District may unknowingly import noxious weed material from outside areas or take weed material off District lands and infest other locales. All road materials and equipment used on District lands, including road-maintenance equipment, timber-harvest equipment, site-preparation equipment, ATVs, or trucks, need to be free of weed material. District Representatives are required to inspect each piece of equipment before or during operations on District lands. If Contractor performs work within 30 yards of a non-native, invasive weed infestation, District Representative is required to inspect the vehicle before it leaves District property. District will designate cleaning areas on each tract for Contractor to clean their equipment, if necessary, and District is responsible for monitoring the cleaning areas for new infestations. If non-native, invasive weeds are found after the work is completed and not at the designated cleaning areas or not at a known location which will be identified in the Work Order “Project Map”, the Contractor may be held liable for eradication or control of non-native, invasive weeds if it is determined the Contractor is responsible.

5. Equipment Fluids – Contractor must follow all local, state, and federal regulations as they relate to fluids, chemicals, oils, lubrications, their containers, and other equipment wastes.

Equipment must be washed and serviced away from any area that may create a water-quality hazard following Florida Silviculture BMPs. Contractor must clean up and contain fuel and oil spills immediately. Contractor must comply with state and federal regulations when reporting spills (discharges), and report any fuel, oil, chemical, or hazardous waste discharge to the District Project Manager immediately. Discharges must be reported by the Contractor within 24 hours to the Florida Department of Environmental Protection (DEP) State Warning Point (800-320-0519). If the discharge threatens or enters waters of the State, Contractor must notify the National Response Center (800-424-8802) within one hour of the discharge. Within seven days, Contractor must submit the required Discharge Report Form to Department of Environmental Protection Bureau of Emergency Response. Under Florida law and Federal law, Contractor may be subject to penalties because of the discharge itself or if Contractor fails to report the discharge. Contractor will be responsible for all requirements and costs associated with the cleanup of discharged pollutants or other hazardous chemicals.

SECTION 5 - SCOPE OF WORK

Proposed services are required in all areas of the District and may include scheduled, project, and emergency work. Operations shall be in conformance with the specifications and procedures described in the Scope of Work. Contractor shall provide all labor, incidental materials, equipment, tools, transportation, and supplies required to complete the work. The heavy equipment rates shall include cost for the equipment, fuel, operator, insurance, and all other items pertaining to the operation of the equipment. Services include but are not limited to, road patching, grading, culvert installation, low-water crossings installation, water control structure maintenance, parking area construction, excavation, hauling, demolition, road mowing, tree removal, and land clearing.

Services may also include the repair or installation of erosion/turbidity control barriers, signage, kiosks, fences, and gates. This work will be completed using supervisor and labor rates.

Work Order: Contractor agrees to be onsite within 5 working days of receiving a Work Order from the District. Contractor is responsible for notifying the District's Project Manager no less than 48 hours prior to initiating or ending work. This notification is necessary for work verification by the District’s inspection staff. Site-specific work orders with greater detailed instructions will be provided to the Contractor before initiating work on District lands.

Inspections and Meetings: Before each project begins, a District representative will schedule a pre-operations site visit with the Contractor. The site visit is a time when Contractor can inspect the work and recommend modifications to Work Order. If the initial Work Order needs to be modified based on observations from the pre-operations meeting, the District Project Manager can make the modifications and have the Work Order represent the agreed upon Scope of Work. District will make periodic inspections to ensure work is being completed by Contractor. District representatives will record information pertaining to work progress, work quality, and equipment downtime. The District must not be invoiced for hours when equipment or Contractor employees are not operating.

The District Project Manager must be notified no less than 48 hours before work is completed and equipment is moved off the project. During this period, the District Project Manager will review the completed work. If the Scope of Work is not completed to the satisfaction of the District Project Manager or found to be outside of the scope detailed, the Contractor must resolve the specified issue(s). The Contractor shall have up to four (4) days following Notification, but no more than eight (8) days after the completion of any of work (whichever date is earlier), to bring the road or facility into full compliance with the terms of this Contract, including completion of necessary BMP work. Work-related to Contract violations must not be invoiced to District, and District will not make payment for invoices associated with Contract violation repairs.

All mobilization and optional equipment invoiced by Contractor will be subject to verification and confirmation by District prior to payment. Mobilization can only be charged for moving equipment to a District work site. Mobilization cannot be charged to the District for demobilization from a District work site to a non-District associated work site or storage facility.

Contractor shall provide justification for each item invoiced.

Contractor will be responsible for properly disposing of all replaced culverts associated with hydrological facility maintenance in accordance with all local ordinances and relevant state statutes or rules.

Contractor will obtain all construction and maintenance materials from approved District locations. Construction aggregates will be obtained from the nearest approved location to the project site unless otherwise instructed by District Contract Manager. Failure to obtain materials from approved District locations will be a Contract violation and may result in the Contractor paying the cost of the unapproved purchase. If aggregate material is believed to be unsuitable or unclean, please contact District Contract Manager before transporting it to the project site.

District Project Manager is available to confirm or provide alternative material locations if necessary.

Operations Requirements: The District expects to have the Contractor complete construction and maintenance of hydrologic improvements and roads at the following project areas during Fiscal Year 2024, which begins October 1, 2023, and ends September 30, 2024. For Fiscal Year 2024 various public, secondary, administrative, and possibly abandoned roads are planned for service on District lands. In addition to this, two extensive road repair projects are planned. The first project is the Pot Springs access road, located in Twin Rivers State Forest.

The second planned project is to a road network requiring extensive repairs of a newly acquired property associated with the Steinhatchee Springs Tract, referred to as the Pinehatchee Addition.

All roads are forest roads and are maintained as forest roads. Surface material hauled to District lands must be non-DOT approved unless otherwise indicated in the work order. Hard rock should only be used if necessary and must be approved by District Project Manager. The District obtains material quotes each fiscal year from local mines.

1. Public roads are maintained in such a way that trucks and cars can be easily driven on the road network. Public roads are generally comprised of a lime rock or native surface (i.e., sand or clay) with hard rock generally used in areas where water flows across a specific area along the road.

2. Secondary and administrative roads are maintained in such a way that 4-wheel drive vehicles can drive the road network. These roads are generally comprised of a native surface with lime rock and hard rock generally used to patch specific areas along the roads (public, secondary, and administrative roads are approximately 15-30 feet wide).

Grading will occur on roads that are predominately lime rock surfaced or are designated as public roads. Secondary and administrative roads receive lime rock patches only if the road cannot be repaired with a grader or other less-expensive methods. Administrative and abandoned roads are only repaired for the purpose of a District projects, for example, timber harvest, or hydrological facility repairs. Patching is generally completed by transporting soft rock (i.e., lime rock) or hard rock to the area needing repairs with an 18-cubic yard dump truck and spreading the material with a loader or other appropriate equipment. Larger dump trucks may be used only when the cost is less than other transport methods. Surface material is not stored on District lands and, generally, there are no areas to dump large loads of material for staging.

Mostly lime rock will be used for patching. Road material will not be placed into the roadside swells, ditches, or wetlands.

Grading may occur on all road types. However, grading is primarily completed on lime rock surfaced roads or roads designated as public or secondary roads. Roads require grading only if the lime rock surface has become rough and patching is not feasible. Grading must not occur on hard rock surfaces. Grading is generally completed by grading with a 12–14-foot blade to ensure all holes or other rough areas are level. Please be aware that many of the roads will have grass growing on them. If it is more feasible to patch roads that are predominately grass, Contractor must get approval from District Project Manager prior to beginning any work. Graded roads must have a gradual dome shape so that rainwater can drain to either side of the road edge. Mounding of road material in the road or along the road edges will not be permissible.

Road material will not be placed into roadside swells, ditches, or wetlands.

Work associated with hydrological facilities is generally comprised of installing, replacing, or repairing culverts; low-water crossings; hard-surface crossings, or ditch blocks. More detailed instructions will be available on the Work Order for this type of work.

Project Areas: The project areas are potentially any District road or hydrological facility located within or associated with District lands. District roads and hydro facilities can be inspected at the bidder’s convenience. Project areas can be accessed as indicated on District maps and are available on the District’s website (mysuwanneeriver.com). If gates are closed or if you require location information, please contact William Irby at 386.688.2381 or wwi@srwmd.org.

Contractors are required to complete all work within designated time frames as quickly and efficiently as possible while maintaining the quality standards listed in the Scope of Work. The District Project Manager may stop work and order the removal and/or replacement of any equipment if the equipment is not working or not calibrated properly. Contractor then has 48 hours to replace the equipment with an acceptable substitute. The District Project Manager may prohibit District work during adverse weather conditions (heat, cold, dry, wet, etc.). If adverse weather is a problem, Contractor must furnish additional personnel and equipment to make up for lost time and ensure timely completion. District work may not stop for a period longer than 48 consecutive hours without advance approval from the District Project Manager.

SECTION 6 - BID RESPONSE FORMS FOR ITB NO. 22/23-020

Bidders are required to complete and submit the forms below following the instructions discussed in SECTION 3.

BIDDER CONTACT INFORMATION

Company Name ___________________________________________________

Address ___________________________________________________

Primary Contact ___________________________________________________

Primary Contact Work Phone ___________________________________________________

Primary Contact Cellular ___________________________________________________

Primary Contact E-mail ___________________________________________________

BIDDER RESPONSE FORMS AND PROJECT COST SCHEDULE

• List and describe below at least three (3) projects of a similar nature and scale specified in this Scope of Work over the past three years.

• List shall include a description of the project and the name and address of company the services were performed for and a contact person and phone number of same companies.

• List must include examples of culvert installations and low-water crossing installation preformed within last three (3) years,

• Bidders must list examples of forest road grading within the last three (3) months,

• Bidders must list examples of forest road patching within the last six (6) months.

List only examples of work that can be viewed locally by District Project Manager.

COMPLETED PROJECT:

AGENCY/COMPANY:

CONTACT: TELEPHONE:

NAME OF PROJECT:

DESCRIPTION:

START DATE: COMPLETION DATE:

(month/year) (month/year)

COST OF PROJECT $_________________________________________

NAMES OF PERSONNEL ASSIGNED TO PROJECT:

CONTACT: TELEPHONE:

CONTACT: TELEPHONE:

CONTACT: TELEPHONE:

REFERENCES

Names/address/telephone numbers of three clients who can attest to your experience as it relates to the tasks provided in Scope of Work in Section 5.

FIRM NAME:

ADDRESS:

CONTACT PERSON:

TELEPHONE:

EMAIL:

FIRM NAME:

ADDRESS:

CONTACT PERSON:

FIRM NAME:

ADDRESS:

CONTACT PERSON:

BID FEE SCHEDULE/EQUIPMENT LIST

1. EQUIPMENT: Please list all available equipment.

**Denotes required piece of equipment

Equipment List Equipment Description (List horsepower, size/type, etc.)

Hourly Rates

MOB/DEM

Rates per hour

Number of Equipment Available

Number of Equipment Operators Available

Farm Tractor

Backhoe

** Small Wheel Loader (50hp-

150hp)

Midsize Wheel Loader (150hp-

375hp)

**Bulldozer (D-4)

Bulldozer (D-6)

**Standard Trackhoe

Longreach Trackhoe

**Skid Loader (75- 125hp)

** Grader w/ 12’ - 14’ wide blade

Other Grader

Rotary Mower/Tractor

Batwing Mower/Tractor

2. TRUCKING: Please list any additional equipment and corresponding rates on the Equipment List provided.

** Denotes required piece of equipment

3. SUPERVISOR OR LABOR:

Supervisor Rate: $ /hour

Labor Rate: $ /hour

Other Rate: $ /hour

Other Rate: $ /hour

SIGNATURE: ___________________________________________________________

Title: ___________________________________________________________________

DATE: TELEPHONE: ________________________

Task Equipment Description Hourly Rates

Number of equipment available

Number of equipment operators available

Dump Truck 8 cy capacity

**Dump Truck 18 cy capacity

Semi-Truck/ 24-ton capacity dump trailer

Semi-Tractor/ low boy/flatbed trailer

Truck and Gooseneck Trailer

EQUIPMENT LIST

Date:

Firm:

Please complete this list for other equipment not specified in the above list that you have available for projects or services noted within this ITB. Note whether equipment is owned or leased.

Type Model Description Rate per Hour

(list type, width, horsepower)

FOR THE SUWANNEE RIVER WATER MANAGEMENT DISTRICT

Submitted:

(Date) By:

(Firm Name) To Whom It May Concern:

The undersigned, as Bidder, hereby declares that the only person or persons interested in this Bidder as principal or principals is or are named herein and that no person other than herein mentioned has any interest in this Bidder or in the agreement to be entered into; that this Bidder is made without connection with any other person, company or parties making a Bidder; and that it is in all respects fair and in good faith without collusion or fraud. Bidder represents to DISTRICT that, except as may be disclosed in Addendum hereto, no officer, employee or agent of DISTRICT has any interest, either directly or indirectly, in the business of the Bidder to be conducted under this Agreement, and that no such person shall have any such interest at any time during the term of the Agreement, should he be awarded the Bidder.

The Bidder further declares that he has examined the documents and informed himself fully in regard to all conditions pertaining to the work to be done; that he has examined the specifications for the work and other contract documents relative thereto and has read all of the Addenda furnished prior to the opening of the Bidders, as acknowledged below; and that he has satisfied himself relative to the work to be performed.

The Bidder agrees, if this Bidder is accepted, to contract with DISTRICT; to furnish everything necessary to complete the work covered by this Bidder and other contract documents for DISTRICT through September 30, 2026; and to furnish the required evidence of the specified insurance noted in Section 4 above.

Acknowledgment is hereby made of the following Addenda (identified by number) received:

Addendum No. Date Addendum No. Date

Signature Typed Name and Title

CERTIFICATE AS TO CORPORATION

The below Corporation is organized under the laws of the State of Florida, authorized by law to make this Bidder, and perform all work and furnish incidental materials and equipment required under the contract documents, and is authorized to do business in the State of Florida.

By:

(Official Title)

(Affix Corporate Seal)

(Address)

Attest:

(Secretary)

FEI/EIN No.

Registered Agent

The full names and residences of persons or firms interested in the foregoing bid as Principals or Officers (specifically include the President, Secretary, and Treasurer and state the corporate office held of all other individuals listed) are as follows:

Attach a copy of a Certificate to do business in the State of Florida, or a copy of the application that has been accepted by the State of Florida to do business in the State of Florida.

SECTION 2 - Proposed Schedule
* Denotes a public meeting. All meetings will be held at District Headquarters in Live Oak,
Florida, and all times denote local time.
SECTION 3 - INSTRUCTIONS TO BIDDERS
QUALIFICATIONS OF BIDDERS - *TO SUBMIT WITH BID PACKAGE*
1) Workers' compensation insurance as required above;
2) Motor vehicular liability insurance with limits of not less than $1,000,000 combined single limit which insurance shall be applicable to any and all vehicles utilized by Bidder to provide the services requested by District;
3) General liability insurance for all services rendered by Bidder for the requested services with a minimum of $1,000,000 personal and advertising injury and $1,000,000 general aggregate.
BIDDER CONTACT INFORMATION:
1:
2:
3:
Primary Contact Work Phone:
Primary Contact Cellular:
Primary Contact Email:
AGENCYCOMPANY:
CONTACT:
TELEPHONE:
NAME OF PROJECT:
DESCRIPTION 1:
DESCRIPTION 2:
DESCRIPTION 3:
DESCRIPTION 4:
DESCRIPTION 5:
DESCRIPTION 6:
DESCRIPTION 7:
DESCRIPTION 8:
DESCRIPTION 9:
DESCRIPTION 10:
START DATE:
COMPLETION DATE:
NAMES OF PERSONNEL ASSIGNED TO PROJECT 1:
NAMES OF PERSONNEL ASSIGNED TO PROJECT 2:
NAMES OF PERSONNEL ASSIGNED TO PROJECT 3:
AGENCYCOMPANY_2:
CONTACT_2:
TELEPHONE_2:
NAME OF PROJECT_2:
DESCRIPTION 1_2:
DESCRIPTION 2_2:
DESCRIPTION 3_2:
DESCRIPTION 4_2:
DESCRIPTION 5_2:
DESCRIPTION 6_2:
DESCRIPTION 7_2:
DESCRIPTION 8_2:
DESCRIPTION 9_2:
DESCRIPTION 10_2:
START DATE_2:
COMPLETION DATE_2:
NAMES OF PERSONNEL ASSIGNED TO PROJECT 1_2:
NAMES OF PERSONNEL ASSIGNED TO PROJECT 2_2:
NAMES OF PERSONNEL ASSIGNED TO PROJECT 3_2:
AGENCYCOMPANY_3:
CONTACT_3:
TELEPHONE_3:
NAME OF PROJECT_3:
DESCRIPTION 1_3:
DESCRIPTION 2_3:
DESCRIPTION 3_3:
DESCRIPTION 4_3:
DESCRIPTION 5_3:
DESCRIPTION 6_3:
DESCRIPTION 7_3:
DESCRIPTION 8_3:
DESCRIPTION 9_3:
DESCRIPTION 10_3:
START DATE_3:
COMPLETION DATE_3:
NAMES OF PERSONNEL ASSIGNED TO PROJECT 1_3:
NAMES OF PERSONNEL ASSIGNED TO PROJECT 2_3:
NAMES OF PERSONNEL ASSIGNED TO PROJECT 3_3:
AGENCYCOMPANY_4:
CONTACT_4:
TELEPHONE_4:
NAME OF PROJECT_4:
DESCRIPTION 1_4:
DESCRIPTION 2_4:
DESCRIPTION 3_4:
DESCRIPTION 4_4:
DESCRIPTION 5_4:
DESCRIPTION 6_4:
DESCRIPTION 7_4:
DESCRIPTION 8_4:
DESCRIPTION 9_4:
DESCRIPTION 10_4:
START DATE_4:
COMPLETION DATE_4:
NAMES OF PERSONNEL ASSIGNED TO PROJECT 1_4:
NAMES OF PERSONNEL ASSIGNED TO PROJECT 2_4:
NAMES OF PERSONNEL ASSIGNED TO PROJECT 3_4:
FIRM NAME:
ADDRESS:
CONTACT PERSON:
TELEPHONE_5:
EMAIL:
FIRM NAME_2:
ADDRESS_2:
CONTACT PERSON_2:
TELEPHONE_6:
EMAIL_2:
FIRM NAME_3:
ADDRESS_3:
CONTACT PERSON_3:
TELEPHONE_7:
EMAIL_3:
Equipment List:
Equipment Description List horsepower sizetype etcFarm Tractor:
Hourly RatesFarm Tractor:
MOBDEM Rates per hourFarm Tractor:
Number of Equipment AvailableFarm Tractor:
Number of Equipment Operators AvailableFarm Tractor:
Equipment Description List horsepower sizetype etcBackhoe:
Hourly RatesBackhoe:
MOBDEM Rates per hourBackhoe:
Number of Equipment AvailableBackhoe:
Number of Equipment Operators AvailableBackhoe:
Equipment Description List horsepower sizetype etc Small Wheel Loader 50hp 150hp:
Hourly Rates Small Wheel Loader 50hp 150hp:
MOBDEM Rates per hour Small Wheel Loader 50hp 150hp:
Number of Equipment Available Small Wheel Loader 50hp 150hp:
Number of Equipment Operators Available Small Wheel Loader 50hp 150hp:
Equipment Description List horsepower sizetype etcMidsize Wheel Loader 150hp 375hp:
Hourly RatesMidsize Wheel Loader 150hp 375hp:
MOBDEM Rates per hourMidsize Wheel Loader 150hp 375hp:
Number of Equipment AvailableMidsize Wheel Loader 150hp 375hp:
Number of Equipment Operators AvailableMidsize Wheel Loader 150hp 375hp:
Equipment Description List horsepower sizetype etcBulldozer D4:
Hourly RatesBulldozer D4:
MOBDEM Rates per hourBulldozer D4:
Number of Equipment AvailableBulldozer D4:
Number of Equipment Operators AvailableBulldozer D4:
Equipment Description List horsepower sizetype etcBulldozer D6:
Hourly RatesBulldozer D6:
MOBDEM Rates per hourBulldozer D6:
Number of Equipment AvailableBulldozer D6:
Number of Equipment Operators AvailableBulldozer D6:
Equipment Description List horsepower sizetype etcStandard Trackhoe:
Hourly RatesStandard Trackhoe:
MOBDEM Rates per hourStandard Trackhoe:
Number of Equipment AvailableStandard Trackhoe:
Number of Equipment Operators AvailableStandard Trackhoe:
Equipment Description List horsepower sizetype etcLongreach Trackhoe:
Hourly RatesLongreach Trackhoe:
MOBDEM Rates per hourLongreach Trackhoe:
Number of Equipment AvailableLongreach Trackhoe:
Number of Equipment Operators AvailableLongreach Trackhoe:
Equipment Description List horsepower sizetype etcSkid Loader 75 125hp:
Hourly RatesSkid Loader 75 125hp:
MOBDEM Rates per hourSkid Loader 75 125hp:
Number of Equipment AvailableSkid Loader 75 125hp:
Number of Equipment Operators AvailableSkid Loader 75 125hp:
Equipment Description List horsepower sizetype etc Grader w 12 14 wide blade:
Hourly Rates Grader w 12 14 wide blade:
MOBDEM Rates per hour Grader w 12 14 wide blade:
Number of Equipment Available Grader w 12 14 wide blade:
Number of Equipment Operators Available Grader w 12 14 wide blade:
Equipment Description List horsepower sizetype etcOther Grader:
Hourly RatesOther Grader:
MOBDEM Rates per hourOther Grader:
Number of Equipment AvailableOther Grader:
Number of Equipment Operators AvailableOther Grader:
Equipment Description List horsepower sizetype etcRotary MowerTractor:
Hourly RatesRotary MowerTractor:
MOBDEM Rates per hourRotary MowerTractor:
Number of Equipment AvailableRotary MowerTractor:
Number of Equipment Operators AvailableRotary MowerTractor:
Equipment Description List horsepower sizetype etcBatwing MowerTractor:
Hourly RatesBatwing MowerTractor:
MOBDEM Rates per hourBatwing MowerTractor:
Number of Equipment AvailableBatwing MowerTractor:
Number of Equipment Operators AvailableBatwing MowerTractor:
Task:
Equipment DescriptionDump Truck 8 cy capacity:
Hourly RatesDump Truck 8 cy capacity:
Number of equipment availableDump Truck 8 cy capacity:
Number of equipment operators availableDump Truck 8 cy capacity:
Equipment DescriptionDump Truck 18 cy capacity:
Hourly RatesDump Truck 18 cy capacity:
Number of equipment availableDump Truck 18 cy capacity:
Number of equipment operators availableDump Truck 18 cy capacity:
Equipment DescriptionSemiTruck 24ton capacity dump trailer:
Hourly RatesSemiTruck 24ton capacity dump trailer:
Number of equipment availableSemiTruck 24ton capacity dump trailer:
Number of equipment operators availableSemiTruck 24ton capacity dump trailer:
Equipment DescriptionSemiTractor low boyflatbed trailer:
Hourly RatesSemiTractor low boyflatbed trailer:
Number of equipment availableSemiTractor low boyflatbed trailer:
Number of equipment operators availableSemiTractor low boyflatbed trailer:
Equipment DescriptionTruck and Gooseneck Trailer:
Hourly RatesTruck and Gooseneck Trailer:
Number of equipment availableTruck and Gooseneck Trailer:
Number of equipment operators availableTruck and Gooseneck Trailer:
Truck and Gooseneck TrailerRow1:
Equipment DescriptionRow6:
Hourly RatesRow6:
Number of equipment availableRow6:
Number of equipment operators availableRow6:
Truck and Gooseneck TrailerRow2:
Equipment DescriptionRow7:
Hourly RatesRow7:
Number of equipment availableRow7:
Number of equipment operators availableRow7:
Truck and Gooseneck TrailerRow3:
Equipment DescriptionRow8:
Hourly RatesRow8:
Number of equipment availableRow8:
Number of equipment operators availableRow8:
Truck and Gooseneck TrailerRow4:
Equipment DescriptionRow9:
Hourly RatesRow9:
Number of equipment availableRow9:
Number of equipment operators availableRow9:
Truck and Gooseneck TrailerRow5:
Equipment DescriptionRow10:
Hourly RatesRow10:
Number of equipment availableRow10:
Number of equipment operators availableRow10:
undefined:
undefined_2:
undefined_3:
undefined_4:
Title:
DATE:
Date:
Firm:
1_2:
2_2:
3_2:
4:
5:
6:
7:
8:
9:
10:
11:
12:
13:
14:
15:
1_3:
2_3:
3_3:
4_2:
5_2:
6_2:
7_2:
8_2:
9_2:
10_2:
11_2:
12_2:
13_2:
14_2:
15_2:
horsepower 1:
horsepower 2:
horsepower 3:
horsepower 4:
horsepower 5:
horsepower 6:
horsepower 7:
horsepower 8:
horsepower 9:
horsepower 10:
horsepower 11:
horsepower 12:
horsepower 13:
horsepower 14:
horsepower 15:
1_4:
2_4:
3_4:
4_3:
5_3:
6_3:
7_3:
8_3:
9_3:
10_3:
11_3:
12_3:
13_3:
14_3:
15_3:
FOR THE SUWANNEE RIVER WATER MANAGEMENT DISTRICT:
Date_2:
Addendum No 1:
Addendum No 2:
Date 1:
Date 2:
Addendum No 1_2:
Addendum No 2_2:
Date 1_2:
Date 2_2:
Typed Name and Title:
By:
Address:
Attest:
FEIEIN No:
Registered Agent:
held of all other individuals listed are as follows 1:
held of all other individuals listed are as follows 2:
held of all other individuals listed are as follows 3:
held of all other individuals listed are as follows 4:
Text1:
Text2:
Text3:
Text4:
Text5:
Text6:
Text7:
Text8:
Text9:
Text10:
Text11:
Text12:
Text13:

File details come from the government source that posted it. Updated .