22168-0014 Roadway Improvements Specs Combined.pdf

PDF 7 MB Posted

Attached to
Roadway Improvements
Solicitation number
22168-0014
Issued by
Clarendon County, South Carolina

About this file

The document is a comprehensive set of bid documents for a roadway improvement project issued by Clarendon County Economic Development in South Carolina. The project encompasses roadway improvements for Spigner Road widening and an interior industrial park roadway at the Alcolu Industrial and Technology Park, with sealed bids (Bid Number 2022-IFB-27) to be received until 2:00 PM on November 2nd, 2023, at the Clarendon County Council Chambers. The work includes extending Jo Rogers Jr Boulevard, installing water main extensions, wastewater gravity and force mains, and constructing a 180 GPM pump station. The project is being partially funded by the South Carolina Rural Infrastructure Authority (RIA) Economic Infrastructure Program, with a contract completion time of 180 calendar days after the Notice to Proceed.

The bid documents specify that bidders must provide a bid security of 5% of their maximum bid price, either as a certified check or bid bond. The total project will involve constructing roadway improvements across approximately 132 acres, with specific components including a 150,000 square foot building pad, a 250,000 square foot building pad, light-duty asphalt paved entrance and access drives, and a railroad spur. Bidders are required to be legally qualified under South Carolina contractor licensing regulations, and the Owner reserves the right to reject any or all bids. The contract will be awarded based on the total cost of the base bid, with the Clarendon County Economic Development Council's funding approval being a key contingency for the project's execution.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DOCUMENTS AND SPECIFICATIONS

FOR

ROADWAY IMPROVEMENTS SPIGNER ROAD WIDENING AND

INTERIOR INDUSTRIAL PARK ROADWAY

AT

ALCULU INDUSTRIAL AND TECHNOLOGY PARK

IN

UNINCORPORATED

CLARENDON COUNTY, SOUTH CAROLINA

CLARENDON COUNTY ECONOMIC DEVELOPMENT

ALLIANCE CONSULTING ENGINEERS, INC.

PROJECT NO. 22168-0014

BID NO. 2022-IFB-27

SEPTEMBER 2023

BID DOCUMENTS

CONTRACTOR:

ADDRESS:

CONTRACTOR'S LICENSE NUMBER:

Alliance Consulting Engineers, Inc.

Post Office Box 8147

Columbia, SC 29202-8147

(803) 779-2078 ● (803) 779-2079 fax www.allianceCE.com http://www.alliancece.com/

TABLE OF CONTENTS

22168-0014 00 01 10 - 1 SEPTEMBER 2023

SECTION 00 01 10

ROADWAY IMPROVEMENTS SPIGNER ROAD AND

GREEN CHURCH ROAD EXTENSION

AT

ALCOLU INDUSTRIAL AND TECHNOLOGY PARK

IN

UNINCORPORATED

CLARENDON COUNTY, SOUTH CAROLINA

SEPTEMBER 2023

DIVISION 00 – BIDDING AND CONTRACT REQUIREMENTS

00 01 10 Table of Contents 00 01 15 Drawings Index 00 11 13 Advertisement for Bids 00 21 13 Instruction to Bidders 00 41 00 Bid Form 00 43 00 Bid Bond 00 43 93 Bidder’s Submittal Checklist 00 45 13 Contractor/Subcontractor Qualifications 00 51 02 Notice of Award 00 52 00 Contract 00 55 00 Notice to Proceed 00 61 13.13 Performance Bond 00 61 13.16 Payment Bond 00 62 76 Contractor’s Application for Payment 00 63 36 Field Order 00 63 49 Work Change Directive 00 63 63 Change Order 00 65 16 Certificate of Substantial Completion 00 65 19.13 Contractor's Affidavit 00 70 00 Standard General Conditions of the Construction Contract 00 70 00 General Conditions Supplement: General Conditions (Clarendon County Economic Development)

DIVISION 01 – GENERAL REQUIREMENTS

01 06 00 Regulatory Requirements 01 23 00 Bid Alternates and Substitutes 01 30 00 Administrative Requirements 01 31 00 Construction Schedules 01 32 00 Project Construction Sequence and Provisions 01 40 00 Quality Requirements 01 41 26 Permits and Rights-of-Way 01 42 19 Reference Standards 01 45 29 Testing Laboratory Services 01 55 10 Vehicular Access and Parking 01 60 00 Product Requirements

22168-0014 00 01 10 - 2 SEPTEMBER 2023

01 61 00 General Equipment Requirements 01 70 00 Execution Requirements 01 71 23 Field Engineering 01 74 19 Waste Management 01 75 16 Start-up Requirements 01 78 00 Closeout Submittals

DIVISION 02 – EXISTING CONDITIONS

02 30 00 Subsurface Evaluation Geotechnical Report (S&ME Project No. 22610306 dated October 3, 2022)

DIVISION 03 – CONCRETE

03 10 00 Concrete Forming and Accessories 03 20 00 Concrete Reinforcing 03 30 00 Cast-In-Place Concrete 03 30 00.10 Testing of Hydraulic Structures 03 40 00 Precast Concrete 03 48 10 Precast Concrete Manholes

DIVISION 31 – EARTHWORK

31 00 00 Earthwork 31 10 00 Site Preparation 31 11 00 Clearing and Grubbing 31 22 00 Grading 31 23 16 Excavation 31 23 16.13 Trenching for Site Utilities 31 23 23.13 Backfill and Compaction 31 25 00 Erosion and Sedimentation Controls 31 37 00 Riprap 31 50 00 Excavation Support and Protection

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 11 23 Aggregate Base Course 32 13 13 Bituminous Concrete Paving 32 17 23 Pavement Markings (Modified for Temporary Striping) 32 17 23 Pavement Markings 32 31 13 Chain Link Fences and Gates 32 92 00 Turf and Grasses

DIVISION 33 – SITE UTILITIES

33 11 00 Water Utility Distribution Piping 33 11 13.14 Ductile Iron Pipe 33 11 13.27 Steel Pipe 33 39 13 Sanitary Utility Sewerage Manholes, Frames and Grates 33 41 00 Storm Utility Drainage Piping

END OF SECTION

DRAWINGS INDEX

22168-0014 00 01 15 - 1 SEPTEMBER 2023

SECTION 00 01 15

Roadway Improvements Spigner Road Alcolu Industrial and Technology Park, Clarendon County, South Carolina (Project No. 22168-0014, dated March 2, 2023 for all drawing sections).

TITLE SHEET

NO.

Cover Sheet C0.0 Overall Site Plan, Index and Notes Typical Section Site Plan (1 of 6) Site Plan (2 of 6) Site Plan (3 of 6) Site Plan (4 of 6) Site Plan (5 of 6) Site Plan (6 of 6) Construction Details Erosion and Sediment Control Phase 1 (1 of 6) Erosion and Sediment Control Phase 1 (2 of 6) Erosion and Sediment Control Phase 1 (3 of 6) Erosion and Sediment Control Phase 1 (4 of 6) Erosion and Sediment Control Phase 1 (5 of 6) Erosion and Sediment Control Phase 1 (6 of 6) Erosion and Sediment Control Phase 2 (1 of 6) Erosion and Sediment Control Phase 2 (2 of 6) Erosion and Sediment Control Phase 2 (3 of 6) Erosion and Sediment Control Phase 2 (4 of 6) Erosion and Sediment Control Phase 2 (5 of 6) Erosion and Sediment Control Phase 2 (6 of 6) Erosion and Sediment Control Phase 3 (1 of 6) Erosion and Sediment Control Phase 3 (2 of 6) Erosion and Sediment Control Phase 3 (3 of 6) Erosion and Sediment Control Phase 3 (4 of 6) Erosion and Sediment Control Phase 3 (5 of 6) Erosion and Sediment Control Phase 3 (6 of 6) Pavement Marking Plan (1 of 6) Pavement Marking Plan (2 of 6) Pavement Marking Plan (3 of 6) Pavement Marking Plan (4 of 6) Pavement Marking Plan (5 of 6) Pavement Marking Plan (6 of 6) Cross Sections (1 of 5) Cross Sections (2 of 5) Cross Sections (3 of 5) Cross Sections (4 of 5) Cross Sections (5 of 5)

C2.0 C2.1 C2.2 C2.3 C2.4 C2.5 C2.6 C2.7 C4.0 C5.0 C5.1 C5.2 C5.3 C5.4 C5.5 C6.0 C6.1 C6.2 C6.3 C6.4 C6.5 C7.0 C7.1 C7.2 C7.3 C7.4 C7.5

PM1

PM2

PM3

PM4

PM5

PM6

X1 X2 X3 X4 X5

18175-0031 00 01 15 - 2 JANUARY 2020

Green Church Road Extension Alcolu Industrial and Technology Park, Clarendon County, South Carolina (Project No. 22168-0014, dated May 30, 2023 for all drawing sections).

TITLE SHEET

NO.

Cover Sheet C0.0 Overall Layout Existing Conditions Plans Existing Conditions Plans Existing Conditions Plans Clearing, Grubbing, and Demolition Plan Clearing, Grubbing, and Demolition Plan Clearing, Grubbing, and Demolition Plan Striping and Signage Plan Striping and Signage Plan Striping and Signage Plan Overall Proposed Roadway Plan and Profile Proposed Roadway Plan and Profile Proposed Roadway Plan and Profile Proposed Roadway Plan and Profile Wetlands Ditch Profile Stormwater Profiles Wetland Ditch Profiles Roadway Cross Sections Roadway Cross Sections Roadway Cross Sections Roadway Cross Sections Erosion and Sediment Control Phase 1 Plan Erosion and Sediment Control Phase 1 Plan Erosion and Sediment Control Phase 1 Plan Erosion and Sediment Control Phase 2 Plan Erosion and Sediment Control Phase 2 Plan Erosion and Sediment Control Phase 2 Plan Erosion and Sediment Control Phase 3 Plan Erosion and Sediment Control Phase 3 Plan Erosion and Sediment Control Phase 3 Plan Erosion Control and Stormwater Details Grading and Storm Drainage Details Site Details

C1.0 C1.1 C1.2 C1.3 C2.0 C2.1 C2.2 C3.0 C3.1 C3.2 C4.0 C4.1 C4.2 C4.3 C4.4 C4.5 C4.6 C5.0 C5.1 C5.2 C5.3 C5.4 C6.0 C6.1 C6.2 C7.0 C7.1 C7.2 C8.0 C8.1

C9.0-C9.4 C10.0-10.1 C11.0-11.1

ADVERTISEMENT FOR BIDS

22168-0014 00 11 13 - 1 SEPTEMBER 2023

SECTION 00 11 13

Owner: Clarendon County Economic Development

Alliance Consulting Engineers, Inc. Project No.: 22168-0014

Separate sealed bids (Bid Number 2022-IFB-27) for construction of the Roadway Improvements Spigner Road Widening and Interior Industrial Park Roadway at Alcolu Industrial and Technology Park in unincorporated Clarendon County, South Carolina will be received until 2:00 PM on Thursday, November 2nd, 2023, and then publicly opened and read aloud. Bids will be accepted in person. The bid will be located at 411 Sunset Drive, Manning, SC 29102 in the Council Chambers. The work to be completed as a part of this project consists of providing all required materials, equipment and labor necessary to complete. The deadline for submitting questions is 12:00 PM on Thursday, October 26, 2023.

Base Bid –Proposed Improvements include work associated with the proposed extension of Jo Rogers Jr Blvd., the proposed water main extension, the proposed wastewater gravity main to serve Buildings No 8 & 9, the proposed wastewater force main, and the proposed 180 GPM pump station.

The Instructions to Bidders, Bid Form, Contract, Plans, Specifications, Bid Bond, Performance Bond, Payment Bond, and other contract documents may be examined at the following locations:

Owner: Clarendon County Economic Development George Kosinski, SCCED, Executive Director 411 Sunset Drive Manning, South Carolina, 29102

Engineers: Alliance Consulting Engineers, Inc., 1201 Main Street, Suite 2020, Columbia, SC 29201

Drawings, specifications, and contract documents may be obtained from the office of Alliance Consulting Engineers, Inc., Post Office Box 8147, Columbia, SC 29202-8147 upon a non-refundable payment of $300. When requesting drawings, specifications, or contract documents, provide the following information about your company: Mailing address; street (UPS) address; telephone number, email and FAX number (if applicable).

Bidders must deposit security with all bids. Security shall be in the form of a certified check or bid bond made payable to the Owner, and shall be for an amount equal to not less than five percent (5%) of the amount of the bid. Provisions of the security shall be as described in the Information for Bidders. No bid will be considered unless the bidder is legally qualified under the provisions of the South Carolina Sections 40-11-10 through 40-11-428).

NOTICE TO BIDDERS:

This project is being funded in part by the South Carolina Rural Infrastructure Authority (RIA) Economic Infrastructure Program.

BIDS WILL NOT BE CONSIDERED FROM ANY VENDOR THAT OWES DELINQUENT BUSINESS

PROPERTY TAXES TO CLARENDON COUNTY ECONOMIC DEVELOPMENT.

NOTICE TO BIDDERS: Each bidder shall fully acquaint himself with the conditions relating to the scope and restrictions attending the execution of the work under the conditions of this Bid. The failure or omission of a bidder to acquaint himself with existing conditions shall in no way relieve him of any obligation with respect to this Bid or to the contract. All amendments to and interpretations of this solicitation shall be in writing and issued by Alliance Consulting Engineers, Inc. Clarendon County Economic Development or Alliance Consulting Engineers, Inc. shall not be legally bound by any amendment or interpretation that is not in writing. Award of the project is contingent on funding

22168-0014 00 11 13 - 2 SEPTEMBER 2023

approval by the Clarendon County Economic Development Council and will be based on the total cost of the base bid.

No bidder may withdraw the bid within sixty (60) days after the actual date of the opening and thereof.

The Owner reserves the right to waive any informality or to reject any or all bids.

ENGINEERS OWNER

Alliance Consulting Engineers, Inc. Clarendon County Economic Development Post Office Box 8147 411 Sunset Drive Columbia, South Carolina 29202-8147 Manning, South Carolina 29102

INSTRUCTIONS TO BIDDERS

22168-0014 00 21 13-1 SEPTEMBER 2023

SECTION 00 21 13

ARTICLE 1 - DEFINED TERMS

ARTICLE 2 - COPIES OF BIDDING DOCUMENTS

ARTICLE 3 - QUALIFICATIONS OF BIDDERS

ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE

ARTICLE 5 - SITE AND OTHER AREAS

ARTICLE 6 - INTERPRETATIONS AND ADDENDA

ARTICLE 7 - BID SECURITY

ARTICLE 8 - CONTRACT TIMES

ARTICLE 9 - LIQUIDATED DAMAGES

ARTICLE 10 - SUBSTITUTE AND “OR-EQUAL” ITEMS

ARTICLE 11 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS

ARTICLE 12 - PREPARATION OF BID

ARTICLE 13 - BASIS OF BID; COMPARISON OF BIDS

ARTICLE 14 - SUBMITTAL OF BID

ARTICLE 15 - MODIFICATION OF BID

ARTICLE 16 - OPENING OF BIDS

ARTICLE 17 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE

ARTICLE 18 - EVALUATION OF BIDS AND AWARD OF CONTRACT

ARTICLE 19 - CONTRACT SECURITY AND INSURANCE

ARTICLE 20 - SIGNING OF AGREEMENT

ARTICLE 21 - RETAINAGE

22168-0014 00 21 13-2 SEPTEMBER 2023

ARTICLE 1 - DEFINED TERMS

1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions.

Additional terms used in these Instructions to Bidders have the meanings indicated below:

A. Issuing Office-The office from which the Bidding Documents are to be issued and where the bidding procedures are to be administered.

ARTICLE 2 - COPIES OF BIDDING DOCUMENTS

2.01 Complete sets of the Bidding Documents in the number and for the deposit sum, if any, stated in the Advertisement or Invitation to Bid may be obtained from Alliance Consulting Engineers, Inc., P.O. Box 8147, Columbia, SC 29202-8147. The deposit will be nonrefundable and a FedEx account number must be provided for FedEx delivery of Plan Sets.

2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.

ARTICLE 3 - QUALIFICATIONS OF BIDDERS

3.01 To demonstrate Bidder’s qualifications to perform the Work, within five (5) days of Owner’s request, Bidder shall submit written evidence such as financial data; previous experience, present commitments.

ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE

4.01 Subsurface and Physical Conditions

A. Deleted

22168-0014 00 21 13-3 SEPTEMBER 2023

4.02 Underground Facilities

A. Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site is based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including Owner, or others.

4.03 Hazardous Environmental Condition

A. The General Conditions identify those reports and drawings relating to a Hazardous Environmental Condition identified at the Site, if any, that Engineer has used in preparing the Bidding Documents.

B. Copies of reports and drawings referenced in Paragraph 4.03.A are included herein. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.06 of the General Conditions has been identified and established. Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.

4.04 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated conditions appear in Paragraphs 4.02, 4.03, and 4.04 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work appear in Paragraph 4.06 of the General Conditions.

4.05 On request, Owner will provide Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid.

Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies. Bidder shall comply with all applicable Laws and Regulations relative to excavation and utility locates. Engineer and Owner shall be notified prior to any site visits.

4.06 Reference is made to Article 7 of the General Conditions for the identification of the general nature of other work that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) that relates to the Work contemplated by these Bidding Documents. On request, Owner will provide to each Bidder for examination access to or copies of Contract Documents (other than portions thereof related to price) for such other work.

4.07 It is the responsibility of each Bidder before submitting a Bid to:

A. Examine and carefully study the Bidding Documents, the other related data identified in the Bidding Documents, and any Addenda.

B. Visit the Site and become familiar with and satisfy Bidder as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.

C. Become familiar with and satisfy Bidder as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work.

22168-0014 00 21 13-4 SEPTEMBER 2023

D. Carefully study all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities), which have been identified in Paragraph 4.02 of the General Conditions, and (2) reports and drawings of Hazardous Environmental Conditions at the Site which have been identified in Paragraph 4.06 of the General Conditions.

E. Obtain and carefully study (or accept consequences of not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site, which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs incident thereto.

F. Agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents.

G. Become aware of the general nature of the work to be performed by Owner and others at the

Site that relates to the Work as indicated in the Bidding Documents.

H. Correlate the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.

I. Promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that

Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder.

J. Determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work.

4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given Engineer written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by Engineer are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.

ARTICLE 5 - SITE AND OTHER AREAS

5.01 The Site is identified in the Bidding Documents. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by Owner unless otherwise provided in the Bidding Documents. All additional land and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor.

22168-0014 00 21 13-5 SEPTEMBER 2023

ARTICLE 6 - INTERPRETATIONS AND ADDENDA

6.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than seven (7) days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

6.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by Owner or Engineer.

ARTICLE 7 - BID SECURITY

7.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of five percent

(5%) of Bidder’s maximum Bid price and in the form of a certified check, bank money order, or a Bid Bond (on the form attached) issued by a surety meeting the requirements of Paragraphs 5.01 and

5.02 of the General Conditions.

7.02 The Bid security of the Successful Bidder will be retained until such Bidder has executed the

Contract Documents, furnished the required contract security and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within fifteen

(15) days after the Notice of Award, Owner may annul the Notice of Award and the Bid security of that Bidder will be forfeited. The Bid security of other Bidders whom Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven (7) days after the Effective Date of the Agreement or sixty (60) days after the Bid opening, whereupon Bid security furnished by such Bidders will be returned.

7.03 Bid security of other Bidders whom Owner believes do not have a reasonable chance of receiving the award will be returned within fourteen (14) days after the Bid opening.

ARTICLE 8 - CONTRACT TIMES

8.01 The time allotted for completion of the Roadway, Water, and Wastewater Improvements at the

Clarendon County Industrial Park, including alternate(s) approved by the Owner and the Engineer is as follows:

Substantial Completion 180 calendar days after the Notice to Proceed has been issued.

ARTICLE 9 - LIQUIDATED DAMAGES

9.01 Document Execution

A. The successful Bidder, upon failure or refusal to execute and deliver the contract and bonds within ten (10) days after they have received the notice of the acceptance of their bid, shall forfeit to the Owner, as liquidated damages, the security deposited with the bid.

9.02 Project Execution

A. Bidder must agree to commence work on or before a date to be specified in a written “Notice to Proceed” of the Owner and to fully complete the project within the dates specified in the Bid Form, Article 6; Paragraph 6.01. Bidder must agree also to pay as liquidated damages the sum as indicated in the Bid Form, Article 6; Paragraph 6.02 for each consecutive calendar day thereafter as hereinafter provided in the General Conditions.

22168-0014 00 21 13-6 SEPTEMBER 2023

ARTICLE 10 - SUBSTITUTE AND “OR-EQUAL” ITEMS

10.01 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration of possible substitute or “or-equal” items. Whenever it is specified or described in the Bidding Documents that a substitute or “or-equal” item of material or equipment may be furnished or used by Contractor if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the Effective Date of the Agreement.

ARTICLE 11 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS

11.01 If the General Conditions require the identity of certain Subcontractors, Suppliers, individuals, or entities to be submitted to Owner in advance of a specified date prior to the Effective Date of the Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall within five (5) days after Bid opening, submit to Owner a list of all such Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, individual, or entity if requested by Owner. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit a substitute, in which case apparent Successful Bidder shall submit an acceptable substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.

11.02 If apparent Successful Bidder declines to make any such substitution, Owner may award the

Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, individuals, or entities. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to revocation of such acceptance after the Effective Date of the Agreement as provided in Paragraph 6.06 of the General Conditions.

11.03 Contractor shall not be required to employ any Subcontractor, Supplier, individual, or entity against whom Contractor has reasonable objection.

ARTICLE 12 - PREPARATION OF BID

12.01 The Bid Form is included with the Bidding Documents. Additional copies may be obtained from

Engineer.

12.02 All blanks on the Bid Form shall be completed by printing in ink or by typewriter and the Bid signed in ink. Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each unit price item listed therein, or the words “No Bid,” “No Change,” or “Not Applicable” entered.

12.03 A Bid by a corporation shall be executed in the corporate name by the president, vice-president, or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the signature.

12.04 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature.

22168-0014 00 21 13-7 SEPTEMBER 2023

12.05 A Bid by a limited liability company shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown below the signature.

12.06 A Bid by an individual shall show the Bidder’s name and official address.

12.07 A Bid by a joint venture shall be executed by each joint venturer in the manner indicated on the Bid

Form. The official address of the joint venture shall be shown below the signature.

12.08 All names shall be typed or printed in ink below the signatures.

12.09 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.

12.10 The address and telephone number for communications regarding the Bid shall be shown.

12.11 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of the Contract.

Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.

ARTICLE 13 - BASIS OF BID; COMPARISON OF BIDS

13.01 Unit Price

A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the Bid schedule.

B. The total of all estimated prices will be the sum of the products of the estimated quantity of each item and the corresponding unit price. The final quantities and Contract Price will be determined in accordance with Paragraph 11.03 of the General Conditions.

C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words.

13.02 The Bid price shall include such amounts as the Bidder deems proper for overhead and profit on account of cash allowances, if any, named in the Contract Documents as provided in Paragraph

11.02 of the General Conditions.

13.03 Deleted

ARTICLE 14 - SUBMITTAL OF BID

14.01 With each copy of the Bidding Documents, a Bidder is furnished one (1) separate unbound copy of the Bid Form, and, if required, the Bid Bond Form. The unbound copy of the Bid Form is to be completed and submitted with the Bid security and the following data:

A. Power of Attorney.

14.02 A Bid shall be submitted no later than the date and time prescribed in the Advertisement for Bid.

Bids will NOT be accepted in any other manner.

ARTICLE 15 - MODIFICATION OF BID

15.01 A Bid may be modified or withdrawn by an appropriate document duly executed in the manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids.

22168-0014 00 21 13-8 SEPTEMBER 2023

ARTICLE 16 - OPENING OF BIDS

16.01 Bids will be opened at the time and place indicated in the Advertisement or Invitation to Bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids in the form of a Bid Tabulation and Bid Comparison. The Bid Opening Minutes will also be provided to all in attendance.

ARTICLE 17 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE

17.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.

ARTICLE 18 - EVALUATION OF BIDS AND AWARD OF CONTRACT

18.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, non-responsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to not be responsible. Owner may also reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder.

18.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest.

18.03 In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.

18.04 In evaluating Bidders, Owner will consider the qualifications of Bidders and may consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or entities proposed for those portions of the Work for which the identity of Subcontractors, Suppliers, and other individuals or entities must be submitted as provided in the General Conditions.

18.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, individuals, or entities to perform the Work in accordance with the Contract Documents.

18.06 If the Contract is to be awarded, Owner will award the Contract to the Bidder whose Bid is in the best interests of the Project.

18.07 The Owner reserves the right not to Award the Project.

ARTICLE 19 - CONTRACT SECURITY AND INSURANCE

19.01 Article 5 of the General Conditions sets forth Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it shall be accompanied by such bonds.

22168-0014 00 21 13-9 SEPTEMBER 2023

ARTICLE 20 - SIGNING OF AGREEMENT

20.01 When Owner gives a Notice of Award to the Successful Bidder, it shall be accompanied by the required number of unsigned counterparts of the Agreement with the other Contract Documents which are identified in the Agreement as attached thereto. Within seven (7) days thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the Agreement and attached documents to Owner. Within seven (7) days thereafter, Owner shall deliver one (1) fully signed counterpart to Successful Bidder with a complete set of the Drawings with appropriate identification.

ARTICLE 21 - RETAINAGE

21.01 Retainage from progress payments to the Contractor shall be ten percent (10%) of each payment for work completed and stored materials on site.

BID FORM

22168-0014 00 41 00-1 SEPTMBER 2023

SECTION 00 41 00

ROADWAY IMPROVEMENTS SPIGNER ROAD WIDENING AND INTERIOR INDUSTRIAL PARK

ROADWAY

AT THE

ALCOLU INDUSTRIAL AND TECHNOLOGY PARK

TABLE OF ARTICLES

ARTICLE 1 – BID RECIPIENT

ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS

ARTICLE 3 – BIDDER’S REPRESENTATIONS

ARTICLE 4 – FURTHER REPRESENTATIONS

ARTICLE 5 – BASIS OF BID

ARTICLE 6 – TIME OF COMPLETION

ARTICLE 7 – ATTACHMENTS TO THIS BID

ARTICLE 8 – DEFINED TERMS

22168-0014 00 41 00-2 SEPTMBER 2023

ARTICLE 1 - BID RECIPIENT

1.01 This Bid is submitted to the office of Clarendon County Economic Development at 411 Sunset Drive, Manning, SC, 29102.

1.02 Deleted

1.03 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.

ARTICLE 2 - BIDDER'S ACKNOWLEDGEMENTS

2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for sixty (60) days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.

ARTICLE 3 - BIDDER'S REPRESENTATIONS

3.01 In submitting this Bid, Bidder represents that:

A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged.

Addendum No. Addendum Date Initials

B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local and Site conditions that may affect cost, progress, and performance of the Work.

C. Bidder is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress and performance of the Work.

D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities), which have been identified in Paragraph 4.02 of General Conditions, and (2) reports and drawings of Hazardous Environmental Conditions that have been identified in Paragraph 4.06 of General Conditions.

E. Bidder has obtained and carefully studied (or accepts the consequences for not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the Site, which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents to be employed by Bidder, and safety precautions and programs incident thereto.

22168-0014 00 41 00-3 SEPTMBER 2023

F. Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents.

G. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.

H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.

I. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by Engineer is acceptable to Bidder.

J. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.

K. Bidder will submit written evidence of its authority to do business in the state where the Project is located not later than the date of its execution of the Agreement.

ARTICLE 4 - FURTHER REPRESENTATIONS

4.01 Bidder further represents that:

A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation.

B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.

C. Bidder has not solicited or induced any individual or entity to refrain from bidding.

D. Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner.

ARTICLE 5 – BASIS OF BID

Base Bid

5.01 Bidder will complete the Work in accordance with the Contract Documents for the following unit price(s):

ROADWAY IMPROVEMENTS SPIGNER ROAD WIDENING

Item No. Description Unit Estimated Quantity

Unit Price

Bid Price

1 Mobilization/Bonds LS 1 $ $ 2 Traffic Control LS 1 $ $ 3 Silt Fence LF 5,750 $ $ 4 Woven Geotextile Fabric SY 50 $ $ 5 Phase One (1) Concrete Washouts EA 1 $ $ 6 Check Dams EA 26 $ $

Erosion Control Matting (North American Green

SC150) SY 2,900 $ $

22168-0014 00 41 00-4 SEPTMBER 2023

Phase Two (2) Clearing and Grubbing (Area Within Limits of Disturbance) AC 3 $ $

9 Removal of Culverts LS 1 $ $ 10 Temporary Seeding AC 2 $ $ 11 Earthwork (Cut, Fill, Unclassified) LS 1 $ $ 12 Relocation of Fire Hydrant Assembly EA 1 $ $ 13 18-Inch Class V RCP Storm Drainage Pipe LF 80 $ $ 14 Rip Rap Outlet Protection SY 45 $ $

2-Inch Asphalt Overlay (Type B) (Include Track Coat) SY 6,350 $ $

16 Mill 2-Inch Asphalt Roadway SY 280 $ $ 17 4.5-Inch Graded Aggregate Base Course SY 2,200 $ $ 18 6-Inch Pavement Drive SY 175 $ $ 19 2-Inch Asphalt Surface Course (Type B) SY 1,890 $ $ 20 Thermoplastic Striping LS 1 $ $ 21 Signage EA 1 $ $ 22 Clean Culverts LS 1 $ $ 23 Permanent Seeding AC 2 $ $ 24 Relocate Sign EA 2 $ $ 25 CSX Flagging/Traffic Control LS 1 $ $

Total Spigner Road Widening Bid:

ROADWAY IMPROVEMENTS FOR ROADWAY EXTENSION INTO THE ALCOLU INDUSTRIAL AND TECHNOLOGY PARK

Item No. Description Unit Estimated Quantity

Unit Price

Bid Price

1 Mobilization/Bonds LS 1 $ $ 2 Silt Fence LF 5,250 $ $ 3 Construction Entrance EA 1 $ $ 4 Cocncrete Washout EA 1 $ $ 5 Earthwork (Cut, Fill, Unclassified) LS 1 $ $ 6 Curb Removal LF 50 $ $ 7 Clearing and Grubbing AC 5 $ $ 8 18-inch Curb and Gutter LF 2,750 $ $ 9 Inlet Protection EA 16 $ $ 10 Outlet Protection SY 108 $ $ 11 Check Dams EA 22 $ $ 12 Catch Basin w/grate Type I 3'x4' EA 8 $ $ 13 15-Inch RCP Class III Pipe LF 100 $ $ 14 18-Inch RCP Class V Pipe LF 165 $ $ 15 30-Inch RCP Class III Pipe LF 160 $ $ 16 Woven Geotextile Fabric SY 110 $ $ 17 Erosion Slope Matting SY 6,500 $ $ 18 Temporary Seeding AC 4 $ $ 19 Permanent Seeding AC 4 $ $ 20 2-Inch Asphalt Surface Course (Type C) SY 4,660 $ $ 21 2.75-Inch Asphalt Intermediate Course (Type B) SY 4,660 $ $ 22 12-Inch Graded Aggregate Base Course SY 4,660 $ $ 23 Thermoplastic Striping LS 1 $ $ 24 Signage EA 2 $ $

22168-0014 00 41 00-5 SEPTMBER 2023

Total Spigner Road Widening Bid: $

Total Roadway Improvements Bid (Spigner Widening and Industrial Park Roadway Combined:

Words listing below should be for the Combined Total for both Roadway Improvements Project

Dollars Cents

Amounts are to be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.

The above unit prices shall include all labor, materials, bailing, shoring, removal, overhead, profit, insurance, etc., to complete the finish work as stipulated in the Bid Documents.

Unit Prices have been computed in accordance with Paragraph 11.03.B of the General Conditions.

Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities, determined as provided in the Contract Documents.

ARTICLE 6 - TIME OF COMPLETION

6.01 Bidder agrees that the Work: Roadway Improvements Spigner Road at Alcolu Industrial and

Technology Park in Clarendon County, South Carolina is to be completed within one hundred eighty (180) calendar days for the Base Bid scope of work after the Notice to Proceed has been issued.

6.02 Bidder accepts the provisions of the Agreement as to liquidate damages in the event of failure to complete the Work within the Contract dates in the amount of $1,500 per day for each calendar day required to complete the work in the manner and within the dates as stated in Paragraph 6.01 above.

ARTICLE 7 - ATTACHMENTS TO THIS BID

7.01 The following documents are attached to and made a condition of this Bid:

A. Required Bid security in the form of five percent (5%) of the total bid amount.

B. Power of Attorney.

ARTICLE 8 - DEFINED TERMS

8.01 The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders and General Conditions.

BID BOND

22168-0014 00 43 00-1 SEPTEMBER 2023

SECTION 00 43 00

Any singular reference to Bidder, Surety, Owner, or other party shall be considered plural where applicable.

BIDDER (Name and Address):

SURETY (Name and Address of Principal Place of Business):

OWNER (Name and Address): Clarendon County Economic Development 411 Sunset Drive Manning, South Carolina, 29102

BID

Bid Due Date:

Project (Brief Description Including Location): Roadway Improvements Spigner Road Widening and

Interior Industrial Park Roadway at Alcolu Industrial and Technology Park

BOND

Bond Number:

Date (Not later than Bid due date):

Penal sum (Words) (Figures)

Surety and Bidder, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this Bid Bond to be duly executed on its behalf by its authorized officer, agent, or representative.

BIDDER SURETY

(Seal) (Seal

Bidder's Name and Corporate Seal Surety’s Name and Corporate Seal

By: By:

Signature and Title Signature and Title

(Attach Power of Attorney)

Attest: Attest:

Signature and Title Signature and Title

Note: Above addresses are to be used for giving required notice.

PENAL SUM FORM

22168-0014 00 43 00-2 SEPTEMBER 2023

1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond.

Payment of the penal sum is the extent of Surety’s liability.

2. Default of Bidder shall occur upon the failure of

Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents.

3. This obligation shall be null and void if:

3.1. Owner accepts Bidder's Bid and Bidder

delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents, or

3.2. All Bids are rejected by Owner, or

3.3. Owner fails to issue a Notice of Award to

Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by Paragraph 5 hereof).

4. Payment under this Bond will be due and payable upon default by Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.

5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from Bid due date without Surety's written consent.

6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after Bid due date.

7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.

8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.

9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute, seal, and deliver such Bond and bind the Surety thereby.

10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.

11. The term "Bid" as used herein includes a Bid, offer, or proposal as applicable.

22168-0014 00 43 93 - 1 September 2023

SECTION 00 43 93

BIDDER’S SUBMITTAL CHECKLIST

PROJECT: Roadway Improvements Spigner Road Widening and Interior Industrial Park Roadway at Alcolu Industrial and Technology Park in unincorporated Clarendon County, South Carolina

BIDDER NAME: ___________________________________________________________________

DATE: ________________________

1.0 This checklist shall be included as the first page of the submitted bidding documents. As outlined in

ARTICLE 7 of the BID FORM the following items shall be included with the submitted bidding documents:

CHECK () ITEM DESCRIPTION

- Properly Executed Bid Form (Including the acknowledgement of all Addenda)

A. Required Bid security in the form of a Bid Bond (EJCDC No. C-430) or Certified Check in the amount of five percent (5%) of the total bid amount

B.

List of Proposed Subcontractors;

(must be submitted within five (5) days of the Bid Opening, only required for the lowest qualified apparent bidder)

C.

List of Proposed Suppliers;

(must be submitted within five (5) days of the Bid Opening, only required for the lowest qualified apparent bidder)

D.

List of Project References;

(must be submitted within five (5) days of the Bid Opening, only required for the lowest qualified apparent bidder)

E. Evidence of authority to do business in the State of South Carolina, or written covenant to obtain such license within the time frame for acceptance of Bids;

F.

Contractor License Number or evidence of Bidder’s ability to obtain a State Contractor’s License and covenant by Bidder to obtain said license within the time for acceptance of Bids.

G.

Required Bidder Qualification Statement with Supporting Data;

(must be submitted within five (5) days of the Bid Opening, only required for the lowest qualified apparent bidder)

H. Completed Bidder’s Submittal Checklist

CONTRACTOR/SUBCONTRACTOR QUALIFICATIONS

22168-0014 00 45 13 - 1 SEPTEMBER 2023

SECTION 00 45 13

PART 1 - GENERAL

1.01 The following information…

This is the start of the file's text. The full file is on GovTribe.