22138 Chippewa ERT Building HVAC Upgrades - Drawings.pdf
PDF 11 MB Posted
- Solicitation number
- RFQ-171-250000000245-2
- Issued by
- Lenawee County, Michigan
About this file
I apologize, but no file content was actually uploaded with the filename. Without the specific document details, I cannot generate a summary. If you would like me to analyze a government contract or bid document, please provide the actual file contents or text for review.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4269 M-80, KINCHELOE, MI 49788
FILE NUMBER: 472/22138.ABG
MATRIX PROJECT NUMBER: 22295.01
MECHANICAL/ELECTRICAL ENGINEER
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
FOR DEPARTMENT OF CORRECTIONS
CHIPPEWA CORRECTIONAL FACILITY (URF) - ERT BUILDING HVAC UPGRADES PROJECT
N SITE MAP
MECHANICAL DRAWING INDEX
ERT BUILDING
ELECTRICAL DRAWING INDEX
M-000
TITLE SHEET
DBP
CAT
22295.01
472/22138.ABG
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
2/14/2025 CD SET
GENERAL HVAC NOTES
1. INSTALL ALL EQUIPMENT, MATERIALS, AND ACCESSORIES PER
MANUFACTURERS WRITTEN INSTRUCTIONS.
2. ALL EXISTING SYSTEMS (PUMPS) THAT SERVES AREAS BEING
RENOVATED SHALL BE REBALANCED AS REQUIRED.
3. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY
CONFLICT WITH NEW CONSTRUCTION AND RELOCATE AS
NEEDED.
4. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER
DISCIPLINES PRIOR TO CONSTRUCTION TO AVOID CONFLICTS.
5. PROVIDE MANUAL AIR VENTS WITH 3/4" HOSE CONNECTION AT
ALL HIGH POINTS.
6. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES, LOCATION,
ELEVATIONS, AND DETAILS OF ALL EXISTING CONDITIONS THAT
MAY AFFECT THE WORK.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING
THE INTEGRITY OF ALL EQUIPMENT AND MATERIALS IN A "NEW"
CONDITION DURING CONSTRUCTION.
8. ALL WORK SHALL BE PERFORMED BY LICENSED
CONTRACTORS AND SUBCONTRACTORS AS REQUIRED BY LAW.
9. ALL WORK SHALL CONFORM TO MICHIGAN MECHANICAL CODE,
LATEST APPLICABLE EDITION.
10. ALL CONDENSATE DRAIN PIPING SET @ MIN. 1% SLOPE.
11. ALL CONDENSATE DRAIN PIPING TO TERMINATE TO DRAIN VIA
AIR GAP.
12. IF THERE IS CONFLICTING INFORMATION IN THE PLANS OR
SPECIFICATIONS THE MORE STRINGENT AND GREATER COST
ITEM SHALL BE USED.
13. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF
TERMINATION OF PIPES AND DUCTS AND SUGGESTED ROUTES.
IT IS NOT INTENTION OF DRAWINGS TO INDICATE ALL
NECESSARY OFFSETS. INSTALL WORK IN MANNER TO
CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE
HEADROOM AND KEEP OPENINGS AND PASSAGEWAYS CLEAR.
DO NOT SCALE FROM DRAWINGS.
14. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS,
REVISIONS, AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE
STATUTES, ORDINANCES, CODES OR REGULATIONS OF
FEDERAL, STATE, AND LOCAL AUTHORITIES HAVING
JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED.
15. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY
OSHA, UNDERWRITERS, LABORATORIES, AMERICAN CODES,
ASA, ASHRAE, ARI, NEC, STATE FIRE INSURANCE REGULATION
BODY, NFPA OR OTHERS, THESE STANDARDS SHALL BE
FOLLOWED WHETHER OR NOT INDICATED ON THE DRAWING
AND SPECIFICATIONS.
16. PIPING LAYOUT IS SCHEMATIC. EXACT LOCATION OF PIPING
AND EQUIPMENT SHALL BE COORDINATED WITH BUILDING
STRUCTURE, EQUIPMENT FURNISHED, EXISTING CONDITIONS
AND ALL OTHER TRADES PRIOR TO INSTALLATION. ANY
CONTRACTOR INSTALLING WORK WITHOUT PRIOR
COORDINATION SHALL RELOCATE HIS WORK AT HIS EXPENSE
TO ALLOW PROPER INSTALLATION OF ANY AND ALL TRADES
WORK.
17. PIPING SHALL NOT BE RUN ABOVE ELECTRICAL GEAR IN THE
SERVICE SPACE REQUIRED BY THE NATIONAL ELECTRICAL
CODE.
18. ANY ADDITIONAL LOW VOLTAGE CONTROL WIRING THAT IS
REQUIRED SHALL BE PROVIDED BY THE HVAC CONTRACTOR.
CONTROL WIRING SHALL BE RUN IN CONDUIT IF REQUIRED BY
LOCAL CODES. POWER SHALL BE PROVIDED BY THE
ELECTRICAL CONTRACTOR.
19. PROVIDE VIBRATION ISOLATION AT EACH CONNECTION TO A
MOTORIZED PIECE OF EQUIPMENT BY THE HVAC
CONTRACTOR.
20. CONTRACTOR TO ATTEND A 6 MONTH AND AN 11 MONTH POST
CONSTRUCTION MEETING WITH THE ENGINEER AND OWNER
TO REVIEW AND FIX ISSUES DURING THE WARRANTY PERIOD.
21. CONTRACTOR TO TRACK AND PROVIDE PAPERWORK TO
OWNER OF THE AMOUNT OF MATERIAL BEING RECYCLED
THROUGHOUT THE PROJECT.
22. CONTRACTOR WILL HAVE 1 ESCORT TO WORK WITH THROUGH
AT THE PROJECT.
23. CONTRACTOR TO PATCH, PRIME, AND PAINT EXISTING
WALLS/CEILINGS AS NEEDED TO MATCH EXISTING WHERE
DEMOLITION AND/OR NEW WORK IS COMPLETED.
24. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING
HEAT/DOMESTIC HOT WATER IN BUILDINGS THROUGHOUT THE
PROJECT.
25. FIELD VERIFY EXISTING SIZE OF ALL CONTROL VALVES AND
EQUIPMENT PRIOR TO ORDERING.
26. CONTRACTOR TO NOTIFY THE FACILITY AT LEAST 1 DAY IN
ADVANCE FOR ANY HOT WORK TO ALLOW THE OWNER TO
DISABLE THE FIRE ALARM.
27. ALL FASTENERS USED IN AREAS EXPOSED TO INMATES SHALL
USE TAMPERPROOF SCREWS.
28. ROOF PENETRATIONS TO INCLUDE A CURB AND ROOF CURB
BOOT. PATCH AND SEAL ROOF PENETRATIONS TO BE WATER
TIGHT. ALL ROOF PENETRATIONS SHALL BE SEALED WATER
TIGHT AND SHALL MAINTAIN ALL EXISTING WARRANTIES.
29. CONTRACTOR TO PROVIDED ALL CONTROLS
EQUIPMENT/ACCESSORIES REQUIRED TO CONNECT
NEW/EXISTING EQUIPMENT TO NEW DDC CONTROL PANEL AS
IN THE CONSTRUCTION DOCUEMENTS.
30. CONNECT NEW DDC CONTROL PANEL TO SECURITY IT RACK
WITH PURPLE CAT-6 CABLES(S) AS REQUIRED TO CONNECT TO
STARNET 2 SYSTEM. CONTRACTOR TO HIRE AND COORDINATE
CONNECTION TO SECURITY IT RACK WITH BRETT EMERSON
FROM COMMTECH DESIGN (PHONE 616-433-7210).
MECHANICAL SYMBOLS LEGEND
HVAC PIPING SYMBOLSHVAC PIPING
HVAC DUCTWORK
F/S
F/S s s
TEMPERATURE CONTROL SYMBOLS
MISCELLANEOUS NOTES
HVAC DUCTWORK SYMBOLS HVAC DUCTWORK & DIFFUSER TAGS HVAC PIPING VALVES
MECHANICAL ABBREVIATIONS
AFF ABOVE FINISH FLOOR
AC AIR COMPRESSOR
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
A.T.C. ARCHITECTURAL TRADES CONTRACTOR
B BOILER
B.A.S. BUILDING AUTOMATION SYSTEM
CAF COMBUSTION AIR FAN
CC COOLING COIL
CFM CUBIC FEET PER MINUTE
CHLR CHILLER
CHP CONSOLE HEAT PUMP
CONV CONVECTOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONTROL VALVE
CWP CHILLED WATER PUMP
DB DRY BULB
DFU DUCT FURNACE
DIA DIAMETER
DN DOWN
DPR DAMPER
DS DUCT SILENCER
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EG EXHAUST GRILLE
E.T.C. ELECTRICAL TRADES CONTRACTOR
EVR EVAPORATOR
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXIST EXISTING
FF FINISH FLOOR
FPM FEET PER MINUTE
FT FEET
FTR FINNED TUBE RADIATION
FU FURNACE
GAL GALLON
GFRH GAS FIRED RADIANT HEATER
GR GRILLE
H HUMIDIFIER
HC HEATING COIL
HD HEAD (FT)
HP HORSE POWER
HHP HORIZONTAL HEAT PUMP
HTG HEATING
HVAC HEATING, VENTILATION, & AIR CONDITIONING
HWP HEATING WATER PUMP
HX HEAT EXCHANGER
ID INSIDE DIAMETER
I.E. INVERT ELEVATION
IAH INTAKE HOOD
LAT LEAVING AIR TEMPERATURE
LH LATENT HEAT (MBH)
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH BTU PER HOUR (THOUSAND)
MIN MINIMUM
M.T.C. MECHANICAL TRADES CONTRACTOR
N.C. NOISE CRITERIA
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NTS NOT TO SCALE
P PUMP
PCR PUMPED CONDENSATE RETURN
PD PRESSURE DROP
RCP RADIANT CEILING PANEL
REQ'D REQUIRED
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RLH RELIEF HOOD
RTU ROOF TOP UNIT
SD SUPPLY DIFFUSER
SF SUPPLY FAN
SG SUPPLY GRILLE
SH SENSIBLE HEAT (MBH)
SM SHEET METAL
SQ. FT. SQUARE FEET
SST SATURATED SUCTION TEMPERATURE
STR STRAINER
TC TOTAL COOLING (MBH)
TCL TEMPERATURE CONTROL
T&P TEMPERATURE & PRESSURE RELIEF VALVE
TYP TYPICAL
UH UNIT HEATER
VAV VARIABLE AIR VOLUME BOX
VRH VARIABLE AIR VOLUME REHEAT BOX
FPVAV FAN POWERED VARIABLE AIR VOLUME BOX
V.F.D VARIABLE FREQUENCY DRIVE
ZD ZONE DAMPER
X-SA EXISTING ITEM (EXISTING SUPPLY AIR DUCT)
ITEM
EXISTING
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSATE DRAIN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
COOLING TOWER WATER SUPPLY
COOLING TOWER WATER RETURN
DIRECT EXPANSION
HEAT PUMP WATER SUPPLY
HEAT PUMP WATER RETURN
HEATING WATER SUPPLY
HEATING WATER RETURN
SUCTION (REFRIGERANT)
LIQUID (REFRIGERANT)
SUCTION (DIRECT EXPANSION)
LIQUID (DIRECT EXPANSION)
LOW PRESSURE STEAM (0-20 LBS.)
MEDIUM PRESSURE STEAM (21-75 LBS.)
HIGH PRESSURE STEAM (76 LBS. & ABV.)
STEAM CONDENSATE (GRAVITY)
PUMPED STEAM CONDENSATE
STEAM CONDENSATE BOILER FEED
GATE VALVE
GAS COCK
CHECK VALVE
BALANCE COCK
CIRCUIT SETTER
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
GLOBE VALVE
BALL VALVE
SOLENOID VALVE
EXPANSION VALVE WITH
THERMOSTATIC BULB
PLUG VALVE
BUTTERFLY VALVE
RELIEF VALVE
HOSE & DRAIN END VALVE
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
TRIPLE DUTY VALVE
GAS PRESSURE REGULATOR
STRAINER (BLOW-OFF)
FLOW DIRECTION
PIPING DROP
PIPING RISE
INLINE PIPING DROP
INLINE PIPING RISE
PIPING TEE
PIPING ELBOW
THERMOMETER
PUMP
UNION
PIPE ANCHOR
PIPE GUIDE
BACK FLOW PREVENTER
PIPE CAP
PIPE BREAK
THERMOMETER WELL
EXPANSION LOOP
EXPANSION COMPENSATOR
FLOAT & THERMOSTATIC STEAM TRAP
INVERTED BUCKET STEAM TRAP
THERMOSTAT
PROGRAMMABLE THERMOSTAT
THERMOSTAT (W/ NIGHT SETBACK)
ROOM SENSOR
HUMIDISTAT
PRESSURE GAUGE
DAMPER (ELECTRIC OPERATION)
DAMPER (PNEUMATIC OPERATION)
DAMPER BLADES
SUPPLY AIR DUCT
EXIST SUPPLY AIR DUCT
RETURN AIR DUCT
EXIST RETURN AIR DUCT
OUTSIDE AIR DUCT
EXIST OUTSIDE AIR DUCT
EXHAUST AIR DUCT
EXIST EXHAUST AIR DUCT
SUPPLY AIR DUCT RISER
RETURN AIR DUCT RISER
OUTSIDE AIR DUCT RISER (AS NOTED)
EXHAUST AIR DUCT
INSULATED DUCTWORK (AS NOTED)
SUPPLY AIR DIFFUSER (SQUARE)
SUPPLY AIR DIFFUSER (INLINE)
TURNING VANES
SURFACE MTD. GRILLE
SUPPLY AIR DIFFUSER (ROUND)
90° TEE W/45° APPROACH
CONICAL TAKE-OFF
CONICAL TAKE-OFF W/ DAMPER
BALANCE DAMPER
RETURN AIR DUCT BOOT
ECCENTRIC REDUCER
CONCENTRIC REDUCER
VERTICAL FIRE DAMPER
EXISTING VERTICAL FIRE DAMPER
HORIZONTAL FIRE DAMPER
EXISTING HORIZONTAL FIRE DAMPER
VERTICAL SMOKE DAMPER
HORIZONTAL SMOKE DAMPER
VERTICAL FIRE / SMOKE DAMPER
HORIZONTAL FIRE / SMOKE DAMPER
DUCT SMOKE DETECTOR, INSTALLED BY M.T.C.,
PROVIDED & WIRED BY E.T.C.
UNIT HEATER
CEILING EXHAUST FAN
ROOF MOUNTED EXHAUST FAN
DEMOLITION
POINT OF CONNECTION BETWEEN NEW AND
EXISTING
POINT OF EXISTING TO REMAIN AND EXISTING
TO BE REMOVED
INDICATES PLAN NOTE
INDICATES DEMOLITION NOTE
DETAIL BUBBLE
DETAIL NUMBER
PAGE LOCATION INDICATES
DIRECTION OF DETAIL SECTION
X
X
XX
XXXX
XX
XXXX
SA
OA
X-OA
X-EA
EA
X-SA
X-RA
RA
SCP
SC
DXS
DXL
HR
CR
CD
CS
DX
CTR
HPR
HS
HPS
CTS
CWR
CWS
S
L
LPS
MPS
HPS
SC (BF)
TAG CFM
NECK REMARKS
SIZE
BT
FT
SD-1 250
8"ø ---
P
H
S
T
T P
T N
M
M
SD
1. EXISTING EQUIPMENT LAYOUT IS SCHEMATIC. EXACT LOCATION OF EXISTING
PIPING AND EQUIPMENT SHALL BE COORDINATED WITH BUILDING STRUCTURE,
EQUIPMENT FURNISHED, ARCHITECTURAL DRAWINGS AND ALL OTHER
TRADES PRIOR TO DEMOLITION.
2. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS, REVISIONS,
AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE STATUTES, ORDINANCES,
CODES OR REGULATIONS OF FEDERAL, STATE, AND LOCAL AUTHORITIES
HAVING JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED.
3. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY OSHA,
UNDERWRITERS LABORATORIES, AMERICAN CODES, ASA, ASHRAE, ARI, NEC,
STATE FIRE INSURANCE REGULATION BODY, NFPA OR OTHERS. THESE
STANDARDS SHALL BE FOLLOWED WHETHER OR NOT INDICATED ON THE
DRAWING AND SPECIFICATIONS.
4. COORDINATE CUTTING AND PATCHING WITH GENERAL CONTRACTOR.
5. ALL BOLD DASHED LINES INDICATE ITEMS TO BE REMOVED UNLESS NOTED BY
KEYNOTE. ALL OTHER EXISTING SYSTEMS SHOWN FOR REFERENCE ONLY.
6. PATCH AND REPAIR ALL FLOOR AND WALL SURFACES LEFT DAMAGED OR
INCOMPLETE FROM REMOVAL OF EXISTING HVAC EQUIPMENT OR OTHER
FIXED ACCESSORIES AND EQUIPMENT WITH MATERIALS TO MATCH EXISTING.
7. NOTATIONS ARE MADE IN VARIOUS PLACES ON THE DRAWINGS TO CALL
ATTENTION TO DEMOLITION WHICH IS REQUIRED. HOWEVER, THESE
DRAWINGS ARE NOT INTENDED TO SHOW EACH AND EVERY ITEM TO BE
REMOVED. CONTRACTOR SHALL REMOVE ALL MATERIALS RELATED TO THEIR
RESPECTIVE TRADES AS REQUIRED TO PERMIT THE CONSTRUCTION OF THE
NEW WORK AS SHOWN.
8. THE GENERAL CONTRACTOR SHALL COORDINATE THE EXTENT OF THE
REQUIRED DEMOLITION OF THE EXISTING BUILDING AS REQUIRED TO
FACILITATE THE CONSTRUCTION OF THE PROJECT AS SHOWN AS PART OF
THIS WORK.
9. ALL DEMOLITION SHALL BE APPROVED BY THE OWNER PRIOR TO
COMMENCEMENT AND SHALL BE PERFORMED UNDER REQUIREMENTS AND
APPROVAL OF THE LOCAL CODE JURISDICTIONS.
10. ASBESTOS ABATEMENT: CONTRACTOR SHALL NOTIFY BUILDING
REPRESENTATIVE IMMEDIATELY WHEN AND IF ANY ITEMS ARE ENCOUNTERED
THAT IN ANY WAY, SHAPE, OR FORM APPEAR TO BE HAZARDOUS OF NATURE.
ASBESTOS ABATEMENT IS NOT PART OF THE SCOPE OF THE DESIGN
PROFESSIONALS DOCUMENTATION OR RESPONSIBILITY TO SURVEY, IDENTIFY,
OR FOR CONSULTATION OF PROPER DISPOSAL.
11. PROTECT ALL EXISTING WORK WHICH IS TO REMAIN AND RESTORE IN AN
APPROVED MANNER ANY SUCH WORK WHICH BECOMES DAMAGED.
12. RUBBISH AND DEBRIS RESULTING FROM THE WORK SHALL BE REMOVED
IMMEDIATELY FROM THE SITE IN A SAFE AND LEGAL MANNER BY THE
CONTRACTOR.
13. DEMOLITION CONTRACTOR SHALL BE RESPONSIBLE TO CONTACT BUILDING
REPRESENTATIVE TO CLARIFY ANY ITEMS NOT SHOWN ON THESE
DOCUMENTS OR SHOWN NOT MATCHING FIELD CONDITIONS.
GENERAL DEMOLITION NOTES
1. THE EXISTING ERT BUILDING (WEST CONVERSION ROOM) HEATING HOT WATER SYSTEM
MUST REMAIN FULLY ACTIVE UNTIL JUNE 1, 2025.
2. CONTRACTOR CAN BEGIN WORK ON THE TEMPORARY HEATING HOT WATER SYSTEM PRIOR
TO JUNE 1, 2025, AS REQUIRED HAVE THE TEMPORARY SYSTEM RUN CONTINUOUSLY FOR 5
DAYS WITH NO ISSUES AND TO BE READY TO DEMOLISH THE EXISTING SYSTEM JUNE 1,
2025. ALL NEW EQUIPMENT MUST BE RECEIVED AND READY TO INSTALL BEFORE
DEMOLITION CAN OCCUR.
2.1. CONTRACTOR TO CONSTRUCT A TEMPORARY HEATING HOT WATER SYSTEM TO FEED
THE EXISTING HEATING HOT WATER SUPPLY AND HEATING HOT WATER RETURN
PIPING DURING CONSTRUCTION.
2.2. THE TEMPORARY HEATING HOT WATER SYSTEM IS TO BE CONSTRUCTED FROM (1)
TEMPORARY BASE MOUNTED PUMP (P-3), (1) SALVAGED HEAT EXCHANGER AND ALL
ASSOCIATED CONTROLS, (1) SALVAGED AIR SEPARATOR, (1) TEMPORARY
CONDENSATE PUMP (CRP-2), AND TEMPORARY PIPING (HEATING SUPPLY, HEATING
RETURN, STEAM, AND STEAM CONDENSATE) AND VALVES AS REQUIRED TO TIE IN THE
EXISTING SYSTEM. THE TEMPORARY HEATING HOT WATER SYSTEM IS TO BE TIED INTO
THE EXISTING SYSTEM DURING A SMALL SHUTDOWN COORDINATED WITH OWNER.
2.3. THE NEW AIR SEPARATOR (AS-2) IS TO BE INSTALLED IN THE LOCATION OF THE
EXISTING AIR SEPARATOR IN THE EXISTING SYSTEM SO THE EXISTING AIR SEPARATOR
CAN BE SALVAGED AND RE-USED FOR THE TEMPORARY HEATING HOT WATER
SYSTEM. THE NEW AIR SEPARATOR (AS-2) IS TO BE INSTALLED IN LOCATION OF
EXISTING SALVAGED AIR SEPARATOR DURING SMALL SHUTDOWN COORDINATED WITH
OWNER.
2.4. CONTRACTOR TO CONSTRUCT TEMPORARY HEATING HOT WATER SYSTEM IN A
CONTRACTOR SUPPLIED STORAGE TRAILER ON THE OUTSIDE OF THE ERT BUILDING.
THE STORAGE TRAILER IS TO BE INSTALLED AS CLOSE AS POSSIBLE TO THE ERT
BUILDING TO ENCLOSE ALL THE TEMPORARY HEATING EQUIPMENT AND TEMPORARY
PIPING TO PROTECT THEM FROM THE WEATHER.
2.5. THE TEMPORARY HEATING HOT WATER SYSTEM MUST RUN CONTINUOUSLY FOR
5-DAYS WITH NO ISSUES BEFORE ANY OF THE EXISTING SYSTEM CAN BEGIN TO BE
DEMOLISHED.
3. SUBSTANTIAL COMPLETION FOR ALL WORK IS TO BE OCTOBER 1, 2025.
4. FINAL COMPLETION FOR ALL WORK IS TO BE OCTOBER 15, 2025
5. ALL NEW EQUIPMENT IS TO HAVE SUBMITTALS PROVIDED/APPROVED AS SOON AS POSSIBLE
ONCE THE CONTRACT CHANGE ORDERED IS ISSUED. ONCE EQUIPMENT SUBMITTALS ARE
PROVIDED/APPROVED EQUIPMENT IS TO BE ORDERED AS SOON AS POSSIBLE.
CONSTRUCTION PHASING SCHEDULE
M-100
DBP
CAT
22295.01
472/22138.ABG
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
2/14/2025 CD SET
MECHANICAL SYMBOLS,
NOTES, ABBREVIATIONS,
AND SCHEDULES
M-300
X-CW
X-HS
X-HR
X-4" CW
X-8" HS
X-8" HR
X-STM
X-PSC
X-6" STM &
X-2-1/2"
PSC IN TUNNEL
X-
HS
X-
HR
X-
PS
C
X-STM
X-P-1
X-P-2
X-XT-1
X-AS
X-HE-2
BT
BT
X-HE-1
BT
X-
HS
X-
HR
X-
PS
C X-
PS
C
X-
ST
M X-
ST
M
X-CW
X-CRP-1
X-2-1/2"
X-2-1/2"
X-6"
X-6"
X-6"
X-2-1/2"
X-8"
X-3"
X-3"
X-
SCX-3/4"
X-8"
X-8"
X-2-1/2"
X-
CW
X-2"
X-6"
X-1-1/2"
X-CONCRETE
PAD (TYP. 2)
CONCRETE
PAD
X-CONTROL
PANEL X-CONTROL
PANEL
X-EF 10
X-4" VTR
DEMOLITION NOTES
CONTRACTOR TO PATCH, PRIME, AND PAINT THE EXISTING DAMAGED
DRYWALL WALL BEHIND THE HEAT EXCHANGERS ONCE THE HEAT
EXCHANGERS ARE REMOVED TO MATCH EXISTING. CONTRACTOR TO
PAINT PATCH AND ENTIRE NORTH WALL WHITE.
DISCONNECT, REMOVE, AND DEMO EXISTING SKID PACKAGE
CONDENSATE RECEIVER TANK/PUMPS, CONTROL PANEL, CONTROLS,
METAL FRAME, CONDENSATE PIPING, VALVES, FITTINGS, CONCRETE
PAD, VENT, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
CONTRACTOR TO REUSE EXISTING VENT ROOF PENETRATION FOR
NEW VENT SHOWN ON NEW DRAWINGS. MODIFY EXISTING ROOF
PENETRATION AS REQUIRED TO BE REUSED.
DISCONNECT, REMOVE, AND SALVAGE EXISTING HEAT EXCHANGER
AND STEAM CONTROL VALVE. DISCONNECT, REMOVE, AND DEMO
EXISTING STEAM PIPING, CONDENSATE PIPING, HEATING SUPPLY
PIPING, HEATING RETURN PIPING, CONTROLS, VALVES, FITTINGS, AND
ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. EXISTING METAL
SUPPORT FRAME TO REMAIN AND BE RE-USED. CONTRACTOR TO SAND
BLAST AND PAINT EXISTING METAL SUPPORT FRAMES PRIOR TO
INSTALL OF NEW HEAT EXCHANGERS.
DISCONNECT, REMOVE, AND SALVAGE EXISTING AIR SEPARATOR.
DISCONNECT, REMOVE, AND DEMO EXISTING, HEATING SUPPLY PIPING,
VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THEIR
ENTIRETY. DISCONNECT, REMOVE, AND DEMO EXISTING COLD WATER
PIPING AND ALL ASSOCIATED ACCESSORIES TO THE LOCATION
SHOWN.
DISCONNECT, REMOVE, AND DEMO EXISTING STEAM PIPING, HEATING
SUPPLY PIPING, HEATING RETURN PIPING, STEAM CONDENSATE
PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES TO
THE EXTENTS SHOWN.
EXISTING PUMPS AND CONCRETE PAD TO REMAIN. DISCONNECT,
REMOVE AND DEMO EXISTING HEATING SUPPLY PIPING, CONTROLS,
VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THEIR
ENTIRETY.
DISCONNECT, REMOVE, AND DEMO EXISTING WEST CONVERSION
ROOM CONTROL PANEL, CONTROLS, PNEUMATIC TUBING, CONTROL
WIRING, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
EXISTING MAINTENANCE BUILDING CONTROL PANEL, AIR DRYER, AIR
COMPRESSOR, CONTROLS, PNEUMATIC TUBING, CONTROL WIRING,
AND ALL ASSOCIATED ACCESSORIES TO REMAIN.
EXISTING EXPANSION TANK, CHEMICAL POT FEEDER, SIDE STREAM
FILTER, AND ALL ASSOCIATED ACCESSORIES TO REMAIN.
EXISTING EXHAUST FAN AND ALL ASSOCIATED ACCESSORIES TO
REMAIN.
EXISTING MAINTENANCE BUILDING INLINE HEATING SUPPLY PUMP,
3-WAY CONTROL VALVE, CONTROLS, PIPING, VALVES, FITTINGS, AND
ALL ASSOCIATED ACCESSORIES TO REMAIN. EXISTING MAINTENANCE
BUILDING INLINE HEATING SUPPLY PUMP, 3-WAY CONTROL VALVE, AND
ALL ASSOCIATED ACCESSORIES ARE NOT SHOWN ON MECHANICAL
ROOM PLAN FOR CLARITY.
DISCONNECT, REMOVE, AND DEMO EXISTING STEAM PRESSURE
REDUCING VALVE, PRESSURE RELIEF VALVE, STEAM PIPING, VENT
PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN
THEIR ENTIRETY. CONTRACTOR TO REUSE EXISTING VENT ROOF
PENETRATION FOR NEW VENT SHOWN ON NEW DRAWINGS. MODIFY
EXISTING ROOF PENETRATION AS REQUIRED TO BE REUSED.
DISCONNECT, REMOVE, AND SALVAGE EXISTING METAL FENCING
ENCLOSURE AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
CONTRACTOR TO PATCH EXISTING FLOOR AS REQUIRED TO MATCH
EXISTING WHERE SUPPORTS WERE INSTALLED. THE SALVAGED METAL
FENCING ENCLOSURE AND ALL ASSOCIATED ACCESSORIES ARE TO BE
TURNED OVER TO THE OWNER.
GENERAL DEMOLITION NOTES
1. BEFORE ROUTING TEMPORARY STEAM PIPING, TEMPORARY STEAM
CONDENSATE PIPING, TEMPORARY HEATING SUPPLY PIPING, TEMPORARY
HEATING RETURN PIPING, CONTRACTOR TO DISCONNECT, REMOVE, AND
SALVAGE STEEL PANELING CONSTRUCTION OF EXTERIOR WALL. TEMPORARY
BOARDING SHALL BE USED TO RE-ENCLOSE THE BUILDING. PENETRATIONS
FOR THE TEMPORARY PIPING SHALL BE MADE IN THE TEMPORARY BOARDING.
TEMPORARY PIPING WILL BE USED TO KEEP THE EXISTING SYSTEM ACTIVE
DURING CONSTRUCTION.
2. CONTRACTOR TO USE SALVAGED HEAT EXCHANGER, NEW BASE MOUNTED
PUMP (P-3), SALVAGED STEAM CONTROL VALVE, SALVAGED AIR SEPARATOR,
NEW TEMPORARY CONDENSATE PUMP (CRP-2), EXISTING EXPANSION TANK,
NEW DDC CONTROL PANEL, AND ALL ASSOCIATED ACCESSORIES AS
REQUIRED TO CREATE TEMPORARY HEATING TO FEED THE EXISTING
HEATING HOT WATER WATER SUPPLY IN THE ERT BUILDING DURING
CONSTRUCTION. CONTRACTOR TO INSTALL NEW TEMPORARY HEATING HOT
WATER SUPPLY PIPING, HEATING HOT WATER RETURN PIPING, AND ALL
ASSOCIATED ACCESSORIES AS REQUIRED TO CONNECT THE TEMPORARY
SALVAGED HEAT EXCHANGER, NEW PUMP PUMP, AND SALVAGED AIR
SEPARATOR TO THE EXISTING HEATING HOT SUPPLY AND HEATING HOT
WATER RETURN RISERS. CONTRACTOR TO INSTALL NEW TEMPORARY STEAM
PIPING, STEAM CONDENSATE PIPING, AND ALL ASSOCIATED ACCESSORIES AS
REQUIRED TO CONNECT THE TEMPORARY SALVAGED HEAT EXCHANGER AND
TEMPORARY CONDENSATE PUMP TO THE EXISTING STEAM AND STEAM
CONDENSATE RISERS. CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT
THE TEMPORARY HEATING SYSTEM IS OPERATIONAL AND ONLINE FOR THE
DURATION OF CONSTRUCTION. NEW TEMPORARY HEATING SYSTEM IS TO BE
INSTALLED OUTSIDE THE ERT BUILDING IN A STORAGE CONTAINER WITH
DOORS ON BOTH ENDS. STORAGE CONTAINER IS TO BE INSTALLED TIGHT TO
THE ERT BUILDING. CONNECT NEW TEMPORARY HEATING SYSTEM DDC
CONTROL PANEL TO DARK NETWORK IT RACK WITH PURPLE CAT-6 CABLE(S)
AS REQUIRED TO CONNECT TO THE EXISTING STARNET 2.0 SYSTEM.
CONTRACTOR TO HIRE AND COORDINATE CONNECTION TO DARK NETWORK
IT RACK WITH BRET EMERSON FROM COMMTECH DESIGN ( PHONE
616-446-4545).
3. CONTRACTOR IS RESPONSIBLE FOR PROVIDING TEMPORARY HEAT AND
DOMESTIC HOT WATER THROUGHOUT THE CONSTRUCTION DURATION
BESIDES SMALL CHANGEOVER SHUTDOWNS.
4. DISCONNECT, REMOVE, AND DEMO EXISTING LAY-IN CEILING, CEILING GRID,
CEILING TILES, AND ALL ASSOCIATED ACCESSORIES TO THE EXTENTS SHOWN
ON DRAWING M-800. TEMPORARY SUPPORT ALL CONDUIT AND OTHER
EQUIPMENT THAT IS SECURED TO THE EXISTING CEILING GRID/CEILING TILES
AS REQUIRED.
X-4" VTR
X-HE-1
X-CRP-1
X-CONCRETE
PAD
X-HE-2
X-AS
X-PSC
X-XT
X-PSC X-PSC
X-
PS
C
X-2-1/2"
X-2-1/2" X-2-1/2" X-2-1/2"
X- V
X- V
X-4"
BT
X-STMX-STMX-STM
BT
X-
SC
X-SC
X-SC
X-3"
X-3"
X-3"
BT
X-
SC
X-3/4"
X-
ST
M
X-
ST
M
P
P
P
P
X-HR X-HR X-HR
X-HS
X-
HSX-
HR
X-
HSX-
HR
X-P-1 X-P-2
X-SSF X-CHEMICAL
POT FEEDER
X-
HS
X-
HS X-
HS
X-
HS
X-
HR
X-
HR
X-HS
X-
HS
X-
HS
X-
HS
X-
HS
X-4" VTR
X-HS
X-P X-
SCX-
SC
X-2-WAY CV (TYP.)
X-PRV
X-PRESSURE
RELIEF VALVE
(TYP.)
X-1/2"
X-8"
X-8" X-8"
X-8"
X-8" X-8" X-8"
X-PSC
X-STM
X-STEAM TRAP
(TYP.)
X-STRAINER
(TYP.)
X-CHECK
VALVE (TYP.) X-DRIP LEG
(TYP.)
X-UNION
(TYP.)
X-CONCRETE
PAD
X-6" X-6"
X-6" X-6" X-6"
X-6" X-6"
X-2-1/2"
X-PRESSURE
GAUGE (TYP.)
X-SHUTOFF
VALVE (TYP.)
P P
X-8" X-8"
P P
X-1/2"
P X-1-1/2"
X-
CW
X-2"
X-2" X-BVPX-PRV
X-2" CW
X-8" X-8" HR
X-8" HS
X-6"
X-3-WAY CVX-P
X-1-1/2"
HS & HR
METAL FRAME2
X-METAL
FRAME (TYP.)
3 3
6 6
12 12
3 3 3
X-PSC
X-STM
M-300
ERT BUILDING FIRST FLOOR
PLAN - MECHANICAL
DEMOLITION
DBP
CAT
N ERT BUILDING FIRST FLOOR PLAN - MECHANICAL DEMOLITION
1 ERT BUILDING MECHANICAL ROOM - MECHANICAL DEMOLITION
SCALE: 1/4" = 1'-0"
22295.01
472/22138.ABG
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
2/14/2025 CD SET
SCALE: 1/8" = 1'-0"
0 1 5 10 20
2 ERT BUILDING MECHANICAL ROOM - PIPING DEMOLITION DIAGRAM
SCALE: NTS
M-600
X-CW
X-HS
X-HR
X-4" CW
X-8" HS
X-8" HR
X-STM
X-PSC
X-6" STM &
X-2-1/2"
PSC IN TUNNEL
X-P-1
X-P-2
X-XT-1
X-CW
X-
CW
X-2"
X-CONCRETE
PAD (TYP. 2)
X-CONTROL
PANEL
X-EF
HSHR
PS
C
STM
X-P-1
X-P-2
AS-2
BT
BT
BT
HS
HR
PS
C
ST
M
ST
M
CRP-1
SC
CONCRETE
PAD
SC
HX-1
HX-2
PRV-2
DDC CONTROL
PANEL
2-1/2"
6"
6"
6"
2-1/2"
8"
3"
3"
3/4"
8"
8"
2-1/2"
6"
1-1/2"
4" VTR
PRV-112
STORAGE TRAILER
LOCATION
MECHANICAL KEY NOTES
INSTALL NEW 2-WAY MODULATING STEAM CONTROL VALVE (6,770 LB/HR). AND ALL ASSOCIATED ACCESSORIES IN
THE LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
INSTALL NEW 2-WAY MODULATING STEAM CONTROL VALVE (3,385 LB/HR) AND ALL ASSOCIATED ACCESSORIES IN
THE LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
INSTALL NEW 2-WAY, 2-POSITION CONTROL VALVE AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN
PER THE MANUFACTURERS INSTALLATION INSTRUCTIONS.
INSTALL NEW SIDE STREAM FILTER MEDIA IN THE EXISTING SIDE STREAM FILTER (FLOW-MAX FILTER MODEL #:
MJCH170) PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
INSTALL NEW DDC TOUCHSCREEN CONTROL PANEL IN LOCATION SHOWN. CONNECT NEW DDC CONTROL PANEL TO DARK NETWORK IT RACK WITH PURPLE CAT-6 CABLE(S) AS REQUIRED TO CONNECT TO THE EXISTING STARNET
2.0 SYSTEM. CONTRACTOR TO HIRE AND COORDINATE CONNECTION TO DARK NETWORK IT RACK WITH BRET
EMERSON FROM COMMTECH DESIGN ( PHONE 616-446-4545).
CONNECT NEW HEATING SUPPLY PIPING, HEATING RETURN PIPING, STEAM PIPING, STEAM CONDENSATE PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES TO EXISTING PIPING. MODIFY EXISTING PIPING AS
REQUIRED FOR NEW CONNECTION.
INSTALL NEW CONDENSATE RECEIVER TANK/PUMP SKID, STEAM CONDENSATE PIPING, VENT PIPING, CONTROLS, CONTROL WIRING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. INSTALL NEW CONDENSATE RECEIVER TANK/PUMP SKID ON 4" INCH THICK CONCRETE PAD WITH 4" OVERLAP IN ALL DIRECTIONS. MODIFY EXISTING VENT ROOF PENETRATION TO BE REUSED FOR NEW VENT. PATCH ROOF TO MATCH EXISTING, SEAL WATER TIGHT, AND MAINTAIN ALL EXISTING ROOF WARRANTIES. CONNECT CONDENSATE RECEIVER TANK/PUMP SKID TO NEW DDC CONTROL PANEL.
INSTALL NEW HEAT EXCHANGER, STEAM PIPING, STEAM CONDENSATE PIPING, HEATING SUPPLY PIPING, HEATING RETURN PIPING, CONTROLS, CONTROL WIRING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. INSTALL NEW HEAT EXCHANGER ON EXISTING METAL SUPPORT FRAME. MODIFY METAL SUPPORT FRAME AS REQUIRED. CONNECT NEW HEAT
EXCHANGER CONTROLS AND CONTROL VALVES TO NEW DDC CONTROL PANEL.
INSTALL NEW AIR SEPARATOR, HEATING SUPPLY PIPING, COLD WATER PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
INSTALL NEW AIR SEPARATOR ON 4" THICK CONCRETE PAD WITH 4" OVERLAP IN ALL DIRECTIONS.
CONNECT NEW HEATING SUPPLY PIPING AND ALL ASSOCIATED ACCESSORIES TO EXISTING PUMPS AND EXISTING
EXPANSION TANK IN THE LOCATION SHOWN.
INSTALL NEW VFD, CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS TO CONNECT THE EXISTING PUMPS TO THE NEW DDC CONTROL
PANEL.
INSTALL NEW PRESSURE REDUCING VALVE, PRESSURE RELIEF VALVE, AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. MODIFY EXISTING VENT ROOF PENETRATION TO BE REUSED FOR NEW VENT. PATCH ROOF TO MATCH EXISTING, SEAL WATER TIGHT, AND
MAINTAIN ALL EXISTING ROOF WARRANTIES.
INSTALL NEW MAKE UP WATER METER AND ALL ASSOCIATED IN NEW MAKE UP COLD WATER PIPING. CONNECT
NEW MAKE UP WATER METER TO BAS.
GENERAL MECHANICAL NOTES
1. BEFORE ROUTING TEMPORARY STEAM PIPING, TEMPORARY STEAM CONDENSATE PIPING, TEMPORARY
HEATING SUPPLY PIPING, TEMPORARY HEATING RETURN PIPING, CONTRACTOR TO DISCONNECT, REMOVE, AND SALVAGE STEEL PANELING CONSTRUCTION OF EXTERIOR WALL. TEMPORARY BOARDING SHALL BE USED TO RE-ENCLOSE THE BUILDING. PENETRATIONS FOR THE TEMPORARY PIPING SHALL BE MADE IN THE TEMPORARY BOARDING. TEMPORARY PIPING WILL BE USED TO KEEP THE EXISTING SYSTEM ACTIVE DURING
CONSTRUCTION.
2. CONTRACTOR TO USE SALVAGED HEAT EXCHANGER, NEW BASE MOUNTED PUMP (P-3), SALVAGED STEAM CONTROL VALVE, SALVAGED AIR SEPARATOR, NEW TEMPORARY CONDENSATE PUMP (CRP-2), EXISTING EXPANSION TANK, NEW DDC CONTROL PANEL, AND ALL ASSOCIATED ACCESSORIES AS REQUIRED TO CREATE TEMPORARY HEATING TO FEED THE EXISTING HEATING HOT WATER WATER SUPPLY IN THE ERT BUILDING DURING CONSTRUCTION. CONTRACTOR TO INSTALL NEW TEMPORARY HEATING HOT WATER SUPPLY PIPING, HEATING HOT WATER RETURN PIPING, AND ALL ASSOCIATED ACCESSORIES AS REQUIRED TO
CONNECT THE TEMPORARY SALVAGED HEAT EXCHANGER, NEW PUMP PUMP, AND SALVAGED AIR
SEPARATOR TO THE EXISTING HEATING HOT SUPPLY AND HEATING HOT WATER RETURN RISERS.
CONTRACTOR TO INSTALL NEW TEMPORARY STEAM PIPING, STEAM CONDENSATE PIPING, AND ALL ASSOCIATED ACCESSORIES AS REQUIRED TO CONNECT THE TEMPORARY SALVAGED HEAT EXCHANGER AND TEMPORARY CONDENSATE PUMP TO THE EXISTING STEAM AND STEAM CONDENSATE RISERS. CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT THE TEMPORARY HEATING SYSTEM IS OPERATIONAL AND ONLINE FOR THE DURATION OF CONSTRUCTION. NEW TEMPORARY HEATING SYSTEM IS TO BE INSTALLED OUTSIDE THE ERT BUILDING IN A STORAGE CONTAINER WITH DOORS ON BOTH ENDS. STORAGE CONTAINER IS TO BE INSTALLED TIGHT TO THE ERT BUILDING. CONNECT NEW TEMPORARY HEATING SYSTEM DDC CONTROL PANEL TO DARK NETWORK IT RACK WITH PURPLE CAT-6 CABLE(S) AS REQUIRED TO CONNECT TO THE EXISTING STARNET 2.0 SYSTEM. CONTRACTOR TO HIRE AND COORDINATE CONNECTION TO DARK NETWORK
IT RACK WITH BRET EMERSON FROM COMMTECH DESIGN ( PHONE 616-446-4545).
3. CONTRACTOR IS RESPONSIBLE FOR PROVIDING TEMPORARY HEAT AND DOMESTIC HOT WATER
THROUGHOUT THE CONSTRUCTION DURATION BESIDES SMALL CHANGEOVER SHUTDOWNS.
4. ONCE NEW SYSTEM IS COMPLETE AND READY TO BE ACTIVATED, REMOVE TEMPORARY HEATING HOT WATER SUPPLY PIPING, HEATING HOT WATER RETURN PIPING, STEAM PIPING, STEAM CONDENSATE PIPING, AND ALL ASSOCIATED ACCESSORIES. CONTRACTOR TO REMOVE TEMPORARY BOARDING AND REINSTALL SALVAGE STEEL PANELING CONSTRUCTION OF WALL. CONTRACTOR IS RESPONSIBLE FOR THE REPLACEMENT OF ANY
DAMAGED STEEL PANELING.
5. INSTALL NEW STEAM PIPING, STEAM CONDENSATE PIPING, HEATING SUPPLY PIPING, HEATING RETURN PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN. CONNECT NEW PIPING TO EXISTING PIPING WHERE SHOWN. MODIFY EXISTING PIPING AS REQUIRED FOR NEW CONNECTION.
6. INSTALL NEW LAY-IN CEILING, CEILING, GRID, CEILING TILES, AND ALL ASSOCIATED ACCESSORIES PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS TO THE EXTENTS SHOW ON THE M-800 DRAWING.
RE-INSTALL ALL TEMPORARY MOUNTED CONDUIT AND ACCESSORIES AS REQUIRED.
7. ALL NEW SHUTOFF VALVES ARE TO BE GATE VALVES.
8. AFTER TEMPORARY HEAT IS NOT LONGER REQUIRED, DISCONNECT, REMOVE AND SALVAGE PUMP (P-3) AND
CONDENSATE RECEIVER PUMP (CRP-2) AND HAND OVER TO OVER.
9. ANY ROOF PENETRATIONS/MODIFICATIONS REQUIRED FOR NEW THROUGH ROOF VENTS ARE TO BE PATCHED TO MATCH EXISTING, SEALED WATER TIGHT, AND MAINTAIN ALL EXISTING ROOF WARRANTIES.
HX-1
CRP-1
HX-2
AS-2
BT
P
P
P P
PP
P
4" VTR
CONCRETE
PAD
PSC PSC PSC
PS
C
2-1/2"
2-1/2" 2-1/2" 2-1/2"
V V
4"
STMSTMSTM
SC
SC
SC
3"
3" 3"
SC
3/4"
ST
M
ST
M
HR HR HR
HS
HSHRHSHR HS
HS
HS
HS
4" VTR
HS
SCSC
PRV-1
PRESSURE
RELIEF VALVE
(TYP.)
8"
8"
8"
8"
8" 8" 8"
PSC
STM
STEAM TRAP
(TYP.)
STRAINER
(TYP.)
CHECK VALVE
(TYP.) DRIP LEG
(TYP.)
UNION
(TYP.)
6" 6"
6" 6" 6"
2-1/2"
PRESSURE
GAUGE (TYP.)
CIRCUIT
SETTER
(TYP.)
8" 8"
CW
2"
8"
6"
METAL SKID
FRAME
THERMOMETER
(TYP.)
P/T SENSOR
PORT (TYP.)
SHUTOFF
VALVE (TYP.)
X-XT
X-P-1 X-P-2
X-SSF X-CHEMICAL
POT FEEDER
X-
HS
X-
HS
X-
HR
X-
HR
X-1/2"
X-CONCRETE
PAD
X-1/2"
X-2" X-BVPX-PRV
X-2" CW
X-8" HR
X-8" HS
X-3-WAY CVX-P
X-1-1/2"
HS & HR
X-METAL
FRAME (TYP.)
X-PSC
X-STM
PUMP
FLEX CONNECTOR (TYP.)
1-1/2"
TO FLOOR
DRAIN (TYP.)
CONCRETE
PAD
11 11
6" (TYP.)
BT
3/4"
3/4"
P P
8 8 8
3"
BT
3"
3"3"
3"
HOSE END
DRAIN VALVE
8" HS & HR
TEMP.
HEATING
SYSTEM
CONNECTIONS
6" (TYP.)
HS
PP
HS
HS
SUCTION DIFFUSER WITH
STRAINER (TYP.)
2 3
NCNC
NC PRV-2
3"3"
FT FT
13 M
2 STEAM PRESSURE REDUCING VALVE DETAIL - NEW
SCALE: NTS
PRV-2
P
4" VTR
SHUTOFF
VALVE (TYP.)
STRAINER
(TYP.)
PRESSURE
GAUGE (TYP.)REDUCER (TYP.)
PIPING KEY NOTES
INSTALL NEW PRESSURE RELIEF VALVE IN THE
LOCATION SHOWN.
PRESSURE RELIEF VALVE SPECS:
MANUFACTURER: SPIRAX SARCO
MODEL: SV74
SIZE: 4"
SET PRESSURE: 100 PSI
INSTALL NEW PRV-1 IN THE LOCATION SHOWN.
PRESSURE REDUCING VALVE SPECS:
MANUFACTURER: SPIRAX SARCO
MODEL: 25P
INLET PRESSURE: 165 PSIG
OUTLET PRESSURE: 90 PSIG
CAPACITY: 20,310 LB/HR
INSTALL NEW PRV-2 IN THE LOCATION SHOWN.
PRESSURE REDUCING VALVE SPECS:
MANUFACTURER: SPIRAX SARCO
MODEL: 25P
INLET PRESSURE: 165 PSIG
OUTLET PRESSURE: 90 PSIG
CAPACITY: 20,310 LB/HR
STEAM PRV NOTES:
1. ALLOW AT LEAST 10 PIPE DIAMETERS OF
STRAIGHT PIPE BEFORE AND AFTER PRV.
2. ALL PIPING VALVING ETC. ON HIGH PRESSURE
SIDE OF PRV'S SHALL BE WELDED OR FLANGED.
3. ALL ACCESSORY PIPING ON HIGH PRESSURE
SIDE OF PRV'S SHALL BE SCREWED AND BACK
WELDED.
4. TOTAL PRV CAPACITY 20,310# FOR INLET
PRESSURE OF 165 PSI AND OUTLET PRESSURE
OF 90 PSI.
6" STM
6" STM
PRESSURE
RELIEF VALVE 6" STM NC PRV-1
P
P
STEAM PIPING ACCESSORIS SPECIFICATION
1.1 Y-PATTERN STRAINERS:
A. BODY: ASTM A 126, CLASS B CAST IRON, WITH BOLTED COVER AND BOTTOM DRAIN CONNECTION.
B. END CONNECTIONS: THREADED ENDS FOR STRAINERS NPS 2 AND SMALLER; FLANGED ENDS FOR STRAINERS NPS 2-1/2 AND LARGER.
C. STRAINER SCREEN: STAINLESS-STEEL, 20 MESH STRAINER, AND PERFORATED STAINLESS-STEEL BASKET WITH 50 PERCENT FREE AREA.
D. TAPPED BLOWOFF PLUG.
E. CWP RATING: 250-PSIG WORKING STEAM PRESSURE.
1.2 PRESSURE-REDUCING VALVES
A. SIZE, CAPACITY, AND PRESSURE RATING: FACTORY SET FOR INLET AND OUTLET PRESSURES INDICATED.
B. DESCRIPTION: PILOT-ACTUATED, DIAPHRAGM TYPE, WITH ADJUSTABLE PRESSURE RANGE AND POSITIVE SHUTOFF.
C. BODY: CAST IRON.
D. END CONNECTIONS: FLANGED CONNECTIONS FOR VALVES NPS 2-1/2 AND LARGER.
E. TRIM: HARDENED STAINLESS STEEL.
F. HEAD AND SEAT: REPLACEABLE, MAIN HEAD STEM GUIDE FITTED WITH FLUSHING AND PRESSURE-ARRESTING DEVICE COVER OVER PILOT
DIAPHRAGM.
G. GASKETS: NON-ASBESTOS MATERIALS.
1.3 PRESSURE GAGES
A. DIRECT-MOUNTED, METAL-CASE, DIAL-TYPE PRESSURE GAGES:
1. STANDARD: ASME B40.100.
2. CASE: LIQUID-FILLED TYPE; CAST ALUMINUM OR DRAWN STEEL 4-1/2-INCH NOMINAL DIAMETER.
3. PRESSURE-ELEMENT ASSEMBLY: BOURDON TUBE UNLESS OTHERWISE INDICATED.
4. PRESSURE CONNECTION: BRASS, WITH NPS 1/4, ASME B1.20.1 PIPE THREADS AND BOTTOM-OUTLET TYPE UNLESS BACK-OUTLET TYPE IS
INDICATED.
5. MOVEMENT: MECHANICAL, WITH LINK TO PRESSURE ELEMENT AND CONNECTION TO POINTER.
6. DIAL: NONREFLECTIVE ALUMINUM WITH PERMANENTLY ETCHED SCALE MARKINGS GRADUATED IN PSI.
7. POINTER: DARK-COLORED METAL.
8. WINDOW: PLASTIC.
9. RING: STAINLESS STEEL.
10. ACCURACY: GRADE A, PLUS OR MINUS 1 PERCENT OF MIDDLE HALF OF SCALE RANGE.
1.4 PRESSURE GAGE ATTACHMENTS
A. SNUBBERS: ASME B40.100, BRASS; WITH NPS 1/4, ASME B1.20.1 PIPE THREADS AND POROUS-METAL-TYPE SURGE-DAMPENING DEVICE. INCLUDE
EXTENSION FOR USE ON INSULATED PIPING.
B. SIPHONS: LOOP-SHAPED SECTION OF BRASS PIPE WITH NPS 1/4 PIPE THREADS.
C. VALVES: BRASS BALL, WITH NPS 1/4, ASME B1.20.1 PIPE THREADS.
M-600
ERT BUILDING FIRST FLOOR
PLAN - MECHANICAL NEW
DBP
CAT
N ERT BUILDING FIRST FLOOR PLAN - MECHANICAL NEW
1 ERT BUILDING MECHANICAL ROOM - MECHANICAL NEW
SCALE: 1/4" = 1'-0"
22295.01
472/22138.ABG
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
2/14/2025 CD SET
SCALE: 1/8" = 1'-0"
0 1 5 10 20
3 ERT BUILDING MECHANICAL ROOM - PIPING NEW DIAGRAM
SCALE: NTS
DEMOLITION NOTES
DISCONNECT, REMOVE, AND DEMO EXISTING LAY-IN CEILING, CEILING
GRID, CEILING TILES, SUPPORTS, AND ALL ASSOCIATED ACCESSORIES
IN THEIR ENTIRETY. EXISTING HIGHLIGHTED SPACE CONTAINING LAY-IN
CEILING THAT IS TO BE DEMOLISHED IS ROUGHLY 1700 SQUARE FEET.
CONRACTOR TO REMOVE AND SALVATE EXISTING LIGHTING, WIRE,
CONDUIT, AND ALL ASSOCIATED ACCESORIES AS REQUIRED TO
REMOVE EXISTING LAY-IN CEILING AND BE RE-INSTALLED AFTER NEW
LAY-IN CEILING IS IN PLACE.
MECHANICAL KEY NOTES
INSTALL NEW LAY-IN CEILING, CEILING GRID, CEILING TILES,
SUPPORTS, AND ALL ASSOCIATED ACCESSORIES IN THE
HIGHLIGHTED AREA SHOWN.HIGHLIGHTED SPACE SHOWN FOR
INSTALLATION OF NEW LAY-IN CEILING THAT IS IS ROUGHLY 1700
SQUARE FEET. NEW LAY IN CEILING GRID AND CEILING TILES
ARE TO BE 2' x 4'. NEW CEILING TILES ARE BE BASED ON
ARMSTRONG GRENOBLE OR APPROVED EQUAL. INSTALL NEW
CEILING AT EXISTING CEILING HEIGHT. RE-INSTALL ALL
SALVAGED LIGHTING, CONDUIT, WIRE, AND ALL ASSOCAITED
ACCESSORIES TO MATCH THE LIGHTING ORIENTATION PRIOR TO
CONSTRUCTION.
WALLS ARE NOT FULL LENGTH UP TO LAY-IN CEILING.
1 1
1 1
1. ACOUSTICAL CEILING UNITS - GENERAL
1.1.STANDARD FOR ACOUSTICAL CEILING UNITS: PROVIDE UNITS
CONFORMING TO APPLICABLE REQUIREMENTS OF ASTM E 1264
FOR CLASS A MATERIALS.
2. CEILING SUSPENSION SYSTEMS - GENERAL
2.1.ATTACHMENT DEVICES FOR SUSPENSION SYSTEM:
2.1.1. ANCHORS AND INTERMEDIATE SUPPORT MEMBERS:
PROVIDE SIZES CAPABLE OF SUSTAINING 5 TIMES THE
LOAD-CARRYING CAPABILITIES SHOWN IN ASTM C 635,TABLE
1, “DIRECT HUNG” COLUMN.
2.1.2. DECK INSERTS AND HANGER CLIPS: FABRICATE FROM
STAINLESS STEEL.
2.1.3. HANGER WIRE: STAINLESS STEEL WIRE, ASTM A 641,
SOFT-TEMPER, WITH CLASS 1 COATING, MINIMUM 12 GA.
(0.106 INCH DIAMETER)
3. EDGE MOLDINGS AND TRIM:
3.1.METAL: PROVIDE INDICATED PROFILES. WHERE PROFILES ARE
NOT INDICATED, PROVIDE MOLDING WITH PROFILES SUITED TO
EDGE PROFILES OF ACOUSTICAL UNITS AND SUSPENSION
MEMBERS.
4. LAY-IN ACOUSTICAL CEILING SYSTEM
4.1.ACOUSTICAL PANELS: ARMSTRONG GRENOBLE, WHITE
4.1.1. SUBSTITUTIONS: EQUIVALENT PRODUCTS BY OTHER
MANUFACTURERS WILL BE CONSIDERED. THE ENGINEER
WILL BE THE SOLE JUDGE OF EQUIVALENCE.
4.1.2. SIZE: 24 X 48
4.1.3. EDGE PROFILE: SQUARE
4.1.4. COLOR: WHITE
4.1.5. PROVIDE 4 CASES FOR ATTIC STOCK.
4.2.EXPOSED GRID: PAINTED ALUMINUM WITH SPECIAL STAINLESS
STEEL LOCKING CLIPS
4.2.1. PROFILE: SINGLE-WEB TEE, 15/16”
4.2.2. STRUCTURAL CLASSIFICATION (ASTM C 635): INTERMEDIATE
DUTY SYSTEM
5. INSTALLATION
5.1. SUSPENSION SYSTEM INSTALLATION
5.1.1. GENERAL:
5.1.1.1. CONFORM TO THE REQUIREMENTS OF ASTM C 636,
MANUFACTURER'S INSTALLATION INSTRUCTIONS AND
GOVERNING REGULATIONS.
5.1.1.2. INSTALL HANGERS PLUMB AND SUPPORTED SOLELY
BY BUILDING STRUCTURE OR CARRYING CHANNELS.
DO NOT ALLOW HANGERS TO CONTACT ANY OBJECTS
OR MATERIALS IN CEILING PLENUM WHICH ARE NOT
ACTUAL COMPONENTS OF CEILING SYSTEM.
5.1.1.3. DO NOT ATTACH HANGERS TO PIPING, CONDUIT, OR
DUCT. PROVIDE CARRYING CHANNEL TRAPEZE
SUPPORT WHERE OBSTRUCTION CANNOT BE AVOIDED
BY SPLAYING HANGER 45 DEGREES FROM VERTICAL
OR LESS.
5.1.1.4. LEVEL CEILING SUSPENSION SYSTEM TO TOLERANCE
OF 1/8 INCH IN 12 FEET. BENDING OR KINKING OF
HANGERS IS NOT ALLOWED.
5.1.2. INDIRECT HUNG SUSPENSION: INSTALL CARRYING
CHANNELS AT 48 INCHES ON CENTER UNLESS INDICATED
OTHERWISE. USE CHANNELS LARGER THAN MINIMUM SIZE (1
½ INCH) OR DOUBLE CHANNELS TO MAINTAIN DEFLECTION
LIMITATION OF 1/360 OF SPAN OR LESS FOR LOADING
INDICATED.
5.2. TRIM INSTALLATION
5.2.1. INSTALL EDGE MOLDINGS AND TRIM UNITS AT ACOUSTICAL
CEILING BORDERS, AT LOCATIONS INDICATED, AND WHERE
REQUIRED TO COVER ACOUSTICAL UNIT EDGES.
FACE-RIVETING OF TRIM AND MOLDINGS IS NOT ALLOWED.
5.3. LAY-IN PANEL INSTALLATION
5.3.1. PANEL INSTALLATIONS: INSTALL ACOUSTICAL PANELS FOR
ACCURATE FIT WITH SUSPENSION SYSTEM AND TRIM
MEMBERS. SCRIBE AND CUT PANELS AT CEILING PERIMETER
AND AT OBSTRUCTIONS TO PROVIDE NEAT, PRECISE-FIT,
SQUARE EDGE PANEL INSTALLATION. PROVIDE
INSTALLATION WITH PANEL EDGES THAT ARE HIDDEN FROM
VIEW BY SUSPENSION MEMBERS OR TRIM.
GENERAL CEILING NOTES
M-800
DBP
CAT
22295.01
472/22138.ABG
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
2/14/2025 CD SET
MECHANICAL DETAILS
N ERT BUILDING MECHANICAL ROOM - CEILING REPLACMENT
SCALE: 1/8" = 1'-0"
0 1 5 10 20
J
PP
WH
D
J
J
EBBH
ECH
S
F
B
UNO
UFD
BD
WM
PM
OR
1,3
NUMBER
T
NF
F
FC
F
IC
TC
H
T
TS
CT
PC
WW
G EOL
ANN
FACP
TTDESIGNATIONS
FIRE ALARM
CONTROL
SERVICE and EQUIPMENT
SOUND and SIGNAL
MECHANICAL
CIRCUITRY and RACEWAYS
SWITCHES
FIXTURES
OUTLETS
MD
J
I
M
C
S
V
DH
ELECTRICAL SYMBOLS LEGEND
V
FCPS
M
C
DC
M
B
KP
SSCP
CCTV
S
VI
AV
B
X
X
X
NURSE CALL
NCC
M
P A
L
B1
B2
SRS
S D
S
C
H
CR
SS
AS
TS
OS1
OS3
PP
OS2
OS4
OS5
OC
SINGLE RECEPTACLE (120 VOLT)
DUPLEX RECEPTACLE
SWITCHED RECEPTACLE
HALF SWITCHED RECEPTACLE
DOUBLE DUPLEX RECEPTACLE
FLUSH FLOOR BOX
SURFACE FLOOR BOX
SPECIAL EQUIPMENT RECEPTACLE
TELEPHONE OUTLET
DATA OUTLET
TELEPHONE / DATA OUTLET
POWER POLE
JUNCTION BOX
WALL JUNCTION BOX
PULL (JUNCTION) BOX
UNDERFLOOR JUNCTION BOX
FIXTURE
STRIP FIXTURE
FIXTURE ON EMERGENCY CIRCUIT
INGRADE FIXTURE
SPOTLIGHT (number of heads shown)
EXIT FIXTURE (face & direction as shown)
WALL MOUNT FIXTURE
DOWN LIGHT
TRACK & FIXTURE
STREET TYPE POLE FIXTURE
POLE MOUNTED FIXTURE
EXTERIOR WALL MOUNTED FIXTURE
WALLPACK FIXTURE
SPECIAL PURPOSE FIXTURE
HIGH BAY
EMERGENCY EGRESS LIGHT
(number of heads shown)
DOCK LIGHT
SINGLE-POLE SWITCH
THREE-WAY SWITCH
FOUR-WAY SWITCH
SWITCH WITH PILOT LIGHT
THERMAL OVERLOAD SWITCH
MANUAL MOTOR SWITCH
KEY SWITCH
DIMMER SWITCH
SINGLE PHASE MOTOR
THREE PHASE MOTOR
RESISTANCE HEATER, KW SHOWN
PIPE TRACE HEATER
ELECTRIC UNIT HEATER
ELECTRIC BASEBOARD HEATER
ELECTRIC CABINET HEATER
ELECTRIC WATER HEATER
NURSE CALL CONTROLLER
MASTER STATION
EMERGENCY PULL STATION
PENDENT INTERFACE
BED / LIGHT INTERFACE
SINGLE BED STATION
DUAL BED STATION
DOME LIGHT
STAFF REGISTER STATION
STAFF STATION
DUTY STATION
DEMOLITION NOTE
PLAN NOTE
ADDENDUM NOTE
EQUIPMENT DESIGNATION
UNLESS NOTED OTHERWISE
CONDUIT INSTALLED (specify method)
CONDUIT INSTALLED (specify method)
CONDUIT INSTALLED (specify method)
CIRCUIT UP
CIRCUIT DOWN
HOME RUN (with circuit numbers)
CONDUCTORS (ground, neutral, phase, switch leg, two travelers)
END OF CONDUIT RUN
END OF RUN, CAP AND STAKE
"RUN CONTINUES" INDICATION
FLEXIBLE PIGTAILS/CONNECTIONS
WIREMOLD AS SPECIFIED
PLUGMOLD AS SPECIFIED
BUS DUCT
UNDERFLOOR DUCT
SPEAKER
WALL MOUNTED SPEAKER
WALL MOUNTED SPEAKER / CLOCK COMBO
CLOCK RECEPTACLE
DUAL CLOCK RECEPTACLE
VIDEO INPUT
AUDIO / VIDEO INPUT
BELL
VOLUME CONTROL
BUZZER
CHIME
TELEVISION OUTLET
MICROPHONE OUTLET
INTERCOM OUTLET
CAMERA
DOOR CONTACT
MOTION DETECTOR
BEAM DETECTOR
KEY PAD
SECURITY SYSTEM CONTROL PANEL
CCTV CONTROL PANEL
CARD READER
STUDENT STATION
ADMINISTRATION STATION
TEACHER STATION
SMOKE DETECTOR
DETECTOR, RATE OF RISE
DUCT DETECTOR
HORN
HORN & LIGHT
SPEAKER
SPEAKER & LIGHT
PULL STATION
FIRE ALARM CONTROL PANEL
ANNUNCIATOR PANEL
END OF LINE DEVICE
REMOTE INDICATING LIGHT, WALL MTD.
REMOTE INDICATING LIGHT, CLG. MTD.
MAGNETIC DOOR HOLDER
FIREFIGHTER COMMUNICATION JACK
FLOW SWITCH (furnished by x/C)
TAMPER SWITCH (furnished by x/C)
VISUAL ONLY UNIT
FIRE CONTROL POWER SUPPLY
MONITOR MODULE
CONTROL MODULE
CARBON DIOXIDE DETECTOR
TRANSFORMER
DISCONNECT SWITCH (fuse size shown)
NON-FUSED DISC. (switch size shown)
MAGNETIC STARTER (BY x/C U.O.N.)
COMB. STARTER (BY x/C U.O.N.)
PANELBOARD, SURFACE MOUNTED
PANELBOARD, FLUSH MOUNTED
WEATHERHEAD
UTILITY METER, AS REQUIRED
CURRENT TRANSFORMERS
GENERATOR, KW SHOWN
TELEPHONE TERMINAL BOARD
GROUND CONNECTION PER N.E.C.
WIREWAY
TRANSFER SWITCH
CIRCUIT BREAKER
CIRCUIT BREAKER
CAPACITOR
THERMOSTAT
HUMIDISTAT
PHOTOCELL (voltage as required)
TIME CLOCK (24 hour U.O.N.)
PUSHBUTTON STATION (number of buttons indicated)
CONTROL TRANSFORMER
LIGHTING CONTACTOR
IRRIGATION CONTROLLER (120 volt xxVA connection by x/C)
MOTION DETECTOR
WALL MOUNT DUAL TECHNOLOGY SENSOR
SENSOR SWITCH WV-PDT-16 SERIES
OCCUPANCY SENSOR / PHOTOCELL SENSOR
SWITCH CMR-PC-ADC SERIES
ULTRASONIC SENSOR - 360° - 2 CIRCUIT SENSOR
SWITCH CMR-PDT-10-2P
ULTRASONIC SENSOR - 360° - 1000 SQ FT
SENSOR SWITCH CMR-PDT-10
ULTRASONIC SENSOR - 360° - 500 SQ FT SENSOR
SWITCH MCR-PDT SERIES
SWITCH STYLE OCCUPANCY SENSOR SENSOR
SWITCH WSD-PDT SERIES
POWER PACK SENSOR SWITCH MP20 SERIES
DIGITAL TIME SWITCH WATT STOPPER TS-400
M
ELECTRICAL ABBREVIATIONS
1P 1 POLE (2P, 3P, 4P, ETC.)
A AMPERE
AC ABOVE COUNTER
AC- AIR CONDITIONER
ACU- AIR CONDITIONING UNIT
ACLG ABOVE CEILING
ADO AUTOMATIC DOOR OPENER
AF AMP FRAME
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFI ARC FAULT CIRCUIT INTERRUPTER
AHJ AUTHORITY HAVING JURISDICTION
AHU- AIR HANDLING UNIT
AIC AMPS INTERUPTING CAPACITY
AL ALUMINUM
ALT ALTERNATE
AMP AMPERE
AMPL AMPLIFIER
ANNUN ANNUNCIATOR
APPROX APPROXIMATELY
AQ-STAT AQUASTAT
ARCH ARCHITECT, ARCHITECTURAL
AS AMP SWITCH OR ABOVE SHELF
AT AMP TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AWG AMERICAN WIRE GAUGE
B- BOILER
BATT BATTERY
BC BELOW COUNTER
BD BOARD
BLDG BUILDING
BMS BUILDING MANAGEMENT SYSTEM
C CONDUIT
CAB CABINET
CAT CATALOG
CATV CABLE TELEVISION
CB CIRCUIT BREAKER
CCTV CLOSED CIRCUIT TELEVISION
CHLR- CHILLER
CKT CIRCUIT
CKT BRKR CIRCUIT BREAKER
CLG CEILING
COMB COMBINATION
CMPR COMPRESSOR
CND(C) CONDUIT
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUATION OR CONTINUOUS
CONTR CONTRACTOR
CONV CONVECTOR
CP CIRCULATING PUMP
CRT CATHODE-RAY TUBE
CT CURRENT TRANSFORMER
CT- COOLING TOWER
CTR CENTER
CU COPPER
CU- CONDENSING UNIT
CUH- CABINET UNIT HEATER
DCP DOMESTIC WATER CIRCULATING PUMP
DEPT DEPARTMENT
DET DETAIL
DFU- DUCT FURNACE
DIA DIAMETER
DISC DISCONNECT
DIST DISTRIBUTION
DN DOWN
DPR DAMPER
DS SAFETY DISCONNECT SWITCH
DT DOUBLE THROW
DWG DRAWING
DWH- DOMESTIC WATER HEATER
EBB- ELECTRIC BASEBOARD
EC ELECTRICAL CONTRACTOR
EF- EXHAUST FAN
ELEC ELECTRIC, ELECTRICAL
ELEV ELEVATOR
EM EMERGENCY
EMS ENERGY MANAGEMENT SYSTEM
EMT ELECTRICAL METALLIC TUBING
EP ELECTRIC PNEUMATIC
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXH EXHAUST
EXIST (E) EXISTING
EXP EXPLOSION PROOF
FA FIRE ALARM
FABP FIRE ALARM BOOSTER POWER
SUPPLY PANEL
FACP FIRE ALARM CONTROL PANEL
FCU FAN COIL UNIT
FIXT FIXTURE
FLA FULL LOAD AMPS
FLEX FLEXIBLE CONDUIT
FLR FLOOR
FLUOR FLUORESCENT
FU FUSE
FU- FURNACE
FUDS FUSED SAFETY DISCONNECT SWITCH
GA GAUGE
GAL GALLON
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERATOR
GFI GROUND FAULT CIRCUIT INTERRUPTER
GFP GROUND FAULT PROTECTOR
GND GROUND
GRS GALVANIZED RIGID STEEL (CONDUIT)
GYP BD GYPSUM BOARD
H- HUMIDIFIER
HID HIGH INTENSITY DISCHARGE
HOA HANDS-OFF-AUTOMATIC SWITCH
HORIZ HORIZONTAL
HP HORSEPOWER
HPF HIGH POWER FACTOR
HR HOUR
HT HEIGHT
HTG HEATING
HTR HEATER
HV HIGH VOLTAGE
HVAC HEATING, VENTILATING AND AIR
CONDITIONING
HWP HYDRONIC WATER PUMP
IC INTERRUPTING CAPACITY
IG ISOLATED GROUND
IMC INTERMEDIATE METAL CONDUIT
INCAND INCANDESCENT
IR INFRARED
I/W INTERLOCK WITH
JB JUNCTION BOX
J-BOX JUNCTION BOX
KV KILOVOLT
KVA KILOVOLT-AMPERE
KVAR KILOVOLT-AMPERE REACTIVE
KW KILOWATT
KWH KILOWATT HOUR
LC LIGHT CONTROL
LOC LOCATE OR LOCATION
LT LIGHT
LT FLEX LIQUID TIGHT FLEXIBLE METAL CONDUIT
LTG LIGHTING
LTNG LIGHTNING
LV LOW VOLTAGE
MAX MAXIMUM
MAG.S MAGNETIC STARTER
M/C MOMENTARY CONTACT
MC MECHANICAL CONTRACTOR
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDC MAIN DISTRIBUTION CENTER
MDP MAIN DISTRIBUTION PANEL
MFR MANUFACTURER
MFS MAIN FUSED DISCONNECT SWITCH
MH MANHOLE
MIC MICROPHONE
MIN MINIMUM
MISC MISCELLANEOUS
MLO MAIN LUGS ONLY
MMS MANUAL MOTOR STARTER
MOA MULTIOUTLET ASSEMBLY
MSP MOTOR STARTER PANELBOARD
MSBD MAIN SWITCHBOARD
MT MOUNT
MT.C EMPTY CONDUIT
MTD MOUNTED
MTG MOUNTING
MTS MANUAL TRANSFER SWITCH
MTR MOTOR, MOTORIZED
MUA- MAKE-UP AIR UNIT
N.C. NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURER'S
ASSOCIATION
NFDS NON-FUSED SAFETY DISCONNECT SWITCH
NIC NOT IN CONTRACT
NL NIGHT LIGHT
N.O. NORMALLY OPEN
NPF NORMAL POWER FACTOR
NTS NOT TO SCALE
OH OVERHEAD
OL OVERLOADS
P POLE
P- PUMP
PA PUBLIC ADDRESS
PB PULL BOX OR PUSHBUTTON
PE PNEUMATIC ELECTRIC
PED PEDESTAL
PF POWER FACTOR
PH PHASE
PIV POST INDICATING VALVE
PNL PANEL
PP POWER POLE
PR PAIR
PRI PRIMARY
PROJ PROJECTION
PRV- POWER ROOF VENTILATOR
PT POTENTIAL TRANSFORMER
PVC POLYVINYL CHLORIDE (CONDUIT)
PWR POWER
QUAN QUANTITY
RCPT RECEPTACLE
RECEPT RECEPTACLE
REQD REQUIRED
RGC RIGID GALVANIZED STEEL CONDUIT
RM ROOM
RSC RIGID STEEL CONDUIT
RTU- ROOF TOP UNIT
SC SURFACE CONDUIT
SEC SECONDARY
SF- SUPPLY FAN
SHT SHEET
SIM SIMILAR
S/N SOLID NEUTRAL
SPEC SPECIFICATION
SPKR SPEAKER
SP SPARE
SR SURFACE RACEWAY
SS STAINLESS STEEL
SSW SELECTOR SWITCH
S/S STOP/START PUSHBUTTONS
STA STATION
STD STANDARD
SURF SURFACE MOUNTED
SW SWITCH
SWBD SWITCHBOARD
SYM SYMMETRICAL
SYS SYSTEM
TCC TEMPERATURE CONTROL CONTRACTOR
TEL TELEPHONE
TEL/DATA TELEPHONE/DATA
TERM TERMINAL
TL TWIST LOCK
TR TAMPER RESISTANT
TS TAMPER PROOF SWITCH
T-STAT THERMOSTAT
TTC TELEPHONE TERMINAL CABINET
TV TELEVISION
TVTC TELEVISION TERMINAL CABINET
TYP TYPICAL
UC UNDER COUNTER
UE UNDERGROUND ELECTRICAL
UF UNDER FLOOR
UG UNDERGROUND
UH- UNIT HEATER
UL UNDERWRITERS' LABORATORIES, INC.
UNO UNLESS NOTED OTHERWISE
UT UNDERGROUND TELEPHONE
UTIL UTILITY
UV UNIT VENTILATOR OR ULTRAVIOLET
V VOLT
VA VOLT-AMPERES
VDT VIDEO DISPLAY TERMINAL
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VL VERIFY LOCATION WITH OWNER
VOL VOLUME
W WATT
W/ WITH
WG WIRE GUARD
WH WATER HEATER
W/O WITHOUT
WP WEATHERPROOF
XFMR TRANSFORMER
XFR TRANSFER
ANGLE
@ AT
DELTA
' FEET
" INCHES
# NUMBER
Ø PHASE
C CENTER LINE
P PLATE
L L
GENERAL ELECTRICAL NOTES
1. ALL NON-FIRE RATED SURFACES ARE TO BE PATCHED WITH LIKE MATERIAL TO
MAINTAIN ORIGINAL RATING.
2. ALL PENETRATIONS THROUGH FIRE RATED SURFACES ARE TO BE SEALED WITH FIRE
CAULK TO MAINTAIN ORIGINAL RATING.
3. CONTRACTORS SHALL VISIT THE PROJECT SITE DURING PRE-BID WALK THROUGH TO
DETERMINE THE EXACT EXTENT OF THE WORK REQUIRED BEFORE BIDDING THE
PROJECT.
4. REMOVE ALL EXISTING EXPOSED CONDUIT, WIRE, AND EQUIPMENT NOT TO BE
RE-USED WHERE WORK IS BEING DONE EXCEPT ITEMS NOTED OTHERWISE.
5. EXISTING WORK WHICH IS PRESENTLY CONCEALED AND WHICH WILL REMAIN
CONCEALED AND DOES NOT INTERFERE WITH ANY NEW WORK OF ANY TRADE NEED
NOT BE REMOVED. HOWEVER, ALL CONDUIT SHALL BE CAPPED BELOW FINISH
SURFACE AND THEN PATCHED AND PAINTED TO MATCH, OR AS NOTED.
6. WHERE BUILDING SURFACES ARE DAMAGED BY THE REMOVAL OF OLD WORK,
SURFACES SHALL BE PATCHED AND PAINTED TO MATCH ADJACENT.
7. EXISTING OPENINGS, WHICH ARE TO BE REUSED, SHALL BE MODIFIED OR ENLARGED
TO SUIT THE NEW SYSTEMS AS REQUIRED. PROVIDE ALL REQUIRED CUTTING AND
PATCHING.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING THE EXISTING WALLS TO
MATCH THE ADJACENT SURFACES BEHIND ALL SURFACE MOUNTED EQUIPMENT.
9. DRAWINGS ARE BASED ON EXISTING RECORD DOCUMENTS AND CASUAL FIELD
OBSERVATION. REPORT ANY DISCREPANCIES TO ENGINEER FOR CLARIFICATION.
10. MINIMUM RACEWAY SIZE; 3/4" TRADE SIZE. ALL FLEXIBLE CONDUIT RACEWAYS SHALL
BE LIQUID TITE, MAXIMUM 36" LENGTH. REFER TO SPECIFICATION 260533 - RACEWAY
AND BOXES FOR ELECTRICAL SYSTEMS.
11. ALL CONDUIT ABOVE 10 FOOT SHALL MEET THE FOLLOWING REQUIREMENTS:
11.1. STRAP DISTANCE: 5 FEET.
11.2. FASTENERS: 2 HOLE WITH SECURITY SCREWS.
11.3. CONDUIT: INTERIOR EMT, EXTERIOR EXPOSED/ CONCEALED- GRC.
11.4. FITTINGS: COMPRESSION.
11.5. BELL BOXES: FS TYPE.
11.6. NO KNOCKOUTS.
11.7. SECURE CONDUIT WITHIN 12 INCHES OF BOXES AND ENCLOSURES.
12. ALL CONDUIT BELOW 10 FOOT SHALL MEET THE FOLLOWING REQUIREMENTS:
12.1. STRAP DISTANCE: 3 FEET.
12.2. FASTENERS: 2 HOLE WITH SECURITY SCREWS.
12.3. CONDUIT: INTERIOR EMT, EXTERIOR EXPOSED/ CONCEALED - GRC.
12.4. FITTINGS: COMPRESSION.
12.5. BELL BOXES: FS TYPE.
12.6. NO KNOCKOUTS.
12.7. SECURE CONDUIT WITHIN 12 INCHES OF BOXES AND ENCLOSURES
13. ALL EXPOSED WIRING SHALL BE IN CONDUIT. OPEN LOW VOLTAGE WIRING ABOVE
CEILINGS IS ACCEPTABLE.
14. ALL NEW CONDUITS AND WIRES SHALL BE INSTALLED STRAIGHT AND LEVEL AND
SHALL BE PARALLEL OR PERPENDICULAR TO THE BUILDING LINES.
15. ALL NEW CONDUITS SHALL BE FIELD ROUTED ALONG EXISTING PIPING AND
STRUCTURAL STEEL.
16. ALL LOCATIONS WHERE THE WALLS CAN'T BE FISHED SHALL BE SURFACE MOUNTED
CONDUIT FOLLOWING NOTES 10 THROUGH 12 ABOVE.
17. ALL WALLS THAT ARE ACCESSIBLE SHALL BE FISHED AND DEVICE CUT INTO WALL.
18. ALL EXTERIOR CONCEALED CONDUIT UNDERGROUND SHALL BE RNC, TYPE
EPC-40-PVC
19. ALL ELECTRICAL OUTAGES SHALL NOT LAST OVER 2-HOURS. PORTABLE GENERATORS
SHALL BE USED TO REPLACE ANY ELECTRICAL SERVICE EXCEEDING THAT DURATION.
20. IN RELATION TO RELOCATING ANY ELECTRICAL DEVICE, CONTRACTOR SHALL
COMPLETE THE RELOCATION IN ONE DAY AND VERIFY THAT ALL DEVICES RELOCATED
ARE WORKING PROPERLY PRIOR TO LEAVING THE SITE.
21. CONTRACTOR SHALL PROVIDE AND INSTALL ALL REQUIRED COMPONENTS,
RACEWAYS, WIRE, AND HARDWARE AS INDICATED ON DRAWINGS.
22. ALL WORK DONE WITHOUT APPROVED SHOP DRAWINGS IS AT CONTRACTORS RISK.
23. CONTRACTOR SHALL CONTACT COMMTECH FOR SPECIFICATIONS FOR CAT6 AND
OTHER…