220802_Torch Lake Addendum No. 1.pdf
PDF 1 MB Posted
- Solicitation number
- RFQ - 171 - 220000000430
- Issued by
- Houghton County, Michigan
About this file
This document is a Construction Bid Addendum No. 1 issued by the Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration Design and Construction Division for the Torch Lake Superfund project. The project consists of two work locations: the North Entry Site and the Hubbell Tamarack Site. The work at the North Entry Site includes installing approximately 450 feet of large boulders, filling holes and ruts, repairing surface disturbances, and adding signage. The work at the Hubbell Tamarack Site includes repairing surface disturbances, tilling the clay cover, and adding 6 inches of topsoil, seed, mulch, and fertilizer at 12 locations. The bid opening date is August 10, 2022, and the contract time is 365 days from the Notice-to-Proceed.
The bid schedule includes 12 base bid items with unit prices and item bid prices. Notable items include fill procurement and installation, boulder procurement and installation, topsoil procurement and installation, seed/mulch/fertilizer application, and site signage procurement and installation. A 5% bid guarantee is required, and performance and payment bonds are required for bids over $50,000. The project is funded by the Department of Environment, Great Lakes and Energy, and the contractor will be required to comply with all applicable state and local regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specification 20188.pdf | ||
| 220802_Torch Lake Addendum No. 2.pdf | ||
| Advertisement 20188.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 RFP (Rev 6/16)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 1
This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals. Addenda will be numbered by the Project Director and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
8/2/2022
PROJECT NAME
Torch Lake Superfund
FILE NUMBER
761/20188.SAR
PROJECT DIRECTOR
Sadi Rayyan, PE
BID OPENING DUE DATE:
8/10/2022
ADDENDUM ITEMS:
Questions and Answers:
Q1 What are the fill specifications to bring the deep rutted areas up to grade?
A1 While the fill will not be required to be verified, it should be suitable material to fill in the deep rutted areas and bring them to grade prior to applying 23a stone on top. It is suggested the fill should be 100% passing 3-inch screen and 10% - 20% passing #200 sieve.
Q2 How is general fill to be paid?
A2 If the general fill is not sourced at a business with weighing capabilities, then the first load of fill must be weighed at a certified scale. The initial weight slip will be used to estimate each load thereafter.
Q3 What is the defined contract time, is it 120 days or October 8th?
A3 The contract time will be adjusted to 365 days. The bulk of the work will be completed by the selected contractor prior to September 20, 2022. The substantial completion inspection will be performed by the Professional in Spring of 2023. The contractors can still invoice for work completed prior to substantial completion. The substantial completion inspection will confirm that the vegetation has established. If vegetation has not established, the contractor will be required to plant again in the Spring 2023.
Q4 What are the dimensions, material, and requirements for the site signage?
A4 The signs should be made from HDPE plastic board, approximately ¾ inch thick. There will be 4 signs with dimensions not to exceed 1-foot by 1-foot. There will be 1 sign not to exceed 3-foot by 2-foot. The final text of the signs will be provided by the professional to the contractor. The 4 1-foot by 1-foot signs will contain up to 100 characters including spaces. The 1 3-foot by 2-foot sign will contain up to 2000 characters including spaces.
Q5 Will geotextile be required for under the boulders as described in the bid specs?
A5 Geotextile will not be required for under the boulders.
http://www.michigan.gov/SIGMAVSS
Q6 Who or what will determine the topsoil depths in the different areas at the Hubbell Tamarack
Site?
A6 Following the pre-bid meeting, a topsoil depth of 6 inches will be required for each of the different areas at Hubbell Tamarack.
Q7 Is builders risk insurance required as described in the bid specs?
A7 Builders Risk insurance is not required for this project.
Q8 Does the SESC permitting go through Houghton County or DTMB?
A8 SESC permitting should go through Houghton County.
Q9 Will the contractor be responsible for removal and disposal of the fenced area?
A9 Yes, the contractor will be responsible for removal and disposal of the fenced area.
Q10 Is there a selected source for the boulders?
A10 The boulder pricing and information was obtained from Valley View Quarry, however there is not a selected source for the boulders. The boulders should be between 3-5 foot wide and 3-5 foot tall and have a generally circular shape.
Q11 What will be the required spacing between the boulders?
A11 The boulders should be spaced approximately 2 feet apart. Smaller boulders should be used along the shoreline side to limit the boulders from blocking the view of the lake from vehicles.
Q12 What type of topsoil will be required at the Hubbell Tamarack Site?
A12 The type/quality of topsoil will be left to the Contractor’s discretion. The topsoil needs to be suitable to protect the cover and promote and establish growth. If the topsoil used does not promote and establish growth the Contractor will be required to repair, replace, or re-plant following the substantial completion inspection in Spring 2023. The soil quantities and conversion factor from tons to cubic yards is included for reference.
Q13 What type of matting will be required at the Hubbell Tamarack Site?
A13 A mulch-blanket is required to cover the seeded areas and be secured with wood-stacking tack to prevent seed and fertilizer from being blown or washed away.
Attachments Bid Summary Bid Schedule Table 1. Work Summary Table Figure 2. Proposed Work Areas, North Entry Figure 3. Proposed Work Areas, Hubbell/Tamarack City
END OF QUESTIONS
APPROVED BY: Sadi Rayyan, Project Director DATE: 8/2/2022
Bidding and Contract Document (R 03/22) Project Name: Torch Lake Superfund File No. 761/20188.SAR
BID SUMMARY
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
3111 W. St. Joseph Street Lansing, Michigan 48917
Bids must be submitted electronically at: https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService
FILE NUMBER
761/20188.SAR
DEPARTMENT/AGENCY
Department of Environment Great Lakes and Energy
CONTRACT TIME(S)
365 Days from Notice-to-Proceed
PROJECT NAME
Torch Lake Superfund
LOCATION
Two work locations (North Entry and Hubbell Tamarack) – Pre-Bid Meeting will start at the North Entry Site and conclude at the Hubbell Tamarack Site.
BID OPENING DATE
August 10, 2022 at 2:00 pm ET
FOR AN EXAMINATION OF THE SITE CONTACT:
Clara Austin, AECOM, 616-481-0125
SEE SECTION 00100 INSTRUCTIONS TO BIDDERS AND SECTION 00700 GENERAL CONDITIONS PROVIDED WITH THE BIDDING DOCUMENTS.
BID: WE PROPOSE TO FURNISH, PERFORM AND COMPLETE THE ENTIRE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS IN
CONSIDERATION OF THE BID PRICE (S) STATED BELOW.
FIRM NAME AND COMPLETE ADDRESS TELEPHONE NUMBER and E-MAIL ADDRESS
□ Qualified Disabled Veteran
SIGMA VENDOR NUMBER
(protected information required for processing payments)
BIDDER'S SIGNATURE AND TITLE DATE
WITNESS' SIGNATURE DATE
By signing this bid above, bidder certifies their enclosed Qualified Disabled Veteran and Michigan-Based Business Certifications.
BASE BID FROM BID SCHEDULE (Include specified Allowances):
____________________________________________________________________________Dollars $____________________ (use words) (in figures)
Alternate1: (Add/Subtract) ______________________________________________________ Dollars $ ____________________ (use words) (in figures)
Alternate 2: (Add/Subtract) ______________________________________________________Dollars $ ____________________ (use words) (in figures)
Alternate 3: (Add/Subtract) ______________________________________________________Dollars $ ____________________ (use words) (in figures)
A PERFORMANCE BOND AND A PAYMENT BOND ARE REQUIRED FOR ALL BIDS OVER $50,000.00. EACH BID MUST BE ACCOMPANIED BY A FIVE (5) PERCENT BID GUARANTEE. BUILDERS RISK INSURANCE IS REQUIRED TO BE PROVIDED BY THE
CONTRACTOR UNLESS OTHERWISE INDICATED IN THE BID DOCUMENTS.
BIDDERS ARE ALSO CAUTIONED TO FAMILIARIZE THEMSELVES WITH ALL OF THE OTHER CONDITIONS OF THE CONTRACT.
Project Scope of Work:
North Entry Site Installation of approximately 450 feet of large boulders, spaced 2 feet apart, to create two stone wall barriers along the current parking lot/turn around and along the beach area of the North Canal Township Park on Breakers Beach. In addition to the boulders, fill matching the existing conditions at the Site will be brought in to fill holes and ruts where stamp sands have been exposed i.e., 22A stone, 23A stone material, ADA trail bond, or similar. Repair of surface disturbances and rutting to existing soil cover to inhibit stamp sand mobility and improve surface water conveyance off. Extension of the turn-around area at Breakers Beach will be necessary following the installation of the stone wall barrier, this again will be done with matching fill. It will be necessary to install a crown and grading for proper drainage of run-off from the lot. Following backfilling, grading of the chosen stone material will be required. Topsoil, seed, mulch, and fertilizer
Bidding and Contract Document (R 03/22) Project Name: Torch Lake Superfund File No. 761/20188.SAR application is not expected at the North Entry Site during this work. Installation of new SESC measures will be necessary where required.
In addition to installation of a stone wall barrier to help prevent vehicular and off-road trespassing, signage will be added to the site. The goal of the signage is to inform the public of the importance of protecting the stamp sands cover. There will be one main sign explaining the stamp sands cover and the importance of protecting the cover. Additional signage will explicitly state no vehicular or off-road vehicle trespassing.
The verbiage of the signs will be provided to the Contractor. The work is tentatively planned to take place the week of September 12, 2022.
Hubbell Tamarack Site Repair of surface disturbances to existing cover to prevent transport of exposed stamp sands and improve surface water conveyance off of Site. Raking or tilling of the top two (2) inches of clay cover will be required followed by installation of six (6) inches of topsoil, seed, mulch, and fertilizer application will be required at twelve (12) locations at the Hubbell Tamarack Site. The work is tentatively planned to take place the week of September 12, 2022.
The Bidder must figure its Base Bid on the specified, or Addendum-approved, materials and equipment only. No “or equal” or substitution proposals will be permitted after Bid opening, except as provided in the General Conditions.
Addenda: Bidder acknowledges receipt of Addenda: No. ___ dated: ________, No. ___ dated: ________ No. ___ dated: ________
BID SCHEDULE
Base Bid Schedule - The Bidder will complete the Work and accept as full payment, for the Work items listed, the following Unit Prices and/or Item Bid Prices, as applicable:
Base Bid Item No.
Bid Quantity
Description Unit Price
Item Bid Price
1 1 Mobilization Lump Sum
2 1 Site Services and Preparation Lump Sum
3 142 Ton Fill Procurement, Installation, and Grading
4 204 Ton 22A Procurement, Installation, and Grading
5 365 Ton 23A Procurement, Installation, and Grading
6 1015 Ton Topsoil Procurement, Installation, and
Grading
7 400 Ton (Approximately
100 Boulders)
Boulder Procurement and Installation
8 0.93 acres Seed / Mulch / Fertilizer Procurement and
Application
9 5 Site Signage Procurement and Installation
10 1 SESC Installation and Removal Lump Sum
11 1 Demobilization Lump Sum
12 1 Provisionary Allowance Amount $10,000
TOTAL (This amount should equal the Base Bid amount on the Bid Summary Form) $
Base Bid (Sum of Item Bid Prices for all Base Bid Items):
__________________________________________________________________ Dollars $__________________________ (use words) (in figures)
Table 1. Work Summary Table 2022 Torch Lake Superfund Maintenance
Item Boulders
Fill, 22A, or 23A Stone
Topsoil (6") Seed/Mulch/Fert.
Unit Ton Ton Ton Acres Ton/CY Factor 4.00 1.48 1.35 N/A
Location GPS ID Figure Issue Area Remedy
HT‐VG‐01 2 Damaged cover no vegetation 445 Apply topsoil to damaged cover and seed
‐ ‐ 11.68125 0.01
HT‐VG‐02 2 Damaged cover no vegetation 554 Apply topsoil to damaged cover and seed
‐ ‐ 14.5425 0.013
HT‐VG‐03 2 Damaged cover no vegetation 792 Apply topsoil to damaged cover and seed
‐ ‐ 20.79 0.019
HT‐VG‐04 2 Damaged cover no vegetation 549 Apply topsoil to damaged cover and seed
‐ ‐ 14.41125 0.013
HT‐VG‐05 2 Large area of damaged cover 30620 Apply topsoil to damaged cover and seed
‐ ‐ 803.775 0.74
HT‐VG‐06 2 Damaged cover no vegetation 1874 Apply topsoil to damaged cover and seed
‐ ‐ 49.1925 0.045
HT‐VG‐08 2 Damaged cover no vegetation 629 Apply topsoil to damaged cover and seed
‐ ‐ 16.51125 0.015
HT‐VG‐09 2 Damaged cover no vegetation 473 Apply topsoil to damaged cover and seed
‐ ‐ 12.41625 0.011
HT‐VG‐11 2 Damaged cover no vegetation 820 Apply topsoil to damaged cover and seed
‐ ‐ 21.525 0.020
HT‐VG‐12 2 Damaged cover no vegetation 1049 Apply topsoil to damaged cover and seed
‐ ‐ 27.53625 0.025
HT‐VG‐13 2 Damaged cover no vegetation 845 Apply topsoil to damaged cover and seed
‐ ‐ 22.18125 0.020
North Entry NE‐ER‐02 3 Rutted areas from vehicles 2,465 Bring in fill to bring ruts up to grade.
‐ 142 ‐ ‐
North Entry NE‐ER‐02 3 Cover damage from vehicles 14,211 Bring in 22A stone to cover the area and expand parking lot turnaround.
‐ 204 ‐ ‐
North Entry NE‐ER‐02 3 Cover damage from vehicles 25,350 Bring in 23A stone to cover the area, creating a new walking area.
‐ 365 ‐ ‐
North Entry NE‐FE‐01 3 Traffic control (boulder installation)
600 ft Install boulders along the 300 foot entryway
(Approximately 100 boulders)
North Entry NE‐FE‐01 3 Fence removal and disposal 250 ft Remove fence posts and fencing and dispose offsite
North Entry NA 3 Site signage. No trespassing and cover explanation
NA
Install no trespassing and cover explanation signage
Total = 400 711 1015 0.93
Hubbell Tamarack
Estimated Material Quantities
Proposed parking lot expansion, install 22A gravel, and grade within this area.
14,211 sq. ft
Install 23A stone and grade within this area.
25,350 sq. ft
Install boulders to prevent vehicular access.
Removal and disposal of fencing and fence posts.
Fill ruts and bring to grade.
55 cu. yds
Fill ruts and bring to grade.
45 cu. yds
Drawn:
Approved:
Project Number:
DP 8/2/2022
CA 8/2/2022
60627460
SHEET 1 OF 1www.aecom.com Copyright ©2022 By: AECOM
MAP AREA
L:\DCS\GIS\ArcMap_GeoDB_Projects\ENV\GIS_Data\GIS\Torch_Lake\GIS\MXDs\2022_O_M\North_Entry_Proposed_2022_OM.mxd p 0 30 6015
Feet
Legend Notes
Boulder Installation
Fencing Removal
Proposed O&M Area
Large Ruts
Engineered Cover Limits (2015 O&M, CDM Smith)
FIGURE 2
PROPOSED WORK AREAS
NORTH ENTRY
TORCH LAKE SUPERFUND SITE
HOUGHTON COUNTY, MICHIGAN
HT-VG-05
30,620 sq. ft
HT-VG-12
1,049 sq. ft
HT-VG-08
629 sq. ft
HT-VG-11
820 sq. ft
HT-VG-06.1
2,185 sq. ft
HT-VG-06
1,874 sq. ft
HT-VG-02
554 sq. ft
HT-VG-09
473 sq. ft
HT-VG-13
845 sq. ft
HT-VG-03
792 sq. ft
HT-VG-04
549 sq. ft
HT-VG-01
445 sq. ft
M 26
Keweenaw
Drawn:
Approved:
Project Number:
DP 7/29/2022
CA 7/29/2022
60627460
SHEET 1 OF 1www.aecom.com Copyright ©2022 By: AECOM
MAP AREA
L:\DCS\GIS\ArcMap_GeoDB_Projects\ENV\GIS_Data\GIS\Torch_Lake\GIS\MXDs\2022_O_M\HubbellTamarack_Proposed_Work_Areas.mxd p 0 50 10025
Feet
Legend Proposed Work Area
Engineered Cover Limits (As-Built, NRCS)
Engineered Cover Limits (2015 O&M, CDM Smith)
Road
FIGURE 3
PROPOSED WORK AREAS
HUBBELL/TAMARACK CITY
TORCH LAKE SUPERFUND SITE
HOUGHTON COUNTY, MICHIGAN