22-Drawings.pdf
PDF 16 MB Posted
- Solicitation number
- 26/0140
- Issued by
- Harris County, Texas
About this file
Summary
This is a technical drawings document for the On-Call Maintenance - BS2N Package 1 project in Precinct 2 for Harris County, Texas, under the BetterStreets2Neighborhoods Community Program (UPIN #26102MF40301). The drawings package contains 27 sheets of construction details and specifications for road repair and related infrastructure work in the Beaumont Place area. The sheets include general notes applicable to Precincts 1, 2, and 4; typical roadway sections for divided highways and floodplain areas; asphalt pavement overlay details; storm sewer and manhole construction details; loop detector installation specifications; pavement marking details; traffic control plans for various work scenarios; small sign details; and stormwater pollution prevention plan (SWPPP) guidelines. The drawings were prepared by Mohamed Sayed (Project Number 142032) with various revision dates ranging from September 2023 through April 2026, with the final document dated April 13, 2026.
The technical specifications address multiple work categories including asphalt concrete overlays ranging from 1 to 2 inches in depth, base course repairs and replacements, parking lot pavement sections with varying subgrade preparations, sidewalk and trail construction, concrete replacement and repair work, and storm drainage improvements. The drawings provide standardized details for typical road cross-sections showing 9.5-foot lanes with 4-foot shoulders, edge tapers, and transitions for mill-and-overlay operations. Parking lot sections are detailed with multiple configurations utilizing materials such as lime/fly ash, crushed concrete, aggregate base, geogrid, and geotextile components. Traffic control and SWPPP details are included to address construction phase management and environmental protection requirements during the maintenance operations.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4/13/2026
ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1
PRECINCT 2 - 2026
2 / 27
PRECINCT 2 - 2025
ON-CALL MAINTENANCE - BS2N BEAUMONT PLACE
# Sheet Title
1 COVER SHEET
2 SHEET INDEX
3 GENERAL NOTES FOR PRECINCT 1, 2, & 4
4 TYPICAL R.O.W. SECTION – DIVIDED ROADWAY
5 TYPICAL DIVIDED ROADWAY
6 TYPICAL SECTION
7 TYPICAL SECTION IN THE FLOODPLAIN
8 TYPICAL EDGE TAPER SECTION
9 OVERLAY AT EXISTING LONGITUDINAL SECTIONS
10 ASPHALT PAVEMENT DETAILS (1 OF 2)
11 ASPHALT PAVEMENT DETAILS (2 OF 2)
12 TYPICAL INTERSECTION DRIVEWAY & TAPER DETAILS
13 STORM SEWER CONSTRUCTION DETAILS
14 MANHOLE AND INLET REPAIR DETAILS
15 LOOP DETECTOR INSTALLATION DETAILS
16 STANDARD INTERSECTION LOOP DETECTOR DETAILS
17 PAVEMENT MARKING DETAILS (1 OF 2)
18 PAVEMENT MARKING DETAILS (2 OF 2)
19 SMALL SIGN DETAILS
20 TRAFFIC CONTROL PLAN (PROJECT APPROACH SIGNING)
21 TRAFFIC CONTROL PLAN (SHOULDER WORK)
22 TRAFFIC CONTROL PLAN (ONE-LANE, TWO-WAY OPERATION)
23 TRAFFIC CONTROL PLAN (LEFT LANE CLOSURE)
24 TRAFFIC CONTROL PLAN (RIGHT LANE CLOSURE)
25 STORM WATER POLLUTION PREVENTION PLAN DETAILS
26 SWPPP GUIDELINES
27 PROJECT SIGN FOR PRECINCT 2
SHEET INDEX
PRECINCT 2 - 2025
On-Call - Construction of Sidewalks,Trails, & Related ItemsFO T EE XTA AT SS
MOHAMED SAYED
142032
1/14/2026
ON-CALL MAINTENANCE - BS2N BEAUMONT PLACE
PRECINCT 2 - 2025
3 / 27
On-call - construction of Sidewalks, Trails & Related Items Precinct 2 - 2025
9/27/2023
TYPICAL R.O.W. SECTION DIVIDED ROADWAY
9.5'9.5' 31'
4 ft 4 ft
FO T EE XTA AT SS
MOHAMED SAYED
142032
1/14/2026
ON-CALL MAINTENANCE - BS2N PACKAGE 1
PRECINCT 2 - 2026
4 / 27
PRECINCT 2 - 2025
ON-CALL MAINTENANCE - BS2N BEAUMONT PLACE
9/27/2023
TYPICAL DIVIDED ROADWAY
FO T EE XTA AT SS
MOHAMED SAYED
142032
1/14/2026
ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1
PRECINCT 2 - 2026
5 / 27
PRECINCT 2 - 2025
8/8/2024
PRECINCT 2 - 2026
6 / 27
PRECINCT 2 - 2025
PRECINCT 2 - 2026
7 / 27
PRECINCT 2 - 2025
PRECINCT 2 - 2026
8 / 27
PRECINCT 2 - 2025
PRECINCT 2 - 2026
9 / 27
PRECINCT 2 - 2025
MILL AND ASPHALT OVERLAY TRANSITION DETAIL
REMOVE EXIST. ASPHALT CONCRETE
SURFACE. PROVIDE SMOOTH SURFACE &
CLEAN VERTICAL CUT.
EXIST. BASE
TRANSITION
10'-0" FOR 1"
1"
EXIST. ASPHALT CONCRETE SURFACE
PROP. H.M.H.L. ASPHALT CONCRETE SURFACE
LEGEND:
20'-0" FOR 2"
10'-0" FOR 1"
REMOVE EXIST. ASPHALT
CONCRETE SURFACE. PROVIDE
ASPHALT OVERLAY TRANSITION DETAIL
TRANSITION
SMOOTH SURFACE & CLEAN
VERTICAL CUT.
TYPICAL EDGE TAPER TYPICAL SECTION
EXIST. BASE
PROPOSED 8"
BLACK BASEEXIST. BASE
EXISTING SUBGRADE
EXISTING ASPHALT SURFACE
PROPOSED 2" H.M.A.C. OVERLAY
TACK COAT
EXIST. BASE
BASE REPAIR TYPICAL SECTION
4'-0" 6"6"
5'-0"
(TO REMAIN)
BASE REPAIR (MIN. 4 FT. X 5 FT.)
ASPHALT OVERLAY
EXIST. BASE
6" MAX
BACKFILL MATERIAL
EXIST. ASPHALT CONCRETE SURFACE
PROP. H.M.H.L. ASPHALT CONCRETE SURFACE
LEGEND:
ASPHALT TAPER (2:1)
ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1
PRECINCT 2 - 2026
10 / 27
PRECINCT 2 - 2025
VARIES VARIES
PROP. 2" ASPHALT
PROP. 8" BLACK BASE PROP. GEOGRID
2%
PROPOSED PARKING LOTS
1.0'
16"
SODDING
WHEEL STOP
NEW PARKING LOT - TYPICAL PAVEMENT SECTION 2
EXISTING
PAVEMENT
EXISTING EDGE OF PAVEMENT
FULL DEPTH SAWCUT
VARIES VARIES
PROP. 2" ASPHALT
PROP. 6" BLACK BASE PROP. 6" LIME/FLY ASH
2%
PROPOSED PARKING LOTS
1.0'
16"
SODDING
WHEEL STOP
NEW PARKING LOT - TYPICAL PAVEMENT SECTION 1
EXISTING
PAVEMENT
EXISTING EDGE OF PAVEMENT
FULL DEPTH SAWCUT
VARIES VARIES
PROP. 2" ASPHALT
PROP. 8" CRUSHED CONCRETE PROP. 6" LIME/FLY ASH
PROPOSED PARKING LOTS
1.0'
16"
SODDING
WHEEL STOP
NEW PARKING LOT - TYPICAL PAVEMENT SECTION 3
EXISTING
PAVEMENT
2%
EXISTING EDGE OF PAVEMENT
FULL DEPTH SAWCUT
VARIES VARIES
PROP. 2" ASPHALT
PROP. 8" AGGREGATE BASE
NEW PARKING LOT - TYPICAL PAVEMENT SECTION 4
PROPOSED PARKING LOTS
1.0'
16"
SODDING
WHEEL STOP
PROP. GEOGRID AND GEOTEXTILE
EXISTING
PAVEMENT
2%
EXISTING EDGE OF PAVEMENT
FULL DEPTH SAWCUT
ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1
PRECINCT 2 - 2026
11 / 27
PRECINCT 2 - 2025
PRECINCT 2 - 2026
12 / 27
PRECINCT 2 - 2025
On-Call - Construction of Sidewalks,Trails, & Related Items
FO T EE XTA AT SS
MOHAMED SAYED
142032
1/14/2026
ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1
PRECINCT 2 - 2026
13 / 27
PRECINCT 2 - 2025
11/8/2023
MANHOLE AND INLET REPAIR DETAILS
On-Call - Maintenance - Concrete Replacement/Repair
South Zone - Precinct 2 - 2026
ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1
PRECINCT 2 - 2026
14 / 27
PRECINCT 2 - 2025
On-call - construction of Sidewalks, Trails & Related ItemsFO T EE XTA AT SS
MOHAMED SAYED
142032
1/14/2026
ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1
PRECINCT 2 - 2026
15 / 27
PRECINCT 2 - 2025
On-Call - Maintenance - Concrete Replacement/Repair South Zone - Precinct 2 - 2026
ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1
PRECINCT 2 - 2026
16 / 27
PRECINCT 2 - 2025
FO T EE XTA AT SS
MOHAMED SAYED
142032
1/14/2026
ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1
PRECINCT 2 - 2026
17 / 27
PRECINCT 2 - 2025
FO T EE XTA AT SS
MOHAMED SAYED
142032
1/14/2026
ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1
PRECINCT 2 - 2026
18 / 27
PRECINCT 2 - 2025
FO T EE XTA AT SS
MOHAMED SAYED
142032
1/14/2026
ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1
PRECINCT 2 - 2026
19 / 27
PRECINCT 2 - 2025
FO T EE XTA AT SS
MOHAMED SAYED
142032
1/14/2026
ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1
PRECINCT 2 - 2026
20 / 27
PRECINCT 2 - 2025
FO T EE XTA AT SS
MOHAMED SAYED
142032
1/14/2026
ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1
PRECINCT 2 - 2026
21 / 27
PRECINCT 2 - 2025
FO T EE XTA AT SS
MOHAMED SAYED
142032
1/14/2026
ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1
PRECINCT 2 - 2026
22 / 27
PRECINCT 2 - 2025
FO T EE XTA AT SS
MOHAMED SAYED
142032
1/14/2026
ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1
PRECINCT 2 - 2026
23 / 27
PRECINCT 2 - 2025
FO T EE XTA AT SS
MOHAMED SAYED
142032
1/14/2026
ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1
PRECINCT 2 - 2026
24 / 27
PRECINCT 2 - 2025
On-call - construction of Sidewalks, Trails & Related ItemsFO T EE XTA AT SS
MOHAMED SAYED
142032
1/14/2026
ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1
PRECINCT 2 - 2026
25 / 27
PRECINCT 2 - 2025
SIDEWALK
Precinct 2 - 2025
9/27/2023
SWPPP GUIDELINES
FO T EE XTA AT SS
MOHAMED SAYED
142032
1/14/2026
ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1
PRECINCT 2 - 2026
26 / 27
PRECINCT 2 - 2025
FO T EE XTA AT SS
MOHAMED SAYED
142032
1/14/2026
ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1
PRECINCT 2 - 2026
27 / 27
PRECINCT 2 - 2025
File details come from the government source that posted it. Updated .