This is a technical drawings document for the On-Call Maintenance - BS2N Package 1 project in Precinct 2 for Harris County, Texas, under the BetterStreets2Neighborhoods Community Program (UPIN #26102MF40301). The drawings package contains 27 sheets of construction details and specifications for road repair and related infrastructure work in the Beaumont Place area. The sheets include general notes applicable to Precincts 1, 2, and 4; typical roadway sections for divided highways and floodplain areas; asphalt pavement overlay details; storm sewer and manhole construction details; loop detector installation specifications; pavement marking details; traffic control plans for various work scenarios; small sign details; and stormwater pollution prevention plan (SWPPP) guidelines. The drawings were prepared by Mohamed Sayed (Project Number 142032) with various revision dates ranging from September 2023 through April 2026, with the final document dated April 13, 2026.

The technical specifications address multiple work categories including asphalt concrete overlays ranging from 1 to 2 inches in depth, base course repairs and replacements, parking lot pavement sections with varying subgrade preparations, sidewalk and trail construction, concrete replacement and repair work, and storm drainage improvements. The drawings provide standardized details for typical road cross-sections showing 9.5-foot lanes with 4-foot shoulders, edge tapers, and transitions for mill-and-overlay operations. Parking lot sections are detailed with multiple configurations utilizing materials such as lime/fly ash, crushed concrete, aggregate base, geogrid, and geotextile components. Traffic control and SWPPP details are included to address construction phase management and environmental protection requirements during the maintenance operations.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4/13/2026

ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1

PRECINCT 2 - 2026

2 / 27

PRECINCT 2 - 2025

ON-CALL MAINTENANCE - BS2N BEAUMONT PLACE

# Sheet Title

1 COVER SHEET

2 SHEET INDEX

3 GENERAL NOTES FOR PRECINCT 1, 2, & 4

4 TYPICAL R.O.W. SECTION – DIVIDED ROADWAY

5 TYPICAL DIVIDED ROADWAY

6 TYPICAL SECTION

7 TYPICAL SECTION IN THE FLOODPLAIN

8 TYPICAL EDGE TAPER SECTION

9 OVERLAY AT EXISTING LONGITUDINAL SECTIONS

10 ASPHALT PAVEMENT DETAILS (1 OF 2)

11 ASPHALT PAVEMENT DETAILS (2 OF 2)

12 TYPICAL INTERSECTION DRIVEWAY & TAPER DETAILS

13 STORM SEWER CONSTRUCTION DETAILS

14 MANHOLE AND INLET REPAIR DETAILS

15 LOOP DETECTOR INSTALLATION DETAILS

16 STANDARD INTERSECTION LOOP DETECTOR DETAILS

17 PAVEMENT MARKING DETAILS (1 OF 2)

18 PAVEMENT MARKING DETAILS (2 OF 2)

19 SMALL SIGN DETAILS

20 TRAFFIC CONTROL PLAN (PROJECT APPROACH SIGNING)

21 TRAFFIC CONTROL PLAN (SHOULDER WORK)

22 TRAFFIC CONTROL PLAN (ONE-LANE, TWO-WAY OPERATION)

23 TRAFFIC CONTROL PLAN (LEFT LANE CLOSURE)

24 TRAFFIC CONTROL PLAN (RIGHT LANE CLOSURE)

25 STORM WATER POLLUTION PREVENTION PLAN DETAILS

26 SWPPP GUIDELINES

27 PROJECT SIGN FOR PRECINCT 2

SHEET INDEX

PRECINCT 2 - 2025

On-Call - Construction of Sidewalks,Trails, & Related ItemsFO T EE XTA AT SS

MOHAMED SAYED

142032

1/14/2026

ON-CALL MAINTENANCE - BS2N BEAUMONT PLACE

PRECINCT 2 - 2025

3 / 27

On-call - construction of Sidewalks, Trails & Related Items Precinct 2 - 2025

9/27/2023

TYPICAL R.O.W. SECTION DIVIDED ROADWAY

9.5'9.5' 31'

4 ft 4 ft

FO T EE XTA AT SS

MOHAMED SAYED

142032

1/14/2026

ON-CALL MAINTENANCE - BS2N PACKAGE 1

PRECINCT 2 - 2026

4 / 27

PRECINCT 2 - 2025

ON-CALL MAINTENANCE - BS2N BEAUMONT PLACE

9/27/2023

TYPICAL DIVIDED ROADWAY

FO T EE XTA AT SS

MOHAMED SAYED

142032

1/14/2026

ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1

PRECINCT 2 - 2026

5 / 27

PRECINCT 2 - 2025

8/8/2024

PRECINCT 2 - 2026

6 / 27

PRECINCT 2 - 2025

PRECINCT 2 - 2026

7 / 27

PRECINCT 2 - 2025

PRECINCT 2 - 2026

8 / 27

PRECINCT 2 - 2025

PRECINCT 2 - 2026

9 / 27

PRECINCT 2 - 2025

MILL AND ASPHALT OVERLAY TRANSITION DETAIL

REMOVE EXIST. ASPHALT CONCRETE

SURFACE. PROVIDE SMOOTH SURFACE &

CLEAN VERTICAL CUT.

EXIST. BASE

TRANSITION

10'-0" FOR 1"

1"

EXIST. ASPHALT CONCRETE SURFACE

PROP. H.M.H.L. ASPHALT CONCRETE SURFACE

LEGEND:

20'-0" FOR 2"

10'-0" FOR 1"

REMOVE EXIST. ASPHALT

CONCRETE SURFACE. PROVIDE

ASPHALT OVERLAY TRANSITION DETAIL

TRANSITION

SMOOTH SURFACE & CLEAN

VERTICAL CUT.

TYPICAL EDGE TAPER TYPICAL SECTION

EXIST. BASE

PROPOSED 8"

BLACK BASEEXIST. BASE

EXISTING SUBGRADE

EXISTING ASPHALT SURFACE

PROPOSED 2" H.M.A.C. OVERLAY

TACK COAT

EXIST. BASE

BASE REPAIR TYPICAL SECTION

4'-0" 6"6"

5'-0"

(TO REMAIN)

BASE REPAIR (MIN. 4 FT. X 5 FT.)

ASPHALT OVERLAY

EXIST. BASE

6" MAX

BACKFILL MATERIAL

EXIST. ASPHALT CONCRETE SURFACE

PROP. H.M.H.L. ASPHALT CONCRETE SURFACE

LEGEND:

ASPHALT TAPER (2:1)

ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1

PRECINCT 2 - 2026

10 / 27

PRECINCT 2 - 2025

VARIES VARIES

PROP. 2" ASPHALT

PROP. 8" BLACK BASE PROP. GEOGRID

2%

PROPOSED PARKING LOTS

1.0'

16"

SODDING

WHEEL STOP

NEW PARKING LOT - TYPICAL PAVEMENT SECTION 2

EXISTING

PAVEMENT

EXISTING EDGE OF PAVEMENT

FULL DEPTH SAWCUT

VARIES VARIES

PROP. 2" ASPHALT

PROP. 6" BLACK BASE PROP. 6" LIME/FLY ASH

2%

PROPOSED PARKING LOTS

1.0'

16"

SODDING

WHEEL STOP

NEW PARKING LOT - TYPICAL PAVEMENT SECTION 1

EXISTING

PAVEMENT

EXISTING EDGE OF PAVEMENT

FULL DEPTH SAWCUT

VARIES VARIES

PROP. 2" ASPHALT

PROP. 8" CRUSHED CONCRETE PROP. 6" LIME/FLY ASH

PROPOSED PARKING LOTS

1.0'

16"

SODDING

WHEEL STOP

NEW PARKING LOT - TYPICAL PAVEMENT SECTION 3

EXISTING

PAVEMENT

2%

EXISTING EDGE OF PAVEMENT

FULL DEPTH SAWCUT

VARIES VARIES

PROP. 2" ASPHALT

PROP. 8" AGGREGATE BASE

NEW PARKING LOT - TYPICAL PAVEMENT SECTION 4

PROPOSED PARKING LOTS

1.0'

16"

SODDING

WHEEL STOP

PROP. GEOGRID AND GEOTEXTILE

EXISTING

PAVEMENT

2%

EXISTING EDGE OF PAVEMENT

FULL DEPTH SAWCUT

ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1

PRECINCT 2 - 2026

11 / 27

PRECINCT 2 - 2025

PRECINCT 2 - 2026

12 / 27

PRECINCT 2 - 2025

On-Call - Construction of Sidewalks,Trails, & Related Items

FO T EE XTA AT SS

MOHAMED SAYED

142032

1/14/2026

ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1

PRECINCT 2 - 2026

13 / 27

PRECINCT 2 - 2025

11/8/2023

MANHOLE AND INLET REPAIR DETAILS

On-Call - Maintenance - Concrete Replacement/Repair

South Zone - Precinct 2 - 2026

ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1

PRECINCT 2 - 2026

14 / 27

PRECINCT 2 - 2025

On-call - construction of Sidewalks, Trails & Related ItemsFO T EE XTA AT SS

MOHAMED SAYED

142032

1/14/2026

ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1

PRECINCT 2 - 2026

15 / 27

PRECINCT 2 - 2025

On-Call - Maintenance - Concrete Replacement/Repair South Zone - Precinct 2 - 2026

ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1

PRECINCT 2 - 2026

16 / 27

PRECINCT 2 - 2025

FO T EE XTA AT SS

MOHAMED SAYED

142032

1/14/2026

ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1

PRECINCT 2 - 2026

17 / 27

PRECINCT 2 - 2025

FO T EE XTA AT SS

MOHAMED SAYED

142032

1/14/2026

ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1

PRECINCT 2 - 2026

18 / 27

PRECINCT 2 - 2025

FO T EE XTA AT SS

MOHAMED SAYED

142032

1/14/2026

ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1

PRECINCT 2 - 2026

19 / 27

PRECINCT 2 - 2025

FO T EE XTA AT SS

MOHAMED SAYED

142032

1/14/2026

ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1

PRECINCT 2 - 2026

20 / 27

PRECINCT 2 - 2025

FO T EE XTA AT SS

MOHAMED SAYED

142032

1/14/2026

ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1

PRECINCT 2 - 2026

21 / 27

PRECINCT 2 - 2025

FO T EE XTA AT SS

MOHAMED SAYED

142032

1/14/2026

ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1

PRECINCT 2 - 2026

22 / 27

PRECINCT 2 - 2025

FO T EE XTA AT SS

MOHAMED SAYED

142032

1/14/2026

ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1

PRECINCT 2 - 2026

23 / 27

PRECINCT 2 - 2025

FO T EE XTA AT SS

MOHAMED SAYED

142032

1/14/2026

ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1

PRECINCT 2 - 2026

24 / 27

PRECINCT 2 - 2025

On-call - construction of Sidewalks, Trails & Related ItemsFO T EE XTA AT SS

MOHAMED SAYED

142032

1/14/2026

ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1

PRECINCT 2 - 2026

25 / 27

PRECINCT 2 - 2025

SIDEWALK

Precinct 2 - 2025

9/27/2023

SWPPP GUIDELINES

FO T EE XTA AT SS

MOHAMED SAYED

142032

1/14/2026

ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1

PRECINCT 2 - 2026

26 / 27

PRECINCT 2 - 2025

FO T EE XTA AT SS

MOHAMED SAYED

142032

1/14/2026

ON-CALL MAINTENANCE - BS2N PACKAGE 1 ON-CALL MAINTENANCE - BS2N PACKAGE 1

PRECINCT 2 - 2026

27 / 27