22. Revised Bid Schedule AMD 0001.pdf
PDF 372 KB Posted
- Attached to
- Hoyt and Kiowa Creek 115-kV Breaker Replacement
- Solicitation number
- 89503222BWA000050_AMD0001
About this file
This document contains a bid schedule for a federal contract opportunity to replace 115-kV breakers at two substations. The bid schedule lays out contract line items for mobilization, site work, demolition, foundations, steel structures, circuit breakers, electrical equipment, cables, and installation. Quantities and units are provided for estimated work. The contract is to replace breakers at the Hoyt Substation and Kiowa Creek Switching Station for the Department of Energy Western Area Power Administration under solicitation number 89503222BWA000050_AMD0001. Pricing will be evaluated based on the amounts entered into the bid schedule for each contract line item at each substation and an overall total price.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION B
SUPPLIES OR SERVICES AND PRICES
BIDDING SCHEDULE
HOYT SUBSTATION 115KV BREAKER REPLACEMENT
CLIN Work or Material Estimated Quantity Unit Unit Price Amount
0001 Mobilization and preparatory work (Not to exceed 5% of TOTAL. See Section H.)
LS $
0002 Miscellaneous sitework LS $
0003 Demolition LS $
0004 Concrete foundations 13.6 CY $ $
0005 Steel structures, welded (galvanized) 3340 LBS. $ $
0006 Power circuit breaker, 115-kV, 3,000 amps (Gov't furnished)
4 EA. $ $
0007 Associated electrical equipment and material LS $
0008 Existing outdoor electrical equipment and material
LS $
0009 Furnishing 5/c No. 10 AWG control cable 5,000 LF $ $
0010 Installing 5/c No. 10 AWG control cable 5,000 LF $ $
0011 Furnishing 12/c No. 10 AWG control cable 2,500 LF $ $
0012 Installing 12/c No. 10 AWG control cable 2,500 LF $ $
SUBTOTAL $
ABBREVIATIONS
CLIN = Contract Line Item Number yards CY = cubic EA = each LBS = pounds LF = linear feet LS = lump sum siltman Highlight
BIDDING SCHEDULE
KIOWA CREEK SWITCHING STATION 115KV BREAKER REPLACEMENT
CLIN Work or Material Estimated Quantity Unit Unit Price Amount
0001 Mobilization and preparatory work (Not to exceed 5% of TOTAL. See Section H.)
LS $
0002 Miscellaneous sitework LS $
0003 Demolition LS $
0004 Concrete foundations 13.6 CY $ $
0005 Steel structures, welded (galvanized) 3340 LBS. $ $
0006 Power circuit breaker, 115-kV, 3,000 amps (Gov't furnished)
4 EA. $ $
0007 Associated electrical equipment and material LS $
0008 Existing outdoor electrical equipment and material
LS $
0009 Furnishing 5/c No. 10 AWG control cable 5,200 LF $ $
0010 Installing 5/c No. 10 AWG control cable 5,200 LF $ $
0011 Furnishing 12/c No. 10 AWG control cable 2,600 LF $ $
0012 Installing 12/c No. 10 AWG control cable 2,600 LF $ $
SUBTOTAL $
ABBREVIATIONS
CLIN = Contract Line Item Number yards CY = cubic EA = each LBS = pounds LF = linear feet LS = lump sum siltman Highlight
BIDDING SCHEDULE
HOYT SUBSTATION KIOWA CREEK SWITCHING
STATION 115-kV BREAKER REPLACEMENT
Substation Unit Amount
SUBTOTAL $ _
SUBTOTAL$ _
TOTAL $ _
Hoyt Substation 115kV Breaker Replacement
Kiowa Creek Switching Substation 115kV Breaker Replacement
ABBREVIATIONS
CLIN = Contract Line Item Number CY = cubic yards EA = each LBS = pounds LF = linear feet LS = lump sum
| HT_BkrRplcmnt_2022_SubBiddingSchedule 07.26.22.pdf |
| Bid Schedule |
| KIC_BkrRplcmnt_2022_SubBiddingSchedule 07.26.22.pdf |
| Bid Schedule |
File details come from the government source that posted it. Updated .