22. Attachment H - Site Visit Q&As and Attendance.pdf
PDF 349 KB Posted
- Attached to
- Lovell Control Building and Breaker Replacement
- Solicitation number
- 89503222BWA000051_AMD0001
About this file
This document contains questions and answers from a site visit regarding Solicitation Number 89503222BWA000051_AMD0001 from the Department of Energy Western Area Power Administration for the Lovell Control Building and Breaker Replacement project. The questions and answers provide clarification on specifications for removing gas and testing oil from circuit breakers; requirements for grounding, busing, and inner ducting of fiber; and confirm drawings and specifications will be included in an amendment for the building HVAC system. Pricing and response timing are not discussed. Contractors are responsible for testing circuit breakers prior to removal and for completely removing gas from breakers. Copper-clad ground wire is required for exposed applications and welded bus may be considered equal to swage and press fittings per the specifications. Gravel and subsurface specifications are referenced, and herbicide application is not necessary for disturbed ground surfaces.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15 June 2022
Attachment H
Site Visit Q&As and Attendance
89503222BWA000051
Questions and Answers on Lovell Substation Control Building and Breaker Replacement
1) Reference Project Specifications, Div. 11 Service Building, Section 23 00 00 – Mechanical. This section is highlighted with a notation “(Placeholder for B&McD Specs)”. When will the building mechanical specifications be available?
Drawings and spec have been sent to RMR, should be sent out with this amendment.
2) Reference Project Specifications, Div. 11, page 40. Specification Section 23 00 00 Mechanical General in Table 1 – Submittals, under Remarks column, indicates “Submittals per Equipment Schedules on drawings”. When will the building HVAC Equipment Schedule drawings be available?
Drawings and spec have been sent to RMR, should be sent out with this amendment.
3) Is WAPA or the contractor responsible for pulling gas out of the 3 gas breakers that are to be removed?
The Contractor is responsible for completely removing the circuit breakers, including removal of the gas.
4) Was the oil in the two oil breakers analyzed for PCBs? If so, are the test reports available?
Contractor is responsible for testing prior to removal, per Division 13.18 and 13.19
5) Please clarify Specification Div 9, B. 10., page 25, Vertical Switchboard Sections “CHB1-CHB2” or
“CHB1-CHB4”?
Please see the revised language included in the amended specifications, Div. 9, B. 10, page 25, Vertical Switchboard Sections CHB1-CHB4.
6) Specification Div 14, H. LFMC / FODC: Does this need to be installed in an inner duct?
Yes, in the service building, the fiber should be in inner duct from the entrance (where the its armor is removed) to the comm rack. Essentially just where the armor is off.
7) Can 4/0 bare copper be used for the grounding rather than the copper clad steel?
Copper clad per Division 9.B.6.b is required for exposed ground wire
8) Is welded bus considered equal to swage and can this method be used over swage press and fittings?
Please see specifications Division 9.B.6.d
9) Is there a sub surface Rock Specification incase the contractor has to install more to the existing substation surface?
Please see construction standard 2.11.1.1 Gravel Surfacing Material and 2.11.2 for Replacing and Protecting Gravel Surfacing. In regards to sub surface rock please see construction standard
2.8.2 Gravel Fills and Sand Fills. If you utilize a gravel material please submit to WAPA for approval.
10) Does Herbicide have to be applied to the disturbed Ground surface?
No
11) Is there Specifications and Drawings available for the HVAC system in the building?
Will be included with this amendment
12) How many lbs. of SF6 gas is in each breaker that needs to be removed?
WAPA’s maintenance records show 66 lbs. per breaker