This document provides details on a federal solicitation amendment for the Lovell Control Building and Breaker Replacement project. The solicitation number 89503222BWA000051 has been amended under number AMD0001 by the Department of Energy Western Area Power Administration to procure services for replacing the control building and breakers at the Lovell substation. The amendment references Attachment B - Drawings but does not provide further details on the specific products, services, response deadline, or award date required by the agency.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B

Drawings AMD 0001

89503222BWA000051

15 July 2022

PROJECT DRAWINGS

LOVELL SUBSTATION

SERVICE BUILDING AND BREAKER REPLACEMENT

STATE

SECTION C

DESCRIPTION/SPECIFICATIONS

Spec. No. 1048

WYOMING

SERVICE BUILDING and BREAKER REPLACEMENT

PROJECT DRAWINGS

A. GENERAL:

CONSTRUCTION DRAWINGS: Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.

PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale. Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.

STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from construction or project drawings or text, the details of construction or project drawings or text shall govern. A complete set of standard drawings are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx.

INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed.

EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.

REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.

CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise WAPA of any errors or omissions.

B. LIST OF DRAWINGS:

LOCATION MAP:

1. LV 0016 Rev D – Location and Vicinity Map

ELECTRICAL:

2. LV 0001 Rev R (EI) – Switching Diagram (Existing Installation)

3. LV 0001 Rev S – Switching Diagram

4. LV 0010 Rev J (EI) – General Plot Plan (Existing Installation)

5. LV 0010 Rev K – General Plot Plan

6. LV 1000 E (FIO) – 12.47kV Bus Structures Sections G-G & J-J (For Information Only)

7. LV 1001 G (EI) – 115/34.5kV Transformer KY4A Area Plan (Existing Installation)

8. LV 1001 H – 115/34.5kV Transformer KY4A Area Plan

9. LV 1002 G (EI) – 69kV Bus Structure Sections B-B, C-C, & D-D (Existing Installation)

10. LV 1002 H – 69kV Bus Structure Sections B-B, C-C, & D-D

11. LV 1003 G (EI) – 115-34.5kV Transformer Sections A-A, B-B, E-E, & I-I (Existing Installation)

12. LV 1003 H – 115-34.5kV Transformer Sections A-A, B-B, E-E, & I-I

13. LV 1004 E (EI) – 115kV Bus Structure Section D-D (Existing Installation)

14. LV 1004 F – 115kV Bus Structure Section D-D

15. LV 1005 M (EI) – 115kV Bus Structure Equipment and Bus Plan (Existing Installation)

16. LV 1005 N – 115kV Bus Structure Equipment and Bus Plan

17. LV 1006 I (EI) – 115kV Bus Structure Sections A-A & PP (Existing Installation)

18. LV 1006 J – 115kV Bus Structure Sections A-A & PP

19. LV 1007 G (EI) – 115kV Bus Structure Section B-B (Existing Installation)

20. LV 1007 H – 115kV Bus Structure Section B-B

21. LV 1008 G (EI) – 115kV Bus Structure Section C-C (Existing Installation)

22. LV 1008 H – 115kV Bus Structure Section C-C

23. LV 1009 D (EI) – 115kV Bus Structure Section E-E (Existing Installation)

24. LV 1009 E – 115kV Bus Structure Section E-E

25. LV 1010 J (EI) – 115kV Bus Structure Sections H-H & R-R (Existing Installation)

26. LV 1010 K – 115kV Bus Structure Sections H-H & R-R

27. LV 1012 E (EI) – 115kV Sections Section M-M (Existing Installation)

28. LV 1012 F – 115kV Sections Section M-M

29. LV 1015 C (EI) – 34.5kV & 12.47kV Bus Structures Sections C-C and F-F (Existing Installation)

30. LV 1015 D – 34.5kV & 12.47kV Bus Structures Sections C-C and F-F

31. LV 1017 C (EI) – 69/115kV XFMR Structure Sections A-A, E-E, F-F & G-G (Existing Installation)

32. LV 1017 D – 69/115kV XFMR Structure Sections A-A, E-E, F-F & G-G

33. LV 1018 E (EI) – 115kV Bus Structures Sections S-S & T-T (Existing Installation)

34. LV 1018 F – 115kV Bus Structures Sections S-S & T-T

35. LV 1019 (EI) – 115kV Transformer KY1A Area Plan (Existing Installation)

36. LV 1019 A – 115kV Transformer KY1A Area Plan

37. LV 1100 G – Equipment and Material Index

38. LV 1101 C – Equipment and Material Index

39. LV 1102 – Substation Signs

40. LV 1500 Rev B (EI) – 69kV Bus Structure Conduit and Grounding Plan (Existing Installation)

41. LV 1500 Rev C – 69kv Bus Structure Conduit and Grounding Plan

42. LV 1501 Rev C (EI) – 34.5kV Grounding and Conduit Plan (Existing Installation)

43. LV 1501 Rev D – 34.5kV Grounding and Conduit Plan

44. LV 1502 Rev F (EI) – 115kV Bus Structure Conduit and Grounding Plan (Existing Installation)

45. LV 1502 Rev G – 115kV Bus Structure Conduit and Grounding Plan

46. LV 1503 – Communications Grounding Details

47. 31 1502 – Communication Site Grounding – Typical Plan

48. 31 1503 – Communication Tower Grounding – Details

49. 31 1504 Rev. B – Building Growing Substation Details

50. LV 1610 Rev. C (EI) – Unit Substation DWA Wiring Diagram (Existing Installation)

51. LV 1610 Rev. E – Unit Substation DWA Wiring Diagram

CIVIL & SITE DRAWINGS:

52. LV 2017 Rev B (FIO) – Grading and Drainage Plan (For Information Only)

53. LV 2018 Rev B (FIO) – Grading & Drainage Facility (For Information Only)

FOUNDATION and STRUCTURAL DRAWING INDEX:

54. LV 2001-1 – Foundation/Structural Data and Drawings Index (Sh 1 of 2)

55. LV 2001-2 – Foundation/Structural Data and Drawings Index (Sh 2 of 2)

FOUNDATION PLANS:

56. LV 2000 Rev J (EI) – Foundation General Plan (Existing Installation)

57. LV 2000-1 – General Foundation Plan (Sh 1 of 4)

58. LV 2000-2 – 115/34.5kV Transformer KY4A Area Foundation Plan (Sh 2 of 4)

59. LV 2000-3 – 115kV Bus Structure Foundation Plan (Sh 3 of 4)

60. LV 2000-4 – 115kV Transformer Foundation Plan (Sh 4 of 4)

CONCRETE:

61. LV 2004 Rev D – Foundations Outline and Reinforcement

62. LV 2012 Rev E – Foundations Outline and Reinforcement

63. LV 2025 Rev E – Foundations Outline and Reinforcement

64. LV 2048 (EI) – Foundations Outline and Reinforcement (Existing Installation)

65. LV 2048 Rev A – Foundations Outline and Reinforcement

66. LV 2300 Rev A – Foundations Outline and Reinforcement

67. LV 2301 – Foundations Outline and Reinforcement

68. LV 2550 – Anchor Bolts & Embeds

69. LV 2877 – 30-Foot Monopole Drilled Auger Type

70. LV 2878 – 30-Foot Monopole Foundation Layout

CABLE TRENCH:

71. LV 2026-1 Rev A (FIO) – Cable Trench Plan, Sections and Details (For Information Only)

72. LV 2026-2 Rev A (FIO) – Cable Trench Plan, Sections and Details (For Information Only)

73. LV 2026-3 Rev A (EI) – Cable Trench Plan, Sections and Details (Existing Installation)

74. LV 2026-3 Rev B – Cable Trench Plan, Sections and Details

75. LV 2501 – Cable Trench Plan

STEEL STRUCTURES:

76. LV 2052 (FIO) – Equipment Supports (For Information Only)

77. LV 2054 (FIO) – 34.5 kV SW & Fuse Support Type I (For Information Only)

78. LV 2600 – Bus and Equipment Support Type I

79. LV 2925 – Equipment Cabinet Platform Type VII Details

80. LV 2876 – 30-Foot Monopole Outline

CONTROL BUILDING:

81. 01 2004-1 Rev. D – Concrete Standards – General Outline & Reinforcement Notes

82. 01 2004-2 Rev. D – Concrete Standards – General Outline & Reinforcement Notes

83. 01 2006-1 – Concrete Standards – Building Slabs-On-Ground Specifications, Notes, Plans & Details (Sheet 1 Of 3)

84. 01 2006-2 – Concrete Standards – Building Slabs-On-Ground Specifications, Notes, Plans & Details (Sheet 2 Of 3)

85. 01 2006-3 – Concrete Standards – Building Slabs-On-Ground Specifications, Notes, Plans & Details (Sheet 3 Of 3)

86. 31 2049-1 Rev. B – Control Switchboard Equipment & Communication Rack – Base Anchorage Details (Sheet 1 Of 2)

87. 31 2051 Rev. B – Structural Building Entry Platforms

88. LV 3010 – Architectural Floor Plan

89. LV 3011 – Battery Room Bridge Crane

90. LV 3012 Rev A – Reflected Ceiling Plan

91. LV 3014 – Elevations

92. LV 3016 – Building Sections

93. LV 3018 – Architectural Detailed Wall Sections

94. LV 3020 – Architectural Details

95. LV 3022 – Architectural Detailed Sections

96. LV 3024 – Door Schedules & Details

97. LV 3200 – General Structural Notes, Abbreviations & Reference Drawings

98. LV 3201 Rev A – Structural Foundation Plan

99. LV 3202 – Structural Roof Framing Plan

100. LV 3203-1 – Structural Foundation Sections & Details (Sh 1 Of 2)

101. LV 3203-2 – Structural Foundation Sections & Details (Sh 2 Of 2)

102. LV 3204-1 – Structural Foundation/Cable Entry Details (Sh 1 Of 2)

103. LV 3204-2 – Structural Foundation/Cable Entry Details (Sh 2 Of 2)

104. LV 3205-1 – Structural Typical Wood-Framed Wall (Sh 1 Of 2)

105. LV 3205-2 – Structural Typical Wood-Framed Wall (Sh 2 Of 2)

106. LV 3206 – Structural Equipment Mounting Details

107. LV 3300 – Mechanical-General Notes & Legends

108. LV 3301 – Mechanical HVAC Floor Plan

109. LV 3302 – Mechanical Details I

110. LV 3303 – Mechanical Details II

111. LV 3304 – Mechanical HVAC Schedules

112. LV 3305 – Mechanical HVAC Controls

113. LV 3306 - Mechanical HVAC Sections I

114. LV 3307 - Mechanical HVAC Sections II

115. LV 3400 Rev A – Electrical Power Plan

116. LV 3401 Rev A – Electrical Lighting Plan

117. LV 3402 Rev A – Electrical Security Plan

118. LV 3403 Rev A – Electrical Panelboards DHA, DHB

119. LV 3404 Rev A – Electrical Wiring Devices Schematic

120. LV 3405 Rev A – Electrical Luminaire and Equipment Schedules

CONTROLS:

121. LV T600-1 – Control Cable List (SH 1 OF 2)

122. LV T600-2 – Control Cable List (SH 2 OF 2)

123. LV 1611D – Outdoor Lighting Wiring Diagram

124. LV 4000 Rev I – Service Building Conduit, Arrangement, & Grounding

125. LV 6000 Rev I – 125VDC Distribution Panel BHA1 & BHA2 WD

126. LV 6021-1 Rev B – 115kV PT VY1A Wiring Diagram

127. LV 6021-2 Rev A – 115kV CCVT VY2A1 Wiring Diagram

128. LV 6021-3 Rev B – 115kV CCVT VY3A1 Wiring Diagram

129. LV 6021-4 Rev B – 115kV CCVT VY4A1 Wiring Diagram

130. LV 6021-5 Rev B – 115kV CCVT VY5A1 Wiring Diagram

131. LV 6021-6 Rev A – 115kV CCVT VY6A1 Wiring Diagram

132. LV 6021-7 Rev A – 115kV CCVT VY7A1 Wiring Diagram

133. LV 6022-1 – 69kV CCVT VZ1B Wiring Diagram

134. LV 6022-2 – 69kV CCVT VZ1A1 Wiring Diagram

135. LV 6023 Rev E – 34.5kV VX1A & VX2A & CT'S QX1A & QX2A WD

136. LV 6024 Rev D – 12.47kV CT QW1A & PT VW1A WD

137. LV 6146 – 12.47kV VW1B and RW1B Wiring Diagram

138. LV 6147 – 12.47kV VW4A and RW4A Wiring Diagram

GEOLOGY:

139. LV 0015 Rev C – Topographic Map and Location of Exploration

140. LV 8000 Rev B – Logs of Exploration

141. LV 8001 Rev B – Logs of Exploration

142. LV 8002 Rev B – Logs of Exploration

143. LV 8003 Rev B – Logs of Exploration

144. LV 8004 Rev B – Logs of Exploration

145. LV 8005 Rev B – Logs of Exploration

SUITABLE FOR CONSTRUCTION AS OF:

May 16, 2022- 4:32pm

May 16, 2022- 4:25pm

May 16, 2022- 4:27pm

May 16, 2022- 4:28pm

May 16, 2022- 4:31pm

May 16, 2022- 4:30pm

May 17, 2022- 6:56am

May 17, 2022- 6:59am

May 16, 2022- 5:10pm

POLE A POLE B POLE C

OPENOPENOPENOPEN

8D 8M

125VDC

MOTOR

May 16, 2022- 5:11pm

May 16, 2022- 5:13pm

May 17, 2022- 7:02am

May 16, 2022- 5:19pm

May 17, 2022- 7:04am

May 16, 2022- 5:29pm

May 17, 2022- 7:06am

May 16, 2022- 5:32pm

May 17, 2022- 7:32am

May 16, 2022- 5:33pm

SU

IT

AB

LE

F O

R C

O N

ST

R

U C

TI

O

N A

S O

F:

J ul

6, 3-

0:

am

May 17, 2022- 7:34am

May 16, 2022- 5:35pm

May 17, 2022- 7:36am

May 16, 2022- 5:37pm

May 17, 2022- 7:40am

May 16, 2022- 5:39pm

May 17, 2022- 7:43am

May 16, 2022- 5:40pm

May 17, 2022- 7:51am

May 16, 2022- 5:42pm

May 17, 2022- 7:54am

May 16, 2022- 5:44pm

May 17, 2022- 7:58am

May 16, 2022- 5:45pm

May 17, 2022- 8:02am

May 16, 2022- 5:47pm

May 17, 2022- 8:03am

May 16, 2022- 5:49pm

May 16, 2022- 5:50pm

May 16, 2022- 5:52pm

TRANSFORMER KY4A

LV 462

PCB JY4A 115KV

TRANSFORMER KY1A

LV 162

PCB JY1A 115KV

YELLOWTAIL NO. 1

LV 662

PCB JY2A 115KV

HILLTOP-THERMOPOLIS

LV 762

PCB JY3A 115KV

YELLOWTAIL NO. 2

LV 862

PCB JY6A 115KV

BIG HORN REA

VX1B1

INSTR XFMR 34.5KV

BIG HORN REA

VX1B2

INSTR XFMR 34.5KV

BIG HORN REA

VX1B3

INSTR XFMR 34.5KV

YELLOWTAIL NO. 1

VY2A1

INSTR XFMR 115KV

YELLOWTAIL NO. 1

EY2A

SECONDARY FUSE

TRANSFER BUS

VY4A1

INSTR XFMR 115KV

TRANSFER BUS

EY4A

SECONDARY FUSE

HILLTOP-THERMOPOLIS

VY3A1

INSTR XFMR 115KV

HILLTOP-THERMOPOLIS

EY3A

SECONDARY FUSE

YELLOWTAIL NO. 2

VY6A1

INSTR XFMR 115KV

YELLOWTAIL NO. 2

EY6A

SECONDARY FUSE

BIG GEORGE

VY7A1

INSTR XFMR 115KV

BIG GEORGE

EY7A

SECONDARY FUSE

GROUND FAULT CIRCUIT

VW4A1

VT 12.47KV

GROUND FAULT CIRCUIT

VW4A2

VT 12.47KV

GROUND FAULT CIRCUIT

VW4A3

VT 12.47KV

GROUND FAULT CIRCUIT

RW4A

RESISTOR 208V

GROUND FAULT CIRCUIT

EW4A

TERMINAL BLOCKS

GROUND FAULT CIRCUIT

VW1B1

VT 12.47KV

GROUND FAULT CIRCUIT

VW1B2

VT 12.47KV

GROUND FAULT CIRCUIT

VW1B3

VT 12.47KV

GROUND FAULT CIRCUIT

RW1B

RESISTOR 208V

GROUND FAULT CIRCUIT

EW1B

TERMINAL BLOCKS

NORTH CODY

EZ1A

SECONDARY FUSE

TRANSFORMER KY1A

EZ1B

SECONDARY FUSE

May 16, 2022- 5:53pm

May 17, 2022- 8:07am

May 16, 2022- 5:55pm

May 17, 2022- 8:09am

May 16, 2022- 5:57pm

May 17, 2022- 8:11am

May 16, 2022- 6:00pm

AS OF: May 16, 2022- 6:01pm

NOT TO BE USED FOR REVIEW SETINTERNAL ENGINEERING REVIEW

May 16, 2022- 6:01pm

May 17, 2022- 8:13am

Jul 11, 2022- 11:13am

May 17, 2022- 8:19am

May 17, 2022- 8:24am

May 16, 2022- 6:16pm

May 16, 2022- 6:17pm

May 17, 2022- 8:15am

May 16, 2022- 6:05pm

May 16, 2022- 6:07pm

May 16, 2022- 6:07pm

May 16, 2022- 6:10pm

May 16, 2022- 6:12pm

May 16, 2022- 6:14pm

May 17, 2022- 8:17am

May 16, 2022- 6:52pm

May 16, 2022- 6:53pm

May 17, 2022- 8:42am

May 17, 2022- 8:38am

May 16, 2022- 7:03pm

May 17, 2022- 8:49am

May 16, 2022- 7:08pm

May 16, 2022- 7:13pm

May 16, 2022- 7:14pm

May 17, 2022- 8:26am

May 17, 2022- 8:30am

May 17, 2022- 8:32am

May 16, 2022- 6:55pm

May 16, 2022- 7:07pm

May 17, 2022- 8:45am

May 17, 2022- 8:47am

May 16, 2022- 7:10pm

May 16, 2022- 7:16pm

May 16, 2022- 7:11pm

Ψ

Ψ

Ψ

Ψ

May 16, 2022- 7:18pm

May 16, 2022- 7:19pm

Jul 11, 2022- 11:15am

May 16, 2022- 7:23pm

May 16, 2022- 7:25pm

May 16, 2022- 7:27pm

May 16, 2022- 7:28pm

May 16, 2022- 7:30pm

May 16, 2022- 7:31pm

May 16, 2022- 7:33pm

Jul 11, 2022- 11:17am

May 16, 2022- 7:38pm

May 16, 2022- 7:39pm

May 16, 2022- 7:41pm

May 16, 2022- 7:43pm

May 16, 2022- 7:44pm

May 16, 2022- 7:46pm

May 16, 2022- 7:48pm

May 16, 2022- 7:49pm

AIRFLOW ARROW

BA BREATHING AIR DROP

CA COMPRESSED AIR DROP

SUPPLY AIR OR OUTSIDE AIR

ROUND DUCT SECTION

RETURN AIR ROUND DUCT

SECTION

EXHAUST AIR ROUND DUCT

SECTION

DP

DIFFERENTIAL PRESSURE

SENSOR

S STATIC PRESSURE SENSOR

OCC OCCUPANCY SENSOR

ROUND & RECTANGULAR DUCT

TAKEOFF

CO CARBON MONOXIDE SENSOR

HVAC LEGEND

M

CONTROL DAMPER, MOTOR

OPERATED

MANUAL BALANCE DAMPER

BD

BACKDRAFT DAMPER

AD

AD

ACCESS DOOR (AD)

ACCESS PANEL (AP)

S

AD

S

DAMPERS:

FIRE (F) -

SMOKE (S) -

FIRE SMOKE (F/S) -

AD

SECURITY BARS

FLEXIBLE DUCT CONNECTION

RECTANGLUAR ELBOW WITH

TURNING VANES

RECTANGULAR TEE WITH

TURNING VANES

RECTANGULAR RADIUS ELBOW

R RISE IN RESPECT TO AIR-FLOW

D DROP IN RESPECT TO AIR-FLOW

SQUARE OR RECTANGULAR TO

ROUND TRANSITION

SUPPLY AIR OR OUTSIDE AIR

RECTANGULAR DUCT SECTION

RETURN AIR RECTANGULAR

DUCT SECTION

EXHAUST AIR RECTANGULAR

DUCT SECTION

ROUND FLEXIBLE DUCT

(5'-0" MAX LENGTH)

SQUARE OR RECTANGULAR

SUPPLY DIFFUSER

RETURN AIR DIFFUSER

EXHAUST AIR DIFFUSER

T THERMOSTAT

CO2 CARBON DIOXIDE SENSOR

H HUMIDISTAT

LINEAR SLOT DIFFUSER

VAV-

VARIABLE AIR VOLUME

TERMINAL BOX

(3'-0") FINNED TUBE RADIATION.

LENGTH OF ELEMENT SHOWN

IN PARENTHESIS

ESS EMERGENCY SHUT-OFF SWITCH

M MOTOR

FCP FAN CONTROL PANEL

PIPE LINE ACCESSORIES

3-WAY VALVE

2-WAY VALVE

ANGLE VALVE

AV

AUTOMATIC AIR VENT

ASSEMBLY

BFP

BACKFLOW PREVENTION

ASSEMBLY

BALANCING VALVE / CIRCUIT

SETTER

BALL VALVE

BLIND FLANGE

BUTTERFLY VALVE

CHECK VALVE

FLEX CONNECTION

FLOW ARROW

FM FLOW METER

GATE VALVE

GLOBE VALVE

HOSE GATE DRAIN VALVE

IF

INSULATING FLANGE

MV

MANUAL AIR VENT ASSEMBLY

- SEE SPECIFICATIONS FOR

APPROPRIATE VALVE TYPE

M METER

M MOTORIZED CONTROL VALVE

OS&Y

OUTSIDE SCREW & YOKE VALVE

PIPE WITH HEAT TRACE

PLUG VALVE

PRESSURE GUAGE

SELF CONTAINED PRESSURE

REDUCING (REGULATING)

VALVE

PUMP

REDUCER (CONCENTRIC)

RELIEF, SAFETY OR THERMAL

RELIEF VALVE

REMOVABLE CAP

REMOVABLE PLUG

S STRAINER

SUCTION DIFFUSER

TEST CONNECTION

THERMOMETER

UNION

Y-TYPE STRAINER

SRC SPRING RETURN CLOSED BALL

VALVE

PIPE SYMBOLS

PIPE ELBOW

PIPE DOWN

PIPE UP

PIPE CONTINUATION

UNITED STATES DEPARTMENT OF ENERGY

APPROVED

E A

C

DESIGNED

WESTERN AREA POWER ADMINISTRATION

LV

MECHANICAL

HEADQUARTERS - LAKEWOOD, COLORADO

LOVELL SUBSTATION

SERVICE BUILDING

WYOMING

GENERAL NOTES & LEGENDS

JUNE 24, 2022

A. OHM D. OLSEN

PIPELINE ABBREVIATIONS

MECHANICAL ABBREVIATIONS GENERAL NOTES:

DETAIL / ENLARGED

CALLOUT SYMBOL

A

M-001

INDICATES

LIMITS OF

DETAIL/SECTION

DETAIL/SECTION

DESIGNATOR

SHEET WHERE

DETAIL/SECTION IS

SHOWN

DETAIL/SECTION TITLE

TITLE

A1

LOCATION WHERE

DETAIL / SECTION

IS SHOWN ON

SHEET

SECTION CUT SYMBOL

A

M-001

INDICATES PERSPECTIVE

AND LIMITS OF SECTION

SECTION

DESIGNATOR

DRAWING WHERE

SECTION IS SHOWN

CONSTRUCTION INTERFACE

DEMOLITION

EXISTING

NEW

EXISTING

EXISTING

NEW

DEMOLITION

AIR DISTRIBUTION DEVICE

IDENTIFICATION

AIR FLOW NECK SIZE

QUANTITY

SYSTEM TYPE SPEC. TYPE

SA-A

(2)175-8Ø

1. LEGEND IS GENERAL IN NATURE AND MAY INDICATE MORE INFORMATION THAN IS APPLICABLE TO

PROJECT. SEE PLANS FOR SPECIFIC SYMBOLS AND ABBREVIATIONS.

2. PROVIDE ALL MATERIALS, VALVES, HANGERS, ETC. AND EQUIPMENT AND PERFORM ALL LABOR

REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE

DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY CODE.

3. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH

MANUFACTURERS RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE CODES AND

REGULATIONS.

4. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH STRUCTURAL, CIVIL, ELECTRICAL

WORK, ETC., SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS.

5. UNLESS OTHERWISE INDICATED MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF PIPES, CONDUITS, ETC., THROUGHOUT ACCESS ROUTES AND IN MECHANICAL ROOMS.

6. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS, AND VALVING.

7. VERIFY DIMENSIONS AND CONNECTION SIZE WITH FURNISHED EQUIPMENT.

8. ALL ELEVATIONS ARE ABOVE FINISHED FLOOR TO BOTTOM OF DUCT, PIPE, OR PIPE INSULATION

UNLESS NOTED OTHERWISE.

9. DUCT DIMENSIONS INDICATED REFER TO SHEET METAL DIMENSIONS. SHEET METAL SIZE SHALL BE AIR OPENING DIMENSION PLUS THE THICKNESS OF ACOUSTICAL LINER WHERE LINER IS INSTALLED.

WHERE LINER IS NOT INSTALLED, AIR OPENING SIZE AND SHEET METAL SIZE SHALL BE THE SAME.

10. COORDINATE ALL WALL AND ROOF PENETRATIONS WITH STRUCTURAL AND ARCHITECTURAL PLANS.

11. INSTALL TEMPERATURE CONTROLS AT 48" ABOVE FINISHED FLOOR AND COORDINATE WITH OTHER

DEVICES LOCATED ON WALLS. COORDINATE WITH ARCHITECTURAL WALL FINISHES.

12. PROVIDE STRUCTURAL EQUIPMENT PADS IN ACCORDANCE WITH STRUCTURAL DRAWINGS AND

SPECIFICATIONS.

13. CONTRACTOR SHALL AIR BALANCE ALL GRILLES TO CFM'S SHOWN ON PLANS.

14. MOUNT ALL OVERHEAD MECHANICAL EQUIPMENT AND FIXTURES WEIGHING 31 POUNDS OR MORE TO SUPPORTS THAT SHALL RESIST FORCES OF 0.5 TIMES THE EQUIPMENT WEIGHT IN ANY HORIZONTAL

DIRECTION AND 1.5 TIMES THE EQUIPMENT WEIGHT IN THE DOWNWARD DIRECTION.

15. BASIS OF DESIGN MANUFACTURER AND MODEL ARE INCLUDED FOR COORDINATION PURPOSES.

PROVIDE BASIS OF DESIGN EQUIPMENT OR APPROVED EQUAL.

BLWDN BLOWDOWN

CD CONDENSATE DRAIN

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CR CONDENSATE RETURN

CT CHEMICAL TREATMENT

CTB COOLING TOWER BLOWDOWN

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

D DRAIN

DI DEIONIZED WATER

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

HPS HIGH PRESSURE STEAM

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

LPS LOW PRESSURE STEAM

MPS MEDIUM PRESSURE STEAM

MW MAKEUP WATER (AFTER

BACKFLOW PREVENTER)

N NITROGEN

NG NATURAL GAS

O OXYGEN

PCR PUMPED CONDENSATE RETURN

V VACUUM

12"Ø ROUND DUCT DIMENSION

24x12 RECTANGULAR DUCT DIMENSION

(INCHES)

AFF ABOVE FINISHED FLOOR

AFMS AIR FLOW MEASURING STATION

ARF ABOVE RAISED FLOOR

BOD BOTTOM OF DUCT

BOP BOTTOM OF PIPE

CD CONTROL DAMPER

CFM CUBIC FEET PER MINUTE

CL CENTER LINE OF PIPE ELEVATION

CONC CONCENTRIC

COND COOLING COIL CONDENSATE DRAIN

CTR CONTROLLER

CU CONDENSING UNIT

DB DRY BULB

DN DOWN

DRG DIFFUSER, REGISTER, GRILLE

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EF EXHAUST FAN

EG EXHAUST GRILLE

EL ELEVATION

ELL ELBOW

ER EXHAUST REGISTER

ESP EXTERNAL STATIC PRESSURE

FCU FAN COIL UNIT

FF FLAT FACED

FO FLAT OVAL

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

HS HYDROGEN SENSOR

HT HUMIDITY TRANSMITTER

I.E. INVERT ELEVATION

IN. W.C INCHES WATER COLUMN

L LOUVER

LAT LEAVING AIR TEMPERATURE

LR LONG RADIUS

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MFR MANUFACTURER

MJ MECHANICAL JOINT

NC NORMALLY CLOSED (FAIL POSITION)

NO NORMALLY OPEN (FAIL POSITION)

OA OUTSIDE AIR

OB OPPOSED BLADE

PB PARALLEL BLADE

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAUGE

RA RETURN AIR

RED REDUCER-REDUCING

RL REFRIGERANT LIQUID

RMJ RESTRAINED MECHANICAL JOINT

RS REFRIGERANT SUCTION

SA SUPPLY AIR

SCH SCHEDULE

SCR SPRING RETURN CLOSED

SHR SHORT RADIUS

SP STATIC PRESSURE SENSOR

SR SUPPLY REGISTER

ST STEAM TRAP

SW SOCKET WELD

TA TRANSFER AIR

TOA TREATED OUTSIDE AIR

TOC TOP OF CONCRETE

TOD TOP OF DUCT

TOS TOP OF STEEL

V VENT

VFD VARIABLE FREQUENCY DRIVE

WB WET BULB

WE WELD END

WN WELD NECK

ZT ZONE TRANSMITTER

6/23/2022

CTR-1T

T

H

T T

TT

495-12x12

TA-A

495-12x12

RA-A

12x12 RA

7' - 0" BOD EL

VERTICAL SWITCHBOARDS

VERTICAL SWITCHBOARDS

C A

B L

E E

N T

R Y

B O

X

R E

F E

R

T O

S T

R U

C T

U R

A L

COMM RACKS

V

D C

B

A T

T E

R Y

CH-1

495-12x12

SA-B

ERU-1

12x12 SA

9' - 0" BOD EL

12x12 EA

9' - 0" BOD EL

12x12 OA

8' - 9" BOD EL

CD-2

LVR-1

16x14 SA

6' - 10" BOD EL

HS1

OCC

OCC

WEATHERHOOD 10

OT-1

ZT-1

HT-1

ZT-2 13

(6)235-10x10

SA-B

FCU-1CU-1

3/8" RL

7/8" RS

3/8" RL

7/8" RS

3/8" RL

5/8" RS

4 4

ST-2

ST-1 16

2019 20

3/4" COND2019

C

A

CD-1

18x18 OA

6' - 8" BOD EL

FCU-3

FCU-2

3/4" COND 3/4" COND

8 21

/1

1' - 0"

PAD BY

STRUCTURAL

CU-3CU-2

3 3

B

3' - 0"

PAD BY

STRUCTURAL

30' - 6"

2' - 1"

9' - 8 7/16"

/4

UNITED STATES DEPARTMENT OF ENERGY

APPROVED

E A

C

DESIGNED

WESTERN AREA POWER ADMINISTRATION

LV

MECHANICAL

HEADQUARTERS - LAKEWOOD, COLORADO

LOVELL SUBSTATION

SERVICE BUILDING

WYOMING

HVAC FLOOR PLAN

JUNE 24, 2022

A. OHM D. OLSEN

NOTES: KEYED NOTES:

1. CONTRACTOR SHALL LOCATE EQUIPMENT SUCH THAT ALL REQUIRED

MAINTENANCE CLEARANCE/ACCESS ARE COORDINATED WITH WORK BY

OTHER TRADES.

2. ALL HORIZONTAL DUCTWORK SHALL BE SUPPORTED PER SMACNA USING

UNISTRUT AND MIN 3/8" ALL-THREAD ROD, SPACED NO MORE THAN 6'-0"

APART. DUCT SHALL BE SECURED TO UNISTRUT BY 24 GAUGE 1-1/2" STRAP.

3. CONTRACTOR TO FIELD ROUTE ALL DUCTWORK. DUCTWORK SHALL BE

ROUTED BE BELOW CABLE TRAYS WERE THEY OCCURE. THIS DRAWING IS

FOR REFERANCE ONLY.

4. TESTING, ADJUSTING AND BALANCING (TAB) SHALL BE PERFORMED

FOLLOWING COMPLETION AND APPROVAL OF EACH HVAC SYSTEM.

5. REFRIGERANT PIPING SIZES AND ROUTING ARE DIAGRAMMATIC AND MUST

BE VERIFIED WITH EQUIPMENT MANUFACTURER PRIOR TO INSTALLATION.

1. FURNISH AND INSTALL MACURCO GD-6 HYDROGEN SENSOR OR APPROVED

EQUAL. INSTALL HYDROGEN SENSOR AT MOUNTING ELEVATION PER

MANUFACTURER'S RECOMMENDATIONS, OR WHERE NOT PROVIDED,

MOUNT 0'-6" BELOW CEILING. INTERLOCK WITH ERU-1. REFER TO

CONTROL SCHEMATIC ON DWG 3305 FOR DETAILS.

2. FURNISH AND INSTALL OCCUPANCY SENSOR, WATTSTOPPER MODEL

DT300 OR APPROVED EQUAL. MOUNT ON CEILING. INTERLOCK WITH ERU-1.

3. INSTALL CONDENSING UNIT WITH MANUFACTURER'S STANDARD 12"

EQUIPMENT STAND ON CONCRETE PAD WITH HILTI KWIK BOLT 3

EXPANSION ANCHORS 3/8"Ø WITH 3-1/2" EMBEDMENT IN CONCRETE.

4. MOUNT CONTROL ROOM UNIT ON FAN COIL SUPPORT AS DETAILED ON

DWG 3303, AND ON MANUFACTURER'S STANDARD PLENUM STAND. INSTALL

PIPING PER DETAIL 2 ON 3302.

5. INSTALL TRANSFER GRILLE WITH 1 HOUR FIRE DAMPER AT 1'-0" AFF.

REFER TO DETAIL 3 ON DWG 3303.

6. PENETRATION THROUGH BATTERY ROOM WALL SHALL BE SEALED WITH

FIRESTOP SEALANT, PER ARHITECTURAL REQUIREMENTS BY OTHERS.

CONTRACTOR TO PROVIDE FIRE-STOPPING DETAILS FOR PENETRATIONS

THROUGH FIRE WALL. INCLUDE UL SYSTEM NUMBERS FOR EACH DETAIL.

7. INSTALL ERU AT 8'-6" AFF TO BASE OF CABINET. VERIFY DUCT

CONNECTION SIZES WITH MANUFACTURER PRIOR TO INSTALLATION AND

UTILIZE DUCT TRANSITIONS AS NECESSARY.

8. INSTALL RETURN GRILLE WITH 1 HOUR FIRE DAMPER AT 9'-8" AFF.

9. PROVIDE WITH MOTORIZED DAMPER AT INLET OF LOUVER PER DETAIL 1

ON DWG 3302.

10. PROVIDE WITH MANUFACTURER'S STANDARD 12"x12" 45° WEATHERHOOD, GREENHECK WTHD-12 OR APPROVED EQUAL. PROVIDE WITH BACKDRAFT

DAMPER AND BIRDSCREEN PER DETAIL 4 ON DWG 3302. MOUNT AT

UNDERSIDE OF SOFFIT.

11. WALL MOUNT BATTERY ROOM UNIT 7'-9" AFF. INSTALL PIPING PER DETAIL 2

ON DWG 3302.

12. INSTALL CONVECTION HEATER AT 0'-0" AFF BELOW BATTERY ROOM UNIT

PER MANUFACTURER'S INSTALLATION INSTRUCTIONS.

13. PROVIDE ZONE TRANSMITTER ACCORDING TO SCHEDULE ON DWG 3304.

14. PROVIDE HUMIDITY TRANSMITTER ACCORDING TO SCHEDULE ON DWG

3304.

15. INSTALL OUTDOOR AIR TEMPERATURE SENSOR ACCORDING TO

SENSOR/TRANSMITTER SCHEDULE ON DWG 3304.

16. MOUNT THERMOSTAT IN DUCT ABOVE FAN COIL UNIT, SEE DETAIL D ON

DWG 3308.

17. INSTALL CONTROLLER ACCORDING TO SENSOR/TRANSMITTER SCHEDULE

ON DWG 3304.

18. PROVIDE FAN COIL UNIT WITH MANUFACTURER'S STANDARD REMOTE

PROGRAMMABLE THERMOSTAT.

19. FIELD ROUTE PIPING, DRAWING IS FOR REFERANCE ONLY. PROVIDE

WEATHER RESISTANT LINESET COVER AND FITTINGS WITH UV INHIBITORS

FOR PIPING THROUGH SOFFIT TO INDOOR UNIT. APPLY CAULKING TO SEAL

WHERE THE LINESET ENTERS AND EXITS THE EXTERIOR WALL.

20. CONDENSATE PIPING SHALL EXTEND PAST CONCRETE SLAB TO DRAIN ON

GRAVEL SURFACING. TURN DOWN TO SPLASH BLOCK.

21. FOR PENETRATION DETAIL REFER TO ARCHITECTURAL BY OTHERS.

SCALE IN FEET

0 2' 4' 8'

NORTH

HVAC PLAN

ACTUATED DAMPER

J-MOLDING

AND CAULKING

ALL AROUND

REFER TO ARCH DRAWINGS

FOR WALL DETAILS.

WOOD BLOCKING ALL

AROUND OPENING

MASONRY VENEER

MASONRY TIE

20 GA GALVANIZED

STEEL FLASHING

WRAP MOISTURE BARRIER

AROUND OPENING

20 GA GALVANIZED STEEL

CLOSURE, REFER TO

ARCH DOOR DETAILS

LOUVER WITH

INTEGRAL FLANGE

MASONRY VENEER

BEYOND

SOFFIT

CHARGING VALVE

LIQUID PIPING

SUCTION PIPING

FILTER-DRIER

SIGHT GLASS

PROVIDE OIL TRAP

INSTALL SENSING BULB

45` ABOVE BOTTOM OF

PIPING, AS CLOSE TO

COIL AS POSSIBLE

CONDENSATE DRAIN

NOTES:

1. CONTRACTOR IS RESPONSIBLE FOR COORDINATING

REFRIGERANT LIQUID AND SUCTION PIPING, SIZES, ROUTING,

AND ALL ACCESSORIES WITH EQUIPMENT MANUFACTURER.

MAINTAIN UNIFORM SLOPE TO PREVENT OIL FROM POOLING IN

LOW POINTS IN THE REFRIGERANT PIPING SYSTEM.

EVAPORATOR COIL

ISOLATION VALVE (TYP.)

EXPANSION VALVE

EQUALIZATION LINE

AIR COOLED

CONDENSING UNIT

STRAP HANGERS

60" MAX.

HANGER

STRAPS

UNLESS FOOT OF STRAP

IS PLACED UNDER A

BOTTOM REINFORCEMENT

SCREWS

SCREWS MAY

BE OMITTED

IF HANGER LOOPS 1" MIN.

NOTES:

1. REFER TO STRUCTURAL DRAWINGS

FOR UNISTRUT SUPPORT DETAILS.

2. REINFORCEMENT MAY BE USED

FOR ATTACHMENT IF IT QUALIFIES

FOR BOTH DUTIES. DO NOT

EXCEED ALLOWABLE LOAD LIMITS.

ROD

STRAP OR

ANGLE

TRAPEZE HANGERS

SIZE BOLT(S)

FOR LOAD

SOFFIT

WEATHER HOOD

MASONRY

VENEER BEYOND

20 GA GALVANIZED

STEEL FLASHING

MASONRY TIE

MASONRY VENEER

20 GA GALVANIZED STEEL

CLOSURE, REFER TO

ARCH DOOR DETAILS

REFER TO ARCH DRAWINGS

FOR WALL DETAILS.

J-MOLDING AND

CAULKING ALL

AROUND

DUCT

WRAP MOISTURE BARRIER

AROUND OPENING

WOOD BLOCKING ALL

AROUND OPENING

BIRDSCREEN

UNITED STATES DEPARTMENT OF ENERGY

APPROVED

E A

C

DESIGNED

WESTERN AREA POWER ADMINISTRATION

LV

MECHANICAL

HEADQUARTERS - LAKEWOOD, COLORADO

LOVELL SUBSTATION

SERVICE BUILDING

WYOMING

HVAC DETAILS I

JUNE 24, 2022

A. OHM D. OLSEN

NOT TO SCALE

LOUVER DETAIL 1

NOT TO SCALE

DX SPLIT SYSTEM PIPING 2

NOT TO SCALE

LOWER DUCT HANGAR

ATTACHMENTS 3

NOT TO SCALE

WEATHERHOOD DETAIL 4

1/4"

PIPE SLEEVE

BACKUP MATERIAL

SEALANT

INSULATION

CENTER OF PIPE

3/8"

PIPE

ESCUTCHEON

INTERIOR SIDE OF

EXTERIOR WALL

HANGER ROD

LOCKING NUT

SUPPORT NUT

INSULATION

PIPE

HEAVY DUTY

CLEVIS HANGER

INSULATION SHIELD MIN. 6" LONG

STEEL SLEEVE : 16 GAUGE 24" MAX.

14 GAUGE OVER 24"

1. SECURE DAMPER TO SLEEVE ON 8" CENTERS WITH:

A. 1/4" BOLTS AND NUTS IN HOLES PROVIDED.

B. NO. 10 STEEL SCREWS.

2. REFER TO MANUFACTURER'S INSTALLATION

INSTRUCTIONS FOR COMPLETE INSTALLATION DETAILS.

NOTES:

TRANSFER/SUPPLY

AIR GRILLE (TYP.)

FUSIBLE LINK

FIRE DAMPER

BATTERY ROOM CONTROL ROOM

STEEL SLEEVE : 16 GAUGE 24" MAX.

14 GAUGE OVER 24"

TRANSFER/RETURN

AIR GRILLE (TYP.)

FUSIBLE LINK

FIRE DAMPER

BATTERY ROOMCONTROL ROOM

RETURN

AIR DUCT

UNISTRUT P1001

CHANNEL, TYP. 4

UNISTRUT P2073

POST BASE, TYP. 4

FILTER ACCESS

PANEL

UNISTRUT P1498

ANGLE FITTINGS,

TYP. 2 EACH LEG

NOTE:

1. SECURE FAN COIL UNITS TO SUPPORTS WITH AT

LEAST FOUR ANGLE FITTINGS. CONNECT ANGLE

FITTINGS TO CHANNEL WITH 1/4" DIA HEX

SLOTTED SCREWS AND P1006 NUTS WITH

SPRINGS AND TO UNIT WITH 1/4" DIA SLOTTED

WASHER SHEET METAL SCREWS.

UNISTRUT P1498

ANGLE FITTING, TYP.FILTER ACCESS

PANEL

UNISTRUT P1001

C3 CHANNEL

GASKET TAPE

SEE SECTION ON LEFTCONNECT ANGLE

FITTINGS TO OPEN SIDE

OF CHANNEL, TYP.

UNISTRUT P1036 PLATE

FITTING, TYP. EACH CORNER

APPLY GASKET TAPE TO

SMOOTH SIDE OF CHANNEL

UNISTRUT P1001 C3

CHANNEL, TYP. 4 SIDES

UNITED STATES DEPARTMENT OF ENERGY

APPROVED

E A

C

DESIGNED

WESTERN AREA POWER ADMINISTRATION

LV

MECHANICAL

HEADQUARTERS - LAKEWOOD, COLORADO

LOVELL SUBSTATION

SERVICE BUILDING

WYOMING

HVAC DETAILS II

JUNE 24, 2022

A. OHM D. OLSEN

NOT TO SCALE

PIPE PENETRATIONS THROUGH

EXTERIOR WALLS 1

NOT TO SCALE

PIPE HANGER - CLEVIS TYPE 2

NOT TO SCALE

FIRE DAMPER IN WALL WITH

GRILLE 3

NOT TO SCALE

FAN COIL SUPPORT 4

NOT TO SCALE

CHANNEL SECTION 5

UNITED STATES DEPARTMENT OF ENERGY

APPROVED

E A

C

DESIGNED

WESTERN AREA POWER ADMINISTRATION

LV

MECHANICAL

HEADQUARTERS - LAKEWOOD, COLORADO

LOVELL SUBSTATION

SERVICE BUILDING

WYOMING

HVAC SCHEDULES

JUNE 24, 2022

A. OHM D. OLSEN

FAN COIL UNIT SCHEDULE

TAG NO. SERVICE

BASIS OF DESIGN

ALTITUDE

(FT.)

TOTAL

AIRFLOW

(CFM)

EXTERNAL

STATIC

PRESSURE

(IN. W.C.)

FAN

HP

COOLING

ELECTRIC HEAT

(KW)

ELECTRICAL

FILTER

SIZE

(INxIN)

FILTER

THICKNESS

(IN)

WEIGHT

(LBS) REMARKS

MAN. MODEL NO.

SENSIBLE

CAPACITY

(MBTUH)

EAT

DB

(°F)

LAT

DB

(°F)

VOLTS PHASE

FCU-1 BATTERY ROOM MITSUBISHI TPKA0A024 3832 705 0.5 0.07 24 75 55 0 230 1 N/A N/A 46 1, 3, 5, 6, 7

FCU-2 CONTROL ROOM TRANE GAM5B0C42 3832 1410 0.5 0.5 42 75 55 10 230 3 16X20 1 163 1, 2, 3, 4, 7

FCU-3 CONTROL ROOM TRANE GAM5B0C42 3832 1410 0.5 0.5 42 75 55 10 230 3 16X20 1 163 1, 2, 3, 4, 7

DIFFUSER, REGISTER, & GRILLE SCHEDULE (DRG)

TAG DESCRIPTION MOUNTING

THROW

PATTERN

PROVIDE

DAMPER?

BASIS OF DESIGN:

REMARKS

MFR.

MODEL

NO.

RA-A

RECTANGULAR RETURN

OR TRANSFER AIR GRILLE

DUCT N/A NO TITUS 350RL

1, 2, 5

SA-B

RECTANGULAR SUPPLY

AIR GRILLE

DUCT N/A YES TITUS 300RS

1-5

ENERGY RECOVERY UNIT SCHEDULE 1/2

TAG NO. SERVICE

ALTITUDE

(FT)

OUTSIDE

AIRFLOW (CFM)

SUPPLY FAN EXHAUST FAN

EXTERNAL

STATIC

PRESSURE

(IN. W.C.)

TOTAL

STATIC

PRESSURE

(IN. W.C.)

FAN RPM TYPE MOTOR HP

EXTERNAL

STATIC

PRESSURE

(IN.W.C)

TOTAL

STATIC

PRESSURE

(IN.W.C.)

FAN RPM TYPE

MOTOR

HP

ERU-1

BATTERY AND

CONTROL ROOMS 3832 495 0.5 0.61 1124

FORWARD

CURVE 0.5 0.5 0.55 1395

FORWARD

CURVE 0.5

ENERGY RECOVERY UNIT SCHEDULE 2/2

TAG NO.

COOLING HEATING

APPROX. UNIT

WEIGHT (LBS)

UNIT ELECTRICAL BASIS OF DESIGN

REMARKS

EAT DB

(°F)

EAT WB

(°F)

LAT

DB

(°F)

LAT WB

(°F)

SENSIBLE

CAPACITY

(MBH)

EAT

(°F)

LAT

(°F)

TOTAL CAPACITY

(MBH)

VOLTS PHASE MOP MCA MAN. MODEL

ERU-1 97.5 62.6 78.7 59.3 5.5 -12.7 56.3 37.1 308 230 1 15 8.4 GREENHECK ERV-10-20L-VG 1-7

CONDENSING UNIT SCHEDULE

TAG NO. SERVICE

BASIS OF DESIGN

COMPRESSOR

TYPE

EFFICIENCY

(SEER)

RATED

OUTDOOR

DB (°F)

REFRIGERANT

TYPE

ELECTRICAL

WEIGHT

(LBS)

REMARKS

MAN. MODEL VOLT PH. MCA

CU-1 BATTERY ROOM MITSUBISHI TRUYA024 INVERTER 21.4 97.5 R410A 230 1 1 151 1-5

CU-2 CONTROL ROOM TRANE 4TTR SCROLL 14 97.5 R410A 230 3 20 246 1-5

CU-3 CONTROL ROOM TRANE 4TTR SCROLL 14 97.5 R410A 230 3 20 246 1-5

LOUVER SCHEDULE

TAG SERVICE

SIZE

(INxIN)

AIRFLOW

(CFM)

PRESSURE

DROP (IN.W.C)

BASIS OF DESIGN

MANF/MODEL

REMARKS

LVR-1 OA INTAKE 18x18 495 0.055 RUSKIN ELF375X 1-3

NOTES:

1. PROVIDE WITH BIRD SCREEN.

2. PROVIDE LOUVER WITH INTEGRAL FLANGE AND INSTALL ACCORDING TO DETAIL 1 ON SHEET 3302.

3. PROVIDE BASIS OF DESIGN LOUVER OR APPROVED EQUAL.

NOTES:

1. DIFFUSER SIZES ARE NOTED IN DRAWINGS.

2. COLOR SHALL MATCH ACOUSTICAL CEILING TILES OR WALL. COORDINATE WITH ARCH

PLANS.

3. DIFFUSERS SHALL BE INITIALLY ADJUSTED FOR DISCHARGE OF AIR DOWNWARD AT

APPROXIMATELY 30° BELOW HORIZONTAL AND IN A HORIZONTALLY SPREAD PATTERN.

4. SUPPLY AIR GRILLE SERVING ERU-1 SHOULD NOT BE PROVIDED WITH DAMPER.

5. PROVIDE BASIS OF DESIGN DIFFUSERS AND GRILLES OR APPROVED EQUAL.

NOTES:

1. PROVIDE EQUIPMENT COMPLYING WITH ENERGY STAR PROGRAM REQUIREMENTS. EQUIPMENT SHALL BE ENERGY STAR CERTIFIED AND BEAR THE ENERGY STAR NAME AND MARK.

2 PROVIDE WITH MANUFACTURER'S STANDARD 2" MERV 8 FILTERS FOR OUTDOOR AND EXHAUST AIR OPENINGS.

3. PROVIDE ENERGY RECOVERY UNIT END CONNECTIONS IN CONFIGURATION WITH DUCTWORK LAYOUT.

4. THE ENERGY RECOVERY UNIT SHALL BE PROVIDED FROM THE FACTORY WITH AN INTEGRAL CONTROL CENTER INCLUDING A SINGLE NON-FUSED DISCONNECT, 24 VAC TRANSFORMER, TERMINAL STRIP, AND FAN STARTERS (CONTACTOR AND OVERLOAD).

5. PROVIDE WITH INTERNAL BACKDRAFT DAMPERS.

6. STANDARD SINGLE POINT POWER TO BE PROVIDED BY MANUFACTURER.

7. PROVIDE BASIS OF DESIGN ENERGY RECOVERY UNIT OR APPROVED EQUAL.

NOTES:

1. PROVIDE ELECTRICAL DISCONNECT.

2. PROVIDE EQUIPMENT COMPLYING WITH ENERGY STAR PROGRAM REQUIREMENTS. EQUIPMENT SHALL BE ENERGY STAR CERTIFIED AND BEAR THE

ENERGY STAR NAME AND MARK.

3. PROVIDE WITH LOW AMBIENT KIT FOR OPERATION TO -20°F.

4. PROVIDE ON CONCRETE EQUIPMENT PAD WITH MANUFACTURER'S STANDARD 12" EQUIPMENT STAND. SEE ARCH DRAWINGS FOR ADDITIONAL

INFORMATION.

5. PROVIDE BASIS OF DESIGN CONDENSING UNIT OR APPROVED EQUAL.

NOTES:

1. PROVIDE VERTICAL FLOOR MOUNT EQUIPMENT COMPLYING WITH ENERGY STAR PROGRAM REQUIREMENTS. EQUIPMENT SHALL BE ENERGY STAR CERTIFIED AND BEAR THE ENERGY STAR NAME AND MARK.

2. PROVIDE WITH MANUFACTURER'S STANDARD PLENUM STAND. MOUNT ON PLENUM STAND PER MANUFACTURER'S RECOMMENDATIONS.

3. POWER PROVIDED BY OUTDOOR UNIT, CONTRACTOR TO PROVIDE WIRING AND FIELD ROUTE. CONNECT PER MANUFACTURER'S RECOMMENDATIONS.

4. PROVIDE WITH SEPARATE CONTROLLER ALLOWING LEAD/LAG CONTROL, ZONE TEMPERATURE MONITORING, AND ALARMING TO SCADA SYSTEM.

5. PROVIDE WITH MANUFACTURER'S STANDARD REMOTE PROGRAMMABLE THERMOSTAT.

6. PROVIDE WITH MANUFACTURER'S STANDARD WALL MOUNT KIT. MOUNT UNIT ON WALL PER MANUFACTURER'S RECOMMENDATIONS.

7. PROVIDE BASIS OF DESIGN FAN COIL UNIT OR APPROVED EQUAL.

CONVECTION HEATER SCHEDULE

MARK

BASIS OF DESIGN ELECTRICAL CAPACITY

(MBH)

CAPACITY

(KW) WEIGHT REMARKS

MANUFACTURER MODEL VOLTS PHASE HZ

CH-1 BERKO CUH945 230 3 60 34 10 160 1-2

NOTES:

1. PROVIDE WITH MANUFACTURER'S STANDARD TAMPERPROOF THERMOSTAT.

2. PROVIDE BASIS OF DESIGN CONVECTION HEATER OR APPROVED EQUAL.

CONTROL DAMPER SCHEDULE

TAG NO. FUNCTION CFM HEIGHT WIDTH

BLADE

OPERATION

ACTUATOR

TYPE

INTERLOCK

WITH

MAX PRESSURE

DROP (IN. W.C.)

REMARKS

CD-1 ERU-1 OUTDOOR AIR 495 18" 18" OPPOSED BELIMO ERU-1 0.05 1-4

CD-2 ERU-1 EXHAUST AIR 495 12" 12" OPPOSED BELIMO ERU-1 0.05 1-4

NOTES:

1. COORDINATE FINAL SIZE WITH WALL OPENING SIZE/DUCTWORK SIZE.

2. BELIMO 120 VAC ELECTRIC ACTUATOR, TWO POSITION CONTROL, SPRING TO CLOSED (NORMALLY CLOSED), PROVIDE WITH

END SWITCH OPTION FOR MONITORING THROUGH BAS.

3. PROVIDE WITH EPDM BLADE SEALS.

4. PROVIDE BASIS OF DESIGN CONTROL DAMPER OR APPROVED EQUAL.

SENSOR/TRANSMITTER SCHEDULE

TAG MANUFACTURER/MODEL OUTPUT RANGE REMARKS

CTR-1 QUEST CONTROLS RSC 1000 - - WALL MOUNT 54" AFF. CONTROLS FCU-2 AND FCU-3

HT-1 VERIS MODEL HEW 2MSX HUMIDITY TRANSMITTER 4-20mA 0-100% WALL MOUNT 60" AFF.

OT-1 VERIS MODEL TOA M10 OUTDOOR AIR TRANSMITTER 4-20mA -40°F-122°F

OUTDOOR WALL MOUNT, 8'-0" ABOVE GRADE, BELOW

SOFFIT.

ST-1 VERIS MODEL TDDA M20 SUPPLY AIR TRANSMITTER 4-20mA 32°F-122°F FCU-2 SUPPLY DUCT MOUNT

ST-2 VERIS MODEL TDDA M20 SUPPLY AIR TRANSMITTER 4-20mA 32°F-122°F FCU-3 SUPPLY DUCT MOUNT

ZT-1 VERIS MODEL TEA MS ZONE TRANSMITTER 4-20mA 50°F-90°F WALL MOUNT 60" AFF. CONNECTED TO CTR-1.

ZT-2 VERIS MODEL TEA MS ZONE TRANSMITTER 4-20mA 50°F-90°F WALL MOUNT 60" AFF. CONNECTED TO CTR-1.

ENERGY RECOVERY UNIT

ERU-1

SF

N 230V

POWER

GENERAL NOTE:

TYPICAL OF TWO (2) OCCUPANCY

SENSORS. REFER TO DRAWING 3301

FOR LOCATIONS.

OCC

M

CD-1

HYDROGEN SENSOR

HS

OCCUPANCY

SENSOR

UNIT BOUNDARY

M

CD-2

POWER PROVIDED BY

ELECTRICAL, SEE ELECTRICAL

DRAWINGS FOR DETAILS.

ENERGY WHEEL

EF

OA

EA RA

SA

UNIT

CONTROLLER

24V

ERU CONTROL SEQUENCE:

A. OPERATING MODES OF SYSTEM: EQUIPMENT SHALL OPERATE PER THE FOLLOWING:

1. UPON ACTIVATION OF THE BUILDING OCCUPANCY SENSOR:

a. CONTROL DAMPERS, CD-1 AND CD-2, SHALL OPEN.

b. AFTER DAMPERS ARE VERIFIED OPEN, ERU-1 SHALL RECEIVE ENABLE SIGNAL

AND ENERGIZE.

2. UPON ACTIVATION OF THE HYDROGEN SENSOR:

A. CONTROLS DAMPERS, CD-1 AND CD-2, SHALL OPEN.

B. AFTER DAMPERS ARE VERIFIED OPEN, ERU-1 SHALL RECEIVE ENABLE SIGNAL

AND ENERGIZE.

B. ALARM

a. UPON EQUIPMENT FAILURE TO START, AN ALARM SHALL BE SENT TO THE SCADA

SYSTEM.

TS

AI - ZONE TEMPERATURE

SA

DX

SF

M

CT

STARTER

AI - ZONE SETPOINT ADJUSTMENT

M

CT

MOTOR

STARTER

OUTDOOR CONDENSING UNIT

INDOOR FAN

COIL UNIT

BOUNDARY

RA

FILTER

UNIT

CONTROLLER

ST

DI - FAN STATUS

DI - FAN START/STOP

DI - FAN STATUS

INTERCONNECTING

COMMUNICATIONS

PROVIDED WITH

EQUIPMENT

ST-1 & ST-2

SUPPLY AIR TEMPERATURE

FAN COIL UNITS

FCU-1/CU-1,

FCU-2/CU-2,

FCU-3/CU-3

(FOR FCU-1)

TO CTR-1 (FOR FCU-2 & FCU-3)

SA

FCU-2 &

FCU-3 ONLY

FCU-1 CONTROL SEQUENCE:

A. OPERATING MODES OF SYSTEM: EQUIPMENT SHALL BE OPERATED CONTINOUSLY TO CONDITION THE ASSOCIATED SPACE.

1. OPERATING MODE: THE UNIT SHALL ENERGIZE AND MAINTAIN ZONE AIR TEMPERATURE SET POINT OF THE FOLLOWING UNDER

ALL LOAD VARIATIONS:

a. COOLING SETPOINT: 78°F (ADJ)

b. SETPOINTS SHALL BE ADJUSTABLE AT ROOM LEVEL (+/- 2°F).

2. UNIT SHALL BE ENABLED AND RUN THROUGH THE STAND ALONE CONTROLLER PROVIDED BY THE MANUFACTURER.

B. FANS

1. THE SUPPLY AIR FAN SHALL RUN ANYTIME THE UNIT IS COMMANDED TO RUN. TO PREVENT SHORT CYCLING, THE SUPPLY

FAN SHALL HAVE A USER DEFINABLE MINIMUM RUNTIME.

2. FAN WILL OPERATE UNLESS SHUTDOWN ON SAFETIES.

C. COOLING SEQUENCE

1. THE CONTROLLER SHALL MEASURE THE SPACE TEMPERATURE AND ENABLE DX COOLING. UNIT SHALL MODULATE FAN AND

COOLING CAPACITY TO MAINTAIN THE ZONE AIR TEMPERATURE SETPOINT.

2. COOLING SHALL BE ENABLED WHENEVER:

a. ZONE AIR TEMPERATURE IS GREATER THAN SETPOINT (+/- 2°F).

b. AND THE UNIT IS OPERATING IN COOLING MODE.

FCU-2 & FCU-3 CONTROL SEQUENCE:

A. GENERAL

a. THE UNIT CONTROLLER (CTR-1) SHALL OPERATE FCU-2 AND FCU-3 ON A LEAD-LAG BASIS, SWITCHING THE LEAD FCU

WEEKLY (ADJ.) BASED ON TOTAL RUN TIME. UPON FAILURE OF THE LEAD FCU, THE LAG FCU SHALL ENERGIZE AND AN

ALARM SHALL BE SENT TO THE SCADA SYSTEM.

B. OPERATING MODES OF SYSTEM: EQUIPMENT SHALL BE OPERATED CONTINOUSLY TO CONDITION THE ASSOCIATED SPACE.

1. OPERATING MODE: THE UNIT SHALL ENERGIZE AND MAINTAIN ZONE AIR TEMPERATURE SET POINT OF THE FOLLOWING

UNDER ALL LOAD VARIATIONS:

a. COOLING SETPOINT: 78°F (ADJ)

b. HEATING SETPOINT: 68°F (ADJ)

c. SETPOINTS SHALL BE ADJUSTABLE AT ROOM LEVEL (+/- 2°F).

2. UNIT SHALL BE ENABLED AND RUN THROUGH THE STAND ALONE CONTROLLER (QUEST CONTROLLER RSC-1000 OR

APPROVED EQUAL).

C. FANS

1. THE SUPPLY AIR FAN SHALL RUN ANYTIME THE UNIT IS COMMANDED TO RUN. TO PREVENT SHORT CYCLING, THE SUPPLY

FAN SHALL HAVE A USER DEFINABLE MINIMUM RUNTIME.

2. FAN WILL OPERATE UNLESS SHUTDOWN ON SAFETIES.

D. COOLING SEQUENCE

1. THE CONTROLLER SHALL MEASURE THE SUPPLY AIR TEMPERATURE AND ENABLE DX COOLING. UNIT SHALL OPERATE TO

MAINTAIN THE ZONE AIR TEMPERATURE SETPOINT.

2. COOLING SHALL BE ENABLED WHENEVER:

a. ZONE AIR TEMPERATURE IS GREATER THAN SETPOINT (+/- 2°F).

b. AND SUPPLY AIR TEMPERATURE IS GREATER THAN SETPOINT.

c. AND THE UNIT IS OPERATING IN COOLING MODE.

E. HEATING SEQUENCE

1. THE CONTROLLER SHALL MEASURE THE SUPPLY AIR TEMPERATURE AND ENABLE HEATING. SUPPLY FAN SHALL MODULATE

TO MAINTAIN THE ZONE AIR TEMPERATURE SETPOINT.

2. HEATING SHALL BE ENABLED WHENEVER:

a. ZONE AIR TEMPERATURE IS LESS THAN SETPOINT.

b. AND SUPPLY AIR TEMPERATURE IS LESS THAN SETPOINT.

c. AND THE UNIT IS OPERATING IN HEATING MODE.

UNITED STATES DEPARTMENT OF ENERGY

APPROVED

E A

C

DESIGNED

WESTERN AREA POWER ADMINISTRATION

LV

MECHANICAL

HEADQUARTERS - LAKEWOOD, COLORADO

LOVELL SUBSTATION

SERVICE BUILDING

WYOMING

HVAC CONTROLS

JUNE 24, 2022

A. OHM D. OLSEN

Level 1 100' - 0"

TOP OF CEILING

111' - 0"

BOTTOM OF SOFFIT

110' - 2"

PLENUM STAND

PROVIDED WITH

FCU

FLOOR STAND

PER DETAILS 4 & 5

ON DWG 3303

FCU-3

3/4" COND

RS 7/8" RL 3/8"

16x14 SA

14x16 SA

6' - 10" BOD EL

Level 1 100' - 0"

TOP OF CEILING

111' - 0"

BOTTOM OF SOFFIT

110' - 2"

CU-3

FCU-3

BACKDRAFT DAMPER,

SHALL BE HORIZONTALLY

MOUNTED WITH THE

HORIZONTAL AIRFLOW NORTH.

DAMPER SHALL BE

GREENHECK ES-10 OR

APPROVED EQUAL.

16x14 SA

6' - 10" BOD EL

ST-2, SUPPLY AIR

TRANSMITTER MOUNTED

IN DUCT. MOUNT FAR

ENOUGH TO ALLOW FOR

FULL MIXING.

FLEXIBLE DUCT

CONNECTOR

6" 6"

MANUFACTURER'S

STANDARD 12" EQUIPMENT

STAND

FLOOR STAND PER

DETAILS 4 & 5 ON DWG

PLENUM STAND

PROVIDED WITH FCU

7/8" RS

3/4" COND

3/8" RL

4 56

5 5

2 4

PAD BY

STRUCTURAL

UNITED STATES DEPARTMENT OF ENERGY

APPROVED

E A

C

DESIGNED

WESTERN AREA POWER ADMINISTRATION

LV

MECHANICAL

HEADQUARTERS - LAKEWOOD, COLORADO

LOVELL SUBSTATION

SERVICE BUILDING

WYOMING

HVAC SECTIONS I

JUNE 24, 2022

A. OHM D. OLSEN

NOT TO SCALE 3301

SPLIT UNIT FRONT PIPING

SECTION A

NOTES:

KEYED NOTES:

1. CONTRACTOR SHALL LOCATE EQUIPMENT SUCH THAT ALL

REQUIRED MAINTENANCE CLEARANCE/ACCESS ARE

COORDINATED WITH WORK BY OTHER TRADES.

2. CONTRACTOR TO FIELD ROUTE ALL DUCTWORK. DUCTWORK

SHALL BE ROUTED BE BELOW CABLE TRAYS WERE THEY

OCCURE. THIS DRAWING IS FOR REFERANCE ONLY.

3. REFRIGERANT PIPE SIZES AND ROUTING ARE DIAGRAMMATIC

AND MUST BE VERIFIED WITH EQUIPMENT MANUFACTURER

PRIOR TO INSTALLATION.

1. MOUNT FAN COIL UNIT ON FAN COIL SUPPORT AS DETAILED ON

DWG 3303, DETAILS 4 & 5, AND ON MANUFACTURER'S PLENUM

STAND PER DRAWINGS 3301 & 3303.

2. PROVIDE INSULATION FOR REFRIGERANT PIPING PER

SPECIFICATION 23 07 00 - THERMAL INSULATION FOR

MECHANICAL SYSTEMS.

3. FOR PENETRATION DETAIL REFER TO ARCHITECTURAL BY

OTHERS.

4. PROVIDE LINESET COVERS WITH A WALL COVER INLET. APPLY

CAULKING TO SEAL WHERE THE LINESET ENTERS AND EXITS

THE EXTERIOR WALL.

5. PENETRATION SHALL BE SEALED PER ARCHITECTURAL

REQUIRMENTS BY OTHERS.

6. MOUNT CONDENSING UNIT ON MANUFACTURER'S STANDARD

12" EQUIPMENT STAND ON MECHANICAL EQUIPMENT PAD.

EQUIPMENT SLAB PROVIDED BY STRUCTURAL.

2 2

FLEX DUCT

CONNECTOR

NOT TO SCALE 3301

SPLIT UNIT PIPING & DUCT TAKE

OFF B

Level 1 100' - 0"

TOP OF CEILING

111' - 0"

ERU-1

BOTTOM OF SOFFIT

110' - 2"

CD-1 18x18 OA

6' - 8" BOD EL

CD-2

495-12x12

SA-B

12x12 SA

9' - 0" BOD EL

12x12 RA

7' - 0" BOD EL

12x12 RA

9' - 0" BOD EL

12x12 EA

9' - 0" BOD EL

12x12 OA

8' - 9" BOD EL

495-12x12

RA-A

WEATHERHOOD,

REFER TO DETAIL

4 ON DWG 3302

CONTROL ROOMBATTERY ROOM 12x12 OA

6' - 11" BOD EL

UNITED STATES DEPARTMENT OF ENERGY

APPROVED

E A

C

DESIGNED

WESTERN AREA POWER ADMINISTRATION

LV

MECHANICAL

HEADQUARTERS - LAKEWOOD, COLORADO

LOVELL SUBSTATION

SERVICE BUILDING

WYOMING

HVAC SECTIONS II

JUNE 24, 2022

A. OHM D. OLSEN

NOTES:

KEYED NOTES:

1. CONTRACTOR SHALL LOCATE EQUIPMENT SUCH THAT ALL

REQUIRED MAINTENANCE CLEARANCE/ACCESS ARE

COORDINATED WITH WORK BY OTHER TRADES.

2. REFRIGERANT PIPE SIZES AND ROUTING ARE DIAGRAMMATIC

AND MUST BE VERIFIED WITH EQUIPMENT MANUFACTURER

PRIOR TO INSTALLATION.

3. CONTRACTOR TO FIELD ROUTE ALL DUCTWORK. DUCTWORK

SHALL BE ROUTED BE BELOW CABLE TRAYS WERE THEY

OCCURE. THIS DRAWING IS FOR REFERANCE ONLY.

1. FOR PENETRATION DETAIL REFER TO ARCHITECTURAL BY

OTHERS.

NOT TO SCALE 3301

ERU EXHAUST AIR SECTION C

Jul 11, 2022- 11:19am

Jul 11, 2022- 11:21am

Jul 11, 2022- 11:23am

Jul 11, 2022- 11:25am

Jul 11, 2022- 11:27am

Jul 11, 2022- 11:28am

May 16, 2022- 8:27pm

May 16, 2022- 8:29pm

May 16, 2022- 6:04pm

May 16, 2022- 8:03pm

May 16, 2022- 8:05pm

May 16, 2022- 8:07pm

May 16, 2022- 8:08pm

May 16, 2022- 8:10pm

May 16, 2022- 8:11pm

May 16, 2022- 8:13pm

May 16, 2022- 8:15pm

May 16, 2022- 8:16pm

May 16, 2022- 8:18pm

May 16, 2022- 8:19pm

May 16, 2022- 8:21pm

May 16, 2022- 8:22pm

May 16, 2022- 8:24pm

May 16, 2022- 8:26pm

Cover Page
Project Drawings
lv_0016d
lv_0001r_ei
lv_0001s
lv_0010j_ei
lv_0010k
lv_1000e_fio
lv_1001g_ei
lv_1001h
lv_1002g_ei
lv_1002h
lv_1003g_ei
lv_1003h
lv_1004e_ei
lv_1004f
lv_1005m_ei
lv_1005n
lv_1006i_ei
lv_1006j
lv_1007g_ei
lv_1007h
lv_1008g_ei
lv_1008h
lv_1009d_ei
lv_1009e
lv_1010j_ei
lv_1010k
lv_1012e_ei
lv_1012f
lv_1015c_ei
lv_1015d
lv_1017c_ei
lv_1017d
lv_1018e_ei
lv_1018f
lv_1019_ei
lv_1019a
lv_1100g
lv_1101c
lv_1102
lv_1500b_ei
lv_1500c
lv_1501c_ei
lv_1501d
lv_1502f_ei
lv_1502g
lv_1503
31_1502
31_1503
31_1504b
lv_1610c_ei
lv_1610e
lv_2017b_fio
lv_2018b_fio
lv_2001_1
lv_2001_2
lv_2000j_ei
lv_2000_1
lv_2000_2
lv_2000_3
lv_2000_4
lv_2004d
lv_2012e
lv_2025e
lv_2048_ei
lv_2048a
lv_2300a
lv_2301
lv_2550
lv_2877
lv_2878
lv_2026_1a_fio
lv_2026_2a_fio
lv_2026_3a_ei
lv_2026_3b
lv_2501
lv_2052_fio
lv_2054_fio
lv_2600
lv_2925
lv_2876
01_2004_1d
01_2004_2d
01_2006_1
01_2006_2
01_2006_3
31_2049_1b
31_2051b
lv_3010
lv_3011
lv_3012a
lv_3014
lv_3016
lv_3018
lv_3020
lv_3022
lv_3024
lv_3200
lv_3201a
lv_3202
lv_3203_1
lv_3203_2
lv_3204_1
lv_3204_2
lv_3205_1
lv_3205_2
lv_3206
lv_3300
lv_3301
lv_3302
lv_3303
lv_3304
lv_3305
lv_3306
lv_3307
lv_3400a
lv_3401a
lv_3402a
lv_3403a
lv_3404a
lv_3405a
lv_t600_1
lv_t600_2
lv_1611d
lv_4000i
lv_6000i
lv_6021_1b
lv_6021_2a
lv_6021_3b
lv_6021_4b
lv_6021_5b
lv_6021_6a
lv_6021_7a
lv_6022_1
lv_6022_2
lv_6023e
lv_6024d
lv_6146
lv_6147
lv_0015c
lv_8000b
lv_8001b
lv_8002b
lv_8003b
lv_8004b
lv_8005b

File details come from the government source that posted it. Updated .