This document provides project drawings and specifications for the Cheyenne Substation 115kV Breaker Replacement solicitation issued by the Department of Energy Western Area Power Administration. The drawings include location maps, existing and proposed switching diagrams, arrangement plans, sections, wiring diagrams, grounding plans, conduit plans, foundation plans, structural details, and control schematics. Specifications require replacement of 115kV breakers and associated equipment at the Cheyenne Substation to modernize aging infrastructure. Bidders should carefully review all 38 drawings and specifications to understand the full scope of work and submit responses accordingly.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment D

AMD 0001 Cheyenne Drawings

89503222BWA000048

11 February 2022

PROJECT DRAWINGS

CHEYENNE SUBSTATION

115KV BREAKER REPLACEMENT

SECTION C

DESCRIPTION/SPECIFICATIONS

Spec No. 1028

WYOMING

115kV BREAKER REPLACEMENT

PROJECT DRAWINGS

A. GENERAL:

CONSTRUCTION DRAWINGS: Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.

PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale.

Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.

STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from construction or project drawings or text, the details of construction or project drawings or text shall govern. A complete set of standard drawings are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx.

INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed.

EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.

REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.

CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise WAPA of any errors or omissions.

B. LIST OF DRAWINGS:

LOCATION MAP:

1. CH 0015 Rev. D – Location and Vicinity Map

ELECTRICAL

2. CH 0001 Rev. Q EI – Switching Diagram (Existing Installation)

3. CH 0001 Rev. R – Switching Diagram

4. CH 0010 Rev. G EI – General Plot Plan (Existing Installation)

5. CH 0010 Rev. H – General Plot Plan

6. CH 1001 Rev. L EI – 115kV Area Arrangement Plan (Existing Installation)

7. CH 1001 Rev. M – 115kV Area Arrangement Plan

8. CH 1012 Rev. F EI – 120/240V AC Station Service Panels DWA and LY11 Wiring Diagram (Existing Installation)

9. CH 1012 Rev. G – 120/240V AC Station Service Panels DWA and LY11 Wiring Diagram

10. CH 1100 Rev. E – Equipment and Material Index

11. CH 1101 – Substation Signs

12. CH 1117 Rev. F EI – 115kV Yard Sections L-L, M-M, N-N. P-P and Q-Q (Existing Installation)

13. CH 1117 Rev. H – 115kV Yard Sections L-L, M-M, N-N. P-P and Q-Q

14. CH 1118 Rev. H EI – 115kV Yard Sections C-C, D-D, E-E, F-F, H-H and J-J (Existing Installation)

15. CH 1118 Rev. J – 115kV Yard Sections C-C, D-D, E-E, F-F, H-H and J-J

16. CH 1510 Rev. G EI – 115kV Area Grounding Plan (Existing Installation)

17. CH 1510 Rev. H – 115kV Area Grounding Plan

18. CH 1610 Rev. E EI – 115kV Yard 120/240V AC Station Service Wiring Diagram (Existing Installation)

19. CH 1610 Rev. F – 115kV Yard 120/240V AC Station Service Wiring Diagram

20. CH 1705 Rev. D EI – 115kV Area Conduit Plan (Existing Installation)

21. CH 1705 Rev. E – 115kV Area Conduit Plan

FOUNDATION AND STRUCTURAL DRAWING INDEX:

22. CH 2081-1 Rev. A – Foundation/Structural Data and Drawing Sheets (SH 1 of 2)

23. CH 2081-2 Rev. A – Foundation/Structural Data and Drawing Sheet (SH 1of 2)

CONCRETE:

24. CH 2000 Rev. I EI– Foundation Plan (Existing Installation)

25. CH 2000 Rev. J – Foundation Plan

26. CH 2010 Rev. J EI – General Foundation Plan (Existing Installation)

27. CH 2010 Rev. J EI – General Foundation Plan (Existing Installation)

28. CH 2024 Rev. D EI – Foundations Outline and Reinforcement (Existing Installation)

29. CH 2025 Rev. D EI – Foundations Outline and Reinforcement (Existing Installation)

30. CH 2310 Rev. A – Foundations Outline and Reinforcement

CABLE TRENCH:

31. CH 2084 Rev. B (FIO) – Type C Cable Trench Plan, Sections and Details (For Information Only)

32. CH 2086 Rev. A (FIO) – Cable Trench Plan 115kV Area (For Information Only)

STEEL STRUCTURES:

33. CH 2550 Rev. H – Anchor Bolts

34. CH 2927 – Equipment Cabinet Platforms

CONTROLS:

35. CH T600 – Control Cable List

115kV BREAKER REPLACEMENT

PROJECT DRAWINGS

36. CH 4001 FIO – Service Building Arrangement, Conduit and Grounding

37. CH 6072 Rev. F FIO – 115kV Bus Differential CT Circuit Summation Cabinet ET11A Wiring Diagram (For Information Only)

GEOLOGY:

38. CH 8000 Rev. A – Logs of Exploration

SUITABLE FOR CONSTRUCTION AS OF:

Sep 01, 2021- 7:20am

Sep 01, 2021- 7:16am

Sep 01, 2021- 7:17am

Sep 01, 2021- 7:18am

Sep 01, 2021- 7:19am

Sep 01, 2021- 7:20am

Sep 01, 2021- 7:21am

Sep 01, 2021- 7:22am

Sep 01, 2021- 7:23am

Sep 01, 2021- 7:23am

OWL CREEK LINE

CH 762

PCB JY13A 115KV

TRANSFORMER KV2A

CH 562

PCB JY14A 115KV

ARCHER NORTH LINE

CH 862

PCB JY15A 115KV

ARCHER SOUTH LINE

CH 262

PCB JY16A 115KV

ARCHER SOUTH LINE

VY16A3

CCVT 115KV

ARCHER SOUTH LINE CCVT

EY16A3

VY16A3 SECONDARY FUSES

SUITABLE FOR CONSTRUCTION AS OF:

Sep 01, 2021- 7:24am

Feb 11, 2022- 12:59pm

SUITABLE FOR CONSTRUCTION AS OF:

Feb 11, 2022- 2:22pm

Feb 11, 2022- 1:02pm

Feb 11, 2022- 1:06pm

Feb 11, 2022- 1:09pm

Sep 01, 2021- 7:27am

Sep 01, 2021- 7:27am

Sep 01, 2021- 7:28am

Sep 01, 2021- 7:29am

Sep 01, 2021- 7:29am

Sep 01, 2021- 7:30am

Sep 01, 2021- 7:36am

Sep 01, 2021- 7:36am

Sep 01, 2021- 7:31am

Sep 01, 2021- 7:31am

Sep 01, 2021- 7:32am

Sep 01, 2021- 7:33am

Sep 01, 2021- 7:37am

Feb 01, 2022- 4:39pm

Feb 01, 2022- 4:41pm

Sep 01, 2021- 7:38am

Sep 01, 2021- 7:38am

Sep 01, 2021- 7:40am

Sep 01, 2021- 7:39am

Sep 01, 2021- 7:39am

DrawingsCoverPage
ProjectDrawings
ch_0015d
ch_0001q_ei
ch_0001r
ch_0010g_ei
ch_0010h
ch_1001l_ei
ch_1001m
ch_1012f_ei
ch_1012g
ch_1100e
ch_1101
ch_1117f_ei
ch_1117g
ch_1118h_ei
ch_1118i
ch_1510g_ei
ch_1510h
ch_1610e_ei
ch_1610f
ch_1705d_ei
ch_1705e
ch_2081_1a
ch_2081_2a
ch_2000i_ei
ch_2000j
ch_2010j_ei
ch_2010k
ch_2024d_ei
ch_2025d_ei
ch_2310a
ch_2084b_fio
ch_2086a_fio
ch_2550h
ch_2927
ch_t600
ch_4001_fio
ch_6072f_fio
ch_8000a
ch_amendment_dwgs_2_11_22.pdf
DrawingsCoverPage
ProjectDrawings
ch_0015d
ch_0001q_ei
ch_0001r
ch_0010g_ei
ch_0010h
ch_1001l_ei
ch_1001m
ch_1012f_ei
ch_1012g
ch_1100e
ch_1101
ch_1117f_ei
ch_1117g
ch_1118h_ei
ch_1118i
ch_1510g_ei
ch_1510h
ch_1610e_ei
ch_1610f
ch_1705d_ei
ch_1705e
ch_2081_1a
ch_2081_2a
ch_2000i_ei
ch_2000j
ch_2010j_ei
ch_2010k
ch_2024d_ei
ch_2025d_ei
ch_2310a
ch_2084b_fio
ch_2086a_fio
ch_2550h
ch_2927
ch_t600
ch_4001_fio
ch_6072f_fio
ch_8000a
CH ProjectDrawings.pdf
A. GENERAL:

File details come from the government source that posted it. Updated .