22. Attachment B - Hoyt Drawings.pdf

PDF 9 MB Posted

Attached to
Hoyt and Kiowa Creek 115-kV Breaker Replacement
Solicitation number
89503222BWA000050
Issued by

About this file

This document package includes construction drawings and specifications for the Hoyt and Kiowa Creek 115-kV Breaker Replacement project. The Western Area Power Administration is soliciting proposals to replace breakers at the Hoyt and Kiowa Creek substations to update aging infrastructure. Drawings cover electrical systems, civil and site plans, foundations, structures, and geology. The scope of work includes installing new 115kV breakers, related equipment, and foundations. The solicitation number is 89503222BWA000050, with responses due on unspecified dates. Western Area Power Administration is the contracting agency responsible for this infrastructure upgrade to enhance reliability of the high voltage transmission system.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B

Hoyt Substation Drawings

89503222BWA000050

27 June 2022

PROJECT DRAWINGS

HOYT SUBSTATION

115KV BREAKER REPLACEMENT

STATE

SECTION C

DESCRIPTION/SPECIFICATIONS

Spec. No. 1045

COLORADO

HOYT SUBSTATION 115kV BREAKER REPLACEMENT

A. GENERAL:

CONSTRUCTION DRAWINGS: Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.

PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale.

Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.

STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from construction or project drawings or text, the details of construction or project drawings or text shall govern. A complete set of standard drawings are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx.

INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed.

EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.

REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.

CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise WAPA of any errors or omissions.

B. LIST OF DRAWINGS:

LOCATION MAP:

1. HT 0015 Rev. A – Location Map

ELECTRICAL:

2. HT 0001 Rev. F EI – Switching Diagram (Existing Installation)

3. HT 0001 Rev. G – Switching Diagram

4. HT 1000 Rev. J EI – Arrangement Plan (Existing Installation)

5. HT 1000 Rev. K – Arrangement Plan

6. HT 1011 Rev. B EI – 115kV Area Plan (Existing Installation)

7. HT 1011 Rev. C – 115kV Area Plan

8. HT 1012 Rev. B FIO – KY3A and 12,47kV Area Plan (For Information Only)

9. HT 1100 Rev. B – Equipment & Material Index

10. HT 1110 Rev. B EI – 115kV Area Sections A-A and B-B (Existing Installation)

11. HT 1110 Rev. C – 115kV Area Sections A-A and B-B

12. HT 1112 Rev. D EI – 115kV Area Sections D-D, E-E and F-F (Existing Installation)

13. HT 1112 Rev. E – 115kV Area Sections D-D, E-E and F-F

14. HT 1113 Rev. B EI – 115kV Area Sections G-G and H-H (Existing Installation)

15. HT 1113 Rev. C – 115kV Area Sections G-G and H-H

16. HT 1115 Rev. A EI – KY3A and 12.47kV Area Sections A-A, B-B, C-C, D-D, E-E and Detail A (Existing Installation)

17. HT 1115 Rev. B – KY3A and 12.47kV Area Sections A-A, B-B, C-C, D-D, E-E

18. HT 1500 Rev. D FIO – Key Grounding Plan

19. HT 1510 Rev. E EI – 115kV Area Grounding and Buried Cable Plan (Existing Installation)

20. HT 1510 Rev. F – 115kV Area Grounding Plan

21. HT 1710 – 115kV Area Conduit & Buried Cable Plan

CIVIL & SITE DRAWINGS:

22. HT 2010 Rev. A FIO – Grading & Plot Plan (For Information Only)

FOUNDATION AND STRUCTURAL DRAWING INDEX:

23. HT 2017 Rev. C – Foundation/Structural Data and Drawing Index

CONCRETE:

24. HT 2012 Rev. B EI – Foundation General Plan (Existing Installation)

25. HT 2012 Rev. C – Foundation General Plan

26. HT 2013 Rev. C EI – Foundation Plan (Existing Installation)

27. HT 2013 Rev. D – Foundation Plan

28. HT 2014 Rev. A EI – Foundation Plan (Existing Installation)

29. HT 2014 Rev. B – Foundation Plan

30. HT 2015 Rev. A EI – Foundation Plan (Existing Installation)

31. HT 2015 Rev. B – Foundation Plan

32. HT 2016 Rev. A EI – Foundation Plan (Existing Installation)

33. HT 2016 Rev. B – Foundation Plan

34. HT 2020 Rev. A – Foundations Outline and Reinforcement

35. HT 2300 – Foundations Outline and Reinforcement

STEEL STRUCTURES:

36. HT 2034 FIO – Equipment Cabinet Platforms Steel Design and Details (For Information Only)

HOYT SUBSTATION 115kV BREAKER REPLACEMENT

37. HT 2550 – Anchor Bolts and Embeds

38. HT 2925 – Equipment Cabinet Platforms Steel Design and Details

GEOLOGY:

39. HT 8000 – Subsurface Exploration Penetration Resistance and Log

40. HT 8001 – Subsurface Exploration Penetration Resistance and Log

41. HT 8002 – Subsurface Exploration Penetration Resistance and Log

42. HT 8003 – Subsurface Exploration Penetration Resistance and Log

43. HT 8004 – Subsurface Exploration Penetration Resistance and Log

44. HT 8005 – Location of Explorations

SUITABLE FOR CONSTRUCTION AS OF:

Jun 24, 2022- 3:12pm

Jun 24, 2022- 3:08pm

Jun 24, 2022- 3:10pm

Jun 24, 2022- 3:14pm

Jun 24, 2022- 3:17pm denton Suitable for Construction

Jun 24, 2022- 3:20pm

Jun 24, 2022- 3:23pm

Jun 24, 2022- 3:26pm

Jun 24, 2022- 3:30pm

Jun 24, 2022- 3:32pm

Jun 24, 2022- 3:35pm

Jun 24, 2022- 3:37pm

Jun 24, 2022- 3:40pm

Jun 27, 2022- 7:05am

Jun 24, 2022- 3:44pm

Jun 27, 2022- 6:43am

Jun 24, 2022- 4:18pm

Jun 24, 2022- 4:21pm

Jun 24, 2022- 4:25pm

FOR INFORMATION ONLY

Jun 24, 2022- 5:05pm

Jun 27, 2022- 10:51am

Jun 24, 2022- 4:30pm

Jun 27, 2022- 10:54am

Jun 24, 2022- 4:35pm

Jun 27, 2022- 10:56am

Jun 24, 2022- 4:52pm

Jun 27, 2022- 10:58am

Jun 24, 2022- 4:58pm

Jun 24, 2022- 5:00pm

Jun 24, 2022- 5:03pm

FOR INFORMATION ONLY

Jun 24, 2022- 5:08pm

Jun 24, 2022- 5:10pm

Jun 24, 2022- 5:13pm

Cover Page
Drawing List
ht_0016
ht_0015a
ht_0001f_ei
ht_0001g
ht_1000j_ei
ht_1000k
ht_1011b_ei
ht_1011c
ht_1012b_fio
ht_1100b
ht_1110b_ei
ht_1110c
ht_1112d_ei
ht_1112e
ht_1113b_ei
ht_1113c
ht_1115a_ei
ht_1115b
ht_1510e_ei
ht_1510f
ht_1710
ht_2010a_fio
ht_2017c
ht_2012b_ei
ht_2012c
ht_2013c_ei
ht_2013d
ht_2014a_ei
ht_2014b
ht_2015a_ei
ht_2015b
ht_2016a_ei
ht_2016b
ht_2020a
ht_2300
ht_2034_fio
ht_2550
ht_2925
ht_8000
ht_8001
ht_8002
ht_8003
ht_8004
ht_8005
HT_BkrRplcmnt_2022_ProjectDrawings.pdf
A. GENERAL:
HT_BkrRplcmnt_2022_ProjectDrawings.pdf
A. GENERAL:
ht_final_project_drawings_6-27-22.pdf
Cover Page
Drawing List
ht_0016
ht_0015a
ht_0001f_ei
ht_0001g
ht_1000j_ei
ht_1000k
ht_1011b_ei
ht_1011c
ht_1012b_fio
ht_1100b
ht_1110b_ei
ht_1110c
ht_1112d_ei
ht_1112e
ht_1113b_ei
ht_1113c
ht_1115a_ei
ht_1115b
ht_1500d_fio
ht_1510e_ei
ht_1510f
ht_1710
ht_2010a_fio
ht_2017c
ht_2012b_ei
ht_2012c
ht_2013c_ei
ht_2013d
ht_2014a_ei
ht_2014b
ht_2015a_ei
ht_2015b
ht_2016a_ei
ht_2016b
ht_2020a
ht_2034_fio
ht_2300
ht_2550
ht_2925
ht_8000
ht_8001
ht_8002
ht_8003
ht_8004
ht_8005
HT_BkrRplcmnt_2022_ProjectDrawings.pdf
A. GENERAL:
HT_BkrRplcmnt_2022_ProjectDrawings.pdf
A. GENERAL: