This document outlines specifications for a federal contract opportunity to complete construction of Seminoe Switchyard Stage 03. The project involves replacing two 115-kV power circuit breakers, six switches, five coupling capacitor voltage transformers, main and jack busses, insulators, structure modifications, associated electrical equipment, and fiber optic cable at the Bureau of Reclamation's Seminoe Dam facility near Sinclair, Wyoming. Key deliverables include galvanized steel structures, electrical testing, modifying existing foundations and handrails, furnishing control cables, installing fiber optic cables and equipment with end-to-end testing, and removing and disposing of existing equipment. The contract is with the Department of Energy Western Area Power Administration. The response due date is 30 calendar days after notice to proceed, with an outage window for work between July 1-31, 2021 and restrictions on work weeks exceeding 60 hours.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A

Seminoe Switchyard Stage 03 Specifications

89503221BWA000040

10 March 2021

SECTION C

DESCRIPTION/SPECIFICATIONS

WYOMING

Spec. No. 1009

SEMINOE SWITCHYARD

STAGE 03

SECTION C

DESCRIPTIONS/SPECIFICATIONS

SEMINOE SWITCHYARD STAGE 03

DIVISION 1 – GENERAL REQUIREMENTS

A. CONTRACT REQUIREMENT

B. DESCRIPTION OF WORK

C. DESCRIPTION OF BIDDING SCHEDULE ITEM

1. Bidding Schedule item “Mobilization and preparatory work”

D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

1. Submittal Approval Time

2. Outage Restrictions

3. Construction Schedule Restrictions

E. CONSTRUCTION SCHEDULE

1. Submittal Time

2. Format and Detail

3. Milestones

F. MATERIAL

1. Points-of-Delivery

G. ELECTRIC POWER FOR CONSTRUCTION PURPOSES

H. WATER FOR CONSTRUCTION PURPOSES

I. EXPLOSIVES AND BLASTING

J. EMPLOYEE REQUIREMENTS

K. ELECTRICAL MINIMUM APPROACH DISTANCES

L. SUBMITTALS AND CORRESPONDENCE

1. General

2. Transmittal

3. Submittal Response

4. Physical Sample Submittals

5. Project Protocol

DIVISION 2 – SITEWORK

A. DESCRIPTION OF BIDDING SCHEDULE ITEMS

1. Bidding Schedule item “Miscellaneous sitework”

2. Bidding Schedule Does Not Contain Separate Items

DIVISION 4 – SUBSTATION METALWORK

A. GENERAL

1. Government-Furnished Drawings

2. Measurement

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS

1. Bidding Schedule item “Steel structures, welded (galvanized)”

2. Bidding Schedule item “Steel structures, lattice”

DIVISION 9 – SUBSTATION - ELECTRICAL

A. GENERAL

1. Bidding Schedule for Government-furnished items

2. Bidding Schedule for items (not furnished by the Government)

3. Associated support structures provided for each electrical equipment rated above 7-kV

4. Installation and painting of electrical equipment and material

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS

1. Bidding Schedule item “Power circuit breaker, 123-kV, 3,000-amps

(Government-furnished)”

2. Bidding Schedule item “Disconnecting switch, 123-kV, 2,000-amps

(Government-furnished)”

3. Bidding Schedule items “Coupling capacitor voltage transformer, 115-kV, single-phase (Government-furnished)”

4. Bidding Schedule item “Surge arrester, 2.4-kV, single-phase”

5. Bidding Schedule item “Three (3) conductor 1 AWG, 5-kV, insulated copper cable”

6. Bidding Schedule item “Associated electrical equipment and material”

7. Bidding Schedule item “Existing outdoor electrical equipment and material”

8. Bidding Schedule items “Furnishing 5/c No. 10 AWG control cable” and “Furnishing

12/c No. 10 AWG control cable”

9. Bidding Schedule items “Installing 5/c No. 10 AWG control cable” and “Installing

12/c No. 10 AWG control cable”

10. Fiber optic cables and associated equipment

DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION

A. DESCRIPTION OF BID ITEMS

1. Bidding Schedule does not contain a separate item for “Environmental

Quality Protection”

DIVISION 14 – COMMUNICATIONS FACILITIES

A. COMMUNICATION FACILITIES

1. Bidding Schedule item “Furnish and install fiber optics (FO) and associated equipment”

DIVISION 1 – GENERAL REQUIREMENTS

A. CONTRACT REQUIREMENT:

Construct and complete Seminoe Switchyard, Stage 03, in accordance with the Construction Contract (Standard Form 1442); the Contract Clauses; WAPA’s Construction Standards, including Standard 1 – General Requirements (September 2016), Standard 2 – Sitework (September 2016), Standard 3 – Concrete (September 2016), Standard 4 – Substation Metalwork and Transmission Line Lattice Structures (September 2016), Standard 9 – Substation – Electrical (September 2016), Standard 12 – Painting (September 2016), Standard 13 – Environmental Quality Protection (September 2016), Standard 14 – Communication Facilities (September 2016), Standard 15 – Drawings (September 2016); Standard Drawings; and these Project Specifications and Drawings.

If a conflict occurs between the Project Specifications and the Construction Standards, the Project Specifications shall govern. The Project Specifications and the drawings are used to take exceptions or provide additions to the Construction Standards. Some paragraphs in the Construction Standards will not apply to this job.

WAPA’s Construction Standards, Standard Drawings and Electrical Equipment Standards are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx.

WAPA Project Specifications and Construction Standards are explained in Standard 1 – General Requirements, Section 1.1.1, “Standards and Project Specifications”.

B. DESCRIPTION OF WORK:

The principal components of work include replace two (2) 115-kV power circuit breakers, six

(6) switches, five (5) coupling capacitor voltage transformers, main and jack busses, insulators, structure modifications, associated electrical equipment and fiber optic cable for Seminoe Switchyard, Stage 03.

Paragraphs “Description of Bidding Schedule Items” in Divisions – 1, 2, 4, 9, 13, and 14 describe the work to be performed, as applicable.

The work is located near Sinclair, Wyoming, at the Bureau of Reclamation’s Seminoe Dam as shown on Drawing S 0015.

C. DESCRIPTION OF BIDDING SCHEDULE ITEM:

1. Bidding Schedule item “Mobilization and preparatory work” includes the following:

a. Performing mobilization and preparatory work in accordance with Section H of the contract clauses.

b. Prepare and submit a Construction Schedule and furnish a Safety and Health Program.

D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: See FAR 52.211-10 in

Section F of the solicitation/contract.

1. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, WAPA will require 30-calendar days for review of drawings or data submitted for approval.

2. OUTAGE RESTRICTIONS: In addition to the restrictions listed in Construction Standard 1, the following outage restrictions shall apply:

a. The contractor shall request a switchyard outage between July 1 and July 31, 2021, with all the switchyard deenergized with the exception of the Seminoe Camp line. Station service power will remain available.

b. All switchyard work must be completed within the switchyard outage between July 1 and July 31, 2021.

c. The Contractor shall coordinate with the COR for the 2.4-kV Seminoe Camp cable cut-over outage period.

3. CONSTRUCTION SCHEDULE RESTRICTIONS: The following Construction Schedule restrictions shall apply: The Contractor shall not work more than 60-hours in one (1) calendar work week without prior approval from the Contracting Officer’s Representative (COR).

E. CONSTRUCTION SCHEDULE:

1. SUBMITTAL TIME: Prepare and Submit a Construction Schedule to the CO within 30-calendar days after date of Notice to Proceed.

2. FORMAT AND DETAIL: Dates for each item of Government-furnished material shall be provided.

Do not program dates earlier than the estimated delivery dates shown in the “Material” paragraph.

3. MILESTONES:

a. During the early part of the July 1 - July 31 switchyard outage, WAPA crews will install overhead optical ground wire approach spans to the Contractor-provided switchyard static wire column peaks during the plant outage. This work shall be completed as early as possible, and a milestone date for contractor completion of the peaks shall be included in the schedule.

b. WAPA crews will also install the Seminoe Camp 2.4-kV new approach span during the plant outage. A milestone date for contractor completion of the cable system between the new take-off switchyard column and KW1A shall be included in the schedule.

F. MATERIAL: Furnish all material for completing the work, except material furnished by WAPA as listed below:

ITEM

ESTIMATED

WEIGHT

(LBS)

ESTIMATED

DELIVERY

DATE

ESTIMATED

COST

Two (2) 3-phase, power circuit breaker, 123-kV, 3,000-amp 7,505 ea NST 4-28-2021

NLT 5-26-2021 $81,570 ea

Six (6) 3-phase, disconnecting switches, 123-kV, 2,000-amp 2,750 ea NST 4-28-2021

NLT 5-26-2021 $10,675 ea

Five (5) single-phase coupling capacitor voltage transformers, 115-kV 1,200 ea on-site $4,780 ea

NST – No sooner than.

NLT – No later than.

1. POINTS-OF-DELIVERY: Material furnished by WAPA will be received and stored at the Bureau of Reclamation’s Seminoe Dam Warehouse shown on Drawing S 0015. Prior to removal of WAPA-furnished material, the Contractor shall inspect the equipment for possible damage during shipment, transportation or storage. The Contractor is responsible for loading, craning and unloading all WAPA-furnished material to the roof of the generating facility where the switchyard is located. Prior to equipment installation, the Contractor shall inspect the equipment for possible damage. After each inspection, the Contractor shall report any damages to the WAPA’s COR.

G. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:

Electric power, when available, is in switchyard receptacles for Contractor’s use. The Contractor may furnish power for his operations by other means at no additional cost to WAPA. Power may be made available from station service by WAPA as single-phase, 60 Hz, AC, at approximately 120-240 V.

Coordinate with the COR for establishing electric power service.

H. WATER FOR CONSTRUCTION PURPOSES:

Furnish water for construction purposes. Make arrangements for obtaining the water and provide for conveying the water to the points of use.

I. EXPLOSIVES AND BLASTING:

Explosives shall not be used.

J. EMPLOYEE REQUIREMENTS:

In addition to the requirements listed in WAPA Construction Standard 1.4.3 all employees are restricted from wearing a headset, headphone or other listening device, other than a hearing aid or instrument for the improvement of defective human hearing, hearing protection worn as the hazard exists or for communication purposes while on a WAPA jobsite.

K. ELECTRICAL MINIMUM APPROACH DISTANCES:

In addition to the requirements listed in WAPA Construction Standard 1.4.9 equipment other than cranes and derricks, conductive objects or personnel, shall not be brought closer to energized facilities than the electrical minimum approach distances established by OSHA 1926.958(b), “Materials, Handling and Storage”. The less stringent equipment clearance distances established by OSHA 1926.960, “Working On or Near Exposed Energized Parts”, Table V-5 and Table V-6, may only be used after the Contractor has completed and submitted WAPA’s Electrical Clearance Variance form and has received the signed form in return from the COR.

L. SUBMITTALS AND CORRESPONDENCE:

1. GENERAL: The Contractor shall furnish submittals via email as specified in the Construction Standards and this Project Specification to the email address listed under the Transmittal section below and with the following requirements:

a. Submittals shall be in standard PDF, Microsoft Word (.doc/.docx), Microsoft Excel

(.xls/.xlsx), Electronic CAD (.dwg) (AutoCAD 2010 or 2014) or formats. All submittals in .dwg format shall also be submitted in .pdf format.

b. Each submittal shall include label at the top of the first catalog/informational page or drawing with the WAPA Contract number with the 3-digit Specification number, if applicable (9503218CWA000XXX-1009), WAPA project title, Bidding Schedule Contract Line Item Number (CLIN) equipment designation or if a designation is not available the applicable division and paragraph number with Equipment type and item description.

(1) Example 1:

(2) Example 2:

c. Multiple CLIN’s on a single submittal are not permitted. For Associated Electrical Equipment and Material’s CLIN, which contains multiple equipment types, each type shall be submitted separately with the exception that Phase Identification Signs and Equipment Identification Signs can be submitted together.

d. A cover transmittal letter in Microsoft Word or PDF format shall be included with each email submittal. The transmittal shall also contain the Contractor address, phone number, a contact name, the WAPA Contract number with the 3-digit Specification number, if applicable (9503218CWA000XXX-1009), WAPA project title, Bidding Schedule Contract Line Item Number (CLIN) and applicable division number and applicable division paragraph number.

2. TRANSMITTAL: The Contractor shall submit all correspondence (Request for Information, Submittals, etc.) to the following email addresses care of the COR.

Rocky Mountain Region

ATTN: J5600

Email: RMR-J5600-CS@wapa.gov

3. SUBMITTAL RESPONSE: WAPA will provide a response to all submittals in accordance with

Division 1.D.2 of these specifications with an “Acceptable” or “Not Acceptable” status, with comments as appropriate to the email address where the submittals originated.

4. PHYSICAL SAMPLE SUBMITTALS: When physical specimens or digital media are required to be submitted for approval, (i.e. brick samples, roofing material samples, carpeting, CDs, DVDs, etc.) the Contractor shall provide a digital cover letter outlining the physical sample submittal prior to sending the sample, including tracking data when applicable, and shall deliver physical specimens to:

Western Area Power Administration

ATTN: A7900

12155 W. Alameda Parkway Lakewood, CO 80228-2802

9503218CWA000XXX-1009

Seminoe, Stage 03 - CLIN-0010

9.B.4 AW1A1, AW1A2, AW1A3

9503218CWA000XXX-1009

Seminoe, Stage 03, CLIN-0012 9.B.6.b Substation Grounding System

– 4/0 AWG copper conductor

5. PROJECT PROTOCOL:

a. Electronic Correspondence:

EMAIL SUBMITTAL FORMAT:

Subject Line in Email

Submittal number, Subject, Applicable Standard Number, Project Name/Number, and Contract Number Example: Submittal 017, Steel Compression Dead Heads-Std 10, Ault Substation Stage No 08, 9503218CWA000XXXX-1009

b. Payment Requests:

EMAIL PAYMENT REQUEST FORMAT:

Invoice number and Project Name/Number and Contract Number Example: Invoice 01, Ault Substation Stage 08, 9503218CWA000XXXX-1009

c. Certified Payrolls-Prime and Subcontractors:

EMAIL CERTIFIED PAYROLL FORMAT:

Certified Payroll (CP), Contractor’s names, Week ending (WE), and Project Name/Number, and Contract Number Example: CP-(Smith Inc., Bob’s Electrical), WE 09/12/18 and 09/19/18, Ault Substation Stage

08, 9503218CWA000XXXX-1009

d. Request for Information:

EMAIL (REQUEST FOR INFORMATION) FORMAT:

Request for Information (RFI), Project Name/Number, and Contract Number Example: RFI-003, Labeling Info, Ault Substation Stage 08, 9503218CWA000XXXX-1009

DIVISION 2 – SITEWORK

A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule item “Miscellaneous sitework” includes the following:

a. Modifying existing concrete foundations as shown on Drawing S 2002. Modification involves cutting off existing anchor bolts flush with the top of concrete, painting exposed end of anchor bolts with zinc-rich paint and installing new expansion anchors.

b. Modifying existing handrail around new Cable Raceway Support as shown on Drawing

S 2604 Rev. A. Modification involves cutting off existing anchor bolts flush with the top of concrete, painting exposed end of anchor bolts with zinc-rich paint and installing new expansion anchors and handrail supports.

2. Bidding Schedule does not contain separate items for the following. Include these items in applicable Bidding Schedule items.

a. Expansion anchors and adhesive anchors.

DIVISION 4 – SUBSTATION METALWORK

A. GENERAL:

1. Government-Furnished Drawings: Except as listed below, existing shop drawings for steel structures are not available.

The Government will furnish, within 30-days following contract award, one (1) reproducible of the following shop detail and erection drawings:

Prints of representative drawings are available from the Civil Engineer. Half-size prints of erection drawings and bills of materials and a representative example of detail drawings will be furnished to prospective bidders upon request at $3.00 per print, nonrefundable.

2. Measurement: Measurement for quantities for Bidding Schedule items “Steel structures, welded

(galvanized)” and “Steel structures, lattice” will be made on the basis of weights calculated in accordance with LRFD, “AISC Code of Standard Practice for Steel Buildings and Bridges”, except that weights for nonrectangular shapes and plates are to be based on actual detailed dimensions.

Steel structure weights, calculated as noted above, are shown on the Government-furnished shop drawings and shall be shown on the Contractor-furnished final shop drawings and payment will be based thereon. Steel estimated weights are shown on the specifications drawings for the structures requiring approval drawings as noted in the Bidding Schedule items “Steel structures, welded (galvanized)”, “Steel structures, lattice”, “Steel structures, welded (painted)”, “Aluminum Structures, welded” and “Relocating and Modifying steel structures”.

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule item “Steel structures, welded (galvanized)” includes providing the following:

a. Two (2) Conduit Supports (S 2602).

b. Two (2) Conduit Supports (S 2603).

c. One (1) Conduit Raceway Support (S 2604 Rev. A and S 2605).

The above material including connection bolts, nuts, washers and lock nuts shall be galvanized.

2. Bidding Schedule item “Steel structures, lattice” includes providing the following:

a. Three (3) Ground Wire Towers (S 2600).

b. One (1) Conduit Support Beam (S 2601).

The above material including connection bolts, anchor bolts, nuts, washers and lock nuts shall be galvanized.

DIVISION 9 – SUBSTATION - ELECTRICAL

A. GENERAL: Electrical equipment and material shall be as specified in WAPA’s “WAPA ES” standard equipment specifications, as shown on project drawings, and in accordance with NEMA, ANSI, IEEE, ICEA, ASTM, NEC, NESC, UL and Federal specifications and standards as applicable. Applicable requirements shall be met under the following service conditions:

Ambient Temperatures:

Maximum .............................................................................. +40°C Maximum 24-Hour Average ................................................. +30°C Minimum ................................................................................ -40°C

Elevation:

Above Mean Sea Level .................................................6,200-Feet

*ASCE-7 Wind Load:

Minimum Basic Wind Speed ............................................. 90-MPH Importance Factor ................................................................... 1.15

*IEEE 693 Seismic Qualification ............................................. Moderate

*May include support structure in accordance with STANDARD 9.1.1.2. Wind and seismic loads are nonsimultaneous.

1. Bidding Schedule for Government-furnished items (including associated supporting structures when furnished) require the Contractor to provide:

a. Unless otherwise indicated, loading, transporting, unloading and inspecting Government-furnished items.

b. Installing Government-furnished items as shown on drawings.

c. Furnishing equipment and material not furnished by WAPA.

2. Bidding Schedule for items (not furnished by the Government) shall be furnished by the

Contractor and shall include the following:

a. Providing (furnishing and installing) bidding schedule items.

b. Furnishing equipment and material not furnished by WAPA.

c. Installing bidding schedule items as shown on drawings.

3. Unless otherwise specified, associated support structures provided for each electrical equipment rated above 7-kV shall be 102-inches in height and hot-dip galvanized, if made of steel.

Instrument transformers that are seismically qualified shall be 96-inches in height. If tubular steel supports are furnished, they shall be galvanized internally and externally.

4. Installation and painting of electrical equipment and material shall be provided in accordance with

Standards 9 and 12 respectively.

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule item “Power circuit breaker, 123-kV, 3,000-amps (Government-furnished)”:

DESIGNATION JY1A, JY2A

Manufacturer Mitsubishi

Model Number 100-SFMT-40HE

Type SF6 gas Nominal Voltage Rating (kV) 115

Maximum Voltage Rating (kV) 123

Continuous Current (Amps) 3,000

Short Circuit Fault Rating (KA) 40

Rated Interrupting Time (cycles) 3

Number CT’s per Bushing 3

Estimated Weight of 3-pole Breaker with Gas (LBS)

7,505

Approximate SF6 Gas Weight (LBS) 61.2

a. The equipment shall be obtained in accordance with Division 1. After contract award, the

Government will provide manufacturer drawings of equipment.

b. Any spare parts furnished with each power circuit breaker shall be inspected for damage and turned over to the COR or to WAPA’s onsite representative. A complete list will be included with the breaker instruction books.

2. Bidding Schedule item “Disconnecting switch, 123-kV, 2,000-amps (Government-furnished” includes providing the following disconnecting switches as shown on the Drawings and in accordance with WAPA ES 8.1 equipment standard:

DESIGNATION YY1A, WY1A YY2A, WY2A WY1B WY2B

Type 3-pole, single throw, outdoor, group operated, vertical break, rotating insulator

DESIGNATION YY1A, WY1A YY2A, WY2A WY1B WY2B

System Nominal Voltage Rating (kV) 115

Rated Maximum Voltage (kV) 145

Basic Impulse Insulation Level (kV) 650

Continuous Current Rating (Amps) 2,000

Short-Time (3-seconds) Symmetrical Current Rating (kA)

Peak Withstand Current (kA at 60Hz) 164

Grounding Blades None

Standard Arcing Horns Yes

Switch Operator Type Manual Swing Handle/Worm-Gear Operator

Phase Spacing (feet) 8-0 7-4 7-0 12-0

Height of Support Structure (feet) 24-6 52-0

Mounting Position Horizontal Vertical

Insulator Technical Reference No. 288 or 289

Control Circuit Voltage Not Required

Auxiliary Switch Not Required

Key Interlock None

*Approximate mounting height.

Government will provide manufacturer drawings of equipment upon request.

b. Any spare parts furnished with each disconnecting switch shall be inspected for damage and turned over to the COR or to WAPA’s onsite representative.

3. Bidding Schedule items “Coupling capacitor voltage transformer, 115-kV, single-phase (Government-furnished)”:

DESIGNATION

(SINGLE-PHASE)

VY1A1, VY2A1, VY3A1,

VY3A2, VY3A3

Type

Single-phase, outdoor, 60-Hz, support structure seismically tested with CCVT qualified to IEEE

Manufacturer ABB/Hitachi

Nominal System Voltage (kV) 115

Maximum System Voltage (kV) 123 Basic Impulse Insulation Level (kV)* 550

Primary to Secondary Ratios 600/1,000: 1 600/1,000: 1

ANSI Accuracy Rating 0.3% M, W, X, Y, Z

Capacitance (pF) 7,000

Mounting Base *BIL rating after adjusting for altitude.

Government will provide manufacturer drawings of equipment upon request.

4. Bidding Schedule item “Surge arrester, 2.4-kV, single-phase” includes providing surge arresters in accordance with ANSI C62.1 and WAPA ES 9.1 equipment standard:

DESIGNATION

(SINGLE-PHASE)

AW1A1, AW1A2,

AW1A3

Class Station

System (kV) (L-L) 2.5 MCOV*(kV, RMS) (Not less than) 2.55

Duty Cycle Voltage (kV) 3

Terminal Pad NEMA 2-or 4-hole pad

Housing Insulating Material Silicone or Porcelain

Color Gray

Mounting Base grounded *MCOV = Maximum Continuous Operating Voltage

a. Associated mounting bracket shall be in accordance with Division 4 – SUBSTATION

METALWORK and as shown on the Drawings.

b. Surge arresters shall be qualified to operate under the service conditions specified in paragraph A General and as follows:

*IEEE 693 Seismic Qualification ............................................... Moderate

*In accordance with STANDARD 9.1.1.2. Wind load per paragraph A, General and seismic loads are nonsimultaneous.

c. Surge arresters shall have the following features:

(1) Be suitable for base mounting.

(2) Be metal oxide station-type.

(3) Be equipped with pressure relief diaphragm.

(4) Have gray colored silicone or porcelain.

(5) Have NEMA CCI terminal pads.

(6) Have ground connector for No. 2 AWG to 400-kcmil copper cable.

(7) Be equipped with grading rings if required for application.

5. Bidding Schedule item “Three (3) conductor 1 AWG, 5-kV, insulated copper cable” includes providing a single, three (3) conductor, 1 AWG, 5-kV, insulated copper power cable, Southwire Simpull 5XW or Simpull 5ET or equal, as shown on the Drawings. Cables shall run between FW1A and Seminoe Camp’s insulator assemblies through the conduit as shown on Drawings.

Cable run is 3-phase. Contractor shall determine the conductor transitions between insulated conductor and conduit as shown on Drawings S 1110 and S 1113 for the Seminoe Camp feed.

6. Bidding Schedule item “Associated electrical equipment and material” includes providing equipment, material and services required to complete the following substation installations as shown on the Drawings:

a. Electrical Testing: Includes providing electrical testing in accordance with Standard

9, paragraph 9.1.2 Acceptance Tests – Method A.

b. Substation Grounding System: Complete and test the substation grounding system. Unless otherwise specified on drawings, splices, connections and other fittings shall be swage type (DMC Power’s Swage, AFL Swage system, or equal. It’s recommended to obtain the necessary tooling from the respective manufacturer). In lieu to WAPA Standard 9, regular compression and exothermic connections are not acceptable. All new exposed ground wire shall be copper clad steel. Informational drawings and data are required for conductor only.

NOTE: Copper clad steel shown on drawings and standard drawings as seven

(7) No. 5 shall be seven (7) No. 4, or 19 No.8, in lieu of seven (7) No. 5. (For clarification, seven (7) No. 4 is seven (7) individual number 4 conductors, stranded together to form a single conductor. 19 No. 8 is nineteen (19) individual number 8 conductors, stranded together to form a single conductor).

c. Electrical Conduit System: Electrical conduit system including embedded and exposed conduit. All conduits shall have sealing compound installed at both ends. Informational drawings and data are not required for this item. Contractor shall determine and provide all conduit transitions, support, bracing and straps as approved by the COR.

d. Outdoor Bus System: Outdoor strain and jumper buses, rigid buses and overhead ground wire unless otherwise specified on the Drawings, splices, elbows, pad type terminal connectors and other fittings used on rigid or cable buses shall be swage compression type (DMC Power’s Bus and Cable Connectors and Swage System, AFL Swage system or equal.

If required, tools shall be obtained from respective manufacturers.). Additional requirements for insulators are described below. Informational drawings and data are required for the rigid bus and AAC conductors.

e. Insulators: Post insulators shall use industry standard 3-, 5- or 7-inch base cap bolt circles in lieu of WAPA Standard 9.3.1.1.3.2 and Drawing 31 1081. All Insulators shall be ANSI 70 gray. The Contractor shall provide new suspension insulators and replace the existing suspension insulators which are encircled on the Drawings and as shown on the Drawing S 1114 for assembly details. Informational drawings and data are required for the insulators.

f. Insulated Conductors: Insulated conductors and cables except 5/c and12/c No. 10 AWG control cable and power cable with insulation greater than 5,000 V. Informational drawings and data are not required for this item.

g. Terminal Boxes: Terminal boxes internal components arrangements shown on Drawings

31 1085 and 31 1086 are typical and the Contractor shall provide internal components for Option 1 Type A and Type F terminal box configurations. Actual internal arrangements will be determined by the COR. NOTE: On Drawing 31 1085, note 7 should be: “Ground all boxes to the main ground grid with 3 conductor No. 7 bare copper-clad cable. Seven

(7) conductor No. 4 bare copper-clad cable may be substituted.” Regardless, the Contractor shall size and provide the ground connector, item 4, to fit the provided grounding conductor in lieu of Burndy ground connector type K2C20B1.

h. Enclosure ET1A: The custom-made enclosure box shall be NEMA 4X and made as shown on Drawing S 1750 and located as shown on S 1740.

i. Enclosures ET2A, ET4A, ET5A: Enclosures shall be NEMA 4X and provided as shown on Drawing S 1755, S 1765 and S1770 and located on Drawing S 1740.

j. Enclosure EL5A: Enclosures shall be NEMA 4X and provided as shown on Drawing

S 1775 and located on Drawing S 1116.

k. Enclosures ET2B and ET3B: Enclosures shall be NEMA 3R, galvanized, and provided as shown on Drawing S 1757 and S 1762 and located as shown on Drawings S 1110 and S 1740.

l. Molded Case Circuit Breakers: The Contractor shall field determine and provide panelboard matching molded case circuit breakers for the station service as shown on Drawings S 1620 and S 1621.

m. Service Panel Circuit Nameplates: The Contractor shall furnish new individual station service engraved nameplates in accordance with ES 2.3.3.5 for circuits modified on Drawings S 1620.

n. Cable Terminators: Cable terminators of the self-supporting type. The cable terminators shall include molded rubber caps, crimp rings, nontracking terminator housings, stress relief, ground straps, mounting brackets and lugs suitable for connecting to electrical equipment with a NEMA 2-hole pad.

o. Phase Identification Signs (31 1000):

(1) One (1) on each phase at both ends of main and jack buses, at each high voltage circuit terminating structure and on each phase of an instrument transformer or single-phase transformer:

(a) Phase A - 9 required.

(b) Phase B - 7 required.

(c) Phase C - 7 required.

p. Equipment Identification Signs (31 1000): Lettering on the signs shall be as shown on

Drawing S 1101.

7. Bidding Schedule item “Existing outdoor electrical equipment and material” includes constructing a temporary storage facility to hold existing equipment containing PCB oil with 2-ppm or greater. The temporary storage facility shall be in accordance with the standards. Bidding Schedule item “Existing outdoor electrical equipment and material” also includes removal, modify and disposal of existing electrical equipment and material.

a. Material to be removed and delivered to WAPA is as follows:

(1) Existing molded case circuit breakers removed/replaced as shown on Drawings

S 1620.

b. Material to be modified is as follows:

(1) The 2-1/2-inch abandoned conduit previously used for the Seminoe Camp line shall have a metal plate fitted to its existing flange and bolted shut and watertight.

(2) All other abandoned conduit risers in the switchyard shall be cut off flush from the top of concrete and capped.

c. Material to be removed and disposed of is as follows:

(1) Two (2) SF6 gas insulated power circuit breakers JY1A and JY2A. Each power circuit breaker contains approximately 120-pounds of SF6 gas and has a total weight of 8,500-pounds.

(2) Four (4) disconnecting switches WY1A, WY1B, WY2A and WY2B.

(3) Two (2) disconnecting switches with ground blades YY1A-ZY1A and YY2A-ZY2A.

(4) Five (5) coupling capacitor voltage transformers VY1A1, VY2A1, VY3A1, VY3A2 and

VY3A3.

(5) Existing main and jack buses, associated insulator assemblies, jumpers and fittings.

(6) Eighteen (18) station post insulators as shown on Drawings. Preserve brown cap-and-pin type station post insulators for COR.

(7) Suspension insulators for conductors not being replaced as shown on Drawings.

(8) One (1) 2.4-kV pothead used in the abandoned Seminoe Camp line, as shown on

Drawing S 1711.

(9) Removal of existing insulated cable for the abandoned Seminoe Camp line, all portions of insulated cable in conduit, overhead cable trays within the generating facility, up to fuse disconnecting switch FW4 shall be removed.

(10) Replaced equipment signs.

(11) Substation control, power cables and conduit as designated on the Drawings. All portions of cables in conduit, conduit embedded in concrete, overhead cable trays, in the switchyard and within the generating facility, shall be removed and disposed of.

d. After contract award, the Government will provide known nameplate data for existing outdoor electrical equipment items to be removed and disposed.

e. The Contractor shall include any credit to the Government for salvage of the equipment and/or materials in this bid item.

8. Bidding Schedule items “Furnishing 5/c No. 10 AWG control cable” and “Furnishing 12/c

No. 10 AWG control cable” include furnishing 5/c No. 10 and 12/c No. 10 AWG control cable, respectively.

9. Bidding Schedule items “Installing 5/c No. 10 AWG control cable” and “Installing 12/c

No. 10 AWG control cable” include installing 5/c No. 10 and 12/c No. 10 AWG control cable, respectively. Contractor shall make conductor terminations in the outdoor equipment cabinets but not in the indoor cabinets, panelboards or switchboards. Include enough additional cable length so that any conductor in the cable can reach the furthest connection point in the equipment plus 10-feet. Neatly coil excess cable near the equipment and provide protection from damage.

10. Fiber optic cables and associated equipment, See Division 14.

DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION

A. DESCRIPTION OF BID ITEMS:

1. Bidding Schedule does not contain a separate item for “Environmental Quality Protection” The cost of compliance with requirements of Division 13 shall be included in the applicable bidding schedule items. The Contractor shall review the latest version of WAPA’s Construction Standard 13 – Environmental Quality Protection and comply with all requirements.

DIVISION 14 – COMMUNICATIONS FACILITIES

A. COMMUNICATION FACILITIES:

1. Bidding Schedule item “Furnish and install fiber optics (FO) and associated equipment”, including installing the splice enclosures, cable coil brackets, fiber optic cable and associated hardware, with testing of the fiber cables, end to end, as detailed below.

NOTE: If applicable, Transmission Line Optical Ground Wire (OPGW) and associated transmission line hardware shall be as specified in Division 10 – Transmission Line – Electrical.

a. General: The fiber optical installation defined by these specifications will result in three (3)

48 optical fiber cables from the substation rooftop to the communications area in the lower floor of the structure and will include end to end testing of the fiber cables. Locations shown in drawings.

b. Government Furnished Equipment (GFE): None.

TABLE 14-1 – FIBER OPTIC INSTALLATION REFERENCE DRAWINGS

DRAWING

NUMBER DRAWING TITLE BLOCK

S 1101 Seminoe Switchyard – Switchyard Signs S 1111 115-kV Bus Structure Section B-B (downstream side) S 1112 115-kV Bus Structure Section C-C and D-D S 1712 Conduit Installation – EL. 6170 to Roof – F Line Wall 144-D-2008 Seminoe Conduit Installation (Comm room lower left)

31 1097 D Fiber Optic Cable Mounting

ATTENTION: Length of fiber cables shown in 31 1097 shall be as specified in the installation section below.

31 1099 A Fiber Optic Cable Armored Cable Installation

ATTENTION: Length of fiber cables shown in 31 1099 shall be as specified in the installation section below.

STANDARD DRAWINGS (as applicable)

41 1028 F Transmission Line Standards, Steel and Concrete Pole Structures, Fiber Optic Cable Mounting

41 1030 F Fiber Optic Cable Mounting Downlead Clamps and Bands 41 1031 F Optical Ground Wire Assemblies 41 1035 Fiber Optic Cable Overhead to Underground Transition

c. Material: FO communications equipment shall be commercially manufactured off-the-shelf items. Provide and install, unless indicated as GFE, then installation only.

(1) Cable Storage Brackets: Provide and install total of three (3) new external coil bracket AFL CB-44-3AL, or equivalent, on substation lattice structures, in accordance with Standard Drawings 31-1097, S 1111 (qty 2) and S 1112 (qty 1).

(2) Splice Enclosures: Provide and mount optical splice enclosure on the structure with coil brackets, as follows:

(a) Substation: Take Off Structure (TOS) optical splice enclosures shall be equivalent to AFL Opti-Guard OG-03 (no bullet guard due to nesting bird kills), including all accessories required for the splicing of the 48-fiber OPGW to Fiber Optic Distribution Cable (FODC). Optical splice enclosure accessories shall include, but not limited to: Connector kits, minimum 48-fiber capacity splice trays/organizers, splice protection sleeves, fiber routing kits and connector kits. The splice tray/organizer shall allow for sufficient bend radii as recommended by the cable/fiber manufacturer, with minimum 24-inches of bare fiber to the fusion splice, coiled in each splice tray.

(b) Splice enclosures shall have the splicing accessories loaded into the splice enclosures and enclosures to be sealed and mounted on the cable coil brackets. LFMC grounding connectors will be installed on the LFMC and grounded as shown in 31 1097.

(3) LFMC/FODC (Liquid-tight Flexible Metal Conduit with Fiber Optic Distribution Cable) i.e., fiber cable inside liquid tight metallic armor, yellow jacket on both:

(a) LFMC/FODC: 48-count fiber cable manufactured with FODC inside LFMC shall be Optical Cable Corporation’s HC048DSLACYR12-F034 (48 Strand single mode fiber, OCC HC Series Interlocked Armored Distribution, OFCR Riser, single mode 9/125, LFMC yellow jacket designating single mode fiber, with easily removable LFMC from FODC), or equivalent. The fibers shall have no factory splices in any continuous length. Each continuous length of cable shall be wound on a separate reel. The end of each length of cable shall be sealed so no moisture can enter the cable. The cable shall be wound onto the reel so it can be pulled off without binding, kinking or other problems. All optical fibers shall be compliant with or exceed the requirements of ITU-T G.652.D and ITU-T G.657.A1 (bend intensive, single mode fiber).

(4) Grounding Systems: Equipment bonded in accordance with specification and standard drawings, as well as standard Drawing 31 1097 (Substation Standards Fiber Optic Cable Mounting). Additionally, the LFMC connectors shall have grounding connection that will be bonded to local ground with either No. 4 or No. 6 AWG wire (LFMC to be grounded just after entry into the communications room, where the LFMC is removed from the fiber cable).

(5) Identification Signs:

(a) Substation Equipment Identification Signs: Signs shall be furnished and installed at lattice structures above the coil bracket locations as shown in drawings of table 14-1. In accordance with S 1101 and Standard Drawing 31 1000 and mounted above the coil bracket and/or splice enclosure. Lettering on the signs shall be as follows:

1) At Substation Lattice structure, downstream side (S 1111):

48 FIBER OPGW CC-57/465

S – K1

SPLICE ENCLOSURE

2) At Substation Lattice structure, downstream side (S 1111):

S – K2

3) At Substation Lattice structure, Seminoe Camp direction side (S 1112):

S – SMM

NOTE: This signage is to identify the communications facilities: OPGW (future installation).

d. Installation (S 1111, S 1112, S 1712, 144-D-2008):

(1) ATTENTION: Substation installation shall be in accordance with Drawing 31 1099

Fiber Optic Cable – Armored Cable Installation and 31 1097 Substation Standards – Fiber Optic Cable Mounting. Per drawings, minimum lengths are specified and attention to end-to-end length of LFMC/FODC shall account for cable length needed for TOS coil brackets, routing in conduits to the control building communications room. The total fiber optic installation at control building(s), will result in 3-fiber optic communication cable paths from substation rooftop to the communications control room, and tested, end to end.

(2) Provide and install fiber cable coil brackets, specified above. Coil brackets shall be mounted on lattice locations shown in S 1111 and S 1112 and in accordance with Drawing 31 1097. Signage listed above shall be mounted above each coil bracket.

(3) Splice enclosures, specified above, with fiber termination accessories loaded inside, shall be mounted on the cable coil brackets

(4) Provide and install fiber optic cable (LFMC/FODC), specified above, including determining end-to-end length from each of the three (3) substation lattice coil brackets to the comm area, farthest corner of the room, of the lowest floor in the substation. Total length shall include 60-feet of FODC coiled on each of the three (3) cable coil brackets and additional 25-feet each in the communication room. FODC to be routed from substation rooftop cable coil brackets (mounted on lattice structures), through conduit and cable ladder racks to the farthest corner of the communications equipment room/area in the lowest floor in the structure. Per drawings, remove LFMC from fiber optic cable approximately 10 feet after the LFMC/FODC enters the communications room ladder rack and ground the LFMC with ground capable LFMC connector. Route the FODC (without LFMC) to the far end of the communications room. Fiber cable coils, minimum 25-feet, in the communications room shall be coiled and mounted on the backer board for termination by others (future).

(5) Fiber cable terminations will be done by others (future).

e. Fiber Optic Testing: Perform fiber optic testing in accordance with the following:

(1) Factory Tests of FODC: Factory tests shall be performed on each fiber of every reel at the factory. Results shall be recorded and included in the packaging with the cables. Product data sheets showing the cable characteristics including dispersion, index of refraction, dimensional quality and tensile strength shall be provided from the manufacturer.

(a) The Contractor shall submit Optical Time Domain Reflectometer (OTDR) charts (on CD: Raw test data and PDF formatted chart data) at 1310-nm and 1550-nm (single-mode fiber), showing launch conditions and all other parameters used in setup, time and date, as well as a diagram of the test setup.

For these tests, each fiber, in turn, shall be mechanically, or fusion, spliced to a single-mode launch fiber, minimum of 1-km in length, which is connected to the OTDR (record length of launch cable on diagram). The OTDR charts shall illustrate and quantify the losses of each length of fiber and stress points on the fiber. Review the traces carefully and explain unusual discontinuities in detail. The OTDR testing waveforms, in native format from the test set, shall be stored on an optical disk and included with the required submittals, as well as, PDF formatted waveforms via email to WAPA-A7930. If OTDR testing is performed using equipment other than Wavetek or Tektronics, the Contractor shall supply WAPA with legitimate test set vendor software necessary to view and manipulate the native test set waveforms.

(2) Post-Installation Field Tests of FODC. The Contractor shall notify COR at least

7-days prior to the post-installation field tests to enable WAPA observers to be present. All installed fiber segments will be tested, end to end.

(a) OTDR testing end to end, of each fiber. At each end of the fiber routes, in the substation control buildings, each fiber shall be tested from patch panel to patch panel using a launch fiber, 1-km in length, which is connected to the OTDR. Perform end to end testing from each fiber patch panel appearance as applicable, at each end of the completed fiber path. Perform and record results as shown in Table 14-3.

(b) The Contractor shall submit OTDR charts (on CD: Raw test data and PDF formatted chart data) at 1310-nm and 1550-nm (single-mode fiber), showing launch conditions and all other parameters used in setup, time and date, as well as a diagram of the test setup. For these tests, each fiber, in turn, shall be mechanically, or fusion, spliced to a single-mode launch fiber, minimum of 1-km in length, which is connected to the OTDR (record length of launch cable on diagram). These charts shall illustrate and quantify the losses at each splice, length of fiber and stress points on the fiber. These tests shall document all splices along the optical path. The Contractor to review the traces carefully and explain unusual discontinuities in detail. OTDR measurements shall be made in both directions and the splice loss results bi-directionally averaged. Bidirectional averaged values shall be clearly displayed in a separate table that identifies each splice location by transmission line and structure number. Bidirectionally averaged splice loss shall not exceed 0.10dB. Submit OTDR results for every fiber of the completed fiber system. The OTDR testing waveforms, in native format from the test set, shall be stored on an optical disk and included with the required submittals, as well as PDF formatted waveforms via email to WAPA-A7930. If the OTDR testing is performed using equipment other than Wavetek or Tektronics, the Contractor shall supply WAPA with licensed legitimate test set vendor software necessary to view and manipulate the test set waveforms.

(c) Optical Loss Testing (End to End): Perform continuity and attenuation tests at

1310-nm and 1550-nm (single-mode fiber), using an optical loss test set pair (power meter pair), on each complete fiber path. Testing shall demonstrate/verify continuity, fiber sequence integrity (i.e., fiber 1 to 1, fiber 2 to 2, etc.) and quantify overall end-to-end losses for each fiber.

(3) Instrument Calibration: All test equipment shall be calibrated with certification traceable to the National Institute of Standards and Technology relative to their intended use. Vendor to provide test equipment model number, serial number and calibration dates of test equipment as part of the test data package.

(4) Qualifications of Splicing and Testing Personnel: The fiber optic tester shall have a minimum of 1-year testing and operations experience with the OTDR test equipment used for tests required in this specification and shall be able to use all necessary test equipment without reference to test equipment instruction books while performing the required tests specified herein. All personnel performing splicing shall be certified to do so by the Electronic Technician Association or equivalent training program.

f. Fiber Optic Communication Drawings and Data:

(1) All drawings and technical data, shown in Table 14-3, are required to be furnished by the Contractor and shall be in English. The Drawings and data shall be complete and accurate in their content. Originals and all copies shall be legible.

TABLE 14-3 – FIBER OPTIC DRAWINGS AND DATA SCHEDULE

TYPE OF DRAWINGS, DATA

and SOFTWARE DELIVERY TIME TYPE OF MATERIAL

Fiber optic material data 40-days after NTP* Catalog sheets

Factory tests With shipment Test results

OTDR software to read and manipulate raw OTDR files With Test Results Software and license from

OTDR vendor Pre-Installation test:

1. Test setup diagram

2. Test Equipment (Make/Model/SN/Calibration date)

14-days after completion of tests

OTDR data CD (raw data &

PDF),

Test setup diagram & Software to read and evaluate raw OTDR files.

Post-installation field test results Preliminary test data Final test report

1) 1-2-days after testing

2) 14-days after completion of tests

OTDR data CD (raw data &

PDF),

Test setup diagram & Software

Post-installation test:

1. Test setup diagram

2. Test Equipment (Make/Model/SN/Calibration date)

14-days after completion of tests PDF file format

Certification of testing personnel 40-days after NTP* Copy of certification

*Notice to Proceed

Message from the Administrator

At Western Area Power Administration (WAPA), we show our commitment to safety every day through the actions we take, the training we offer and the work conditions we provide. We expect the same commitment to safety from each of our contractors who provide products or services to WAPA. In performing work for WAPA, all contractors must make the right decisions to ensure that the work environment is as safe as possible.

Our safety program is based on four points:

Safety procedures or common sense must be applied by each Federal and contract employee. Safety should not be set aside to meet a project schedule or for personal convenience.

Employees and contractors must believe that they have the right and the responsibility to identify and take action to reduce, if not eliminate, hazardous work environments and hazardous work practices.

Managers and supervisors must lead by example and execute their responsibility to ensure each job is accomplished in a safe and healthy way.

Safety is a personal responsibility. Each individual makes the decision on what action to take to accomplish a task.

By integrating these principles into every task we take, together we can ensure WAPA is a safe place to work.

Mark A. Gabriel Administrator and CEO

DIVISION 1 – GENERAL REQUIREMENTS
A. CONTRACT REQUIREMENT:
B. DESCRIPTION OF WORK:
C. DESCRIPTION OF BIDDING SCHEDULE ITEM:
1. Bidding Schedule item “Mobilization and preparatory work” includes the following:
D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: See FAR 52.211-10 in Section F of the solicitation/contract.
1. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, WAPA will require 30-calendar days for review of drawings or data submitted for approval.
2. OUTAGE RESTRICTIONS: In addition to the restrictions listed in Construction Standard 1, the following outage restrictions shall apply:
3. CONSTRUCTION SCHEDULE RESTRICTIONS: The following Construction Schedule restrictions shall apply: The Contractor shall not work more than 60-hours in one (1) calendar work week without prior approval from the Contracting Officer’s Representative ...
E. CONSTRUCTION SCHEDULE:
1. SUBMITTAL TIME: Prepare and Submit a Construction Schedule to the CO within 30-calendar days after date of Notice to Proceed.
2. FORMAT AND DETAIL: Dates for each item of Government-furnished material shall be provided. Do not program dates earlier than the estimated delivery dates shown in the “Material” paragraph.
3. MILESTONES:
F. MATERIAL: Furnish all material for completing the work, except material furnished by WAPA as listed below:
1. POINTS-OF-DELIVERY: Material furnished by WAPA will be received and stored at the Bureau of Reclamation’s Seminoe Dam Warehouse shown on Drawing S 0015. Prior to removal of WAPA-furnished material, the Contractor shall inspect the equipment for p...
G. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:
H. WATER FOR CONSTRUCTION PURPOSES:
I. EXPLOSIVES AND BLASTING:
J. EMPLOYEE REQUIREMENTS:
K. ELECTRICAL MINIMUM APPROACH DISTANCES:
L. SUBMITTALS AND CORRESPONDENCE:
1. GENERAL: The Contractor shall furnish submittals via email as specified in the Construction Standards and this Project Specification to the email address listed under the Transmittal section below and with the following requirements:

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .