22. 89503221BWA000040.pdf
PDF 750 KB Posted
- Attached to
- Seminoe Switchyard Stage 03
- Solicitation number
- 89503221BWA000040
About this file
This invitation for bids solicits offers for the Seminoe Switchyard Stage 03 project. The Department of Energy Western Area Power Administration is seeking bids for construction services including installation of steel structures, circuit breakers, disconnect switches, cable, and fiber optics. Offerors must submit bids via FedConnect by April 26, 2021 to be considered. The estimated value of the contract is between $500,000 to $1,000,000, and the project is set aside exclusively for small businesses. The contract will be a firm-fixed-price award with a performance period of 120 calendar days from notice to proceed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Energy Western Area Power Administration
Rocky Mountain Customer Service Region P.O. Box 3700
Loveland, CO 80539-3003
Prospective Bidders: Date: 23 March 20201
The Department of Energy, Western Area Power Administration (WAPA), invites you to submit a bid for “Seminoe Switchyard Stage 03”, under Invitation for Bids (IFB) 89503221BWA000040. This solicitation is issued as a 100% Small Business Set-Aside. The estimated order of magnitude for this acquisition is $500,000 to $1,000,000. This letter is not an integral part of the IFB, which is a self-contained stand-alone document. In the event of any conflict between the contents of this letter and the enclosed IFB, the IFB language shall prevail.
NOTE: the Buy American Act applies to this solicitation. Refer to FAR Clause 52.225-9 (Section I) and FAR Provision 52.225-10 (Section L) if any non-domestic material will be proposed. Bidders must identify any non-domestic materials (not manufactured in United States) included in their bid. Please check with your suppliers and subcontractors to verify whether or not their quotes include non-domestic material.
This IFB consists of Section A, Standard Form (SF) 1442, and Sections B to M, including Attachments listed in Section J.
Bid prices are to be shown in Section B and bidders are advised to inspect Sections F, G, H, K, L, and M for other information that may be required. Bidders must submit as a minimum: (1) One originally signed and dated copy of the SF 1442; (2) Section B bid prices; (3) Sections F, G, H, K, L and M (if information has been requested of the bidder); (4) Any other documentation required by the IFB. Electronic bids are required and shall be submitted through FedConnect only. The bid opening will take place IAW the information set forth on
SF1442.
Bidders are advised to submit only bids meeting all the performance and design requirements of the specifications and drawings, and the delivery requirements in Section F. In no event shall telephone discussions be construed as changes to the solicitation or place conditions on the solicitation. Only written amendment(s) to the solicitation issued by the Contracting Officer shall constitute a change to the solicitation or specifications.
Sealed bids must be received via FedConnect as shown in Block 10 of the SF 1442 by the date and time indicated in Block 13. Bids received after this date and time will be handled in accordance with the paragraph titled “Late Submissions, Modifications, and Withdrawals of Bids,” Section L of the IFB.
Note: When a bidder submits its Bid Bond and the Bid Bond is supported or backed by a Small Business Administration (SBA) Guarantee Loan, the bidder must submit a copy of the SBA Guarantee Loan agreement along with their bid package. Original signatures are required on bid bonds submitted to meet bonding requirements.
Sincerely, Benjamin Siltman Contracting Officer
Enclosure:
Invitation for Bids
Siltman Highlight
SECTION B
SUPPLIES OR SERVICES AND PRICES
BIDDING SCHEDULE
SEMINOE SWITCHYARD, STAGE 03
CLIN Work or Material Estimated Quantity Unit Unit Price Amount
0001 Mobilization and preparatory work (Not to exceed 5% of TOTAL. See Sections H and M.)
LS $
0002 Miscellaneous sitework LS $
0003 Steel structures, welded (galvanized) 4380 LB $ $
0004 Steel structures, lattice 1680 LB $ $
0005 Power circuit breaker, 123-kV, 3,000 amps (Gov't furnished)
2 EA $ $
0006 Disconnecting switch, 123-kV, 2,000 amps (Gov't furnished)
6 EA $ $
0007 Coupling capacitor voltage transformer, 115-kV, single phase (Gov't furnished)
5 EA $ $
0008 Surge arrester, 2.4-kV, single phase 3 EA $ $
0009 Three conductor 1 AWG, 5-kV, insulated copper cable
130 LF $ $
0010 Associated electrical equipment and material LS $
0011 Exisiting outdoor electrical equipment and material
LS $
0012 Furnishing 5/c No. 10 AWG control cable 2140 LF $ $
0013 Installing 5/c No. 10 AWG control cable 2140 LF $ $
0014 Furnishing 12/c No. 10 AWG control cable 1600 LF $ $
0015 Installing 12/c No. 10 AWG control cable 1600 LF $ $
0016 Furnish and install fiber optics (FO) and associated equipment
LS $
TOTAL $
ABBREVIATIONS
CLIN = Contract Line Item Number
CY = cubic yards EA = each LF = linear feet LS = for the lump sum of LB = pounds
NOTE: the Buy American Act applies to this solicitation. Refer to FAR Clause 52.225-9 (Section I) and FAR Provision 52.225-10 (Section L) if any non-domestic material will be proposed. Bidders must identify any non-domestic materials (not manufactured in United States) included in their bid. Please check with your suppliers and subcontractors to verify whether or not their quotes include non-domestic material.
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
21WA138770
WAPA (RMR)
US DOE/WESTERN AREA POWER
ROCKY MOUNTAIN REGIONAL OFFICE
5555 E. CROSSROADS BLVD
RMR
LOVELAND CO 80539-8986
Benjamin Siltman 970-461-7630 x
03/23/2021
89503221BWA000040
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
SEMINOE SWITCHYARD STAGE 03
89503221BWA000040
23 MARCH 2021
100% SMALL BUSINESS SET-ASIDE
Note: The Government intends to issue a "Notice to Proceed" on or about 10 days following contract award.
The opening of the bids will take place virtually the day after the date and time listed for receipt of offers in block 13. The bid opening will commence via
Microsoft Teams Meeting on 27 April 2021 at 1300 MT IAW FAR 14.102-3(a) and FAR
14.102-3(a)(2).
Microsoft Meeting:
Call In Number: 720-738-1532
Phone Conference ID: 453 049 866#
The bid opening is hereby limited to one representative per bidder.
For Block 17: See Section B - Bid Schedule Supplies - Bid Schedule Supplies of
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 120 calendar days and complete it within ________________ ________________ calendar days after receiving
Section F, Clause 52.211-10
04/26/2021
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
WAPA (RMR)
US DOE/WESTERN AREA POWER
ROCKY MOUNTAIN REGIONAL OFFICE
5555 E. CROSSROADS BLVD
RMR
LOVELAND CO 80539-8986
Benjamin R. Siltman
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
03/23/2021
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 75
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
89503221BWA000040
Service or Price/Costs.
Contracting Officer Email: siltman@wapa.gov
00001 SEMINOE SWITCHYARD STAGE 03
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Section C - Description/Specifications Clauses
DOE-C-2001 STATEMENT OF WORK (OCT 2014)
Section E - Inspection and Acceptance Clauses
DOE-E-2001 INSPECTION AND ACCEPTANCE (OCT 2014)
Section F - Deliveries or Performance Clauses
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK. (APR 1984)
52.211-12 LIQUIDATED DAMAGES - CONSTRUCTION. (SEP 2000)
52.211-18 VARIATION IN ESTIMATED QUANTITY. (APR 1984)
Section G - Contract Administration Data Clauses
WES-G-2001 ADMINISTRATIVE TIME FOR COMPLETION OF DRAWINGS (WAPA, JAN 2008)
DOE-G-2001 CONTRACTING OFFICER AUTHORITY (OCT 2014)
DOE-G-2002 CONTRACTING OFFICER'S REPRESENTATIVE (OCT 2014)
DOE-G-2004 CONTRACT ADMINISTRATION (OCT 2014)
DOE-G-2007 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING (JUL 2018)
Section H - Special Contract Requirements Clauses
WES-H-2001 RETAINAGE/HOLDBACK FOR UNDELIVERED DATA (WAPA, APR 2009)
WES-H-2007 MOBILIZATION AND PREPARATORY WORK (WAPA, MAY 2018)
WES-H-2011 FOREIGN VISITORS AND CONTRACT EMPLOYEES (WAPA, MAY 2018)
WES-H-2015 SAFETY AND HEALTH – HIGH RISK (WAPA, MAY 2018)
WES-H-2023 LIMITATION OF COSTS RESULTING FROM SUBCONTRACTING PRICE
ADJUSTMENTS (WAPA, FEB 2008)
DOE-H-2012 SUSTAINABLE ACQUISITIONS UNDER DOE CONSTRUCTION CONTRACTS (JUL
2018)
DOE-H-2013 CONSECUTIVE NUMBERING (OCT 2014)
DOE-H-2033 ALTERNATIVE DISPUTE RESOLUTION (OCT 2014)
DOE-H-2034 CONTRACTOR INTERFACE WITH OTHER CONTRACTORS AND/OR GOVERNMENT
EMPLOYEES (OCT 2014)
DOE-H-2044 MATERIAL SAFETY DATA SHEET AVAILABILITY (OCT 2014)
DOE-H-2049 INSURANCE REQUIREMENTS (OCT 2014)
DOE-H-2052 REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF THE
OFFEROR (OCT 2014)
DOE-H-2055 GOVERNMENT FURNISHED PROPERTY (OCT 2014)
DOE-H-2059 PRESERVATION OF ANTIQUITIES, WILDLIFE AND LAND AREAS (OCT 2014)
DOE-H-2065 REPORTING OF FRAUD, WASTE, ABUSE, CORRUPTION, OR MISMANAGEMENT
(OCT 2014)
DOE-H-2076 LOBBYING RESTRICTIONS (NOV 2018)
Section I - Contract Clauses Clauses
52.202-1 DEFINITIONS. (JUN 2020)
52.203-3 GRATUITIES. (APR 1984)
52.203-5 COVENANT AGAINST CONTINGENT FEES. (MAY 2014)
52.203-7 ANTI-KICKBACK PROCEDURES. (JUN 2020)
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR
IMPROPER ACTIVITY. (MAY 2014)
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY. (MAY 2014)
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS.
(JUN 2020)
52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO
INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS. (JUN 2020)
52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN
INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS-REPRESENTATION. (JAN 2017)
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS. (JAN 2017)
52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER.
(MAY 2011)
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE. (OCT 2018)
52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS. (OCT 2016)
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE. (AUG 2020)
52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES
DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES. (JUL 2018)
52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND
VIDEO SURVEILLANCE SERVICES OR EQUIPMENT. (AUG 2020)
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT. (JUN 2020)
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY
MATTERS. (OCT 2018)
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS.
(NOV 2015)
52.214-26 AUDIT AND RECORDS - SEALED BIDDING. (JUN 2020)
52.214-27 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA -
MODIFICATIONS - SEALED BIDDING. (JUN 2020)
52.214-28 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA - MODIFICATIONS - SEALED
BIDDING. (MAY 2020)
52.214-29 ORDER OF PRECEDENCE - SEALED BIDDING. (JAN 1986)
52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE. (NOV 2020)
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS. (OCT 2018)
52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN. (JUN 2020) - ALTERNATE I (NOV 2016) ..22
52.219-14 LIMITATIONS ON SUBCONTRACTING. (MAR 2020)
52.219-16 LIQUIDATED DAMAGES - SUBCONTRACTING PLAN. (JAN 1999)
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION. (NOV 2020)
52.222-3 CONVICT LABOR. (JUN 2003)
52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS - OVERTIME COMPENSATION.
(MAY 2018)
52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS. (AUG 2018)
52.222-7 WITHHOLDING OF FUNDS. (MAY 2014)
52.222-8 PAYROLLS AND BASIC RECORDS. (AUG 2018)
52.222-9 APPRENTICES AND TRAINEES. (JUL 2005)
52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS. (FEB 1988)
52.222-11 SUBCONTRACTS (LABOR STANDARDS). (MAY 2014)
52.222-12 CONTRACT TERMINATION - DEBARMENT. (MAY 2014)
52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED
REGULATIONS. (MAY 2014)
52.222-14 DISPUTES CONCERNING LABOR STANDARDS. (FEB 1988)
52.222-15 CERTIFICATION OF ELIGIBILITY. (MAY 2014)
52.222-21 PROHIBITION OF SEGREGATED FACILITIES. (APR 2015)
52.222-26 EQUAL OPPORTUNITY. (SEP 2016)
52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION. (APR
2015)
52.222-35 EQUAL OPPORTUNITY FOR VETERANS. (JUN 2020)
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES. (JUN 2020)
52.222-37 EMPLOYMENT REPORTS ON VETERANS. (JUN 2020)
52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS
ACT. (DEC 2010)
52.222-50 COMBATING TRAFFICKING IN PERSONS. (OCT 2020)
52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION. (OCT 2015)
52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658. (NOV 2020)
52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706. (JAN 2017)
52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND
CONSTRUCTION CONTRACTS. (SEP 2013)
52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA. (FEB 2021)
52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION. (MAY 2011)
52.223-6 DRUG-FREE WORKPLACE. (MAY 2001)
52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-
DESIGNATED ITEMS. (MAY 2008)
52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND
CONSTRUCTION CONTRACTS. (AUG 2018)
52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE
DRIVING. (JUN 2020)
52.223-22 PUBLIC DISCLOSURE OF GREENHOUSE GAS EMISSIONS AND REDUCTION GOALS-
REPRESENTATION. (DEC 2016)
52.225-9 BUY AMERICAN - CONSTRUCTION MATERIALS. (FEB 2021)
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES. (FEB 2021)
52.227-1 AUTHORIZATION AND CONSENT. (JUN 2020)
52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS. (DEC 2007)
52.228-1 BID GUARANTEE. (SEP 1996)
52.228-2 ADDITIONAL BOND SECURITY. (OCT 1997)
52.228-5 INSURANCE - WORK ON A GOVERNMENT INSTALLATION. (JAN 1997)
52.228-11 INDIVIDUAL SURETY-PLEDGE OF ASSETS. (FEB 2021)
52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS. (MAY 2014)
52.228-14 IRREVOCABLE LETTER OF CREDIT. (NOV 2014)
52.228-15 PERFORMANCE AND PAYMENT BONDS - CONSTRUCTION. (JUN 2020)
52.229-3 FEDERAL, STATE, AND LOCAL TAXES. (FEB 2013)
52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS. (MAY 2014)
52.232-17 INTEREST. (MAY 2014)
52.232-23 ASSIGNMENT OF CLAIMS. (MAY 2014)
52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS. (JAN 2017)
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR AWARD
MANAGEMENT. (OCT 2018)
52.232-36 PAYMENT BY THIRD PARTY. (MAY 2014)
52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS. (JUN 2013)
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS.
(DEC 2013)
52.233-1 DISPUTES. (MAY 2014)
52.233-3 PROTEST AFTER AWARD. (AUG 1996)
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM. (OCT 2004)
52.236-2 DIFFERING SITE CONDITIONS. (APR 1984)
52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK. (APR 1984)
52.236-5 MATERIAL AND WORKMANSHIP. (APR 1984)
52.236-6 SUPERINTENDENCE BY THE CONTRACTOR. (APR 1984)
52.236-7 PERMITS AND RESPONSIBILITIES. (NOV 1991)
52.236-8 OTHER CONTRACTS. (APR 1984)
52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES,
AND IMPROVEMENTS. (APR 1984)
52.236-10 OPERATIONS AND STORAGE AREAS. (APR 1984)
52.236-11 USE AND POSSESSION PRIOR TO COMPLETION. (APR 1984)
52.236-12 CLEANING UP. (APR 1984)
52.236-13 ACCIDENT PREVENTION. (NOV 1991)
52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES. (APR 1984)
52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS. (APR 1984)
52.236-17 LAYOUT OF WORK. (APR 1984)
52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION. (FEB 1997) - ALTERNATE I
(APR 1984)
52.236-26 PRECONSTRUCTION CONFERENCE. (FEB 1995)
52.242-5 PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS. (JAN 2017)
52.242-13 BANKRUPTCY. (JUL 1995)
52.242-14 SUSPENSION OF WORK. (APR 1984)
52.243-4 CHANGES. (JUN 2007)
52.243-6 CHANGE ORDER ACCOUNTING. (APR 1984)
52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS. (NOV 2020)
52.245-1 GOVERNMENT PROPERTY. (JAN 2017)
52.245-9 USE AND CHARGES. (APR 2012)
52.246-12 INSPECTION OF CONSTRUCTION. (AUG 1996)
52.246-21 WARRANTY OF CONSTRUCTION. (MAR 1994)
52.248-3 VALUE ENGINEERING - CONSTRUCTION. (OCT 2020)
52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE). (APR 2012)
52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION). (APR 1984)
52.252-2 CLAUSES INCORPORATED BY REFERENCE. (FEB 1998)
52.253-1 COMPUTER GENERATED FORMS. (JAN 1991)
952.202-1 DEFINITIONS
Section J - List of Documents, Exhibits and Other Attachments List of Documents, Exhibits, and Other Attachments Clauses
Section K - Representations, Certifications, and Other Statements of Bidders Clauses
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS. (MAR 2020)
52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT. (OCT 2020)
52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS-
REPRESENTATION. (NOV 2015)
52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS. (AUG 2020)
52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS. (OCT 2018)
52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY
OR A FELONY CONVICTION UNDER ANY FEDERAL LAW. (FEB 2016)
52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS-CERTIFICATION. (FEB
2021)
52.222-38 COMPLIANCE WITH VETERANS' EMPLOYMENT REPORTING REQUIREMENTS. (FEB
2016)
52.223-1 BIOBASED PRODUCT CERTIFICATION. (MAY 2012)
52.223-4 RECOVERED MATERIAL CERTIFICATION. (MAY 2008)
Section L - Instructions,Conditions, and Notices to Bidders Clauses
52.204-7 SYSTEM FOR AWARD MANAGEMENT. (OCT 2018)
52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING. (AUG 2020)
52.204-17 OWNERSHIP OR CONTROL OF OFFEROR. (AUG 2020)
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS.
(DEC 2014)
52.204-20 PREDECESSOR OF OFFEROR. (AUG 2020)
52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS. (DEC 2016)
52.214-4 FALSE STATEMENTS IN BIDS. (APR 1984)
52.214-5 SUBMISSION OF BIDS. (DEC 2016)
52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS. (APR 1984)
52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS. (NOV 1999)
52.214-18 PREPARATION OF BIDS - CONSTRUCTION. (APR 1984)
52.214-19 CONTRACT AWARD - SEALED BIDDING - CONSTRUCTION. (AUG 1996)
52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE. (APR 1991)
52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY. (APR 1991)
52.216-1 TYPE OF CONTRACT. (APR 1984)
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS-SECONDARY SITE OF THE WORK.
(MAY 2014)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION. (FEB 1999)
52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT - CONSTRUCTION MATERIALS. (MAY
2014)
52.233-2 SERVICE OF PROTEST. (SEP 2006)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE. (FEB 1998)
952.233-2 SERVICE OF PROTEST
952.233-4 NOTICE OF PROTEST FILE AVAILABILITY. (AUG 2009)
952.233-5 AGENCY PROTEST REVIEW. (SEP 1996)
WES-L-2004 CONTRACTOR'S CONTRACT ADMINISTRATION (WAPA, FEB 2008)
WES-L-2003 QUESTIONS CONCERNING THE SOLICITATION (WAPA, MAR 2002)
DOE-L-2014 DATE, TIME, AND PLACE OFFERS ARE DUE (OCT 2015)
DOE-L-2016 NUMBER OF AWARDS (OCT 2015)
DOE-L-2017 EXPENSES RELATED TO OFFEROR SUBMISSIONS (OCT 2015)
DOE-L-2019 SITE VISIT (OCT 2015)
DOE-L-2021 GUIDANCE FOR PROSPECTIVE OFFERORS - IMPACT OF TEAMING
ARRANGEMENTS ON SMALL BUSINESS STATUS (OCT 2015)
DOE-L-2022 ALTERNATE BID/PROPOSAL INFORMATION - NONE (OCT 2015)
DOE-L-2026 SERVICE OF PROTEST (OCT 2015)
DOE-L-2027 NOTICE OF PROTEST FILE AVAILABILITY (OCT 2015)
DOE-L-2028 AGENCY PROTEST REVIEW (OCT 2015)
Section M - Evaluation Factors for Award Clauses
WES-M-2001 AWARD ON AN ALL OR NONE BASIS (WAPA, NOV 1995)
WES-M-2002 UNBALANCED BIDS – MOBILIZATION AND PREPARATORY WORK (WAPA, MAY
2018)
Section C - Description/Specifications
Clauses
DOE-C-2001 STATEMENT OF WORK (OCT 2014)
Attachment A Specifications in Section J
(End of Clause)
Section E - Inspection and Acceptance
Clauses
DOE-E-2001 INSPECTION AND ACCEPTANCE (OCT 2014)
Inspection and acceptance of all items under this contract shall be accomplished by the Contracting Officer in accordance with the clause entitled FAR 52.246-12 Inspection of Construction. If the Contracting Officer assigns this responsibility to the Contracting Officer's Representative or another representative of the Government, the Contracting Officer shall notify the Contractor in writing.
(End of Clause)
Section F - Deliveries or Performance
Clauses
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK. (APR 1984)
The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 calendar days after notice to proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)
* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
52.211-12 LIQUIDATED DAMAGES - CONSTRUCTION. (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,941.32 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.211-18 VARIATION IN ESTIMATED QUANTITY. (APR 1984)
If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.
(End of clause)
Section G - Contract Administration Data
Clauses
WES-G-2001 ADMINISTRATIVE TIME FOR COMPLETION OF DRAWINGS (WAPA, JAN 2008)
a. The contractor is authorized up to 60 calendar days after the contract completion date to complete and submit final drawings, operation and maintenance manuals, and any other data required by the contract.
b. This period noted above is strictly for administrative purposes and is not an extension of the actual performance period of the contract. Liquidated damages are not applicable to this period.
DOE-G-2001 CONTRACTING OFFICER AUTHORITY (OCT 2014)
The Contracting Officer is responsible for administration of the contract. The Contracting Officer may appoint a Contracting Officer's Representative (COR), in accordance with the clause entitled Contracting Officer's Representative, to perform specifically delegated functions. The Contracting Officer is the only individual who has the authority on behalf of the Government, among other things, to take the following actions under the contract:
(a) Assign additional work within the general scope of the contract.
(b) Issue a change in accordance with the clause entitled Changes.
(c) Change the cost or price of the contract.
(d) Change any of the terms, conditions, specifications, or services required by the contract.
(e) Accept non-conforming work.
(f) Waive any requirement of the contract.
(End of Clause)
DOE-G-2002 CONTRACTING OFFICER'S REPRESENTATIVE (OCT 2014)
Pursuant to the clause at DEAR 952.242-70, Technical Direction, the Contracting Officer shall designate in writing a Contracting Officer's Representative (COR) for this contract, and provide a copy of such designation to the contractor, including the delegated responsibilities and functions. The COR does not have authority to perform those functions reserved exclusively for the Contracting Officer.
(End of Clause)
DOE-G-2004 CONTRACT ADMINISTRATION (OCT 2014)
To promote timely and effective contract administration, correspondence delivered to the Government under this contract shall reference the contract number, title, and subject matter, and shall be subject to the following procedures:
(a) Technical correspondence. Technical correspondence shall be addressed to the Contracting Officer's Representative (COR) for this contract, and a copy of any such correspondence shall be sent to Benjamin Siltman. As used herein, technical correspondence does not include correspondence where patent or rights in data issues are involved, nor technical correspondence which proposes or involves waivers, deviations, or modifications to the requirements, terms or conditions of this contract.
(b) Other Correspondence.
(1) Correspondence regarding patent or rights in data issues should be sent to the Intellectual Property Counsel. A copy of such correspondence shall be provided to Benjamin Siltman.
(2) If no Government Contract Administration Office is designated on Standard Form 33 (Block
24) or Standard Form 26 (Block 6), all correspondence, other than technical correspondence and correspondence regarding patent or rights in data, including correspondence regarding waivers, deviations, or modifications to requirements, terms or conditions of the contract, shall be addressed to the Contracting Officer. Copies of all such correspondence shall be provided to the
COR.
(3) Where a Government Contract Administration Office, other than DOE, is Designated on either Standard Form 33 (Block 24), or Standard Form 26 (Block 6), of this contract, all correspondence, other than technical correspondence, shall be addressed to the Government Contract Administration Office so designated, with copies of the correspondence to the Contract Officer and the COR.
(c) Information regarding correspondence addresses and contact information is as follows:
(1) Contract Specialist:
(A) Benjamin Siltman
(B) Telephone number: 970-461-7630
(C) Address: 5555 E. Crossroads Blvd, Loveland, CO 80538
(D) Email address: siltman@wapa.gov
(2) Contracting Officer:
(A) Benjamin Siltman
(B) Telephone number: 970-461-7630
(C) Address: 5555 E. Crossroads Blvd, Loveland, CO 80538
(D) Email address: siltman@wapa.gov
(3) Contracting Officer's Representative:
(A) To be determined at time of award
(B) Telephone number: To be determined at time of award
(C) Address: To be determined at time of award
(D) Email address: To be determined at time of award
(4) Intellectual Property Counsel:
(A) Not Applicable
(B) Telephone number: Not Applicable
(C) Address: Not Applicable
(D) Email address: Not Applicable
(5) Government Contract Administration Office Not Applicable
(A) Name: Not Applicable
(B) Telephone number: Not Applicable
(C) Mailing address: Not Applicable
(D) Email address: Not Applicable
(End of Clause)
DOE-G-2007 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING (JUL 2018)
(a) The Contracting Officer will document the Contractor's performance under this contract (including any task orders placed against it, if applicable) by using the Contractor Performance Assessment Reporting System (CPARS). CPARS information is handled as "Source Selection Information," available to authorized Government personnel seeking past performance information when evaluating proposals for award.
(b) Contractor performance will be evaluated at least annually at the contract or task-order level, as determined by the Contracting Officer. Evaluation categories may include any or all of the following at the Government's discretion: (1) technical/quality, (2) cost control, (3) schedule, (4) management or business relations, and (5) small business subcontracting. Past performance information is available at https://www.cpars.gov. It is recommended that the Contractor take the overview training found on the CPARS website. The Contractor shall acknowledge receipt of the Government's request for comments on CPARS assessments at the time it is received and shall respond to such requests within fourteen (14) calendar days of the request.
(c) Joint Ventures. Performance assessments shall be prepared on contracts with joint ventures. When the joint venture has a unique Commercial and Government Entity (CAGE) code and Data Universal Numbering System (DUNS) number, a single assessment will be prepared for the joint venture using its CAGE code and DUNS number. If the joint venture does not have a unique CAGE code and DUNS number, separate assessments, containing identical narrative, will be prepared for each participating contractor and will state that the evaluation is based on performance under a joint venture and will identify the contractors that were part of the joint venture.
(d) In addition to the performance assessments addressed above, the Government will perform other performance assessments necessary for administration of the contract in accordance with other applicable clauses in this contract.
Section H - Special Contract Requirements
Clauses
WES-H-2001 RETAINAGE/HOLDBACK FOR UNDELIVERED DATA (WAPA, APR 2009)
The Government may retain/holdback up to ten (10) percent of the above line items total amount, as shown in Schedule B of the contract, until all deliverable data has been delivered and accepted, and final payment will not be made until all final drawings, as-builts, operation and maintenance manuals, and any other data required under the contract have been delivered to and accepted by the Government.
WES-H-2007 MOBILIZATION AND PREPARATORY WORK (WAPA, MAY 2018)
a. General. Mobilization and preparatory work may include movement of personnel, equipment, supplies, and incidentals to the project site; establishment of offices, buildings, plants and other facilities at the project site;
necessary costs for acquisition of equipment; and for any other work which must be performed incident to the start of construction at the site.
b. Facilities, plants, and equipment required for this project that are established at, or brought to, the worksite are subject to the provisions of this clause unless the Contracting Officer specifically excludes, in writing, a particular item or items. The contractor is solely responsible for the adequacy, efficiency, use, protection, maintenance, repair, and preservation of all its facilities, plants, and equipment. The facilities, plants, and equipment covered by this paragraph shall not be dismantled or removed from the worksite prior to completion of the work specified in the contract without the written permission of the Contracting Officer.
c. Payment. Payment for mobilization and preparatory work will be made at the lump sum price specified in Section B of the contract. Progress payments for mobilization and preparatory work will be made as follows:
(1) When 5__percent of the total amount of the original contract is earned from other schedule items, 50__percent of the amount agreed upon for mobilization and preparatory work will be paid.
(2) When 10__percent of the total amount of the original contract is earned from other schedule items, the balance of the amount agreed upon for mobilization and preparatory work will be paid.
d. Progress payments for mobilization and preparatory work shall be subject to retainage as provided by FAR 52.232-5, “Payments Under Fixed-Price Construction Contracts.” In addition, the line item for mobilization and preparatory work will not be considered to be a separate division of the work, completion of which would permit the payment of the complete item price without retention.
WES-H-2011 FOREIGN VISITORS AND CONTRACT EMPLOYEES (WAPA, MAY 2018)
The Contractor must receive prior, written approval from WAPA’S Personnel Security Office before any non- U.S. Citizens (Foreign Nationals) visit or work at any Western Area Power Administration (WAPA) facility.
WAPA’s Personnel Security Office will verify that:
(1) Each of the contractors working under this contract that may visit or be assigned to work at any WAPA facility is a U.S. Citizen, or;
(2) The Contractor shall provide an accurately completed Foreign National Data Card, WAPA Form 3000-72, Attached to the WAPA’s Standard Operating Procedures (SOP), found at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx, for each of their Foreign National employees that may visit or work at any WAPA facility. The Contractor shall forward the completed form to the COR at least 45 days in advance of each Foreign National employee's visit or their beginning work. Foreign National employees shall not be allowed on-site at any WAPA facility without prior approval of the cognizant WAPA Personnel Security Office. Circumstances which do not allow a 45 day notification require prior, written approval of the cognizant WAPA Personnel Security Office. The Contractor shall include this requirement in any subcontract it issues under this contract. WAPA reserves the right to remove any contract employee from WAPA’s property pending the conclusion of the Foreign National background check.
(End of Clause)
WES-H-2015 SAFETY AND HEALTH – HIGH RISK (WAPA, MAY 2018)
In performing the work required by this contract, the Contractor shall comply with all applicable Federal, State, or local safety, health, or industrial safety codes including the latest effective standards promulgated by the Department of Labor, Occupational Safety and Health Administration; Safety and Health Standards 29 CFR 1910, 29 CFR 1925; and the Construction Safety and Health regulations promulgated under Section 107 of the Contract Work Hours and Safety Standards Act, 29 CFR 1926. If there is a conflict between the requirements of the applicable Federal, State, or local safety, health, or industrial safety codes, the more stringent requirements shall prevail. Prior to the performance of work involving the use of cranes, a copy of the crane inspection records, operators and riggers certifications, and completed on-site crane load test form shall be furnished to WAPA’s on-site representative. The United States is liable only for negligence on the part of its employees in accordance with the Federal Tort Claims Act, as amended.
Prior to starting work, an on-site safety meeting shall be held with Western's representative to address and discuss safety procedures related to the work required.
In addition, the contractor agrees to the following requirements:
(1) A hazard evaluation will be developed for each major work component.
(2) A safety meeting will be held to discuss potential hazards and their mitigation before work begins.
(3) The Contractor agrees that Western has the right to remove any supervisor that does not adhere to said requirements.
(End of Clause)
WES-H-2023 LIMITATION OF COSTS RESULTING FROM SUBCONTRACTING PRICE
ADJUSTMENTS (WAPA, FEB 2008)
a. When contract price adjustments are allowed for performance wholly or substantially by subcontractors or suppliers, the Government will reimburse the prime contractor for actual associated indirect costs and profit up to a maximum adjustment of 10% of the total adjustment allowed for the subcontractor or supplier.
b. Where more than one tier of subcontractors or suppliers are involved in contract performance, the total allowance for the prime contractor's indirect cost and profit shall not exceed 10% of the total adjustment allowed for all subcontractors or suppliers who wholly or substantially perform the work.
DOE-H-2012 SUSTAINABLE ACQUISITIONS UNDER DOE CONSTRUCTION CONTRACTS (JUL
2018)
The Department of Energy is committed to efficiently managing its facilities in an environmentally preferable manner. While performing work under this contract, the Contractor shall exert its best efforts to provide its services in a manner that will promote the natural environment and protect the health and wellbeing of Federal and contract employees at the facility. Sustainable acquisition or environmentally preferable contracting has several interacting initiatives. The following resources provide more information:
• Recycled Content Products are described at https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program
• Biobased Products are described at https://www.biopreferred.gov/
• Energy efficient products are at https://energystar.gov/products for Energy Star products
• Energy efficient products are at https://www.energy.gov/eere/femp/energy-efficient-products-and-energy-saving-technologies for FEMP designated products
• Environmentally Preferable Computers are at https://www.epeat.net
• Non-Ozone Depleting Alternative Products are at https://www.epa.gov/ozone-layer-protection
• Water efficient plumbing products are at https://epa.gov/watersense
To the extent that the services provided by the Contractor require provision of any of the above types of products, the Contractor is expected to provide the sustainable, environmentally preferable type of product unless that type of product is not available competitively within a reasonable time, at a reasonable price, is not life cycle cost efficient in the case of energy consuming products, or does not meet reasonable performance standards. The clauses at FAR 52.223-2, Affirmative Procurement of Biobased Products under Service and Construction Contracts, 52.223-15, Energy Efficiency in Energy-Consuming Products, and 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts (in Section I of this contract) require the use of products that have biobased content, are energy efficient, or have recycled content.
In case of an apparent inconsistency between this provision and any specification elsewhere in the contract, consult the contracting officer for resolution.
(End of Clause)
DOE-H-2013 CONSECUTIVE NUMBERING (OCT 2014)
Due to automated procedures employed in formulating this document, clauses and provisions contained within may not always be consecutively numbered.
(End of Clause)
DOE-H-2033 ALTERNATIVE DISPUTE RESOLUTION (OCT 2014)
(a) The DOE and the Contractor both recognize that methods for fair and efficient resolution of contractual issues in controversy by mutual agreement are essential to the successful and timely completion of contract requirements. Accordingly, DOE and the Contractor shall use their best efforts to informally resolve any contractual issue in controversy by mutual agreement. Issues of controversy may include a dispute, claim, question, or other disagreement. The parties agree to negotiate with each other in good faith, recognizing their mutual interests, and attempt to reach a just and equitable solution satisfactory to both parties.
(b) If a mutual agreement cannot be reached through negotiations within a reasonable period of time, the parties may use a process of alternate dispute resolution (ADR) in accordance with the clause at FAR 52.233-1, Disputes. The ADR process may involve mediation, facilitation, fact-finding, group conflict management, and conflict coaching by a neutral party. The neutral party may be an individual, a board comprised of independent experts, or a company with specific expertise in conflict resolution or expertise in the specific area of controversy. The neutral party will not render a binding decision, but will assist the parties in reaching a mutually satisfactory agreement. Any opinions of the neutral party shall not be admissible in evidence in any subsequent litigation proceedings.
(c) Either party may request that the ADR process be used. The Contractor shall make a written request to the Contracting Officer, and the Contracting Officer shall make a written request to the appropriate official of the Contractor. A voluntary election by both parties is required to participate in the ADR process. The parties must agree on the procedures and terms of the process, and officials of both parties who have the authority to resolve the issue must participate in the agreed upon process.
(d) ADR procedures may be used at any time that the Contracting Officer has the authority to resolve the issue in controversy. If a claim has been submitted by the Contractor, ADR procedures may be applied to all or a portion of the claim. If ADR procedures are used subsequent to issuance of a Contracting Officer's final decision under the clause at FAR 52.233-1, Disputes, their use does not alter any of the time limitations or procedural requirements for filing an appeal of the Contracting Officer's final decision and does not constitute reconsideration of the final decision.
(e) If the Contracting Officer rejects the Contractor's request for ADR proceedings, the Contracting Officer shall provide the Contractor with a written explanation of the specific reasons the ADR process is not appropriate for the resolution of the dispute. If the Contractor rejects the Contracting Officer's request to use ADR procedures, the Contractor shall provide the Contracting Officer with the reasons for rejecting the request.
(End of Clause)
DOE-H-2034 CONTRACTOR INTERFACE WITH OTHER CONTRACTORS AND/OR
GOVERNMENT EMPLOYEES (OCT 2014)
The Government may award contracts to other contractors for work to be performed at a DOE-owned or -controlled site or facility. The Contractor shall cooperate fully with all other on-site DOE contractors and Government employees. The Contractor shall coordinate its own work with such other work as maybe directed by the Contracting Officer or a duly authorized representative. The Contractor shall not commit or permit any act which will interfere with the performance of work by any other contractor or by a Government employee.
DOE-H-2044 MATERIAL SAFETY DATA SHEET AVAILABILITY (OCT 2014)
In implementation of the clause at FAR 52.223-3, Hazardous Material Identification and Material Safety Data, the Contractor shall obtain, review and maintain a Material Safety Data Sheet (MSDS) in a readily accessible manner for each hazardous material (or mixture containing a hazardous material) ordered, delivered, stored or used; and maintain an accurate inventory and history of use of hazardous materials at each use and storage location. The MSDS shall conform to the requirements of 29 CFR 1910.1200(g).
(End of Clause)
DOE-H-2049 INSURANCE REQUIREMENTS (OCT 2014)
(a) In accordance with the clause FAR 52.228-5, Insurance - Work on a Government Installation (Property Damage Liability $500,000.00 per occurence) the following types and minimum amounts of insurance shall be maintained by the Contractor:
(1) Workers' compensation - Amount in accordance with applicable Federal and State workers' compensation and occupational disease statutes.
(2) Employer's liability - $100,000 (except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers).
(3) Comprehensive bodily injury liability - $500,000.
(4) Property damage liability - None, unless otherwise required by the Contracting Officer.
(5) Comprehensive automobile bodily injury liability - $200,000 per person and $500,000 per occurrence.
(6) Comprehensive automobile property damage - $20,000 per occurrence.
(b) The Contractor shall provide evidence of such insurance, if requested by the Contracting Officer; and the Contracting Officer may require such evidence to be provided prior to the commencement of work under the contract.
(End of Clause)
DOE-H-2052 REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF THE
OFFEROR (OCT 2014)
The following additional contractor Representations, Certifications and Other Statements are hereby incorporated into the contract by reference:
To be included a time of award.
(End of Clause)
DOE-H-2055 GOVERNMENT FURNISHED PROPERTY (OCT 2014)
In accordance with the clause FAR 52.245-1, the Government will provide the property as stated in Attachment A - Specifications, Division 1, Paragraph F.
See Attachment A - Specifications, Division 1, Paragraph F
(End of Clause)
DOE-H-2059 PRESERVATION OF ANTIQUITIES, WILDLIFE AND LAND AREAS (OCT 2014)
(a) Federal Law provides for the protection of antiquities located on land owned or controlled by the Government. Antiquities include Indian graves or campsites, relics and artifacts. The Contractor shall control the movements of its personnel and its subcontractor's personnel at the job site to ensure that any existing antiquities discovered thereon will not be disturbed or destroyed by such personnel. It shall be the duty of the Contractor to report to the Contracting Officer the existence of any antiquities so discovered.
(b) The Contractor shall also preserve all vegetation (including wetlands) except where such Vegetation must be removed for survey or construction purposes. Any removal of vegetation shall be in accordance with the terms of applicable habitat mitigation plans and permits. Furthermore, all wildlife must be protected consistent with programs approved by the Contacting Officer.
(c) Except as required by or specifically provided for in other provisions of this contract, the Contractor shall not perform any excavations, earth borrow, preparation of borrow areas, or otherwise disturb the surface soils within the job site without the prior approval of DOE or its designee.
(End of Clause)
DOE-H-2065 REPORTING OF FRAUD, WASTE, ABUSE, CORRUPTION, OR MISMANAGEMENT
(OCT 2014)
The Contractor shall comply with the following:
(a) Notify employees annually of their duty to report allegations of fraud, waste, abuse, misuse, corruption, criminal acts, or mismanagement relating to DOE programs, operations, facilities, contracts, or information technology systems to an appropriate authority (e.g., OIG, other law enforcement, supervisor, employee concerns office, security officials). Examples of violations to be reported include, but are not limited to, allegations of false statements; false claims; bribery; kickbacks; fraud; DOE environment, safety, and health violations; theft; computer crimes; contractor mischarging; conflicts of interest; and conspiracy to commit any of these acts. Contractors must also ensure that their employees are aware that they may always report incidents or information directly to the Office of Inspector General (OIG).
(b) Display the OIG hotline telephone number in buildings and common areas such as cafeterias, public telephone areas, official bulletin boards, reception rooms, and building lobbies.