22. 89503421BWA000023 (1).pdf
PDF 508 KB Posted
- Solicitation number
- 89503421BWA000023
About this file
This solicitation is for the construction of the Sioux Falls O&M Service Center and Garage in South Dakota. The Department of Energy Western Area Power Administration is seeking bids for site preparation, a pre-engineered building, concrete work, mechanical and electrical systems, interior finishes, and related site improvements. Bids are due by the date and time specified on the SF1442 form. The contract is set aside for small businesses and has an estimated value between $1-5 million. The selected contractor must begin work within 10 days of notice and complete the project within 365 calendar days, meeting defined intermediate deadlines. Payment will be made for line item deliverables. Standard clauses for construction contracts are included regarding labor standards, insurance, safety requirements, and more.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 05. SFC Project Drawings.pdf | ||
| 05. SFC Appendix A - Technical Specifications.pdf | ||
| 12. General Decision Number.docx | DOCX document | |
| 05. SFC Project Specifications.pdf | ||
| 05. SFC Appendix B - Geotechnical Evaluation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Energy Western Area Power Administration
200 4th Street SW Huron, SD 57350-2474
PROSPECTIVE BIDDERS:
The Department of Energy, Western Area Power Administration (WAPA), invites you to submit a bid for the Construct Sioux Falls O&M Service Center, Office and Garage, South Dakota under Invitation for Bids (IFB) Solicitation No. 89503421BWA000023. The price range for this work is between $1,000,000 and $5,000,000.
This letter is not an integral part of the IFB which is a self-contained stand-alone document. In the event of any conflict between the contents of this letter and the enclosed IFB, the IFB language shall prevail. This solicitation is issued as 100% Small Business Set-Aside.
This IFB consists of Section A, Standard Form (SF) 1442 and Sections B, C, and E through M, including Attachments A, B, C, D, E, and F as listed in Section J. This solicitation, specifications and drawings, and any subsequent amendments will only be available in electronic format, downloadable from the internet at https://beta.sam.gov/ . No plan holders list, CD’s, or hard copies will be furnished.
Bid prices are to be shown in Section B and bidders are advised to inspect Sections F, G, H, K, L, and M for other information that may be required. Bidders must submit as a minimum: (1) one originally signed and dated copy of the SF 1442; (2) Section B bid prices; (3) Section K, Note bidders need to complete information in ORCA (Online Representations and Certifications Application); (4) Section J, Attachment D Bid Bond; and (5) Any other documentation required by the IFB. Electronic bids are required and shall be submitted through FedConnect only. The bid opening will take place IAW the information set forth on the SF 1442.
Note: Contractors must register in the System for Award Management system (SAM) at (https://sam.gov/SAM), which integrates both the Central Contractors Registration database and Online Representations and Certifications Application, and the VETS 4212 Reporting System (https://www.dol.gov/agencies/vets/programs/vets4212), in order to be eligible to receive an award from any Federal Agency.
Bidders are advised to submit only bids meeting all the performance and design requirements of the specifications in Section C, and the delivery requirements in Section F. In no event shall telephone discussions be construed as changes to the solicitation or place conditions on the solicitation. Only written amendment(s) to the solicitation issued by the Contracting Officer shall constitute a change to the solicitation or specifications.
Sealed bids must be received at the address shown in Block 8 of the SF1442 by the date and time indicated in Block 13. Bids received after this date and time will be handled in accordance with the paragraph entitled “Late Submissions, Modifications, and Withdrawals of Bids,” Section L of this IFB.
Note: IAW FAR 28.101-3, when a bidder submits its Bid Bond and the Bid Bond is supported/backed by a Small Business Administration (SBA) Guarantee Loan, the bidder must submit a copy of the SBA Guarantee Loan agreement along with their bid package. Original signatures are required on bid bonds submitted to meet bonding requirements.
Sincerely, Jonathan Dittmer Jonathan Dittmer Contracting Officer
Enclosure https://beta.sam.gov/
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
21WA139216
WAPA (UGP)
US DOE/WESTERN AREA POWER
200 4th STREET SW
HURON SD 57350-2474
UGP-HURON
See Block 7
Jonathan Dittmer 605-353-2641
21WC139216-1015
x
05/05/2021
89503421BWA000023
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
This acquisition is 100% Set-aside for Small Business Concern.
The Project Magnitude for this project is between $1,000,000 and $5,000,000.
The NAICS code for this project is 236220 with a Small Business Size Standard of
$39,500,000.
Refer to FAR Clause 52.204-8 on the Annual Representations and Certifications (Apr
2016) on www.sam.gov
Electronic bids are required and shall be submitted through FedConnect only. The bid opening will take place IAW the information set forth on the SF 1442.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 365 calendar days and complete it within ________________ ________________ calendar days after receiving
FAR 52.211-10
06/10/2021
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
WAPA (UGP)
US DOE/WESTERN AREA POWER
200 4th STREET SW
HURON SD 57350-2474
UGP-HURON
Jonathan D. Dittmer
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
05/05/2021
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 44
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
89503421BWA000023
NOT SPECIFIED /OTHER
00001 CLIN 0001 - MOBILIZATION AND PREPARATORY WORK,
BUILDING, 21 SFC 0002C-WCF 35210 B5600 3220
NOT SPECIFIED /OTHER
00002 CLIN 0002 - PRE-ENGINEERED BUILDING, BUILDING, 21
SFC 0002C-WCF 35210 B5600 3220
NOT SPECIFIED /OTHER
00003 CLIN 0003 - CIVIL SITE PREPARATION, OTHER
STRUCTURES & IMPROVEMENTS, 21 SFC 0002C-WCF 35220
B5600 3220
NOT SPECIFIED /OTHER
00004 CLIN 0004 - CONCRETE, BUILDING, 21 SFC 0002C-WCF
35210 B5600 3220
NOT SPECIFIED /OTHER
00005 CLIN 0005 - MECHANICAL AND PLUMBING, BUILDING, 21
SFC 0002C-WMF 35210 B5600 3220
NOT SPECIFIED /OTHER
00006 CLIN 0006 - FIRE PROTECTION, BUILDING, 21 SFC
0002C-WCF 35210 B5600 3220
NOT SPECIFIED /OTHER
00007 CLIN 0007 - ELECTRICAL, BUILDING, 21 SFC
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 44
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
89503421BWA000023
0002C-WCF 35210 B5600 3220
NOT SPECIFIED /OTHER
00008 CLIN 0008 - INTERIOR FINISHES, BUILDING, 21 SFC
0002C-WCF 35210 B5600 3220
NOT SPECIFIED /OTHER
00009 CLIN 0009 - COMPLETE SEPTIC SYSTEM, OTHER
STRUCTURES & IMPROVEMENTS, 21 SFC 0002C-WCF 35220
B5600 3220
NOT SPECIFIED /OTHER
00010 CLIN 0010 - OUTDOOR CONCRETE, OTHER STRUCTURES &
IMPROVEMENTS, 21 SFC 0002C-WCF 35220 B5600 3220
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
SECTION B
SUPPLIES OR SERVICES AND PRICES
BIDDING SCHEDULE
SIOUX FALLS O&M SERVICE CENTER
MAINTENANCE OFFICE AND GARAGE
CLIN Work or Material Estimated Quantity Unit
Unit Price Amount
0001 Mobilization and preparatory work (Not to exceed 5% of TOTAL. See Sections H and M.)
LS $
0002 Pre-engineered Building LS $
0003 Civil Site Preparation LS $
0004 Concrete LS $
0005 Mechanical and Plumbing LS $
0006 Fire Protection LS $
0007 Electrical LS $
0008 Interior Finishes LS $
0009 Complete Septic System LS $
0010 Outdoor Concrete LS $
0011 Provide New Physical Access Control System
LS $
0012 Provide Security Key Pads at Three New Doors
LS $
TOTAL $
ABBREVIATIONS
CLIN = Contract Line Item Number
LS = for the lump sum of
Section C - Description/Specifications DOE-C-2001 Statement of Work (OCT 2014) Section E - Inspection and Acceptance Section F - Deliveries or Performance Section G - Contract Administration Data Section H - Special Contract Requirements Section I - Contract Clauses Section J - List of Documents, Exhibits and Other Attachments Section K - Representations, Certifications, and Other Statements of Bidders Section L - Instructions, Conditions, and Notices to Bidders Section M - Evaluation Factors for Award
Section C - Description/Specifications
DOE-C-2001 Statement of Work (OCT 2014)
Attachments are located in Section J.
Section E - Inspection and Acceptance
DOE-E-2001 Inspection and Acceptance (OCT 2014)
Inspection and acceptance of all items under this contract shall be accomplished by the Contracting Officer in accordance with the clause entitled FAR 52.246-12 Inspection of Construction (AUG 1996). If the Contracting Officer assigns this responsibility to the Contracting Officer’s Representative or another representative of the Government, the Contracting Officer shall notify the Contractor in writing.
Section F - Deliveries or Performance
52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)
The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 days from receipt of the Notice to Proceed. This includes the intermediate completion dates identified in Division 1, paragraph D(3) of the attached project specifications. The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.211-12 Liquidated Damages - Construction. (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,506.44 for each calendar day of delay until the work is completed or accepted. Liquidated damages also apply to the intermediate completion dates set forth in the specifications under Division 1, paragraph (D)(3)(a-c).
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.211-18 Variation in Estimated Quantity. (APR 1984)
Section G - Contract Administration Data
DOE-G-2001 Contracting Officer Authority (OCT 2014)
The Contracting Officer is responsible for administration of the contract. The Contracting Officer may appoint a Contracting Officer’s Representative (COR), in accordance with the clause entitled Contracting Officer’s Representative, to perform specifically delegated functions. The Contracting Officer is the only individual who has the authority on behalf of the Government, among other things, to take the following actions under the contract:
(a) Assign additional work within the general scope of the contract.
(b) Issue a change in accordance with the clause entitled Changes.
(c) Change the cost or price of the contract.
(d) Change any of the terms, conditions, specifications, or services required by the contract.
(e) Accept non-conforming work.
(f) Waive any requirement of the contract.
DOE-G-2002 Contracting Officer’s Representative (OCT 2014)
Pursuant to the clause at DEAR 952.242-70, Technical Direction, the Contracting Officer shall designate in writing a Contracting Officer’s Representative (COR) for this contract, and provide a copy of such designation to the contractor, including the delegated responsibilities and functions. The COR does not have authority to perform those functions reserved exclusively for the Contracting Officer.
DOE-G-2004 Contract Administration (OCT 2014)
To promote timely and effective contract administration, correspondence delivered to the Government under this contract shall reference the contract number, title, and subject matter, and shall be subject to the following procedures:
(a) Technical correspondence. Technical correspondence shall be addressed to the Contracting Officer’s Representative (COR) for this contract, and a copy of any such correspondence shall be sent to Jonathan Dittmer (Contracting Officer) at Western Area Power Administration, 200 4th St SW, Huron SD 57350. As used herein, technical correspondence does not include correspondence where patent or rights in data issues are involved, nor technical correspondence which proposes or involves waivers, deviations, or modifications to the requirements, terms or conditions of this contract.
(b) Other Correspondence.
(1) Correspondence regarding patent or rights in data issues should be sent to the Intellectual Property Counsel. A copy of such correspondence shall be provided to Jonathan Dittmer (Contracting Officer) at Western Area Power Administration, Attn: J. Dittmer, 200 4th St SW, Huron, SD 57350.
(2) If no Government Contract Administration Office is designated on Standard Form 33 (Block 24) or Standard Form 26 (Block 6), all correspondence, other than technical correspondence and correspondence regarding patent of rights in data, including correspondence regarding waivers, deviations, or modifications to requirements, terms or conditions of the contract, shall be addressed to the Contract Specialist. Copies of all such correspondence shall be provided to the COR.
(3) Where a Government Contract Administration Office, other than DOE, is designated on either Standard Form 33 (Block 24), or Standard Form 26 (Block 6), of this contract, all correspondence, other than technical correspondence, shall be addressed to the Government Contract Administration Office so designated, with copies of the correspondence to the (insert Contract Specialist or Contracting Officer) and the COR.
(c) Information regarding correspondence addresses and contact information is as follows:
(1) Contract Specialist:
(A) Jonathan Dittmer
(B) Telephone number (605)353-2641
(C) Address: Western Area Power Administration, 200 4th St SW, Huron, SD 57350
(D) Email address: Dittmer@wapa.gov
(2) Contracting Officer
(A) Jonathan Dittmer
(B) Telephone number (605) 353-2641
(C) Address: Western Area Power Administration, 200 4th St SW, Huron, SD 57350
(D) Email address: dittmer@wapa.gov
(3) Contracting Officer’s Representative
(A) **TO BE NAMED AT A LATER DATE
(B) Telephone number **TO BE NAMED AT A LATER DATE
(C) Address **TO BE NAMED AT A LATER DATE
(D) Email address **TO BE NAMED AT A LATER DATE
(4) Intellectual Property Counsel
(A) N/A
(B) Telephone number N/A
(C) Address N/A
(D) Email address N/A
(5) Government Contract Administration Office Western Area Power Administration
(A) Name Jonathan Dittmer
(B) Telephone number (605) 353-2641
(C) Mailing address: Western Area Power Administration, 200 4th St SW, Huron SD 57350
(D) Email address: Dittmer@wapa.gov
Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP)
In accordance with Office of Management and Budget Memorandum M-15-19, effective April 1, 2018, all payment requests must be submitted electronically. Western Area Power Administration (WAPA) has selected the U. S. Department of the Treasury's Invoice Processing Platform System (IPP) as its electronic processing platform.
"Payment request" means any Contractor request for contract financing payment or invoice payment. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the Contractor shall upload relevant back-up documentation as an attachment to the electronic invoice when requesting payment through IPP.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Accounts Receivable (AR) Point of Contact as listed in SAM will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email stls.ipphelpdesk@stls.frb.org or phone (866) 973-3131.
DOE-G-2007 Contractor Performance Assessment Reporting (OCT 2014)
(a) The Contracting Officer will document the Contractor’s performance under this contract (including any task orders placed against it, if applicable) by using the Contractor Performance Assessment Reporting System (CPARS). CPARS information is handled as “Source Selection Information.” Performance assessments entered into CPARS by the Contracting Officer are transmitted to the Past Performance Information Retrieval System (PPIRS) which is maintained by the Department of Defense (DoD). Information in PPIRS is available to authorized Government personnel seeking past performance information when evaluating proposals for award.
(b) Contractor performance will be evaluated at least annually at the contract or task order level, as determined by the Contracting Officer. Evaluation categories may include any or all of the following at the Government’s discretion: (1) quality, (2) schedule, (3) business relations, (4) business management/key personnel, and (5) cost/price. PPIRS information is available at http://www.ppirs.gov, and CPARS information is available at http://www.cpars.gov. It is recommended that the Contractor take the overview training that can be found on the CPARS website. The Contractor shall acknowledge receipt of the Government’s request for comments on CPARS assessments at the time it is received and shall respond to such requests within thirty (30) calendar days of the request.
(c) Joint Ventures. Performance assessments shall be prepared on contracts with joint ventures. When the joint venture has a unique Commercial and Government Entity (CAGE) code and Data Universal Numbering System (DUNS) number, a single assessment will be prepared for the joint venture using its CAGE code and DUNS number. If the joint venture does not have a unique CAGE code and DUNS number, separate assessments, containing identical narrative, will be prepared for each participating contractor and will state that the evaluation is based on performance under a joint venture and will identify the contractors that were part of the joint venture.
(d) In addition to the performance assessments addressed above, the Government will perform other performance assessments necessary for administration of the contract in accordance with other applicable clauses in this contract.
WES-G-1001 CORRESPONDENCE PROCEDURES (WAPA, JAN 2008)
a. The designated DOE contract specialist is the focal point for all non-technical matters related to this contract. The DOE contract specialist for this contract is:
Contract Specialists Name: Jonathan Dittmer
Telephone: 605-353-2641
U.S. Department of Energy
Western Area Power Administration
ATTN: J. Dittmer
200 4th ST SW
Huron, SD 57350
b. All correspondence submitted under this contract shall reference the contract number.
c. One copy of all correspondence related to this contract shall be sent to each of the following:
1. The DOE Contract Specialist.
2. The DOE Contracting Officer.
3. The DOE Contracting Officer's Representative (COR).
4. The DOE Patent Counsel (only if patent or technical data issues are involved).
d. If a Government Contract Administration Office (CAO) other than DOE has been designated for this contract, a copy of all correspondence shall also be sent to the Government CAO. The assigned CAO, if any, is designated on the form used to award this contract.
WES-G-2001 ADMINISTRATIVE TIME FOR COMPLETION OF DRAWINGS (WAPA, JAN 2008)
a. The contractor is authorized up to 60 calendar days after the contract completion date to complete and submit final drawings, operation and maintenance manuals, and any other data required by the contract.
b. This period noted above is strictly for administrative purposes and is not an extension of the actual performance period of the contract. Liquidated damages are not applicable to this period.
WES-G-2004 CONTRACTOR'S CONTRACT ADMINISTRATION (WAPA, FEB 2008)
The name, title, phone number, office name, and complete mailing address of the Contractor's point of contact for contract administration, including defective or improper invoices, is as follows:
Name:
Title:
Phone Number:
E-mail address:
Fax Number:
Company Name:
Address:
City/State/Zip:
Section H - Special Contract Requirements
DOE-H-2012 Sustainable Acquisitions under DOE Construction Contracts (OCT 2014)
Pursuant to Executive Order 13423, Strengthening Federal Environmental, Energy and Transportation Management, and 13514, Federal Leadership in Environmental, Energy, and Economic Performance, the Department of Energy is committed to managing its facilities in an environmentally preferable manner that will promote the natural environment and protect the health and well being of its Federal employees and contractor service providers. In the performance of work under this contract, the Contractor shall exert its best efforts to provide its services in a manner that will promote the natural environment and protect the health and well being of Federal and contract employees at the facility. Sustainable acquisition or environmentally preferable contracting has several interacting initiatives. Among the initiatives are the following:
• Recycled Content Products are described at http://epa.gov/cpg
• Biobased Products are described at http://www.biopreferred.gov/
• Energy efficient products are at http://energystar.gov/products for Energy Star products
• Energy efficient products are at http://www.eere.energy.gov/femp/procurement for FEMP designated products
• Environmentally Preferable Computers are at http://www.epeat.net
• Non-Ozone Depleting Alternative Products are at http://www.epa.gov/ozone/strathome.html
• Water efficient plumbing products are at http://epa.gov/watersense
To the extent that the services provided by the Contractor require provision of any of the above types of products, the Contractor is expected to provide the sustainable, environmentally preferable type of product unless that type of product is not available competitively within a reasonable time, at a reasonable price, is not life cycle cost efficient in the case of energy consuming products, or does not meet reasonable performance standards. The clauses at FAR 52.223-2, Affirmative Procurement of Biobased Products under Service and Construction Contracts, 52.223-15, Energy Efficiency in Energy Consuming Products, and 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts, in Section I of this contract require the use of products that have biobased content, are energy efficient, or have recycled content.
In case of an apparent inconsistency between this provision and any specification elsewhere in the contract, consult the contracting officer for resolution.
DOE-H-2013 Consecutive Numbering (OCT 2014)
Due to automated procedures employed in formulating this document, clauses and provisions contained within may not always be consecutively numbered.
(End of clause)
DOE-H-2033 Alternative Dispute Resolution (OCT 2014)
(a) The DOE and the Contractor both recognize that methods for fair and efficient resolution of contractual issues in controversy by mutual agreement are essential to the successful and timely completion of contract requirements. Accordingly, DOE and the Contractor shall use their best efforts to informally resolve any contractual issue in controversy by mutual agreement. Issues of controversy may include a dispute, claim, question, or other disagreement. The parties agree to negotiate with each other in good faith, recognizing their mutual interests, and attempt to reach a just and equitable solution satisfactory to both parties.
(b) If a mutual agreement cannot be reached through negotiations within a reasonable period of time, the parties may use a process of alternate dispute resolution (ADR) in accordance with the clause at FAR 52.233-1, Disputes. The ADR process may involve mediation, facilitation, fact-finding, group conflict management, and conflict coaching by a neutral party. The neutral party may be an individual, a board comprised of independent experts, or a company with specific expertise in conflict resolution or expertise in the specific area of controversy. The neutral party will not render a binding decision, but will assist the parties in reaching a mutually satisfactory agreement. Any opinions of the neutral party shall not be admissible in evidence in any subsequent litigation proceedings.
(c) Either party may request that the ADR process be used. The Contractor shall make a written request to the Contracting Officer, and the Contracting Officer shall make a written request to the appropriate official of the Contractor. A voluntary election by both parties is required to participate in the ADR process. The parties must agree on the procedures and terms of the process, and officials of both parties who have the authority to resolve the issue must participate in the agreed upon process.
(d) ADR procedures may be used at any time that the Contracting Officer has the authority to resolve the issue in controversy. If a claim has been submitted by the Contractor, ADR procedures may be applied to all or a portion of the claim. If ADR procedures are used subsequent to issuance of a Contracting Officer’s final decision under the clause at FAR 52.233-1, Disputes, their use does not alter any of the time limitations or procedural requirements for filing an appeal of the Contracting Officer’s final decision and does not constitute reconsideration of the final decision.
(e) If the Contracting Officer rejects the Contractor’s request for ADR proceedings, the Contracting Officer shall provide the Contractor with a written explanation of the specific reasons the ADR process is not appropriate for the resolution of the dispute. If the Contractor rejects the Contracting Officer’s request to use ADR procedures, the Contractor shall provide the Contracting Officer with the reasons for rejecting the request.
DOE-H-2034 Contractor Interface With Other Contractors And/Or Government Employees (OCT 2014)
The Government may award contracts to other contractors for work to be performed at a DOE-owned or –controlled site or facility.
The Contractor shall cooperate fully with all other on-site DOE contractors and Government employees. The Contractor shall coordinate its own work with such other work as may be directed by the Contracting Officer or a duly authorized representative. The Contractor shall not commit or permit any act which will interfere with the performance of work by any other contractor or by a Government employee.
DOE-H-2044 Material Safety Data Sheet Availability (OCT 2014)
In implementation of the clause at FAR 52.223-3, Hazardous Material Identification and Material Safety Data, the Contractor shall obtain, review and maintain a Material Safety Data Sheet (MSDS) in a readily accessible manner for each hazardous material (or mixture containing a hazardous material) ordered, delivered, stored or used; and maintain an accurate inventory and history of use of hazardous materials at each use and storage location. The MSDS shall conform to the requirements of 29 CFR 1910.1200(g).
DOE-H-2047 Federal Holidays And Other Closures (OCT 2014)
(a) Designated Federal holidays. Federal employees observe the following Federal holidays:
(1) New Year’s Day
(2) Birthday of Martin Luther King, Jr.
(3) Washington’s Birthday
(4) Memorial Day
(5) Independence Day
(6) Labor Day
(7) Columbus Day
(8) Veterans Day
(9) Thanksgiving Day
(10) Christmas Day
Generally, Federal holidays that fall on Saturday are observed on the preceding Friday; and holidays that fall on Sunday are observed on the following Monday. The exact calendar day and/or date on which any of the listed holidays are observed may change year to year.
(b) Other Federal Holidays. In addition to the holidays specified above in paragraph (a), Federal employees may observe other holidays designated by Federal Statute, Executive Order, or Presidential Proclamation as a one-time, day-off such as Inauguration Day for the President of the United States.
(c) Unscheduled closures. Occasionally, an individual Federally-owned or -controlled site or facility will be closed or have an early closure on a normal work day for other reasons such as inclement weather or facility conditions. If an unplanned closure occurs, the
Contractor will be notified as soon as possible after the determination that the Federally-owned or -controlled site or facility will be closed.
(d) The Contractor shall provide the services required by the contract at Federally-owned or –controlled sites or facilities on all regularly scheduled Federal work days and other days as may be required by the contract. The Contractor shall not provide the services required by the contract on those days, or portions thereof, specified in paragraphs (a), (b) and (c), except as required under paragraph (e). Accordingly, the Contractor’s employees, whose regular duty station in performance of this contract is a Federally-owned or controlled site or facility, shall not be granted access to the facility during those times specified in paragraphs (a), (b) and (c), unless required by paragraph (e) below.
(e) There may be times that the Contractor is required to perform the services required by the contract on a Federal holiday or other closure times. In the event that such performance is required, the Contracting Officer will notify the Contractor, in writing, and specify the extent to which performance of the contract will be required. The Contractor shall provide sufficient personnel to perform the contractually-required work on those days, as directed by the Contracting Officer.
(f) In accordance with the payment and other applicable clauses of the contract, the Government will not pay the Contractor for its employees’ regularly scheduled work hours not actually provided directly in performance of the contract due to an unscheduled closure as contemplated in paragraphs (b) and (c) above.
DOE-H-2052 Representations, Certifications, And Other Statements Of The Offeror
The following additional contractor Representations, Certifications and Other Statements are hereby incorporated into the contract by reference:
Name of the Representations, Certifications and Other Statements
Solicitation No.: 89503421BWA000023
Date: 6/10/2021
DOE-H-2057 Department Of Labor Wage Determinations (OCT 2014)
The Contractor’s performance under this contract shall comply with the requirements of the U.S. Department of Labor Wage Determination(s) located in Section J, Attachment 005 and the clause at FAR 52.222-42, Statement of Equivalent Rates for Federal Hires.
DOE-H-2059 Preservation Of Antiquities, Wildlife And Land Areas (OCT 2014)
(a) Federal Law provides for the protection of antiquities located on land owned or controlled by the Government. Antiquities include Indian graves or campsites, relics and artifacts. The Contractor shall control the movements of its personnel and its subcontractor's personnel at the job site to ensure that any existing antiquities discovered thereon will not be disturbed or destroyed by such personnel.
It shall be the duty of the Contractor to report to the Contracting Officer the existence of any antiquities so discovered.
(b) The Contractor shall also preserve all vegetation (including wetlands) except where such vegetation must be removed for survey or construction purposes. Any removal of vegetation shall be in accordance with the terms of applicable habitat mitigation plans and permits. Furthermore, all wildlife must be protected consistent with programs approved by the Contacting Officer.
(c) Except as required by or specifically provided for in other provisions of this contract, the Contractor shall not perform any excavations, earth borrow, preparation of borrow areas, or otherwise disturb the surface soils within the job site without the prior approval of DOE or its designee.
DOE-H-2065 Reporting Of Fraud, Waste, Abuse, Corruption, Or Mismanagement (OCT 2014)
The Contractor shall comply with the following:
(a) Notify employees annually of their duty to report allegations of fraud, waste, abuse, misuse, corruption, criminal acts, or mismanagement relating to DOE programs, operations, facilities, contracts, or information technology systems to an appropriate authority (e.g., OIG, other law enforcement, supervisor, employee concerns office, security officials). Examples of violations to be reported include, but are not limited to, allegations of false statements; false claims; bribery; kickbacks; fraud; DOE environment, safety, and health violations; theft; computer crimes; contractor mischarging; conflicts of interest; and conspiracy to commit any of these acts. Contractors must also ensure that their employees are aware that they may always report incidents or information directly to the Office of Inspector General (OIG).
(b) Display the OIG hotline telephone number in buildings and common areas such as cafeterias, public telephone areas, official bulletin boards, reception rooms, and building lobbies.
(c) Publish the OIG hotline telephone number in telephone books and newsletters under the Contractor’s cognizance.
(d) Ensure that its employees report to the OIG within a reasonable period of time, but not later than 24 hours after discovery, all alleged violations of law, regulations, or policy, including incidents of fraud, waste, abuse, misuse, corruption, criminal acts, or mismanagement, that have been referred to Federal, State, or local law enforcement entities.
(e) Ensure that its employees report to the OIG any allegations of reprisals taken against employees who have reported to the OIG fraud, waste, abuse, misuse, corruption, criminal acts, or mismanagement.
(f) Ensure that its managers do not retaliate against DOE contractor employees who report fraud, waste, abuse, misuse, corruption, criminal acts, or mismanagement.
(g) Ensure that all their employees understand that they must –
(1) Comply with requests for interviews and briefings and must provide affidavits or sworn statements, if so requested by an employee of the OIG so designated to take affidavits or sworn statements;
(2) Not impede or hinder another employee's cooperation with the OIG; and
(3) Not take reprisals against DOE contractor employees who cooperate with or disclose information to the OIG or other lawful appropriate authority.
(h) Seek more specific guidance concerning reporting of fraud, waste, abuse, corruption, or mismanagement, and cooperation with the Inspector General, in DOE directives.
DOE-H-2076 LOBBYING RESTRICTIONS (OCT 2014)
The Contractor agrees that none of the funds obligated on this award shall be expended, directly or indirectly, to influence congressional action on any legislation or appropriation matters pending before Congress, other than to communicate to Members of Congress as described in 18 U.S.C. § 1913. This restriction is in addition to those prescribed elsewhere in statute and regulation.
(End of clause)
WES-H-2001 RETAINAGE/HOLDBACK FOR UNDELIVERED DATA (WAPA, APR 2009)
The Government may retain/holdback up to ten (10) percent of the total amount as shown in Section B of the contract and final payment will not be made until all final drawings, as-builts, operation and maintenance manuals, and any other data required under the contract have been delivered to and accepted by the Government.
WES-H-2002 REQUIRED INSURANCE - POLLUTION LIABILITY (WAPA, FEB 2008)
a. The Contractor shall procure and maintain during the entire period of its performance under this contract the following minimum insurance:
(1) Workman's compensation. In accordance with the laws of the state where work is being performed, including Occupational Disease Coverage and Employees Liability Coverage.
(2) Unless otherwise authorized by the contracting officer, all policies shall have appropriate language waiving all subrogation rights against the Government.
b. The Contractor shall procure and maintain Pollution Liability Insurance for accidental discharge of toxic and/or hazardous material.
Such insurance shall have limits of not less than one million dollars ($1,000,000) per occurrence. This paragraph is applicable to the prime contractor and any subcontractor dealing with hazardous or toxic waste for the period that hazardous and/or toxic waste is being disposed of or otherwise handled.
c. Prior to the commencement of work, the Contractor shall furnish a copy of the above-required insurance to the Contracting Officer.
The policies evidencing required insurance shall contain an endorsement to the effect that cancellation or any material change in the policies adversely affecting the interests of the Government in such insurance shall not be effective for such period as may be prescribed by the laws of the State in which this contract is to be performed, and in no event less than thirty (30) days after written notice is given to the Contracting Officer.
d. The contractor agrees to insert the substance of this clause, including this paragraph (d), in any subcontracts issued under this contract.
WES-H-2007 MOBILIZATION AND PREPARATORY WORK (WAPA, MAY 2018)
a. General. Mobilization and preparatory work may include movement of personnel, equipment, supplies, and incidentals to the project site; establishment of offices, buildings, plants and other facilities at the project site; necessary costs for acquisition of equipment; and for any other work which must be performed incident to the start of construction at the site.
b. Facilities, plants, and equipment required for this project that are established at, or brought to, the worksite are subject to the provisions of this clause unless the Contracting Officer specifically excludes, in writing, a particular item or items. The contractor is solely responsible for the adequacy, efficiency, use, protection, maintenance, repair, and preservation of all its facilities, plants, and equipment. The facilities, plants, and equipment covered by this paragraph shall not be dismantled or removed from the worksite prior to completion of the work specified in the contract without the written permission of the Contracting Officer.
c. Payment. Payment for mobilization and preparatory work will be made at the lump sum price specified in Section B of the contract.
Progress payments for mobilization and preparatory work will be made as follows:
(1) When five (5) percent of the total amount of the original contract is earned from other schedule items, fifty (50) percent of the amount agreed upon for mobilization and preparatory work will be paid.
(2) When ten (10) percent of the total amount of the original contract is earned from other schedule items, the balance of the amount agreed upon for mobilization and preparatory work will be paid.
d. Progress payments for mobilization and preparatory work shall be subject to retainage as provided by FAR 52.232-5, “Payments Under Fixed-Price Construction Contracts.” In addition, the line item for mobilization and preparatory work will not be considered to be a separate division of the work, completion of which would permit the payment of the complete item price without retention.
WES-H-2011 FOREIGN VISITORS AND CONTRACT EMPLOYEES (WAPA, MAY 2018)
The Contractor must receive prior, written approval from WAPA’S Personnel Security Office before any non-U.S. Citizens (Foreign Nationals) visit or work at any Western Area Power Administration (WAPA) facility. WAPA’s Personnel Security Office will verify that:
(1) Each of the contractors working under this contract that may visit or be assigned to work at any WAPA facility is a U.S. Citizen, or;
(2) The Contractor shall provide an accurately completed Foreign National Data Card, WAPA Form 3000-72, Attached to the WAPA’s Standard Operating Procedures (SOP), found at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx, for each of their Foreign National employees that may visit or work at any WAPA facility. The Contractor shall forward the completed form to the COR at least 45 days in advance of each Foreign National employee's visit or their beginning work.
Foreign National employees shall not be allowed on-site at any WAPA facility without prior approval of the cognizant WAPA Personnel Security Office. Circumstances which do not allow a 45 day notification require prior, written approval of the cognizant WAPA Personnel Security Office. The Contractor shall include this requirement in any subcontract it issues under this contract.
WAPA reserves the right to remove any contract employee from WAPA’s property pending the conclusion of the Foreign National background check.
(End of Clause)
WES-H-2015 SAFETY AND HEALTH – HIGH RISK (WAPA, MAY 2018)
In performing the work required by this contract, the Contractor shall comply with all applicable Federal, State, or local safety, health, or industrial safety codes including the latest effective standards promulgated by the Department of Labor, Occupational Safety and Health Administration; Safety and Health Standards 29 CFR 1910, 29 CFR 1925; and the Construction Safety and Health regulations promulgated under Section 107 of the Contract Work Hours and Safety Standards Act, 29 CFR 1926. If there is a conflict between the requirements of the applicable Federal, State, or local safety, health, or industrial safety codes, the more stringent requirements shall prevail. Prior to the performance of work involving the use of cranes, a copy of the crane inspection records, operators and riggers certifications, and completed on-site crane load test form shall be furnished to WAPA’s on-site representative. The United States is liable only for negligence on the part of its employees in accordance with the Federal Tort Claims Act, as amended.
Prior to starting work, an on-site safety meeting shall be held with Western's representative to address and discuss safety procedures related to the work required.
In addition, the contractor agrees to the following requirements:
(1) A hazard evaluation will be developed for each major work component.
(2) A safety meeting will be held to discuss potential hazards and their mitigation before work begins.
(3) The Contractor agrees that Western has the right to remove any supervisor that does not adhere to said requirements.
(End of Clause)
WES-H-2023 LIMITATION OF COSTS RESULTING FROM SUBCONTRACTING PRICE ADJUSTMENTS (WAPA, FEB 2008)
a. When contract price adjustments are allowed for performance wholly or substantially by subcontractors or suppliers, the Government will reimburse the prime contractor for actual associated indirect costs and profit up to a maximum adjustment of 10% of the total adjustment allowed for the subcontractor or supplier.
b. Where more than one tier of subcontractors or suppliers are involved in contract performance, the total allowance for the prime contractor's indirect cost and profit shall not exceed 10% of the total adjustment allowed for all subcontractors or suppliers who wholly or substantially perform the work.
Section I - Contract Clauses
52.202-1 Definitions. (NOV 2013)
52.203-3 Gratuities. (APR 1984)
52.203-5 Covenant Against Contingent Fees. (MAY 2014)
52.203-7 Anti-Kickback Procedures. (MAY 2014)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (MAY 2014)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (OCT 2010)
52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights. (APR 2014)
52.203-19, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements
(JAN 2017)
(a) Definitions. As used in this clause-
“Internal confidentiality agreement or statement” means a confidentiality agreement or any other written statement that the contractor requires any of its employees or subcontractors to sign regarding nondisclosure of contractor information, except that it does not include confidentiality agreements arising out of civil litigation or confidentiality agreements that contractor employees or subcontractors sign at the behest of a Federal agency.
“Subcontract” means any contract as defined in subpart 2.1 entered into by a subcontractor to furnish supplies or services for performance of a prime contract or a subcontract. It includes but is not limited to purchase orders, and changes and modifications to purchase orders.
“Subcontractor” means any supplier, distributor, vendor, or firm (including a consultant) that furnishes supplies or services to or for a prime contractor or another subcontractor.
(b) The Contractor shall not require its employees or subcontractors to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting waste, fraud, or abuse related to the performance of a Government contract to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information (e.g., agency Office of the Inspector General).
(c) The Contractor shall notify current employees and subcontractors that prohibitions and restrictions of any preexisting internal confidentiality agreements or statements covered by this clause, to the extent that such prohibitions and restrictions are inconsistent with the prohibitions of this clause, are no longer in effect.
(d) The prohibition in paragraph (b) of this clause does not contravene requirements applicable to Standard Form 312 (Classified Information Nondisclosure Agreement), Form 4414 (Sensitive Compartmented Information Nondisclosure Agreement), or any other form issued by a Federal department or agency governing the nondisclosure of classified information.
(e)In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015, (Pub. L. 113-235), and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions) use of funds appropriated (or otherwise made available) is prohibited, if the Government determines that the Contractor is not in compliance with the provisions of this clause.
(f) The Contractor shall include the substance of this clause, including this paragraph (f), in subcontracts under such contracts.
(End of clause)
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. (MAY 2011)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (OCT 2016)
52.204-13 System for Award Management Maintenance. (OCT 2016)
52.204-14 Service Contract Reporting Requirements. (OCT 2016)
52.204-25 Prohibition on Contracting for Certain…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .