22-B-0003 1442 Open End Painting.pdf

PDF 2 MB Posted

Attached to
Open-End Painting USAG-HI
Solicitation number
W912CN22B0003
Issued by

View the file

Other files

File Type Posted
SUMMARY OF WORK.pdf PDF
ATTACHMENT 01 BID ATTACHMENT OPEN END PAINTING.docx DOCX document
Attachment 02 Excel Bid Sheet Attachment OPEN END PAINTING.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011791638

PROJECT TITLE: Open-end Replace/Repair Painting and Related Work at Various Army Installations on Oahu, HI, FEWR: RN001842J

MAGNITUDE OF CONSTRUCTION: More than $10,000,000

NAICS: 238320

SMALL BUSINESS SIZE STANDARD: $16.5M

This requirement is an 8(a) set-aside and is limited to eligible 8(a) participants IAW FAR 52.219-18.

X

MARK R. DAHILIG 808.656.0995

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

23-Sep-2022

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________10 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, X negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________18 Oct 2022 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

413 CSB

413TH CSB, RCO-HAWAII,

742 SANTOS DUMONT AVENUE

BLDG 108, 3RD FLOOR (WAAF)

SCHOFIELD BARRACKS HI 96857-5026

W912CN

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

09:00 AM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W912CN22B0003 348

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912CN22B0003

Section 00 10 00 - Solicitation

SUBMISSION REQUIREMENT

1. 100% SET-ASIDE FOR 8(A) COMPETITIVE FIRMS. The proposed contract is limited to qualifying 8(a) firms serviced by the Hawaii District Office (HDO) of the Small Business Administration. The Government will not consider offers from firms other than 8(a) firms or from 8(a) firms outside of the HDO. 8(a) firms that are not serviced by the HDO, but have a bona fide place of business (as defined by SBA) within the geographic area served by the HDO are also eligible to submit offers. An 8(a) firm not serviced by the HDO must consult its servicing District Office regarding the establishment of a bona fide place of business or status of a previously established bona fide place of business. All other firms are deemed ineligible to submit offers.

2. CONTRACT TYPE: The Government intends to award a firm fixed price requirements-type construction contract. Split or multiple awards will not result from this acquisition.

3. PERIOD OF PERFORMANCE: The anticipated period of performance will be a base year and four (4) one-year option periods as shown below:

Base Year: 01 December 2022 – 30 November 2023

1st Option: 01 December 2023 – 30 November 2024 2nd Option: 01 December 2024 – 30 November 2025 3rd Option: 01 December 2025 – 30 November 2026 4th Option: 01 December 2026 – 30 November 2027 52.217-8: 01 December 2027 – 01 May 2028

4. QUESTIONS. Questions/RFIs must be submitted by email to Risha Walters, risha.o.walters.civ@army.mil with CC to Mark Dahilig mark.r.dahilig.civ@army.mil with the IFB number W912CN-22-B-0003 in the subject line.

Telephone and faxed inquires will not be accepted. In order in ensure a timely response, questions must be submitted no later than 10:00am, seven days after the date of IFB issuance as identified in Block 3 of the solicitation. Questions and responses will be issued on an amendment. Any questions received after the RFI due date may not be answered.

5. AWARD. Award will be made to the responsible bidder whose bid is responsive to the terms and conditions of the IFB and is most advantageous to the Government.

6. BID OPENING DATE AND TIME. A face to face public bid opening will be conducted with a telphone confrence option (see detail below). To attend the Bid Opening either in-person or via telephone, offerors must notify Risha Walters, risha.o.walters.civ@army.mil with CC to Mark Dahilig Mark.r.dahilig.civ@army.mil no later than seven days prior to the Bid Opening date. List the name, phone number, number of personnel attending and if joining in person or via teleconfrence. The conference call number and password will be provided via email.

Date & Time: 18 October 2022, 1000AM HST Location:

Regional Contracting Office, Hawaii Bldg 108, 3rd Floor (Located on Wheeler Army Airfield (WAAF)) Schofield Barracks, HI 96857

Teleconfrence Number: Will be emailed upon notfication.

INSTRUCTION TO OFFEROR

1. PROPOSAL SUBMITTAL. Contractor shall provide a complete breakdown of cost proposal. Contractor shall provide price line items for each CLIN listed on SF 1442 as the price schedule.

2. (a) Proposal Submission Requirement:

Bids shall be submitted by date and time specified in Block 13.A. of the SF 1442. Subject line of the email will read – Solicitation W912CN-22-B-0003, short description. Bid shall be emailed to Risha Walters, Contract Specialist, email address risha.o.walters.civ@army.mil and cc to Mark Dahilig, Contracting Officer, email address mark.r.dahilig.civ@army.mil

SUBMISSION REQUIREMENT

1. Offers shall include the following:

a. Completed Standard Form 1442.

b. Completed Schedule of offer/bids/prices. All unit price and estimated amount filled out.

c. Completed Attachment 1 Bid Attachment.

d. Signed or other acknowledgement of all amendments.

e. Completed Representation and Certifications.

f. Bid Guarantee in accordance with FAR 52.228-1.

2. Offerors shall furnish unit prices and extended total for all items listed on the schedule of bid items in

Section 00 10 00. In the event there is a difference between the unit price and the extended total, the unit price will be the intended bid. In the event the unit price or extended total are omitted for any item, the bid will be deemed non-responsive.

3. Facsimile proposals/Bids will not be considered.

4. Telegraphic proposals/Bids will not be considered.

5. Proposals /Bids must be submitted by date and time specified in Block 13 above.

GENERAL INFORMATION:

1. Scope of Work: This is a firm fixed price requirements-type construction contract to furnish all labor, materials, equipment, management, supervision, tools, transportation and other incidental items to perform painting and related work located at Army Installations on the Island of Oahu.

2. The contractor shall submit a safety plan within 30 days of award or 7 days prior to commencement of on-site work, whichever occurs first in accordance with the AR 385-10, Construction Safety, US Army Corps of Engineers "Safety and Health Requirements Manual (EM 385-1-1)" and Occupational Safety and Health Administration (OSHA) regulations.

3. To assure compliance with general construction trade practice, the contractor shall establish and maintain quality control for materials and work. The Government may perform inspections and conduct tests while the contractor's work is in process to assure compliance to performance standards.

4. Existing conditions or areas damaged or disturbed by the contractor's operation shall be restored to their original condition, or near original condition as possible, to the satisfaction of the Contracting Officer at no additional cost to the Government.

5. Prior to start of any excavation or trenching work, the contractor shall obtain clearance, in writing, from the appropriate communications agency and from the Directorate of Public Works.

6. Interruptions to existing utilities shall be held to a minimum. A schedule for any required power or water outages shall be submitted to the Contracting Officer a minimum of four weeks prior to the intended outage.

7. The contractor shall establish work procedures and methods to prevent interference with existing operations within or adjacent to the construction area.

8. The Contractor’s normal working hours will be 7:30 a.m. – 4:30 p.m. Monday thru Friday. The Contractor will not normally work on Saturdays, Sundays, or Holidays. If the Contractor chooses to work outside the normal working hours, Contractor must submit an application to the Contracting Officer in writing one week prior to the requested work for approval.

9. Rubbish and debris shall be removed from Government-controlled property daily unless otherwise directed, so as not to allow accumulation inside or outside the building. Materials that cannot be removed daily shall be stored in areas designated by the Contracting Officer.

10. The contractor shall provide, install, and maintain all necessary signs, lights, barricades, markers, cones, flagmen, and other protective facilities and shall take all necessary precautions for the protection and for the convenience and safety of military and public traffic (vehicular and pedestrian).

11. The amount of dust resulting from the contractor's work shall be controlled to prevent the spread of dust and to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as flooding and pollution.

12. The contractor shall obtain the necessary hot work permit from the appropriate Fire Department prior to any welding, burning, and torching operations.

13. Daily Clean-up - During the course of the work, the Contractor shall keep the entire premises free from any accumulation of empty cans, rags, etc. or rubbish that constitutes a fire hazard. At the end of each days work, the Contractor shall remove all debris. The entire area shall be cleaned and left in a condition acceptable to the Technical Representative of the Contracting Officer.

14. Storage area will be provided based on task order issued.

15. When available, the Government may provide a reasonable amount of water and electricity. If not available or cannot be provided it shall be specified in the task order documents.

16. The Contractor shall be responsible to have a quality control program to ensure services are performed in accordance with the Scope of Work and commonly accepted commercial practices.

17. The Contractor is required to follow DPW’s Best Management Practice (BMP) of Storm Water Compliance.

Copy will be provided at the pre-construction conference, if requested.

18. The work shall be constructed using best practices per industry standards. The Contractor shall abide by all applicable regulations to include Federal, State, local requirements.

19. Progress of Work. Contractor shall submit all proposed work schedules to the Contracting Officer for review/approval within ten (10) calendar days after issuance of the Notice to Proceed (NTP) unless otherwise specified.

20. Contractor shall submit schedule of values as a material submittal within 30 days of contract award for projects at or above $250,000. Schedule of values will be sent with requested billings to the project inspector and CC the COR to justify billing requests.

21. If a dumpster is provided for this contract, contractor shall include a sign on the dumpster with their name/address/phone and indicate the dumpster is only used for construction debris.

22. Abbreviations used in the Unit column: (use if applicable)

CY = Cubic Yard; LH = Labor Hours; SF = Square Foot; EA = Each; LF = Linear Foot; SY = Square Yard

23. Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes."

24. Identification of Contractor Employees.

a. Provide each employee with identification (ID) badge made of nonmetallic material, easily readable and including employee’s name, contractor’s name, functional area of assignment, with recent color photograph of the employee.

b. All contractor personnel shall wear the ID badge at all times when performing work under this contract at a Government site, including while attending Government meetings that may take place outside the Government facility. Contractor employee shall wear the ID badge in a conspicuous place on the front of exterior clothing above the waist except when safety or health reasons prohibit such placement.

25. ESTIMATED QUANTITIES: All quantities are estimated and are stated for the information of the prospective contractors. The actual quantities ordered may be more or less than the estimated quantities. (See clause at 52.216- 21, Section 00 70 00 entitled “Requirements”). As a prerequisite, there must be (i) adequate and sufficient funds available to cover the order, and (ii) an administrative determination by the Government that the requirement exists.

26. ISSUANCE OF TASK ORDERS

(a) The work to be accomplished under this contract will be performed via issuance of a task order. The Contractor shall coordinate all work with the Contracting Officer in order that there will be a minimum of interruption and inconvenience to the Government. Scheduling and programming of work shall be arranged during the pre-construction conference.

(b) Survey of Unit Price Items: At least ten (10) workdays prior to the issuance of a task order, a joint inspection by the Contractor and the Contracting Officer Representative shall be made to determine the work to be accomplished therein. Survey will be conducted within two (2) workdays of notification by the COR. During the inspection and survey, both parties will jointly annotate on the order form to be prescribed by the Contracting Officer, the quantity for each unit price item that is to be utilized. The Contracting Officer will confirm the starting and completion date of work for each unit in the task order.

27. HARDWARE, PAINT and items on the mandatory procurement list are to be purchased from AbilityOne.

Please refer to FAR Clause 52.208-9. See website http://www.abilityone.com for ordering instructions.

Unless otherwise specified herein, the contractor shall furnish all supplies, material and equipment necessary for the performance of work under this contract. The contractor shall utilize products and materials made from biobased materials (e.g. biobased degreasers and biobased toilet bowl cleaner) to the maximum extent practical without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. The EPA’s Comprehensive Procurement Guidelines and product list can be found at http://www.epa.gov/epawaste/conserve/tools/cpg/index.htm.

Upon request of the COR, the contractor shall submit a list indicating the name of the manufacturer, the brand name, and the intended use of each of the materials used in the performance of its work. The Contractor shall not use any materials, chemicals, or compound which the COR determines would be unsuitable for the intended purpose or harmful to the surfaces to which applied or, as might be the case for such items as paper or soap products, unsatisfactory for use by occupants. For biobased content products evaluation, all non-chemical products proposed for use under this contract must conform to the Department of Agriculture (USDA) Designated Biobased Products List (DBPL) whenever practicable.

28. APPLICABLE CODES AND REGULATIONS

28.1. The latest edition of the following Codes, regulations, guides, and criteria shall be used for all design and construction under this contract. If there is a conflict between these codes or regulations and these contract specifications the Unified Facility Criteria will override. The Contractor shall have a copy of each of these documents available for use during the term of this contract.

The Unified Facility Criteria (UFC) documents including, but not limited to:

UFC 3-410-01 Design: Heating, Ventilating, And Air Conditioning UFC 4-010-01 Dod Minimum Antiterrorism Standards For Buildings UFC 3-600-01 Design: Fire Protection Engineering For Facilities UFC 1-200-01 DoD Building Code (General Building Requirements

A complete listing can be obtained at http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4

28.2. The Unified Facility Guide Specifications are mandatory for all work required under this contract. The contractor is responsible for obtaining the Unified Facility Guide Specifications and for maintaining updates to the specifications. The specifications whether referenced or not (in whole or part), shall be considered to be a part of all task orders issued under this contract. Where two specifications are listed for a certain item of work the Army section as denoted by an “A” shall be used. When there is no Army designated spec use the Navy (denoted by “N”) or in the absence of either use an industry standard specifications or others listed in the Construction Criteria Base CCB. A complete listing of the UFGS Division 01 - General Requirements can be obtained at https://wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs

28.3. The following are additional criteria, codes, regulations and guides which shall be incorporated into all designs and used for construction:

ASHRAE 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings EPACT 2005 Energy Policy Act of 2005, Public Law 109-58.

IBC, International Building Code IEEE C2, National Electrical Safety Code IESNA Illuminating Engineering Society of North America MIL HDBK 1190, Military Handbook for Facility Planning and Design Guide MIL HDBK 1191, Military Handbook for Medical and Dental Treatment Facilities, Design and Construction Criteria Guide National Electrical Contractors Association (NECA) National Electrical Installation Standards (NEIS) TI 800-01, Design Criteria TI 800-03, Technical Requirements for Design-Build TM 5-811-3, Electrical Design: Lightning and Static Electricity Protection •USDA – Rural Utility Service (RUS) RUS 1728F-310 Drawing Index 35.5 to 69 kV RUS 1728F-804 Drawing Index 12.5 & 7.2 kV RUS 1724D-101B System Planning Guide RUS 1724D-104 Econ Worksheet RUS 1724E-152 OH Dist. Line Conductors Mechanics RUS 1724E-153 Guys and Anchors RUS 1724E-154 Distribution Conductor Clearances and Span Limitations

RUS 1724E-200 Design Manual HV Transmission Lines RUS 1724E-203 Upgrading RUS Transmission Lines RUS 1724E-204 Specs Steel Pole H Frame RUS 1724E-205 Embedment Depths RUS 1724E-214 Guide Specifications For Standard Class Steel Transmission Poles RUS 1724E-300 Rural Sub Station Design RUS 1724E-224 Specifications and Drawings for Steel Poles RUS 1728F-804 Specifications and Drawings for 12.47/7.2 kV Line Construction RUS 1728F-806 Specifications for Underground Distribution RUS 1728F-810 Specifications and Drawings for 34.5 to 69 kV RUS 1730B-121 Pole Inspection and Maintenance RUS 1751F-650 Aerial Plant Guying and Anchoring UEP-steel poles Guidelines for the Use Steel Distribution Poles Uniform Building Code Uniform Mechanical Code Uniform Plumbing Code Standard Building Code National Electrical Code (NEC) American National Standards Institute (ANSI) C-2, national Electrical Safety Code (QIESC) Life Safety Code, National Fire Protection Association (NFPA) 101 National Fire Protection Association (NFPA) 70 MIL Handbook 1190

Occupational safety and Health Administration (OSHA) Regulation www.OSHA.gov National Fire protection Association (NFPA) Regulations www.NFPA.org Directorate of Public Works, Environmental Division, US Army Garrison Hawaii (USAG-HI) https://home.army.mil/hawaii/index.php/garrison/dpw/environmental-a-z

28.4. Workmanship shall be governed by the preceding documents and National Electrical Contractors Association (NECA) listed below:

NECA 100-2006 - Electrical Symbols Set © 2006, NECA NECA 100-2006 - Symbols for Electrical Construction Drawings (ANSI) © 2006, NECA NECA 101-2006 - Standard for Installing Steel Conduit (Rigid, IMC, EMT) (ANSI) © 2006, NECA NECA 102-2004 - Standard for Installing Aluminum Rigid Metal Conduit (ANSI) © 2004, NEIS NECA 111-2003 - Standard for Installing Nonmetallic Raceways (RNC, ENT, LFNC) (ANSI) © 2003, NECA NECA 1-2010 - Standard Practice of Good Workmanship in Electrical Construction (ANSI) © 2010, NECA NECA 120-2006 - Standard for Installing Armored Cable (Type AC) and Metal-Clad Cable (Type MC) (ANSI) ©

2006, NECA

NECA 121-2007 - Standard for Installing Nonmetallic-Sheathed Cable (Type NM) and Underground Feeder and Branch-Circuit Cable (Type UF) (ANSI) © 2007, NECA NECA 130-2010 - Standard for Installing and Maintaining Wiring Devices © 2010, NECA NECA 169 - Standard for Installing and Maintaining Arc-Fault Circuit Interrupters © 2010, NECA NECA 200-2010 - Recommended Practice for Installing and Maintaining Temporary Electric Power at Construction Sites (ANSI) © 2010, NECA NECA 202-2006 - Standard for Installing and Maintaining Industrial Heat Tracing Systems (ANSI) © 2006, NECA NECA 230-2010 - Standard for Selecting, Installing, and Maintaining Electric Motors and Motor Controllers

(ANSI) © 2010, NEIS

NECA 303-2005 - Standard for Installing Closed-Circuit Television Systems (CCTV) (ANSI) © 2005, NECA NECA 305-2010 - Standard for Fire Alarm System Job Practices (ANSI) © 2010, NECA NECA 331-2009 - Standard for Building and Service Entrance Grounding and Bonding (ANSI) © 2009, NECA NECA 400-2007 - Standard for Installing and Maintaining Switchboards (ANSI) © 2007, NECA NECA 402-2007 - Standard for Installing and Maintaining Motor Control Centers (ANSI) © 2007, NECA NECA 406-2003 - Standard for Installing Residential Generator Sets (ANSI) © 2003, NECA NECA 407-2009 - Recommended Practice for Installing and Maintaining Panelboards (ANSI) © 2009, NECA

NECA 408-2009 - Standard for Installing and Maintaining Busways (ANSI) © 2009, NECA NECA 409 – 2009 - Standard for Installing and Maintaining Dry-Type Transformers (ANSI) © 2009, NECA NECA 410-2005 - Standard for Installing and Maintaining Liquid-Filled Transformers (ANSI) © 2005 NECA 411-2006 - Standard for Installing and Maintaining Uninterruptible Power Supplies (UPS) (ANSI) © 2006 NECA 420-2007 - Standard for Fuse Applications (ANSI) © 2007, NECA NECA 430-2006 - Standard for Installing Medium-Voltage Metal-Clad Switchgear (ANSI) © 2006, NEIS NECA 503-2005 - Standard for Installing Fiber Optic Lighting Systems © 2005, NECA NECA 505 Standard for Installing and Maintaining High Mast, Roadway and Area Lighting © 2010, NECA NECA 700-2010 - Standard for Installing Overcurrent Protection to Achieve Selective Coordination • © 2010, NECA NECA 90 Recommended Practice for Commissioning Building Electrical Systems (ANSI) © 2009, NECA NECA/AA 104-2006 - Standard for Installing Aluminum Building Wire and Cable (ANSI) © 2006, NEIS NECA/BICSI 568-2006 - Standard for Installing Building Telecommunications Cabling (ANSI) © 2006, NECA NECA/BICSI 607-2011 - Standard for Telecommunications Bonding and Grounding Planning and Installation Methods for Commercial Buildings © 2011, NECA/BICSI NECA/EGSA 404-2007 - Standard for Installing Generator Sets (ANSI) © 2007, NECA NECA/FOA 301-2009 - Standard for Installing and Testing Fiber Optics (ANSI) © 2009, NEIS NECA/IESNA 500-2006 - Standard for Installing Indoor Lighting Systems (ANSI) © 2006, NECA, NECA/IESNA 501-2006 - Standard for Installing Exterior Lighting Systems (ANSI) © 2006, NEIS NECA/IESNA 502-2006 - Standard for Installing Industrial Lighting Systems (ANSI) © 2006, NECA NECA/MACSCB 600-2003 - Recommended Practice for Installing and Maintaining Medium- Voltage Cable

(ANSI) © 2003, NECA

NECA/NEMA 105-2007 - Standard for Installing Metal Cable Tray Systems (ANSI) © 2007, NECA NECA/NEMA 605-2005 - Recommended Practice for Installing Underground Nonmetallic Utility (ANSI) © 2005, NECA

EM 385-1-1 Corps of Engineers Manual, - Safety and Health Requirements Manual Additional publications and regulatory documents may be identified as required for individual task orders.

28.5. DPW requirements

a. Federal Fire. Electrical installation must be in accordance with NFPA 70E for electrical safety in the workplace.

b. Electrical. Power assessment as well as installation is to be done by a certified electrician/contractor, to determine existing power availability, assess whether existing infrastructure needs to be upgraded to accommodate those requirements and provide installation as required in compliance with NEC, NESC and UFC 3-520-01.

c. Environmental. Prior to disturbance of existing building materials, ensure asbestos, containing materials are identified in accordance with Army Regulation 200-1, Ch 9-2(b), Hawaii Administrative Rule Ch, 11-501, and 40 Code of Federal Regulations 61.140-156. Ensure all asbestos and lead paint are removed by a qualified and licensed contractor. Handling, storing and disposal of hazardous materials must be done in accordance with local, state and federal laws and regulations.

STATEMENT OF WORK

SECTION 01026

SUMMARY OF WORK

PART 1 GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

1.1.1 Project Description

Contractor shall furnish all labor, equipment, materials, and other services required to perform all work described below in strict accordance with these technical provisions. The scope of work covered by this Contract does not cover Exterior / Interior Painting work which might arise as part of a Contract to repair or renovate a Building or group of Buildings. This work covered by this Contract does not include projects awarded by The U.S. Army Engineering District, Honolulu.

1.1.2 DESCRIPTION OF WORK:

Exterior painting involving; Two-coat painting with masonry, wood and metal paint, to be applied on walls and other surfaces considered to be Exterior to include but not be limited to previously painted floors, stairs/steps, painted or varnished balcony walls, balcony ceilings, underside of eaves, and railings. Other work includes surface preparation and puttying, replacement of deteriorated surface or structural lumber, and priming of new and previously painted Oil Based painted surfaces, prior to painting with Latex paint.

Interior painting involving; Two coats of flat, semi-gloss and gloss latex paint. Paint will be applied on wood, metal, plywood, fiberwood, masonry, acoustic plaster, gypsum board; walls ceilings; doors, sashes, cabinets, closets, trim work, shelves, floors, and other surfaces considered to be Interior. Other work includes surface preparation and puttying; replacement of deteriorated floor sheathing, surface or structural lumber, and priming of new and previously painted Oil Base painted surfaces, prior to painting with Latex paint.

Furnish all labor, equipment, materials, and services necessary to complete the work in accordance with the Technical Provisions for Removal and Disposal of Lead Containing Paint, Miscellaneous Buildings at Various Army Installations, Island of Oahu, Hawaii. Exterior work consists of:

Misting (no hosing) of flaky paint prior to scraping.

Scraping and catching of flaky chips in plastic sheets and vacuuming of affected areas.

Collecting and storing of flaky chips in steel drums, secured in Poly-Paks and disposing of same in a timely manner.

Test collected paint chips to determine if Hazardous Waste (Minimum of one test per container).

Contractor to provide a detailed procedure plan for the Exterior abatement work described above. For Interior work, Contractor to provide a paint removal plan. Plans to be submitted for approval within ten (10) calendar days after the award date of the contract.

1.2 ESTIMATED QUANTITIES

The estimated quantities of work, indicated herein, are for information of the prospective Contractors. The actual quantities ordered may be more or less than the estimated quantities.

LOCATIONS

The location of work sites shall be as follows:

Fort Shafter Areas Fort Shafter Fort DeRussy Tripler Army Medical Center, (Except for the main Medical Bldg.)

Aliamanu Military Reservation Schofield Barracks Area Schofield Barracks (includes East Range & Leilehua Golf Course, Wheeler Army Airfield Helemano Military Reservation)

The exact locations will be shown by the Contracting Officer.

1.3 ITEMS OF WORK

1.3.1 Base Year Estimated quantities, item numbers, units of measure, unit prices and amounts are as described in CLINs listed in this solicitation.

LOT: I Exterior/Interior Painting of Miscellaneous Buildings at Fort Shafter, Fort DeRussy, Tripler,(excluding the Medical Facilities (TAMC), and Buildings at Aliamanu Military Reservation), Schofield Barracks, Helemano Military Reservation, and Wheeler Army Airfield

1.4 METHODS OF MEASUREMENTS FOR EXTERIOR PAINTED SURFACES:

The following methods shall be utilized to arrive at the quantity of painting work. Per PDCA no factors will be used for Lead paint removal quantities.

1.4.1 All Walls: Obtain actual area of all Walls and Gables. Do not deduct for openings less than 1'-0" X 10'-0", except windows and doors shall be deducted and computed separately as shown under windows and doors.

Deductions shall be the actual opening of window and doors.

1.4.2 Eaves: Plain eaves painted same colors as side walls, obtain area from perimeter dimension and multiply by 1-1/2. If eaves are painted a different color than side walls, obtain area from perimeter dimension and multiply by 2.

1.4.3 Cornices: Cornices, obtain area from perimeter dimension and multiply by 2.

1.4.4 Downspouts and Gutters: Measure the area and multiply by 2.

1.4.5 Fixed Louvers: Measure one side and multiply 4 for each side painted.

1.4.6 Columns and Pilasters: Plain columns or pilasters, obtain actual area only. If fluted, obtain area and multiply by 1-1/2; if paneled, multiply by 2.

1.4.7 Porch Rail, Balustrade Balusters: If solid balustrade, add one foot to height to cover top and bottom rail.

Multiply the length by the height. If painted two sides, multiply by 2. If balustrade consists of individual balusters and handrail, multiply length by the height, then multiply the result by 4. For handrail only. If under 1'-0" girth, figure as 1'-0" by the length and multiply by 2.

1.4.8 Moldings: Cut in on both sides, figure 1 sq.ft. per lin.ft. if under 12" girth. If over 12" girth, take actual measurement.

1.4.9 Doors and Frames, Exterior: All Doors, 3'-0" X 7'-0" or less is 40 square feet. If sash contains more than one side and frame. For larger doors, add 2'-0" to actual width and 1'-0" to the actual height for one side and frame. Do not deduct for glass in doors. If door contains small lights of glass, add 2 square feet for each light. If both sides of door are painted, multiply one side by 2. For cased openings, allow area of openings to take care of both sides and head.

1.4.10 Window, Exterior: Minimum measurement for windows 3'-0" X 6'-0" or less is 40 square feet. If sash contains more than one light each, add 2 square feet for each additional light. Example: A 6 light window would be 12 square feet additional.

1.4.11 Other Surfaces: Should other painting surfaces be encountered, a mutually agreeable method of measurement shall be negotiated between the Contracting Officer and the Contractor prior to painting and the contract shall be modified accordingly. The estimating guide published by the Painting and decorating Contractors of America shall be utilized to determine the basis for square footage of painting.

1.4.12 Height Modifier Factors for Exterior surfaces to be painted above 15'-0", Add 30% to the square foot area calculations of the high portion calculations (multiply final area calculations by 1.3).

1.5 METHODS OF MEASUREMENT FOR INTERIOR PAINTED SURFACES:

The following methods shall be utilized to arrive at the quantity of painting work. Per PDCA no factors will be used for Lead Paint removal quantities.

1.5.1 Wall, Ceiling, and Floor: Direct measurement of the two dimensions comprising the wall, ceiling, or floor surfaces. No deductions for openings are necessary. No additional allowance for conduits, piping, decorative trim, moldings, baseboards, and other similar items attached to the wall, ceiling, and floor surfaces.

1.5.2 Wainscot that have different color from the wall above. Direct measurement of the two dimensions comprising wainscot. In addition, add one square foot for each running foot of horizontal straight line requiring cuttings. The wall above the wainscot shall be measured in accordance with paragraph 6-1.

1.5.3 Door: Add 2'-0" to the actual width and 1'-0" to the actual height. For example, 3'-0" X 7'-0" door will be measured as 5'-0" X 8'-0" or 40 square feet of painting surface for one side. Do not deduct for glass in doors. If door contains small lights of glass, add 2 square feet for each light.

1.5.4 Window: Add 2'-0" to the actual width and 2'-0" to the actual height. For example, a 3'-0" X 6'-0" window will be measured as 5'-0" X 8'-0" for 40 square feet of painting on one side. If sash contains more than one light each, add 2 square feet for each additional light. Example: a 6-light window would be 12 square feet additional.

There is no allowance for metal casement windows.

1.5.5 Cabinet: If cabinet is without door, obtain the areas of the front face (width by height), and multiply by 3.

If cabinet is with door, multiply the front face area by 5. The above area shall be considered complete for both sides of all shelves, both sides of doors, ends, backs, top and bottom.

1.5.6 Stairs: Add 2'-0" to the length of treads and risers to allow for stair strings on each side of stairs. Each tread and riser combination shall be figured at 2'-0". For the railing, allow 6" to the measured height and multiply by the actual length for one side painting areas. Double this quantity for both sides painting area.

1.5.7 Battens: Figure 10% of wall area for all battens.

1.5.8 Other Surfaces: Should other painting surfaces be encountered, a mutually agreeable method of measurement shall be negotiated between the Contracting Officer and the Contractor prior to painting and the contract shall be modified accordingly. The estimating guide published by the Painting and Decorating Contractors of America shall be utilized to determine the basis for square footage of painting.

1.6 METHOD OF MEASUREMENT FOR LUMBER REPLACEMENT:

Lumber and Plywood replaced shall be tabulated in the actual quantity of board feet of lumber and square feet of plywood replaced. Wastage due to sawing, other field operations, and correction of deficiencies as a result of the Contractor's negligence or fault shall not be included in the allowances. The Contractor shall maintain a record of quantities of lumber and plywood replaced and shall submit it to the Contracting Officer for verification.

1.7 OBSTRUCTION AND INTERFERENCES:

In the prosecution of this work, the Contractor shall move, return, or relocate all obstructions or interferences such as signs, furniture, rugs, appliances, office furnishings, draperies, desks, cabinets, office equipment, and (1/2" diameter, bright yellow "Ethernet", 1 EEE 82.3 which is not to be painted wherever encountered), with the exception of valuables and personal effects. Prior to the commencement, the Contractor should report to the occupants and the Technical Representative of the Contracting Officer any noticeable damage to all items.

1.8 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Structures, Equipment, Utilities, and Improvements":

� Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

� Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.

1.9 DAILY CLEAN-UP:

During the course of the work, the Contractor shall keep the entire premises free from any accumulation of empty cans, rags, or rubbish that constitutes a fire hazard. At the end of each day’s work, the Contractor shall remove all paint smears and stains. The entire area shall be cleaned and left in a condition acceptable to the Technical Representative of the Contracting Officer.

PART 2 PRODUCTS Not used.

PART 3 EXECUTION

Not used.

-- End of Section

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE ESTIMATED AMOUNT

0001 550,000 Square Foot

0001 Z2AA - REPAIR OR ALTERATION OF

FFP

: CLIN 0001; Pressure wash building exterior prior to painting. To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

PURCHASE REQUEST NUMBER: 0011791638

PSC CD: Z2AA

ESTIMATED

NET AMT

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE ESTIMATED AMOUNT

0002 400,000 Square Foot

0002 Z2AA - REPAIR OR ALTERATION OF

FFP

: CLIN 0002; Two-coats exterior painting with two-coat masonry paint. To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

PURCHASE REQUEST NUMBER: 0011791638

PSC CD: Z2AA

UNIT UNIT PRICE ESTIMATED AMOUNT

0003 20,000 Square

0003 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0003; Two-coats exterior painting of previously painted concrete steps, porches, and floors. To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0004 50,000 Square

0004 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0004; Two-coats exterior painting of wood surfaces. To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0005 20,000 Square

0005 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0005; Two-coats exterior painting of metal surfaces. To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0006 10,000 Square

0006 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0006; Two-coats exterior painting of galvanized surfaces. To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0007 100 Board Feet

0007 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0007; Replacement of exterior deteriorated surface lumber. To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0008 100 Board

0008 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0008; Replacement of exterior deteriorated structural lumber. To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0009 550,000 Square

0009 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0009; One-coat Exterior grade primer of bare or previously painted surfaces. To include clean-up, and all incidental items ne cessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0010 100 Square

0010 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0010; One-coat cement emulsion fill coat. To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0011 30,000 Square

0011 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0011; Non-Lead paint chips removal and disposal from various Wood surfaces. To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0012 5,000 Square

0012 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0012; Non-Lead paint chips removal various Metal surfaces. To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0013 6,000 Square

0013 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0013; Non-Lead paint chips removal and disposal from various Concrete surfaces. To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0014 2,000 Square

0014 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0014; Non-Lead paint chips removal and disposal from various CMU surfaces. To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0015 500 Square

0015 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0015; Non-Lead paint chips removal and disposal from various drywall surfaces. To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0016 20,000 Square

0016 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0016; Remove mold prior to painting. To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0017 200,000 Square

0017 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0017; Two-coats interior painting with semi-gloss latex paint on wood, metal, concrete, fiberboard or gypsum board walls, ceilings, doors, and windows.

To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0018 15,000 Square

0018 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0018; Two-coats interior painting with gloss latex paint on wood, metal, concrete, fiberboard or gypsum board walls, ceilings, doors, and windows. To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0019 100 Square

0019 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0019; Two-coats interior painting with flat latex paint on wood, concrete, fiberboard or gypsum board walls, ceilings, doors, and windows. To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0020 100 Square

0020 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0020; Two-coats interior painting with flat latex paint on rough textured acoustical plaster ceilings. To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0021 2,000 Square

0021 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0021; Two-component Epoxy paint, with surface preparation, mixing, Epoxy base, and finish. To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0022 100 Board

0022 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0022; Replacement of interior deteriorated surface lumber. To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0023 100 Board

0023 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0023; Replacement of interior deteriorated structural lumber. To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0024 100 Square

0024 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0024; Repair/replace drywall. Provide 1/2" or 5/8 gypsum wallboard (match existing), tape edges, level 4 finish. To include clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0025 150,000 Square

0025 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0025; One-coat Interior grade primer of bare or previously painted surfaces. To include clean-up, and all incidental items ne cessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0026 10 Each

0026 Z2AA - REPAIR OR ALTERATION OF

FFP

: CLIN 0026; Sample analysis: Collection and laboratory analysis to determine if paint contains lead and resulting debris can be classified as hazardous waste. To include sampling, testing, clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0027 5 Each

0027 Z2AA - REPAIR OR ALTERATION OF

FFP

: CLIN 0027; Soil sample testing prior to and after work completion. To include sampling, testing, clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0028 30 Each

0028 Z2AA - REPAIR OR ALTERATION OF

FFP

: CLIN 0028; Collection and laboratory analysis to determine if paint exceeds regulatory limits for RCRA 8 materials and resulting debris can be classified as hazardous waste, testing, clean-up, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0029 15,000 Square

0029 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0029; Lead based paint chips removal and disposal from Various Wood surfaces. To include clean-up, area air monitoring, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0030 2,000 Square

0030 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0030; Lead based paint chips removal and disposal from various Metal surfaces. To include clean-up, area air monitoring, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0031 15,000 Square

0031 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0031; Lead based paint chips removal and disposal from various Concrete surfaces. To include clean-up, area air monitoring, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0032 500 Square

0032 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0032; Lead based paint chips removal and disposal from various CMU surfaces. To include clean-up, area air monitoring, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0033 500 Square

0033 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0033; Lead based paint chips removal and disposal from various drywall surfaces. To include clean-up, area air monitoring, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0034 4,500 Square

0034 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0034; Lead containing paint chips removal and disposal from Various Wood surfaces. To include clean-up, area air monitoring, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0035 500 Square

0035 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0035; Lead containing paint chips removal and disposal from various Metal surfaces. To include clean-up, area air monitoring, and all incidental items necessary to complete the work.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0036 2,000 Square

0036 Z2AA - REPAIR OR ALTERATION OF

: CLIN 0036; Lead containing paint chips…