22_7090 Blackmon Road Middle School 11_22_23_.pdf
PDF 6 MB Posted
- Attached to
- Phase 3 Field Upgrades
- Solicitation number
- PE-55046-NONST-2024-000000004
- Issued by
- Muscogee County, Columbus City, Georgia
About this file
This document provides the site development plans for the Blackmon Road Middle School field renovations project, which is being managed by the Muscogee County School District in Columbus, Georgia. The project involves conducting field renovations at the existing Blackmon Road Middle School located at 7251 Blackmon Road, Columbus, GA 31909. The total project site area is 24.0 acres, with a total disturbed area of 0.9 acres. EMC Engineering Services, Inc. is serving as the Engineer of Record and Project Manager for this civil site work project. The point of contact for the project is Joel Womack of EMC Engineering Services, Inc.
The document includes general notes, a project description, a utilities location disclaimer, and a detailed legend of the proposed site features and erosion control measures. There are no specific details provided regarding project timelines, bidding requirements, or contract terms. Additionally, no information is included about pricing, set asides, incumbents, funding sources, or other commercial terms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE
Know what's below.
www.Georgia811.com
R
Call before you dig.
VICINITY MAP
NOT TO SCALE
EMC ENGINEERING SERVICES, INC.
ENVIRONMENTAL- MARINE - CIVIL - SURVEY
PROJECT LOCATION: REVISION DESCRIPTION
ENVIRONMENTAL
CIVIL
MARINE
Prepared for
SITE DEVELOPMENT PLANS
FOR
EMC ENGINEERING SERVICES, INC.
3575 MACON ROAD, SUITE 15
COLUMBUS, GEORGIA 31907
PHONE: (706) 565-5985
FAX: (706) 565-5983
columbus@emc-eng.com www.emc-eng.com
DATE
ALBANY • ATLANTA • AUGUSTA • BRUNSWICK • COLUMBUS • SAVANNAH
STATESBORO • THOMASTON • VALDOSTA • WARNER ROBINS
MUSCOGEE COUNTY SCHOOL DISTRICT
COLUMBUS, MUSCOGEE COUNTY, GEORGIA
COLUMBUS, MUSCOGEE COUNTY, GEORGIA
7251 BLACKMON ROAD #4460
EMC PROJECT# 22-7090
BLACKMON ROAD MS FIELD RENOVATIONS
1 ADDENDUM 2 11/22/23
- - -NOVEMBER 2023
UTILITY LOCATION DISCLAIMER
THE UTILITIES ARE SHOWN AS PER THE LOCATION OF POLES, MANHOLES, VALVES,
PEDESTALS, ETC., EXISTING DRAWINGS AND INFORMATION PROVIDED BY UTILITY
PERSONNEL. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES SHOWN
COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED.
THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UTILITIES SHOWN ARE
THE EXACT LOCATION INDICATED, ALTHOUGH HE DOES CERTIFY THAT THEY ARE
LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION AVAILABLE.
PROFESSIONAL
ENGINEER
REGISTERED
*G
EO
RGIA
JOEL DAV ID WOMACK
No. PE39141
11/22/23
APPROVAL OF THESE PLANS DOES NOT RELIEVE
THE OWNER OR CONTRACTOR FROM COMPLYING
WITH ALL ORDINANCES AND LAWS OF THE
CONSOLIDATED GOVERNMENT OF COLUMBUS.
This approval in no way relieves the property owner, contractor or other agent of his damage to adjacent prop-erties and liability resulting therefrom and shall not constitute an assumption of liability by the City of Columbus for damages caused by construction and/or grading performed under said plans and permits.
This Property
Is not located on a flood plain is located in a flood plain and requires an elevation certificate
An elevation certificate (has) (has not) been issued
REVIEW OF
SOIL EROSION AND SEDIMENTATION
CONTROL ORDINANCE
Approved_________
DEPARTMENT OF ENGINEERING
Any construction within the dripline of a tree within the public right-of-way must be permitted by the City Arborist.
Ord. No. 20-A-1.1 (20)
SPNR-05-23-000759
SHEET INDEX
Sheet
Number Sheet Title
C01 COVER
C02 GENERAL NOTES
C03 EXISTING CONDITIONS & DEMOLITION PLAN
C04 FOOTBALL SITE PLAN
C05 SOCCER SITE PLAN
C06 PAVING, GRADING & DRAINAGE PLAN
C07 IRRIGATION PLAN
C08 CONSTRUCTION DETAILS
C09 CONSTRUCTION DETAILS
EC01 ESPC COVER
EC02 EROSION CONTROL PLAN - INITIAL PHASE
EC03 EROSION CONTROL PLAN - INTERMEDIATE PHASE
EC04 EROSION CONTROL PLAN - FINAL PHASE
EC05 HYDROLOGY PLAN
EC06 ESPC NOTES
EC07 ESPC DETAILS
SHEET
OF
Pr ep ar ed fo r:
SURVEY DATE:
SE
R
VI
C
ES
, I
N C
E
M C
E N
G
IN
EE
R
IN
G
SCALE:
DATE:
PROJECT NO.:
SURVEYED BY:
CHECKED BY:
DESIGNED BY:
DRAWN BY:
M ac on R d.
, S ui te
C ol um bu s, G
A
Ph
6)
-5
Fa x:
(7
) 5
-5 co lu m bu s@ em c-en g.
co m w w w
.e m c-en g.
co m
EN
VI
R
O N
M
EN
TA
L
C
IV
IL
M
AR
IN
E
AL
BA
N Y
• A
TL
AN
TA
AU
G U
ST
A
• B R
U N
SW
IC
K
• C
O
LU
M
BU
S
SA
VA
N
N
AH
ST
AT
ES
BO
R
O
TH
O
M
AS
TO
N
VA
LD
O
ST
A
• W
AR
N
ER
R O
BI
N
S
D
AT
E N
O
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N G
EN
ER
AL
N
O
TE
S
B
LA
C
KM
O N
R O
AD
C O
LU
M
BU
S, M U
SC
O
G
EE
C O
U N
TY
, G
EO
R
G
IA
BL
AC
KM
O
N R
O
AD
M S
FI
EL
D R
EN
O
VA
TI
O N
S
M U
SC
O
G
EE
C O
U N
TY
S
C H
O O
L D
IS
TR
IC
T
22-7090
CDS
CDS
EMC
1/19/23
JDW
NO SCALE
11/22/23
C02
AD
D
EN
D U
M
/2
2/
PROJECT DESCRIPTION:
1. THE DEVELOPER'S INTENT IS TO CONDUCT FIELD RENOVATIONS FOR BLACKMON ROAD MIDDLE SCHOOL.
2. AN EXISTING CONDITIONS / TOPOGRAPHIC SURVEY OF THESE PARCELS WERE PERFORMED BY EMC
ENGINEERING SERVICES, INC ON JANUARY 19, 2023.
3. NO GEOTECHNICAL REPORT OF THE PROJECT SITE IS AVAILABLE.
4. NO ENVIRONMENTAL SITE ASSESSMENT OF THE PROJECT SITE WAS PREPARED.
5. THE TOTAL PARCEL AREAS IS: 24.0 ACRES.
THE TOTAL DISTURBED AREA IS: 0.9 ACRES.
6. THE PROJECT IS LOCATED AT: BLACKMON ROAD MIDDLE SCHOOL: 7251 BLACKMON ROAD #4460, COLUMBUS, GA 31909
7. EMC REVIEWED THE U.S. FISH AND WILDLIFE SERVICE NATIONAL WETLAND INVENTORY (NWI) MAP, WHICH DOCUMENTED NO REGULATED WETLANDS ON THE SUBJECT PROPERTY OR ADJOINING PROPERTIES.
8. THERE ARE NO WATERS OF THE STATE PRESENT WITHIN 200 FEET OF THE DISTURBED AREA.
9. THERE ARE NO IMPAIRED STREAM SEGMENTS WITHIN ONE MILE OF THE PROJECT SITE.
10. THE INITIAL RECEIVING WATER FOR STORMWATER RUNOFF FROM BAKER MIDDLE SCHOOL IS COOPER
CREEK, A WARM WATER FISHERY.
11. THE PROPERTY OF BAKER MIDDLE SCHOOL IS LOCATED ON MAP NO. 1351580026F OF THE FEMA FLOOD INSURANCE RATE MAP, EFFECTIVE DATE: 9/5/07, AND SHOWS THIS PROPERTY IS NOT LOCATED IN A
DESIGNATED FLOOD HAZARD AREA.
12. THE POINT OF CONTACT FOR CIVIL SITE WORK FOR THIS PROJECT IS:
ENGINEER OF RECORD:
JOEL WOMACK
EMC ENGINEERING SERVICES, INC.
3575 MACON ROAD, SUITE 15
COLUMBUS, GEORGIA 31907
PHONE: (706) 565-5985
JOEL_WOMACK@EMC-ENG.COM
PROJECT MANAGER:
JOEL WOMACK
EMC ENGINEERING SERVICES, INC.
3575 MACON ROAD, SUITE 15
COLUMBUS, GEORGIA 31907
PHONE: (706) 565-5985
JOEL_WOMACK@EMC-ENG.COM
DEVELOPER/OWNER :
MUSCOGEE COUNTY SCHOOL DISTRICT
C/O WARD ODOM
2960 MACON ROAD
COLUMBUS, GA 31906
PHONE: (706) 748-2000
ODOM.JAMES.H@MUSCOGEE.K12.GA.US
13. TWENTY-FOUR HOUR CONTACT RESPONSIBLE FOR EROSION AND SEDIMENT CONTROL:
JEFF BATTLES
(706) 573-4209
GENERAL NOTES:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SAFETY AND ALL WAYS, MEANS, AND METHODS OF
CONSTRUCTION.
2. THE SAFE AND ORDERLY PASSAGE OF TRAFFIC AND PEDESTRIANS SHALL BE PROVIDED WHERE
CONSTRUCTION OPERATIONS ABUT PUBLIC THROUGH-FARES AND ADJACENT PROPERTY.
3. THE CONTRACTOR WILL COORDINATE THE WORK WITH THE UTILITY COMPANIES AND WILL VERIFY ALL
EXISTING PIPE INVERTS AND EXISTING ROAD ELEVATIONS PRIOR TO CONSTRUCTION.
4. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO INSURE THAT ALL REQUIRED PERMITS ARE
OBTAINED AND IN HAND PRIOR TO THE COMMENCEMENT OF CONSTRUCTION.
5. THE DATA, TOGETHER WITH ALL OTHER INFORMATION SHOWN ON THESE PLANS, OR IN ANY WAY INDICATED THEREBY, WHETHER BY DRAWINGS OR NOTES, OR IN ANY OTHER MANNER, ARE BASED UPON FIELD INVESTIGATIONS AND ARE BELIEVED TO BE INDICATIVE OF ACTUAL CONDITIONS. HOWEVER, THE SAME ARE SHOWN AS INFORMATION ONLY, ARE NOT GUARANTEED AND DO NOT BIND THE ENGINEER IN ANY WAY.
6. UNDERGROUND UTILITY INFORMATION SHOWN HEREON IS BASED ON GROUND MARKINGS BY OTHERS. NO CERTIFICATION IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. VISIBLE EVIDENCE OF UTILITY STRUCTURES OBSERVED DURING THE COURSE OF THE FIELD SURVEY IS SHOWN HEREON.
7. PRIOR TO INSTALLATION OF ANY UTILITY LINES, THE CONTRACTOR SHALL GIVE THE UTILITY COMPANIES THREE (3) WORKING DAYS NOTICE TO ALLOW TIME FOR EXISTING UTILITIES TO BE STAKED. BEFORE CALLING
(811) THE CONTRACTOR SHALL HAVE THE FOLLOWING INFORMATION READY: COUNTY, TOWN, LOCATION, NEAREST STREET INTERSECTIONS, TYPE OF WORK (SEWER, WATER, PAVING, ETC.) YOUR COMPANY NAME, TELEPHONE NUMBER, OWNER'S NAME, DATE AND TIME YOU EXPECT TO COMMENCE CONSTRUCTION, AND WHERE AND HOW YOU CAN BE REACHED AND THE BEST TIME TO CONTACT YOU. THE CONTRACTOR SHALL EXERCISE CAUTION WHEN CROSSING AN UNDERGROUND UTILITY, WHETHER SHOWN ON THE PLAN OR LOCATED BY THE UTILITY COMPANY. ALL UTILITIES WHICH INTERFERE WITH THE PROPOSED CONSTRUCTION SHALL BE RELOCATED BY THE RESPECTIVE UTILITY COMPANIES, AND THE CONTRACTOR SHALL COOPERATE WITH THEM DURING RELOCATION OPERATIONS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY
VARIANCES PRIOR TO COMMENCEMENT OF WORK OR PURCHASING ANY MATERIALS.
8. IT IS THE OBLIGATION OF THE CONTRACTOR TO MAKE HIS OWN INTERPRETATION OF ALL SURFACE AND SUBSURFACE DATA THAT IS AVAILABLE AS TO THE NATURE AND EXTENT OF THE MATERIALS TO BE EXCAVATED AND WASTED, AND/OR GRADED AND COMPACTED. THE INFORMATION SHOWN ON THESE PLANS AND SPECIFICATIONS DOES NOT IN ANY WAY GUARANTEE THE AMOUNT OR NATURE OF THE MATERIAL WHICH
MAY BE ENCOUNTERED.
9. ALL DISTURBED AREAS, NOT DESIGNATED TO BE PAVED, SHALL BE GRASSED WITH PERMANENT SEEDING OR
PLANTED WITH PERMANENT VEGETATION, EXCEPT WHERE PROPOSED CONSTRUCTION INDICATES
OTHERWISE.
10. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND FURNISHING OF BORROW MATERIAL AS NECESSARY FOR THE CONSTRUCTION OF THIS PROJECT. FILL MATERIAL SHALL BE CLEAN AND FREE OF ALL
DEBRIS AND ORGANIC MATERIAL.
11. ALL ITEMS REMOVED FROM THE PROJECT WHICH ARE NOT TO BE REUSED SHALL BE MOVED TO A LOCATION
APPROVED BY THE OWNER.
12. ALL STRIPING AND SIGNS SHALL BE IN CONFORMITY WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES FOR STREETS AND HIGHWAYS, LATEST EDITION.
13. ANY SURVEY MARKER OR MONUMENTS DISTURBED DURING CONSTRUCTION REQUIRES RE-ESTABLISHMENT BY A SURVEYOR LICENSED IN THE STATE THE PROJECT RESIDES IN AT THE CONTRACTOR'S EXPENSE.
14. ANY INFORMATION BY THE GOVERNING AGENCY, INCLUDING BUT NOT LIMITED TO STANDARDS, REQUIREMENTS, SPECIFICATIONS, NOTES, AND DETAILS, SHALL SUPERCEDE IF THERE IS ANY CONFLICTING
INFORMATION HEREIN.
15. IF ANY CONFLICTS, DISCREPANCIES, OR OTHER UNSATISFACTORY CONDITIONS ARE DISCOVERED, EITHER ON THE CONSTRUCTION DOCUMENTS OR THE FIELD CONDITIONS, THE CONTRACTOR MUST NOTIFY THE ENGINEER IMMEDIATELY IN WRITING, AND SHALL NOT COMMENCE OPERATION UNTIL CONFLICTS, DISCREPANCIES, OR OTHER UNSATISFACTORY CONDITIONS ARE RESOLVED.
GRATE INLET
GRATE INLET WITH HOOD
DOUBLE WING CURB INLET
WEIR INLET
STORM MANHOLE
FLARED END SECTION
ST
TOPOGRAPHY
RIPRAP< <
CONTOUR & LABELS
DITCH/SWALE
150150.00 STORM SEWER
PROPOSED FEATURES LEGEND
PROPERTY
EASEMENT
SETBACKSRW
PROPERTY LINE
RIGHT OF WAY
FW
E
T
TV
G
T
TV
E
FIRE WATER LINE
AERIAL POWER
AERIAL TELEPHONE
AERIAL CABLE
BURIED POWER
BURIED TELEPHONE
BURIED CABLE
NATURAL GAS
WWATER LINE
TS
TSAERIAL TRAFFIC SIGNAL
BURIED TRAFFIC SIGNAL
FM>FORCEMAIN
SSSANITARY SEWER
POWER POLE
LIGHT POLE
SANITARY CLEANOUT
SANITARY MANHOLE
BACKFLOW PREVENTER
FIRE DEPARTMENT
CONNECTION
FIRE HYDRANT
REDUCED PRESSURE
ZONE ASSEMBLY
WATER METER
VALVE
CO
SS
WMFDC
FH
BFP
LP
PP RPZ
UTILITIES
EROSION CONTROL
X X X
XX XX XX
ORANGE BARRIER
FENCING
SILT FENCE (SINGLE ROW)
SILT FENCE (DOUBLE
ROW)
BUFFER
DIVERSION BERM &
SWALE
LIMITS OF DISTURBANCE
PAVEMENT HATCHING
HEAVY DUTY ASPHALT PAVING
ASPHALT PAVING
HEAVY DUTY CONCRETE PAVING
CONCRETE PAVING
HEAVY DUTY GRAVEL PAVING
GRAVEL PAVING
UNPAVED WALKWAY
UNPAVED ROADWAY
DEMOLITION
AREA
DELINEATION X X X X
EXISTING FEATURES LEGEND
SYMBOLS
BMS
CMS
CNS
CPT
DHS
HBS
HTS
IPS
MNS
NS
PKS
RBS
RRSS
RWMS
TS
XS
LINETYPES
ABBREVIATIONS
PROFESSIONAL
ENGINEER
REGISTERED
*G
EO
RGIA
JOEL DAV ID WOMACK
No. PE39141
11/22/23
MISC. OBJECTS
PROPOSED FENCE O O
Know what's below.
www.Georgia811.com
R
Call before you dig.
SPNR-05-23-000759
LIMITS OF DISTURBANCE
REMOVE GOAL POST
REMOVE GOAL POST
REMOVE NO PARKING SIGN
REMOVE EXISTING DOUBLE GATE
RELOCATE EXISTING
IRRIGATION CONTROL VALVE
DEMO SCOREBOARD
SHEET
OF
Pr ep ar ed fo r:
SURVEY DATE:
SE
R
VI
C
ES
, I
N C
E
M C
E N
G
IN
EE
R
PROJECT NO.:
SURVEYED BY:
CHECKED BY:
DESIGNED BY:
DRAWN BY:
GRAPHIC SCALE: 1" =
0'
M ac on R d.
, S ui te
C ol um bu s, G
A
Ph
6)
-5
Fa x:
(7
) 5
-5 co lu m bu s@ em c-en g.
co m w w w
.e m c-en g.
co m
EN
VI
R
O N
M
EN
TA
L
C
IV
IL
M
AR
IN
E
AL
BA
N Y
• A
TL
AN
TA
AU
G U
ST
A
• B R
U N
SW
IC
K
• C
O
LU
M
BU
S G
R
EE
N
VI
LL
E
• S
AV
AN
N
AH
ST
AT
ES
BO
R O
TH
O M
AS
TO
N
VA
LD
O
ST
A
D
AT
E N
O
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N
EX
IS
TI
N G
C O
N D
IT
IO
N S
D
EM
O
LI
TI
O N
P
LA
N
B
LA
C
KM
O N
R O
AD
C O
LU
M
BU
S, M U
SC
O
G
EE
C O
U N
TY
, G
EO
R
G
IA
BL
AC
KM
ON
R
OA
D M
S
FI
EL
D
RE
NO
VA
TI
ON
S
M U
SC
O
G
EE
C O
U N
TY
S
C H
O O
L D
IS
TR
IC
T
22-7090
CDS
CDS
EMC
1/19/23
JDW
1" = 40' 11/22/23
C03
40' 40'
40'
20'
AD
D
EN
D U
M
/2
2/
DEMOLITION AND EXISTING CONDITIONS NOTES
1. THE CONTRACTOR SHALL PROVIDE THREE WORKING DAYS NOTICE TO THE UTILITIES PROTECTION CENTER BY CALLING 811 IN ORDER TO LOCATE UTILITIES PRIOR TO STARTING ANY EXCAVATION OR
CONSTRUCTION.
2. THE LOCATIONS OF UNDERGROUND UTILITIES AS SHOWN HEREON ARE BASED ON ABOVE-GROUND STRUCTURES PROVIDED BY THE SURVEYOR. NO EXCAVATIONS OR SUBSURFACE LOCATING SERVICES
WERE MADE DURING THE PERFORMANCE OF THE TOPOGRAPHIC SURVEY TO LOCATE / IDENTIFY
BURIED UTILITIES / STRUCTURES. LOCATIONS OF UNDERGROUND UTILITIES / STRUCTURES MAY VARY
FROM LOCATIONS SHOWN HEREON.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY UTILITIES DAMAGED DURING DEMOLITION
AND/OR CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER.
4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO STARTING WORK AND SHALL BE RESPONSIBLE FOR THE PROPER FIT OF ALL COMPONENTS. SOME DIMENSIONS AND CONDITIONS MAY VARY. NOTIFY ENGINEER IN WRITING OF ANY DISCREPANCIES OR CONFLICTS.
5. CONTRACTOR SHALL PROVIDE ADEQUATE TEMPORARY BARRIERS & WARNINGS TO LIMIT ACCESS TO
PROJECT AREA TO ONLY THOSE PERSONNEL AUTHORIZED BY THE CONTRACTOR. SAFE PASSAGE
SHALL BE MAINTAINED FOR PEDESTRIANS TO AREAS ADJACENT TO THE PROJECT SITE AS REQUIRED.
6. ALL ITEMS REMOVED OR DEMOLISHED BY THE CONTRACTOR, WHICH ARE NOT LISTED BY THE SPECIAL PROVISIONS, OR HEREIN, TO BE TURNED OVER TO THE OWNER, SHALL BECOME THE PROPERTY OF THE
CONTRACTOR & SHALL BECOME THE CONTRACTOR'S RESPONSIBILITY FOR PROPER DISPOSAL.
7. DEMOLITION ACTIVITIES ARE NOT EXPECTED TO INCLUDE THE REMOVAL OF HAZARDOUS MATERIALS. IN
THE EVENT THAT THAT HAZARDOUS MATERIALS ARE ENCOUNTERED OR SUSPECTED, CONTRACTOR
SHALL NOTIFY ENGINEER IN WRITING OF THE MATERIAL AND LOCATION.
8. CONTRACTOR SHALL COORDINATE WITH APPROPRIATE UTILITY COMPANIES TO SCHEDULE ALL UTILITY
& SERVICE INTERRUPTIONS TO OCCUPIED PORTIONS OF THE SITE.
9. CONTRACTOR SHALL REMOVE TREES AS INDICATED ON CIVIL PLANS. CONTRACTOR SHALL USE CAUTION DURING ALL CONSTRUCTION ACTIVITIES TO PROTECT ALL TREES, SHRUBS AND OTHER VEGETATION THAT ARE NOT INDICATED TO BE REMOVED. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SITE CLEAN-UP, CLEARING AND GRUBBING PER SPECIFICATIONS. ALL TREES THAT HAVE A MARKETABLE VALUE SHALL BE SALVAGED. CONTRACTOR SHALL COORDINATE WITH OWNER AS TO THE
TREES TO BE RELOCATED OR SOLD.
10. ALL TREE SAVE AREAS SHALL BE CLEARLY IDENTIFIED WITH TREE PROTECTION FENCING AS INDICATED
ON THE CIVIL PLANS PRIOR TO COMMENCEMENT OF ANY LAND DISTURBANCE. NO ABOVE OR
BELOW-GROUND DISTURBANCE OF ANY KIND SHALL OCCUR WITHIN THE TREE PROTECTION FENCING, NOR ANY PARKING, STOCK-PILING, BURNING ETC. SEE PLANS FOR TREE PROTECTION FENCING.
11. REQUIRED DEMOLITION IS NOTED ON PLANS, SECTIONS AND DETAILS. ADDITIONAL DEMOLITION AND REPAIR MAY BE REQUIRED. FAILURE TO NOTE SUCH WORK SHALL NOT BE THE BASIS FOR CONTRACT
MODIFICATIONS OR ADDITIONS.
12. WHERE ASPHALT OR CONCRETE DEMOLITION IS REQUIRED, CONTRACTOR SHALL USE A SAW CUT AT
THE LIMITS OF DEMOLITION OR NEAREST JOINT TO OBTAIN A CLEAN EDGE.
13. AT THE END OF EACH DAY'S WORK, REMOVE ANY DEBRIS (RESULTING FROM CONTRACTOR'S
DEMOLITION OPERATIONS) THAT IS NOT WITHIN THE CONTRACTOR CONSTRUCTION LIMITS.
14. ALL PROPOSED AND EXISTING PAVEMENT AND CURB TO REMAIN SHALL BE PROTECTED. IF DAMAGED, IT SHALL BE REPLACED OR REPAIRED PROMPTLY TO MEET STATE AND LOCAL REQUIREMENTS AT THE
CONTRACTOR'S EXPENSE.
15. CONTRACTOR IS REQUIRED TO NOTIFY ENGINEER IN WRITING OF ANY DISCREPANCIES OR CONFLICTS
ENCOUNTERED DURING CONSTRUCTION ACTIVITIES.
HATCH LEGEND:
EXISTING CONCRETE
EXISTING CHAINLINK FENCE
TREE REMOVAL
EXISTING RIP-RAP
EXISTING ASPHALT
EXISTING BUILDING
DEMOLITION
Know what's below.
www.Georgia811.com
R
Call before you dig.
PROFESSIONAL
ENGINEER
REGISTERED
*G
EO
RGIA
JOEL DAV ID WOMACK
No. PE39141
11/22/23
SPNR-05-23-000759
SPECIAL NOTES:
SAWCUT TO ENSURE SMOOTH TRANSITION
REMOVE FENCE (±1,250 LF, TOTAL)2
REMOVE EXISTING STRUCTURES4
REMOVE GRAVEL DRIVE
OWNER TO RELOCATE TICKETING BOOTH5
REMOVE STRIPING6
<10
<20
<30
<40
<10
<20
<30
<40
10>
20>
30>
40>
10>
20>
30>
40>
360'
30'
30'
300'
27' 53.33'
53.33'
53.33'
80'
160'
2 ½ "W
2 12" MAINLINE
BOOSTER PUMP
(IF REQUIRED, SEE IRRIGATION NOTE 6)
GOAL POST
O
O
O O
O O
O
O
O
O
O
O O
O
O
O
O R15'
R10'
R20'
R15' R15'
LIMITS OF DISTURBANCE
GOAL POST
OUTER FIELD BOX- FOR INFORMATION ONLY
RELOCATED IRRIGATION
CONTROL VALVE
INSTALL ±120 SF
CONCRETE PAD
FOR SCORE TABLE
INSTALL ±3,600 SF HEAVY DUTY
CONCRETE ADA PARKING LOT
INSTALL ±4,700 SF
CONCRETE SIDEWALK
(TOTAL)
INSTALL ±800 LF 4' CHAINLINK
FENCE AROUND TREELINE
INSTALL ±1,080 SF CONCRETE
BLEACHER PAD (SEE
BLEACHER PAD DETAILS)
INSTALL ±24 FT 4'
CHAINLINK GATE
PROPOSED VENDING BUILDING
(SEE ARCH FOR DETAILS)
2 12" WATERLINE EXTENSION
TOTAL FIELD AREA
R20'
R5', TYP.
INSTALL HANDICAP PARKING
SIGNS AND MARKINGS
R20'
10'
21'
5'
5'
45'
5'
9', TYP.
24.11'
24'
36' 30'
10'
12'
45'
10'
20', TYP.
5'
INSTALL ±320 SF CONCRETE
PAD AND PICNIC AREA
INSTALL ±168 LF ROLLED CURB AND GUTTER
45° V-NOTCH WEIR CUT
INSTALL ±753 SF CCG R/W
CONCRETE SIDEWALK
CONCRETE STAIRS
(SEE STRUCTURAL
DRAWINGS FOR DETAILS)
LOCATION OF FORMER CONTROL VALVE
INSTALL WHEEL STOPS, TYP.
O
O
O
O O
O
O
O
O
O
O
O
INSTALL DOUBLE GATE
INSTALL ±595 LF 4' FENCE
(SEE DETAILS)
INSTALL NEW SCOREBOARD
8'
PYLON
(4"x4"x18")
RESTRICTED AREA
TEAM BOX
RESTRICTED AREA
TEAM BOX
INSTALL SINGLE GATE
PYLON
(4"x4"x18")
PYLON
(4"x4"x18")
PYLON
(4"x4"x18")
R10'
5'
SHEET
OF
Pr ep ar ed fo r:
SURVEY DATE:
SE
R
VI
C
ES
, I
N C
E
M C
E N
G
IN
EE
R
PROJECT NO.:
SURVEYED BY:
CHECKED BY:
DESIGNED BY:
DRAWN BY:
GRAPHIC SCALE: 1" =
0'
M ac on R d.
, S ui te
C ol um bu s, G
A
Ph
6)
-5
Fa x:
(7
) 5
-5 co lu m bu s@ em c-en g.
co m w w w
.e m c-en g.
co m
EN
VI
R
O N
M
EN
TA
L
C
IV
IL
M
AR
IN
E
AL
BA
N Y
• A
TL
AN
TA
AU
G U
ST
A
• B R
U N
SW
IC
K
• C
O
LU
M
BU
S G
R
EE
N
VI
LL
E
• S
AV
AN
N
AH
ST
AT
ES
BO
R O
TH
O M
AS
TO
N
VA
LD
O
ST
A
D
AT
E N
O
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N
FO
O
TB
AL
L
SI
TE
P
LA
N
B
LA
C
KM
O N
R O
AD
C O
LU
M
BU
S, M U
SC
O
G
EE
C O
U N
TY
, G
EO
R
G
IA
BL
AC
KM
ON
R
OA
D M
S
FI
EL
D
RE
NO
VA
TI
ON
S
M U
SC
O
G
EE
C O
U N
TY
S
C H
O O
L D
IS
TR
IC
T
22-7090
CDS
CDS
EMC
1/19/23
JDW
1" = 40' 11/22/23
C04
40' 40'
40'
20'
AD
D
EN
D U
M
/2
2/
SITE LAYOUT AND STAKING NOTES
1. THE CONTRACTOR SHALL PROVIDE THREE WORKING DAYS NOTICE TO THE UTILITIES PROTECTION CENTER BY CALLING 811 IN ORDER TO LOCATE UTILITIES PRIOR TO STARTING ANY EXCAVATION OR
CONSTRUCTION.
2. THE LOCATIONS OF UNDERGROUND UTILITIES AS SHOWN HEREON ARE BASED ON ABOVE-GROUND STRUCTURES PROVIDED BY THE SURVEYOR. NO EXCAVATIONS OR SUBSURFACE LOCATING SERVICES
WERE MADE DURING THE PERFORMANCE OF THE TOPOGRAPHIC SURVEY TO LOCATE / IDENTIFY
BURIED UTILITIES / STRUCTURES. LOCATIONS OF UNDERGROUND UTILITIES / STRUCTURES MAY VARY
FROM LOCATIONS SHOWN HEREON.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY UTILITIES DAMAGED DURING DEMOLITION
AND/OR CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER.
4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO STARTING WORK AND SHALL BE RESPONSIBLE FOR THE PROPER FIT OF ALL COMPONENTS. SOME DIMENSIONS AND CONDITIONS MAY VARY. NOTIFY ENGINEER IN WRITING OF ANY DISCREPANCIES OR CONFLICTS.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL SETBACKS, EASEMENTS, BUFFERS, ETC. PRIOR TO COMMENCEMENT OF CONSTRUCTION.
6. CONTRACTOR SHALL CAREFULLY EXAMINE ALL DOCUMENTS AND THE CONSTRUCTION SITE TO OBTAIN
FIRST HAND KNOWLEDGE OF EXISTING CONDITIONS.
7. ALL DIMENSIONS ARE MEASURED TO BACK OF CURB WHERE CURB & GUTTER IS PRESENT. ALL OTHER DIMENSIONS ARE MEASURED TO EDGE OF PAVEMENT UNLESS NOTED OTHERWISE. CONTRACTOR IS TO COORDINATE WITH THE ARCHITECTURAL PLANS AS TO THE BUILDING LAYOUT AND DIMENSIONS.
8. ALL NEW ASPHALT AND/OR CONCRETE PAVING SHALL HAVE A SMOOTH TRANSITION TO EXISTING
PAVEMENT.
9. ALL SIGNS AND UTILITY MARKERS REMOVED/DISTURBED DURING CONSTRUCTION SHALL BE
REINSTALLED UNLESS NOTED OTHERWISE ON PLANS.
10. ALL HANDICAP ACCESSIBLE SITE IMPROVEMENTS INCLUDING HANDICAP PARKING SPACES AND
ACCESSIBLE ROUTES SHALL CONFORM WITH THE AMERICANS WITH DISABILITY ACT DESIGN
GUIDELINES AND SPECIFICATIONS, LATEST EDITION, AND ANY ADDITIONAL FEDERAL, STATE, AND LOCAL
CODES, REQUIREMENTS, AND REGULATIONS.
11. ALL PARKING STRIPING SHALL BE 5" PAINTED WHITE UNLESS NOTED OTHERWISE. ALL PAINT TO BE
WATERBORNE TRAFFIC PAINT THAT IS ENVIRONMENTALLY FRIENDLY.
12. ALL STRIPING AND SIGNS SHALL CONFORM WITH THE STATE'S DEPARTMENT OF TRANSPORTATION AND
THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), LATEST EDITION.
13. AT THE END OF EACH DAY'S WORK, REMOVE/RELOCATE ANY DEBRIS AND/OR CONSTRUCTION
MATERIALS THAT IS NOT WITHIN THE CONTRACTOR CONSTRUCTION LIMITS.
14. ALL PROPOSED AND EXISTING PAVEMENT AND CURB TO REMAIN SHALL BE PROTECTED. IF DAMAGED, IT SHALL BE REPLACED PROMPTLY TO MEET STATE AND LOCAL REQUIREMENTS AT THE CONTRACTOR'S
EXPENSE.
15. CONTRACTOR IS REQUIRED TO NOTIFY ENGINEER IN WRITING OF ANY DISCREPANCIES OR CONFLICTS
ENCOUNTERED DURING CONSTRUCTION ACTIVITIES.
16. CONTRACTOR IS REQUIRED TO PROVIDE FIELD PYLONS AND ADDITIONAL EQUIPMENT.
17. ALL FIELD LAYOUTS SHALL BE COMPLETED UNDER THE SUPERVISION OF A PROFESSIONAL LAND
SURVEYOR IN THE STATE OF GEORGIA.
HATCH LEGEND:
EXISTING CONCRETE
PROPOSED CONCRETE
EXISTING RIP-RAP
EXISTING ASPHALT
EXISTING BUILDING
PROPOSED HEAVY DUTY CONCRETE
Know what's below.
www.Georgia811.com
R
Call before you dig.
PROFESSIONAL
ENGINEER
REGISTERED
*G
EO
RGIA
JOEL DAV ID WOMACK
No. PE39141
11/22/23
SPNR-05-23-000759
PROPOSED CCG R/W CONCRETE
165'
360'
180'
30'
60'
60'
10'
30'
54'
18' 8'
24'
60'
132' R30'
R30'
R0.75'
R3'
10'
36'
30'
10'
15'
10'
56'
180' 62'
56'
180'
2 ½ "W
2 12" MAINLINE
BOOSTER PUMP
(IF REQUIRED, SEE IRRIGATION NOTE 6)
GOAL POST
O
O
O O
O O
O
O
O
O
O
O O
O
O
O
O R15'
R10'
R20'
R15' R15'
LIMITS OF DISTURBANCE
GOAL POST
OUTER FIELD BOX- FOR INFORMATION ONLY
RELOCATED IRRIGATION
CONTROL VALVE
INSTALL ±120 SF
CONCRETE PAD
FOR SCORE TABLE
INSTALL ±3,600 SF HEAVY DUTY
CONCRETE ADA PARKING LOT
INSTALL ±4,700 SF
CONCRETE SIDEWALK
(TOTAL)
INSTALL ±800 LF 4' CHAINLINK
FENCE AROUND TREELINE
INSTALL ±1,080 SF CONCRETE
BLEACHER PAD (SEE
BLEACHER PAD DETAILS)
INSTALL ±24 FT 4'
CHAINLINK GATE
PROPOSED VENDING BUILDING
(SEE ARCH FOR DETAILS)
2 12" WATERLINE EXTENSION
TOTAL FIELD AREA
R20'
R5', TYP.
INSTALL HANDICAP PARKING
SIGNS AND MARKINGS
R20'
10'
21'
5'
5'
45'
5'
9', TYP.
24.11'
24'
36' 30'
10'
12'
45'
10'
20', TYP.
5'
INSTALL ±320 SF CONCRETE
PAD AND PICNIC AREA
INSTALL ±168 LF ROLLED CURB AND GUTTER
45° V-NOTCH WEIR CUT
INSTALL ±753 SF CCG R/W
CONCRETE SIDEWALK
CONCRETE STAIRS
(SEE STRUCTURAL
DRAWINGS FOR DETAILS)
LOCATION OF FORMER CONTROL VALVE
INSTALL WHEEL STOPS, TYP.
O
O
O
O O
O
O
O
O
O
O
O
INSTALL DOUBLE GATE
INSTALL ±595 LF 4' FENCE
(SEE DETAILS)
INSTALL NEW SCOREBOARD
8'
OFFICIAL AREA
TEAM AND COACHING AREA
PENALTY MARK
GOAL
GOAL AREA
PENALTY AREA
TOUCH LINE
TEAM AND COACHING AREA
GOAL LINE
INSTALL SINGLE GATE
R10'
5'
SHEET
OF
Pr ep ar ed fo r:
SURVEY DATE:
SE
R
VI
C
ES
, I
N C
E
M C
E N
G
IN
EE
R
PROJECT NO.:
SURVEYED BY:
CHECKED BY:
DESIGNED BY:
DRAWN BY:
GRAPHIC SCALE: 1" =
0'
M ac on R d.
, S ui te
C ol um bu s, G
A
Ph
6)
-5
Fa x:
(7
) 5
-5 co lu m bu s@ em c-en g.
co m w w w
.e m c-en g.
co m
EN
VI
R
O N
M
EN
TA
L
C
IV
IL
M
AR
IN
E
AL
BA
N Y
• A
TL
AN
TA
AU
G U
ST
A
• B R
U N
SW
IC
K
• C
O
LU
M
BU
S G
R
EE
N
VI
LL
E
• S
AV
AN
N
AH
ST
AT
ES
BO
R O
TH
O M
AS
TO
N
VA
LD
O
ST
A
D
AT
E N
O
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N
SO
C C
ER
S
IT
E
PL
AN
B
LA
C
KM
O N
R O
AD
C O
LU
M
BU
S, M U
SC
O
G
EE
C O
U N
TY
, G
EO
R
G
IA
BL
AC
KM
ON
R
OA
D M
S
FI
EL
D
RE
NO
VA
TI
ON
S
M U
SC
O
G
EE
C O
U N
TY
S
C H
O O
L D
IS
TR
IC
T
22-7090
CDS
CDS
EMC
1/19/23
JDW
1" = 40' 11/22/23
C05
40' 40'
40'
20'
AD
D
EN
D U
M
/2
2/
SITE LAYOUT AND STAKING NOTES
1. THE CONTRACTOR SHALL PROVIDE THREE WORKING DAYS NOTICE TO THE UTILITIES PROTECTION CENTER BY CALLING 811 IN ORDER TO LOCATE UTILITIES PRIOR TO STARTING ANY EXCAVATION OR
CONSTRUCTION.
2. THE LOCATIONS OF UNDERGROUND UTILITIES AS SHOWN HEREON ARE BASED ON ABOVE-GROUND STRUCTURES PROVIDED BY THE SURVEYOR. NO EXCAVATIONS OR SUBSURFACE LOCATING SERVICES
WERE MADE DURING THE PERFORMANCE OF THE TOPOGRAPHIC SURVEY TO LOCATE / IDENTIFY
BURIED UTILITIES / STRUCTURES. LOCATIONS OF UNDERGROUND UTILITIES / STRUCTURES MAY VARY
FROM LOCATIONS SHOWN HEREON.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY UTILITIES DAMAGED DURING DEMOLITION
AND/OR CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER.
4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO STARTING WORK AND SHALL BE RESPONSIBLE FOR THE PROPER FIT OF ALL COMPONENTS. SOME DIMENSIONS AND CONDITIONS MAY VARY. NOTIFY ENGINEER IN WRITING OF ANY DISCREPANCIES OR CONFLICTS.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL SETBACKS, EASEMENTS, BUFFERS, ETC. PRIOR TO COMMENCEMENT OF CONSTRUCTION.
6. CONTRACTOR SHALL CAREFULLY EXAMINE ALL DOCUMENTS AND THE CONSTRUCTION SITE TO OBTAIN
FIRST HAND KNOWLEDGE OF EXISTING CONDITIONS.
7. ALL DIMENSIONS ARE MEASURED TO BACK OF CURB WHERE CURB & GUTTER IS PRESENT. ALL OTHER DIMENSIONS ARE MEASURED TO EDGE OF PAVEMENT UNLESS NOTED OTHERWISE. CONTRACTOR IS TO COORDINATE WITH THE ARCHITECTURAL PLANS AS TO THE BUILDING LAYOUT AND DIMENSIONS.
8. ALL NEW ASPHALT AND/OR CONCRETE PAVING SHALL HAVE A SMOOTH TRANSITION TO EXISTING
PAVEMENT.
9. ALL SIGNS AND UTILITY MARKERS REMOVED/DISTURBED DURING CONSTRUCTION SHALL BE
REINSTALLED UNLESS NOTED OTHERWISE ON PLANS.
10. ALL HANDICAP ACCESSIBLE SITE IMPROVEMENTS INCLUDING HANDICAP PARKING SPACES AND
ACCESSIBLE ROUTES SHALL CONFORM WITH THE AMERICANS WITH DISABILITY ACT DESIGN
GUIDELINES AND SPECIFICATIONS, LATEST EDITION, AND ANY ADDITIONAL FEDERAL, STATE, AND LOCAL
CODES, REQUIREMENTS, AND REGULATIONS.
11. ALL PARKING STRIPING SHALL BE 5" PAINTED WHITE UNLESS NOTED OTHERWISE. ALL PAINT TO BE
WATERBORNE TRAFFIC PAINT THAT IS ENVIRONMENTALLY FRIENDLY.
12. ALL STRIPING AND SIGNS SHALL CONFORM WITH THE STATE'S DEPARTMENT OF TRANSPORTATION AND
THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), LATEST EDITION.
13. AT THE END OF EACH DAY'S WORK, REMOVE/RELOCATE ANY DEBRIS AND/OR CONSTRUCTION
MATERIALS THAT IS NOT WITHIN THE CONTRACTOR CONSTRUCTION LIMITS.
14. ALL PROPOSED AND EXISTING PAVEMENT AND CURB TO REMAIN SHALL BE PROTECTED. IF DAMAGED, IT SHALL BE REPLACED PROMPTLY TO MEET STATE AND LOCAL REQUIREMENTS AT THE CONTRACTOR'S
EXPENSE.
15. CONTRACTOR IS REQUIRED TO NOTIFY ENGINEER IN WRITING OF ANY DISCREPANCIES OR CONFLICTS
ENCOUNTERED DURING CONSTRUCTION ACTIVITIES.
16. CONTRACTOR IS REQUIRED TO PROVIDE FIELD PYLONS AND ADDITIONAL EQUIPMENT.
17. ALL FIELD LAYOUTS SHALL BE COMPLETED UNDER THE SUPERVISION OF A PROFESSIONAL LAND
SURVEYOR IN THE STATE OF GEORGIA.
HATCH LEGEND:
EXISTING CONCRETE
PROPOSED CONCRETE
EXISTING RIP-RAP
EXISTING ASPHALT
EXISTING BUILDING
PROPOSED HEAVY DUTY CONCRETE
Know what's below.
www.Georgia811.com
R
Call before you dig.
PROFESSIONAL
ENGINEER
REGISTERED
*G
EO
RGIA
JOEL DAV ID WOMACK
No. PE39141
11/22/23
SPNR-05-23-000759
PROPOSED CCG R/W CONCRETE
2 ½ "W
GOAL POST
O
O
O O
O O
O
O
O
O
O
O O
O
O
O
O
LIMITS OF DISTURBANCE
GOAL POST
OUTER FIELD BOX- FOR INFORMATION ONLY
STRUCTURE - (2) (HDPE Flared End Section)
IE: 487.00
50 LF 12" N12 HDPE @ 0.50%
TOTAL FIELD AREA FFE:
492.0
3.2%
2.0%
1.
8%
1.5%
1.
7%
1.2%
1.2
1.6%
1.
9%
1.5%
1.7%
0.5
0.7%
1.
5%
1.2%
2.0%
2.1%
2.2%
1.
8%
2.5% 2.2%
1.
8%
1.6%
3.2
1.6%
2.
9%
1.
7%
2.
5%
O
O
O
O O
O
O
O
O
O
O
O
INSTALL DOUBLE GATE
INSTALL ±595 LF 4' FENCE
(SEE DETAILS)
INSTALL NEW SCOREBOARD
2.7%
2.
4%
494.10 493.66
493.66 493.59
493.21
493.14
492.72
492.72
493.21
493.66
LP: 493.55
493.90 491.91
492.42
492.65 492.50
492.00
491.89
490.33
472.50 474.63
480.21
488.17
491.90
493.48
492.91
492.91
493.36
493.44
492.65
491.96
491.97 491.50
491.50 491.92
491.92
LP: 492.48
485.79
LP: 490.44
492.50
FIELD ADJUST PIPE SLOPE AND LENGTH AS NEEDED
STRUCTURE - (1) (GASTD 1019A TYPE "A")
TOP: 489.75
IE OUT (NW): 487.25
491.85
491.77
491.68
INSTALL SINGLE GATE
S
492.553.4%
SHEET
OF
Pr ep ar ed fo r:
SURVEY DATE:
SE
R
VI
C
ES
, I
N C
E
M C
E N
G
IN
EE
R
PROJECT NO.:
SURVEYED BY:
CHECKED BY:
DESIGNED BY:
DRAWN BY:
GRAPHIC SCALE: 1" =
0'
M ac on R d.
, S ui te
C ol um bu s, G
A
Ph
6)
-5
Fa x:
(7
) 5
-5 co lu m bu s@ em c-en g.
co m w w w
.e m c-en g.
co m
EN
VI
R
O N
M
EN
TA
L
C
IV
IL
M
AR
IN
E
AL
BA
N Y
• A
TL
AN
TA
AU
G U
ST
A
• B R
U N
SW
IC
K
• C
O
LU
M
BU
S G
R
EE
N
VI
LL
E
• S
AV
AN
N
AH
ST
AT
ES
BO
R O
TH
O M
AS
TO
N
VA
LD
O
ST
A
D
AT
E N
O
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N
PA
VI
N
G , G
R
AD
IN
G
D
R
AI
N
AG
E
PL
AN
B
LA
C
KM
O N
R O
AD
C O
LU
M
BU
S, M U
SC
O
G
EE
C O
U N
TY
, G
EO
R
G
IA
BL
AC
KM
ON
R
OA
D M
S
FI
EL
D
RE
NO
VA
TI
ON
S
M U
SC
O
G
EE
C O
U N
TY
S
C H
O O
L D
IS
TR
IC
T
22-7090
CDS
CDS
EMC
1/19/23
JDW
1" = 40' 11/22/23
C06
40' 40'
40'
20'
AD
D
EN
D U
M
/2
2/
GRADING AND DRAINAGE NOTES
1. THE CONTRACTOR SHALL PROVIDE THREE WORKING DAYS NOTICE TO THE UTILITIES PROTECTION CENTER BY CALLING 811 IN ORDER TO LOCATE UTILITIES PRIOR TO STARTING ANY EXCAVATION OR
CONSTRUCTION.
2. THE LOCATIONS OF UNDERGROUND UTILITIES AS SHOWN HEREON ARE BASED ON ABOVE-GROUND STRUCTURES PROVIDED BY THE SURVEYOR. NO EXCAVATIONS OR SUBSURFACE LOCATING SERVICES
WERE MADE DURING THE PERFORMANCE OF THE TOPOGRAPHIC SURVEY TO LOCATE / IDENTIFY
BURIED UTILITIES / STRUCTURES. LOCATIONS OF UNDERGROUND UTILITIES / STRUCTURES MAY VARY
FROM LOCATIONS SHOWN HEREON.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY UTILITIES DAMAGED DURING DEMOLITION
AND/OR CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER.
4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO STARTING WORK AND SHALL BE RESPONSIBLE FOR THE PROPER FIT OF ALL COMPONENTS. SOME DIMENSIONS AND CONDITIONS MAY VARY. NOTIFY ENGINEER IN WRITING OF ANY DISCREPANCIES OR CONFLICTS.
5. ALL SUITABLE FILL MATERIAL SHALL BE PLACED IN LIFTS NOT TO EXCEED 8 INCHES & COMPACTED TO
95% OF MAX. DRY DENSITY OF STANDARD PROCTOR.
6. FILL MATERIAL SHALL BE CLEAN AND FREE OF ALL DEBRIS AND ORGANIC MATERIAL
7. CONTRACTOR TO FILL AND/OR EXCAVATE AS REQUIRED FOR INSTALLATION OF ALL PROPOSED FEATURES. FINAL GRADES SHALL BE FLUSH WITH EDGE OF ASPHALT, SIDEWALK, AND/OR BACK OF CURB AND GRADED TO ENSURE POSITIVE DRAINAGE. PONDING OF STORMWATER SHALL NOT OCCUR.
8. ADJUST ALL TOP OF STRUCTURES ELEVATIONS (MANHOLES, CLEANOUTS, VALVE BOXES, ETC.) TO FINISH GRADE ELEVATIONS. FAILURE TO NOTE SUCH WORK SHALL NOT BE THE BASIS FOR CONTRACT
MODIFICATIONS OR ADDITIONS.
9. ALL PROPOSED AND EXISTING PAVEMENT AND CURB TO REMAIN SHALL BE PROTECTED. IF DAMAGED, IT SHALL BE REPLACED PROMPTLY TO MEET STATE AND LOCAL REQUIREMENTS AT THE CONTRACTOR'S
EXPENSE.
10. CARE SHALL BE TAKEN NEAR EXISTING TREES, SHRUBS, AND OTHER VEGETATION WHICH ARE TO
REMAIN SO AS TO NOT CAUSE INJURY TO ROOT SYSTEMS OR TRUNKS.
11. AT THE END OF EACH DAY'S WORK, REMOVE ANY DEBRIS, MATERIAL, ETC. (RESULTING FROM
CONTRACTOR'S GRADING OPERATIONS) THAT IS NOT WITHIN THE CONTRACTOR CONSTRUCTION
LIMITS.
12. ALL DISTURBED AREAS OF THE SITE SHALL BE DRESSED TO UNIFORM, WELL DRAINED AND VISUALLY
APPEALING SURFACE WITH A MINIMUM TOPSOIL LAYER OF FOUR INCHES.
13. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THE SITE IS ADA ACCESSIBLE AS
REQUIRED BY FEDERAL, STATE AND LOCAL GOVERNMENT.
14. FINISH GRADE ELEVATIONS INDICATE EDGE OF PAVEMENT/TOP OF PAVEMENT UNLESS OTHERWISE
NOTED.
15. REFER TO DETAILS FOR PAVEMENT TYPICAL SECTION.
16. SITE SHALL BE GRADED UNIFORMLY FOR POSITIVE DRAINAGE AS SHOWN FROM THE PROPOSED
ELEVATIONS, CONTOURS, AND THE DRAINAGE SLOPE ARROWS.
17. MAXIMUM SIDEWALK CROSS SLOPE IS 2%. MAXIMUM LONGITUDINAL SLOPE ALONG AN ACCESSIBLE SIDEWALK IS 5%. MAXIMUM PAVEMENT SLOPE IN HANDICAP PARKING AREA AND ACCESS AISLE IS 2% IN
ANY DIRECTION. MAXIMUM HANDICAP RAMP SLOPE IS 12H:1V.
18. CONTRACTOR IS REQUIRED TO NOTIFY ENGINEER IN WRITING OF ANY DISCREPANCIES OR CONFLICTS
ENCOUNTERED DURING CONSTRUCTION ACTIVITIES.
Know what's below.
www.Georgia811.com
R
Call before you dig.
HATCH LEGEND:
EXISTING CONCRETE
PROPOSED CONCRETE
EXISTING RIP-RAP
EXISTING ASPHALT
EXISTING BUILDING
PROPOSED HEAVY DUTY CONCRETE
PROFESSIONAL
ENGINEER
REGISTERED
*G
EO
RGIA
JOEL DAV ID WOMACK
No. PE39141
11/22/23
SPNR-05-23-000759
PROPOSED CCG R/W CONCRETE
2 ½"W
2 ½"W
2 ½"W
W
W W
W
W
W
W
W
2 12" MAINLINE
2 12"
2 12"
2"
2 12"
2"
1"
1"
2"
1"
1"
1"
1"
1"
BOOSTER PUMP
(IF REQUIRED, SEE IRRIGATION NOTE 6)
1 12" 1 12"
1 12"
1 12"
1 12"
2"
2 12"
2 12"
2 12"
2 12"
2 12"
GOAL POST
C 5
QUICK COUPLING VALVE, TYP.
O
O
O O
O O
O
O
O
O
O
O O
O
O
O
O
LIMITS OF DISTURBANCE
GOAL POST
OUTER FIELD BOX- FOR INFORMATION ONLY
RELOCATED IRRIGATION
CONTROL VALVE
2 12" WATERLINE EXTENSION
TOTAL FIELD AREA
IRRIGATION CONTROL
BOX AT SCORE BOARD
LOCATION OF FORMER CONTROL VALVE
O
O
O
O O
O
O
O
O
O
O
O
INSTALL DOUBLE GATE
INSTALL ±595 LF 4' FENCE
(SEE DETAILS)
INSTALL NEW SCOREBOARD
W
2 12"
2 12"
1 12"
W
2 12"
2 12"
INSTALL SINGLE GATE
SHEET
OF
Pr ep ar ed fo r:
SURVEY DATE:
SE
R
VI
C
ES
, I
N C
E
M C
E N
G
IN
EE
R
PROJECT NO.:
SURVEYED BY:
CHECKED BY:
DESIGNED BY:
DRAWN BY:
GRAPHIC SCALE: 1" =
0'
M ac on R d.
, S ui te
C ol um bu s, G
A
Ph
6)
-5
Fa x:
(7
) 5
-5 co lu m bu s@ em c-en g.
co m w w w
.e m c-en g.
co m
EN
VI
R
O N
M
EN
TA
L
C
IV
IL
M
AR
IN
E
AL
BA
N Y
• A
TL
AN
TA
AU
G U
ST
A
• B R
U N
SW
IC
K
• C
O
LU
M
BU
S G
R
EE
N
VI
LL
E
• S
AV
AN
N
AH
ST
AT
ES
BO
R O
TH
O M
AS
TO
N
VA
LD
O
ST
A
D
AT
E N
O
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N
IR
R
IG
AT
IO
N P
LA
N
B
LA
C
KM
O N
R O
AD
C O
LU
M
BU
S, M U
SC
O
G
EE
C O
U N
TY
, G
EO
R
G
IA
BL
AC
KM
ON
R
OA
D M
S
FI
EL
D
RE
NO
VA
TI
ON
S
M U
SC
O
G
EE
C O
U N
TY
S
C H
O O
L D
IS
TR
IC
T
22-7090
CDS
CDS
EMC
1/19/23
JDW
1" = 40' 11/22/23
C07
40' 40'
40'
20'
AD
D
EN
D U
M
/2
2/
Know what's below.
www.Georgia811.com
R
Call before you dig.
SPRINKLER HEAD
(SPRAY PATTERN)
ZONE LINE
(SIZE VARIES)
MAINLINE
(SIZE VARIES)
IRRIGATION KEY:
CONTROLLER (LOCATION TBD BY OWNER)C
ROTOR POP-UP SPRINKLER
SCALE: N.T.S.
ZONE # GPM (60 PSI) SPRINKLER TYPE VALVE SIZE
60.0
60.0
48.0
NOZZLE
ZONE SCHEDULE
RB-8005 2" 12
RB-8005
RB-8005
4 60.0 RB-8005
5 60.0 RB-8005 12
2" 2"
2"
2"
IRRIGATION NOTES:
1. IRRIGATION SYSTEM LAYOUT IS DIAGRAMMATIC AND SHALL BE INSTALLED PER RAINBIRD'S ESP-LXD 2-WIRE DECODER SYSTEM DESIGN GUIDE. EXACT LOCATIONS OF PIPING, SPRINKLER HEADS, VALVES
AND OTHER COMPONENTS SHALL BE ESTABLISHED BY CONTRACTOR IN THE FIELD AT TIME OF
INSTALLATION.AND IN COORDINATION WITH THE LANDSCAPE PLAN.
2. CONTRACTOR SHALL SUPPLY ALL NECESSARY MATERIALS, EQUIPMENT, AND METHODS OF INSTALLATION
TO SATISFACTORILY COMPLETE AN IRRIGATION SYSTEM FOR THE SITE AS SHOWN AND SHALL
COMPLY WITH ALL APPLICABLE CODES AND STANDARDS.
3. A BACKFLOW PREVENTER AS REQUIRED BY CITY / COUNTY SHALL BE INSTALLED.
4. THE IRRIGATION CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY UTILITY LINES
DAMAGED DURING INSTALLATION.
5. SYSTEM DESIGNED TO RUN @ 60 PSI HEAD PRESSURE.
6. CONTRACTOR SHALL CHECK FOR ADEQUATE WATER LINE SIZE (2 12") AND WATER PRESSURE AT POINT OF
CONNECTION (80 PSI) AND IF INSUFFICIENT CONTACT A RAIN BIRD REPRESENTATIVE FOR
APPROPRIATE BOOSTER PUMP REQUIRED.
-- RECOMMENDED FLOW TEST TO BE CONDUCTED BY CONTRACTOR.
7. SPRINKLERS SHALL BE RAINBIRD 8005-PRS SERIES WITH #12 NOZZLES AND SOD CUPS.
8. VALVES SHALL BE RAINBIRD PGA SERIES ANGLE ELECTRIC. (INSTALLED WITH FD-101 DECODERS IN
VB-STD VALVE BOXES)
9. WIRE SHALL BE LOCKING MAXICABLE TWO-WIRE W/ 2" CONDUIT.
10 IRRIGATION SYSTEM CONTROLLER SHALL BE RAINBIRD ESP-LXD 50 STATION 2-WIRE DECODER
CONTROLLER.
11. PLASTIC PIPE SHALL BE MINIMUM SCHEDULE 40 PVC, ASTM D2241, ALL FITTINGS AND SLEEVES SHALL BE
SCHEDULE 40 PVC ASTM D2241. FLEXIBLE POLYETHENE PIPE RATED AT 100 PSI MINIMUM.
12. A RAIN SENSOR SHALL BE INSTALLED INTO THE SYSTEM.
13. MAINLINE BURIAL SHALL BE 18"", LATERAL BURIAL 18".
14. WHENEVER POSSIBLE, MAINLINE AND LATERAL WILL BE BURED IN THE SAME TRENCH.
15. 4" PVC SLEEVES AS NEEDED BY GENERAL CONTRACTOR, 24" BURIAL.
16. CONTRACTOR SHALL INSTALL A DRAIN VALVE AT THE LOW POINT IN THE SYSTEM.
17. IRRIGATION CONTRACTOR SHALL SUBMIT AS-BUILT AND OPERATIONAL PROCEDURES TO GENERAL
CONTRACTOR.
18. WATERING SCHEDULE:
ALL ZONES: EVERY OTHER DAY FOR 30 MINUTES
(TO BE ADJUSTED AS REQUIRED)
19. GUARANTEE: THE IRRIGATION CONTRACTOR SHALL GUARANTEE ALL WORKMANSHIP, MATERIALS, FIXTURES, AND IRRIGATION EQUIPMENT TO BE FREE OF DEFECTS FOR A PERIOD OF ONE (1) YEAR FROM DATE OF FINAL ACCEPTANCE OF THE PROJECT. CONTRACTOR SHALL REPLACE ANY PART OR PARTS FOUND TO BE DEFECTIVE WITHIN THE PERIOD OF GUARANTEE AT NO COST TO THE OWNER
EXCEPT REPAIRS OR REPLACEMENT NECESSITATED BY OTHERS.
20.QUICK COUPLING VALVES SHALL BE RAINBIRD 33DLRC (2 PIECE W/ LOCKING COVER) OR APPROVED
EQUAL.
QUICK COUPLING VALVE
C
ESP-LXD_TWO-WIRE_DECODER_CONTROLLER
IN_PLASTIC_CABINETNTS
PROFESSIONAL
ENGINEER
REGISTERED
*G
EO
RGIA
JOEL DAV ID WOMACK
No. PE39141
11/22/23
Pr ep ar ed fo r:
SURVEY DATE:
SE
R
VI
C
ES
, I
N C
E
M C
E N
G
IN
EE
R
PROJECT NO.:
SURVEYED BY:
CHECKED BY:
DESIGNED BY:
DRAWN BY:
M ac on R d.
, S ui te
C ol um bu s, G
A
Ph
6)
-5
Fa x:
(7
) 5
-5 co lu m bu s@ em c-en g.
co m w w w
.e m c-en g.
co m
EN
VI
R
O N
M
EN
TA
L
C
IV
IL
M
AR
IN
E
AL
BA
N Y
• A
TL
AN
TA
AU
G U
ST
A
• B R
U N
SW
IC
K
• C
O
LU
M
BU
S
SA
VA
N
N
AH
ST
AT
ES
BO
R
O
TH
O
M
AS
TO
N
VA
LD
O
ST
A
• W
AR
N
ER
R O
BI
N
S
D
AT
E N
O
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N C
O N
ST
R
U C
TI
O
N D
ET
AI
LS
B
LA
C
KM
O N
R O
AD
C O
LU
M
BU
S, M U
SC
O
G
EE
C O
U N
TY
, G
EO
R
G
IA
BL
AC
KM
O
N R
O
AD
M S
FI
EL
D R
EN
O
VA
TI
O N
S
M U
SC
O
G
EE
C O
U N
TY
S
C H
O O
L D
IS
TR
IC
T
22-7090
CDS
CDS
EMC
1/19/23
JDW
NO SCALE
11/22/23
C08
AD
D
EN
D U
M
/2
2/
PROFESSIONAL
ENGINEER
REGISTERED
*G
EO
RGIA
JOEL DAV ID WOMACK
No. PE39141
11/22/23
SPNR-05-23-000759
NOTE:
1. EXACT EXP. JOINT AND SAW CUT SPACING SHALL BE PROVIDED BY
CONTRACTOR ON A LAYOUT PLAN AND APPROVED BY THE ENGINEER
REBAR REINFORCMENT
SEE TABLE4,000 PSI - SEE TABLE FOR LOAD
SCARIFY SUBGRADE TO DEPTH OF 6";
SEE TABLE FOR COMPACTION
VARIES
(SEE TABLE)
1/2"
COMPACTED EARTH FILL
CONC. WALK
1/2" RADIUS EACH SIDE (TYP.)
1/2"
CONTROL JOINT
1/2"
1/2" RADIUS EACH SIDE (TYP.)
CONC. WALK
COMPACTED EARTH FILL
EXPANSION JOINT
PRE-MOLDED
EXPANSION
JOINT FILLER
CONSTRUCTION
JOINT WHERE
REQ'D.
LOAD THICKNESS (IN) BASE COURSE SUBGRADE
COMPACTION
STANDARD DUTY 6" - 4,000 PSI 4" GRANULAR BASE KYTC
DGA 98% STD. PROCTOR
HEAVY DUTY 7" - 4,000 PSI 5" GRANULAR BASE KYTC
DGA 98% MOD. PROCTOR
CONCRETE PAVEMENT SECTION DETAIL NOT TO SCALE
7' -0
HANDICAP SIGN DETAIL NOT TO SCALE
PAVEMENT
EMBEDDED IN
#4 BARS, 12" LONG (2)
EACH END
BARS 12" FROM
2 HOLES FOR #4
LONG
2 - #3 BARS, 6`-6"
45°
STRIPE
PAINTED
4" WHITE
STALL
PARKING
CENTERLINE
2' A
A 6'
5"
2"
1"
PLAN
SECTION A-A
WHEEL STOP DETAIL NOT TO SCALE
CURB TRANSITION DETAIL NOT TO SCALE
2'
TRANSITION
STANDARD CURB
& GUTTER
ROLLED CURB
& GUTTER
ISOMETRIC VIEW
PLAN VIEW
GUTTER LINE
GUTTER LINE
STANDARD CURB
& GUTTER
ROLLED CURB
& GUTTER
6"
3"
24" ROLLED CURB DETAIL NOT TO SCALE
3"
2'-0"
6"
1'-0"1'-0"
MATCH SLOPE
OF PAVEMENT
STREET PAVEMENT
5' -0
M
IN
IM
U M
BASE COURSE
(SEE TABLE FOR DEPTHS)
NOTES:
1. ALL CONSTRUCTION SHALL CONFORM TO THE COLUMBUS CONSOLIDATED GOVERNMENT
SPECIFICATIONS.
2. ADA COMPLIANT HANDICAP RAMPS SHALL BE INSTALLED AT EACH INTERSECTION OR
DESIGNATED CROSSWALK LOCATION AND MUST MEET OR EXCEED THE MOST CURRENT ADA
STANDARDS AND THE COLUMBUS CONSOLIDATED GOVERNMENT SPECIFICATIONS AT THE
TIME OF CONSTRUCTION.
3. CONTRACTOR TO INSTALL 1/2" WIDE AND 1/4" DEEP TOOLED JOINT EVERY 5 FEET OR AS
SHOWN ON THE PLAN. CONTRACTOR IS TO INSTALL 1/2" PRE-MOLDED EXPANSION JOINT
MATERIAL THAT IS TRIM FLUSH WITH CONCRETE TOP EVERY 30' FEET, BETWEEN CONCRETE
POURS OR AS SHOWN ON THE PLANS.
4. ALL SIDEWALKS SHALL MEET ADA STANDARDS.
FORMER OR SAWED CONTRACTION
JOINT, 3/4" DEEP. SPACED AT
5' INTERVALS.
PLAN VIEW
5'
0"5'-0"
(TYPICAL)
SLOPE
2% MAX.
CROSS
INSTALL 1/2" EXPANSION
JOINT EVERY 30 FT. FORMED
OR SAWCUT 1" DEEP
MEDIUM BROOM FINISH
12" COMPACTED SOIL SUB GRADE
98% MODIFIED PROCTOR
5" - 3,000 PSI CONCRETE
SECTION VIEW
FIBERMESH REINFORCEMENT
SIDEWALK WITHIN RIGHT-OF-WAY DETAILS NOT TO SCALE
NOTES:
1. ALL CONSTRUCTION SHALL CONFORM TO THE GDOT SPECIFICATIONS.
2. ADA COMPLIANT HANDICAP RAMPS SHALL BE INSTALLED AT EACH INTERSECTION OR DESIGNATED
CROSSWALK LOCATION AND MUST MEET OR EXCEED THE MOST CURRENT ADA STANDARDS AND THE
GDOT SPECIFICATIONS AT THE TIME OF CONSTRUCTION.
3. CONTRACTOR TO INSTALL 1/2" WIDE AND 1/4" DEEP TOOLED JOINT EVERY 5 FEET OR AS SHOWN ON THE PLAN. CONTRACTOR IS TO INSTALL 1/2" PRE-MOLDED EXPANSION JOINT MATERIAL THAT IS TRIM FLUSH WITH CONCRETE TOP EVERY 30' FEET, BETWEEN CONCRETE POURS OR AS SHOWN ON
THE PLANS.
4. ALL SIDEWALKS SHALL MEET ADA STANDARDS.
5. SIDEWALKS WITHIN R/W MUST BE A MINIMUM OF 5' WIDE, 5" THICK AND REINFORCED WITH
FIBERMESH.
FORMER OR SAWED CONTRACTION
JOINT, 3/4" DEEP. SPACED AT 5'
INTERVALS.
PLAN VIEW
(TYPICAL)
5'-0"
MEDIUM BROOM FINISH
AS
P
ER
P
LA
N
S 5'
M
IN
. 2% MAX.
CROSS
SLOPE
INSTALL 1/2" EXPANSION
JOINT EVERY 30 FT. FORMED
OR SAWCUT 1" DEEP
SECTION VIEW
12" COMPACTED SOIL SUB GRADE
98% STANDARD PROCTOR
4" - 3,000 PSI CONCRETE
TYPE 5
TYPE 4
CLASS "B"
CLASS "A"
O.D. + 2'-0"
MAX.
0.5xO.D. MIN.
1.25xO.D.
O.D.+8"MIN.
8"MIN.<21"Ø
12"MIN.>24"Ø
0.25xO.D.
4"MIN.
4"MIN.
0.25xO.D.
PIPE BEDDED IN SAND,
GRAVEL OR CRUSHED
STONE TO A DEPTH OF
1/4 PIPE DIAMETER OR
4" MINIMUM. PLACE
1500 psi (MIN.)
CONCRETE TO 1/4 OF
PIPE DIAMETER ABOVE
PIPE INVERT TO 6"
ABOVE TOP OF PIPE.
PIPE BEDDED TO ITS
CENTERLINE IN
COMPACTED
GRANULAR MATERIAL,
4" MINIMUM UNDER
PIPE. COMPACTED
GRANULAR OR SELECT
MATERIAL++ TO 1'-0"
ABOVE TOP OF PIPE.
(APPROXIMATELY 90%
STANDARD PROCTOR,
AASHTO T-99.)
PIPE BEDDED IN SAND,
GRAVEL OR CRUSHED
STONE TO DEPTH OF
1/8 PIPE DIAMETER 4"
MINIMUM. BACKFILL
COMPACTED TO TOP
OF PIPE.
(APPROXIMATELY 80%
STANDARD PROCTOR,
AASHTO T-99.)
NOTE:
++ "LOOSE SOIL" OR "SELECT MATERIAL" IS DEFINED AS NATIVE SOIL EXCAVATED FROM THE
TRENCH, FREE OF ROCKS, FOREIGN MATERIAL AND FROZEN EARTH.
4" X 6 MIL, DRY TRAFFIC PAINT: PPG INDUSTRIES "TRAFFIC AND ZONE MARKING PAINT 11 LINE", GLIDDEN, "TRAFFIC ZONE PAINT", BENJAMIN MOORE, "IRON CLAD SAFETY ZONE PAINT" OR EQUAL.
COLOR: HANDICAP - BLUE STANDARD - WHITE
F.
O
.C
9' 9' 9' 9'
PARKING SIGN (TYPICAL) 2'
HANDICAP
PARKING
SPACE
HANDICAP
PARKING
SPACE
STRIPING 45° ANGLE
2' SPACING PARALLEL
VAN ACCESSIBLE HANDICAP
PIPE BEDDED TO TOP
OF PIPE IN
COMPACTED
GRANULAR MATERIAL,
4" MINIMUM UNDER
PIPE.
CONCRETE SIDEWALK DETAIL NOT TO SCALE
HANDICAP STRIPING DETAIL NOT TO SCALE
STANDARD PIPE LAYING CONDITIONS NOT TO SCALE
1'-0"
MIN.
S S
EDGE OF ASPHALT
NOTES:
1. SEE ROLLED CURB & GUTTER DETAIL FOR CONCRETE SECTION AND ADDITIONAL INFORMATION.
0.12' 0.12'
2.0'
ROLLED CURB &
GUTTER (TYP)
45° V-NOTCH WEIR CURB CUT DETAIL NOT TO SCALE
PLAN VIEW
PROFILE VIEW
ROLLED CURB &
GUTTER (TYP)
ROLLED CURB &
GUTTER (TYP)
45°
EL: 492.479
EL: 492.763EL: 492.763
EDGE OF GRASS
Pr ep ar ed fo r:
SURVEY DATE:
SE
R
VI
C
ES
, I
N C
E
M C
E N
G
IN
EE
R
PROJECT NO.:
SURVEYED BY:
CHECKED BY:
DESIGNED BY:
DRAWN BY:
M ac on R d.
, S ui te
C ol um bu s, G
A
Ph
6)
-5
Fa x:
(7
) 5
-5 co lu m bu s@ em c-en g.
co m w w w
.e m c-en g.
co m
EN
VI
R
O N
M
EN
TA
L
C
IV
IL
M
AR
IN
E
AL
BA
N Y
• A
TL
AN
TA
AU
G U
ST
A
• B R
U N
SW
IC
K
• C
O
LU
M
BU
S
SA
VA
N
N
AH
ST
AT
ES
BO
R
O
TH
O
M
AS
TO
N
VA
LD
O
ST
A
• W
AR
N
ER
R O
BI
N
S
D
AT
E N
O
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N C
O N
ST
R
U C
TI
O
N D
ET
AI
LS
B
LA
C
KM
O N
R O
AD
C O
LU
M
BU
S, M U
SC
O
G
EE
C O
U N
TY
, G
EO
R
G
IA
BL
AC
KM
O
N R
O
AD
M S
FI
EL
D R
EN
O
VA
TI
O N
S
M U
SC
O
G
EE
C O
U N
TY
S
C H
O O
L D
IS
TR
IC
T
22-7090
CDS
CDS
EMC
1/19/23
JDW
NO SCALE
11/22/23
C09
AD
D
EN
D U
M
/2
2/
PROFESSIONAL
ENGINEER
REGISTERED
*G
EO
RGIA
JOEL DAV ID WOMACK
No. PE39141
11/22/23
4" MIN.
2'-0" SQ. CONC.
TYP. ALL VALVE BOXES
8" PVC
SDR 35
TAPPING VALVE
BRICK
PVC
SPECIFIED REQUIREMENTS
2'-0"
(SEE NOTE 5)
TAPPING SLEEVE
EXIST.
WATER
LINE
NOTES:
MIN. 1'-6"
CONC. BLOCKING
(SEE DETAIL 36)
MIN.
THROUGHTLY TAMP DITCH TO
TEST TAP
SEE NOTE 4
& PLUG
1. TEMPORARILY SUPPORT TAPPING SADDLE AND VALVE, THEN APPLY STANDARD
HYDROSTATIC TEST.
2. IF NO LEAKS, POUR INDICATED PERMANENT CONCRETE BLOCK AND SUPPORT PAD
3. MAKE TAP, LINE EXTENSION AND BACKFILL.
4. COVER GLAND AND BOLTS WITH HEAVY POLYETHELENE SHEETING TO KEEP CONCRETE
FROM BONDING. TYPICAL WHENEVER BOLTS OR GLAND MAY BE "WRAPPED-UP" IN CONCRETE.
5. COAT TAPPING SLEEVE AND BOLTS WITH AN APPROVED BITUMASTIC COATING BEFORE
POURING CONCRETE. TYPICAL FOR ALL STEEL INCLUDING RODS, COUPLINGS, STRAPS AND
OTHER BURIED STEEL, AFTER INSTALLATION, THE ASSEMBLY SHALL BE THOROUGHLY
COVERED WITH ROYSTON LABS, INC ROSKOTE MASTIC NO A939, OR KOPPERS CO. INC
BITUMASTIC SUPERSERVICE BLACK.
HOLLOW CONCRETE BLOCK AND/OR BRICK
FOR TEMPORARY SUPPORT. SET WITH
HOLLOW CORE HORIZONTAL WRAP-UP BLOCKS
IN CONCRETE POUR. MAKE SURE CONCRETE
FILLS HOLLOW PORTION OF BLOCKS.
SPNR-05-23-000759
CHAINLINK FENCE DETAIL
TAPPING SLEEVE AND VALVE INSTALLATION
3"
3"
6"
1" RADIUS
3"
3" 8" 8"
X X X X X4"
6"x6" - W1.4 x W1.4 WELDED WIRE
FABRIC OR FIBER MESH EQUIVALENT
4" - 3,000 PSI CONCRETE
12" COMPACTED SOIL
SUBGRADE, 98%
MODIFIED PROCTOR
SCORE TABLE SLAB DETAIL NOT TO SCALE
NOT TO SCALE
CORNER, END & PULL POST
REQUIRED AT ALL
TRUSS BRACING
10'-0" C TO C MAX.
SPECIFICATIONS:
* FINISH SHALL MATCH EXISTING FENCE
* 2" MESH
* 9 GAUGE
* 6' & 4' HIGH
36"
10" 8''
24''
1 5/8" OD SCH 40 2.27 LBS / FT
TOP RAIL
LINE POST 2" OD SCH 40
2.72 LBS / FT
1/2 FABRIC
HEIGHT
1 5/8" OD SCH 40 2.27 LBS / FT
BOTTOM RAIL
#7 GAUGE
TENSION WIRE
1" MAX
BOTTOM OF
FENCE LINE
STRETCHER
BAR BANDS
(MAX.
SPACING 12")
3" OD CORNER,
END OR PULL
POST SCH 40
5.79 LBS / FT
STRETCHER
BAR
TOP OF FABRIC
CONCRETE
FOOTING
NOT TO SCALE
UTILITY LOCATION DISCLAIMER
THE UTILITIES ARE SHOWN AS PER THE LOCATION OF POLES, MANHOLES, VALVES,
PEDESTALS, ETC., EXISTING DRAWINGS AND INFORMATION PROVIDED BY UTILITY
PERSONNEL. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES SHOWN
COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED.
THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UTILITIES SHOWN ARE
THE EXACT LOCATION INDICATED, ALTHOUGH HE DOES CERTIFY THAT THEY ARE
LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION AVAILABLE.
VICINITY MAP
NOT TO SCALE
EMC ENGINEERING SERVICES, INC.
ENVIRONMENTAL- MARINE - CIVIL - SURVEY
PROJECT LOCATION: REVISION DESCRIPTION
ENVIRONMENTAL
CIVIL
MARINE
Prepared for
EROSION, SEDIMENT, AND POLLUTION CONTROL PLANS
FOR
EMC ENGINEERING SERVICES, INC.
3575 MACON ROAD, SUITE 15
COLUMBUS, GEORGIA 31907
PHONE: (706) 565-5985
FAX: (706) 565-5983
columbus@emc-eng.com www.emc-eng.com
DATE
ALBANY • ATLANTA • AUGUSTA • BRUNSWICK • COLUMBUS • SAVANNAH
STATESBORO • THOMASTON • VALDOSTA • WARNER ROBINS
MUSCOGEE COUNTY SCHOOL DISTRICT
COLUMBUS, MUSCOGEE COUNTY, GEORGIA
COLUMBUS, MUSCOGEE COUNTY, GEORGIA
7251 BLACKMON ROAD #4460
NOVEMBER 2023
EMC PROJECT# 22-7090
BLACKMON ROAD MS FIELD RENOVATIONS
1 ADDENDUM 2 11/22/23
Know what's below.
www.Georgia811.com
R
Call before you dig.
PROJECT INFORMATION & DATA
1. THE PROJECT IS LOCATED IN MUSCOGEE COUNTY, GA. THE PROJECT SITE IS LOCATED AT 7251 BLACKMOMN
ROAD #4460.
TOTAL SITE AREA: 24.0 AC
TOTAL DISTURBED AREA: 0.94 AC
VOLUME EARTHWORK: 21 Cu. Yd. FILL TOTAL CUT VOLUME: 201 Cu. Yd.
TOTAL FILL VOLUME: 222 Cu Yd.
EARTHWORK QUANTITIES SHOWN ARE FOR PURPOSES OF PERMITTING ONLY AND SHOULD NOT BE USED
FOR CONSTRUCTION. THE CONTRACTORS IS RESPONSIBLE FOR DETERMINING EXACT EARTHWORK
QUANTITIES
PRIMARY PERMITEE: MUSCOGEE COUNTY SCHOOL DISTRICT
2. EXISTING CONDITIONS: EXISTING DIRT LOT WITH FOOTBALL FIELD.
3. PREDOMINANT SOIL TYPE: DOTHAN LOAMY SAND, 2 TO 5 PERCENT SLOPES AND VANCE SANDY CLAY LOAM, 6
TO 10 PERCENT SLOPES.
4. STORMWATER MANAGEMENT CONSIDERATIONS: EXISTING CONDITIONS SHEET FLOW ACROSS THE SITE.
5. EXISTING CONTOURS OBTAINED BY: EMC ENGINEERING SERVICES, INC ON JANUARY 19, 2023 THERE MAY BE EASEMENTS, SETBACK LINES, OR OTHER MATTERS AFFECTING THIS PROPERTY THAT ARE NOT SHOWN ON
THIS DRAWING.
6. DISPOSAL OF DEBRIS: ALL DEBRIS WILL BE HAULED OFFSITE TO A STATE APPROVED LANDFILL.
7. INSTALLATION STATEMENT: THE INSTALLATION OF EROSION CONTROL MEASURES AND PRACTICES SHALL
OCCUR PRIOR TO OR CONCURRENT WITH LAND DISTURBING ACTIVITIES.
8. ACCORDING TO FEMA FLOOD INSURANCE RATE MAP COMMUNITY PANEL NO. 1351580026F, DATED SEPTEMBER 5, 2007, SHOW THIS PROPERTY IS LOCATED IN ZONE X, WHICH IS NOT A DESIGNATED FLOOD
HAZARD AREA.
9. MS4 FACILITY NAME: COLUMBUS CONSOLIDATED GOVERNMENT.
IDENTIFY THE PROJECT RECEIVING WATERS AND DESCRIBE ALL ADJACENT AREAS INCLUDING STREAMS, LAKES, RESIDENTIAL AREAS, WETLANDS, ETC. WHICH MAY BE AFFECTED: THE RUN-OFF FROM THE SITE WILL SHEET
FLOW INTO COOPER CREEK.
SEDIMENT BASIN: N/A
SEE SHEET # N/A
EMD APPROVAL REVIEW: REVIEWER CERTIFICATION #
* ALL STATE WATERS MUST BE IDENTIFIED WITH A SIGN.
CHECKLIST #3:
LIMITS OF DISTURBANCE SHALL BE NO GREATER THAN 50 ACRES FOR EACH INDIVIDUAL PERMITTEE (I.E. PRIMARY, SECONDARY OR TERTIARY) AT ANY ONE TIME AND NO MORE THAN 50 CONTIGUOUS ACRES AT ONE TIME WITHOUT PRIOR WRITTEN AUTHORIZATION FROM THE EPD DISTRICT OFFICE. IF EPD APPROVES THE REQUEST TO DISTURB 50 ACRES OR MORE AT ANY ONE TIME, THE PLAN MUST INCLUDE AT LEAST 4 OF THE BMPS LISTED IN APPENDIX 1 OF THIS CHECKLIST. A COPY OF THE WRITTEN APPROVAL BY EPD MUST BE ATTACHED TO THE PLAN FOR THE PLAN
TO BE REVIEWED.
CHECKLIST #7:
GPS LOCATION CONSTRUCTION EXIT:+32.547608, -84.895664
CHECKLIST #17:
AMENDMENTS/REVISIONS TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT ON BMP'S WITH A HYDRAULIC
COMPONENT MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL.
OWNER/FACILITY CONTACT:
OWNER/OPERATOR/PRIMARY PERMITTEE:
MUSCOGEE COUNTY SCHOOL DISTRICT
P.O. BOX 2427
COLUMBUS, GA 31902-2427
PHONE: (706) 748-2338
EMAIL: ODOM.JAMES.H@MUSCOGEE.K12.GA.US
THE POINT OF CONTACT FOR CIVIL SITE WORK FOR
THIS PROJECT IS:
EMC ENGINEERING SERVICES, INC.
CONTACT: JOEL D. WOMACK, PE
3575 MACON ROAD; SUITE 15
COLUMBUS, GA 31907
(706) 478-9035
EMAIL: JOEL_WOMACK@EMC-ENG.COM
TWENTY-FOUR HOUR CONTACT RESPONSIBLE
FOR EROSION AND SEDIMENT CONTROL:
JEFF BATTLES
(706) 573-4209
PROFESSIONAL
ENGINEER
REGISTERED
*G
EO
RGIA
JOEL DAV ID WOMACK
No. PE39141
11/22/23
SITE
DESIGN PROFESSIONAL'S CERTIFICATIONS:
“I CERTIFY THAT THE PERMITTEE'S EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN PROVIDES FOR AN APPROPRIATE AND COMPREHENSIVE SYSTEM OF BEST MANAGEMENT PRACTICES REQUIRED BY THE GEORGIA WATER QUALITY CONTROL ACT AND THE DOCUMENT "MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA" (MANUAL) PUBLISHED BY THE GEORGIA SOIL AND WATER CONSERVATION COMMISSION AS OF JANUARY 1 OF THE YEAR IN WHICH THE LAND-DISTURBING ACTIVITY WAS PERMITTED, PROVIDES FOR THE SAMPLING OF THE RECEIVING WATER(S) OR THE SAMPLING OF THE STORM WATER OUTFALLS AND THAT THE DESIGNED SYSTEM OF BEST MANAGEMENT PRACTICES AND SAMPLING METHODS IS EXPECTED TO MEET THE REQUIREMENTS CONTAINED IN THE GENERAL NPDES PERMIT NO. GAR 100001."”
"I CERTIFY UNDER PENALTY OF LAW THAT THIS PLAN WAS PREPARED AFTER A SITE VISIT TO THE LOCATIONS DESCRIBED HEREIN BY MYSELF OR MY AUTHORIZED AGENT, UNDER MY SUPERVISION."
Joel D. Womack LEVEL II CERTIFICATION #: 0000061976
SPNR-05-23-000759
SHEET INDEX
Sheet
Number Sheet Title
EC01 ESPC COVER
EC02 EROSION CONTROL PLAN - INITIAL PHASE
EC03 EROSION CONTROL PLAN - INTERMEDIATE PHASE
EC04 EROSION CONTROL PLAN - FINAL PHASE
EC05 HYDROLOGY PLAN
EC06 ESPC NOTES
EC07 ESPC DETAILS
UTILIZE ON ALL
DISTURBED AREAS
Du Ds1
Co
Sd1-NS
±487 LF
Sd1-NS
±530 LF
±22 LF
Sd1-NS
±220 LF
Sd1-NSX
XX
XX
X X
XX
XX
X X
XX
XX
XX
X X
XX
XX
XX
XX
XX
X X XX
XX XX X X XX XX X X
XX
XX
XX XX XX X X
XX
X X
XX
XX XX XX XX XX XX
XX
XX
XX
XX
XX
X X X
X XX XX XX XX XX XX XX XX
XX
XX
XX
XX
XX
X X
XX
XX
XX
XX
X X XX XX XX XX
X X XX XX XX X X
XX
XX
XX
X
X
XX
XX
X
X
XX
XX
XX
XX
XX
X
X X
X X
X
XX
XX
XX
XX
XX
XXXX
XX
XX
XX
XX
XX
XX
XX
XX
XX
X
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
Du
Ds1
Du
Ds1
Du Ds1
OOOO
O
OO O O
O
Tf
FIELD ADJUST
AS NECESSARY
SHEET
OF
Pr ep ar ed fo r:
SURVEY DATE:
SE
R
VI
C
ES
, I
N C
E
M C
E N
G
IN
EE
R
PROJECT NO.:
SURVEYED BY:
CHECKED BY:
DESIGNED BY:
DRAWN BY:
GRAPHIC SCALE: 1" =
0'
M ac on R d.
, S ui te
C ol um bu s, G
A
Ph
6)
-5
Fa x:
(7
) 5
-5 co lu m bu s@ em c-en g.
co m w w w
.e m c-en g.
co m
EN
VI
R
O N
M
EN
TA
L
C
IV
IL
M
AR
IN
E
AL
BA
N Y
• A
TL
AN
TA
AU
G U
ST
A
• B R
U N
SW
IC
K
• C
O
LU
M
BU
S G
R
EE
N
VI
LL
E
• S
AV
AN
N
AH
ST
AT
ES
BO
R O
TH
O M
AS
TO
N
VA
LD
O
ST
A
D
AT
E N
O
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N
ER
O
SI
O N
C O
N
TR
O L
PL
AN
IN
IT
IA
L
PH
AS
E
B
LA
C
KM
O N
R O
AD
C O
LU
M
BU
S, M U
SC
O
G
EE
C O
U N
TY
, G
EO
R
G
IA
BL
AC
KM
ON
R
OA
D M
S
FI
EL
D
RE
NO
VA
TI
ON
S
M U
SC
O
G
EE
C O
U N
TY
S
C H
O O
L D
IS
TR
IC
T
22-7090
CDS
CDS
EMC
1/19/23
JDW
1" = 40' 11/22/23
EC02
40' 40'
40'
20'
AD
D
EN
D U
M
/2
2/
HATCH LEGEND:
EXISTING CONCRETE
EXISTING CHAINLINK FENCE
TREE REMOVAL
EXISTING RIP-RAP
EXISTING ASPHALT
EXISTING BUILDING
DEMOLITION
Know what's below.
www.Georgia811.com
R
Call before you dig.
INITIAL PHASE NARRATIVE:
1. CONTRACTOR SHALL INSTALL CONSTRUCTION SITE ENTRANCE / EXIT (Co).
2. CONTRACTOR SHALL INSTALL ALL INITIAL SEDIMENT STORAGE REQUIREMENTS AND PERIMETER CONTROL BMP'S (Sd1-NS).
3. CONTRACTOR SHALL UTILIZE DUST CONTROL AND OTHER EROSION & SEDIMENT CONTROL
MEASURES AS NEEDED.
4. NO GRADING OPERATIONS ARE TO COMMENCE UNTIL ALL PERIMETER AND SEDIMENT STORAGE
BMPS HAVE BEEN PROPERLY INSTALLED AND INSPECTED.
5. CONTRACTOR SHALL ENSURE THAT SEDIMENT LADEN RUNOFF DOES NOT UNDERMINE SEDIMENT BARRIERS. THE CONTRACTOR IS REQUIRED TO CHECK SEDIMENT BARRIERS DURING STORM EVENTS
AND MAKE REPAIRS AS NEEDED.
4. [CHECKLIST #6 & 47] THE DISTURBED AREA FOR THE INITIAL PHASE IS ±0.2 ACRES.
***THIS SHEET FOR EROSION CONTROL MEASURES ONLY***
12'
6"
GRADE
" S = 3:1 MAX
GSWCC GEORGIA SOIL AND WATER
CONSERVATION
COMMISSION
Joel D Womack Level II Certified Design Professional
CERTIFICATION NUMBER 0000061976
ISSUED 04/18/2023 EXPIRES 04/18/2026