This is a comprehensive project manual and bidding document for a construction project issued by Escanaba Area Public Schools in Escanaba, Michigan, involving the construction of a Junior/Senior High School Athletic Restroom Building. The project, designated as Project No. 22-4520, is being managed by Dynamic Design Group, Inc. and involves constructing a 22ft by 16ft restroom building, including new utilities and concrete sidewalks. Bids are scheduled to be received on Wednesday, April 30, 2025, at 2:00 P.M. (E.S.T.), with a mandatory pre-bid meeting for Prime Contractors to be held by appointment on Monday, April 21, 2025, or Tuesday, April 22, 2025. The desired project completion date is Monday, April 1, 2026, with on-site work permitted to begin on or after Monday, June 9, 2025.
The project will be awarded through a lump sum (fixed price) contract, with bidders required to submit a bid security of 5% of their total bid amount, either as a certified check or bid bond. Contractors must comply with State of Michigan Prevailing Wage Rates for State Funded Projects and provide performance and payment bonds covering 100% of the contract price. Bid documents can be purchased from the Engineer's office, with hard copies available for $150 and electronic copies on CD for $25. The project includes provisions for alternate bids, such as a 6ft sidewalk to a proposed Tennis Pavilion and additional buried conduit and water supply pipe upgrades. Bidders must also submit a Familial Disclosure Affidavit and an Iran Economic Sanctions Act Affidavit as part of their bid package.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 22-4520Plans04-15-2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Manual including Specifications
Project title:
Junior/Senior High School Athletic Restroom Building Escanaba Area Public Schools Escanaba, Michigan
Owner:
Escanaba Area Public Schools 1500 Ludington Street Escanaba, Michigan 49829
Date: 04-15-2025
DDGi Project No.: 22-4520
Designer:
Dynamic Design Group, inc. 04-15-2025 900 1st Avenue South, Suite A Escanaba, MI 49829 Phone: 906-786-3300 Fax: 906-233-7391
22-4520 / Junior/Senior High School Athletic Restroom Building
00 0102 - 1 PROJECT INFORMATION
SECTION 00 0102
PROJECT INFORMATION
PART 1 GENERAL
1.01 PROJECT IDENTIFICATION
A. Project Name:
1. Junior/Senior High Athletic Restroom Building
2. Escanaba Area Public Schools
3. Escanaba, MI
B. Project Number: 22-4520.
C. The Owner, hereinafter referred to as Owner: Escanaba Area Public Schools
1. Address: 1500 Ludington St.
2. City, State, Zip: Escanaba MI 49829
D. The Owners representative: Dynamic Design Group, Inc..
1.02 NOTICE TO PROSPECTIVE BIDDERS
A. These documents constitute an Invitation to Bid to General Contractors for the construction of the project described below.
1.03 PROJECT DESCRIPTION
A. Summary Project Description: Construction of a 22ftx16ft restroom building, including new utilities and concrete sidewalks.
B. Contract Terms: Lump sum (fixed price, stipulated sum).
C. Site Examination: See Section 00 1113 Advertisement for Bids.
D. Prevailing Wages: Contractors must follow the requirements as defined by the State of
Michigan, Prevailing Wage Rates for State Funded Projects. Wage rates and fringe benefits to be paid to each trade contractor and all subcontractors in the amounts not less than the wage and fringe benefit rate prevailing in the location in which the work is to be performed, at the time the work is performed. Current rates are included in this package, however, Contractor shall contact the State of Michigan to acquire the most current rates.
1.04 PROJECT CONSULTANTS
A. The Engineer, hereinafter referred to as Engineer: Dynamic Design Group, inc.
1. Address: 900 1st Ave. So., Suite A
2. City, State, Zip: Escanaba, MI 49829
3. Phone/Fax: (906) 786-3300 / (906) 233-7391.
1.05 PROCUREMENT TIMETABLE
A. Last Request for Substitution Due: 75 days prior to due date of bids.
B. Last Request for Information Due: 5 days prior to due date of bids.
C. Bids Due: Wednesday, April 30, 2025 at 2:00 P.M. (E.S.T.)
D. Construction Start: See 00 4100 Bid Form.
E. Substantial Completion Date: See 00 4100 Bid Form.
F. The Owner reserves the right to change the schedule or terminate the entire procurement process at any time.
END OF SECTION
00 0110 - 1 TABLE OF CONTENTS
SECTION 00 0110
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
2.01 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
A. 00 0102 - Project Information B. 00 0110 - Table of Contents C. 00 1113 - Advertisement for Bids D. 00 2113 - Instructions to Bidders E. 00 3100 - Available Project Information F. State of Michigan, Prevailing Wage Rates for State Funded Projects - Delta County G. 00 4100 - Bid Form H. Familial Disclosure Affidavit I. Iran Economic Sanction Act Affidavit J. 00 5000 - Contracting Forms and Supplements K. 00 7200 - General Conditions L. General Conditions for Construction Document M. 00 7300 - Supplementary Conditions
SPECIFICATIONS
3.01 DIVISION 01 -- GENERAL REQUIREMENTS
A. 01 2200 - Unit Prices B. 01 2500 - Substitution Procedures C. Substitution Request Form (During Procurement) D. Substitution Request Form (During Construction) E. 01 3000 - Administrative Requirements F. 01 4000 - Quality Requirements G. 01 5000 - Temporary Facilities and Controls H. 01 5713 - Temporary Erosion and Sediment Control I. 01 6000 - Product Requirements J. 01 7000 - Execution and Closeout Requirements K. 01 7800 - Closeout Submittals
3.02 DIVISION 02 -- EXISTING CONDITIONS
A. 02 4100 - Demolition
3.03 DIVISION 03 -- CONCRETE
A. 03 3000 - Cast-in-Place Concrete
3.04 DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
A. 06 1000 - Rough Carpentry B. 06 1753 - Shop-Fabricated Wood Trusses
3.05 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
A. 07 3113 - Asphalt Shingles B. 07 4213 - Metal Wall Panels
00 0110 - 2 TABLE OF CONTENTS
3.06 DIVISION 08 -- OPENINGS
A. 08 1113 - Hollow Metal Doors and Frames B. 08 7100 - Door Hardware
3.07 DIVISION 09 -- FINISHES
A. 09 2116 - Gypsum Board Assemblies B. 09 9123 - Interior Painting
3.08 DIVISION 10 -- SPECIALTIES
A. 10 2113.19 - Plastic Toilet Compartments B. 10 2800 - Toilet, Bath, and Laundry Accessories
3.09 DIVISION 31 -- EARTHWORK
A. 31 1000 - Site Clearing B. 31 2200 - Grading C. 31 2316 - Excavation D. 31 2323 - Fill
3.10 DIVISION 32 -- EXTERIOR IMPROVEMENTS
A. 32 1623 - Sidewalks B. 32 9219 - Seeding
3.11 DIVISION 33 -- UTILITIES
A. 33 3113 - Site Sanitary Sewerage Gravity Piping
00 1113 - 1 ADVERTISEMENT FOR BIDS
SECTION 00 1113
ADVERTISEMENT FOR BIDS
SINGLE PRIME BIDS WILL BE RECIEVED FOR:
The Project:
Junior/Senior High Athletic Restroom Building Escanaba Area Public Schools Escanaba, MI
The Owner:
Escanaba Area Public Schools 1500 Ludington St.
Escanaba MI 49829
The Engineer:
Dynamic Design Group, inc., 900 1st Ave., So., Escanaba, MI 49829
To Potential Bidders:
Bids will be accepted by the Owner and are to be delivered to Dynamic Design Group, inc., 900 1st Ave. So., Suite A, Escanaba, MI 49829 on or before, Wednesday, April 30, 2025 at 2:00 P.M. (E.S.T.).
Late bids will not be accepted.
The School Board will not consider or accept a bid received after the date and time specified for bid submission. Bids shall be accompanied by a completed Familial Disclosure Affidavit and Iran Economic Sanctions Act Affidavit.
Bids will be publicly opened and read aloud in the office of Dynamic Design Group on Wednesday, April 30, 2025 at 2:15 P.M. (E.S.T.). Bids will be reviewed by the School and presented to the School Board on Monday, May 12, 2025. The Board will make a decision during this meeting or at the next meeting on Monday, May 19, 2025.
Prevailing Wages: Contractors must follow the requirements as defined by the State of Michigan, Prevailing Wage Rates for State Funded Projects. Wage rates and fringe benefits to be paid to each trade contractor and all subcontractors in the amounts not less than the wage and fringe benefit rate prevailing in the location in which the work is to be performed, at the time the work is performed.
Current rates are included in this package, however, Contractor shall contact the State of Michigan to acquire the most current rates.
Project Description:
Construction of a 22ftx16ft restroom building, including new utilities and concrete sidewalks.
Plans and Specifications:
Plans and Specifications will be available on or after Tuesday, April 15, 2025.
Terms of Obtaining Plans and Specifications:
Hard Copies: Printed paper documents can be purchased from the Office of the Engineer upon a payment of $150.00 nonrefundable fee plus $25.00 if mailed.
Electronic Copies: PDF copies on CD can be purchased from the Office of the Engineer upon a payment of $25.00 nonrefundable fee plus $15.00 if mailed.
Plans will be posted at the Delta County and Marquette County builder's exchanges.
Prebid Meeting:
A prebid meeting for Prime Contractors will be held, by appointment, on Monday, April 21, 2025 or Tuesday, April 22, 2025. Contact Dynamic Design Group at (906) 786-3300 to schedule a time. The prebid meeting is mandatory for Contractors that did not previously bid this project.
00 1113 - 2 ADVERTISEMENT FOR BIDS
The site is also available for additional contractor visits prior to their bid, on weekdays, after 4pm or on weekends at any time. However, the Owner would appreciate that Contractors contact Dynamic Design Group to let them know of dates and time when they intend to visit the site.
Questions:
Direct all questions to the office of the Engineer: Dynamic Design Group, inc., telephone number (906) 786-3300.
Bid Security:
Bidders will be required to provide Bid Security in the form of a Certified Check or Bid Bond payable to the Owner for not less than 5% of their total bid amount.
The project will require the Prime contractor to obtain a performance and payment bond in the amount to cover the total contract.
The Owner reserves the right to accept or reject any or all bids.
00 2113 - 1 INSTRUCTIONS TO BIDDERS
SECTION 00 2113
INSTRUCTIONS TO BIDDERS
SUMMARY
1.01 RELATED DOCUMENTS
A. Document 00 7300 - Supplementary Conditions:
INVITATION
2.01 BID SUBMISSION
A. Bids signed, executed, and dated will be received at the office of the Engineer at the date/time listed in on the bid form.
B. Offers submitted after the above time shall be returned to the bidder unopened.
C. Amendments to the submitted offer will be permitted if received in writing prior to bid closing and if endorsed by the same party or parties who signed and sealed the offer.
2.02 INTENT
A. The intent of this bid request is to obtain an offer to perform and complete the work as outlined in the Construction Docuement.
2.03 WORK IDENTIFIED IN THE CONTRACT DOCUMENTS
A. Work of this proposed Contract comprises building construction, site development, and demolition, including concrete sidewalk work.
2.04 CONTRACT TIME
A. Identify Contract Time in the Bid Form.
BID DOCUMENTS AND CONTRACT DOCUMENTS
3.01 AVAILABILITY
A. Bid Documents may be obtained from: See Section 00 1113 Advertisement for Bids.
3.02 EXAMINATION
A. Bid Documents may be viewed at the office of Engineer.
B. Bid Documents are on display at the offices of the following construction plan rooms:
1. Marquette County.
2. Delta County.
C. Upon receipt of Bid Documents verify that documents are complete. Notify Engineer should the documents be incomplete.
D. Immediately notify Engineer upon finding discrepancies or omissions in the Bid Documents.
3.03 INQUIRIES/ADDENDA
A. Direct all questions to the Office of the Engineer.
B. Addenda may be issued during the bidding period. All Addenda become part of the Contract
Documents. Include resultant costs in the Bid Amount. ADDENDA WILL BE SENT TO
THOSE THAT OBTAIN PLANS FROM THE OFFICE OF THE ENGINEER AND ARE LISTED
ON THE CURRENT PLAN HOLDERS LIST.
C. Verbal answers are not binding on any party.
D. Clarifications requested by bidders must be in writing not less than 7 days before date set for receipt of bids. The reply will be in the form of an Addendum, a copy of which will be forwarded to known recipients.
3.04 PRODUCT/ASSEMBLY/SYSTEM SUBSTITUTIONS
A. Where the Bid Documents stipulate a particular product, substitutions will be considered up to 7 days before receipt of bids.
00 2113 - 2 INSTRUCTIONS TO BIDDERS
B. When a request to substitute a product is made, Engineer may approve the substitution and will issue an Addendum to known bidders.
C. The submission shall provide sufficient information to determine acceptability of such products.
D. Provide complete information on required revisions to other work to accommodate each proposed substitution.
E. Provide products as specified unless substitutions are submitted in this manner and accepted.
F. See Section 01 6000 - Product Requirements for additional requirements.
SITE ASSESSMENT
4.01 SITE EXAMINATION
A. Examine the project site before submitting a bid. Site availability is defined in the Advertisment for Bids. Failure to examine the project site will not warrant additional charges to the Owner for items that could have been noted during a site examination.
4.02 PREBID CONFERENCE
A. See 00 1113 - Advertisement for Bids
QUALIFICATIONS
5.01 SUBCONTRACTORS/SUPPLIERS/OTHERS
A. Owner reserves the right to reject a proposed subcontractor for reasonable cause.
BID SUBMISSION
6.01 SUBMISSION PROCEDURE
A. Bidders shall be solely responsible for the delivery of their bids in the manner and time prescribed.
B. Submit one copy of the executed offer on the Bid Forms provided, signed and sealed in a closed opaque envelope, clearly identified with bidder's name, project name and Owner's name on the outside.
C. Bids shall be accompanied by a completed Familial Disclosure Affidavit and Iran Economic Sanctions Act Affidavit.
D. Bids and accompanied paperwork will be accepted in person and via e-mail and can be e-mailed to dan@ddgi-ddm.com. Hard copies will be required to be mailed prior to being awarded a contract with the Owner. DDGi will not be responsible for any technical problems with e-mail submission of bids associated with computers, internet, services, etc. neither internally or externally. It is the Contractors responsibility to verify that electronically submitted bids are received in their entirety. DDGi strongly recommends that Contractors phyically deliver their bid in person at the office of DDGi.
6.02 BID INELIGIBILITY
A. Bids that are unsigned, improperly signed or sealed, conditional, illegible, obscure, contain arithmetical errors, erasures, alterations, or irregularities of any kind, may at the discretion of the Owner, be declared unacceptable.
B. Bid Forms, Appendices, and enclosures that are improperly prepared may, at the discretion of Owner, be declared unacceptable.
BID ENCLOSURES/REQUIREMENTS
7.01 SECURITY DEPOSIT
A. Bids shall be accompanied by a security deposit as follows:
1. Bid Bond of a sum no less than 5 percent of the Bid Amount on AIA A310 Bid Bond Form.
2. Certified check in the amount of 5% of the total maximum bid amount.
B. Endorse the Bid Bond in the name of the Owner as obligee, signed and sealed by the principal (Contractor) and surety.
00 2113 - 3 INSTRUCTIONS TO BIDDERS
C. Endorse the certified check in the name of the Owner.
D. The security deposit will be returned after delivery to the Owner of the required Performance and Payment Bond(s) by the accepted bidder.
E. Include the cost of bid security in the Bid Amount.
F. After a bid has been accepted, all securities will be returned to the respective bidders and other requested enclosures.
G. If no contract is awarded, all security deposits will be returned.
7.02 PERFORMANCE ASSURANCE
A. Accepted Bidder: Provide a Performance bond as described in 00 7300 - Supplementary
Conditions.
B. Include the cost of performance assurance bonds in the Bid Amount.
7.03 BID FORM REQUIREMENTS
A. Complete all requested information in the Bid Form and Appendices.
7.04 FEES FOR CHANGES IN THE WORK
A. Include the fees for overhead and profit on own Work and Work by subcontractors, identified in
Document 00 7300 - Supplementary Conditions .
B. Include in the Bid Form, the overhead and profit fees on own Work and Work by subcontractors, applicable for Changes in the Work, whether additions to or deductions from the Work on which the Bid Amount is based.
7.05 BID FORM SIGNATURE
A. The Bid Form shall be signed by the bidder, as follows:
1. By one of the Owners of the Company submitting a bid or the principal incharge.
2. Sole Proprietorship: Signature of sole proprietor in the presence of a witness who will also sign. Insert the words "Sole Proprietor" under the signature. Affix seal.
3. Partnership: Signature of all partners in the presence of a witness who will also sign.
Insert the word "Partner" under each signature. Affix seal to each signature.
4. Corporation: Signature of a duly authorized signing officer(s) in their normal signatures.
Insert the officer's capacity in which the signing officer acts, under each signature. Affix the corporate seal. If the bid is signed by officials other than the president and secretary of the company, or the president/secretary/treasurer of the company, a copy of the by-law resolution of their board of directors authorizing them to do so, must also be submitted with the Bid Form in the bid envelope.
7.06 ADDITIONAL BID INFORMATION
A. Prevailing Wages: Contractors must follow the requirements as defined by the State of
Michigan, Prevailing Wage Rates for State Funded Projects. Wage rates and fringe benefits to be paid to each trade contractor and all subcontractors in the amounts not less than the wage and fringe benefit rate prevailing in the location in which the work is to be performed, at the time the work is performed. Current rates are included in this package, however, Contractor shall contact the State of Michigan to acquire the most current rates.
OFFER ACCEPTANCE/REJECTION
8.01 DURATION OF OFFER
A. Bids shall remain open to acceptance and shall be irrevocable for a period of sixty (60) days after the bid closing date.
8.02 ACCEPTANCE OF OFFER
A. Owner reserves the right to accept or reject any or all offers.
00 3100 - 1 AVAILABLE PROJECT
INFORMATION
SECTION 00 3100
AVAILABLE PROJECT INFORMATION
PART 1 GENERAL
1.01 EXISTING CONDITIONS
A. State of Michigan, Prevailing Wage Rates for State Funded Projects: Current rates are included in this package, however, Contractor shall contact the State of Michigan to acquire the most current rates.
Prevailing Wage Rates for State Funded Projects Official Rate Schedule
Delta
Classification Name Category Last Updated
Boilermaker Boilermaker 05/10/2024
Classification Description: Boilermaker
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $72.47 $107.55 $142.63
Apprentice: 1st Period $53.53 $79.15 $104.75
Apprentice: 2nd Period $55.14 $81.56 $107.97
Apprentice: 3rd Period $56.73 $83.94 $111.15
Apprentice: 4th Period $58.31 $86.31 $114.31
Apprentice: 5th Period $59.85 $88.62 $117.39
Apprentice: 6th Period $63.03 $93.39 $123.75
Apprentice: 7th Period $66.17 $98.10 $130.03
Apprentice: 8th Period $69.32 $102.83 $136.33
Overtime Provisions Over 8-hour day/40-hour week
9th hour $90.82
10th hour $90.82
Beyond 10 hours $90.82
Saturday
First 8 hours $90.82
9th hour $90.82
10th hour $90.82
Beyond 10 hours $90.82
Sunday/Holiday $109.17
Four 10-hour days allowed? - Yes Make Up Day Allowed? - No
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3451 of 14407
Delta
Classification Name Category Last Updated
Bricklayer/Mason/Plasterer/Terrazzo BAC 2 - UP Bricklayer 12/12/2024
Classification Description: Regardless of new or different methods of installation, bricklayers, cement masons, marble masons, mosaic workers, plasterers, pointer-caulkers-cleaners, stone masons, terrazzo workers, tile layers, refractory specialists, plant masonry workers, and allied craftworkers. The operation of any robotic or mechanical device used to install and finish masonry products shall be included.
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $54.15 $68.40 $82.65
Apprentice: Apprentice Level 1 $41.79 $50.86 $59.93
Apprentice: Apprentice Level 2 $43.40 $53.28 $63.15
Apprentice: Apprentice Level 3 $45.01 $55.69 $66.37
Apprentice: Apprentice Level 4 $46.62 $58.11 $69.59
Apprentice: Apprentice Level 5 $48.23 $60.52 $72.81
Apprentice: Apprentice Level 6 $49.84 $62.94 $76.03
Apprentice: Apprentice Level 7 & 8 $51.45 $65.35 $79.25
Overtime Provisions Over 8-hour day/40-hour week
9th hour $68.40
10th hour $68.40
Beyond 10 hours $68.40
Saturday
First 8 hours $68.40
9th hour $68.40
10th hour $68.40
Beyond 10 hours $68.40
Sunday/Holiday $82.65
Four 10-hour days allowed? - Yes Make Up Day Allowed? - No
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3452 of
Delta
Classification Name Category Last Updated
Bricklayer-L2-UP Bricklayer 09/24/2024
Classification Description: Regardless of new or different methods of installation, bricklayers, cement masons, marble masons, mosaic workers, plasterers, pointer-caulkers-cleaners, stone masons, terrazzo workers, tile layers, refractory specialists, plant masonry workers, and allied craftworkers. The operation of any robotic or mechanical device used to install and finish masonry products shall be the work of Bricklayers
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $54.15 $68.40 $82.65 Apprentice: Bricklayer Apprentice Level 3 $45.01 $55.69 $66.37
Apprentice: Bricklayer Apprentice Level 6 $49.84 $62.94 $76.03
Apprentice: Bricklayer Apprentice Level 7 & 8 $51.45 $65.35 $79.25
Apprentice: Bricklayers Apprentice Level 1 $41.79 $50.86 $59.93
Apprentice: Bricklayers Apprentice Level 2 $43.40 $53.28 $63.15
Apprentice: Bricklayers Apprentice Level 4 $46.62 $58.11 $69.59
Apprentice: Bricklayers Apprentice Level 5 $48.23 $60.52 $72.81
Overtime Provisions Over 8-hour day/40-hour week
9th hour $68.40
10th hour $68.40
Beyond 10 hours $68.40
Saturday
First 8 hours $68.40
9th hour $68.40
10th hour $68.40
Beyond 10 hours $68.40
Sunday/Holiday $82.65
Four 10-hour days allowed? - Yes
Base Rate Comment: Saturday shall be considered a make-up day for lost time Monday through Friday. If the makeup day is utilized, a full eight (8) hour work day must be scheduled for everyone that reports to work, with all hours in excess of forty (40) hours to be paid at the rate of time and one-half.
Make Up Day Allowed? - No
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3453 of
Delta
Classification Name Category Last Updated
Carpenter-L1510 Carpenter 09/17/2024
Classification Description: Carpenter, Drywall Taper & Finisher, & Floor Layer
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $52.28 $68.29 $84.29
Apprentice: Apprentice 0-6 months $42.68 $53.89 $65.09
Apprentice: Apprentice 13-18 months $44.28 $56.29 $68.29
Apprentice: Apprentice 19-24 months $45.88 $58.69 $71.49
Apprentice: Apprentice 25-30 months $47.48 $61.09 $74.69
Apprentice: Apprentice 31-36 months $49.08 $63.49 $77.89
Apprentice: Apprentice 37-42 months $50.68 $65.89 $81.09
Apprentice: Apprentice 43-48 months $51.48 $67.09 $82.69
Apprentice: Apprentice 7-12 months $43.48 $55.09 $66.69
Overtime Provisions Over 8-hour day/40-hour week
9th hour $52.28
10th hour $52.28
Beyond 10 hours $68.28
Saturday
First 8 hours $68.28
9th hour $68.28
10th hour $68.28
Beyond 10 hours $68.28
Sunday/Holiday $84.29
Four 10-hour days allowed? - Yes
Saturdays may be used as a makeup day on a voluntary basis, with a minimum of eight (8) hours scheduled.
Make Up Day Allowed? - Yes
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3454 of
Delta
Classification Name Category Last Updated
Diver-L1510 Carpenter 09/18/2024
Classification Description: Carpenter - Diver
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $71.09 $94.98 $118.86
Apprentice: 1st 6 months $56.81 $73.53 $90.25
Apprentice: 2nd 6 months $58.00 $75.32 $92.63
Apprentice: 3rd 6 months $59.20 $77.12 $95.03
Apprentice: 4th 6 months $61.59 $80.70 $99.81
Apprentice: 5th 6 months $63.97 $84.27 $104.57
Apprentice: 6th 6 months $66.36 $87.86 $109.35
Apprentice: 7th 6 months $68.75 $91.44 $114.13
Apprentice: 8th 6 months $69.95 $93.24 $116.53
Overtime Provisions Over 8-hour day/40-hour week
9th hour $71.09
10th hour $71.09
Beyond 10 hours $94.97
Saturday
First 8 hours $94.97
9th hour $94.97
10th hour $94.97
Beyond 10 hours $94.97
Sunday/Holiday $118.86
Four 10-hour days allowed? - Yes
Saturdays may be used as a makeup day on a voluntary basis, with a minimum of eight (8) hours scheduled.
Make Up Day Allowed? - Yes
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3455 of
Delta
Classification Name Category Last Updated
Journeyman Resilient Floorlayer-L1510 Carpenter 09/18/2024
Classification Description: Journeyman Resilient Floorlayer
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $55.22 $72.52 $89.81
Apprentice: Apprentice 1st Year $44.99 $57.17 $69.35
Apprentice: Apprentice 2nd Year $46.70 $59.74 $72.77
Apprentice: Apprentice 3rd Year $50.11 $64.85 $79.59
Apprentice: Apprentice 4th Year $53.52 $69.97 $86.41
Overtime Provisions Over 8-hour day/40-hour week
9th hour $55.22
10th hour $55.22
Beyond 10 hours $72.52
Saturday
First 8 hours $72.52
9th hour $72.52
10th hour $72.52
Beyond 10 hours $72.52
Sunday/Holiday $89.81
Four 10-hour days allowed? - No
Saturdays may be used as a makeup day on a voluntary basis, with a minimum of eight (8) hours scheduled.
Make Up Day Allowed? - Yes
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3456 of
Delta
Classification Name Category Last Updated
Pile Driver-L1510 Carpenter 09/17/2024
Classification Description: Pile driver
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $52.48 $68.59 $84.69
Apprentice: 2nd 6 months $46.72 $58.40 $70.07
Apprentice: 3rd 6 months $47.53 $59.61 $71.69
Apprentice: 4th 6 months $49.14 $62.03 $74.91
Apprentice: 5th 6 months $50.75 $64.44 $78.13
Apprentice: 6th 6 months $52.36 $66.86 $81.35
Apprentice: 7th 6 months $53.97 $69.27 $84.57
Apprentice: 8th 6 months $54.77 $70.47 $86.17
Apprentice: Apprentice 1st 6 months $45.92 $57.20 $68.47
Overtime Provisions Over 8-hour day/40-hour week
9th hour $52.48
10th hour $52.48
Beyond 10 hours $68.58
Saturday
First 8 hours $68.58
9th hour $68.58
10th hour $68.58
Beyond 10 hours $68.58
Sunday/Holiday $84.69
Four 10-hour days allowed? - Yes
Saturday
Make Up Day Allowed? - Yes
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3457 of
Delta
Classification Name Category Last Updated
Communication Technician Communication Technician 05/13/2024
Classification Description:
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $67.89 $98.24 $128.58
Overtime Provisions Over 8-hour day/40-hour week
9th hour $98.24
10th hour $98.24
Beyond 10 hours $98.24
Saturday
First 8 hours $98.24
9th hour $98.24
10th hour $98.24
Beyond 10 hours $98.24
Sunday/Holiday $128.58
Four 10-hour days allowed? - Yes
ONLY due to inclement weather or customer requirements may Friday be used as a make up day if the normal scheduled work week was interrupted and time lost of five (5) hours or more was incurred by workmen covered under the terms of the 6-17-C/6-876-T agreement.
Make Up Day Allowed? - Yes
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3458 of
Delta
Classification Name Category Last Updated
Drywall Finisher Drywall 05/10/2024
Classification Description: Drywall Finisher, Soundproofing, & Plural Component Applicator
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $42.87 $57.12 $71.36
Apprentice: 1st 1,000 hours $31.47 $40.02 $48.56
Apprentice: 2nd 1,000 hours $32.90 $42.16 $51.42
Apprentice: 3rd 1,000 hours $34.32 $44.29 $54.26
Apprentice: 4th 1,000 hours $35.75 $46.44 $57.12
Apprentice: 5th 1,000 hours $37.17 $48.56 $59.96
Apprentice: 6th 1,000 hours $38.60 $50.71 $62.82
Apprentice: 7th 1,000 hours $40.02 $52.84 $65.66
Apprentice: 8th 1,000 hours $41.45 $54.98 $68.52
Overtime Provisions Over 8-hour day/40-hour week
9th hour $57.12
10th hour $57.12
Beyond 10 hours $57.12
Saturday
First 8 hours $57.12
9th hour $57.12
10th hour $57.12
Beyond 10 hours $57.12
Sunday/Holiday $71.36
Four 10-hour days allowed? - No Make Up Day Allowed? - No
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3459 of
Delta
Classification Name Category Last Updated
Electrician - 906 H - Z1 Electrician 05/10/2024
Classification Description: Journeyman - Inside wireman for work above $160,000
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $61.03 $79.26 $97.48
Apprentice: 1st period $30.57 $37.99 $45.40
Apprentice: 2nd period $32.43 $40.78 $49.12
Apprentice: 3rd period $36.13 $46.33 $56.52
Apprentice: 4th period $39.84 $51.89 $63.94
Apprentice: 5th period $45.56 $59.64 $73.72
Apprentice: 6th period $49.31 $65.26 $81.22
Overtime Provisions Over 8-hour day/40-hour week
9th hour $79.26
10th hour $79.26
Beyond 10 hours $79.26
Saturday
First 8 hours $79.26
9th hour $79.26
10th hour $79.26
Beyond 10 hours $79.26
Sunday/Holiday $97.48
Four 10-hour days allowed? - Yes
4 consecutive tens allowed M-Th F makeup day for inclement weather and holidays
Make Up Day Allowed? - Yes
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3460 of
Delta
Classification Name Category Last Updated
Electrician - 906 H - Z3 Electrician 05/10/2024
Classification Description: Inside Wireman for jobs over $160,000 4 consecutive tens allowed M-Th
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $59.06 $77.32 $95.58
Apprentice: 1st period $30.35 $37.66 $44.96
Apprentice: 2nd period $32.17 $40.38 $48.60
Apprentice: 3rd period $35.82 $45.86 $55.90
Apprentice: 4th period $39.47 $51.34 $63.20
Apprentice: 5th period $43.13 $56.82 $70.52
Apprentice: 6th period $46.77 $62.29 $77.80
Overtime Provisions Over 8-hour day/40-hour week
9th hour $76.79
10th hour $76.79
Beyond 10 hours $76.79
Saturday
First 8 hours $76.79
9th hour $76.79
10th hour $76.79
Beyond 10 hours $76.79
Sunday/Holiday $94.51
Four 10-hour days allowed? - Yes
Friday for inclement weather & holidays
Make Up Day Allowed? - Yes
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3461 of
Delta
Classification Name Category Last Updated
Electrician - 906 L - Z1 Electrician 05/10/2024
Classification Description: Inside wireman for work below $160,000
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $57.57 $75.08 $92.59
Apprentice: 1st period $29.75 $36.76 $43.76
Apprentice: 2nd period $31.50 $39.38 $47.26
Apprentice: 3rd period $35.00 $44.63 $54.26
Apprentice: 4th period $38.50 $49.88 $61.26
Apprentice: 5th period $42.00 $55.13 $68.26
Apprentice: 6th period $45.51 $60.40 $75.28
Overtime Provisions Over 8-hour day/40-hour week
9th hour $74.57
10th hour $74.57
Beyond 10 hours $74.57
Saturday
First 8 hours $74.57
9th hour $74.57
10th hour $74.57
Beyond 10 hours $74.57
Sunday/Holiday $91.57
Four 10-hour days allowed? - Yes Make Up Day Allowed? - No
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3462 of
Delta
Classification Name Category Last Updated
Electrician - 906 L - Z3 Electrician 05/10/2024
Classification Description: Inside Wireman for jobs at or below $160,000 4 consecutive tens allowed M-Th
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $57.00 $74.23 $91.46
Apprentice: 1st period $29.52 $36.41 $43.30
Apprentice: 2nd period $31.24 $39.00 $46.74
Apprentice: 3rd period $34.69 $44.17 $53.64
Apprentice: 4th period $38.13 $49.33 $60.52
Apprentice: 5th period $41.58 $54.51 $67.42
Apprentice: 6th period $45.02 $59.66 $74.30
Overtime Provisions Over 8-hour day/40-hour week
9th hour $73.73
10th hour $73.73
Beyond 10 hours $73.73
Saturday
First 8 hours $73.73
9th hour $73.73
10th hour $73.73
Beyond 10 hours $73.73
Sunday/Holiday $90.45
Four 10-hour days allowed? - Yes
Friday for inclement weather & holidays
Make Up Day Allowed? - Yes
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3463 of
Delta
Classification Name Category Last Updated
Elevator Constructor Mechanic Elevator Constructor 05/10/2024
Classification Description: Elevator Constructor Mechanic
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $96.72 $83.78 $152.57
Apprentice: 1st year $68.96 $46.08 $99.68
Apprentice: 2nd year $74.88 $54.45 $111.18
Apprentice: 3rd year $77.85 $58.65 $116.95
Apprentice: 4th year $84.65 $67.02 $129.33
Overtime Provisions Over 8-hour day/40-hour week
9th hour $152.57
10th hour $152.57
Beyond 10 hours $152.57
Saturday
First 8 hours $152.57
9th hour $152.57
10th hour $152.57
Beyond 10 hours $152.57
Sunday/Holiday $152.57
Four 10-hour days allowed? - Yes Make Up Day Allowed? - No
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3464 of
Delta
Classification Name Category Last Updated
Fiber Optic Splicer Fiber Optic Splicer 05/13/2024
Classification Description:
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $67.89 $98.24 $128.58
Overtime Provisions Over 8-hour day/40-hour week
9th hour $98.24
10th hour $98.24
Beyond 10 hours $98.24
Saturday
First 8 hours $98.24
9th hour $98.24
10th hour $98.24
Beyond 10 hours $98.24
Sunday/Holiday $128.58
Four 10-hour days allowed? - Yes
ONLY due to inclement weather or customer requirements may Friday be used as a make up day if the normal scheduled work week was interrupted and time lost of five (5) hours or more was incurred by workmen covered under the terms of the 6-17-C/6-876-T agreement.
Make Up Day Allowed? - Yes
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3465 of
Delta
Classification Name Category Last Updated
Foreman Foreman 05/10/2024
Classification Description:
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $67.89 $98.24 $128.58
Overtime Provisions Over 8-hour day/40-hour week
9th hour $90.71
10th hour $90.71
Beyond 10 hours $90.71
Saturday
First 8 hours $90.71
9th hour $90.71
10th hour $90.71
Beyond 10 hours $90.71
Sunday/Holiday $113.52
Four 10-hour days allowed? - Yes Make Up Day Allowed? - No
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3466 of
Delta
Classification Name Category Last Updated
Foreman Foreman 05/10/2024
Classification Description:
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $67.89 $98.24 $128.58
Overtime Provisions Over 8-hour day/40-hour week
9th hour $90.71
10th hour $90.71
Beyond 10 hours $90.71
Saturday
First 8 hours $90.71
9th hour $90.71
10th hour $90.71
Beyond 10 hours $90.71
Sunday/Holiday $113.52
Four 10-hour days allowed? - Yes Make Up Day Allowed? - No
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3467 of
Delta
Classification Name Category Last Updated
Foreman Foreman 05/10/2024
Classification Description:
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $67.89 $98.24 $128.58
Overtime Provisions Over 8-hour day/40-hour week
9th hour $90.71
10th hour $90.71
Beyond 10 hours $90.71
Saturday
First 8 hours $90.71
9th hour $90.71
10th hour $90.71
Beyond 10 hours $90.71
Sunday/Holiday $113.52
Four 10-hour days allowed? - Yes Make Up Day Allowed? - No
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3468 of
Delta
Classification Name Category Last Updated
Foreman Foreman 05/10/2024
Classification Description:
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $67.89 $98.24 $128.58
Overtime Provisions Over 8-hour day/40-hour week
9th hour $90.71
10th hour $90.71
Beyond 10 hours $90.71
Saturday
First 8 hours $90.71
9th hour $90.71
10th hour $90.71
Beyond 10 hours $90.71
Sunday/Holiday $113.52
Four 10-hour days allowed? - Yes Make Up Day Allowed? - No
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3469 of
Delta
Classification Name Category Last Updated
Foreman Foreman 05/10/2024
Classification Description:
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $75.47 $109.62 $143.74
Overtime Provisions Over 8-hour day/40-hour week
9th hour $109.61
10th hour $109.61
Beyond 10 hours $109.61
Saturday
First 8 hours $109.61
9th hour $109.61
10th hour $109.61
Beyond 10 hours $109.61
Sunday/Holiday $143.74
Four 10-hour days allowed? - Yes
ONLY due to inclement weather or customer requirements may Friday be used as a make up day if the normal scheduled work week was interrupted and time lost of five (5) hours or more was incurred by workmen covered under the terms of the 6-17-C/6-876-T agreement.
Make Up Day Allowed? - Yes
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3470 of
Delta
Classification Name Category Last Updated
Foreman Foreman 05/10/2024
Classification Description:
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $75.47 $109.61 $143.74
Overtime Provisions Over 8-hour day/40-hour week
9th hour $101.14
10th hour $101.14
Beyond 10 hours $101.14
Saturday
First 8 hours $101.14
9th hour $101.14
10th hour $101.14
Beyond 10 hours $101.14
Sunday/Holiday $126.80
Four 10-hour days allowed? - Yes Make Up Day Allowed? - No
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3471 of
Delta
Classification Name Category Last Updated
Foreman Foreman 05/10/2024
Classification Description:
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $76.98 $111.87 $146.76
Overtime Provisions Over 8-hour day/40-hour week
9th hour $103.22
10th hour $103.22
Beyond 10 hours $103.22
Saturday
First 8 hours $103.22
9th hour $103.22
10th hour $103.22
Beyond 10 hours $103.22
Sunday/Holiday $129.45
Four 10-hour days allowed? - Yes Make Up Day Allowed? - No
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3472 of
Delta
Classification Name Category Last Updated
Glazier Glazier 05/10/2024
Classification Description: Glazier 4 tens allowed on consecutive days
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $49.84 $67.73 $85.62
Apprentice: 1st level $31.62 $40.40 $49.18
Apprentice: 2nd level $35.12 $45.66 $56.18
Apprentice: 3rd Level $40.38 $53.54 $66.70
Apprentice: 4th level $45.66 $61.46 $77.26
Overtime Provisions Over 8-hour day/40-hour week
9th hour $66.72
10th hour $66.72
Beyond 10 hours $66.72
Saturday
First 8 hours $66.72
9th hour $66.72
10th hour $66.72
Beyond 10 hours $66.72
Sunday/Holiday $83.59
Four 10-hour days allowed? - Yes Make Up Day Allowed? - No
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3473 of
Delta
Classification Name Category Last Updated
Ironworker - A Ironworker 05/10/2024
Classification Description: For work over $10 million: Structural, Ornamental, Machinery Rigger & Reinforcing Ironworker;
installation of sheet metal siding
A 4-10 work week allowed Monday thru Thursday. Friday may be used as a make-up day. Hours in excess of 40 must be paid tim
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $50.07 $69.76 $89.45
Apprentice: 0 - 1,000 hours $25.39 $37.75 $50.11
Apprentice: 1,001 - 2,000 hours $37.71 $51.22 $64.73
Apprentice: 2,001 - 3,000 hours $39.01 $53.17 $67.33
Apprentice: 3,001 - 4,000 hours $40.31 $55.12 $69.93
Apprentice: 4,001 - 5,000 hours $41.61 $57.07 $72.53
Apprentice: 5,001 - 6,000 hours $42.92 $59.04 $75.15
Apprentice: 6,001 - 7,000 hours $44.22 $60.98 $77.75
Overtime Provisions Over 8-hour day/40-hour week
9th hour $63.09
10th hour $63.09
Beyond 10 hours $76.10
Saturday
First 8 hours $63.09
9th hour $76.10
10th hour $76.10
Beyond 10 hours $76.10
Sunday/Holiday $76.10
Four 10-hour days allowed? - Yes Make Up Day Allowed? - Yes
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3474 of
Delta
Classification Name Category Last Updated
Ironworker - B Ironworker 05/10/2024
Classification Description: For work under $10 Million: Structural, Ornamental, Machinery Rigger & Reinforcing Ironworker; pre-engineered metal buildings
A 4-10 work week allowed Monday thru Thursday. Friday may be used as a make-up day. Hours in excess of 40 must be paid time a
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $46.73 $64.76 $82.79
Apprentice: 0-1,000 hours $25.39 $37.75 $50.11
Apprentice: 1,001 - 2,000 hours $37.71 $51.22 $64.73
Apprentice: 2,001 - 3,000 hours $39.01 $53.17 $67.33
Apprentice: 3,001 - 4,000 hours $40.31 $55.12 $69.93
Apprentice: 4,001 - 5,000 hours $41.61 $57.07 $72.53
Apprentice: 5,001 - 6,000 hours $42.92 $59.04 $75.15
Apprentice: 6,001 - 7,000 hours $44.22 $60.98 $77.75
Overtime Provisions Over 8-hour day/40-hour week
9th hour $58.09
10th hour $58.09
Beyond 10 hours $69.44
Saturday
First 8 hours $58.09
9th hour $69.44
10th hour $69.44
Beyond 10 hours $69.44
Sunday/Holiday $69.44
Four 10-hour days allowed? - Yes Make Up Day Allowed? - Yes
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3475 of
Delta
Classification Name Category Last Updated
Journeyman Signal Technician Journeyman Signal Technician 05/13/2024
Classification Description:
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $67.89 $98.24 $128.58
Apprentice: Apprentice 1st 6 months $43.61 $61.82 $80.02
Apprentice: Apprentice 2nd 6 months $46.65 $66.38 $86.10
Apprentice: Apprentice 3rd 6 months $49.68 $70.92 $92.16
Apprentice: Apprentice 4th 6 months $52.71 $75.47 $98.22
Apprentice: Apprentice 5th 6 months $55.75 $80.03 $104.30
Apprentice: Apprentice 6th 6months $61.82 $89.13 $116.44
Overtime Provisions Over 8-hour day/40-hour week
9th hour $98.24
10th hour $98.24
Beyond 10 hours $98.24
Saturday
First 8 hours $98.24
9th hour $98.24
10th hour $98.24
Beyond 10 hours $98.24
Sunday/Holiday $128.58
Four 10-hour days allowed? - Yes
ONLY due to inclement weather or customer requirements may Friday be used as a make up day if the normal scheduled work week was interrupted and time lost of five (5) hours or more was incurred by workmen covered under the terms of the 6-17-C/6-876-T agreement.
Make Up Day Allowed? - Yes
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3476 of
Delta
Classification Name Category Last Updated
Journeyman Specialist Journeyman Specialist 05/13/2024
Classification Description:
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $76.98 $111.88 $146.76
Overtime Provisions Over 8-hour day/40-hour week
9th hour $111.87
10th hour $111.87
Beyond 10 hours $111.87
Saturday
First 8 hours $111.87
9th hour $111.87
10th hour $111.87
Beyond 10 hours $111.87
Sunday/Holiday $146.76
Four 10-hour days allowed? - Yes
ONLY due to inclement weather or customer requirements may Friday be used as a make up day if the normal scheduled work week was interrupted and time lost of five (5) hours or more was incurred by workmen covered under the terms of the 6-17-C/6-876-T agreement.
Make Up Day Allowed? - Yes
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3477 of
Delta
Classification Name Category Last Updated
Labor Crew Foreman Labor Crew Foreman 05/13/2024
Classification Description:
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $61.86 $89.19 $116.52
Overtime Provisions Over 8-hour day/40-hour week
9th hour $89.19
10th hour $89.19
Beyond 10 hours $89.19
Saturday
First 8 hours $89.19
9th hour $89.19
10th hour $89.19
Beyond 10 hours $89.19
Sunday/Holiday $116.52
Four 10-hour days allowed? - Yes
ONLY due to inclement weather or customer requirements may Friday be used as a make up day if the normal scheduled work week was interrupted and time lost of five (5) hours or more was incurred by workmen covered under the terms of the 6-17-C/6-876-T agreement.
Make Up Day Allowed? - Yes
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3478 of
Delta
Classification Name Category Last Updated
Asbestos & Lead Abatement Laborer Laborer 05/10/2024
Classification Description: Asbestos & Lead Abatement Laborer 4 ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $50.60 $65.37 $80.13 Apprentice: Trainee 600 hours +1 year
$34.07 $18.89 $20.54
Overtime Provisions Over 8-hour day/40-hour week
9th hour $65.37
10th hour $65.37
Beyond 10 hours $65.37
Saturday
First 8 hours $65.37
9th hour $65.37
10th hour $65.37
Beyond 10 hours $65.37
Sunday/Holiday $80.13
Four 10-hour days allowed? - Yes Make Up Day Allowed? - No
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3479 of
Delta
Classification Name Category Last Updated
Laborer - B-A Laborer 05/10/2024
Classification Description: Class A Laborer - construction laborer on building and heavy construction work, storm, and sanitary sewers on all construction sites and streets which are not included in the road builder rates, tool crib attendant, civil engineer helper, rodman, oxi-gun
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $40.18 $53.15 $66.11
Apprentice: 0 - 1,000 hours $31.69 $40.68 $49.67
Apprentice: 1,001 - 2,000 hours $34.99 $45.37 $55.74
Apprentice: 2,001 - 3,000 hours $36.29 $47.31 $58.33
Apprentice: 3,001 - 4,000 hours $38.88 $51.20 $63.54
Overtime Provisions Over 8-hour day/40-hour week
9th hour $53.15
10th hour $53.15
Beyond 10 hours $66.11
Saturday
First 8 hours $53.15
9th hour $66.11
10th hour $66.11
Beyond 10 hours $66.11
Sunday/Holiday $66.11
Four 10-hour days allowed? - Yes Make Up Day Allowed? - No
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3480 of
Delta
Classification Name Category Last Updated
Laborer - B-B Laborer 05/10/2024
Classification Description: Class B Laborer - Cement gun nozzleman, blasters, miners, drillers, buster operators, layers of all non-metallic pipe
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $42.41 $56.49 $70.57
Overtime Provisions Over 8-hour day/40-hour week
9th hour $56.49
10th hour $56.49
Beyond 10 hours $70.57
Saturday
First 8 hours $56.49
9th hour $70.57
10th hour $70.57
Beyond 10 hours $70.57
Sunday/Holiday $70.57
Four 10-hour days allowed? - Yes Make Up Day Allowed? - No
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3481 of
Delta
Classification Name Category Last Updated
Laborer - B-C Laborer 05/10/2024
Classification Description: Class C Laborer - caisson worker & airtrack
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $37.68 $49.67 $61.66
Overtime Provisions Over 8-hour day/40-hour week
9th hour $49.67
10th hour $49.67
Beyond 10 hours $49.67
Saturday
First 8 hours $49.67
9th hour $49.67
10th hour $49.67
Beyond 10 hours $49.67
Sunday/Holiday $61.66
Four 10-hour days allowed? - Yes Make Up Day Allowed? - No
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3482 of
Delta
Classification Name Category Last Updated
Laborer - B-D Laborer 05/10/2024
Classification Description: Class E Laborer - digester, tanks & kilns
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $43.23 $57.81 $72.39 Apprentice: Apprentice 1 (0-1,000 hours) $34.27 $44.37 $54.47
Apprentice: Apprentice 2 (1,001- 2,000 hours) $35.61 $46.38 $57.15
Apprentice: Apprentice 3 (2,001- 3,000 hours) $36.96 $48.41 $59.85
Apprentice: Apprentice 4 (3,001-4000 hours) $39.65 $52.44 $65.23
Overtime Provisions Over 8-hour day/40-hour week
9th hour $57.81
10th hour $57.81
Beyond 10 hours $72.39
Saturday
First 8 hours $43.23
9th hour $72.39
10th hour $72.39
Beyond 10 hours $72.39
Sunday/Holiday $72.39
Four 10-hour days allowed? - Yes Make Up Day Allowed? - No
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3483 of
Delta
Classification Name Category Last Updated
Laborer - Class 1 - RZ4 Laborer 05/10/2024
Classification Description: Laborer Road Class 1: asphalt shoveler or loader, yard man, fence erector tender, dumper, joint filling, form setting, form stripper, pavement reinforcing, waterproofing, seal coating, bridge painting, sandblasting, pressure grouting, RC equipment
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $46.14 $59.90 $73.66
Apprentice: 0-1,000 hours $39.26 $49.58 $59.90
Apprentice: 1,001-2,000 hours $40.64 $51.65 $62.66
Apprentice: 2,001-3,000 hours $42.01 $53.71 $65.40
Apprentice: 3,001-4,000 hours $44.76 $57.83 $70.90
Overtime Provisions Over 8-hour day/40-hour week
9th hour $59.90
10th hour $59.90
Beyond 10 hours $59.90
Saturday
First 8 hours $59.90
9th hour $59.90
10th hour $59.90
Beyond 10 hours $59.90
Sunday/Holiday $73.66
Four 10-hour days allowed? - Yes Make Up Day Allowed? - No
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3484 of
Delta
Classification Name Category Last Updated
Laborer - Class 2 - RZ4 Laborer 05/10/2024
Classification Description: Laborer Road Class 2: mixer operator, air or electric tool operator, spreader, boxman, concreter paddler, power chain saw operator, paving patch truck dumper, tunnel mucker, concrete saw operator, dry pack macine and roto-mill grounds person
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $46.35 $60.22 $74.08
Apprentice: 0-1,000 hours $39.42 $49.82 $60.22
Apprentice: 1,001-2,000 hours $40.80 $51.89 $62.98
Apprentice: 2,001-3,000 hours $42.19 $53.98 $65.76
Apprentice: 3,001-4,000 hours $44.96 $58.13 $71.30
Overtime Provisions Over 8-hour day/40-hour week
9th hour $60.22
10th hour $60.22
Beyond 10 hours $60.22
Saturday
First 8 hours $60.22
9th hour $60.22
10th hour $60.22
Beyond 10 hours $60.22
Sunday/Holiday $74.08
Four 10-hour days allowed? - Yes Make Up Day Allowed? - No
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3485 of
Delta
Classification Name Category Last Updated
Laborer - Class 3 - RZ4 Laborer 05/10/2024
Classification Description: Laborer Road Class 3: tunnel miner, finish tenders, guard rail builder, median barrier installer, earth retention barrier and wall installer, fence erector, bottom man, powder man, wagon drill and air track operator, curb and side rail setter
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $46.64 $60.65 $74.66
Apprentice: 0-1,000 hours $39.64 $50.15 $60.66
Apprentice: 1,001-2,000 hours $40.54 $51.75 $62.96
Apprentice: 2,001-3,000 hours $42.44 $54.35 $66.26
Apprentice: 3,001-4,000 hours $45.24 $58.55 $71.86
Overtime Provisions Over 8-hour day/40-hour week
9th hour $60.65
10th hour $60.65
Beyond 10 hours $60.65
Saturday
First 8 hours $60.65
9th hour $60.65
10th hour $60.65
Beyond 10 hours $60.65
Sunday/Holiday $74.66
Four 10-hour days allowed? - Yes Make Up Day Allowed? - No
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3486 of
Delta
Classification Name Category Last Updated
Laborer - Class 4 - RZ4 Laborer 05/10/2024
Classification Description: Laborer Road Class 4: asphalt raker
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $47.08 $61.31 $75.54
Apprentice: 0-1,000 hours $39.96 $50.63 $61.30
Apprentice: 1,001-2,000 hours $41.39 $52.78 $64.16
Apprentice: 2,001-3,000 hours $42.81 $54.91 $67.00
Apprentice: 3,001-4,000 hours $45.66 $59.18 $72.70
Overtime Provisions Over 8-hour day/40-hour week
9th hour $61.31
10th hour $61.31
Beyond 10 hours $61.31
Saturday
First 8 hours $61.31
9th hour $61.31
10th hour $61.31
Beyond 10 hours $61.31
Sunday/Holiday $75.54
Four 10-hour days allowed? - Yes Make Up Day Allowed? - No
ORS#: ORS-001654 | CA#: CA-0232 | Date Issued: 01/13/2025 | Contract Award By Date: 04/13/2025 Page 3487 of
Delta
Classification Name Category Last…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .