Contract Agreement Summary
This is a contract agreement document (ITB #22-080-1) between the City of Johns Creek, Georgia, and a contractor for 2022 Main Roads Resurfacing. The scope of work involves plant mix resurfacing with 1.5 inches of 12.5mm asphalt and edge milling on five main roads: State Bridge Road (Medlock Bridge Road to River Park Drive), East Fox Court (Jones Bridge Road to City Limits), Brumbelow Road (Nesbitt Ferry Road to Old Alabama Road), McGinnis Ferry Road-East Bound lanes only (Bell Road to Chattahoochee River City Limits), and Abberley Cove. The contractor must comply with Georgia Department of Transportation specifications, standards, and details. The bid release date was February 18, 2022, with a deadline for submitting questions by March 14, 2022 at 5:00 PM ET and a bid submission deadline of March 21, 2022 at 2:00 PM ET. An anticipated Notice to Proceed was scheduled for April 18, 2022, with a completion date of September 30, 2022. The contractor must provide three references demonstrating experience with similar projects and is responsible for inspecting the jobsite prior to bidding. Work must be performed Monday through Friday from 8:00 AM to 5:00 PM, with no lane closures or equipment movement allowed between 6:00 AM to 9:00 AM or 4:00 PM to 7:00 PM on weekdays, or 9:00 AM to 1:00 PM on Sundays.
Pricing is firm and fixed on a unit basis with payment made for actual work completed. The contract standard payment term is Net-30. The City will retain 10 percent retainage from each monthly invoice until project completion and acceptance, with all punch-list work requiring completion before retainage release. Liquidated damages of $300 per calendar day will be assessed for unexcused delays beyond the September 30, 2022 completion date. The contractor must obtain a 5 percent bid bond, 100 percent payment bond, and 100 percent performance bond, each based on contract value. Workers' compensation insurance is required at statutory limits, and commercial general liability insurance must provide minimum coverage of $1,000,000 per person and $2,000,000 per occurrence for bodily injury and $500,000 per occurrence for property damage. The contractor is responsible for all permits, licenses, traffic control, utility coordination, materials sourcing from GDOT-approved sources, and site cleanup. No change orders will be issued for differing site conditions, and the City reserves the right to add, modify, or delete quantities.
Text of this file
CONTRACT AGREEMENT
ITB #22-080-1
2022 MAIN ROADS RESURFACING
This Agreement made and entered into this __ day of ___________, in the year 2____; by and between The City of Johns Creek, Georgia, having its principal place of business at 11360 Lakefield Drive, Johns Creek, Georgia 30097 and TBD (“Contractor”), located at Address, City, State Zip.
WHEREAS, the City of Johns Creek is charged with the responsibility for the establishment of contracts for the acquisition of goods, materials, supplies and equipment, and services by the various departments of the City of Johns Creek; and
WHEREAS, the City of Johns Creek has caused Invitation to Bid (ITB) #22-080-1 to be issued soliciting proposals from qualified Contractors to furnish all items, labor services, materials and appurtenances called for by them in accordance with this proposal. Selected (“TBD”) is required to provide the services as called for in the specifications; and
WHEREAS, the Contractor submitted a response to the ITB #22-080-1 and the Contractor’s submittal was deemed by the City of Johns Creek to be the lowest most responsive, responsible bid meeting the minimum specifications to the City per the scope dated March 21, 2022.
NOW THEREFORE, in consideration of the mutual covenant and promises contained herein, the parties agree as follows:
1.0 Scope of Work
The Contractor agrees with the City to furnish all equipment, tools, materials, skill, labor of every description, and all things necessary to carry out in each designated area as delineated in Specifications
(Exhibit A) and complete in a good, firm, substantial and workmanlike manner, the Work in strict conformity with the specifications which shall form an essential part of this agreement. In addition to the foregoing, and notwithstanding anything to the contrary stated herein, the following terms and conditions, amendments, and other documents are incorporated by reference and made a part of the terms and conditions of this Agreement as is fully set out herein:
EXHIBIT A-SPECIFICATIONS
EXHIBIT B-COST PROPOSAL
EXHIBIT C-IMMIGRATION & SECURITY FORM / REQUIRED DOCUMENTS
EXHIBIT D-2021 CONCRETE REPAIR LIST #1
2.0 Key Personnel
The City of Johns Creek enters into this Agreement having relied upon Contractor providing the services of the Key Personnel, if any, identified as such in the body of the Agreement. No Key Personnel may be replaced or transferred without the prior approval of the City’s authorized representative. Any Contractor personnel to whom the City objects shall be removed from City work immediately. The City maintains the right to approve in its sole discretion all personnel assigned to the work under this Agreement.
3.0 Compensation
3.1 Pricing. The Contractor will be paid for the goods and services sold pursuant to the Contract in accordance with the ITB and final pricing documents as incorporated into the terms of the Contract. Unless clearly stated otherwise in the Standard Contract, all prices are firm and fixed and are not subject to variation. Prices include, but are not limited to freight, insurance, fuel surcharges and customs duties. The prices quoted and listed on the attached Cost Proposal, a copy of which is attached hereto as Exhibit “B” and incorporated herein, shall be firm throughout the term of this Contract.
3.2 Billings. If applicable, and unless the ITB provides otherwise, the Contractor shall submit, on a regular basis, an invoice for goods and services supplied to the City under the Contract at the billing address specified in the Purchase Instrument or Contract. The invoice shall comply with all applicable rules concerning payment of such claims. The City shall pay all approved invoices in arrears and in accordance with applicable provisions of City law. Unless otherwise agreed in writing by the parties, the Contractor shall not be entitled to receive any other payment or compensation from the City for any goods or services provided by or on behalf of the Contractor under the Contract. The Contractor shall be solely responsible for paying all costs, expenses and charges it incurs in connection with its performance under the Contract.
Standard payment terms: Net-30.
3.3 Delay of Payment Due to Contractor’s Failure. If the City in good faith determines that the Contractor has failed to perform or deliver any service or product as required by the Contract, the Contractor shall not be entitled to any compensation under the Contract until such service or product is performed or delivered.
In this event, the City may withhold that portion of the Contractor’s compensation which represents payment for services or products that were not performed or delivered. To the extent that the Contractor’s failure to perform or deliver in a timely manner causes the City to incur costs, the City may deduct the amount of such incurred costs from any amounts payable to Contractor. The City’s authority to deduct such incurred costs shall not in any way affect the City’s authority to terminate the Contract.
3.4 Set-Off Against Sums Owed by the Contractor. In the event that the Contractor owes the City any sum under the terms of the Contract, pursuant to any judgment, or pursuant to any law, the City may set off the sum owed to the City against any sum owed by the City to the Contractor in the City's sole discretion.
4.0 Duration of Contract
4.1 The Contract between the City and the Contractor shall begin and end on the dates specified, unless terminated earlier in accordance with the applicable terms and conditions. Pursuant to O.C.G.A. Section
36-60-13, this Contract shall not be deemed to create a debt of the City for the payment of any sum beyond the fiscal year of execution or, in the event of a renewal, beyond the fiscal year of such renewal.
The term of this Contract shall be for a period from the date the Contractor receives the “Notice to Proceed” until September 30, 2022 when all orders/services issued and postmarked by the City during said term shall be filled at the contract price.
4.2 Contract Extension. In the event that this Standard Contract shall terminate or be likely to terminate prior to the making of an award for a new contract for the identified goods and ancillary services, the City may, with the written consent of Contractor, extend this Contract for such period as may be necessary to afford the City a continuous supply of the identified goods and ancillary services.
If not set forth in the ITB/RFP and/or Contractor’s submittal, the City will determine the basic period of performance for the completion of any of Contractor’s actions contemplated within the scope of this
Agreement and notify Contractor of the same via written notice. If no specific period for the completion of
Contractor’s required actions pursuant to this Agreement is set out in writing, such time period shall be a reasonable period of time based upon the nature of the activity. If the completion of this Contract is delayed by actions of the City, then and in such event the time of completion of this Contract shall be extended for such additional time within which to complete the performance of the Contract as is required by such delay.
This Contract may be extended by mutual consent of both the City and the Contractor for reasons of additional time, additional services and/or additional areas of work.
5.0 Independent Contractor
5.1 The Contractor shall be an independent Contractor. The Contractor is not an employee, agent or representative of the City of Johns Creek. The successful Contractor shall obtain and maintain, at the
Contractor’s expense, all permits, license or approvals that may be necessary for the performance of the services. The Contractor shall furnish copies of all such permits, licenses or approvals to the City of Johns
Creek Representative within ten (10) day after issuance.
5.2 Inasmuch as the City of Johns Creek and the Contractor are independent of one another neither has the authority to bind the other to any third person or otherwise to act in any way as the representative of the other, unless otherwise expressly agreed to in writing signed by both parties hereto. The Contractor agrees not to represent itself as the City’s agent for any purpose to any party or to allow any employee of the
Contractor to do so, unless specifically authorized, in advance and in writing, to do so, and then only for the limited purpose stated in such authorization. The Contractor shall assume full liability for any contracts or agreements the Contractor enters into on behalf of the City of Johns Creek without the express knowledge and prior written consent of the City.
6.0 Indemnification
6.1 The Contractor agrees to indemnify, hold harmless and defend the City, its public officials, officers, employees, and agents from and against any and all liabilities, suits, actions, legal proceedings, claims, demands, damages, costs and expenses (including attorney’s fees) to the extent rising out of any act or omission of the Contractor, its agents, subcontractors or employees in the performance of this Contract except for such claims that arise from the City’s sole negligence or willful misconduct.
6.2 Notwithstanding the foregoing indemnification clause, the City may join in the defense of any claims raised against it in the sole discretion of the City. Additionally, if any claim is raised against the City, said claim(s) cannot be settled or compromised without the City’s written consent, which shall not be unreasonably withheld.
7.0 Performance
Performance will be evaluated on a weekly basis. If requirements are not met, City of Johns Creek
Procurement will notify the Contractor in writing stating deficiencies, substitutions, delivery schedule, and/or poor workmanship.
A written response from the Contractor detailing how correction(s) will be made is required to be delivered to the City. Contractor will have no more than thirty (30) days to remedy the situation.
If requirements are not remedied City of Johns Creek has the right to cancel this Agreement with no additional obligation to Contractor.
7.1 Final Completion, Acceptance, and Payment
a) Final Completion shall be achieved when the work is fully and finally complete in accordance with the Contract Documents. The City shall notify Contractor once the date of final completion has been achieved in writing.
b) Final Acceptance is the formal action of City acknowledging Final Completion. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the
City’s right under any warranty or guarantee. Prior to Final Acceptance, Contractor shall, in addition to all other requirements in the Contract Documents, submit to City a Notice of any outstanding disputes or claims between Contractor and any of its Subcontractors, including the amounts and other details thereof. Neither Final Acceptance, nor final payment, shall release
Contractor or its sureties from any obligations of these Contract Documents or the bond, or constitute a waiver of any claims by City arising from Contractor’s failure to perform the work in accordance with the Contract Documents.
c) Acceptance of final payment by Contractor, or any Subcontractor, shall constitute a waiver and release to City of all claims by Contractor, or any such Subcontractor, for an increase in the Contract
Sum or the Contract Time, and for every act or omission of City relating to or arising out of the work, except for those Claims made in accordance with the procedures, including the time limits, set forth in section 13.
8.0 Changes
City, within the general scope of the Agreement, may, by written notice to Contractor, issue additional instructions, require additional services or direct the omission of services covered by this Agreement. In such event, there will be made an equitable adjustment in price, but any claim for such an adjustment must be made within thirty (30) days of the receipt of said written notice.
9.0 Change Order Defined
Change Order shall mean a written order to the Contractor executed by the City issued after the execution of this Agreement, authorizing and directing a change in services. The Price and Time may be changed only by a Change Order.
10.0 Time and Liquidated Damages
10.1 The Contractor shall not proceed to furnish such services and the City shall not become obligated to pay for same until a written authorization to proceed (“Notice to Proceed”) has been sent to the Contractor from the City. The Contractor shall commence the Work no later than ten (10) days after the effective date of the Notice to Proceed and shall achieve Substantial Completion of the Work, as hereinafter defined, no later than September 30, 2022, in accordance with the Contract Documents. The number of calendar days from the date on which the Work is permitted to proceed, through the date set forth for Substantial
Completion, shall constitute the Contract Time. The Work shall be carried on expeditiously, it being understood, however, that this Agreement may be extended or continued in force by the parties hereto in writing as provided herein.
The Contractor represents that it has taken all difficulties due to weather conditions into consideration in preparing the proposed Contract Sum and in establishing the time for completion of the Work. the completion time will not be extended for normal bad weather. Time for completion of the Work includes an allowance for calendar days on which work cannot be performed out-of-doors. For the purposes of this
Agreement, the Contractor agrees that it expects to lose working days to weather in accordance with the following table:
January-14 days May-6 days September-2 days
February-14 days June-3 days October-3 days
March-10 days July-4 days November-5 days
April-7 days August-2 days December-9 days
If the total number of calendar days lost per month due to bad weather exceeds the total monthly calendar days identified in the above table, the contract time will be extended by the number of calendar days needed to include the excess number of days lost. However, the Owner will not be obligated to pay any additional sums resulting from such a delay, including but not limited to overhead and profit.
10.2 The Contractor shall pay the City the sum of $300.00 per day for each and every calendar day of unexcused delay in achieving Substantial Completion beyond the date set forth herein for Substantial
Completion of the Work. Any sums due and payable hereunder by the Contractor shall be payable, not as a penalty, but as liquidated damages representing an estimate of delay damages likely to be sustained by the City, estimated at or before the time of executing this Contract. When the City reasonably believes that
Substantial Completion will be inexcusably delayed, the City shall be entitled, but not required, to withhold from any amounts otherwise due the Contractor an amount then believed by the City to be adequate to recover liquidated damages applicable to such delays. If and when the Contractor overcomes the delay in achieving Substantial Completion, or any part thereof, for which the City has withheld payment, the City shall promptly release to the Contractor those funds withheld, but no longer applicable, as liquidated damages.
11.0 Insurance
11.1 The Contractor shall, at its own cost and expense, obtain and maintain worker’s compensation and commercial general liability insurance coverage covering the period of this Agreement, such insurance to be obtained from a responsible insurance company legally licensed and authorized to transact business in the State of Georgia. The minimum limit for Worker’s Compensation Insurance shall be the statutory limit for such insurance. The minimum limits for commercial general liability insurance, which must include personal liability coverage will be $1,000,000 per person and $2,000,000 per occurrence for bodily injury and $500,000 per occurrence for property damage.
11.2 Contractor shall provide certificates of insurance evidencing the coverage requested herein before the execution of this Agreement, and at any time during the term of this Agreement, upon the request of the
City, Contractor shall provide proof sufficient to the satisfaction of the City that such insurance continues in force and effect.
12.0 Termination
12.1 Immediate Termination. Pursuant to O.C.G.A. Section 36-60-13, this Contract will terminate immediately and absolutely if the City determines that adequate funds are not appropriated or granted or funds are de-appropriated such that the City cannot fulfill its obligations under the Contract, which determination is at the City's sole discretion and shall be conclusive. Further, the City may terminate the
Contract for any one or more of the following reasons effective immediately without advance notice:
a) In the event the Contractor is required to be certified or licensed as a condition precedent to providing goods and services, the revocation or loss of such license or certification may result in immediate termination of the Contract effective as of the date on which the license or certification is no longer in effect;
b) The City determines that the actions, or failure to act, of the Contractor, its agents, employees or subcontractors have caused, or reasonably could cause, life, health or safety to be jeopardized;
c) The Contractor fails to comply with confidentiality laws or provisions; and/or
d) The Contractor furnished any statement, representation or certification in connection with the
Contract or the bidding process which is materially false, deceptive, incorrect or incomplete.
12.2 Termination for Cause. The occurrence of any one or more of the following events shall constitute cause for the City to declare the Contractor in default of its obligations under the Contract:
a) The Contractor fails to deliver or has delivered nonconforming goods or services or fails to perform, to the City’s satisfaction, any material requirement of the Contract or is in violation of a material provision of the Contract, including, but without limitation, the express warranties made by the
Contractor;
b) The City determines that satisfactory performance of the Contract is substantially endangered or that a default is likely to occur;
c) The Contractor fails to make substantial and timely progress toward performance of the contract;
d) The Contractor becomes subject to any bankruptcy or insolvency proceeding under federal or state law to the extent allowed by applicable federal or state law including bankruptcy laws; the
Contractor terminates or suspends its business; or the City reasonably believes that the Contractor has become insolvent or unable to pay its obligations as they accrue consistent with applicable federal or state law;
e) The Contractor has failed to comply with applicable federal, state and local laws, rules, ordinances, regulations and orders when performing within the scope of the Contract;
f) The Contractor has engaged in conduct that has or may expose the City to liability, as determined in the City’s sole discretion; or
g) The Contractor has infringed any patent, trademark, copyright, trade dress or any other intellectual property rights of the State, the City, or a third party.
12.3 Notice of Default. If there is a default event caused by the Contractor, the City shall provide written notice to the Contractor requesting that the breach or noncompliance be remedied within the period of time specified in the City’s written notice to the Contractor. If the breach or noncompliance is not remedied by the date of the written notice, the City may:
a) Immediately terminate the Contract without additional written notice; and/or
b) Procure substitute goods or services from another source and charge the difference between the
Contract and the substitute contract to the defaulting Contractor; and/or,
c) Enforce the terms and conditions of the Contract and seek any legal or equitable remedies.
12.4 Termination for Convenience. The City may terminate this Agreement for convenience at any time upon thirty (30) day written notice to the Contractor. In the event of a termination for convenience, Contractor shall take immediate steps to terminate work as quickly and effectively as possible and shall terminate all commitments to third-parties unless otherwise instructed by the City. Provided that no damages are due to the City for Contractor’s failure to perform in accordance with this Agreement, the City shall pay Contractor for work performed to date in accordance with Section 3 herein. The City shall have no further liability to Contractor for such termination.
12.5 Payment Limitation in Event of Termination. In the event of termination of the Contract for any reason by the City, the City shall pay only those amounts, if any, due and owing to the Contractor for goods and services actually rendered up to and including the date of termination of the Contract and for which the City is obligated to pay pursuant to the Contract or Purchase Instrument. Payment will be made only upon submission of invoices and proper proof of the Contractor’s claim. This provision in no way limits the remedies available to the City under the Contract in the event of termination. The City shall not be liable for any costs incurred by the Contractor in its performance of the Contract, including, but not limited to, startup costs, overhead, profit, delay damages or other costs associated with the performance of the
Contract.
12.6 The Contractor’s Termination Duties. Upon receipt of notice of termination or upon request of the
City, the Contractor shall:
a) Cease work under the Contract and take all necessary or appropriate steps to limit disbursements and minimize costs, and furnish a report within thirty (30) days of the date of notice of termination, describing the status of all work under the Contract, including, without limitation, results accomplished, conclusions resulting therefrom, and any other matters the City may require;
b) Immediately cease using and return to the City, any personal property or materials, whether tangible or intangible, provided by the City to the Contractor;
c) Comply with the City’s instructions for the timely transfer of any active files and work product produced by the Contractor under the Contract;
d) Cooperate in good faith with the City, its employees, agents and Contractors during the transition period between the notification of termination and the substitution of any replacement Contractor;
and
e) Immediately return to the City any payments made by the City for goods and services that were not delivered or rendered by the Contractor.
13.0 CLAIMS and DISPUTE RESOLUTION
13.1 Claims Procedure
a) If the parties fail to reach agreement regarding any dispute arising from the Contract Documents, including a failure to reach agreement on the terms of any Change Order for City-directed work as provided in Section 8, or on the resolution of any request for an equitable adjustment in the Contract
Sum or the Contract Time, Contractor’s only remedy shall be to file a Claim with City as provided in this section.
b) Contractor shall file its Claim within the earlier of: 120 Days from City’s final offer in accordance with Section 8; or the date of Final Acceptance.
c) The Claim shall be deemed to cover all changes in cost and time (including direct, indirect, impact, and consequential) to which Contractor may be entitled. It shall be fully substantiated and documented. The Claim shall contain a detailed factual statement of the Claim for additional compensation and time, if any, providing all necessary dates, locations, and items of work affected by the Claim.
d) If an adjustment in the Contract Time is sought: the specific Days and dates for which it is sought;
the specific reasons Contractor believes an extension in the Contract Time should be granted; and
Contractor’s analysis of its Progress Schedule to demonstrate the reason for the extension in
Contract Time.
e) If any adjustment in the Contract Sum is sought: the exact amount sought and a breakdown of that amount into the categories; and a statement certifying, under penalty of perjury, that the Claim is made in good faith, that the supporting cost and pricing data are true and accurate to the best of
Contractor’s knowledge and belief, that the Claim is fully supported by the accompanying data, and that the amount requested accurately reflects the adjustment in the Contract Sum or Contract
Time for which Contractor believes City is liable.
f) After Contractor has submitted a fully-documented Claim that complies with all applicable provisions of this Section 13.1, City shall respond, in writing, to Contractor with a decision within sixty (60) Days from the date the Claim is received, or with notice to Contractor of the date by which it will render its decision.
13.2 Arbitration
a) If Contractor disagrees with City’s decision rendered in accordance with paragraph 13.1f, Contractor shall provide City with a written demand for arbitration. No demand for arbitration of any such Claim shall be made later than thirty (30) Days after the date of City’s decision on such
Claim; failure to demand arbitration with said thirty (30) Day period shall result in City’s decision being final and binding upon Contractor and its Subcontractors.
b) Notice of the demand for arbitration shall be filed with the American Arbitration Association
(AAA), with a copy provide to City. The parties shall negotiate or mediate under the Voluntary
Construction Mediation Rules of the AAA, or mutually acceptable service, before seeking arbitration in accordance with the Construction Industry Arbitration Rules of AAA as follows:
1. Disputes involving $30,000 or less shall be conducted in accordance with the Southeast Region
Expedited Commercial Arbitration Rules; or
2. Disputes over $30,000 shall be conducted in accordance with the Construction Industry
Arbitration Rules of the AAA, unless the parties agree to use the expedited rules.
c) All Claims arising out of the work shall be resolved by arbitration. The judgment upon the arbitration award may be entered, or review of the award may occur, in the Superior Court of Fulton
County.
d) If the parties resolve the Claim prior to arbitration judgment, the terms of the resolution shall be incorporated in a Change Order. The Change Order shall constitute full payment and final settlement of the Claim, including all claims for time and for direct, indirect, or consequential costs, including costs of delays, inconvenience, disruption of schedule, or loss of efficiency or productivity.
e) Choice of Law and Forum. The laws of the State of Georgia shall govern and determine all matters arising out of or in connection with this Contract without regard to the choice of law provisions of
State law. The Superior Court of Fulton County, Georgia shall have exclusive jurisdiction to try disputes arising under or by virtue of this contract. In the event any proceeding of a quasi-judicial or judicial nature is commenced in connection with this Contract, such proceeding shall solely be brought in a court or other forum of competent jurisdiction within Fulton County, Georgia. This provision shall not be construed as waiving any immunity to suit or liability, including without limitation sovereign immunity, which may be available to the City.
f) All Claims filed against City shall be subject to audit at any time following the filing of the Claim.
Failure of Contractor, or Subcontractor of any tier, to maintain and retain sufficient records to allow
City to verify all or a portion of the Claim or to permit City access to the books and records of
Contractor, or Subcontractors of any tier, shall constitute a waiver of the Claim and shall bar any recovery.
14.0 Confidential Information
14.1 Access to Confidential Data. The Contractor’s employees, agents and subcontractors may have access to confidential data maintained by the City to the extent necessary to carry out the Contractor's responsibilities under the Contract. The Contractor shall presume that all information received pursuant to the Contract is confidential unless otherwise designated by the City. If it is reasonably likely the Contractor will have access to the City’s confidential information, then:
a) The Contractor shall provide to the City a written description of the Contractor's policies and procedures to safeguard confidential information;
b) Policies of confidentiality shall address, as appropriate, information conveyed in verbal, written, and electronic formats;
c) The Contractor must designate one individual who shall remain the responsible authority in charge of all data collected, used, or disseminated by the Contractor in connection with the performance of the Contract; and
d) The Contractor shall provide adequate supervision and training to its agents, employees and subcontractors to ensure compliance with the terms of the Contract. The private or confidential data shall remain the property of the City at all times. Some services performed for the City may require the Contractor to sign a nondisclosure agreement. Contractor understands and agrees that refusal or failure to sign such a nondisclosure agreement, if required, may result in termination of the
Contract.
14.2 No Dissemination of Confidential Data. No confidential data collected, maintained, or used in the course of performance of the Contract shall be disseminated except as authorized by law and with the written consent of the City, either during the period of the Contract or thereafter. Any data supplied to or created by the Contractor shall be considered the property of the City. The Contractor must return any and all data collected, maintained, created or used in the course of the performance of the Contract, in whatever form it is maintained, promptly at the request of the City.
14.3 Subpoena. In the event that a subpoena or other legal process is served upon the Contractor for records containing confidential information, the Contractor shall promptly notify the City and cooperate with the
City in any lawful effort to protect the confidential information.
14.4 Reporting of Unauthorized Disclosure. The Contractor shall immediately report to the City any unauthorized disclosure of confidential information.
14.5 Survives Termination. The Contractor’s confidentiality obligation under the Contract shall survive termination of the Contract.
15.0 Inclusion of Documents
Contractor’s response submitted in response thereto, including any best and final offer, are incorporated in this Agreement by reference and form an integral part of this agreement. In the event of a conflict in language between this Agreement and the foregoing documents incorporated herein, the provisions and requirements set forth in this Agreement shall govern. In the event of a conflict between the language of the ITB, as amended, and the Contractor’s submittal, the language in the former shall govern.
15.1 Counterparts: This Agreement may be executed in any number of counterparts, each of which shall be an original, but all of which together shall constitute one and the same instrument.
16.0 Compliance with All Laws and Licenses
The Contractor must obtain all necessary licenses and comply with local, state and federal requirements.
The Contractor shall comply with all laws, rules and regulations of any governmental entity pertaining to its performance under this Agreement.
16.1 Federal Requirements.
16.1.1 Federal Compliance Regulations
Federal regulations apply to all City of Johns Creek contracts using Federal funds as a source for the solicitation of goods and services. Successful bidders must comply with the following Federal requirement as they apply to:
a) Equal Employment Opportunity - The Contractor shall not discriminate against any employee or applicant or employment because of race, color, religion, sex, or national origin. The Contractor shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to: employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. The Contractor shall comply with Executive Order
11246, as amended, and the rules, regulations, and orders of the Secretary of Labor.
b) Reports - The submission of reports to the City on behalf of the U.S. Department of Housing and
Urban Development as may be determined necessary for the activities covered by this contract, which is federally funded;
c) Patents - The U.S. Department of Housing and Urban Development reserves a royalty-free, nonexclusive and irrevocable right to use, and to authorize others to use, for Federal Government purposes:
1. Any patent that shall result under this Contract; and
2. Any patent rights to which the Contractor purchases ownership with grant support;
d) Copyrights - The U.S. Department of Housing and Urban Development reserves a royalty-free, nonexclusive and irrevocable license to reproduce, publish or otherwise use, and to authorize others to use, for Federal Government purposes:
1. The copyright in any work developed under this contract; and
2. Any rights of copyright to which the Contractor purchases ownership with grant support.
e) Access to books, documents, papers and records of the Contractor which are directly pertinent to the specific contract for the purposes of making audit, examination, excerpts and transcriptions by
Federal agencies, the Comptroller General of the United States, or any of their duly authorized representatives; and
f) Retention of all required records for three years after the City makes final payment and all other pending matters are closed.
16.2 Georgia Security and Immigration Compliance Act
a) The parties certify that Contractor has executed an affidavit verifying that Contractor has registered and participates in the federal work authorization program to verify information of all new employees, per O.C.G.A. 13-10-90, et seq., and Georgia Department of Labor Regulations Rule
300-10-1-02. The appropriate affidavit is attached hereto as “Exhibit C” and incorporated herein by reference and made a part of this contract.
b) The Contractor further certifies that any subcontractor employed by Contractor for the performance of this agreement has executed an appropriate subcontractor affidavit verifying its registration and participation in the federal work authorization program and compliance with O.C.G.A. 13-10-90, et seq., and Georgia Department of Labor Regulations Rule 300-10-1-02, and that all such affidavits are incorporated into and made a part of every contract between the Contractor and each subcontractor.
c) Contractor’s compliance with O.C.G.A. 13-10-90, et. seq., and Georgia Department of Labor
Regulations Rule 300-10-1-02 is a material condition of this agreement and Contractor’s failure to comply with said provisions shall constitute a material breach of this agreement.
17.0 Assignment
The Contractor shall not assign or subcontract the whole or any part of this Agreement without the City of
Johns Creek’s prior written consent.
18.0 Amendments in Writing
No amendments to this Agreement shall be effective unless it is in writing and signed by duly authorized representatives of the parties.
19.0 Drug-Free and Smoke-Free Work Place
19.1 A drug-free and smoke-free work place will be provided for the Contractor’s employees during the performance of this Agreement; and
19.2 The Contractor will secure from any sub-contractor hired to work in a drug-free and smoke-free work place a written certification so stating and in accordance with Paragraph 7, subsection B of the Official
Code of Georgia Annotated Section 50-24-3.
19.3 The Contractor may be suspended, terminated, or debarred if it is determined that:
a) The Contractor has made false certification herein; or
b) The Contractor has violated such certification by failure to carry out the requirements of Official
Code of Georgia Annotated Section 50-24-3.
20.0 Additional Terms
Neither the City nor any Department shall be bound by any terms and conditions included in any Contractor packaging, invoice, catalog, brochure, technical data sheet, or other document which attempts to impose any condition in variance with or in addition to the terms and conditions contained herein.
21.0 Antitrust Actions
For good cause and as consideration for executing this Contract or placing this order, Contractor acting herein by and through its duly authorized agent hereby conveys, sells, assigns, and transfers to the City of
Johns Creek all rights, title, and interest to and to all causes of action it may now or hereafter acquire under the antitrust laws of the United States and the State of Georgia relating to the particular goods or services purchased or acquired by the City of Johns Creek pursuant hereto.
22.0 Reporting Requirement
Reports shall be submitted to the Project Manager on a Monthly basis providing, as a minimum, data regarding the number of items purchased as well as the total dollar volume of purchases made from this contract.
23.0 Governing Law
This Agreement shall be governed in all respects by the laws of the State of Georgia. The Superior Court of Fulton County, Georgia shall have exclusive jurisdiction to try disputes arising under or by virtue of this contract.
24.0 Entire Agreement
This Agreement constitutes the entire Agreement between the parties with respect to the subject matter contained herein; all prior agreements, representations, statement, negotiations, and undertakings are suspended hereby. Neither party has relied on any representation, promise, or inducement not contained herein.
25.0 Special Terms and Conditions
(Attached are any special terms and conditions to this contract, if applicable:)
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be duly executed by their duly authorized officers as of the day and year set forth next to each signature.
CITY OF JOHNS CREEK: CONTRACTOR NAME
By: __________________________ By: ________________________________
Title:_________________________ Title:_______________________________
Name:________________________ Name:______________________________
Date: ________________________ Date: ______________________________
ATTEST:__________________________ ATTEST:____________________________
Sign Sign
NAME: ____________________________ NAME: ______________________________
Print Print
DATE: _________________________ DATE: ___________________________
SEAL: SEAL:
EXHIBIT A
Bid Specifications
PURPOSE, INTENT AND PROJECT DESCRIPTION
The City of Johns Creek Public Works Department (City), requests that interested parties submit formal sealed bids/proposals for the plant mix resurfacing on Johns Creek Main Roads. All roads can be located on the location map provided in this bid package.
Main Road
State Bridge Road – (Medlock Bridge Road to River Park Drive)
East Fox Court – (Jones Bridge Road to City Limits)
Brumbelow Road – (Nesbitt Ferry Road to Old Alabama Road)
McGinnis Ferry Road-East Bound lanes only – (Bell Road to Chattahoochee River City Limits)
Abberley Cove
All main road work are to be resurfaced with 1.5” of 12.5mm asphalt, with edge milling of the roadway.
SCOPE OF WORK
The Contractor shall construct the project per:
Georgia Department of Transportation (GDOT) Specifications, Standards, and Details;
The Contract Documents including but not limited to the scope of work and specifications;
Purchase Order;
Approved Schedule;
City of Johns Creek ordinances and regulations;
OSHA standards and guidelines;
Any other applicable codes, laws and regulations including but not limited to Section 45-10-20 through 45-10-28 of the Official Code of Georgia Annotated, Title VI of the Civil Rights Act, Drug-Free Workplace Act, and all applicable requirements of the Americans with Disabilities Act of 1990.
In case of discrepancy between the unit price and the total price on the completed Bid Schedule, the unit price will prevail and the total price will be corrected.
The contractor will be responsible for providing all labor, materials, and equipment necessary to perform the work. The bid basis is for unit pricing. Payment will be made based on actual work completed.
The contractor is responsible for inspecting the jobsite prior to submitting a bid. No change orders will be issued for differing site conditions. In case of discrepancies between the plans and specifications, the most stringent prevails.
Materials must come from GDOT approved sources. The contractor will be required to submit in writing a list of proposed sources of materials. When required representative samples will be taken for examination and testing prior to approval. The materials used in the work shall meet all quality requirements of the contract. Materials will not be considered as finally accepted until all tests, including any to be taken from the finished work have been completed and evaluated. Standard Specification 106 –
The successful bidder must have verifiable experience at construction of similar projects in accordance with these specifications. Bidder shall submit (3) references demonstrating experience completing projects of similar scope (please include contact email please).
The City will inspect the work as it progresses.
Retainage in the amount of 10% of the total amount due on each monthly invoice will be held by the City until project completion and acceptance.
BID QUESTIONS:
All questions related to the project and documents must be asked electronically through BidNet. A response will be made within 72 hours electronically via BidNet. Contact with City staff during the solicitation period is forbidden. Offerors may contact the procurement officer for any clarification on schedule and bid submissions at purchasing@johnscreekga.gov .
PROCUREMENT SCHEDULE:
Bid Release February 18, 2022
Deadline to Submit Questions March 14, 2022 5:00 PM ET
Deadline to Submit Bid March 21, 2022 2:00 PM ET
Anticipated Work Session March 28, 2022
Anticipated Council Meeting April 11, 2022
Anticipated NTP April 18, 2022
Completion Date September 2022
SPECIAL PROVISIONS
All materials and workmanship associated with this contract shall meet current GDOT Specifications and
Standards for construction materials, methods and procedures. Please refer to the GDOT website for the most current versions of the Specifications and Special Provisions.
The following are special provisions prepared specifically for this contract and may be in conflict with parts of the standard specifications. If conflicts are evident the special provisions shall take precedence over the standard specifications.
PROSECUTION AND PROGRESS
The Contractor will mobilize with sufficient forces such that all construction identified as part of this contract shall be substantially completed by September 30, 2022. Upon Notice of Award the Contractor will be required to submit a Progress Schedule. The Contractor shall be assessed liquidated damages in the amount of $300.00 per calendar day for any work not completed by the deadline. Liquidated damages shall be deducted from the 10% retainage held by the City.
Normal workday for this project shall be 8:00 AM to 5:00 PM and the normal work week shall be Monday through Friday. The City will consider extended workdays or work weeks upon written request. No work will be allowed on City holidays (a complete list can be found on the City website).
mailto:purchasing@johnscreekga.gov
The Contractor shall not install lane closures or perform work or move equipment or materials on the traveled way that interferes with traffic flow between the hours of 6:00 am to 9:00 am and 4:00 pm to 7:00 pm (Monday through Friday), and 9:00 am to 1:00 pm on Sundays.
The work will require bidder to provide all labor, administrative forces, equipment, materials and other incidental items to complete all required work. The City shall perform a Final Inspection upon notification from the contractor that all work is complete. A Punch List of found deficiencies will be submitted to the contractor upon completion of the Final Inspection. All repairs shall be completed by the Contractor at his expense prior to issuance of Final Acceptance. 10% retainage will be held from the total amount due the
Contractor until Final Acceptance of work is issued by the City.
The City will retain 10% of the fee due the Contractor. The retainage will be paid as the final invoice after the project has been completed and accepted. All punch-list work must be complete before release of any retainage.
PERMITS AND LICENSES
The Contractor shall procure all permits and licenses, pay all charges, taxes and fees, and give all notices necessary and incidental to the due and lawful prosecution of the work.
MATERIALS
The city will solicit a task order from a CEI consultant for quality control testing of materials and workmanship incorporated into the project. All materials will meet appropriate GDOT specifications.
Materials quality control test types will meet GDOT specifications at a frequency equal to or exceeding that set by those specifications.
Contractor will be responsible for replacing any work performed with material from rejected sample lot at no cost to the City.
PUBLIC NOTIFICATION
The contractor shall be responsible for installing notification signs at all entrances to subdivisions that are to be resurfaced. The notifications are to be installed one day prior to commencement of work. The signs will be furnished by the city. Signs shall be installed on temporary metal stakes driven in the ground or on tripods. Signs are to remain in place until contracted work (except punch-list) has been completed and accepted. No separate payment will be made for this work. The contractor is responsible for returning the signs to the City when the project is complete.
INVOICING
The Contractor shall invoice monthly for work satisfactorily completed. Invoices need to be sent to the
City’s Project Manager for approval.
EXISTING CONDITIONS / DEVIATION OF QUANTITIES
The City reserves the right to add, modify, or delete quantities. Contractor will be paid for actual in-place quantities completed and accepted for pay items listed in the Bid Schedule. Contractor will not be entitled to an adjustment of unit price on an item which increased or decreased from the original plan quantity.
All other work required by this ITB, plans, specs, standards, etc. but not specifically listed in the Bid
Schedule shall be considered “incidental work”. The bidder shall include the cost for all incidental work in the “Grading Complete” bid item. Contractor will notify the City in writing if quantities of contract items will exceed plan. At no time will contractor proceed with work outside the prescribed scope of services for which additional payment will be requested without the written authorization of the City.
All information given concerning existing conditions is for information purposes only. It is the Contractors responsibility to inspect the project site to verify existing conditions prior to submitting their bid.
No adjustment will be made to the bid based on missing or inaccurate information on the plans.
UTILITIES
Contractor shall be responsible for protecting all utilities and for coordinating any utility relocation necessary for the completion of the work.
Contractor shall be responsible for the adjusting to grade of existing utility structures that are incorporated into the work including but not limited to water valves and sewer cleanouts.
All manholes are to be adjusted to grade prior to placement of asphalt per specifications provided by Fulton
County. The contractor shall be held responsible for property damage due to unsafe adjusted manholes.
Payment for this work will be for each unit. The contractor will also be responsible for the adjustment of all water valves at no additional cost to the city.
Manholes risers will be furnished by Fulton County at no additional cost to the contractor. Pricing for this work is for installation of the manhole risers only.
TRAFFIC CONTROL
The Contractor shall, at all times, conduct his work as to assure the least possible obstruction to the citizens.
Work staging and operations shall be conducted in a manner to minimize interference with traffic flow thru existing parking areas. The safety and convenience of the general public and the protection of persons and property shall be provided for by the Contractor as specified in the State of Georgia, Department of
Transportation Standard Specifications Sections 104.05, 107.09 and 150.
The Contractor shall furnish, install and maintain all necessary and required barricades, signs and other traffic control devices in accordance with MUTCD and DOT specifications. Contractor shall take all necessary precautions for the protection of the workers and safety of the public.
All existing signs, markers and other traffic control devices removed or damaged during construction operations will be reinstalled or replaced at the Contractors expense. At no time will Contractor remove regulatory signing which may cause a hazard to the public. The Contractor shall, within 24 hours place temporary pavement markings (paint or removable tape) to match existing pavement markings. No additional payment will be made for this work.
The ingress and egress includes entrances and exits via driveways at various properties, and access to the intersecting roads and streets. The Contractor shall maintain sufficient personnel and equipment (including flaggers and traffic control signing) on the project at all times, particularly during inclement weather, to insure that ingress and egress are safely provided when and where needed.
Two way traffic shall be maintained at all times, utilizing certified flaggers as necessary, unless otherwise specified or approved by the City.
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| 22-080-2 Addendum #2 | — | |
| 22-080-1 received Bids | — | |
| Award Information | — | |
| 22-080-1 Bid Packet | — | |
| 22-080-1 Addendum #1 | — | |
| 22-080-1 NOIA | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .