22-080-1 Bid Packet

988 KB Posted

Attached to
2022 Main Roads Resurfacing
Solicitation number
22-080-1
Issued by
Fulton County, Georgia

About this file

Summary

This is an Invitation to Bid (ITB) packet issued by the City of Johns Creek, Georgia for 2022 main road resurfacing. The project involves plant mix resurfacing on five primary road segments: State Bridge Road (Medlock Bridge Road to River Park Drive), East Fox Court (Jones Bridge Road to City Limits), Brumbelow Road (Nesbitt Ferry Road to Old Alabama Road), McGinnis Ferry Road East Bound lanes (Bell Road to Chattahoochee River City Limits), and Abberley Cove. All roads are to be resurfaced with 1.5 inches of 12.5mm asphalt with edge milling. Sealed bids are due by March 21, 2022 at 2:00 PM ET, with the deadline for questions submitted electronically via BidNet set for March 10, 2022 at 5:00 PM ET. No pre-bid meeting is required. The anticipated Notice to Proceed is April 18, 2022, with substantial completion required by September 30, 2022. Bidders must provide three references demonstrating experience with similar projects and must conduct site inspections prior to submission.

The bid basis is unit pricing with payment made for actual work completed. Contractors must secure a 5% bid bond and, upon award, 100% payment and performance bonds. The City will retain 10% retainage from monthly invoices until final project acceptance. Contractors are responsible for all labor, materials, equipment, traffic control, utility coordination, thermoplastic pavement markings, signal system repairs, and site cleanup. Liquidated damages of $300 per calendar day apply for work not completed by the deadline. All materials must meet Georgia Department of Transportation specifications from approved sources, and quality control testing will be performed by a City-hired consultant. Insurance requirements include worker's compensation at statutory limits and commercial general liability of $1,000,000 per person and $2,000,000 per occurrence for bodily injury, plus $500,000 per occurrence for property damage.

Text of this file

INVITATION TO BID (ITB)

2022 MAIN ROAD RESURFACING

BID NUMBER 22-080-1

Release of Bid February 18, 2022

Bid Due Date March 21, 2022 @ 2:00 PM ET

This project will not require a Pre-bid meeting.

Questions must be asked electronically via BidNet:

Deadline for Questions

March 10, 2022 5:00PM ET

Quotes, bids, and RFPs are electronically managed through the Georgia Purchasing Group by BidNet, our online bidding/vendor registration system, on the City website:

https://www.johnscreekga.gov/Residents/Purchasing. To access the RFP document you must register with BidNet. Go to the City website above and click the link “register and view quote/bid/RFP opportunities”.

EXHIBIT A - Bid Specifications

PURPOSE, INTENT AND PROJECT DESCRIPTION

The City of Johns Creek Public Works Department (City), requests that interested parties submit formal sealed bids/proposals for the plant mix resurfacing on Johns Creek Main Roads. All roads can be located on the location map provided in this bid package.

Main Road

State Bridge Road – (Medlock Bridge Road to River Park Drive) East Fox Court – (Jones Bridge Road to City Limits) Brumbelow Road – (Nesbitt Ferry Road to Old Alabama Road) McGinnis Ferry Road-East Bound lanes Only – (Bell Road to Chattahoochee River City Limits) Abberley Cove

All main road work are to be resurfaced with 1.5” of 12.5mm asphalt, with edge milling of the roadway.

SCOPE OF WORK

The Contractor shall construct the project per:

Georgia Department of Transportation (GDOT) Specifications, Standards, and Details;

The Contract Documents including but not limited to the scope of work and specifications;

Purchase Order;

Approved Schedule;

City of Johns Creek ordinances and regulations;

OSHA standards and guidelines;

Any other applicable codes, laws and regulations including but not limited to Section 45-10-20 through 45-10-28 of the Official Code of Georgia Annotated, Title VI of the Civil Rights Act, Drug-Free Workplace Act, and all applicable requirements of the Americans with Disabilities Act of 1990

In case of discrepancy between the unit price and the total price on the completed Bid Schedule, the unit price will prevail and the total price will be corrected.

The contractor will be responsible for providing all labor, materials, and equipment necessary to perform the work. The bid basis is for unit pricing. Payment will be made based on actual work completed.

The contractor is responsible for inspecting the jobsite prior to submitting a bid. No change orders will be issued for differing site conditions. In case of discrepancies between the plans and specifications, the most stringent prevails.

Materials must come from GDOT approved sources. The contractor will be required to submit in writing a list of proposed sources of materials. When required representative samples will be taken for examination and testing prior to approval. The materials used in the work shall meet all quality requirements of the contract. Materials will not be considered as finally accepted until all tests, including any to be taken from the finished work have been completed and evaluated. Standard Specification 106 –

Control of Materials will be used as a guide. All materials will be tested according to the GDOT Sampling, Testing, and Inspection Manual by an approved consultant/lab hired by the City.

The successful bidder must have verifiable experience at construction of similar projects in accordance with these specifications. Bidder shall submit (3) references demonstrating experience completing projects of similar scope (please include contact email please).

The City will inspect the work as it progresses.

Retainage in the amount of 10% of the total amount due on each monthly invoice will be held by the City until project completion and acceptance.

BID QUESTIONS:

All questions related to the project and documents must be asked electronically through BidNet. A response will be made within 72 hours electronically via BidNet. Contact with City staff during the solicitation period is forbidden. Offerors may contact the procurement officer for any clarification on schedule and bid submissions at purchasing@johnscreekga.gov .

PROCUREMENT SCHEDULE:

Bid Release February 18, 2022 Deadline to Submit Questions March 14, 2022 5:00 PM ET Deadline to Submit Bid March 21, 2022 2:00 PM ET Anticipated Work Session March 28, 2022 Anticipated Council Meeting April 11, 2022 Anticipated NTP April 18, 2022 Completion Date September 2022

SPECIAL PROVISIONS

All materials and workmanship associated with this contract shall meet current GDOT Specifications and Standards for construction materials, methods and procedures. Please refer to the GDOT website for the most current versions of the Specifications and Special Provisions.

The following are special provisions prepared specifically for this contract and may be in conflict with parts of the standard specifications. If conflicts are evident the special provisions shall take precedence over the standard specifications.

PROSECUTION AND PROGRESS

The Contractor will mobilize with sufficient forces such that all construction identified as part of this contract shall be substantially completed by September 30, 2022. Upon Notice of Award the Contractor will be required to submit a Progress Schedule. The Contractor shall be assessed liquidated damages in the amount of $300.00 per calendar day for any work not completed by the deadline. Liquidated damages shall be deducted from the 10% retainage held by the City.

Normal workday for this project shall be 8:00 AM to 5:00 PM and the normal work week shall be Monday through Friday. The City will consider extended workdays or work weeks upon written request. No work will be allowed on City holidays (a complete list can be found on the City website).

The Contractor shall not install lane closures or perform work or move equipment or materials on the traveled way that interferes with traffic flow between the hours of 6:00 am to 9:00 am and 4:00 pm to 7:00 pm (Monday through Friday), and 9:00 am to 1:00 pm on Sundays.

The work will require bidder to provide all labor, administrative forces, equipment, materials and other incidental items to complete all required work. The City shall perform a Final Inspection upon notification from the contractor that all work is complete. A Punch List of found deficiencies will be submitted to the contractor upon completion of the Final Inspection. All repairs shall be completed by the Contractor at his expense prior to issuance of Final Acceptance. 10% retainage will be held from the total amount due the Contractor until Final Acceptance of work is issued by the City.

The City will retain 10% of the fee due the Contractor. The retainage will be paid as the final invoice after the project has been completed and accepted. All punch-list work must be complete before release of any retainage.

PERMITS AND LICENSES

The Contractor shall procure all permits and licenses, pay all charges, taxes and fees, and give all notices necessary and incidental to the due and lawful prosecution of the work.

MATERIALS

The city will solicit a task order from a CEI consultant for quality control testing of materials and workmanship incorporated into the project. All materials will meet appropriate GDOT specifications.

Materials quality control test types will meet GDOT specifications at a frequency equal to or exceeding that set by those specifications.

Contractor will be responsible for replacing any work performed with material from rejected sample lot at no cost to the City.

PUBLIC NOTIFICATION

The contractor shall be responsible for installing notification signs at all entrances to subdivisions that are to be resurfaced. The notifications are to be installed one day prior to commencement of work. The signs will be furnished by the city. Signs shall be installed on temporary metal stakes driven in the ground or on tripods. Signs are to remain in place until contracted work (except punch-list) has been completed and accepted. No separate payment will be made for this work. The contractor is responsible for returning the signs to the City when the project is complete.

INVOICING

The Contractor shall invoice monthly for work satisfactorily completed. Invoices need to be sent to the City’s Project Manager for approval.

EXISTING CONDITIONS / DEVIATION OF QUANTITIES

The City reserves the right to add, modify, or delete quantities. Contractor will be paid for actual in-place quantities completed and accepted for pay items listed in the Bid Schedule. Contractor will not be entitled to an adjustment of unit price on an item which increased or decreased from the original plan quantity.

All other work required by this ITB, plans, specs, standards, etc. but not specifically listed in the Bid

Schedule shall be considered “incidental work”. The bidder shall include the cost for all incidental work in the “Grading Complete” bid item. Contractor will notify the City in writing if quantities of contract items will exceed plan. At no time will contractor proceed with work outside the prescribed scope of services for which additional payment will be requested without the written authorization of the City.

All information given concerning existing conditions is for information purposes only. It is the Contractors responsibility to inspect the project site to verify existing conditions prior to submitting their bid.

No adjustment will be made to the bid based on missing or inaccurate information on the plans.

UTILITIES

Contractor shall be responsible for protecting all utilities and for coordinating any utility relocation necessary for the completion of the work.

Contractor shall be responsible for the adjusting to grade of existing utility structures that are incorporated into the work including but not limited to water valves and sewer cleanouts.

All manholes are to be adjusted to grade prior to placement of asphalt per specifications provided by Fulton County. The contractor shall be held responsible for property damage due to unsafe adjusted manholes.

Payment for this work will be for each unit. The contractor will also be responsible for the adjustment of all water valves at no additional cost to the city.

Manholes risers will be furnished by Fulton County at no additional cost to the contractor. Pricing for this work is for installation of the manhole risers only.

TRAFFIC CONTROL

The Contractor shall, at all times, conduct his work as to assure the least possible obstruction to the citizens.

Work staging and operations shall be conducted in a manner to minimize interference with traffic flow thru existing parking areas. The safety and convenience of the general public and the protection of persons and property shall be provided for by the Contractor as specified in the State of Georgia, Department of Transportation Standard Specifications Sections 104.05, 107.09 and 150.

The Contractor shall furnish, install and maintain all necessary and required barricades, signs and other traffic control devices in accordance with MUTCD and DOT specifications. Contractor shall take all necessary precautions for the protection of the workers and safety of the public.

All existing signs, markers and other traffic control devices removed or damaged during construction operations will be reinstalled or replaced at the Contractors expense. At no time will Contractor remove regulatory signing which may cause a hazard to the public. The Contractor shall, within 24 hours place temporary pavement markings (paint or removable tape) to match existing pavement markings. No additional payment will be made for this work.

The ingress and egress includes entrances and exits via driveways at various properties, and access to the intersecting roads and streets. The Contractor shall maintain sufficient personnel and equipment (including flaggers and traffic control signing) on the project at all times, particularly during inclement weather, to insure that ingress and egress are safely provided when and where needed.

Two way traffic shall be maintained at all times, utilizing certified flaggers as necessary, unless otherwise specified or approved by the City. In the event of an emergency situation, the Contractor shall provide access to emergency vehicles and/or emergency personnel through or around the construction area.

All personnel, equipment, and materials required for installing and maintaining traffic control shall be the responsibility of the contractor.

PROTECTION AND RESTORATION OF PROPERTY AND LANDSCAPE

The Contractor shall be responsible for the preservation of all public and private property, crops, fish ponds, trees, monuments, highway signs and markers, fences, grassed and sodded areas, etc. along and adjacent to the highway, road or street, and shall use every precaution necessary to prevent damage or injury thereto, unless the removal, alteration, or destruction of such property is provided for under the contract.

When or where any direct or indirect damage or injury is done to public or private property by or on account of any act, omission, neglect or misconduct in the execution of the work, or in consequence of the non-execution thereof by the Contractor, he shall restore, at his/her own expense, such property to a condition similar or equal to that existing before such damage or injury was done, by repairing, rebuilding or otherwise restoring as may be directed, or she/he shall make good such damage or injury in an acceptable manner. The Contractor shall correct all disturbed areas before retainage will be released.

RIGHTS AND USE OF MATERIAL

Materials excavated within the project limits become the property of the Contractor. The Contractor, at his/her discretion, may elect to incorporate any of the excavated material into his/her work provided and that it is suitable for the intended use. Materials identified to be removed and are unsuitable for the project will be removed from the site by the Contractor. All excavation, placement, hauling and grading of on-site material will be the Contractors responsibility.

ASPHALT CONCRETE PAVING

Surface course on the main roads shall be a 12.5mm Superpave, Type I, GP 2 only, including bitum material & H lime. (Corrected Optimum Asphalt Content)

The roads shall be topped with 1.5” (165 lbs. /sy.) of topping. This shall include mainlines, deceleration lanes, and turn lanes only.

The plant mix materials from which the asphaltic pavement is manufactured and the plant at which it is manufactured shall meet the requirements of the State of Georgia Department of Transportation (GDOT), Standard specifications, Articles 820; 802; 883; 831; 828; and 882.

Load tickets that meet Georgia Department of Transportation Specifications must accompany all delivered materials. The Contractor must supply copies of all asphalt tickets to the City.

The contractor is not required to use an MTV when placing the surface course material on the main roads in this contract.

COORDINATION

The Contractor shall keep the City updated on the construction schedule, daily work plans and any challenges, setbacks in a timely manner.

THERMOPLASTIC/PREFORMED PLASTIC PAVEMENT MARKINGS

This work shall consist of placement of Thermoplastic Pavement Markings on the asphalt pavement sections and Preformed Plastic Markings with black contrast on the bridge. Final (thermoplastic and preformed plastic) pavement markings shall be placed at least 20 calendar days but no more than 60 calendar days after placement of final asphalt lift. Final pedestrian crosswalk markings shall adhere to the latest standards. Pavement marking materials shall meet GDOT standard specifications and be on the qualified products list.

The 20-day wait period for installing final thermoplastic striping will not count against the available calendar days as long as all other work is complete, including temporary centerline striping, and the road has been re-opened.

SOLID TRAFFIC STRIPE, 24 IN, WHITE

24in. white permanent solid stripe is to be installed as a stop bar at each stop sign where previously existed, or as directed.

SOLID TRAFFIC STRIPE, 5 IN, YELLOW

5in double yellow permanent traffic paint is to be installed at each stop sign of each subdivision entrance approaching main roads for a total length of 120 LF each stripe, at each location.

SIGNAL SYSTEM REPAIR

This work shall consist of repair and installation of loop detectors damaged as a result of the pulverizing, milling, and paving operations. When operations damage existing traffic signal loops, the Contractor shall replace the loops not more than 7 calendar days after final asphalt lift is placed. Contractor shall immediately notify the Traffic Services Manager at (678) 512-3200 when loops are damaged. When loop replacements at an intersection are complete the contractor shall again notify the Traffic Services Manager.

Location of replacement loop detectors and lead-in wire, where practical, shall coincide with original location. If, at the splice location a pull box does not exist, a traffic signal pull box (PB-1) conduit and loop lead-in shall be installed per GDOT specifications and as directed by the Traffic Services Manager. Pull boxes installed shall be on the GDOT qualified products list. Testing of the replacement loop detectors shall be performed at the point where the loop wire is spliced to the existing shielded lead-in wire. There shall be no work or testing required beyond this splice point.

SAFETY

Beginning with mobilization and ending with acceptance of work, the Contractor shall be responsible for providing a clean and safe work environment at the project site. The Contractor shall comply with all OSHA regulations as they pertain to this project.

CLEANUP

All restoration and clean-up work shall be performed daily. Operations shall be suspended if the Contractor fails to accomplish restoration and clean-up within an acceptable period of time. Failure to perform clean-up activities may result in suspension of the work.

REQUIRED BONDS

5% Bid Bond (Contract value).

100% Payment Bond (Contract value).

100% Performance Bond (Contract value)

INSURANCE REQUIREMENTS

The Contractor shall, at its own cost and expense, obtain and maintain worker’s compensation and commercial general liability insurance coverage covering the period of this Agreement, such insurance to be obtained from a responsible insurance company legally licensed and authorized to transact business in the State of Georgia. The minimum limit for Worker’s Compensation Insurance shall be the statutory limit for such insurance. The minimum limits for commercial general liability insurance, which must include personal liability coverage will be $1,000,000 per person and $2,000,000 per occurrence for bodily injury and $500,000 per occurrence for property damage

EXHIBIT B.

COST PROPOSAL

Offeror’s shall enter their firm’s unit price cost proposal directly into BidNet at the time of your bid submission. Offeror’s may copy and pace line items from bid document page into an excel sheet in order to create a worksheet. No worksheet shall accompany a firm’s bid submission.

EXHIBIT C.

REQUIRED FORMS AND DOCUMENTS

Offeror(s) will list N/A-Not Applicable to the fields below, if applies:

employees

BID BOND

KNOW ALL MEN BY THESE PRESENTS, THAT ______________

(Name of Contractor)_________________ (Address of Contractor) at __________________________________

(Corporation, Partnership and or Individual) hereinafter called Principal, and ________________

(Name of Surety)

(Address of Surety

A corporation of the State of _________________, and a surety authorized by law to do business in the State of Georgia, hereinafter called Surety, are held and firmly bound unto

City of Johns Creek Georgia (Name of Obligee) 10700 Abbotts Bridge Rd., Suite 190, Johns Creek, Georgia 30097 (Address of Obligee)

Hereinafter referred to as Obligee, in the penal sum of___________________________________ Dollars ($ _______________) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.

WHEREAS, the Principal is about to submit, or has submitted, to the City of Johns Creek, Georgia, a proposal for furnishing materials, labor and equipment for:

TITLE

WHEREAS, the Principal desires to file this Bond in accordance with law in lieu of a certified Bidder’s check otherwise required to accompany this Proposal.

NOW, THEREFORE, the conditions of this obligation are such that if the bid is accepted, the Principal shall within ten days after receipt of notification of the acceptance execute a Contract in accordance with the Bid and upon the terms, conditions, and prices set forth in the form and manner required by the City of Johns Creek, Georgia, and execute a sufficient and satisfactory Performance Bond and Payment Bond payable to the City of Johns Creek, Georgia, each in an amount of 100% of the total Contract Price, in form and with security satisfactory to said the City of Johns Creek, Georgia, and otherwise, to be and remain in full force and virtue in law; and the Surety shall, upon failure of the Principal to comply with any or all of the foregoing requirements within the time specified above, immediately pay to the City of Johns Creek, Georgia, upon demand, the amount hereof in good and lawful money of the United States of America, not as a penalty, but as liquidated damages.

PROVIDED, FURTHER, that Principal and Surety agree and represent that this bond is executed pursuant, to and in accordance with the applicable provisions of the Official Code of Georgia Annotated, as Amended, including, but not limited to, O.C.G.A. SS 13-10-1, et. Seg. And SS 36- 86-101, et. Seg. And is intended to be and shall be constructed as a bond in compliance with the requirements thereof.

Signed, sealed, and dated this __________ day of ________________________________A.D., 20____

ATTEST:

(Principal Secretary) (Principal)

(SEAL) BY: _________________________________

(Witness to Principal) (Address)

(Address) (Surety)

ATTEST

BY: _______________________________

(Attorney-in-Fact) and Resident Agent (Attorney-in-Fact)

(Seal) _________________________________ (Address) (Witness as to Surety) (Address)

Form W-9 (Rev. October 2018) Department of the Treasury Internal Revenue Service

Request for Taxpayer Identification Number and Certification

Go to www.irs.gov/FormW9 for instructions and the latest information.

Give Form to the requester. Do not send to the IRS.

P ri n t o r ty p e

S ee

S p e c if ic

I n s tr u c ti o n s o n p ag e

3.

1 Name (as shown on your income tax return). Name is required on this line; do not leave this line blank.

2 Business name/disregarded entity name, if different from above

3 Check appropriate box for federal tax classification of the person whose name is entered on line 1. Check only one of the following seven boxes.

Individual/sole proprietor or single-member LLC

C Corporation S Corporation Partnership Trust/estate

Limited liability company. Enter the tax classification (C=C corporation, S=S corporation, P=Partnership)

Note: Check the appropriate box in the line above for the tax classification of the single-member owner. Do not check LLC if the LLC is classified as a single-member LLC that is disregarded from the owner unless the owner of the LLC is another LLC that is not disregarded from the owner for U.S. federal tax purposes. Otherwise, a single-member LLC that is disregarded from the owner should check the appropriate box for the tax classification of its owner.

Other (see instructions)

4 Exemptions (codes apply only to certain entities, not individuals; see instructions on page 3):

Exempt payee code (if any)

Exemption from FATCA reporting code (if any)

(Applies to accounts maintained outside the U.S.)

5 Address (number, street, and apt. or suite no.) See instructions.

6 City, state, and ZIP code

Requester’s name and address (optional)

7 List account number(s) here (optional)

Part I Taxpayer Identification Number (TIN)

Enter your TIN in the appropriate box. The TIN provided must match the name given on line 1 to avoid backup withholding. For individuals, this is generally your social security number (SSN). However, for a resident alien, sole proprietor, or disregarded entity, see the instructions for Part I, later. For other entities, it is your employer identification number (EIN). If you do not have a number, see How to get a TIN, later.

Note: If the account is in more than one name, see the instructions for line 1. Also see What Name and Number To Give the Requester for guidelines on whose number to enter.

Social security number or Employer identification number

Part II Certification

Under penalties of perjury, I certify that:

1. The number shown on this form is my correct taxpayer identification number (or I am waiting for a number to be issued to me); and

2. I am not subject to backup withholding because: (a) I am exempt from backup withholding, or (b) I have not been notified by the Internal Revenue

Service (IRS) that I am subject to backup withholding as a result of a failure to report all interest or dividends, or (c) the IRS has notified me that I am no longer subject to backup withholding; and

3. I am a U.S. citizen or other U.S. person (defined below); and

4. The FATCA code(s) entered on this form (if any) indicating that I am exempt from FATCA reporting is correct.

Certification instructions. You must cross out item 2 above if you have been notified by the IRS that you are currently subject to backup withholding because you have failed to report all interest and dividends on your tax return. For real estate transactions, item 2 does not apply. For mortgage interest paid, acquisition or abandonment of secured property, cancellation of debt, contributions to an individual retirement arrangement (IRA), and generally, payments other than interest and dividends, you are not required to sign the certification, but you must provide your correct TIN. See the instructions for Part II, later.

Sign Here

Signature of

U.S. person Date

General Instructions Section references are to the Internal Revenue Code unless otherwise noted.

Future developments. For the latest information about developments related to Form W-9 and its instructions, such as legislation enacted after they were published, go to www.irs.gov/FormW9.

Purpose of Form An individual or entity (Form W-9 requester) who is required to file an information return with the IRS must obtain your correct taxpayer identification number (TIN) which may be your social security number (SSN), individual taxpayer identification number (ITIN), adoption taxpayer identification number (ATIN), or employer identification number (EIN), to report on an information return the amount paid to you, or other amount reportable on an information return. Examples of information returns include, but are not limited to, the following.

• Form 1099-INT (interest earned or paid)

• Form 1099-DIV (dividends, including those from stocks or mutual funds)

• Form 1099-MISC (various types of income, prizes, awards, or gross proceeds)

• Form 1099-B (stock or mutual fund sales and certain other transactions by brokers)

• Form 1099-S (proceeds from real estate transactions)

• Form 1099-K (merchant card and third party network transactions)

• Form 1098 (home mortgage interest), 1098-E (student loan interest), 1098-T (tuition)

• Form 1099-C (canceled debt)

• Form 1099-A (acquisition or abandonment of secured property)

Use Form W-9 only if you are a U.S. person (including a resident alien), to provide your correct TIN.

If you do not return Form W-9 to the requester with a TIN, you might be subject to backup withholding. See What is backup withholding, later.

Cat. No. 10231X Form W-9 (Rev. 10-2018)

REFERENCES

REFERENCES: Please provide the City with three (3) clients of similar size and scope of work. You may submit your standard list of references as opposed to using this form, but you still need to complete and sign at the bottom.

REFERENCE # 1

Name of Entity/Firm:

Mailing Address:

City/State/Zip Code:

Contact Person Name: _____________________________________________________

Contact Phone Number and Email:

Date When Work Performed:

Description of Work Performed _

REFERENCE # 2

Contact Person Name: ____________________________________________________

Description of Work Performed

REFERENCE # 3

Contact Person Name: ____________________________________________________

Description of Work Performed

EXHIBIT D.

LOCATION MAP

Other files

File Type Posted
22-080-1 Sample Contract —
22-080-2 Addendum #2 —
22-080-1 Addendum #1 —
22-080-1 NOIA —
22-080-1 received Bids —
Award Information —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .