22-06-89-03 - Plans.pdf

PDF 3 MB Posted

Attached to
Bitternut Lake Boat Ramp, Shimek State Forest, Van Buren County
Solicitation number
22-06-89-03
Issued by
Scott County, Iowa

About this file

This is a plans document for the State of Iowa related to the Bitternut Lake Boat Ramp project located in Shimek State Forest, Van Buren County. The project scope encompasses replacing an existing gravel boat ramp with a Portland Cement Concrete (PCC) pavement ramp, constructing an ADA-compliant boat parking stall, and enlarging and regrading the existing parking lot to accommodate improved accessibility and vehicle circulation. The bid closing date is October 1, 2026, at 3:00 PM, with bids required to be submitted electronically according to the General Information and Instructions to Bidders. Bidders should refer to the complete plans and bid package documents for detailed specifications, site conditions, and submission requirements.

The plans document serves as the technical reference material establishing the design standards, dimensions, material specifications, and construction requirements for the proposed improvements. As the plans component of the bid package, this document provides the graphical and written specifications necessary for contractors to prepare accurate cost estimates and develop construction methodologies. Additional information regarding pricing terms, bonding requirements, project funding sources, and specific bid conditions would be contained in the associated bid package and General Information documents referenced in the contract opportunity.

View the file

Other files

File Type Posted
22-06-89-03 - Bid Package.pdf PDF
22-06-89-03 - Addendum No 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Michael D. Dufoe Date License Number: 17753 My license renewal date is December 31, 2027 Pages or sheets covered by this seal:

All

This project includes replacing a gravel boat ramp with a PCC pavement ramp, an ADA boat parking stall, and enlarging and regrading the existing parking lot.

Iowa DNR

Morgan Nordyke

515-250-3711 morgan.nordyke@dnr.iowa.gov

6200 Park Ave, Ste 200

Des Moines, IA, 50123

Iowa Department of Natural Resources Construction Documents for

Shimek State Forest Van Buren County, Iowa

Bitternut Lake Boat Ramp Project No. 22-06-89-03

Project Location Map

N

Sheet Index

Cover Sheet Project Overview Quantities & Information Boat Ramp Grading Plan Boat Ramp Plan & Profile Details

Iowa DNR

Bruce Flippin

515-689-8009 bruce.flippin@dnr.iowa.gov

6200 Park Avenue, Ste 200

Des Moines, IA 50321

I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.

Directory Project Manager

Organization

Contact

Phone

Email

Address

City, State, Zip

District Engineer Organization

Contact

Phone

Email

Address

City, State, Zip

Project Description

Project Number:

22-06-89-03

Bid Date:

mm/dd/yyyy

Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270

Bitternut Lake Boat Ramp Shimek State Forest, Van Buren County

Sheet No:Drawn by: MN

G:

\S ha re d dr iv es

\D N

R

LW

B

EN

G Pr oj ec ts \8

9_ Va n Bu re n\

-0

6-

-0

Sh im ek F or es t B itt er nu t B oa t R am p\ De sig n\

-0

6-

-0

Sh im ek B itt er nu t B oa t R am p.

dw g

8/

/2

1:

P

M Pl ot D at e:

Revision Date Cover Sheet

Project Area

AutoCAD SHX Text

MICHAEL D. DUFOE 17753

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text W

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

0' 500' 1000'

N

Project Number:

22-06-89-03

Bid Date:

mm/dd/yyyy

Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270

Bitternut Lake Boat Ramp Shimek State Forest, Van Buren County

Sheet No:Drawn by: MN

G:

\S ha re d dr iv es

\D N

R

LW

B

EN

G Pr oj ec ts \8

9_ Va n Bu re n\

-0

6-

-0

Sh im ek F or es t B itt er nu t B oa t R am p\ De sig n\

-0

6-

-0

Sh im ek B itt er nu t B oa t R am p.

dw g

8/

/2

1:

P

M Pl ot D at e:

Revision Date 2Project Overview

Des M oines River

Farmington

Bitternut Lake Road

Ro ut e W

270th St

Route J5

Project Location Bitternut Lake

Estimate Reference Information 1.

2.

3.

4.

5.

6.

7.

8.

9.

11.

12.

Mobilization - Payment per Iowa DOT 2533.

Clearing and Grubbing - To be paid lump sum for removal of small trees/bushes (including 3 larger trees) within the disturbed area.

Downed trees shall be taken to the gravel parking lot in the Bitternut campground. Stumps to be removed and disposed of offsite. Trees to be cut down during the October 1st - March 31st window.

Silt Fence - Installation per Iowa DOT Section 4196, locations to be determined in the field by DNR Field Engineer.

Excavation (Class 10) - Per Iowa DOT Section 2102. This item is for excavating a new boat ramp and parking area as shown in plans.

Quantity calculated with AutoCAD surface information including a 25% fill factor. Excavated material is to be removed and disposed of offsite.

Special Backfill - Place 6" of special backfill under the ADA parking stall and boat ramp concrete per Iowa DOT section 4132.

PCC Pavement - 6" Depth, Reinforced - Use Iow DOT Class C4-Mix.

Shall be reinforced by #4 bars, 24" O.C., each way. Grading necessary to meet plan elevations shall be incidental.

PCC Pavement - 6" Depth, Non-reinforced - Use Class C4-Mix.

Maximum 1.8% slope in all directions. Grading necessary to meet plan elevations shall be incidental.

Erosion Stone, 6" Depth - Place 6 " of erosion stone in ditch along both sides of the boat ramp per Iowa DOT Section 4130.

Macadam Stone, 9" Depth - To be used for the base of the new parking area per Iowa DOT Section 2210.

Class A Road Stone, 3" Depth - Install on top of the 9" of macadam stone in the parking area per Iowa DOT Section 4120.

ADA Signage and Painting -

a. Painting - Yellow, High Build Waterborne Paint, Pavement shall be power washed before painting. A minimum of a 7-day waiting period after paving shall be observed. Paint shall be 4" wide. Hatched ADA access areas shall have 2-foot spacing per

MUTCD.

b. Signage - Purchase ADA compliant handicap parking sign and supply to local park staff to install.

Site Restoration - Site to be reestablished back to original condition including seeding and mulching all disturbed areas with Iowa DOT Type 2 Seeding Mix per Section 9010.

Project Number:

22-06-89-03

Bid Date:

mm/dd/yyyy

Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270

Bitternut Lake Boat Ramp Shimek State Forest, Van Buren County

Sheet No:Drawn by: MN

G:

\S ha re d dr iv es

\D N

R

LW

B

EN

G Pr oj ec ts \8

9_ Va n Bu re n\

-0

6-

-0

Sh im ek F or es t B itt er nu t B oa t R am p\ De sig n\

-0

6-

-0

Sh im ek B itt er nu t B oa t R am p.

dw g

8/

/2

1:

P

M Pl ot D at e:

Revision Date Quantities & General Information

General Information

1. Verify actual locations and elevations with DNR Engineer.

2. All work shall conform to and be performed in accordance with all applicable codes and ordinances.

3. The contractor shall visit the site and inspect the project area and thoroughly familiarize themselves with the actual job conditions prior to bidding and the start of work. Failure to visit the project site shall not relieve the contractor from performing the work in accordance to the plans, specification, special provisions and contract.

4. The contractor shall verify, at the site, all dimensions and conditions shown on the plans and shall notify the DNR Engineer of any discrepancies, omissions, and/or conflicts prior to proceeding with the work.

5. It shall be the contractor’s responsibility to provide waste areas or disposal sites for excess material (excavated material or broken concrete) which is not desirable to be incorporated into the work involved on this project. No payment for overhaul will be allowed for material hauled to these sites.

No material shall be placed within the right-of-way, unless specifically stated in the plans or approved by the DNR Engineer.

6. The contractor shall not disturb desirable grass areas and desirable trees outside the construction limits. The contractor will not be permitted to park or service vehicles and equipment or use these areas for storage of materials. Storage, parking and service areas will be subject to the approval of the DNR Engineer.

7. Where utilities and fixtures are shown as Existing on the plans or encountered within the construction area, it shall be the responsibility of the contractor to notify the DNR Engineer of those utilities prior to the beginning of any construction. The contractor shall be afforded access to these facilities for necessary modification of services. Underground facilities, structures and utilities have been plotted from available surveys and records and therefore their locations must be considered approximate only. It is possible there may be others, the existence of which is presently not known or shown. It is the contractor’s responsibility to determine their existence and exact location and to avoid damage thereto. No claims for additional compensation will be allowed to the contractor for any interference or delay caused by such work.

8. The contractor shall shape graded area to maintain surface drainage. All elevations are to finish grade.

9. The contractor is expected to have materials, equipment, and labor available on a daily basis to install and maintain erosion control features on the project. This may involve seeding, silt fence, rock ditch checks, silt basins or silt dikes.

-0+74

0+00

0+98

0' 10' 20'

N

Project Number:

22-06-89-03

Bid Date:

mm/dd/yyyy

Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270

Bitternut Lake Boat Ramp Shimek State Forest, Van Buren County

Sheet No:Drawn by: MN

G:

\S ha re d dr iv es

\D N

R

LW

B

EN

G Pr oj ec ts \8

9_ Va n Bu re n\

-0

6-

-0

Sh im ek F or es t B itt er nu t B oa t R am p\ De sig n\

-0

6-

-0

Sh im ek B itt er nu t B oa t R am p.

dw g

8/

/2

1:

P

M Pl ot D at e:

Revision Date Boat Ramp Grading Plan

AD

A

Pa rk in g S ta ll

Boat R amp

Proposed additional parking area

Grade new 4' wide, 1' depth ditch with 3:1 side slopes around outside edge of parking area

Existing gravel parking area to be cored out.

Reuse existing rock as base if possible. Place 312 tons of new macadam stone topped with 112 tons of Class A road stone at new grades

10'

R26.5'

Install 120 ft of silt fence at edge of lake

Remove trees within disturbed area (3)

Place 23 tons of erosion stone along edge of ramp

-0+74 0+00 0+98

2.

2.

N: 247,724.75 E: 2,129,824.67

EL: 640.20

N: 247,716.21 E: 2,129,838.20

EL: 640.49

N: 247,686.71 E: 2,129,800.64

EL: 640.65

N: 247,678.17 E: 2,129,814.16

EL: 640.94

Boat Ramp CL

-1+00 -0+90 -0+80 -0+70

3.

3.

-0+60

3.

2.

-0+50

3.

2.

-0+40

3.

2.

-0+30

3.

2.

-0+20

3.

1.

-0+10

3.

1.

0+00

2.

1.

0+10

2.

0.

0+20

1.

9.

0+30

9.

8.

0+40

7.

7.

0+50

5.

5.

0+60

3.

4.

0+70

1.

2.

0+80

8.

0.

0+90

8.

1+00 1+10 1+20

-8.00%

-18.00%

-12.00%

-16.00%

-2.49%

Sta = -0+74.47 Elev = 643.21

Sta = 0+20.00 Elev = 639.76

Sta = 0+96.00 Elev = 627.80

Sta = 0+40.00 Elev = 637.36

Sta = 0+66.00 Elev = 633.20

Sta = 0+00.00 Elev = 641.36

0' 7' 15'

N

Project Number:

22-06-89-03

Bid Date:

mm/dd/yyyy

Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270

Bitternut Lake Boat Ramp Shimek State Forest, Van Buren County

Sheet No:Drawn by: MN

G:

\S ha re d dr iv es

\D N

R

LW

B

EN

G Pr oj ec ts \8

9_ Va n Bu re n\

-0

6-

-0

Sh im ek F or es t B itt er nu t B oa t R am p\ De sig n\

-0

6-

-0

Sh im ek B itt er nu t B oa t R am p.

dw g

8/

/2

1:

P

M Pl ot D at e:

Revision Date Boat Ramp Plan & Profile

Place 153 SY of reinforced PCC, 6" depth on 46 tons of granular subbase.

Proposed elev

Existing elev

Proposed PCC Boat Ramp

Proposed gravel parking

Existing ground

Normal pool elev 631.80

Place 89 SY of PCC, 6" depth on 27 tons of granular subbase.

Edge of normal pool

Last 30' of pavement to be formed and pushed in place on two layers of poly sheeting to assist in push

30'

11' 5'

Joint per Detail A Sheet 6

Joint per Detail C Sheet 6

18"

60°

45°

NOT TO SCALE

NOTE: BEND ENDS OF

ANGLE IN TO FORM BOW

OF BOAT AND WELD

2-1/2" 1-1/2" X 1-1/2"

ANGLES, CONTINUOUS

WELD EACH ANGLE

Note: Grooving Device is available from DNR Field Engineer.

2-1/2" 1-1/2"

DETAIL OF GROOVING DEVICE

PLAN

SECTION

SECTION

2'

8"

6"

6" 6"

6"

1'-6"

6"

Note:

Expansion joint material, reinforcing steel, and tie bars to be incidental to boat ramp bid item.

6" 6"

6"

1'-6"

15" min.

24"

Polyethylene moisture barrier

Special Backfill (6" min. Depth)

Drill and epoxy #4 bar into existing slab, 15" length. Place at 24", o.c., shall be continuous with new boat ramp slab reinforcement.

6" Boat Ramp Slab shall be reinforced with No. 4 bars at 24" o.c. (each way) Minimum lap length of 12"

Detail C Not to scale

Detail B Not to scale

Detail A Not to scale

Expansion joint and sealant

Expansion joint and sealant

Expansion joint and sealant where the ramp meets the existing pavement

Special Backfill (6" min. Depth)

Special Backfill (6" min. Depth)

6" Boat Ramp Slab shall be reinforced with No. 4 bars at 24" o.c. (each way) Minimum lap length of 12"

6" Boat Ramp Slab shall be reinforced with No. 4 bars at 24" o.c. (each way) Minimum lap length of 12"

Note: Ramp finish shall be grooved diagonally to form a non-skid surface - min 1" depth, max. 2-1/2 between grooves and/or as directed by the inspector. On river ramps, grooves shall slope towards downstream side. Grooving Device may be obtained from the DNR Field Engineer.

Pushed in slab

Project Number:

22-06-89-03 Bid Date:

mm/dd/yyyy Iowa Department of Natural Resources

Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270

Bitternut Lake Boat Ramp Shimek State Forest, Van Buren County

Sheet No:Drawn by: MN

G:

\S ha re d dr iv es

\D N

R

LW

B

EN

G Pr oj ec ts \8

9_ Va n Bu re n\

-0

6-

-0

Sh im ek F or es t B itt er nu t B oa t R am p\ De sig n\

-0

6-

-0

Sh im ek B itt er nu t B oa t R am p.

dw g

8/

/2

1:

P

M Pl ot D at e:

Revision Date Details

2' 3' 14' 3' 2'

Boat Ramp Typical Section

3:1 Slope toexisting grade

Place erosion stone 6" depth

Proposed 6" reinforced PCC on 6" granular subbase

Reinforce with no. 4 bars every 24"

Sheets and Views
22-06-89-03 Shimek Bitternut Boat Ramp-1
22-06-89-03 Shimek Bitternut Boat Ramp-2
22-06-89-03 Shimek Bitternut Boat Ramp-3
22-06-89-03 Shimek Bitternut Boat Ramp-4
22-06-89-03 Shimek Bitternut Boat Ramp-5
22-06-89-03 Shimek Bitternut Boat Ramp-6
2026-08-21T13:56:17-0500
Michael Dufoe

File details come from the government source that posted it. Updated .