This is Addendum No. 1 to a competitive quotation for minor public improvement contract issued by the Iowa Department of Natural Resources, Land & Waters Bureau, for the Bitternut Lake Boat Ramp project located at Shimek State Forest in Lee County, Iowa (Project Number 22-06-89-03). The project scope includes replacing a gravel boat ramp with Portland cement concrete pavement, constructing an ADA-compliant boat parking stall, and enlarging and regrading the existing parking lot. The addendum modifies the original bid date from October 1, 2026 to October 8, 2026 at 3:00 p.m., adds units to the proposal quantities, and extends the project completion date from May 14, 2024 to May 14, 2027. Work items include mobilization, clearing and grubbing, silt fence installation (120 linear feet), excavation (608 cubic yards), granular subbase (74 tons), PCC pavement for boat ramp (152 square yards) and ADA stall (89 square yards), erosion stone (23 tons), macadam (312 tons), class A road stone (112 tons), ADA signage and painting, and site restoration. All proposals must be submitted electronically to constructionbids@dnr.iowa.gov by the deadline, with acknowledgment of Addendum No. 1 required on the proposal form.

Payment for this unit price contract will be made within 30 days of receipt of approved payment requests based on actual units incorporated into the work, with the number of units shown in the schedule considered approximate only. The Department reserves the right to withhold up to 3 percent of payments consistent with Iowa Code Chapter 573, and monthly estimates may be requested if work extends beyond one month, with no estimate less than five hundred dollars except for final estimates. Bidders must be registered with the Iowa Contractor Registration program, and preference will be given to products grown and coal produced within Iowa. The successful bidder will be the lowest responsive, responsible bidder and must guarantee construction for one year from the Department's final acceptance. The offer contained in any proposal shall remain valid for 45 days from the submission deadline. Contact for procurement matters is Darin Galbraith, Procurement Specialist, at constructionbids@dnr.iowa.gov or 515-344-0055; contact for technical questions is Bruce Flippin, District Engineer, at Bruce.flippin@dnr.iowa.gov or 515-689-8009.

View the file

Other files

File Type Posted
22-06-89-03 - Plans.pdf PDF
22-06-89-03 - Bid Package.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM No. 1

LAND & WATERS BUREAU

6200 Park Ave., Ste. 200, Des Moines, IA 50312

SHIMEK STATE FOREST

BITTERNUT LAKE BOAT RAMP

LEE COUNTY, IOWA

PROJECT NUMBER: 22-06-89-03

SEPTEMBER 23, 2026

This Addendum is issued to modify, explain or correct the original Drawings and Specifications, and is hereby made a part of the Contract Documents. Please attach this Addendum to the Project Manual in your possession. Insert the number and issue date of this Addendum in the blank space provided on the Proposal Form.

Plans:

A. No Changes.

Specifications:

A. Page 1: The bid date has been changed from 10/1/2026 to 10/8/2026.

B. Page 2: A. Units have been added to the quantities in the proposal (ATTACHMENT A).

B. Acknowledgement of Addendum No 1 and the date, September 23, 2026 has been added to the proposal (ATTACHMENT A).

C. Page 4: The completion date has been changed from 5/14/2024 to 5/14/2027.

Replace the original pages with the attached pages.

Rev.7-07-2026 COMPETITIVE QUOTATION (MINOR) PUBLIC IMPROVEMENT CONTRACT

IOWA DEPARTMENT OF NATURAL RESOURCES

GENERAL INFORMATION AND INSTRUCTIONS TO BIDDERS

FOR

Bitternut Lake Boat Ramp, 22-06-89-03

COMPETITIVE QUOTATION

Please read and familiarize yourself with all of these Instructions before preparing your proposal.

1. To be considered a responsible and responsive bidder, all the information requested on the Proposal Form

(Attachment A) must be completed and received by the Iowa Department of Natural Resources by 3:00pm, 10/8/2026. If you are signing on behalf of a corporation, include your title in the signature line. Keep a copy of the proposal as your record of your submitted proposal.

2. Email your proposal to constructionbids@dnr.iowa.gov. All proposals must be submitted electronically. No paper proposals will be accepted. Include the following information in the subject line: Project Name, Contract Number, and Bid Letting Date.

Contact for the competitive quotation process is as follows:

Darin Galbraith, Procurement Specialist constructionbids@dnr.iowa.gov 515-344-0055

Contact for questions on plans and specifications is as follows:

Bruce Flippin, District Engineer 901 W Stone Ave.

Fairfield, IA 52556 Bruce.flippin@dnr.iowa.gov 515-689-8009

3. DO NOT alter the proposal with alternates, qualifications, reservations, or stipulations. If the bid is not a lump sum, clearly identify unit prices. In event of any inconsistency between the Proposed Bid Total and the bid total derived from provided unit prices, unit prices will prevail. (See Article 4.)

4. Your proposal will be audited, extensions and totals verified, and notification of decision of award will be made promptly after the closing date for receipt of proposals shown above. The lowest responsive, responsible bidder will be eligible for award of a subsequent contract. The DEPARTMENT reserves the unconditional right not to award a contract for the project described in these instructions and related attachments.

5. Both successful and unsuccessful bidders will be notified of the result of the bidding. If you are the successful bidder, an award letter and contract documents will be sent to you with detailed instructions for completion. By submitting a proposal, you agree and understand that acceptance of your proposal by the DEPARTMENT constitutes a binding agreement to enter into a contract and that the offer contained in your proposal shall be valid for a period of 45 days from the deadline for submission of proposals.

mailto:constructionbids@dnr.iowa.gov mailto:constructionbids@dnr.iowa.gov

ATTACHMENT A - PROPOSAL FORM

PROJECT: Bitternut Lake Boat Ramp CONTRACT NO.: 22-06-89-03

LOCATION: Shimek State Forest

ITEM

NO.

DESCRIPTION

ESTIMATED

QUANTITY

UNIT PRICE* AMOUNT

DOLLARS CENTS DOLLARS CENTS

1 Mobilization 1 LS

2 Clearing and Grubbing 1 LS

3 Silt Fence 120 LF

4 Excavation (Class 10) - Disposed Offsite 608 CY

5 Granular Subbase 74 TONS

PCC Pavement - 6" Depth, Reinforced (Boat Ramp)

152 SY

7 PCC Pavement - 6" Depth (ADA Stall) 89 SY

8 Erosion Stone, 6" (For Ditch) 23 TONS

9 Macadam, 9" Depth 312 TONS

10 Class A Road Stone, 3" Depth 112 TONS

11 ADA Signage and Painting 1 LS

12 Site Restoration 1 LS

*Unit Prices Prevail; Amount equals Estimated Quantity multiplied by Unit Price

Proposed Bid Total: $

By virtue of statutory authority, preference will be given to products grown and coal produced within the State of Iowa.

Signature Date Legal Name of Company

Printed Name Street Address

Title City, State, Zip Code

Phone No. Remit to Address (if different than above)

Email Address Remit to City, State, Zip Code (if different than above)

Iowa Contractor Registration Number

Bidder Acknowledges Receipt of Any Issued Addenda: Addendum No 1. September 23, 2026

Subcontractor Information

Name Iowa Contractor

Registration Number Email Address

● CONTRACTOR’s Proposal attached as Attachment A.

It is intended that the specifications and plans, which include the Description of the Project on the first page of this Contract and supplemented as may be necessary by the DEPARTMENT, shall provide for the completion of the work specified herein.

The omission of specific reference to any minor items of material or work reasonably necessary to provide a complete project, will not release the CONTRACTOR from the responsibility of furnishing or doing the items omitted.

The CONTRACTOR shall leave the site free and clean of all construction equipment, materials, and rubbish. The CONTRACTOR shall replace any defective material or workmanship in the construction at no cost to the DEPARTMENT, and shall guarantee the construction for a period of one year from the date of the Department’s final acceptance.

ARTICLE 3 - TIME OF COMMENCEMENT AND COMPLETION

The time of commencement of work under this contract shall be within a reasonable period of time after the preconstruction conference as approved by the Department. The date of completion of the work under this contract shall be: 5/14/2027.

ARTICLE 4 - BASIS OF PAYMENT

The DEPARTMENT shall make payment within 30 days of receipt of a payment request which is approved as payable by the Department, on this contract as is indicated below, by one of the following methods:

1. Lump Sum Basis- This section is not applicable to this contract. Except for adjustments as provided for herein, the

DEPARTMENT shall pay to the CONTRACTOR, for the performance of work, the lump sum of $____________, hereinafter called the Contract Sum. The Contract Sum shall be equitably adjusted to cover changes in the work ordered by the DEPARTMENT, but not shown on the drawings or required by the specifications. Such increases or decreases in the Contract Sum shall be determined by agreement between the DEPARTMENT and the CONTRACTOR.

2. Unit Price Basis- This section is applicable to this contract. The DEPARTMENT shall pay to the CONTRACTOR the unit price amount stated with respect to each item of work on the attached schedule for the total number of units each item of work completed. The number of units shown on the attached schedule is approximate only, and the final payment shall be made for the actual number of units that are incorporated into or made necessary by the work covered by this contract. Should the number of units of completed work of any individual item shown on the attached schedule vary by more than twenty percent (20%) from the number of units stated, either the DEPARTMENT or the CONTRACTOR may request a revision of the unit price for the item so affected, but such changes shall not exceed 10% of the total Contract amount. Both parties agree that under such conditions an equitable revision of the price shall be made. Changes that cannot be classified under any of the contract units may be performed at mutually agreed upon unit prices, or on a lump sum basis.

The Department, under this Contract, shall reserve the right to withhold up to 3% consistent with Iowa Code Chapter

573. The Contractor may invoice the Department only for work completed. If the work extends over a period of more than one month, the DEPARTMENT may, upon request by the CONTRACTOR, make written estimates of the value of materials complete in place and the work performed. Estimates shall be on a monthly basis or on a longer period of time mutually agreed upon. No estimate, except the final estimate, shall be for less than five hundred dollars ($500). The estimates shall be figured at the contract unit prices for contracts on a unit price basis or on a mutually agreed upon percentage of the total work completed for contracts on a lump sum basis. Each estimate shall be filed in the form of a claim against the DEPARTMENT. Estimates are approximate only, and shall be subject to correction in the first estimate rendered following the discovery of an error in any previous estimate. Should a reasonable doubt arise as to the integrity of any part of the work completed prior to the final acceptance and payment, the department will deduct from the first estimate rendered, after the discovery of such work, an amount equal in value to the defective or questioned work. Further, such work will not be included in a subsequent estimate until the defects have been remedied or the