Text version
*WARNING: This document contains For Official Use Only (FOUO) and Privacy Act information which must be protected or removed IAW AFI 33-119, AFI 33-129, AFI 33-219, AFI 33-332, and DOD Regulation 5400.7/AF Supplement prior to further disclosure.
FOR OFFICIAL USE ONLY
STATEMENT OF WORK
For
BUILDING 6 HVAC HOT WATER BOILER
CIRCULATION PUMP REPLACEMENTS
W/O 20210101
BUILDING 6
November 20, 2020
161st AIR REFUELING WING
GOLDWATER AIR NATIONAL GUARD BASE
AFI 33-332, and DOD Regulation 5400.7/AF Supplement prior to further disclosure.
FOR OFFICIAL USE ONLY
Scope of Work Bldg. 6 Hot Water Boiler Circulation Pump Replacement: Replace Two (2) Existing TACO Hot Water Circulating Pumps and associated components located at Building 6 for HVAC Heating:
1. Supply Two (2) New TACO FI Series Base Mounted Model 1509D Circulating Pumps or Equal Specifications to include all but not limited to the following:
• SIZE: 2 ½” X 1 ½ “ X 8 1/2” Cast Iron Bronze Fitted Pump
Construction
• GPM: 78
• Head/FT: 75’
• MOTOR: 5 H.P. 1760 RPM, 460v/3ph/60Hz, Premium Efficient, Inverter Ready. TEFC
• Steel Pump/Motor Base
• Flex Type Coupling w/Coupling Guard
• Suction Diffuser w/Strainer
• Isolation Valves
• BARBER/COLMAN 0-60PSI Differential Pressure Switch or Equal
• TACO PMPV Multi-Purpose Valves or Equal
• Concrete/Grout Pump Pad as Needed for Installation.
• Pipe, Pipe Insulation, Pipe Fittings, Flex Connectors, Flange Kits, Bolt Kits and all Miscellaneous Materials as Needed for Complete Installation.
• Perform a Flush of the System and Fill with Treated Water
• Testing & Balance
2. Provide all Labor Necessary for Removal / Disposal of Existing Pumps and the Installation, Startup & Testing of New TACO FI Series Base Mounted Model 1509D Circulating Pumps or Equal.
Located at the 161st ARW, Goldwater Air National Guard Base, 3200 E. Old Tower Rd., Phoenix, AZ. 85034.
3. Duration of project not to exceed 90 days from Notice to Proceed.
Description of Services:
The Contractor shall provide all supplies, parts, equipment, tools, labor, testing, personnel, crane, rigging, transportation, supervision, management & engineering services necessary to Remove Two (2) Existing TACO Circulating Pumps and Installation of Two New TACO FI Series Base Mounted 1509D Circulating Pumps or Equal located at Building 6 and to provide a warranty of 1 year parts and 1 year labor.
The project will be completed in accordance with the project contract documents, drawings, specifications, Federal and State law, and the terms and conditions of the contract.
AFI 33-332, and DOD Regulation 5400.7/AF Supplement prior to further disclosure.
FOR OFFICIAL USE ONLY
The Plan for Removal of Existing TACO Circulating Pumps and Installation of Two New TACO FI Series Base Mounted 1509D Circulating Pumps or Equal at Bldg. 6 shall be submitted to the Contracting Officer and designated 161st Civil Engineer Squadron personnel for approval, within 7 days of contract award. The plan shall include an estimated schedule of all work to be performed. Once approved, the contractor shall follow the schedule as closely as possible to facilitate the 161st Civil Engineer Squadron inspection process.
Government Furnished Equipment, Property And Services:
Utilities: The Contractor may use reasonably required amounts of available government furnished electricity and water from existing outlets and lines without charge. The contractor shall be responsible to conservatively use utilities only as required for intended purposes under the requirements of this contract.
1.1. Point of Contact. The designated 161st ARW/CES Contracting Officer Representative (COR) will be the primary government Point of Contact concerning Removal of TACO Circulating Pumps and Installation of New Two New TACO FI Series Base Mounted 1509D Circulating Pumps or Equal.
1.2. Contractor Access. The contractor will have access to the base during the hours of operation (0600-1500). Monday through Friday). Contractor will access public areas only when necessary to perform duties and will limit amount of time spent in such areas as much as possible.
1.3. Contractor Personnel:
1.3.1. Project Manager: The Contractor shall provide a Project Manager (PM) who shall be responsible for the performance of all work. The name of this person and an alternate or alternates, who shall act for the Contractor when the manager is absent, shall be designated in writing to the KO. The PM or alternate shall have full authority to act on behalf of the Contractor on all contract matters relating to daily operation of this contract. The PM and alternate(s) shall be able to read, write, speak, and understand English.
1.3.2. Employees: The Contractor shall not employ persons for work on this contract if such employee is identified to the Contractor by the KO or COR as a potential threat to the health, safety, security, general well being or operational mission of the installation and its population.
Employees of the contractor may be subject to a criminal background check and must be legally employed in the United States.
1.3.3. All work performed under this contract shall be done by skilled workers. The Contractor shall ensure that affected employees have current professional certifications necessary before starting work. The KO or COR reserves the right to require the Contractor to furnish proof of the experience and professional certification of any employees engaged by the Contractor for the accomplishment of work involved under this contract.
1.3.4. The Contractor shall not employ any person who is an employee of the United States Government if employing that person would create a conflict of interest.
AFI 33-332, and DOD Regulation 5400.7/AF Supplement prior to further disclosure.
FOR OFFICIAL USE ONLY
1.4. Government Quality Assurance. The government will regularly evaluate the contractor’s performance to ensure compliance with contract terms and conditions. Evaluations will be performed by designated 161st ARW/CES Personnel.
GENERAL INFORMATION
2.1. Contractor Point of Contact The contractor shall provide the name of a point of contact and an alternate that shall be responsible for the performance of services. The contractor point of contact shall be available via telephone for discussion of removal and installation issues with the designated 161st ARW/CES Personnel. The contractor shall designate these individuals, in writing, to the Contracting Officer (KO) before the contract start date.
2.2. Emergency Services
There are no emergency medical services available on base. The contractor shall dial on base number 602-302-9117 for FIRE / MEDICAL EMERGENCIES & 602-302-9267 SECURITY
FORCES. 2.3.
2.3.Security Requirements
2.3.1. Contractor Badge. The contractor shall ensure that all contractor badge applications are obtained for employees if required. State of Arizona background checks will be submitted to the COR, and approved prior for anyone working on the base longer than 2 hours.
2.3.2. Retrieving Identification Media. The contractor shall retrieve all identification media, including contractor badge’s from employees who depart for any reason before the contract expires; e.g. terminated for cause, retirement, etc., and turn them in to the issuing office.
2.3.3. Traffic Laws. Contractor employees shall comply with all base traffic regulations.
Contractor employees are subject to random vehicle speed control checks. Contractor personnel cited for speeding on the installation may suffer loss of base driving privileges, debarment from the base, or other administrative action.
2.3.4. Random Personnel and Vehicle Searches. Contractor personnel are subject to random personnel and vehicle searches. If contractor personnel refuse to be searched, they will be denied entry to the base, and may result in loss of base driving privileges, debarment from the base, or other administrative action.
2.3.5. Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor owned vehicle or privately owned vehicle while on 161st ARW Base at Sky Harbor. 2.3.6. Reporting Requirements. Contractor personnel shall immediately report to an appropriate government authority any information or circumstances of which they are aware may pose a threat to the security of Department of Defense personnel, contractor personnel, resources, and classified or unclassified defense information.
2.3.7. Physical Security. Contractor employees shall be responsible for safeguarding all government property and controlled forms provided for contractor use. At the end of each work period, all government facilities, equipment, and materials shall be secured.
AFI 33-332, and DOD Regulation 5400.7/AF Supplement prior to further disclosure.
FOR OFFICIAL USE ONLY
2.3.8. Safety. The contractor shall comply with all applicable laws and safety regulations.
Compliance with OSHA and other applicable laws and regulations for the protection of employees is exclusively the obligation of the contractor, and the government will assume no liability or responsibility for the contractor’s compliance or noncompliance with such responsibilities.
2.3.9. Work Area. The contractor shall, at all times, keep work areas free from accumulations of waste material, rubbish, tools, scaffolding, equipment, and materials. Upon completion of the job or when away from the work site, the contractor shall leave the work area and premises in a clean, neat, safe and workmanlike condition. The contractor is responsible for removal and proper disposal of all job related waste material at a permitted site.
3.0 Attachments: None
| STATEMENT OF WORK |
| BUILDING 6 HVAC HOT WATER boiler |
| circulation pump REPLACEMENTS |
| W/o 20210101 |
| Building 6 |