[Type here]

Reconstruction of Sector Locker-room

Department of Homeland Security

United States Coast Guard

Scope of Work For

Replacement of Fueling Station At

U.S. Coast Guard

Mobile, Alabama

1/20/21 United States Coast Guard

Submitted: CWO Arnold, Michael

Facility Engineer, Sector Mobile, AL

TABLE OF CONTENTS

Section
Title
Page
1
General Contracting Guidelines
3
2
Submittals and Outcome
3
3
Project Performance Timeline
3
4
Location
3
5
Point of Contact
3
6
Work Phasing/Scope of Work
4
7
Availability of Utilities
4
8
Coordination
5
9
Contractor Use of Premises
5
10
Laydown Area
5
11
Storm Protection
5
12
Environmental Protection
5
13
Delivery and Storage
5
14
Receipt of Materials
5
15
Cleanup
5
16
Utility Outages
6
17
Security
6
18
Quality
6
19
Warranties
6
20
Final Inspection and Acceptance
6
21
Safety
7
22
Site Plan/Drawing
Enclosed

1 General Contracting Guidelines:

1.1: For the execution of this contract, contractor shall provide all labor, parts, and materials not described in this Scope of Work. Government Furnished materials will be outlined in this scope of work and will be defined as GFM.

1.2: Contractor shall make all reports to the Contracting Officer/On site supervisor in regards to progress of the scheduled work log. If there are questions or concerns regarding the scope of work and/or the work log, the contractor shall not proceed further without guidance from the Contracting Officer.

1.3: Contractor shall provide all necessary documentation for all employees (Valid State ID, Drivers Licenses, etc.). As well any vehicle brought on board any Coast Guard/Military Facility shall have valid state registration and insurance.

1.4: Contractor shall execute the contract IAW this Scope of Work. The contractor is not authorized to deviate from this Scope of Work without written authorization from the Contracting Officer.

1.5: Contractor shall execute the contract IAW this Scope of Work. The contractor is not authorized to deviate from this Scope of Work without written authorization from the Contracting Officer.

1.6: Contractor shall execute the contract IAW this Scope of Work. The contractor is not authorized to deviate from this Scope of Work without written authorization from the Contracting Officer.

1.7: The contractor shall provide a list of all employees that will be working on Coast Guard property to the Contracting Officer prior to the scheduled work days.

2 SUBMITTALS AND OUTCOMES

2.1 The Contractor shall submit a work schedule including all milestones immediately following contract award.

2.2 Submit removal and application procedures for all building surfaces.

3 PROJECT PERFORMANCE TIME

The contractor must make notification to the Contracting Officer and CWO Arnold inventory availability and estimate time of arrival for required leased office trailers and supporting supplies/equipment.

4 LOCATION

All work shall take place at:

US Coast Guard Sector Mobile 1500 15th Street Mobile, AL 36615

5 POINT OF CONTACT

The Government Point of Contact (POC) for this work is CWO Arnold, (251)441-6241, Michael.C.Arnold@uscg.mil. All work shall be coordinated through the POC to minimize operational impacts to the unit during the execution of the work.

6 WORK PHASING/SCOPE OF WORK

Work shall be completed as expeditiously as possible; Contractor shall coordinate with the POC’s to coordinate phasing and job sequencing. Contractor shall submit construction schedule for Government review and approval prior to commencing in any work to be performed.

6.1 SCOPE OF WORK: REMODELING GYM LOCKER ROOM

A. Contractor is required to lockout/tagout all valves, electrical connections, and safety interlocks before removing existing fuel hose reel.

B. Contractor will remove existing digital hose reel at the Fuel dispensing terminal connection, and apply spill prevention/collection pads at all terminated fuel piping junctions.

C. Contractor will design and install a compatible analog fueling system with hose reel that is compatible with Sector Mobile’s digital controlled fueling station.

D. Analog fueling system will consist of the following requirements:

(A) All piping will be constructed of stainless steel 304/316 or aluminum. All electrical/communication wiring will be housed in schedule 80 conduit.

(B)12”-14” s/s or aluminum containment pan for over spray/leaks.

(C) 1.5” stainless steel hose reel with automated/power rewind with a minimum of 120’ of 1.5” hose capacity.

(D) 20-CG-DP14 hot gas equalizing headers and valves with 70+ gallon capacity.

(E) Liquid controlled M5 Class 1 meter, mechanical V-R register dual element filter, 2” solenoid valve.

(F) Powdered coated/ corrosion resistant frame and top cover, installed using 304 stainless steel hardware and nylon locking nuts.

E. Contractor will install designed analog fuel system and test for leaks and pressure rating with Coast Guard approval.

F. If required items on line 6.1.E are acceptable for reuse then contractor shall reuse all existing required items with Coast Guard’s approval.

7 AVAILABILITY OF UTILITIES

Reasonable amounts of the following utilities will be made available to the Contractor without charge.

+ Electricity +Water

+Bathroom facilities

8 COORDINATION

The Contractor shall coordinate with the POC to minimize interference with Coast Guard operations or personnel. All work shall be coordinated with other trades involved in the project and carefully laid out in advance.

9 CONTRACTOR USE OF PREMESES

The Contractor will be working on a Coast Guard military installation. Become familiar with and obey installations’ fire, traffic, and security regulations. Personnel shall not stray from the immediate area of work nor direct avenues of ingress and egress unless authorized in advance by the Government.

10 LAYDOWN AREA

The Contractor will be provided with an uncovered lay-down area in the immediate vicinity of the work. The Contractor shall be responsible for restoring the area to its original condition at the completion of the work. The Contractor shall be responsible for repair of any damage incurred to buildings, vehicles, boats, equipment, or pavement as a result of storage activities.

11 STORM PROTECTION

Should warnings of extreme weather (such as high waves, storm surge, wind of gale force) be issued, the Contractor shall take every practicable precaution to minimize danger to personnel, the work and adjacent property. Precautions shall include, but not be limited to, relocating equipment, closing all openings, removing all loose materials, tools exposed locations, and removing or securing fencing, scaffolding and other temporary work.

12 ENVIRONMENTAL PROTECTION

All Federal, State and local laws must be strictly adhered to. Demolition and disposal of existing fuel system shall be disposed of at a permitted facility.

13 DELIVERY AND STORAGE

Equipment and materials shall be carefully handled, properly stored, and adequately protected to prevent damage before and during installation, in accordance with the manufacturer's recommendations. Damaged or defective items/equipment shall be replaced. Location of storage and staging area shall be designated by the POC’s. The contractor will be responsible for security of all materials and equipment.

14 RECEIPT OF MATERIALS

Shipment of equipment, materials, and supplies shall be addressed to the Contractor - not the Government. The Contractor must be on hand to accept shipments; the Government will not accept shipments.

15 CLEANUP

The Contractor shall keep the work area, including storage areas, free from accumulations of waste materials on a daily basis and comply with all federal, state and local regulations pertaining to the storage, transport and disposal of wastes. The Contractor shall not use Coast Guard waste disposal facilities including garbage cans, trash piles or dumpsters.

16 UTILITY OUTAGES

Before interrupting or shutting down any utility, make a request for the interruption to the POC’s at least two (2) working days before the anticipated interruption. Identify the utility, reason for interruption, proposed time of interruption, and duration of interruption. Do not interrupt utilities until authorized by the POC.

17 SECURITY

17.1 Working Personnel List.

The Contractor shall provide the Contracting Officer and Onsite supervisor with a list of names of all personnel who will be working on the site. The Contractor may submit a revised list at any time during the project. Only personnel on the approved listing will be allowed on the site.

17.2 Personnel Identification

All personnel shall carry proper identification (ID) when on site. Proper ID is defined as either the individual’s driver’s license, or a company issued ID. The identification must be laminated, and show facial picture of the individual. Individuals without proper ID will be escorted off the Coast Guard premises.

18 QUALITY

Quality of Contractor Furnished Material. Materials supplied by the Contractor shall be of a quality conforming to applicable Federal specifications.

19 WARRANTIES

All warranties and/or guarantees, either implied or expressed, for individual equipment shall be endorsed to the Government.

20 FINAL INSPECTION AND ACCEPTANCE

When the work is complete and ready for final inspection, submit a written request to schedule final inspection to the Government. Prior to such requests, all submittals must be complete and approved. Such requests shall allow a minimum of two (2) days’ notice prior to final inspection date.

21 SAFETY

21.1 General

The Contractor is solely responsible for work site safety. The Contractor shall implement a safety program that protects the lives and health of personnel in the construction area, prevents damage to property and avoids work interruptions. The Contractor shall provide appropriate safety measures including, but not limited to barricades, signs and signal lights as well as complying with the requirements of all applicable Federal, State and Local safety laws, rules and regulations.

21.2 Compliance

The Contractor is specifically required to comply with the requirements of the U. S. Army Corps of Engineers "Safety and Health Requirements Manual" (EM 385-1-1, latest version available) and the “Accident Prevention” clause (FAR 52.236-13). Once accepted, this safety plan shall become part of the contract requirements. Note: This review/acceptance does not in any way relinquish the Contractor from responsibility for work site safety nor the obligation to comply with the OSHA regulations found in 29 CFR 1910 & 1926 or any other State or Local safety law, rule or regulation applicable to the contract work. The Coast Guard will cooperate fully with the Department of Labor (Occupational Safety and Health Administration) in their enforcement of OSHA regulations.