This is an Advertisement to Bid issued by Memorial Health System in Gulfport, Mississippi for Nuclear Medicine Camera Installations and Renovations at Memorial Hospital Gulfport and Memorial Hospital Biloxi. The project will be executed as a Multiple Prime Contract with a Construction Manager Advisor delivery method across three separate bid packages: General Works (ICRA, General Conditions, Selective Demolition and Renovation, Fire Suppression); Mechanical & Plumbing (Including Med-gases); and Electrical (Including Low Voltage, Fire Alarm). The scope of work includes nuclear medicine camera installations, demolition, renovation, finishes, and associated structural, plumbing, fire protection, mechanical, electrical, and low-voltage work at both hospital locations. Sealed bids with qualification statements are due by Thursday, September 10, 2026 at 2:00 PM. A Pre-Bid Conference and Site Visit will be held on Tuesday, August 18, 2026 at 10:00 AM at Memorial Hospital Gulfport, with site inspections following at 10:45 AM (Gulfport) and 1:30 PM (Biloxi). The advertisement will run on Wednesday, August 12, 2026 and Wednesday, August 19, 2026. Contract time is outlined in the project manual Section 01 12 16 Proposed Construction Schedule with liquidated damages of $1,000 per calendar day assessed for delays.
Bidders must demonstrate healthcare experience within the last five years, including Infection Control Risk Assessment (ICRA) experience, as work will be performed in occupied hospital areas requiring strict infection control compliance, temporary partitions, negative air pressure systems, and construction noise abatement. A Performance and Payment Bond is required of successful bidders. Official Bid Documents are available through www.eleyguildhardyprojects.com in both digital and hard copy formats (non-refundable). Bidders may submit bids electronically or by mail, hand delivery, or courier service to Mark Thomas, Director of Facilities, Engineering Department at Memorial Hospital Gulfport. Mississippi resident contractors shall receive preference over non-residents in accordance with state law. The Owner reserves the right to waive irregularities, reject any or all bids, and review bidder qualifications prior to contract award. All bidders must obtain a Certificate of Responsibility as required by Mississippi law and comply with non-discrimination policies.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
24-028r 00 11 13 - 1 ADVERTISEMENT TO BID
ADVERTISEMENT FOR BIDS
To Advertise:
1. Wednesday August 12, 2026
2. Wednesday August 19, 2026
ADVERTISEMENT FOR BIDS
Nuclear Medicine Camera Installations and Renovations Memorial Hospital Gulfport and Biloxi
Memorial Health System will receive Sealed Bids with Qualification Statements until Thursday September 10, 2026 at 2:00 PM for the furnishing of all labor and material and performing all work necessary and incidental to bid Nuclear Medicine Camera Installations and Renovations at Memorial Hospital Gulfport and Biloxi, in accordance with Drawings and Project Manual. This project will be completed as a Multiple Prime Contract Construction Manager Advisor (CMa) delivery method for all work required by the Contract Documents in accordance with the Instructions to Bidders contained within the Official Bid Documents. Bids will be received on three prime contract bid packages as follows with bidders responsible for the associated bid package contract scope of work.
PACKAGE # BID PACKAGE TITLE
1 General Works (ICRA, General Conditions, Selective Demolition and Renovation, Fire
Suppression, etc.)
2 Mechanical & Plumbing (Including Med-gasses, etc.)
3 Electrical (Including Low Voltage, Fire Alarm, etc.)
PROJECT SCOPE: Generally, the project scope of work consists of Nuclear Medicine Camera installations and related renovations at Memorial Hospital Gulfport and Memorial Hospital Biloxi, including demolition, renovation, finishes, coordination, and associated structural, plumbing, fire protection, mechanical, electrical, low-voltage, and related work as indicated in the drawings and as specified. The project scope of work associated with each Bid Package is further described in detail in the project manual Bid Package Summary of Work for each respective Bid Package.
The Project Scope of Work will be performed while areas outside of the defined project Limits of Work are occupied by Memorial Hospital. Strict conformance to the specified Infection Control guidelines is required, to include installation of temporary partitions and negative air pressure systems, construction noise abatement, and ability to organize work with flexible hours and manage disruption in continuity of work is vital to the successful completion of the project. The CMa shall lead the coordination of this effort, and bidders shall be able to prove and demonstrate the ability to perform this Scope of Work in these restrictive environments and shall be able to prove experience in the Healthcare environment within the last five (5) years. Bidders may meet this requirement by assigning to the project a team in which the members are able to demonstrate their healthcare abilities and qualifications including but not limited to Infection Control Risk Assessment (ICRA) experience.
Owner reserves the right to review qualifications of Bidders prior to award of Contract.
For each of the Prime Contracts, the Contract Time for the Project Scope of Work is as outlined in the project manual Section 01 12 16 Proposed Construction Schedule. Liquidated damages of One Thousand Dollars ($1,000.00) per calendar day shall apply, and a Performance and Payment Bond is required of the successful bidder.
BIDS:
Official Bid Documents are available via hard copy or electronic download at www.eleyguildhardyprojects.com.
Interested bidders should log-in or register for a free account to view and order Bid Documents. All plan holders are required to have a valid email address for registration. The cost of printed bid documents are non-refundable and must be purchased through the website (digital and hard copies). Questions regarding website registration and online orders please contact Plan House at (662) 407-0193.
At the Bidder’s option, in lieu of submitting a physical sealed Bid, electronic bids may be submitted at www.eleyguildhardyprojects.com. Bids shall be received electronically until the date/time as stated above. For http://www.eleyguildhardyprojects.com/
24-028r 00 11 13 - 2 ADVERTISEMENT TO BID any questions relating to the electronic bidding process, please call Plan House at (662) 407-0193. Electronic submittal of Bids is not required.
Bids submitted by mail must be addressed to:
Memorial Hospital at Gulfport P.O. Box 1810, Gulfport, MS 39502 Attention: Mark Thomas, Director of Facilities, Engineering Department.
Bids submitted by delivery services, such as FedEx or UPS, must be delivered before 1:45 p.m. on bid date and shall be addressed to:
the office of Mark Thomas, Director of Facilities, Engineering Department Memorial Hospital at Gulfport 4500 13TH Street, Gulfport, MS 39501.
Bids hand delivered before 1:45 p.m. on bid date shall be delivered to:
the office of Mark Thomas, Director of Facilities, Engineering Department
4500 13TH Street, Gulfport, MS.
Bids hand delivered between 1:45 p.m. and 2:00 p.m. on bid date shall be delivered to:
Lagniappe Room on the First Floor at
4500 13TH Street, Gulfport, MS.
All bids will be publicly opened and read aloud in the Lagniappe Room, right off the main dining room, on the First Floor of Memorial Hospital at Gulfport at the time and date first noted at the top of this advertisement.
Instructions to Bidders, Form of Bid, Form of Contract, Form of Contract Bond, Drawings, Specifications and other Contract Documents may be examined at the following locations:
1. Office of the Construction Manager, Andercorp,1404 24th Ave, Suite 300, Gulfport, MS 39501.
2. Office of the Architect, EGH Architects, P.A., 1091 Tommy Munro Drive, Biloxi, Mississippi 39532.
3. During examination no verbal questions may be asked, and none will be answered. All bidding questions must be submitted in accordance with the Instructions to Bidders.
To assist Bidders during the bid period, one (1) Pre-Bid Conference and Site Visit will be held at Memorial Hospital at Gulfport on Tuesday, August 18, 2026 at 10:00 AM. The Pre-Bid Conference will be held in the Lagniappe Room, right off the main dining room, on the First Floor of Memorial Hospital at Gulfport. The Gulfport site inspection visit to tour the existing Nuclear Medicine Camera room at MHG will immediately follow the Pre-Bid Conference at 10:45 AM. The Biloxi site inspection visit to tour the existing Nuclear Medicine Camera room at MHB will occur this same day after lunch at 1:30 PM. Bidders should attend the Pre-Bid Conference and applicable Site Visits to fully inform themselves of the project requirements.
All proposals must be filed with Memorial Hospital prior to the opening time as stated above. Bids received after opening time will not be opened and will be considered non-responsive. All proposals must be sealed and clearly marked on the outside of the envelopes as follows: SEALED BID: MEMORIAL HEALTH SYSTEM, Nuclear Medicine Camera Installations and Renovations at Memorial Hospital Gulfport and Biloxi, BID Package # X {List all bid packages included}, to be opened on Thursday September 10, 2026. Envelopes not so marked are submitted at the risk of the Bidder and Memorial Health System assumes no responsibility for the premature opening of same by any hospital employee.
Bidders must indicate CERTIFICATE OF RESPONSIBILITY NUMBER on the outside of the sealed proposal. Any proposal lacking this number will not be opened.
24-028r 00 11 13 - 3 ADVERTISEMENT TO BID
The Owner reserves the right to waive any informalities or irregularities and to reject any or all bids.
Each bidder must deposit with his bid (or upload at Bidders Option), security in the amount, form and subject to the conditions provided in the Instructions to Bidders. Performance and Payment Bonds will be required from the successful Bidders. Bidders shall comply with the law of the State of Mississippi requiring Certificate of Responsibility.
Resident contractors shall, in accordance with the laws of the State of Mississippi, be granted preference over non-residents in the award of this contract in the same manner and to the same extent as provided by the laws of the state of domicile of the non-resident. A non-resident contractor shall attach to his proposal a copy of his resident state's current law pertaining to such state's treatment of non-resident contractors.
The successful bidder must adhere to the Owner’s policy concerning non-discrimination without regard to race, creed, color, age, sex, national origin or handicap. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof.
No bid shall be considered awarded until such time as all contract documents have been signed and received by both parties.
MEMORIAL HEALTH SYSTEM
GULFPORT, MISSISSIPPI
Kevin Holland, Vice President
File details come from the government source that posted it. Updated .