21128.10_Attachment 4 - OQ Task List.pdf

PDF 196 KB Posted

Attached to
OceanSpray Project
Solicitation number
BD-21-1296-02346-MGED1-69671
Issued by
Plymouth County, Massachusetts

About this file

This document is an attachment to a state and local contract opportunity in Massachusetts related to construction services to perform modifications to the OceanSpray project assembly. The Northeast Gas Association is managing the tasks and qualifications related to this project. The tasks cover a wide range of pipeline construction and maintenance activities, with over 80 specific tasks that require certification and periodic requalification every 36 months. The tasks cover areas such as corrosion control, leak detection, pipe installation, valve maintenance, and compressor station operations. The document provides detailed information on the required certifications, skill names, start dates, and requalification intervals for the various tasks.

The contract opportunity does not provide additional details beyond the scope of work covered in the attachment. It indicates this is a request for proposal for construction services related to modifications to the OceanSpray project assembly, located in Massachusetts. No information is provided on pricing, set asides, incumbent contractors, funding sources, or other salient commercial terms.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OnBoard Learning Management System Northeast Gas Association ‐ Tasks ‐ NGA OQ Run By Darcy Wall on 1/12/2021 7:48:59 AM

Code Task/Skil l Name Required Start Date Requal i f icat ion Interval

01 CT01 ‐ Inspecting for Shorted Casings 01/01/2016

NGA‐WE‐01 NGA‐WE‐01‐Inspecting for Shorted Casings Required 36 months

02A CT02A‐Measuring Pipe‐To‐Soil Potential ﴾Measuring and Interpreting Readings﴿

01/23/2017

NGA‐WE‐02A NGA‐WE‐02A‐Measuring Pipe‐To‐Soil Potential ﴾Measuring and Interpreting Readings﴿

Required 36 months

02B CT02B‐Measuring Pipe‐To‐Soil Potential ﴾Measuring Only﴿ 01/23/2017

NGA‐WE‐02B NGA‐WE‐02B‐Measuring Pipe‐To‐Soil Potential ﴾Measuring Only﴿ Required 36 months

03 CT03‐Conduct a Soil Resistivity Survey 01/23/2017

NGA‐WE‐03 NGA‐WE‐03‐Conduct a Soil Resistivity Survey Required 36 months

04A CT04A‐Conducting Interference Testing and Remediation 01/23/2017

NGA‐WE‐04A NGA‐WE‐04A‐Conducting Interference Testing and Remediation Required 36 months

04B CT04B‐Conducting Interference Testing 01/23/2017

NGA‐WE‐04B NGA‐WE‐04B‐Conducting Interference Testing Required 36 months

05A CT05A‐Electrically Checking for Proper Performance of Diodes and Interference Bonds, Including Testing for A/C Mitigation

01/23/2017

NGA‐WE‐05A NGA‐WE‐05A‐Electrically Checking for Proper Performance of Diodes and Interference Bonds, Including Testing for A/C Mitigation

Required 36 months

05B CT05B‐Electrically Checking for Proper Performance of Diodes and Interference Bonds

01/23/2017

NGA‐WE‐05B NGA‐WE‐05B‐Electrically Checking for Proper Performance of Diodes and Interference Bonds

Required 36 months

06A CT06A‐Inspecting for Atmospheric Corrosion, Including Evaluation and Remediation

01/23/2017

NGA‐WE‐06A NGA‐WE‐06A‐Inspecting for Atmospheric Corrosion, Including Evaluation and Remediation

Required 36 months

06B CT06B‐Inspecting for Atmospheric Corrosion 01/23/2017

NGA‐WE‐06B NGA‐WE‐06B‐Inspecting for Atmospheric Corrosion Required 36 months

07A/13A CT07A & 13A‐Installing, Replacing and Ensuring Operation of a Rectifier on a Pipeline ﴾Installing, Replacing and Troubleshooting﴿

01/23/2017

NGA‐WE‐

07A/13A

NGA‐WE‐07A & 13A‐Installing, Replacing and Ensuring Operation of a Rectifier on a Pipeline ﴾Installing, Replacing and Troubleshooting﴿

Required 36 months

07B/13B CT07B & CT13B‐Installing, Replacing and Ensuring Operation of a Rectifier on a Pipeline ﴾Installing and Replacing Only﴿

01/23/2017

NGA‐WE‐

07B/13B

NGA‐WE‐07B & 13B‐ Installing, Replacing and Ensuring Operation of a Rectifier on a Pipeline ﴾Installing and Replacing Only﴿

Required 36 months

08 CT08‐‐Visually Inspecting for Internal Corrosion 01/23/2017

NGA‐WE‐08 NGA‐WE‐08‐Visually Inspecting for Internal Corrosion Required 36 months

CT09‐Removing Coupons/Sample Gas or Liquids for Analysis and Evaluation of Internal Corrosion

11/04/2016

NGA‐WE‐09 NGA‐WE‐09‐Internal Corrosion Coupon and Fluids/Solids Testing Required 36 months

10 CT10‐Clear a shorted casing 01/23/2017

NGA‐WE‐10 NGA‐WE‐10‐Clearing a Shorted Casing Required 36 months

11B/12B/17B CT11B, 12B & 17B‐Pipe Coatings ﴾Hot Applied Tape﴿ 01/01/2016

NGA‐WE‐

11A/12A/17A

NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months

NGA‐WE‐

11B/12B/17B

NGA‐WE‐11B, 12B & 17B‐Pipe Coatings ﴾Hot Applied Tape﴿ Required 36 months

11C/12C/17C CT11C, 12C & 17C‐Pipe Coatings ﴾Heat Shrink Sleeve﴿ 01/23/2017

NGA‐WE‐

11A/12A/17A

NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months

NGA‐WE‐

11C/12C/17C

NGA‐WE‐11C, 12C & 17C‐Pipe Coatings ﴾Heat Shrink Sleeve﴿ Required 36 months

11D/12D/17D CT11D, 12D & 17D‐Pipe Coatings ﴾Wax Tape﴿ 01/23/2017

NGA‐WE‐

11A/12A/17A

NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months

NGA‐WE‐

11D/12D/17D

NGA‐WE‐11D, 12D & 17D‐Pipe Coatings ﴾Wax Tape﴿ Required 36 months

11E/12E/17E CT11E, 12E & 17E‐Pipe Coatings ﴾Mastic﴿ 01/23/2017

NGA‐WE‐

11A/12A/17A

NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months

NGA‐WE‐

11E/12E/17E

NGA‐WE‐11E, 12E & 17E‐Pipe Coatings ﴾Mastic﴿ Required 36 months

11F/12F/17F CT11F, 12F & 17F‐Pipe Coatings ﴾Cold Applied Tape﴿ 01/23/2017

NGA‐WE‐

11A/12A/17A

NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months

NGA‐WE‐

11F/12F/17F

NGA‐WE‐11F, 12F & 17F‐Pipe Coatings ﴾Cold Applied Tape﴿ Required 36 months

11G/12G/17G CT11G, 12G & 17G‐Pipe Coatings ﴾Two Part Epoxy﴿ 01/23/2017

NGA‐WE‐

11A/12A/17A

NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months

NGA‐WE‐

11G/12G/17G

NGA‐WE‐11G, 12G & 17G‐Pipe Coatings ﴾Two Part Epoxy﴿ Required 36 months

11H/12H/17H CT11H, 12H & 17H‐Pipe Coatings ﴾Paint﴿ 01/23/2017

NGA‐WE‐

11H/12H/17H

NGA‐WE‐11H, 12H & 17H‐Pipe Coatings ﴾Paint﴿ Required 36 months

14A CT14A ‐ Installing/Replacing an Anode on a Pipeline including Exothermic Welding

01/01/2016

NGA‐PE‐

14/16

NGA‐PE‐14/16‐Exothermic Welding Required 36 months

NGA‐WE‐14 NGA‐WE‐14‐Installing/Replacing an Anode Required 36 months

14B CT14B ‐ Installing/Replacing an Anode on a Pipeline 05/14/2018

NGA‐WE‐14 NGA‐WE‐14‐Installing/Replacing an Anode Required 36 months

15A CT15A‐Installing, Replacing and Testing Electrical Isolation Couplings

01/23/2017

NGA‐WE‐15A NGA‐WE‐15A‐Installing, Replacing and Testing Electrical Isolation Couplings

Required 36 months

15B CT15B‐Installing and Replacing Electrical Isolation Couplings 01/23/2017

NGA‐WE‐15B NGA‐WE‐15B‐Installing and Replacing Electrical Isolation Couplings Required 36 months

16A CT16A ‐ Installing or Replacing a Corrosion Test Station on a Pipeline including Exothermic Welding

05/14/2018

NGA‐PE‐

14/16

NGA‐PE‐14/16‐Exothermic Welding Required 36 months

NGA‐WE‐16 NGA‐WE‐16‐Installing or Replacing a Corrosion Test Station on a Pipeline

Required 36 months

16B CT16B ‐ Installing or Replacing a Corrosion Test Station on a Pipeline

05/14/2018

NGA‐WE‐16 NGA‐WE‐16‐Installing or Replacing a Corrosion Test Station on a Pipeline

Required 36 months

18A CT18A Conducting Gas Leakage Surveys ﴾Mobile and Walking Surveys﴿

11/01/2017

NGA‐PE‐18.1 NGA‐PE‐18.1‐Leak Survey Required 36 months

NGA‐WE‐

CT18A

NGA‐WE‐CT18A‐Conducting Gas Leakage Survey ﴾Mobile and Walking Surveys﴿

Required 36 months

18B CT18B Conducting Gas Leakage Surveys ﴾Walking Surveys Only﴿

11/01/2017

NGA‐PE‐18.1 NGA‐PE‐18.1‐Leak Survey Required 36 months

NGA‐WE‐

CT18B

NGA‐WE‐CT18B‐Conducting Gas Leakage Survey ﴾Walking Surveys Only﴿

Required 36 months

19A CT19A‐Patrolling ‐ Inspecting Right of Ways, Pipeline Markers and Exposed Above Ground Mains

06/28/2017

NGA‐WE‐19A NGA‐WE‐19A‐Patrolling ‐ Inspecting Right of Ways, Pipeline Markers and Exposed Above Ground Mains

Required 36 months

19B CT19B‐Patrolling ‐ Inspecting Right of Ways and Pipeline Markers

06/28/2017

NGA‐WE‐19B NGA‐WE‐19B‐Patrolling ‐ Inspecting Right of Ways and Pipeline Markers

Required 36 months

20A CT20A‐Investigating Leak or Odor Complaints ﴾Inside and Outside﴿

01/10/2017

NGA‐WE‐20A NGA‐WE‐20A‐ Investigating Leak or Odor Complaints ﴾Inside and Outside﴿

Required 36 months

20B CT20B‐Investigating Leak or Odor Complaints ﴾Outside Investigation Only﴿

01/10/2017

NGA‐WE‐20B NGA‐WE‐20B‐ Investigating Leak or Odor Complaints ﴾Outside Investigation Only﴿

Required 36 months

20C CT20C‐Investigating Leak or Odor Complaints ﴾Inside Investigation Only﴿

01/10/2017

NGA‐WE‐20C NGA‐WE‐20C‐ Investigating Leak or Odor Complaints ﴾Inside Investigation Only﴿

Required 36 months

20D CT20D‐Leak Classification 01/10/2017

NGA‐WE‐20D NGA‐WE‐20D‐ Leak Classification Required 36 months

21‐CT CT21‐Line Locating and Mark Out ﴾Connecticut﴿ 01/01/2016

NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months

NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months

NGA‐WE‐CT NGA‐WE‐State Damage Prevention Regulations ﴾Connecticut﴿ Required 36 months

21‐MA CT21‐Line Locating and Mark Out ﴾Massachusetts﴿ 01/23/2017

NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months

NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months

NGA‐WE‐MA NGA‐WE‐State Damage Prevention Regulations ﴾Massachusetts﴿ Required 36 months

21‐MD CT21‐Line Locating and Mark Out ﴾Maryland﴿ 01/23/2017

NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months

NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months

NGA‐WE‐MD NGA‐WE‐State Damage Prevention Regulations ﴾Maryland﴿ Required 36 months

21‐ME CT21‐Line Locating and Mark Out ﴾Maine﴿ 01/23/2017

NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months

NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months

NGA‐WE‐ME NGA‐WE‐State Damage Prevention Regulations ﴾Maine﴿ Required 36 months

21‐NH CT21‐Line Locating and Mark Out ﴾New Hampshire﴿ 01/23/2017

NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months

NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months

NGA‐WE‐NH NGA‐WE‐State Damage Prevention Regulations ﴾New Hampshire﴿ Required 36 months

21‐NJ CT21‐Line Locating and Mark Out ﴾New Jersey﴿ 01/23/2017

NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months

NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months

NGA‐WE‐NJ NGA‐WE‐State Damage Prevention Regulations ﴾New Jersey﴿ Required 36 months

21‐NY CT21‐Line Locating and Mark Out ﴾New York﴿ 01/23/2017

NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months

NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months

NGA‐WE‐NY NGA‐WE‐State Damage Prevention Regulations ﴾New York﴿ Required 36 months

21‐PA CT21‐Line Locating and Mark Out ﴾Pennsylvania﴿ 01/23/2017

NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months

NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months

NGA‐WE‐PA NGA‐WE‐State Damage Prevention Regulations ﴾Pennsylvania﴿ Required 36 months

21‐RI CT21‐Line Locating and Mark Out ﴾Rhode Island﴿ 01/23/2017

NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months

NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months

NGA‐WE‐RI NGA‐WE‐State Damage Prevention Regulations ﴾Rhode Island﴿ Required 36 months

21‐VT CT21‐Line Locating and Mark Out ﴾Vermont﴿ 01/23/2017

NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months

NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months

NGA‐WE‐VT NGA‐WE‐State Damage Prevention Regulations ﴾Vermont﴿ Required 36 months

22A CT22A‐Inspecting of 3rd Party Excavations for Damage Prevention, Including Root Cause Analysis

05/14/2018

NGA‐WE‐22A NGA‐WE‐22A‐Inspecting of 3rd Party Excavations for Damage Prevention, Including Root Cause Analysis

Required 36 months

22B CT22B‐Inspecting of 3rd Party Excavations for Damage Prevention

05/14/2018

NGA‐WE‐22B NGA‐WE‐22B‐Inspecting of 3rd Party Excavations for Damage Prevention

Required 36 months

23/24 CT23 & 24 Inspecting the Condition of Exposed Pipe 01/23/2017

NGA‐WE‐

23/24

NGA‐WE‐23 & 24‐Inspecting the Condition of Exposed Pipe Required 36 months

25 CT25‐Repairing a Transmission Pipe 01/23/2017

NGA‐WE‐25 NGA‐WE‐25‐Repairing a Transmission Pipe Required 36 months

26/27 CT26 & 27‐Inspecting, Lubricating, Repairing and Operating Transmission Valves

01/23/2017

NGA‐WE‐

26/27

NGA‐WE‐26 & 27‐Inspecting, Lubricating, Repairing and Operating Transmission Valves

Required 36 months

28 CT28‐Uprating 01/23/2017

NGA‐WE‐28 NGA‐WE‐28‐Uprating Required 36 months

29A/30A CT29A & 30A‐Repairing a Plastic, Steel and Cast Iron Distribution Pipe

01/23/2017

NGA‐WE‐

29A/30A

NGA‐WE‐29A & 30A‐Repairing a Plastic, Steel and Cast Iron Distribution Pipe

Required 36 months

29B/30B CT29B & 30B‐Repairing a Plastic Distribution Pipe 01/23/2017

NGA‐WE‐

29B/30B

NGA‐WE‐29B & 30B‐Repairing a Plastic Distribution Pipe Required 36 months

29C/30C CT29C & 30C‐Repairing a Steel Distribution Pipe 01/23/2017

NGA‐WE‐

29C/30C

NGA‐WE‐29C & 30C‐Repairing a Steel Distribution Pipe Required 36 months

29D/30D CT29D & 30D‐Repairing Cast Iron Distribution Pipe, Including Using Anaerobic Sealing

01/23/2017

NGA‐WE‐

29D/30D

NGA‐WE‐29D & 30D‐Repairing Cast Iron Distribution Pipe, Including Using Anaerobic Sealing

Required 36 months

29E/30E CT29E & 30E‐Repairing Cast Iron Distribution Pipe, Not Including Anaerobic Sealing

01/23/2017

NGA‐WE‐

29E/30E

NGA‐WE‐29E & 30E‐Repairing Cast Iron Distribution Pipe, Not Including Anaerobic Sealing

Required 36 months

31A CT31A‐Installation of Pipe: Storage, Handling and Inspection of Pipe: General Knowledge

10/16/2015

NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405

Required 36 months

31B CT31B‐Installation of Pipe: Install Pipe in a Ditch 10/16/2015

NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405

Required 36 months

NGA‐WE‐31B NGA‐WE‐31B‐Installation of Pipe: Install Pipe in a Ditch ‐ 14406 Required 36 months

31C CT31C‐Installation of Pipe: Installing Pipe by Horizontal Directional Drilling

10/16/2015

NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405

Required 36 months

NGA‐WE‐31C NGA‐WE‐31C‐Installation of Pipe:Installing Pipe by Horizontal Directional Drilling ‐ 14407

Required 36 months

31D CT31D‐Installation of Pipe: Installing Pipe by Horizontal Boring ﴾Piercing Tools﴿

10/16/2015

NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405

Required 36 months

NGA‐WE‐31D NGA‐WE‐31D‐Installation of Pipe: Installing Pipe by Horizontal Boring ﴾Piercing Tools﴿ ‐ 14408

Required 36 months

31E CT31E‐Installation of Pipe: Installing Pipe by Dead Insertion 10/16/2015

NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405

Required 36 months

NGA‐WE‐31E NGA‐WE‐31E‐Installation of Pipe: Installing Pipe by Dead Insertion ‐ 14409

Required 36 months

31F CT31F‐Installation of Pipe: Installing Pipe by Vibratory Plow 10/16/2015

NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405

Required 36 months

NGA‐WE‐

CT31F

NGA‐WE‐CT31F‐Installation of Pipe: Installing Pipe by Vibratory Plow Required 36 months

32 CT32‐Purging a pipeline into service 10/16/2015

NGA‐WE‐32

& 33

NGA‐WE‐32 & 33‐Purging a Pipeline In and Out of Service ‐ 13828 Required 36 months

33 CT33‐Purging a pipeline out of service 10/16/2015

NGA‐WE‐32

& 33

NGA‐WE‐32 & 33‐Purging a Pipeline In and Out of Service ‐ 13828 Required 36 months

34 CT34‐Performing pressure test on a pipeline 10/16/2015

NGA‐WE‐34 NGA‐WE‐34‐Performing Pressure Test on a Pipeline ‐ 13830 Required 36 months

35.1B CT35.1B‐Stopping Gas Flow ﴾Mains and Services﴿ 05/14/2018

NGA‐PE‐35.1 NGA‐PE‐35.1 Squeeze‐Off Required 36 months

NGA‐WE‐

35.1B

NGA‐WE‐35.1B‐ Stopping Gas Flow ﴾Squeeze‐Off ‐ Mains & Services﴿

Required 36 months

35.1C CT35.1C‐Stopping Gas Flow ﴾Services Only﴿ 05/14/2018

NGA‐PE‐35.1 NGA‐PE‐35.1 Squeeze‐Off Required 36 months

NGA‐WE‐

35.1C

NGA‐WE‐35.1C‐ Stopping Gas Flow ﴾Squeeze‐Off ‐ Services Only﴿ Required 36 months

35.2 CT35.2‐Stopping Gas Flow ﴾Bagging﴿ 05/14/2018

NGA‐PE‐35.2 NGA‐PE‐35.2 Bagging Required 36 months

NGA‐WE‐

35.2/35.3

NGA‐WE‐35.2/35.3‐ Stopping Gas Flow ﴾Bagging, Valves and Mechanical Only﴿

Required 36 months

35.3 CT35.3‐Stopping Gas Flow ﴾Mechanical﴿ 05/14/2018

NGA‐PE‐35.3 NGA‐PE‐35.3 Mechanical Required 36 months

NGA‐WE‐

35.2/35.3

NGA‐WE‐35.2/35.3‐ Stopping Gas Flow ﴾Bagging, Valves and Mechanical Only﴿

Required 36 months

36/47 CT36 & 47‐Abandonment of Facilities 01/23/2017

NGA‐WE‐

36/47

NGA‐WE‐36 & 47‐Abandonment of Facilities Required 36 months

37A CT37A ‐ Tapping Plastic Pipe with Specialized Equipment 01/23/2017

NGA‐PE‐

37A.1

NGA‐PE‐37A.1‐Tapping Plastic Pipe with Specialized Equipment Required 36 months

NGA‐WE‐37A NGA‐WE‐37A‐Tapping Plastic Pipe with Specialized Equipment Required 36 months

37B CT37B ‐ Tapping Cast Iron Pipe with Specialized Equipment 01/23/2017

NGA‐PE‐

37B.1/37C.1

NGA‐PE‐37B.1 & 37C.1‐Tapping Cast Iron and Steel Pipe with Specialized Equipment

Required 36 months

NGA‐WE‐37B NGA‐WE‐37B‐Tapping Cast Iron Pipe with Specialized Equipment Required 36 months

37C CT37C‐Tapping Steel Pipe with Specialized Equipment 01/23/2017

NGA‐PE‐

37B.1/37C.1

NGA‐PE‐37B.1 & 37C.1‐Tapping Cast Iron and Steel Pipe with Specialized Equipment

Required 36 months

NGA‐WE‐37C NGA‐WE‐37C‐Tapping Steel Pipe with Specialized Equipment Required 36 months

38A CT38A‐Starting Up or Shutting Down Any Part of a Pipeline that Could Cause the MAOP to be Exceeded, Including Turning Valves and Monitoring Flows and Pressure

01/23/2017

NGA‐WE‐38A

NGA‐WE‐38A‐Starting Up or Shutting Down Any Part of a Pipeline that Could Cause the MAOP to be Exceeded, Including Turning Valves and Monitoring Flows and Pressure

Required 36 months

38B CT38B‐Starting Up or Shutting Down Any Part of a Pipeline that Could Cause the MAOP to be Exceeded, Including Turning Valves

01/23/2017

NGA‐WE‐38B

NGA‐WE‐38B‐Starting Up or Shutting Down Any Part of a Pipeline that Could Cause the MAOP to be Exceeded, Including Turning Valves

Required 36 months

39A CT39A ‐ Removing Service Tee or Fitting from Steel and Cast Iron Pipe

01/23/2017

NGA‐WE‐39A NGA‐WE‐39A ‐ Removing Service Tee or Fitting from Steel and Cast Iron Pipe

Required 36 months

39B CT39B‐Removing Service Tee or Fitting from Steel Pipe 01/23/2017

NGA‐WE‐39B NGA‐WE‐39B‐Removing Service Tee or Fitting from Steel Pipe Required 36 months

40 CT40‐Install/Replace tracer wire 01/23/2017

NGA‐WE‐40 NGA‐WE‐40‐Install/Replace Tracer Wire Required 36 months

41/42 CT41 & 42‐Inspecting, Lubricating, Repairing and Operating Distribution Valves

01/23/2017

NGA‐WE‐

41/42

NGA‐WE‐41 & 42‐Inspecting, Lubricating, Repairing and Operating Distribution Valves

Required 36 months

44/54 CT44 & 54‐Welding on a Pipeline 01/23/2017

NGA‐WE‐

44/54

NGA‐WE‐44 & 54‐Welding on a Pipeline Required 36 months

45 CT45‐Restore Service 01/23/2017

NGA‐WE‐45 NGA‐WE‐45‐Restore Service Required 36 months

49.1/49.2 CT49.1/49.2 Mechanical Joining of Pipe other than Plastic ﴾Threaded and Flange﴿

01/10/2017

NGA‐WE‐49 NGA‐WE‐49‐ Mechanical Joining of Pipe Other than Plastic to Plastic Pipe

Required 36 months

49.3 CT49.3 Mechanical Joining of Pipe other than Plastic ﴾Compression﴿

01/10/2017

NGA‐PE‐49.3 NGA‐PE‐49.3 Mechanical Joining of Pipe – Compression Required 36 months

NGA‐WE‐49 NGA‐WE‐49‐ Mechanical Joining of Pipe Other than Plastic to Plastic Pipe

Required 36 months

50/51/52C.04 CT50/51/52‐Joining Plastic Pipe‐Saddle Electrofusion 02/05/2017

NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months

NGA‐WE‐﴾C﴿ NGA‐WE‐﴾C﴿‐Electrofusion ‐ 14667 Required 36 months

PJQ‐04 NGA‐PE‐CT50‐Saddle Electrofusion ﴾PJQ‐04﴿ Required 12 months

50/51/52F CT50/51/52‐Joining Plastic Pipe‐Saddle Fusion 02/05/2017

NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months

NGA‐WE‐﴾F﴿ NGA‐WE‐﴾F﴿‐Saddle Fusion ‐ 14670 Required 36 months

PJQ‐03 NGA‐PE‐CT50‐Saddle Fusion ﴾PJQ‐03﴿ Required 12 months

50/51B.06 CT50/51‐Joining Plastic Pipe‐Bolted ﴾Bolt On﴿ Fitting‐ Mechanical Couplings

02/05/2017

NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months

NGA‐WE‐﴾B﴿ NGA‐WE‐﴾B﴿‐Mechanical Couplings ‐ 17213 Required 36 months

PJQ‐06 NGA‐PE‐CT50‐Bolted ﴾Bolt On﴿ Fitting ﴾PJQ‐06﴿ Required 12 months

50/52C.05 CT50/52‐Joining Plastic Pipe‐Coupling Electrofusion 02/05/2017

NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months

NGA‐WE‐﴾C﴿ NGA‐WE‐﴾C﴿‐Electrofusion ‐ 14667 Required 36 months

PJQ‐05 NGA‐PE‐CT50‐Coupling Electrofusion ﴾PJQ‐05﴿ Required 12 months

50/52D CT50/52‐Joining Plastic Pipe‐Hydraulic Butt Fusion PJQ‐11 02/06/2020

NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months

NGA‐WE‐﴾D﴿ NGA‐WE‐﴾D﴿‐Hydraulic Butt Fusion ‐ 14668 Required 36 months

NGA‐WE‐﴾E﴿ NGA‐WE‐﴾E﴿‐Butt Fusion ‐ 14669 Required 36 months

PJQ‐11 NGA‐PE‐CT50‐Hydraulic Fusion ﴾PJQ‐11﴿ Required 12 months

50/52E CT50/52‐Joining Plastic Pipe‐Manual Butt Fusion 02/05/2017

NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months

NGA‐WE‐﴾E﴿ NGA‐WE‐﴾E﴿‐Butt Fusion ‐ 14669 Required 36 months

PJQ‐01B NGA‐PE‐CT50‐Coiled Pipe Butt Fusion ﴾PJQ‐01B﴿ Required 12 months

50/52G CT50/52‐Joining Plastic Pipe‐Socket Fusion 02/05/2017

NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months

NGA‐WE‐﴾G﴿ NGA‐WE‐﴾G﴿‐Socket Fusion ‐ 14671 Required 36 months

PJQ‐02 NGA‐PE‐CT50‐Socket Fusion ﴾PJQ‐02﴿ Required 12 months

50B.07 CT50/51‐Joining Plastic Pipe‐Stab Fitting‐Mechanical Couplings

02/05/2017

NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months

NGA‐WE‐﴾B﴿ NGA‐WE‐﴾B﴿‐Mechanical Couplings ‐ 17213 Required 36 months

PJQ‐07 NGA‐PE‐CT50‐Stab Fitting ﴾PJQ‐07﴿ Required 12 months

50B.08 CT50/51‐Joining Plastic Pipe‐Compression Fitting‐Mechanical Couplings

02/05/2017

NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months

NGA‐WE‐﴾B﴿ NGA‐WE‐﴾B﴿‐Mechanical Couplings ‐ 17213 Required 36 months

PJQ‐08 NGA‐PE‐CT50‐Compression Fitting ﴾PJQ‐08﴿ Required 12 months

50B.09 CT50/51‐Joining Plastic Pipe‐Nut Follower ﴾Threaded Fitting﴿‐ Mechanical Couplings

02/05/2017

NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months

NGA‐WE‐﴾B﴿ NGA‐WE‐﴾B﴿‐Mechanical Couplings ‐ 17213 Required 36 months

PJQ‐09 NGA‐PE‐CT50‐Nut Follower ﴾Threaded Fitting﴿ ﴾PJQ‐09﴿ Required 12 months

51D CT51D‐Tapping Using Plastic and Steel Self Tapping Tees 01/23/2017

NGA‐PE‐

51D.1/51D.2

NGA‐PE‐51D.1 & 51D.2‐Tapping a Plastic and Steel Self Tapping Tee Required 36 months

NGA‐WE‐51D NGA‐WE‐51D‐Tapping Using Plastic and Steel Self Tapping Tees Required 36 months

51E CT51E‐Tapping Using Plastic Self Tapping Tees 01/23/2017

NGA‐PE‐

51D.1/51D.2

NGA‐PE‐51D.1 & 51D.2‐Tapping a Plastic and Steel Self Tapping Tee Required 36 months

NGA‐WE‐51E NGA‐WE‐51E‐Tapping Using Plastic Self Tapping Tees Required 36 months

51F CT51F‐Tapping Using Steel Self Tapping Tees 01/23/2017

NGA‐PE‐

51D.1/51D.2

NGA‐PE‐51D.1 & 51D.2‐Tapping a Plastic and Steel Self Tapping Tee Required 36 months

NGA‐WE‐51F NGA‐WE‐51F‐Tapping Using Steel Self Tapping Tees Required 36 months

52H.B 1YR

CT52H.B‐Inspect Plastic Pipe Fusion Joint ﴾Visual Inspection Only‐Butt Fusion ‐ 1 Year﴿

06/01/2019

NGA‐WE‐

52H.B 1YR

NGA‐WE‐52H.B‐Inspect Plastic Pipe Fusion Joint‐Butt Fusion ﴾Field inspector Only ‐ 1 Year﴿

Required 12 months

52H.B 3YR

CT52H.B‐Inspect Plastic Pipe Fusion Joint ﴾Visual Inspection Only‐Butt Fusion ‐ 3 Year﴿

06/01/2019

NGA‐WE‐

52H.B 3YR

NGA‐WE‐52H.B‐Inspect Plastic Pipe Fusion Joint‐Butt Fusion ﴾Field inspector Only ‐ 3 Year﴿

Required 36 months

52H.D 1YR

CT52H.D‐Inspect Plastic Pipe Fusion Joint ﴾Visual Inspection Only‐Saddle Fusion ‐ 1 Year﴿

06/01/2019

NGA‐WE‐

52H.D 1YR

NGA‐WE‐52H.D‐Inspect Plastic Pipe Fusion Joint‐Saddle Fusion ﴾Field inspector Only ‐ 1 Year﴿

Required 12 months

52H.D 3YR

CT52H.D‐Inspect Plastic Pipe Fusion Joint ﴾Visual Inspection Only‐Saddle Fusion ‐ 3 Year﴿

06/01/2019

NGA‐WE‐

52H.D 3YR

NGA‐WE‐52H.D‐Inspect Plastic Pipe Fusion Joint‐Saddle Fusion ﴾Field inspector Only ‐ 3 Year﴿

Required 36 months

52H.E 1YR

CT52H.E‐Inspect Plastic Pipe Fusion Joint ﴾Visual Inspection Only‐Electrofusion ‐ 1 Year﴿

06/01/2019

NGA‐WE‐

52H.E 1YR

NGA‐WE‐52H.E‐Inspect Plastic Pipe Fusion Joint‐Electrofusion ﴾Field inspector Only ‐ 1 Year﴿

Required 12 months

52H.E 3YR

CT52H.E‐Inspect Plastic Pipe Fusion Joint ﴾Visual Inspection Only‐Electrofusion ‐ 3 Year﴿

06/01/2019

NGA‐WE‐

52H.E 3YR

NGA‐WE‐52H.E‐Inspect Plastic Pipe Fusion Joint‐Electrofusion ﴾Field inspector Only ‐ 3 Year﴿

Required 36 months

52H.F 1YR

CT52H.F‐Inspect Plastic Pipe Fusion Joint ﴾Visual Inspection Only‐Socket Fusion ‐ 1 Year﴿

06/01/2019

NGA‐WE‐

52H.F 1YR

NGA‐WE‐52H.F‐Inspect Plastic Pipe Fusion Joint‐Socket Fusion ﴾Field inspector Only ‐ 1 Year﴿

Required 12 months

52H.F 3YR

CT52H.F‐Inspect Plastic Pipe Fusion Joint ﴾Visual Inspection Only‐Socket Fusion ‐ 3 Year﴿

06/01/2019

NGA‐WE‐

52H.F 3YR

NGA‐WE‐52H.F‐Inspect Plastic Pipe Fusion Joint‐Socket Fusion ﴾Field inspector Only ‐ 3 Year﴿

Required 36 months

52H.V CT52H.V‐Vintage Pipe 01/01/1970

NGA‐WE‐

52H.V

NGA‐WE‐52H.V‐Vintage Pipe Required 12 months

55.1 CT55.1 Maintain a Pipeline Compressor Station 01/10/2017

NGA‐PE‐

CT55.1

NGA‐PE‐CT55.1‐Maintain a Pipeline Compressor Station ‐ 14410 Required 36 months

55.2 CT55.2 Maintain a Pipeline Compressor Station ﴾ESD Only﴿ 01/10/2017

NGA‐PE‐

CT55.2

NGA‐PE‐CT55.2‐Maintain a Pipeline Compressor Station ﴾ESD Only﴿ Required 36 months

56 CT56‐Operate a Pipeline Compressor Station 01/01/1970

NGA‐PE‐CT56 NGA‐PE‐CT56‐Operate a Pipeline Compressor Station ‐ 14411 Required 36 months

57 CT57‐Repair a Compressor 01/01/1970

NGA‐PE‐CT57 NGA‐PE‐CT57‐Repair a Compressor ‐ 14426 Required 36 months

CT58‐Maintaining gas detection systems and alarms in compressor stations

01/01/1970

NGA‐PE‐CT58 NGA‐PE‐CT58‐Maintain Gas Detection Systems and Alarms in Compressor Stations ‐ 14412

Required 36 months

59/60 CT59 & 60‐Controlling and Monitoring Gas Pressures and Flows

01/23/2017

NGA‐WE‐

59/60

NGA‐WE‐59 & 60‐Controlling and Monitoring Gas Pressures and Flows

Required 36 months

61 CT61‐Inspecting a Pressure Recording Gauge 05/11/2017

NGA‐WE‐61 NGA‐WE‐61‐Inspecting a Pressure Recording Gauge Required 36 months

62A/63A/65A CT62A, 63A & 65A‐ Inspect and Test Pressure Regulation Station, Including Heating Equipment

01/23/2017

NGA‐PE‐

62.1/63.1/65.1

NGA‐PE‐62.1, 63.1 & 65.1‐Inspect and Test Pressure Regulator Station

Required 36 months

NGA‐WE‐

62A/63A/65A

NGA‐WE‐62A, 63A & 65A‐ Inspect and Test Pressure Regulation Station, Including Heating Equipment

Required 36 months

62B/63B/65B CT62B, 63B & 65B‐ Inspect and Test Pressure Regulation Station, Not Including Heating Equipment

01/23/2017

NGA‐PE‐

62.1/63.1/65.1

NGA‐PE‐62.1, 63.1 & 65.1‐Inspect and Test Pressure Regulator Station

Required 36 months

NGA‐WE‐

62B/63B/65B

NGA‐WE‐62B, 63B & 65B‐ Inspect and Test Pressure Regulation Station, Not Including Heating Equipment

Required 36 months

CT64‐Inspecting Telemetering Equipment at a Pressure Limiting or Regulating Station

01/23/2017

NGA‐WE‐64 NGA‐WE‐64‐Inspecting Telemetering Equipment Required 36 months

66A CT66A‐Field Interpretation of Pressure Recording Charts and Electronic Devices

01/23/2017

NGA‐WE‐66A NGA‐WE‐66A‐Field Interpretation of Pressure Recording Charts and Electronic Devices

Required 36 months

66B CT66B‐Field Interpretation of Pressure Recording Charts 01/23/2017

NGA‐WE‐66B NGA‐WE‐66B‐Field Interpretation of Pressure Recording Charts Required 36 months

66C CT66C‐Field Interpretation of Pressure Recording Electronic Devices

01/23/2017

NGA‐WE‐66C NGA‐WE‐66C‐Field Interpretation of Pressure Recording Electronic Devices

Required 36 months

67 CT67‐Inspecting a Pressure Regulator Vault 01/23/2017

NGA‐WE‐67 NGA‐WE‐67‐Inspecting a Pressure Regulator Vault Required 36 months

68 CT68‐Operating an Odorizer 01/23/2017

NGA‐WE‐68 NGA‐WE‐68‐Operating an Odorizer Required 36 months

69 CT69‐Monitor Natural Gas Odorization Levels 01/23/2017

NGA‐WE‐69 NGA‐WE‐69‐Monitor Natural Gas Odorization Levels Required 36 months

CT70‐Properties of Natural Gas and Abnormal Operating Conditions

01/23/2017

NGA‐WE‐70 NGA‐WE‐70‐Properties of Natural Gas and Abnormal Operating Conditions

Required 36 months

70P CT70P‐Properties of Propane Air and Abnormal Operating Conditions

01/01/1970

NGA‐WE‐

CT70P

NGA‐WE‐CT70P‐Properties of Propane Air and Abnormal Operating Conditions ‐ 13867

Required 36 months

71 CT71‐Excavation & Backfill 05/14/2018

NGA‐WE‐71 NGA‐WE‐71‐Excavation & Backfill Required 36 months

72A CT72A‐Installing and Turning Off Residential, Small Commercial, Large Commercial and Industrial Meters and Regulators

01/23/2017

NGA‐WE‐72A

NGA‐WE‐72A‐Installing and Turning Off Residential, Small Commercial, Large Commercial and Industrial Meters and Regulators

Required 36 months

72B CT72B‐Installing and Turning Off Residential and Small Commercial Meters and Regulators

01/23/2017

NGA‐WE‐72B NGA‐WE‐72B‐Installing and Turning Off Residential and Small Commercial Meters and Regulators

Required 36 months

72C CT72C‐Turning Off Meters Only 01/23/2017

NGA‐WE‐72C NGA‐WE‐72C‐Turning Off Meters Only Required 36 months

CT73‐Inspecting and maintaining air compressors at LP‐Air plants

01/01/1970

NGA‐PE‐CT73 NGA‐PE‐CT73‐Inspecting and Maintaining Air Compressors at LP‐Air Plants ‐ 14414

Required 36 months

CT74‐Inspecting and Maintaining Instrument Air Dryers at LP‐ Air Plants

01/01/1970

NGA‐PE‐CT74 NGA‐PE‐CT74‐Inspecting and Maintaining Instrument Air Dryers at LP‐Air Plants ‐ 14415

Required 36 months

CT75‐Inspecting and Maintaining Emergency Shutoff Systems at LP‐ Air Plants

01/01/1970

NGA‐PE‐CT75 NGA‐PE‐CT75‐Inspecting and Maintaining Emergency Shutoff Systems at LP‐Air Plants ‐ 14416

Required 36 months

76 CT76‐Maintaining Fire Protection Systems at LP‐Air Plants 01/01/1970

NGA‐PE‐CT76 NGA‐PE‐CT76‐Maintaining Fire Protection Systems at LP‐Air Plants ‐ 14417

Required 36 months

CT77‐Inspecting and maintaining storage tanks, piping, valves and fittings at LP‐Air plants

01/01/1970

NGA‐PE‐CT77 NGA‐PE‐CT77‐Inspecting and Maintaining Storage Tanks, Piping, Valves and Fittings at LP‐Air Plants ‐ 14418

Required 36 months

CT78‐Inspecting and Maintaining Vapor Compressors at LP‐Air Plants

01/01/1970

NGA‐PE‐CT78 NGA‐PE‐CT78‐Inspecting and Maintaining Vapor Compressors at LP‐ Air Plants ‐ 14419

Required 36 months

CT79‐Inspecting, Operating, and Maintaining Vapor Detection Systems at LP‐Air Plants

01/01/1970

NGA‐PE‐CT79 NGA‐PE‐CT79‐Inspecting, Operating and Maintaining Vapor Detection Systems at LP‐Air Plants ‐ 14420

Required 36 months

CT80‐Inspecting and Maintaining Propane Vaporizers at LP‐Air Plants

01/01/1970

NGA‐PE‐CT80 NGA‐PE‐CT80‐Inspecting and Maintaining Propane Vaporizers at LP‐ Air Plants ‐ 14421

Required 36 months

CT81‐Load, Unload and Transfer Liquid Propane at LP‐Air Plants

01/01/1970

NGA‐PE‐CT81 NGA‐PE‐CT81‐Load, Unload and Transfer Liquid Propane at LP‐Air Plants ‐ 14422

Required 36 months

CT82‐Inspecting and Maintaining Auxiliary Power Sources at LP‐Air Plants

01/01/1970

NGA‐PE‐CT82 NGA‐PE‐CT82‐Inspecting and Maintaining Auxillary Power Sources at LP‐Air Plants ‐ 14423

Required 36 months

83 CT83‐Operating a Propane Air Plant 01/01/1970

NGA‐PE‐CT83 NGA‐PE‐CT83‐Operating a Propane Air Plant ‐ 14424 Required 36 months

84 CT84‐Bending Steel Pipe 01/23/2017

NGA‐WE‐84 NGA‐WE‐84‐Bending Steel Pipe Required 36 months

85 CT85‐Meter Assembly Abnormal Operating Conditions 08/27/2015

NGA‐WE‐

CT85

NGA‐WE‐CT85‐EXAM‐Meter Assembly Abnormal Operating Conditions

Required 36 months

86 CT86 – Interior Jurisdictional Piping Safety Inspections 01/01/1970

NGA‐PE‐ 86 NGA‐PE‐86‐ Interior Jurisdictional Piping Safety Inspections Required 36 months

NGA‐WE‐86 NGA‐WE‐86‐Interior Jurisdictional Piping Safety Inspections Required 36 months

NGA‐WE‐

86/87

NGA‐WE‐86/87‐Jurisdictional Piping: General Knowledge Required 36 months

86‐PV

CT86 – Interior Jurisdictional Piping Safety Inspections ‐ ﴾Plumbers Version﴿

07/12/2018

NGA‐PE‐86‐

PV

NGA‐PE‐86‐Interior Jurisdictional Piping Safety Inspections ‐ ﴾Plumbers Version﴿

Required 36 months

NGA‐WE‐86‐

PV

NGA‐WE‐86‐Interior Jurisdictional Piping Safety Inspections ‐ ﴾Plumbers Version﴿

Required 36 months

NGA‐WE‐

86/87‐PV

NGA‐WE‐86/87‐Jurisdictional Piping: General Knowledge ‐ ﴾Plumbers Version﴿

Required 36 months

87‐PV

CT87 – Interior Jurisdictional Piping Construction and Maintenance Activities ‐ ﴾Plumbers Version﴿

07/12/2018

NGA‐WE‐

86/87‐PV

NGA‐WE‐86/87‐Jurisdictional Piping: General Knowledge ‐ ﴾Plumbers Version﴿

Required 36 months

NGA‐WE‐87‐

PV

NGA‐WE‐87‐Interior Jurisdictional Piping Construction and Maintenance Activities ‐ ﴾Plumbers Version﴿

Required 36 months

PJQ10 CT‐Soil Compaction 01/01/1970

NGA‐WE‐﴾H﴿ NGA‐WE‐﴾H﴿‐EXAM Soil Compaction ‐ 14682 Required 36 months

TSK‐

20693298 NGA Example Exam 01/06/2015

VGOA Proctoring Presentation Exam 01/01/1970

VGOAWE VGOA Proctoring Exam ‐ 18592 Required 600 months

Page 1 / 11 javascript:void(0) javascript:void(0) javascript:void(0) javascript:void(0) javascript:void(0) RGarcia Highlight

RGarcia Highlight

RGarcia Highlight

RGarcia Highlight

Code Task/Skil l Name Required Start Date Requal i f icat ion Interval

Northeast Gas Association ‐ Tasks ‐ NGA OQ Run By Darcy Wall on 1/12/2021 7:48:59 AM

Code Task/Skil l Name Required Start Date Requal i f icat ion Interval

01 CT01 ‐ Inspecting for Shorted Casings 01/01/2016

NGA‐WE‐01 NGA‐WE‐01‐Inspecting for Shorted Casings Required 36 months

02A CT02A‐Measuring Pipe‐To‐Soil Potential ﴾Measuring and Interpreting Readings﴿

01/23/2017

NGA‐WE‐02A NGA‐WE‐02A‐Measuring Pipe‐To‐Soil Potential ﴾Measuring and Interpreting Readings﴿

Required 36 months

02B CT02B‐Measuring Pipe‐To‐Soil Potential ﴾Measuring Only﴿ 01/23/2017

NGA‐WE‐02B NGA‐WE‐02B‐Measuring Pipe‐To‐Soil Potential ﴾Measuring Only﴿ Required 36 months

03 CT03‐Conduct a Soil Resistivity Survey 01/23/2017

NGA‐WE‐03 NGA‐WE‐03‐Conduct a Soil Resistivity Survey Required 36 months

04A CT04A‐Conducting Interference Testing and Remediation 01/23/2017

NGA‐WE‐04A NGA‐WE‐04A‐Conducting Interference Testing and Remediation Required 36 months

04B CT04B‐Conducting Interference Testing 01/23/2017

NGA‐WE‐04B NGA‐WE‐04B‐Conducting Interference Testing Required 36 months

05A CT05A‐Electrically Checking for Proper Performance of Diodes and Interference Bonds, Including Testing for A/C Mitigation

01/23/2017

NGA‐WE‐05A NGA‐WE‐05A‐Electrically Checking for Proper Performance of Diodes and Interference Bonds, Including Testing for A/C Mitigation

Required 36 months

05B CT05B‐Electrically Checking for Proper Performance of Diodes and Interference Bonds

01/23/2017

NGA‐WE‐05B NGA‐WE‐05B‐Electrically Checking for Proper Performance of Diodes and Interference Bonds

Required 36 months

06A CT06A‐Inspecting for Atmospheric Corrosion, Including Evaluation and Remediation

01/23/2017

NGA‐WE‐06A NGA‐WE‐06A‐Inspecting for Atmospheric Corrosion, Including Evaluation and Remediation

Required 36 months

06B CT06B‐Inspecting for Atmospheric Corrosion 01/23/2017

NGA‐WE‐06B NGA‐WE‐06B‐Inspecting for Atmospheric Corrosion Required 36 months

07A/13A CT07A & 13A‐Installing, Replacing and Ensuring Operation of a Rectifier on a Pipeline ﴾Installing, Replacing and Troubleshooting﴿

01/23/2017

NGA‐WE‐

07A/13A

NGA‐WE‐07A & 13A‐Installing, Replacing and Ensuring Operation of a Rectifier on a Pipeline ﴾Installing, Replacing and Troubleshooting﴿

Required 36 months

07B/13B CT07B & CT13B‐Installing, Replacing and Ensuring Operation of a Rectifier on a Pipeline ﴾Installing and Replacing Only﴿

01/23/2017

NGA‐WE‐

07B/13B

NGA‐WE‐07B & 13B‐ Installing, Replacing and Ensuring Operation of a Rectifier on a Pipeline ﴾Installing and Replacing Only﴿

Required 36 months

08 CT08‐‐Visually Inspecting for Internal Corrosion 01/23/2017

NGA‐WE‐08 NGA‐WE‐08‐Visually Inspecting for Internal Corrosion Required 36 months

CT09‐Removing Coupons/Sample Gas or Liquids for Analysis and Evaluation of Internal Corrosion

11/04/2016

NGA‐WE‐09 NGA‐WE‐09‐Internal Corrosion Coupon and Fluids/Solids Testing Required 36 months

10 CT10‐Clear a shorted casing 01/23/2017

NGA‐WE‐10 NGA‐WE‐10‐Clearing a Shorted Casing Required 36 months

11B/12B/17B CT11B, 12B & 17B‐Pipe Coatings ﴾Hot Applied Tape﴿ 01/01/2016

NGA‐WE‐

11A/12A/17A

NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months

NGA‐WE‐

11B/12B/17B

NGA‐WE‐11B, 12B & 17B‐Pipe Coatings ﴾Hot Applied Tape﴿ Required 36 months

11C/12C/17C CT11C, 12C & 17C‐Pipe Coatings ﴾Heat Shrink Sleeve﴿ 01/23/2017

NGA‐WE‐

11A/12A/17A

NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months

NGA‐WE‐

11C/12C/17C

NGA‐WE‐11C, 12C & 17C‐Pipe Coatings ﴾Heat Shrink Sleeve﴿ Required 36 months

11D/12D/17D CT11D, 12D & 17D‐Pipe Coatings ﴾Wax Tape﴿ 01/23/2017

NGA‐WE‐

11A/12A/17A

NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months

NGA‐WE‐

11D/12D/17D

NGA‐WE‐11D, 12D & 17D‐Pipe Coatings ﴾Wax Tape﴿ Required 36 months

11E/12E/17E CT11E, 12E & 17E‐Pipe Coatings ﴾Mastic﴿ 01/23/2017

NGA‐WE‐

11A/12A/17A

NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months

NGA‐WE‐

11E/12E/17E

NGA‐WE‐11E, 12E & 17E‐Pipe Coatings ﴾Mastic﴿ Required 36 months

11F/12F/17F CT11F, 12F & 17F‐Pipe Coatings ﴾Cold Applied Tape﴿ 01/23/2017

NGA‐WE‐

11A/12A/17A

NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months

NGA‐WE‐

11F/12F/17F

NGA‐WE‐11F, 12F & 17F‐Pipe Coatings ﴾Cold Applied Tape﴿ Required 36 months

11G/12G/17G CT11G, 12G & 17G‐Pipe Coatings ﴾Two Part Epoxy﴿ 01/23/2017

NGA‐WE‐

11A/12A/17A

NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months

NGA‐WE‐

11G/12G/17G

NGA‐WE‐11G, 12G & 17G‐Pipe Coatings ﴾Two Part Epoxy﴿ Required 36 months

11H/12H/17H CT11H, 12H & 17H‐Pipe Coatings ﴾Paint﴿ 01/23/2017

NGA‐WE‐

11H/12H/17H

NGA‐WE‐11H, 12H & 17H‐Pipe Coatings ﴾Paint﴿ Required 36 months

14A CT14A ‐ Installing/Replacing an Anode on a Pipeline including Exothermic Welding

01/01/2016

NGA‐PE‐

14/16

NGA‐PE‐14/16‐Exothermic Welding Required 36 months

NGA‐WE‐14 NGA‐WE‐14‐Installing/Replacing an Anode Required 36 months

14B CT14B ‐ Installing/Replacing an Anode on a Pipeline 05/14/2018

NGA‐WE‐14 NGA‐WE‐14‐Installing/Replacing an Anode Required 36 months

15A CT15A‐Installing, Replacing and Testing Electrical Isolation Couplings

01/23/2017

NGA‐WE‐15A NGA‐WE‐15A‐Installing, Replacing and Testing Electrical Isolation Couplings

Required 36 months

15B CT15B‐Installing and Replacing Electrical Isolation Couplings 01/23/2017

NGA‐WE‐15B NGA‐WE‐15B‐Installing and Replacing Electrical Isolation Couplings Required 36 months

16A CT16A ‐ Installing or Replacing a Corrosion Test Station on a Pipeline including Exothermic Welding

05/14/2018

NGA‐PE‐

14/16

NGA‐PE‐14/16‐Exothermic Welding Required 36 months

NGA‐WE‐16 NGA‐WE‐16‐Installing or Replacing a Corrosion Test Station on a Pipeline

Required 36 months

16B CT16B ‐ Installing or Replacing a Corrosion Test Station on a Pipeline

05/14/2018

NGA‐WE‐16 NGA‐WE‐16‐Installing or Replacing a Corrosion Test Station on a Pipeline

Required 36 months

18A CT18A Conducting Gas Leakage Surveys ﴾Mobile and Walking Surveys﴿

11/01/2017

NGA‐PE‐18.1 NGA‐PE‐18.1‐Leak Survey Required 36 months

NGA‐WE‐

CT18A

NGA‐WE‐CT18A‐Conducting Gas Leakage Survey ﴾Mobile and Walking Surveys﴿

Required 36 months

18B CT18B Conducting Gas Leakage Surveys ﴾Walking Surveys Only﴿

11/01/2017

NGA‐PE‐18.1 NGA‐PE‐18.1‐Leak Survey Required 36 months

NGA‐WE‐

CT18B

NGA‐WE‐CT18B‐Conducting Gas Leakage Survey ﴾Walking Surveys Only﴿

Required 36 months

19A CT19A‐Patrolling ‐ Inspecting Right of Ways, Pipeline Markers and Exposed Above Ground Mains

06/28/2017

NGA‐WE‐19A NGA‐WE‐19A‐Patrolling ‐ Inspecting Right of Ways, Pipeline Markers and Exposed Above Ground Mains

Required 36 months

19B CT19B‐Patrolling ‐ Inspecting Right of Ways and Pipeline Markers

06/28/2017

NGA‐WE‐19B NGA‐WE‐19B‐Patrolling ‐ Inspecting Right of Ways and Pipeline Markers

Required 36 months

20A CT20A‐Investigating Leak or Odor Complaints ﴾Inside and Outside﴿

01/10/2017

NGA‐WE‐20A NGA‐WE‐20A‐ Investigating Leak or Odor Complaints ﴾Inside and Outside﴿

Required 36 months

20B CT20B‐Investigating Leak or Odor Complaints ﴾Outside Investigation Only﴿

01/10/2017

NGA‐WE‐20B NGA‐WE‐20B‐ Investigating Leak or Odor Complaints ﴾Outside Investigation Only﴿

Required 36 months

20C CT20C‐Investigating Leak or Odor Complaints ﴾Inside Investigation Only﴿

01/10/2017

NGA‐WE‐20C NGA‐WE‐20C‐ Investigating Leak or Odor Complaints ﴾Inside Investigation Only﴿

Required 36 months

20D CT20D‐Leak Classification 01/10/2017

NGA‐WE‐20D NGA‐WE‐20D‐ Leak Classification Required 36 months

21‐CT CT21‐Line Locating and Mark Out ﴾Connecticut﴿ 01/01/2016

NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months

NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months

NGA‐WE‐CT NGA‐WE‐State Damage Prevention Regulations ﴾Connecticut﴿ Required 36 months

21‐MA CT21‐Line Locating and Mark Out ﴾Massachusetts﴿ 01/23/2017

NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months

NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months

NGA‐WE‐MA NGA‐WE‐State Damage Prevention Regulations ﴾Massachusetts﴿ Required 36 months

21‐MD CT21‐Line Locating and Mark Out ﴾Maryland﴿ 01/23/2017

NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months

NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months

NGA‐WE‐MD NGA‐WE‐State Damage Prevention Regulations ﴾Maryland﴿ Required 36 months

21‐ME CT21‐Line Locating and Mark Out ﴾Maine﴿ 01/23/2017

NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months

NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months

NGA‐WE‐ME NGA‐WE‐State Damage Prevention Regulations ﴾Maine﴿ Required 36 months

21‐NH CT21‐Line Locating and Mark Out ﴾New Hampshire﴿ 01/23/2017

NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months

NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months

NGA‐WE‐NH NGA‐WE‐State Damage Prevention Regulations ﴾New Hampshire﴿ Required 36 months

21‐NJ CT21‐Line Locating and Mark Out ﴾New Jersey﴿ 01/23/2017

NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months

NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months

NGA‐WE‐NJ NGA‐WE‐State Damage Prevention Regulations ﴾New Jersey﴿ Required 36 months

21‐NY CT21‐Line Locating and Mark Out ﴾New York﴿ 01/23/2017

NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months

NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months

NGA‐WE‐NY NGA‐WE‐State Damage Prevention Regulations ﴾New York﴿ Required 36 months

21‐PA CT21‐Line Locating and Mark Out ﴾Pennsylvania﴿ 01/23/2017

NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months

NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months

NGA‐WE‐PA NGA‐WE‐State Damage Prevention Regulations ﴾Pennsylvania﴿ Required 36 months

21‐RI CT21‐Line Locating and Mark Out ﴾Rhode Island﴿ 01/23/2017

NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months

NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months

NGA‐WE‐RI NGA‐WE‐State Damage Prevention Regulations ﴾Rhode Island﴿ Required 36 months

21‐VT CT21‐Line Locating and Mark Out ﴾Vermont﴿ 01/23/2017

NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months

NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months

NGA‐WE‐VT NGA‐WE‐State Damage Prevention Regulations ﴾Vermont﴿ Required 36 months

22A CT22A‐Inspecting of 3rd Party Excavations for Damage Prevention, Including Root Cause Analysis

05/14/2018

NGA‐WE‐22A NGA‐WE‐22A‐Inspecting of 3rd Party Excavations for Damage Prevention, Including Root Cause Analysis

Required 36 months

22B CT22B‐Inspecting of 3rd Party Excavations for Damage Prevention

05/14/2018

NGA‐WE‐22B NGA‐WE‐22B‐Inspecting of 3rd Party Excavations for Damage Prevention

Required 36 months

23/24 CT23 & 24 Inspecting the Condition of Exposed Pipe 01/23/2017

NGA‐WE‐

23/24

NGA‐WE‐23 & 24‐Inspecting the Condition of Exposed Pipe Required 36 months

25 CT25‐Repairing a Transmission Pipe 01/23/2017

NGA‐WE‐25 NGA‐WE‐25‐Repairing a Transmission Pipe Required 36 months

26/27 CT26 & 27‐Inspecting, Lubricating, Repairing and Operating Transmission Valves

01/23/2017

NGA‐WE‐

26/27

NGA‐WE‐26 & 27‐Inspecting, Lubricating, Repairing and Operating Transmission Valves

Required 36 months

28 CT28‐Uprating 01/23/2017

NGA‐WE‐28 NGA‐WE‐28‐Uprating Required 36 months

29A/30A CT29A & 30A‐Repairing a Plastic, Steel and Cast Iron Distribution Pipe

01/23/2017

NGA‐WE‐

29A/30A

NGA‐WE‐29A & 30A‐Repairing a Plastic, Steel and Cast Iron Distribution Pipe

Required 36 months

29B/30B CT29B & 30B‐Repairing a Plastic Distribution Pipe 01/23/2017

NGA‐WE‐

29B/30B

NGA‐WE‐29B & 30B‐Repairing a Plastic Distribution Pipe Required 36 months

29C/30C CT29C & 30C‐Repairing a Steel Distribution Pipe 01/23/2017

NGA‐WE‐

29C/30C

NGA‐WE‐29C & 30C‐Repairing a Steel Distribution Pipe Required 36 months

29D/30D CT29D & 30D‐Repairing Cast Iron Distribution Pipe, Including Using Anaerobic Sealing

01/23/2017

NGA‐WE‐

29D/30D

NGA‐WE‐29D & 30D‐Repairing Cast Iron Distribution Pipe, Including Using Anaerobic Sealing

Required 36 months

29E/30E CT29E & 30E‐Repairing Cast Iron Distribution Pipe, Not Including Anaerobic Sealing

01/23/2017

NGA‐WE‐

29E/30E

NGA‐WE‐29E & 30E‐Repairing Cast Iron Distribution Pipe, Not Including Anaerobic Sealing

Required 36 months

31A CT31A‐Installation of Pipe: Storage, Handling and Inspection of Pipe: General Knowledge

10/16/2015

NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405

Required 36 months

31B CT31B‐Installation of Pipe: Install Pipe in a Ditch 10/16/2015

NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405

Required 36 months

NGA‐WE‐31B NGA‐WE‐31B‐Installation of Pipe: Install Pipe in a Ditch ‐ 14406 Required 36 months

31C CT31C‐Installation of Pipe: Installing Pipe by Horizontal Directional Drilling

10/16/2015

NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405

Required 36 months

NGA‐WE‐31C NGA‐WE‐31C‐Installation of Pipe:Installing Pipe by Horizontal Directional Drilling ‐ 14407

Required 36 months

31D CT31D‐Installation of Pipe: Installing Pipe by Horizontal Boring ﴾Piercing Tools﴿

10/16/2015

NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405

Required 36 months

NGA‐WE‐31D NGA‐WE‐31D‐Installation of Pipe: Installing Pipe by Horizontal Boring ﴾Piercing Tools﴿ ‐ 14408

Required 36 months

31E CT31E‐Installation of Pipe: Installing Pipe by Dead Insertion 10/16/2015

NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405

Required 36 months

NGA‐WE‐31E NGA‐WE‐31E‐Installation of Pipe: Installing Pipe by Dead Insertion ‐ 14409

Required 36 months

31F CT31F‐Installation of Pipe: Installing Pipe by Vibratory Plow 10/16/2015

NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405

Required 36 months

NGA‐WE‐

CT31F

NGA‐WE‐CT31F‐Installation of Pipe: Installing Pipe by Vibratory Plow Required 36 months

32 CT32‐Purging a pipeline into service 10/16/2015

NGA‐WE‐32

& 33

NGA‐WE‐32 & 33‐Purging a Pipeline In and Out of Service ‐ 13828 Required 36 months

33 CT33‐Purging a pipeline out of service 10/16/2015

NGA‐WE‐32

& 33

NGA‐WE‐32 & 33‐Purging a Pipeline In and Out of Service ‐ 13828 Required 36 months

34 CT34‐Performing pressure test on a pipeline 10/16/2015

NGA‐WE‐34 NGA‐WE‐34‐Performing Pressure Test on a Pipeline ‐ 13830 Required 36 months

35.1B CT35.1B‐Stopping Gas Flow ﴾Mains and Services﴿ 05/14/2018

NGA‐PE‐35.1 NGA‐PE‐35.1 Squeeze‐Off Required 36 months

NGA‐WE‐

35.1B

NGA‐WE‐35.1B‐ Stopping Gas Flow ﴾Squeeze‐Off ‐ Mains & Services﴿

Required 36 months

35.1C CT35.1C‐Stopping Gas Flow ﴾Services Only﴿ 05/14/2018

NGA‐PE‐35.1 NGA‐PE‐35.1 Squeeze‐Off Required 36 months

NGA‐WE‐

35.1C

NGA‐WE‐35.1C‐ Stopping Gas Flow ﴾Squeeze‐Off ‐ Services Only﴿ Required 36 months

35.2 CT35.2‐Stopping Gas Flow ﴾Bagging﴿ 05/14/2018

NGA‐PE‐35.2 NGA‐PE‐35.2 Bagging Required 36 months

NGA‐WE‐

35.2/35.3

NGA‐WE‐35.2/35.3‐ Stopping Gas Flow ﴾Bagging, Valves and Mechanical Only﴿

Required 36 months

35.3 CT35.3‐Stopping Gas Flow ﴾Mechanical﴿ 05/14/2018

NGA‐PE‐35.3 NGA‐PE‐35.3 Mechanical Required 36 months

NGA‐WE‐

35.2/35.3

NGA‐WE‐35.2/35.3‐ Stopping Gas Flow ﴾Bagging, Valves and Mechanical Only﴿

Required 36 months

36/47 CT36 & 47‐Abandonment of Facilities 01/23/2017

NGA‐WE‐

36/47

NGA‐WE‐36 & 47‐Abandonment of Facilities Required 36 months

37A CT37A ‐ Tapping Plastic Pipe with Specialized Equipment 01/23/2017

NGA‐PE‐

37A.1

NGA‐PE‐37A.1‐Tapping Plastic Pipe with Specialized Equipment Required 36 months

NGA‐WE‐37A NGA‐WE‐37A‐Tapping Plastic Pipe with Specialized Equipment Required 36 months

37B CT37B ‐ Tapping Cast Iron Pipe with Specialized Equipment 01/23/2017

NGA‐PE‐

37B.1/37C.1

NGA‐PE‐37B.1 & 37C.1‐Tapping Cast Iron and Steel Pipe with Specialized Equipment

Required 36 months

NGA‐WE‐37B NGA‐WE‐37B‐Tapping Cast Iron Pipe with Specialized Equipment Required 36 months

37C CT37C‐Tapping Steel Pipe with Specialized Equipment 01/23/2017

NGA‐PE‐

37B.1/37C.1

NGA‐PE‐37B.1 & 37C.1‐Tapping Cast Iron and Steel Pipe with Specialized Equipment

Required 36 months

NGA‐WE‐37C NGA‐WE‐37C‐Tapping Steel Pipe with Specialized Equipment Required 36 months

38A CT38A‐Starting Up or Shutting Down Any Part of a Pipeline that Could Cause the MAOP to be Exceeded, Including Turning Valves and Monitoring Flows and Pressure

01/23/2017

NGA‐WE‐38A

NGA‐WE‐38A‐Starting Up or Shutting Down Any Part of a Pipeline that Could Cause the MAOP to be Exceeded, Including Turning Valves and Monitoring Flows and Pressure

Required 36 months

38B CT38B‐Starting Up or Shutting Down Any Part of a Pipeline that Could Cause the MAOP to be Exceeded, Including Turning Valves

01/23/2017

NGA‐WE‐38B

NGA‐WE‐38B‐Starting Up or Shutting Down Any Part of a Pipeline that Could Cause the MAOP to be Exceeded, Including Turning Valves

Required 36 months

39A CT39A ‐ Removing Service Tee or Fitting from Steel and Cast Iron Pipe

01/23/2017

NGA‐WE‐39A NGA‐WE‐39A ‐ Removing Service Tee or Fitting from Steel and Cast Iron Pipe

Required 36 months

39B CT39B‐Removing Service Tee or Fitting from Steel Pipe 01/23/2017

NGA‐WE‐39B NGA‐WE‐39B‐Removing Service Tee or Fitting from Steel Pipe Required 36 months

40 CT40‐Install/Replace tracer wire 01/23/2017

NGA‐WE‐40 NGA‐WE‐40‐Install/Replace Tracer Wire Required 36 months

41/42 CT41 & 42‐Inspecting, Lubricating, Repairing and Operating Distribution Valves

01/23/2017

NGA‐WE‐

41/42

NGA‐WE‐41 & 42‐Inspecting, Lubricating, Repairing and Operating Distribution Valves

Required 36 months

44/54 CT44 & 54‐Welding on a Pipeline 01/23/2017

NGA‐WE‐

44/54

NGA‐WE‐44 & 54‐Welding on a Pipeline Required 36 months

45 CT45‐Restore Service 01/23/2017

NGA‐WE‐45 NGA‐WE‐45‐Restore Service Required 36 months

49.1/49.2 CT49.1/49.2 Mechanical Joining of Pipe other than Plastic ﴾Threaded and Flange﴿

01/10/2017

NGA‐WE‐49 NGA‐WE‐49‐ Mechanical Joining of Pipe Other than Plastic to Plastic Pipe

Required 36 months

49.3 CT49.3 Mechanical Joining of Pipe other than Plastic ﴾Compression﴿

01/10/2017

NGA‐PE‐49.3 NGA‐PE‐49.3 Mechanical Joining of Pipe – Compression Required 36 months

NGA‐WE‐49 NGA‐WE‐49‐ Mechanical Joining of Pipe Other than Plastic to Plastic Pipe

Required 36 months

50/51/52C.04 CT50/51/52‐Joining Plastic Pipe‐Saddle Electrofusion 02/05/2017

NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months

NGA‐WE‐﴾C﴿ NGA‐WE‐﴾C﴿‐Electrofusion ‐ 14667 Required 36 months

PJQ‐04 NGA‐PE‐CT50‐Saddle Electrofusion ﴾PJQ‐04﴿ Required 12 months

50/51/52F CT50/51/52‐Joining Plastic Pipe‐Saddle Fusion 02/05/2017

NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months

NGA‐WE‐﴾F﴿ NGA‐WE‐﴾F﴿‐Saddle Fusion ‐ 14670 Required 36 months

PJQ‐03 NGA‐PE‐CT50‐Saddle Fusion ﴾PJQ‐03﴿ Required 12 months

50/51B.06 CT50/51‐Joining Plastic Pipe‐Bolted ﴾Bolt On﴿ Fitting‐ Mechanical Couplings

02/05/2017

NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665…