21128.10_Attachment 4 - OQ Task List.pdf
PDF 196 KB Posted
- Attached to
- OceanSpray Project
- Solicitation number
- BD-21-1296-02346-MGED1-69671
- Issued by
- Plymouth County, Massachusetts
About this file
This document is an attachment to a state and local contract opportunity in Massachusetts related to construction services to perform modifications to the OceanSpray project assembly. The Northeast Gas Association is managing the tasks and qualifications related to this project. The tasks cover a wide range of pipeline construction and maintenance activities, with over 80 specific tasks that require certification and periodic requalification every 36 months. The tasks cover areas such as corrosion control, leak detection, pipe installation, valve maintenance, and compressor station operations. The document provides detailed information on the required certifications, skill names, start dates, and requalification intervals for the various tasks.
The contract opportunity does not provide additional details beyond the scope of work covered in the attachment. It indicates this is a request for proposal for construction services related to modifications to the OceanSpray project assembly, located in Massachusetts. No information is provided on pricing, set asides, incumbent contractors, funding sources, or other salient commercial terms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 21128.10_Attachment 1 - IFB.pdf | ||
| 21128.10_Attachment 2 - Prevailing Wage.pdf | ||
| 21128.10_Attachment 3 - General Contract.docx | DOCX document | |
| 21128.10_Attachment 5 - Construction Spec.pdf | ||
| 21128.10_Scope of Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OnBoard Learning Management System Northeast Gas Association ‐ Tasks ‐ NGA OQ Run By Darcy Wall on 1/12/2021 7:48:59 AM
Code Task/Skil l Name Required Start Date Requal i f icat ion Interval
01 CT01 ‐ Inspecting for Shorted Casings 01/01/2016
NGA‐WE‐01 NGA‐WE‐01‐Inspecting for Shorted Casings Required 36 months
02A CT02A‐Measuring Pipe‐To‐Soil Potential ﴾Measuring and Interpreting Readings﴿
01/23/2017
NGA‐WE‐02A NGA‐WE‐02A‐Measuring Pipe‐To‐Soil Potential ﴾Measuring and Interpreting Readings﴿
Required 36 months
02B CT02B‐Measuring Pipe‐To‐Soil Potential ﴾Measuring Only﴿ 01/23/2017
NGA‐WE‐02B NGA‐WE‐02B‐Measuring Pipe‐To‐Soil Potential ﴾Measuring Only﴿ Required 36 months
03 CT03‐Conduct a Soil Resistivity Survey 01/23/2017
NGA‐WE‐03 NGA‐WE‐03‐Conduct a Soil Resistivity Survey Required 36 months
04A CT04A‐Conducting Interference Testing and Remediation 01/23/2017
NGA‐WE‐04A NGA‐WE‐04A‐Conducting Interference Testing and Remediation Required 36 months
04B CT04B‐Conducting Interference Testing 01/23/2017
NGA‐WE‐04B NGA‐WE‐04B‐Conducting Interference Testing Required 36 months
05A CT05A‐Electrically Checking for Proper Performance of Diodes and Interference Bonds, Including Testing for A/C Mitigation
01/23/2017
NGA‐WE‐05A NGA‐WE‐05A‐Electrically Checking for Proper Performance of Diodes and Interference Bonds, Including Testing for A/C Mitigation
Required 36 months
05B CT05B‐Electrically Checking for Proper Performance of Diodes and Interference Bonds
01/23/2017
NGA‐WE‐05B NGA‐WE‐05B‐Electrically Checking for Proper Performance of Diodes and Interference Bonds
Required 36 months
06A CT06A‐Inspecting for Atmospheric Corrosion, Including Evaluation and Remediation
01/23/2017
NGA‐WE‐06A NGA‐WE‐06A‐Inspecting for Atmospheric Corrosion, Including Evaluation and Remediation
Required 36 months
06B CT06B‐Inspecting for Atmospheric Corrosion 01/23/2017
NGA‐WE‐06B NGA‐WE‐06B‐Inspecting for Atmospheric Corrosion Required 36 months
07A/13A CT07A & 13A‐Installing, Replacing and Ensuring Operation of a Rectifier on a Pipeline ﴾Installing, Replacing and Troubleshooting﴿
01/23/2017
NGA‐WE‐
07A/13A
NGA‐WE‐07A & 13A‐Installing, Replacing and Ensuring Operation of a Rectifier on a Pipeline ﴾Installing, Replacing and Troubleshooting﴿
Required 36 months
07B/13B CT07B & CT13B‐Installing, Replacing and Ensuring Operation of a Rectifier on a Pipeline ﴾Installing and Replacing Only﴿
01/23/2017
NGA‐WE‐
07B/13B
NGA‐WE‐07B & 13B‐ Installing, Replacing and Ensuring Operation of a Rectifier on a Pipeline ﴾Installing and Replacing Only﴿
Required 36 months
08 CT08‐‐Visually Inspecting for Internal Corrosion 01/23/2017
NGA‐WE‐08 NGA‐WE‐08‐Visually Inspecting for Internal Corrosion Required 36 months
CT09‐Removing Coupons/Sample Gas or Liquids for Analysis and Evaluation of Internal Corrosion
11/04/2016
NGA‐WE‐09 NGA‐WE‐09‐Internal Corrosion Coupon and Fluids/Solids Testing Required 36 months
10 CT10‐Clear a shorted casing 01/23/2017
NGA‐WE‐10 NGA‐WE‐10‐Clearing a Shorted Casing Required 36 months
11B/12B/17B CT11B, 12B & 17B‐Pipe Coatings ﴾Hot Applied Tape﴿ 01/01/2016
NGA‐WE‐
11A/12A/17A
NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months
NGA‐WE‐
11B/12B/17B
NGA‐WE‐11B, 12B & 17B‐Pipe Coatings ﴾Hot Applied Tape﴿ Required 36 months
11C/12C/17C CT11C, 12C & 17C‐Pipe Coatings ﴾Heat Shrink Sleeve﴿ 01/23/2017
NGA‐WE‐
11A/12A/17A
NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months
NGA‐WE‐
11C/12C/17C
NGA‐WE‐11C, 12C & 17C‐Pipe Coatings ﴾Heat Shrink Sleeve﴿ Required 36 months
11D/12D/17D CT11D, 12D & 17D‐Pipe Coatings ﴾Wax Tape﴿ 01/23/2017
NGA‐WE‐
11A/12A/17A
NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months
NGA‐WE‐
11D/12D/17D
NGA‐WE‐11D, 12D & 17D‐Pipe Coatings ﴾Wax Tape﴿ Required 36 months
11E/12E/17E CT11E, 12E & 17E‐Pipe Coatings ﴾Mastic﴿ 01/23/2017
NGA‐WE‐
11A/12A/17A
NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months
NGA‐WE‐
11E/12E/17E
NGA‐WE‐11E, 12E & 17E‐Pipe Coatings ﴾Mastic﴿ Required 36 months
11F/12F/17F CT11F, 12F & 17F‐Pipe Coatings ﴾Cold Applied Tape﴿ 01/23/2017
NGA‐WE‐
11A/12A/17A
NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months
NGA‐WE‐
11F/12F/17F
NGA‐WE‐11F, 12F & 17F‐Pipe Coatings ﴾Cold Applied Tape﴿ Required 36 months
11G/12G/17G CT11G, 12G & 17G‐Pipe Coatings ﴾Two Part Epoxy﴿ 01/23/2017
NGA‐WE‐
11A/12A/17A
NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months
NGA‐WE‐
11G/12G/17G
NGA‐WE‐11G, 12G & 17G‐Pipe Coatings ﴾Two Part Epoxy﴿ Required 36 months
11H/12H/17H CT11H, 12H & 17H‐Pipe Coatings ﴾Paint﴿ 01/23/2017
NGA‐WE‐
11H/12H/17H
NGA‐WE‐11H, 12H & 17H‐Pipe Coatings ﴾Paint﴿ Required 36 months
14A CT14A ‐ Installing/Replacing an Anode on a Pipeline including Exothermic Welding
01/01/2016
NGA‐PE‐
14/16
NGA‐PE‐14/16‐Exothermic Welding Required 36 months
NGA‐WE‐14 NGA‐WE‐14‐Installing/Replacing an Anode Required 36 months
14B CT14B ‐ Installing/Replacing an Anode on a Pipeline 05/14/2018
NGA‐WE‐14 NGA‐WE‐14‐Installing/Replacing an Anode Required 36 months
15A CT15A‐Installing, Replacing and Testing Electrical Isolation Couplings
01/23/2017
NGA‐WE‐15A NGA‐WE‐15A‐Installing, Replacing and Testing Electrical Isolation Couplings
Required 36 months
15B CT15B‐Installing and Replacing Electrical Isolation Couplings 01/23/2017
NGA‐WE‐15B NGA‐WE‐15B‐Installing and Replacing Electrical Isolation Couplings Required 36 months
16A CT16A ‐ Installing or Replacing a Corrosion Test Station on a Pipeline including Exothermic Welding
05/14/2018
NGA‐PE‐
14/16
NGA‐PE‐14/16‐Exothermic Welding Required 36 months
NGA‐WE‐16 NGA‐WE‐16‐Installing or Replacing a Corrosion Test Station on a Pipeline
Required 36 months
16B CT16B ‐ Installing or Replacing a Corrosion Test Station on a Pipeline
05/14/2018
NGA‐WE‐16 NGA‐WE‐16‐Installing or Replacing a Corrosion Test Station on a Pipeline
Required 36 months
18A CT18A Conducting Gas Leakage Surveys ﴾Mobile and Walking Surveys﴿
11/01/2017
NGA‐PE‐18.1 NGA‐PE‐18.1‐Leak Survey Required 36 months
NGA‐WE‐
CT18A
NGA‐WE‐CT18A‐Conducting Gas Leakage Survey ﴾Mobile and Walking Surveys﴿
Required 36 months
18B CT18B Conducting Gas Leakage Surveys ﴾Walking Surveys Only﴿
11/01/2017
NGA‐PE‐18.1 NGA‐PE‐18.1‐Leak Survey Required 36 months
NGA‐WE‐
CT18B
NGA‐WE‐CT18B‐Conducting Gas Leakage Survey ﴾Walking Surveys Only﴿
Required 36 months
19A CT19A‐Patrolling ‐ Inspecting Right of Ways, Pipeline Markers and Exposed Above Ground Mains
06/28/2017
NGA‐WE‐19A NGA‐WE‐19A‐Patrolling ‐ Inspecting Right of Ways, Pipeline Markers and Exposed Above Ground Mains
Required 36 months
19B CT19B‐Patrolling ‐ Inspecting Right of Ways and Pipeline Markers
06/28/2017
NGA‐WE‐19B NGA‐WE‐19B‐Patrolling ‐ Inspecting Right of Ways and Pipeline Markers
Required 36 months
20A CT20A‐Investigating Leak or Odor Complaints ﴾Inside and Outside﴿
01/10/2017
NGA‐WE‐20A NGA‐WE‐20A‐ Investigating Leak or Odor Complaints ﴾Inside and Outside﴿
Required 36 months
20B CT20B‐Investigating Leak or Odor Complaints ﴾Outside Investigation Only﴿
01/10/2017
NGA‐WE‐20B NGA‐WE‐20B‐ Investigating Leak or Odor Complaints ﴾Outside Investigation Only﴿
Required 36 months
20C CT20C‐Investigating Leak or Odor Complaints ﴾Inside Investigation Only﴿
01/10/2017
NGA‐WE‐20C NGA‐WE‐20C‐ Investigating Leak or Odor Complaints ﴾Inside Investigation Only﴿
Required 36 months
20D CT20D‐Leak Classification 01/10/2017
NGA‐WE‐20D NGA‐WE‐20D‐ Leak Classification Required 36 months
21‐CT CT21‐Line Locating and Mark Out ﴾Connecticut﴿ 01/01/2016
NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months
NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months
NGA‐WE‐CT NGA‐WE‐State Damage Prevention Regulations ﴾Connecticut﴿ Required 36 months
21‐MA CT21‐Line Locating and Mark Out ﴾Massachusetts﴿ 01/23/2017
NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months
NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months
NGA‐WE‐MA NGA‐WE‐State Damage Prevention Regulations ﴾Massachusetts﴿ Required 36 months
21‐MD CT21‐Line Locating and Mark Out ﴾Maryland﴿ 01/23/2017
NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months
NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months
NGA‐WE‐MD NGA‐WE‐State Damage Prevention Regulations ﴾Maryland﴿ Required 36 months
21‐ME CT21‐Line Locating and Mark Out ﴾Maine﴿ 01/23/2017
NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months
NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months
NGA‐WE‐ME NGA‐WE‐State Damage Prevention Regulations ﴾Maine﴿ Required 36 months
21‐NH CT21‐Line Locating and Mark Out ﴾New Hampshire﴿ 01/23/2017
NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months
NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months
NGA‐WE‐NH NGA‐WE‐State Damage Prevention Regulations ﴾New Hampshire﴿ Required 36 months
21‐NJ CT21‐Line Locating and Mark Out ﴾New Jersey﴿ 01/23/2017
NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months
NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months
NGA‐WE‐NJ NGA‐WE‐State Damage Prevention Regulations ﴾New Jersey﴿ Required 36 months
21‐NY CT21‐Line Locating and Mark Out ﴾New York﴿ 01/23/2017
NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months
NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months
NGA‐WE‐NY NGA‐WE‐State Damage Prevention Regulations ﴾New York﴿ Required 36 months
21‐PA CT21‐Line Locating and Mark Out ﴾Pennsylvania﴿ 01/23/2017
NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months
NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months
NGA‐WE‐PA NGA‐WE‐State Damage Prevention Regulations ﴾Pennsylvania﴿ Required 36 months
21‐RI CT21‐Line Locating and Mark Out ﴾Rhode Island﴿ 01/23/2017
NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months
NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months
NGA‐WE‐RI NGA‐WE‐State Damage Prevention Regulations ﴾Rhode Island﴿ Required 36 months
21‐VT CT21‐Line Locating and Mark Out ﴾Vermont﴿ 01/23/2017
NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months
NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months
NGA‐WE‐VT NGA‐WE‐State Damage Prevention Regulations ﴾Vermont﴿ Required 36 months
22A CT22A‐Inspecting of 3rd Party Excavations for Damage Prevention, Including Root Cause Analysis
05/14/2018
NGA‐WE‐22A NGA‐WE‐22A‐Inspecting of 3rd Party Excavations for Damage Prevention, Including Root Cause Analysis
Required 36 months
22B CT22B‐Inspecting of 3rd Party Excavations for Damage Prevention
05/14/2018
NGA‐WE‐22B NGA‐WE‐22B‐Inspecting of 3rd Party Excavations for Damage Prevention
Required 36 months
23/24 CT23 & 24 Inspecting the Condition of Exposed Pipe 01/23/2017
NGA‐WE‐
23/24
NGA‐WE‐23 & 24‐Inspecting the Condition of Exposed Pipe Required 36 months
25 CT25‐Repairing a Transmission Pipe 01/23/2017
NGA‐WE‐25 NGA‐WE‐25‐Repairing a Transmission Pipe Required 36 months
26/27 CT26 & 27‐Inspecting, Lubricating, Repairing and Operating Transmission Valves
01/23/2017
NGA‐WE‐
26/27
NGA‐WE‐26 & 27‐Inspecting, Lubricating, Repairing and Operating Transmission Valves
Required 36 months
28 CT28‐Uprating 01/23/2017
NGA‐WE‐28 NGA‐WE‐28‐Uprating Required 36 months
29A/30A CT29A & 30A‐Repairing a Plastic, Steel and Cast Iron Distribution Pipe
01/23/2017
NGA‐WE‐
29A/30A
NGA‐WE‐29A & 30A‐Repairing a Plastic, Steel and Cast Iron Distribution Pipe
Required 36 months
29B/30B CT29B & 30B‐Repairing a Plastic Distribution Pipe 01/23/2017
NGA‐WE‐
29B/30B
NGA‐WE‐29B & 30B‐Repairing a Plastic Distribution Pipe Required 36 months
29C/30C CT29C & 30C‐Repairing a Steel Distribution Pipe 01/23/2017
NGA‐WE‐
29C/30C
NGA‐WE‐29C & 30C‐Repairing a Steel Distribution Pipe Required 36 months
29D/30D CT29D & 30D‐Repairing Cast Iron Distribution Pipe, Including Using Anaerobic Sealing
01/23/2017
NGA‐WE‐
29D/30D
NGA‐WE‐29D & 30D‐Repairing Cast Iron Distribution Pipe, Including Using Anaerobic Sealing
Required 36 months
29E/30E CT29E & 30E‐Repairing Cast Iron Distribution Pipe, Not Including Anaerobic Sealing
01/23/2017
NGA‐WE‐
29E/30E
NGA‐WE‐29E & 30E‐Repairing Cast Iron Distribution Pipe, Not Including Anaerobic Sealing
Required 36 months
31A CT31A‐Installation of Pipe: Storage, Handling and Inspection of Pipe: General Knowledge
10/16/2015
NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405
Required 36 months
31B CT31B‐Installation of Pipe: Install Pipe in a Ditch 10/16/2015
NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405
Required 36 months
NGA‐WE‐31B NGA‐WE‐31B‐Installation of Pipe: Install Pipe in a Ditch ‐ 14406 Required 36 months
31C CT31C‐Installation of Pipe: Installing Pipe by Horizontal Directional Drilling
10/16/2015
NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405
Required 36 months
NGA‐WE‐31C NGA‐WE‐31C‐Installation of Pipe:Installing Pipe by Horizontal Directional Drilling ‐ 14407
Required 36 months
31D CT31D‐Installation of Pipe: Installing Pipe by Horizontal Boring ﴾Piercing Tools﴿
10/16/2015
NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405
Required 36 months
NGA‐WE‐31D NGA‐WE‐31D‐Installation of Pipe: Installing Pipe by Horizontal Boring ﴾Piercing Tools﴿ ‐ 14408
Required 36 months
31E CT31E‐Installation of Pipe: Installing Pipe by Dead Insertion 10/16/2015
NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405
Required 36 months
NGA‐WE‐31E NGA‐WE‐31E‐Installation of Pipe: Installing Pipe by Dead Insertion ‐ 14409
Required 36 months
31F CT31F‐Installation of Pipe: Installing Pipe by Vibratory Plow 10/16/2015
NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405
Required 36 months
NGA‐WE‐
CT31F
NGA‐WE‐CT31F‐Installation of Pipe: Installing Pipe by Vibratory Plow Required 36 months
32 CT32‐Purging a pipeline into service 10/16/2015
NGA‐WE‐32
& 33
NGA‐WE‐32 & 33‐Purging a Pipeline In and Out of Service ‐ 13828 Required 36 months
33 CT33‐Purging a pipeline out of service 10/16/2015
NGA‐WE‐32
& 33
NGA‐WE‐32 & 33‐Purging a Pipeline In and Out of Service ‐ 13828 Required 36 months
34 CT34‐Performing pressure test on a pipeline 10/16/2015
NGA‐WE‐34 NGA‐WE‐34‐Performing Pressure Test on a Pipeline ‐ 13830 Required 36 months
35.1B CT35.1B‐Stopping Gas Flow ﴾Mains and Services﴿ 05/14/2018
NGA‐PE‐35.1 NGA‐PE‐35.1 Squeeze‐Off Required 36 months
NGA‐WE‐
35.1B
NGA‐WE‐35.1B‐ Stopping Gas Flow ﴾Squeeze‐Off ‐ Mains & Services﴿
Required 36 months
35.1C CT35.1C‐Stopping Gas Flow ﴾Services Only﴿ 05/14/2018
NGA‐PE‐35.1 NGA‐PE‐35.1 Squeeze‐Off Required 36 months
NGA‐WE‐
35.1C
NGA‐WE‐35.1C‐ Stopping Gas Flow ﴾Squeeze‐Off ‐ Services Only﴿ Required 36 months
35.2 CT35.2‐Stopping Gas Flow ﴾Bagging﴿ 05/14/2018
NGA‐PE‐35.2 NGA‐PE‐35.2 Bagging Required 36 months
NGA‐WE‐
35.2/35.3
NGA‐WE‐35.2/35.3‐ Stopping Gas Flow ﴾Bagging, Valves and Mechanical Only﴿
Required 36 months
35.3 CT35.3‐Stopping Gas Flow ﴾Mechanical﴿ 05/14/2018
NGA‐PE‐35.3 NGA‐PE‐35.3 Mechanical Required 36 months
NGA‐WE‐
35.2/35.3
NGA‐WE‐35.2/35.3‐ Stopping Gas Flow ﴾Bagging, Valves and Mechanical Only﴿
Required 36 months
36/47 CT36 & 47‐Abandonment of Facilities 01/23/2017
NGA‐WE‐
36/47
NGA‐WE‐36 & 47‐Abandonment of Facilities Required 36 months
37A CT37A ‐ Tapping Plastic Pipe with Specialized Equipment 01/23/2017
NGA‐PE‐
37A.1
NGA‐PE‐37A.1‐Tapping Plastic Pipe with Specialized Equipment Required 36 months
NGA‐WE‐37A NGA‐WE‐37A‐Tapping Plastic Pipe with Specialized Equipment Required 36 months
37B CT37B ‐ Tapping Cast Iron Pipe with Specialized Equipment 01/23/2017
NGA‐PE‐
37B.1/37C.1
NGA‐PE‐37B.1 & 37C.1‐Tapping Cast Iron and Steel Pipe with Specialized Equipment
Required 36 months
NGA‐WE‐37B NGA‐WE‐37B‐Tapping Cast Iron Pipe with Specialized Equipment Required 36 months
37C CT37C‐Tapping Steel Pipe with Specialized Equipment 01/23/2017
NGA‐PE‐
37B.1/37C.1
NGA‐PE‐37B.1 & 37C.1‐Tapping Cast Iron and Steel Pipe with Specialized Equipment
Required 36 months
NGA‐WE‐37C NGA‐WE‐37C‐Tapping Steel Pipe with Specialized Equipment Required 36 months
38A CT38A‐Starting Up or Shutting Down Any Part of a Pipeline that Could Cause the MAOP to be Exceeded, Including Turning Valves and Monitoring Flows and Pressure
01/23/2017
NGA‐WE‐38A
NGA‐WE‐38A‐Starting Up or Shutting Down Any Part of a Pipeline that Could Cause the MAOP to be Exceeded, Including Turning Valves and Monitoring Flows and Pressure
Required 36 months
38B CT38B‐Starting Up or Shutting Down Any Part of a Pipeline that Could Cause the MAOP to be Exceeded, Including Turning Valves
01/23/2017
NGA‐WE‐38B
NGA‐WE‐38B‐Starting Up or Shutting Down Any Part of a Pipeline that Could Cause the MAOP to be Exceeded, Including Turning Valves
Required 36 months
39A CT39A ‐ Removing Service Tee or Fitting from Steel and Cast Iron Pipe
01/23/2017
NGA‐WE‐39A NGA‐WE‐39A ‐ Removing Service Tee or Fitting from Steel and Cast Iron Pipe
Required 36 months
39B CT39B‐Removing Service Tee or Fitting from Steel Pipe 01/23/2017
NGA‐WE‐39B NGA‐WE‐39B‐Removing Service Tee or Fitting from Steel Pipe Required 36 months
40 CT40‐Install/Replace tracer wire 01/23/2017
NGA‐WE‐40 NGA‐WE‐40‐Install/Replace Tracer Wire Required 36 months
41/42 CT41 & 42‐Inspecting, Lubricating, Repairing and Operating Distribution Valves
01/23/2017
NGA‐WE‐
41/42
NGA‐WE‐41 & 42‐Inspecting, Lubricating, Repairing and Operating Distribution Valves
Required 36 months
44/54 CT44 & 54‐Welding on a Pipeline 01/23/2017
NGA‐WE‐
44/54
NGA‐WE‐44 & 54‐Welding on a Pipeline Required 36 months
45 CT45‐Restore Service 01/23/2017
NGA‐WE‐45 NGA‐WE‐45‐Restore Service Required 36 months
49.1/49.2 CT49.1/49.2 Mechanical Joining of Pipe other than Plastic ﴾Threaded and Flange﴿
01/10/2017
NGA‐WE‐49 NGA‐WE‐49‐ Mechanical Joining of Pipe Other than Plastic to Plastic Pipe
Required 36 months
49.3 CT49.3 Mechanical Joining of Pipe other than Plastic ﴾Compression﴿
01/10/2017
NGA‐PE‐49.3 NGA‐PE‐49.3 Mechanical Joining of Pipe – Compression Required 36 months
NGA‐WE‐49 NGA‐WE‐49‐ Mechanical Joining of Pipe Other than Plastic to Plastic Pipe
Required 36 months
50/51/52C.04 CT50/51/52‐Joining Plastic Pipe‐Saddle Electrofusion 02/05/2017
NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months
NGA‐WE‐﴾C﴿ NGA‐WE‐﴾C﴿‐Electrofusion ‐ 14667 Required 36 months
PJQ‐04 NGA‐PE‐CT50‐Saddle Electrofusion ﴾PJQ‐04﴿ Required 12 months
50/51/52F CT50/51/52‐Joining Plastic Pipe‐Saddle Fusion 02/05/2017
NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months
NGA‐WE‐﴾F﴿ NGA‐WE‐﴾F﴿‐Saddle Fusion ‐ 14670 Required 36 months
PJQ‐03 NGA‐PE‐CT50‐Saddle Fusion ﴾PJQ‐03﴿ Required 12 months
50/51B.06 CT50/51‐Joining Plastic Pipe‐Bolted ﴾Bolt On﴿ Fitting‐ Mechanical Couplings
02/05/2017
NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months
NGA‐WE‐﴾B﴿ NGA‐WE‐﴾B﴿‐Mechanical Couplings ‐ 17213 Required 36 months
PJQ‐06 NGA‐PE‐CT50‐Bolted ﴾Bolt On﴿ Fitting ﴾PJQ‐06﴿ Required 12 months
50/52C.05 CT50/52‐Joining Plastic Pipe‐Coupling Electrofusion 02/05/2017
NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months
NGA‐WE‐﴾C﴿ NGA‐WE‐﴾C﴿‐Electrofusion ‐ 14667 Required 36 months
PJQ‐05 NGA‐PE‐CT50‐Coupling Electrofusion ﴾PJQ‐05﴿ Required 12 months
50/52D CT50/52‐Joining Plastic Pipe‐Hydraulic Butt Fusion PJQ‐11 02/06/2020
NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months
NGA‐WE‐﴾D﴿ NGA‐WE‐﴾D﴿‐Hydraulic Butt Fusion ‐ 14668 Required 36 months
NGA‐WE‐﴾E﴿ NGA‐WE‐﴾E﴿‐Butt Fusion ‐ 14669 Required 36 months
PJQ‐11 NGA‐PE‐CT50‐Hydraulic Fusion ﴾PJQ‐11﴿ Required 12 months
50/52E CT50/52‐Joining Plastic Pipe‐Manual Butt Fusion 02/05/2017
NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months
NGA‐WE‐﴾E﴿ NGA‐WE‐﴾E﴿‐Butt Fusion ‐ 14669 Required 36 months
PJQ‐01B NGA‐PE‐CT50‐Coiled Pipe Butt Fusion ﴾PJQ‐01B﴿ Required 12 months
50/52G CT50/52‐Joining Plastic Pipe‐Socket Fusion 02/05/2017
NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months
NGA‐WE‐﴾G﴿ NGA‐WE‐﴾G﴿‐Socket Fusion ‐ 14671 Required 36 months
PJQ‐02 NGA‐PE‐CT50‐Socket Fusion ﴾PJQ‐02﴿ Required 12 months
50B.07 CT50/51‐Joining Plastic Pipe‐Stab Fitting‐Mechanical Couplings
02/05/2017
NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months
NGA‐WE‐﴾B﴿ NGA‐WE‐﴾B﴿‐Mechanical Couplings ‐ 17213 Required 36 months
PJQ‐07 NGA‐PE‐CT50‐Stab Fitting ﴾PJQ‐07﴿ Required 12 months
50B.08 CT50/51‐Joining Plastic Pipe‐Compression Fitting‐Mechanical Couplings
02/05/2017
NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months
NGA‐WE‐﴾B﴿ NGA‐WE‐﴾B﴿‐Mechanical Couplings ‐ 17213 Required 36 months
PJQ‐08 NGA‐PE‐CT50‐Compression Fitting ﴾PJQ‐08﴿ Required 12 months
50B.09 CT50/51‐Joining Plastic Pipe‐Nut Follower ﴾Threaded Fitting﴿‐ Mechanical Couplings
02/05/2017
NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months
NGA‐WE‐﴾B﴿ NGA‐WE‐﴾B﴿‐Mechanical Couplings ‐ 17213 Required 36 months
PJQ‐09 NGA‐PE‐CT50‐Nut Follower ﴾Threaded Fitting﴿ ﴾PJQ‐09﴿ Required 12 months
51D CT51D‐Tapping Using Plastic and Steel Self Tapping Tees 01/23/2017
NGA‐PE‐
51D.1/51D.2
NGA‐PE‐51D.1 & 51D.2‐Tapping a Plastic and Steel Self Tapping Tee Required 36 months
NGA‐WE‐51D NGA‐WE‐51D‐Tapping Using Plastic and Steel Self Tapping Tees Required 36 months
51E CT51E‐Tapping Using Plastic Self Tapping Tees 01/23/2017
NGA‐PE‐
51D.1/51D.2
NGA‐PE‐51D.1 & 51D.2‐Tapping a Plastic and Steel Self Tapping Tee Required 36 months
NGA‐WE‐51E NGA‐WE‐51E‐Tapping Using Plastic Self Tapping Tees Required 36 months
51F CT51F‐Tapping Using Steel Self Tapping Tees 01/23/2017
NGA‐PE‐
51D.1/51D.2
NGA‐PE‐51D.1 & 51D.2‐Tapping a Plastic and Steel Self Tapping Tee Required 36 months
NGA‐WE‐51F NGA‐WE‐51F‐Tapping Using Steel Self Tapping Tees Required 36 months
52H.B 1YR
CT52H.B‐Inspect Plastic Pipe Fusion Joint ﴾Visual Inspection Only‐Butt Fusion ‐ 1 Year﴿
06/01/2019
NGA‐WE‐
52H.B 1YR
NGA‐WE‐52H.B‐Inspect Plastic Pipe Fusion Joint‐Butt Fusion ﴾Field inspector Only ‐ 1 Year﴿
Required 12 months
52H.B 3YR
CT52H.B‐Inspect Plastic Pipe Fusion Joint ﴾Visual Inspection Only‐Butt Fusion ‐ 3 Year﴿
06/01/2019
NGA‐WE‐
52H.B 3YR
NGA‐WE‐52H.B‐Inspect Plastic Pipe Fusion Joint‐Butt Fusion ﴾Field inspector Only ‐ 3 Year﴿
Required 36 months
52H.D 1YR
CT52H.D‐Inspect Plastic Pipe Fusion Joint ﴾Visual Inspection Only‐Saddle Fusion ‐ 1 Year﴿
06/01/2019
NGA‐WE‐
52H.D 1YR
NGA‐WE‐52H.D‐Inspect Plastic Pipe Fusion Joint‐Saddle Fusion ﴾Field inspector Only ‐ 1 Year﴿
Required 12 months
52H.D 3YR
CT52H.D‐Inspect Plastic Pipe Fusion Joint ﴾Visual Inspection Only‐Saddle Fusion ‐ 3 Year﴿
06/01/2019
NGA‐WE‐
52H.D 3YR
NGA‐WE‐52H.D‐Inspect Plastic Pipe Fusion Joint‐Saddle Fusion ﴾Field inspector Only ‐ 3 Year﴿
Required 36 months
52H.E 1YR
CT52H.E‐Inspect Plastic Pipe Fusion Joint ﴾Visual Inspection Only‐Electrofusion ‐ 1 Year﴿
06/01/2019
NGA‐WE‐
52H.E 1YR
NGA‐WE‐52H.E‐Inspect Plastic Pipe Fusion Joint‐Electrofusion ﴾Field inspector Only ‐ 1 Year﴿
Required 12 months
52H.E 3YR
CT52H.E‐Inspect Plastic Pipe Fusion Joint ﴾Visual Inspection Only‐Electrofusion ‐ 3 Year﴿
06/01/2019
NGA‐WE‐
52H.E 3YR
NGA‐WE‐52H.E‐Inspect Plastic Pipe Fusion Joint‐Electrofusion ﴾Field inspector Only ‐ 3 Year﴿
Required 36 months
52H.F 1YR
CT52H.F‐Inspect Plastic Pipe Fusion Joint ﴾Visual Inspection Only‐Socket Fusion ‐ 1 Year﴿
06/01/2019
NGA‐WE‐
52H.F 1YR
NGA‐WE‐52H.F‐Inspect Plastic Pipe Fusion Joint‐Socket Fusion ﴾Field inspector Only ‐ 1 Year﴿
Required 12 months
52H.F 3YR
CT52H.F‐Inspect Plastic Pipe Fusion Joint ﴾Visual Inspection Only‐Socket Fusion ‐ 3 Year﴿
06/01/2019
NGA‐WE‐
52H.F 3YR
NGA‐WE‐52H.F‐Inspect Plastic Pipe Fusion Joint‐Socket Fusion ﴾Field inspector Only ‐ 3 Year﴿
Required 36 months
52H.V CT52H.V‐Vintage Pipe 01/01/1970
NGA‐WE‐
52H.V
NGA‐WE‐52H.V‐Vintage Pipe Required 12 months
55.1 CT55.1 Maintain a Pipeline Compressor Station 01/10/2017
NGA‐PE‐
CT55.1
NGA‐PE‐CT55.1‐Maintain a Pipeline Compressor Station ‐ 14410 Required 36 months
55.2 CT55.2 Maintain a Pipeline Compressor Station ﴾ESD Only﴿ 01/10/2017
NGA‐PE‐
CT55.2
NGA‐PE‐CT55.2‐Maintain a Pipeline Compressor Station ﴾ESD Only﴿ Required 36 months
56 CT56‐Operate a Pipeline Compressor Station 01/01/1970
NGA‐PE‐CT56 NGA‐PE‐CT56‐Operate a Pipeline Compressor Station ‐ 14411 Required 36 months
57 CT57‐Repair a Compressor 01/01/1970
NGA‐PE‐CT57 NGA‐PE‐CT57‐Repair a Compressor ‐ 14426 Required 36 months
CT58‐Maintaining gas detection systems and alarms in compressor stations
01/01/1970
NGA‐PE‐CT58 NGA‐PE‐CT58‐Maintain Gas Detection Systems and Alarms in Compressor Stations ‐ 14412
Required 36 months
59/60 CT59 & 60‐Controlling and Monitoring Gas Pressures and Flows
01/23/2017
NGA‐WE‐
59/60
NGA‐WE‐59 & 60‐Controlling and Monitoring Gas Pressures and Flows
Required 36 months
61 CT61‐Inspecting a Pressure Recording Gauge 05/11/2017
NGA‐WE‐61 NGA‐WE‐61‐Inspecting a Pressure Recording Gauge Required 36 months
62A/63A/65A CT62A, 63A & 65A‐ Inspect and Test Pressure Regulation Station, Including Heating Equipment
01/23/2017
NGA‐PE‐
62.1/63.1/65.1
NGA‐PE‐62.1, 63.1 & 65.1‐Inspect and Test Pressure Regulator Station
Required 36 months
NGA‐WE‐
62A/63A/65A
NGA‐WE‐62A, 63A & 65A‐ Inspect and Test Pressure Regulation Station, Including Heating Equipment
Required 36 months
62B/63B/65B CT62B, 63B & 65B‐ Inspect and Test Pressure Regulation Station, Not Including Heating Equipment
01/23/2017
NGA‐PE‐
62.1/63.1/65.1
NGA‐PE‐62.1, 63.1 & 65.1‐Inspect and Test Pressure Regulator Station
Required 36 months
NGA‐WE‐
62B/63B/65B
NGA‐WE‐62B, 63B & 65B‐ Inspect and Test Pressure Regulation Station, Not Including Heating Equipment
Required 36 months
CT64‐Inspecting Telemetering Equipment at a Pressure Limiting or Regulating Station
01/23/2017
NGA‐WE‐64 NGA‐WE‐64‐Inspecting Telemetering Equipment Required 36 months
66A CT66A‐Field Interpretation of Pressure Recording Charts and Electronic Devices
01/23/2017
NGA‐WE‐66A NGA‐WE‐66A‐Field Interpretation of Pressure Recording Charts and Electronic Devices
Required 36 months
66B CT66B‐Field Interpretation of Pressure Recording Charts 01/23/2017
NGA‐WE‐66B NGA‐WE‐66B‐Field Interpretation of Pressure Recording Charts Required 36 months
66C CT66C‐Field Interpretation of Pressure Recording Electronic Devices
01/23/2017
NGA‐WE‐66C NGA‐WE‐66C‐Field Interpretation of Pressure Recording Electronic Devices
Required 36 months
67 CT67‐Inspecting a Pressure Regulator Vault 01/23/2017
NGA‐WE‐67 NGA‐WE‐67‐Inspecting a Pressure Regulator Vault Required 36 months
68 CT68‐Operating an Odorizer 01/23/2017
NGA‐WE‐68 NGA‐WE‐68‐Operating an Odorizer Required 36 months
69 CT69‐Monitor Natural Gas Odorization Levels 01/23/2017
NGA‐WE‐69 NGA‐WE‐69‐Monitor Natural Gas Odorization Levels Required 36 months
CT70‐Properties of Natural Gas and Abnormal Operating Conditions
01/23/2017
NGA‐WE‐70 NGA‐WE‐70‐Properties of Natural Gas and Abnormal Operating Conditions
Required 36 months
70P CT70P‐Properties of Propane Air and Abnormal Operating Conditions
01/01/1970
NGA‐WE‐
CT70P
NGA‐WE‐CT70P‐Properties of Propane Air and Abnormal Operating Conditions ‐ 13867
Required 36 months
71 CT71‐Excavation & Backfill 05/14/2018
NGA‐WE‐71 NGA‐WE‐71‐Excavation & Backfill Required 36 months
72A CT72A‐Installing and Turning Off Residential, Small Commercial, Large Commercial and Industrial Meters and Regulators
01/23/2017
NGA‐WE‐72A
NGA‐WE‐72A‐Installing and Turning Off Residential, Small Commercial, Large Commercial and Industrial Meters and Regulators
Required 36 months
72B CT72B‐Installing and Turning Off Residential and Small Commercial Meters and Regulators
01/23/2017
NGA‐WE‐72B NGA‐WE‐72B‐Installing and Turning Off Residential and Small Commercial Meters and Regulators
Required 36 months
72C CT72C‐Turning Off Meters Only 01/23/2017
NGA‐WE‐72C NGA‐WE‐72C‐Turning Off Meters Only Required 36 months
CT73‐Inspecting and maintaining air compressors at LP‐Air plants
01/01/1970
NGA‐PE‐CT73 NGA‐PE‐CT73‐Inspecting and Maintaining Air Compressors at LP‐Air Plants ‐ 14414
Required 36 months
CT74‐Inspecting and Maintaining Instrument Air Dryers at LP‐ Air Plants
01/01/1970
NGA‐PE‐CT74 NGA‐PE‐CT74‐Inspecting and Maintaining Instrument Air Dryers at LP‐Air Plants ‐ 14415
Required 36 months
CT75‐Inspecting and Maintaining Emergency Shutoff Systems at LP‐ Air Plants
01/01/1970
NGA‐PE‐CT75 NGA‐PE‐CT75‐Inspecting and Maintaining Emergency Shutoff Systems at LP‐Air Plants ‐ 14416
Required 36 months
76 CT76‐Maintaining Fire Protection Systems at LP‐Air Plants 01/01/1970
NGA‐PE‐CT76 NGA‐PE‐CT76‐Maintaining Fire Protection Systems at LP‐Air Plants ‐ 14417
Required 36 months
CT77‐Inspecting and maintaining storage tanks, piping, valves and fittings at LP‐Air plants
01/01/1970
NGA‐PE‐CT77 NGA‐PE‐CT77‐Inspecting and Maintaining Storage Tanks, Piping, Valves and Fittings at LP‐Air Plants ‐ 14418
Required 36 months
CT78‐Inspecting and Maintaining Vapor Compressors at LP‐Air Plants
01/01/1970
NGA‐PE‐CT78 NGA‐PE‐CT78‐Inspecting and Maintaining Vapor Compressors at LP‐ Air Plants ‐ 14419
Required 36 months
CT79‐Inspecting, Operating, and Maintaining Vapor Detection Systems at LP‐Air Plants
01/01/1970
NGA‐PE‐CT79 NGA‐PE‐CT79‐Inspecting, Operating and Maintaining Vapor Detection Systems at LP‐Air Plants ‐ 14420
Required 36 months
CT80‐Inspecting and Maintaining Propane Vaporizers at LP‐Air Plants
01/01/1970
NGA‐PE‐CT80 NGA‐PE‐CT80‐Inspecting and Maintaining Propane Vaporizers at LP‐ Air Plants ‐ 14421
Required 36 months
CT81‐Load, Unload and Transfer Liquid Propane at LP‐Air Plants
01/01/1970
NGA‐PE‐CT81 NGA‐PE‐CT81‐Load, Unload and Transfer Liquid Propane at LP‐Air Plants ‐ 14422
Required 36 months
CT82‐Inspecting and Maintaining Auxiliary Power Sources at LP‐Air Plants
01/01/1970
NGA‐PE‐CT82 NGA‐PE‐CT82‐Inspecting and Maintaining Auxillary Power Sources at LP‐Air Plants ‐ 14423
Required 36 months
83 CT83‐Operating a Propane Air Plant 01/01/1970
NGA‐PE‐CT83 NGA‐PE‐CT83‐Operating a Propane Air Plant ‐ 14424 Required 36 months
84 CT84‐Bending Steel Pipe 01/23/2017
NGA‐WE‐84 NGA‐WE‐84‐Bending Steel Pipe Required 36 months
85 CT85‐Meter Assembly Abnormal Operating Conditions 08/27/2015
NGA‐WE‐
CT85
NGA‐WE‐CT85‐EXAM‐Meter Assembly Abnormal Operating Conditions
Required 36 months
86 CT86 – Interior Jurisdictional Piping Safety Inspections 01/01/1970
NGA‐PE‐ 86 NGA‐PE‐86‐ Interior Jurisdictional Piping Safety Inspections Required 36 months
NGA‐WE‐86 NGA‐WE‐86‐Interior Jurisdictional Piping Safety Inspections Required 36 months
NGA‐WE‐
86/87
NGA‐WE‐86/87‐Jurisdictional Piping: General Knowledge Required 36 months
86‐PV
CT86 – Interior Jurisdictional Piping Safety Inspections ‐ ﴾Plumbers Version﴿
07/12/2018
NGA‐PE‐86‐
PV
NGA‐PE‐86‐Interior Jurisdictional Piping Safety Inspections ‐ ﴾Plumbers Version﴿
Required 36 months
NGA‐WE‐86‐
PV
NGA‐WE‐86‐Interior Jurisdictional Piping Safety Inspections ‐ ﴾Plumbers Version﴿
Required 36 months
NGA‐WE‐
86/87‐PV
NGA‐WE‐86/87‐Jurisdictional Piping: General Knowledge ‐ ﴾Plumbers Version﴿
Required 36 months
87‐PV
CT87 – Interior Jurisdictional Piping Construction and Maintenance Activities ‐ ﴾Plumbers Version﴿
07/12/2018
NGA‐WE‐
86/87‐PV
NGA‐WE‐86/87‐Jurisdictional Piping: General Knowledge ‐ ﴾Plumbers Version﴿
Required 36 months
NGA‐WE‐87‐
PV
NGA‐WE‐87‐Interior Jurisdictional Piping Construction and Maintenance Activities ‐ ﴾Plumbers Version﴿
Required 36 months
PJQ10 CT‐Soil Compaction 01/01/1970
NGA‐WE‐﴾H﴿ NGA‐WE‐﴾H﴿‐EXAM Soil Compaction ‐ 14682 Required 36 months
TSK‐
20693298 NGA Example Exam 01/06/2015
VGOA Proctoring Presentation Exam 01/01/1970
VGOAWE VGOA Proctoring Exam ‐ 18592 Required 600 months
Page 1 / 11 javascript:void(0) javascript:void(0) javascript:void(0) javascript:void(0) javascript:void(0) RGarcia Highlight
RGarcia Highlight
RGarcia Highlight
RGarcia Highlight
Code Task/Skil l Name Required Start Date Requal i f icat ion Interval
Northeast Gas Association ‐ Tasks ‐ NGA OQ Run By Darcy Wall on 1/12/2021 7:48:59 AM
Code Task/Skil l Name Required Start Date Requal i f icat ion Interval
01 CT01 ‐ Inspecting for Shorted Casings 01/01/2016
NGA‐WE‐01 NGA‐WE‐01‐Inspecting for Shorted Casings Required 36 months
02A CT02A‐Measuring Pipe‐To‐Soil Potential ﴾Measuring and Interpreting Readings﴿
01/23/2017
NGA‐WE‐02A NGA‐WE‐02A‐Measuring Pipe‐To‐Soil Potential ﴾Measuring and Interpreting Readings﴿
Required 36 months
02B CT02B‐Measuring Pipe‐To‐Soil Potential ﴾Measuring Only﴿ 01/23/2017
NGA‐WE‐02B NGA‐WE‐02B‐Measuring Pipe‐To‐Soil Potential ﴾Measuring Only﴿ Required 36 months
03 CT03‐Conduct a Soil Resistivity Survey 01/23/2017
NGA‐WE‐03 NGA‐WE‐03‐Conduct a Soil Resistivity Survey Required 36 months
04A CT04A‐Conducting Interference Testing and Remediation 01/23/2017
NGA‐WE‐04A NGA‐WE‐04A‐Conducting Interference Testing and Remediation Required 36 months
04B CT04B‐Conducting Interference Testing 01/23/2017
NGA‐WE‐04B NGA‐WE‐04B‐Conducting Interference Testing Required 36 months
05A CT05A‐Electrically Checking for Proper Performance of Diodes and Interference Bonds, Including Testing for A/C Mitigation
01/23/2017
NGA‐WE‐05A NGA‐WE‐05A‐Electrically Checking for Proper Performance of Diodes and Interference Bonds, Including Testing for A/C Mitigation
Required 36 months
05B CT05B‐Electrically Checking for Proper Performance of Diodes and Interference Bonds
01/23/2017
NGA‐WE‐05B NGA‐WE‐05B‐Electrically Checking for Proper Performance of Diodes and Interference Bonds
Required 36 months
06A CT06A‐Inspecting for Atmospheric Corrosion, Including Evaluation and Remediation
01/23/2017
NGA‐WE‐06A NGA‐WE‐06A‐Inspecting for Atmospheric Corrosion, Including Evaluation and Remediation
Required 36 months
06B CT06B‐Inspecting for Atmospheric Corrosion 01/23/2017
NGA‐WE‐06B NGA‐WE‐06B‐Inspecting for Atmospheric Corrosion Required 36 months
07A/13A CT07A & 13A‐Installing, Replacing and Ensuring Operation of a Rectifier on a Pipeline ﴾Installing, Replacing and Troubleshooting﴿
01/23/2017
NGA‐WE‐
07A/13A
NGA‐WE‐07A & 13A‐Installing, Replacing and Ensuring Operation of a Rectifier on a Pipeline ﴾Installing, Replacing and Troubleshooting﴿
Required 36 months
07B/13B CT07B & CT13B‐Installing, Replacing and Ensuring Operation of a Rectifier on a Pipeline ﴾Installing and Replacing Only﴿
01/23/2017
NGA‐WE‐
07B/13B
NGA‐WE‐07B & 13B‐ Installing, Replacing and Ensuring Operation of a Rectifier on a Pipeline ﴾Installing and Replacing Only﴿
Required 36 months
08 CT08‐‐Visually Inspecting for Internal Corrosion 01/23/2017
NGA‐WE‐08 NGA‐WE‐08‐Visually Inspecting for Internal Corrosion Required 36 months
CT09‐Removing Coupons/Sample Gas or Liquids for Analysis and Evaluation of Internal Corrosion
11/04/2016
NGA‐WE‐09 NGA‐WE‐09‐Internal Corrosion Coupon and Fluids/Solids Testing Required 36 months
10 CT10‐Clear a shorted casing 01/23/2017
NGA‐WE‐10 NGA‐WE‐10‐Clearing a Shorted Casing Required 36 months
11B/12B/17B CT11B, 12B & 17B‐Pipe Coatings ﴾Hot Applied Tape﴿ 01/01/2016
NGA‐WE‐
11A/12A/17A
NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months
NGA‐WE‐
11B/12B/17B
NGA‐WE‐11B, 12B & 17B‐Pipe Coatings ﴾Hot Applied Tape﴿ Required 36 months
11C/12C/17C CT11C, 12C & 17C‐Pipe Coatings ﴾Heat Shrink Sleeve﴿ 01/23/2017
NGA‐WE‐
11A/12A/17A
NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months
NGA‐WE‐
11C/12C/17C
NGA‐WE‐11C, 12C & 17C‐Pipe Coatings ﴾Heat Shrink Sleeve﴿ Required 36 months
11D/12D/17D CT11D, 12D & 17D‐Pipe Coatings ﴾Wax Tape﴿ 01/23/2017
NGA‐WE‐
11A/12A/17A
NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months
NGA‐WE‐
11D/12D/17D
NGA‐WE‐11D, 12D & 17D‐Pipe Coatings ﴾Wax Tape﴿ Required 36 months
11E/12E/17E CT11E, 12E & 17E‐Pipe Coatings ﴾Mastic﴿ 01/23/2017
NGA‐WE‐
11A/12A/17A
NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months
NGA‐WE‐
11E/12E/17E
NGA‐WE‐11E, 12E & 17E‐Pipe Coatings ﴾Mastic﴿ Required 36 months
11F/12F/17F CT11F, 12F & 17F‐Pipe Coatings ﴾Cold Applied Tape﴿ 01/23/2017
NGA‐WE‐
11A/12A/17A
NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months
NGA‐WE‐
11F/12F/17F
NGA‐WE‐11F, 12F & 17F‐Pipe Coatings ﴾Cold Applied Tape﴿ Required 36 months
11G/12G/17G CT11G, 12G & 17G‐Pipe Coatings ﴾Two Part Epoxy﴿ 01/23/2017
NGA‐WE‐
11A/12A/17A
NGA‐WE‐11A, 12A & 17A‐Pipe Coatings ﴾General Knowledge﴿ Required 36 months
NGA‐WE‐
11G/12G/17G
NGA‐WE‐11G, 12G & 17G‐Pipe Coatings ﴾Two Part Epoxy﴿ Required 36 months
11H/12H/17H CT11H, 12H & 17H‐Pipe Coatings ﴾Paint﴿ 01/23/2017
NGA‐WE‐
11H/12H/17H
NGA‐WE‐11H, 12H & 17H‐Pipe Coatings ﴾Paint﴿ Required 36 months
14A CT14A ‐ Installing/Replacing an Anode on a Pipeline including Exothermic Welding
01/01/2016
NGA‐PE‐
14/16
NGA‐PE‐14/16‐Exothermic Welding Required 36 months
NGA‐WE‐14 NGA‐WE‐14‐Installing/Replacing an Anode Required 36 months
14B CT14B ‐ Installing/Replacing an Anode on a Pipeline 05/14/2018
NGA‐WE‐14 NGA‐WE‐14‐Installing/Replacing an Anode Required 36 months
15A CT15A‐Installing, Replacing and Testing Electrical Isolation Couplings
01/23/2017
NGA‐WE‐15A NGA‐WE‐15A‐Installing, Replacing and Testing Electrical Isolation Couplings
Required 36 months
15B CT15B‐Installing and Replacing Electrical Isolation Couplings 01/23/2017
NGA‐WE‐15B NGA‐WE‐15B‐Installing and Replacing Electrical Isolation Couplings Required 36 months
16A CT16A ‐ Installing or Replacing a Corrosion Test Station on a Pipeline including Exothermic Welding
05/14/2018
NGA‐PE‐
14/16
NGA‐PE‐14/16‐Exothermic Welding Required 36 months
NGA‐WE‐16 NGA‐WE‐16‐Installing or Replacing a Corrosion Test Station on a Pipeline
Required 36 months
16B CT16B ‐ Installing or Replacing a Corrosion Test Station on a Pipeline
05/14/2018
NGA‐WE‐16 NGA‐WE‐16‐Installing or Replacing a Corrosion Test Station on a Pipeline
Required 36 months
18A CT18A Conducting Gas Leakage Surveys ﴾Mobile and Walking Surveys﴿
11/01/2017
NGA‐PE‐18.1 NGA‐PE‐18.1‐Leak Survey Required 36 months
NGA‐WE‐
CT18A
NGA‐WE‐CT18A‐Conducting Gas Leakage Survey ﴾Mobile and Walking Surveys﴿
Required 36 months
18B CT18B Conducting Gas Leakage Surveys ﴾Walking Surveys Only﴿
11/01/2017
NGA‐PE‐18.1 NGA‐PE‐18.1‐Leak Survey Required 36 months
NGA‐WE‐
CT18B
NGA‐WE‐CT18B‐Conducting Gas Leakage Survey ﴾Walking Surveys Only﴿
Required 36 months
19A CT19A‐Patrolling ‐ Inspecting Right of Ways, Pipeline Markers and Exposed Above Ground Mains
06/28/2017
NGA‐WE‐19A NGA‐WE‐19A‐Patrolling ‐ Inspecting Right of Ways, Pipeline Markers and Exposed Above Ground Mains
Required 36 months
19B CT19B‐Patrolling ‐ Inspecting Right of Ways and Pipeline Markers
06/28/2017
NGA‐WE‐19B NGA‐WE‐19B‐Patrolling ‐ Inspecting Right of Ways and Pipeline Markers
Required 36 months
20A CT20A‐Investigating Leak or Odor Complaints ﴾Inside and Outside﴿
01/10/2017
NGA‐WE‐20A NGA‐WE‐20A‐ Investigating Leak or Odor Complaints ﴾Inside and Outside﴿
Required 36 months
20B CT20B‐Investigating Leak or Odor Complaints ﴾Outside Investigation Only﴿
01/10/2017
NGA‐WE‐20B NGA‐WE‐20B‐ Investigating Leak or Odor Complaints ﴾Outside Investigation Only﴿
Required 36 months
20C CT20C‐Investigating Leak or Odor Complaints ﴾Inside Investigation Only﴿
01/10/2017
NGA‐WE‐20C NGA‐WE‐20C‐ Investigating Leak or Odor Complaints ﴾Inside Investigation Only﴿
Required 36 months
20D CT20D‐Leak Classification 01/10/2017
NGA‐WE‐20D NGA‐WE‐20D‐ Leak Classification Required 36 months
21‐CT CT21‐Line Locating and Mark Out ﴾Connecticut﴿ 01/01/2016
NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months
NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months
NGA‐WE‐CT NGA‐WE‐State Damage Prevention Regulations ﴾Connecticut﴿ Required 36 months
21‐MA CT21‐Line Locating and Mark Out ﴾Massachusetts﴿ 01/23/2017
NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months
NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months
NGA‐WE‐MA NGA‐WE‐State Damage Prevention Regulations ﴾Massachusetts﴿ Required 36 months
21‐MD CT21‐Line Locating and Mark Out ﴾Maryland﴿ 01/23/2017
NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months
NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months
NGA‐WE‐MD NGA‐WE‐State Damage Prevention Regulations ﴾Maryland﴿ Required 36 months
21‐ME CT21‐Line Locating and Mark Out ﴾Maine﴿ 01/23/2017
NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months
NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months
NGA‐WE‐ME NGA‐WE‐State Damage Prevention Regulations ﴾Maine﴿ Required 36 months
21‐NH CT21‐Line Locating and Mark Out ﴾New Hampshire﴿ 01/23/2017
NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months
NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months
NGA‐WE‐NH NGA‐WE‐State Damage Prevention Regulations ﴾New Hampshire﴿ Required 36 months
21‐NJ CT21‐Line Locating and Mark Out ﴾New Jersey﴿ 01/23/2017
NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months
NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months
NGA‐WE‐NJ NGA‐WE‐State Damage Prevention Regulations ﴾New Jersey﴿ Required 36 months
21‐NY CT21‐Line Locating and Mark Out ﴾New York﴿ 01/23/2017
NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months
NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months
NGA‐WE‐NY NGA‐WE‐State Damage Prevention Regulations ﴾New York﴿ Required 36 months
21‐PA CT21‐Line Locating and Mark Out ﴾Pennsylvania﴿ 01/23/2017
NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months
NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months
NGA‐WE‐PA NGA‐WE‐State Damage Prevention Regulations ﴾Pennsylvania﴿ Required 36 months
21‐RI CT21‐Line Locating and Mark Out ﴾Rhode Island﴿ 01/23/2017
NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months
NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months
NGA‐WE‐RI NGA‐WE‐State Damage Prevention Regulations ﴾Rhode Island﴿ Required 36 months
21‐VT CT21‐Line Locating and Mark Out ﴾Vermont﴿ 01/23/2017
NGA‐PE‐21.1 NGA‐PE‐21.1‐Line Locating and Mark Out Required 36 months
NGA‐WE‐21 NGA‐WE‐21‐Line Locating and Mark Out Required 36 months
NGA‐WE‐VT NGA‐WE‐State Damage Prevention Regulations ﴾Vermont﴿ Required 36 months
22A CT22A‐Inspecting of 3rd Party Excavations for Damage Prevention, Including Root Cause Analysis
05/14/2018
NGA‐WE‐22A NGA‐WE‐22A‐Inspecting of 3rd Party Excavations for Damage Prevention, Including Root Cause Analysis
Required 36 months
22B CT22B‐Inspecting of 3rd Party Excavations for Damage Prevention
05/14/2018
NGA‐WE‐22B NGA‐WE‐22B‐Inspecting of 3rd Party Excavations for Damage Prevention
Required 36 months
23/24 CT23 & 24 Inspecting the Condition of Exposed Pipe 01/23/2017
NGA‐WE‐
23/24
NGA‐WE‐23 & 24‐Inspecting the Condition of Exposed Pipe Required 36 months
25 CT25‐Repairing a Transmission Pipe 01/23/2017
NGA‐WE‐25 NGA‐WE‐25‐Repairing a Transmission Pipe Required 36 months
26/27 CT26 & 27‐Inspecting, Lubricating, Repairing and Operating Transmission Valves
01/23/2017
NGA‐WE‐
26/27
NGA‐WE‐26 & 27‐Inspecting, Lubricating, Repairing and Operating Transmission Valves
Required 36 months
28 CT28‐Uprating 01/23/2017
NGA‐WE‐28 NGA‐WE‐28‐Uprating Required 36 months
29A/30A CT29A & 30A‐Repairing a Plastic, Steel and Cast Iron Distribution Pipe
01/23/2017
NGA‐WE‐
29A/30A
NGA‐WE‐29A & 30A‐Repairing a Plastic, Steel and Cast Iron Distribution Pipe
Required 36 months
29B/30B CT29B & 30B‐Repairing a Plastic Distribution Pipe 01/23/2017
NGA‐WE‐
29B/30B
NGA‐WE‐29B & 30B‐Repairing a Plastic Distribution Pipe Required 36 months
29C/30C CT29C & 30C‐Repairing a Steel Distribution Pipe 01/23/2017
NGA‐WE‐
29C/30C
NGA‐WE‐29C & 30C‐Repairing a Steel Distribution Pipe Required 36 months
29D/30D CT29D & 30D‐Repairing Cast Iron Distribution Pipe, Including Using Anaerobic Sealing
01/23/2017
NGA‐WE‐
29D/30D
NGA‐WE‐29D & 30D‐Repairing Cast Iron Distribution Pipe, Including Using Anaerobic Sealing
Required 36 months
29E/30E CT29E & 30E‐Repairing Cast Iron Distribution Pipe, Not Including Anaerobic Sealing
01/23/2017
NGA‐WE‐
29E/30E
NGA‐WE‐29E & 30E‐Repairing Cast Iron Distribution Pipe, Not Including Anaerobic Sealing
Required 36 months
31A CT31A‐Installation of Pipe: Storage, Handling and Inspection of Pipe: General Knowledge
10/16/2015
NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405
Required 36 months
31B CT31B‐Installation of Pipe: Install Pipe in a Ditch 10/16/2015
NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405
Required 36 months
NGA‐WE‐31B NGA‐WE‐31B‐Installation of Pipe: Install Pipe in a Ditch ‐ 14406 Required 36 months
31C CT31C‐Installation of Pipe: Installing Pipe by Horizontal Directional Drilling
10/16/2015
NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405
Required 36 months
NGA‐WE‐31C NGA‐WE‐31C‐Installation of Pipe:Installing Pipe by Horizontal Directional Drilling ‐ 14407
Required 36 months
31D CT31D‐Installation of Pipe: Installing Pipe by Horizontal Boring ﴾Piercing Tools﴿
10/16/2015
NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405
Required 36 months
NGA‐WE‐31D NGA‐WE‐31D‐Installation of Pipe: Installing Pipe by Horizontal Boring ﴾Piercing Tools﴿ ‐ 14408
Required 36 months
31E CT31E‐Installation of Pipe: Installing Pipe by Dead Insertion 10/16/2015
NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405
Required 36 months
NGA‐WE‐31E NGA‐WE‐31E‐Installation of Pipe: Installing Pipe by Dead Insertion ‐ 14409
Required 36 months
31F CT31F‐Installation of Pipe: Installing Pipe by Vibratory Plow 10/16/2015
NGA‐WE‐31A NGA‐WE‐31A‐Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge ‐ 14405
Required 36 months
NGA‐WE‐
CT31F
NGA‐WE‐CT31F‐Installation of Pipe: Installing Pipe by Vibratory Plow Required 36 months
32 CT32‐Purging a pipeline into service 10/16/2015
NGA‐WE‐32
& 33
NGA‐WE‐32 & 33‐Purging a Pipeline In and Out of Service ‐ 13828 Required 36 months
33 CT33‐Purging a pipeline out of service 10/16/2015
NGA‐WE‐32
& 33
NGA‐WE‐32 & 33‐Purging a Pipeline In and Out of Service ‐ 13828 Required 36 months
34 CT34‐Performing pressure test on a pipeline 10/16/2015
NGA‐WE‐34 NGA‐WE‐34‐Performing Pressure Test on a Pipeline ‐ 13830 Required 36 months
35.1B CT35.1B‐Stopping Gas Flow ﴾Mains and Services﴿ 05/14/2018
NGA‐PE‐35.1 NGA‐PE‐35.1 Squeeze‐Off Required 36 months
NGA‐WE‐
35.1B
NGA‐WE‐35.1B‐ Stopping Gas Flow ﴾Squeeze‐Off ‐ Mains & Services﴿
Required 36 months
35.1C CT35.1C‐Stopping Gas Flow ﴾Services Only﴿ 05/14/2018
NGA‐PE‐35.1 NGA‐PE‐35.1 Squeeze‐Off Required 36 months
NGA‐WE‐
35.1C
NGA‐WE‐35.1C‐ Stopping Gas Flow ﴾Squeeze‐Off ‐ Services Only﴿ Required 36 months
35.2 CT35.2‐Stopping Gas Flow ﴾Bagging﴿ 05/14/2018
NGA‐PE‐35.2 NGA‐PE‐35.2 Bagging Required 36 months
NGA‐WE‐
35.2/35.3
NGA‐WE‐35.2/35.3‐ Stopping Gas Flow ﴾Bagging, Valves and Mechanical Only﴿
Required 36 months
35.3 CT35.3‐Stopping Gas Flow ﴾Mechanical﴿ 05/14/2018
NGA‐PE‐35.3 NGA‐PE‐35.3 Mechanical Required 36 months
NGA‐WE‐
35.2/35.3
NGA‐WE‐35.2/35.3‐ Stopping Gas Flow ﴾Bagging, Valves and Mechanical Only﴿
Required 36 months
36/47 CT36 & 47‐Abandonment of Facilities 01/23/2017
NGA‐WE‐
36/47
NGA‐WE‐36 & 47‐Abandonment of Facilities Required 36 months
37A CT37A ‐ Tapping Plastic Pipe with Specialized Equipment 01/23/2017
NGA‐PE‐
37A.1
NGA‐PE‐37A.1‐Tapping Plastic Pipe with Specialized Equipment Required 36 months
NGA‐WE‐37A NGA‐WE‐37A‐Tapping Plastic Pipe with Specialized Equipment Required 36 months
37B CT37B ‐ Tapping Cast Iron Pipe with Specialized Equipment 01/23/2017
NGA‐PE‐
37B.1/37C.1
NGA‐PE‐37B.1 & 37C.1‐Tapping Cast Iron and Steel Pipe with Specialized Equipment
Required 36 months
NGA‐WE‐37B NGA‐WE‐37B‐Tapping Cast Iron Pipe with Specialized Equipment Required 36 months
37C CT37C‐Tapping Steel Pipe with Specialized Equipment 01/23/2017
NGA‐PE‐
37B.1/37C.1
NGA‐PE‐37B.1 & 37C.1‐Tapping Cast Iron and Steel Pipe with Specialized Equipment
Required 36 months
NGA‐WE‐37C NGA‐WE‐37C‐Tapping Steel Pipe with Specialized Equipment Required 36 months
38A CT38A‐Starting Up or Shutting Down Any Part of a Pipeline that Could Cause the MAOP to be Exceeded, Including Turning Valves and Monitoring Flows and Pressure
01/23/2017
NGA‐WE‐38A
NGA‐WE‐38A‐Starting Up or Shutting Down Any Part of a Pipeline that Could Cause the MAOP to be Exceeded, Including Turning Valves and Monitoring Flows and Pressure
Required 36 months
38B CT38B‐Starting Up or Shutting Down Any Part of a Pipeline that Could Cause the MAOP to be Exceeded, Including Turning Valves
01/23/2017
NGA‐WE‐38B
NGA‐WE‐38B‐Starting Up or Shutting Down Any Part of a Pipeline that Could Cause the MAOP to be Exceeded, Including Turning Valves
Required 36 months
39A CT39A ‐ Removing Service Tee or Fitting from Steel and Cast Iron Pipe
01/23/2017
NGA‐WE‐39A NGA‐WE‐39A ‐ Removing Service Tee or Fitting from Steel and Cast Iron Pipe
Required 36 months
39B CT39B‐Removing Service Tee or Fitting from Steel Pipe 01/23/2017
NGA‐WE‐39B NGA‐WE‐39B‐Removing Service Tee or Fitting from Steel Pipe Required 36 months
40 CT40‐Install/Replace tracer wire 01/23/2017
NGA‐WE‐40 NGA‐WE‐40‐Install/Replace Tracer Wire Required 36 months
41/42 CT41 & 42‐Inspecting, Lubricating, Repairing and Operating Distribution Valves
01/23/2017
NGA‐WE‐
41/42
NGA‐WE‐41 & 42‐Inspecting, Lubricating, Repairing and Operating Distribution Valves
Required 36 months
44/54 CT44 & 54‐Welding on a Pipeline 01/23/2017
NGA‐WE‐
44/54
NGA‐WE‐44 & 54‐Welding on a Pipeline Required 36 months
45 CT45‐Restore Service 01/23/2017
NGA‐WE‐45 NGA‐WE‐45‐Restore Service Required 36 months
49.1/49.2 CT49.1/49.2 Mechanical Joining of Pipe other than Plastic ﴾Threaded and Flange﴿
01/10/2017
NGA‐WE‐49 NGA‐WE‐49‐ Mechanical Joining of Pipe Other than Plastic to Plastic Pipe
Required 36 months
49.3 CT49.3 Mechanical Joining of Pipe other than Plastic ﴾Compression﴿
01/10/2017
NGA‐PE‐49.3 NGA‐PE‐49.3 Mechanical Joining of Pipe – Compression Required 36 months
NGA‐WE‐49 NGA‐WE‐49‐ Mechanical Joining of Pipe Other than Plastic to Plastic Pipe
Required 36 months
50/51/52C.04 CT50/51/52‐Joining Plastic Pipe‐Saddle Electrofusion 02/05/2017
NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months
NGA‐WE‐﴾C﴿ NGA‐WE‐﴾C﴿‐Electrofusion ‐ 14667 Required 36 months
PJQ‐04 NGA‐PE‐CT50‐Saddle Electrofusion ﴾PJQ‐04﴿ Required 12 months
50/51/52F CT50/51/52‐Joining Plastic Pipe‐Saddle Fusion 02/05/2017
NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665 Required 36 months
NGA‐WE‐﴾F﴿ NGA‐WE‐﴾F﴿‐Saddle Fusion ‐ 14670 Required 36 months
PJQ‐03 NGA‐PE‐CT50‐Saddle Fusion ﴾PJQ‐03﴿ Required 12 months
50/51B.06 CT50/51‐Joining Plastic Pipe‐Bolted ﴾Bolt On﴿ Fitting‐ Mechanical Couplings
02/05/2017
NGA‐WE‐﴾A﴿ NGA‐WE‐﴾A﴿‐General Knowledge ‐ 14665…
This is the start of the file's text. The full file is on GovTribe.