USCGC ZEPHYR (WPC-8) DRYDOCK AVAILABILITY 2010
| ITEM |
| DESCRIPTION |
| UNIT PRICE |
| UNIT |
| QTY |
| EXTENDED PRICE |
| 1-D |
| Perform Ultrasonic Thickness Measurements |
| 2-D |
| Clean and Inspect Fuel and Oil Tanks (Includes Disposal) |
| 3-D |
| Clean and Inspect Sewage and Grey Water Collection and Holding Tanks |
| 4-D |
| Remove, Inspect, and Reinstall Propeller Shafts |
| 5-D |
| Straighten and Repair Shaft |
| 7-D |
| Remove, Inspect, and Reinstall Propellers |
| 8-O |
| Repair Propeller Root Erosion |
| 9-D |
| Overhaul Stabilizing Fins |
| 10-D |
| Remove, Inspect, and Reinstall Rudder Assemblies |
| 11-D |
| Inspect and Preserve Anchor & Anchor Chain |
| 12-D |
| Combatant Craft Retrieval System Maintenance |
| 13-D |
| Clean Sewage and Grey Water Piping Systems |
| 14-O |
| Renew 5 LF of CHT Piping |
| 15-D |
| Preserve Chain Locker & Anchor Windlass Room Surfaces |
| 16-D |
| Preserve Various Bilges |
| 17-D |
| Preserve and Disinfect Potable Water Tanks |
| 18-D |
| Preserve Ballast Tanks and Voids |
| 19-D |
| Preserve Boat Well and Stern Door Interior Surfaces |
| 20-D |
| Preserve Underwater Body - "100%" |
| 22-O |
| Preserve Superstructure |
| 23-D |
| Inspect and Maintain Cathodic Protection System |
| 25-D |
| Provide Temporary Logistics |
| 26-D |
| Inspect Remote Operated Valve Gear (Reach Rod Assemblies) |
| 27-D |
| Renew Deck Covering Systems |
| 29-D |
| Install Static Inverter (ShipAlt 40D) |
| 31-D |
| Battery Isolator Replacement (ShipAlt 78E) |
| 32-D |
| Install Air Test Fitting (ShipAlt 82E) |
| 33-D |
| Install MDE Starter Disconnect Switch (ShipAlt 46D) |
| 34-D |
| Install AFFF Bilge Sprinkling (S/A 0012D) |
| 35-D |
| Replace Grounding Straps Topside |
| 36-D |
| Overhaul J-Bar Davit Sockets |
| 37-D |
| Preserve Aft Steering Compartment |
| 38-D |
| Fabricate Ready Service Locker for FWD 25MM Gun |
| B-D |
| GFP Report |
| NSP |
| EA |
| 1 |
| NSP |
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items