210129_Drawings_03.29.2024.pdf

PDF 2 MB Posted

Attached to
WWYK210129 Repair Facility HVAC Control System, B2122
Solicitation number
FA813725R0049
Issued by

About this file

These mechanical engineering design drawings document the HVAC Control System Repair Facility project for Tinker Air Force Base in Oklahoma, Project Number WWYK210129. The drawings cover a comprehensive mechanical layout across multiple floors (ground floor, second floor, and roof level) for Building B2122, detailing the precise placement of numerous mechanical equipment units including air handling units (AHUs), make-up air units (MAUs), exhaust fans (EFs), control units (CUs), and various electrical panels and transformers. The design is a concept-level mechanical layout showing the spatial arrangement and distribution of HVAC infrastructure, with a key focus on providing mechanical systems for a repair facility, including specialized areas like ejection rooms, dock entrances, tool cribs, and mechanical rooms. The drawings include detailed zone maps, equipment location specifics, and a vicinity map showing the project's location within Tinker Air Force Base.

View the file

Other files

File Type Posted
210129_ATT9_8A_DESIGN-BUILD_SOW_v6.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVIEWED BY:

REVIEWED BY:

USING AGENCY:

ASBESTOS EVALUATION:

SAFETY:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

INDUSTRIAL HYGIENE:

DATE:

PROJECT DRAWING INDEX SIGNATURES

CORROSION ENGINEER: (CECE)

CE OPERATIONS: (CECO)

COMMUNICATIONS: (COMM)

CHIEF ENGINEER DIR: (CECE)

CHIEF DESIGN BRANCH: (CECE)

DESIGN MANAGER: (CECE)

ZONE MANAGER:

CONSTRUCTION MANAGEMENT: (CECE)

ENVIRONMENTAL:

BASE CIVIL ENGINEER: (CE)

FIRE DEPARTMENT: (CEFT)

GENERAL1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES

OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING

MINIMUM QUALITY STANDARDS, IDENTIFICATION AND

GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF

OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED

THE SPECIFIED ITEMS IN TERMS OF PHYSICAL

PROPERTIES, INCLUDING, COLOR RANGE, FINISH,

DURABILITY, APPEARANCE, PERFORMANCE

CHARACTERISTICS, AND OTHER FACTORS. OTHER

PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE

SUBMITTED FOR EVALUATION AND

APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.

2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE

CONSIDERED AS A WHOLE IN THAT THE GENERAL

CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE

RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL

SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF

THE SPECIFICATIONS.

3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL

CONSTRUCTION FENCING AND BARRICADES AS REQUIRED

TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT

ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE

CONSTRUCTION SITE.

4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES

CAUSED BY CONSTRUCTION TRAFFIC OR ANY

CONSTRUCTION OPERATION SHALL BE REPAIRED OR

REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED

EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE

GOVERNMENT.

5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE

UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL NEW

LABOR & MATERIALS UNLESS SPECIFICALLY NOTED TO BE

"EXISTING" OR "BY OTHERS".

WWYK210129

REPAIR FACILITY HVAC

CONTROL SYSTEM, B2122

KEY PLAN:

GENERAL NOTES:

PROJECT

LOCATION

1 G-101 GENERAL NOTES & VICINITY MAP

SHT.SEQ. SHEET TITLE

OF

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

CONCEPT

W W

YK

RE

PA

IR

F

AC

ILI

TY

H

VA

C

CO

NT

RO

L S

YS

TE

M, B

XX

X TE

PA

-C

SA

G

S

SE

XT

O

N

G-101

K

FR

EE

M

AN

J W

H

EE

LE

R

En gr

\D es ig n\ s\

\2

9\

0_ Su pp or t\0 _3

_D ra w in gs \M od el

GE

NE

RA

L N

OT

ES

AN

D

VI

CI

NI

TY

M

AP

01 05

DISCIPLINE

M-101 PARTIAL GROUND FLOOR MECHANICAL HVAC LAYOUT

M-102 M-103

PARTIAL SECOND FLOOR MECHANICAL HVAC LAYOUT

PARTIAL ROOF LEVEL MECHANICAL HVAC LAYOUT

M-100 OVERALL GROUND FLOOR MECHANICAL HVAC LAYOUT

RU

NW

AY

/36

RUNWAY 13/31

TA

XI

W

AY

G

TAXIW

AY H

TAXIWAY B

TAXIWAY C

TAXIWAY M

TA

XI

W

AY

K

TAXIWAY E

TAXIWAY A

TA

XIW

AY EE

TAXIWAY F

TAXIWAY D

TAXIWAY E

TAXIWAY J

TA

XI

W

AY

G

TAXIWAY A

TAXIW

AY H

TAXIWAY C

TAXIWAY D

TAXIWAY EE

TAXIWAY F

Elm Creek

Crutcho Creek

Kuhlman Creek

Kuhlman Creek

Elm Creek

East Crutcho Creek

Elm Creek

El m

Cr ee k

Elm Creek

Elm Creek

Elm Creek

Elm Creek

Ku hlm an Cr ee k

Ea st

Cr utc ho C ree k

Elm Cree k

West Crutcho Creek W es t C ru tch o C re ek

Elm Creek

Soldier Creek

Elm Creek

Soldier Creek

Soldier Creek

Ea st

Cr utc ho C re ek

Elm Creek

Ea st

Cr utc ho C re ek

East Crutcho Creek

Soldier Creek

So ldi er Cr ee k

East C rutcho Creek

Soldier Creek

Soldier Creek

So ldi er C re ek

East Crutcho Creek

416506

11401128

59035909

838837

62509

62512

62525

99999

62543

71086

53902

50414

55300

56601

61019

62501

45134

62503

61289

62542

15904

15908

15904

15908

62502

41046

62501

62514

62501

41157

45815

40592

62522

15930

11824

3 10

62540

61089

62528

62523

62501X

43774

62516

3592135916

32101

930G

948-E

911-E

948-W

911-W

33001

35913

65672

930S

43609

42116

62517

62515

62526

62527

62513

62501OK

11289

62501

15930

15908

15904

15908

15904

61018

71089

45134

96022

43120

44045

43610

41163

15930

Ea st

Dr

SE 59th St.

St aff

D r.

5th Ave

W ar eh ou se R d.

7th St.

Mc Na rn ey

A ve

Mitchell Ave

Co ok

A ve

W es t D r.

Extender Dr.

5th Ave.

Globemaster Dr.

Ai r D ep ot

Mercury Rd.

Po nd

R d.

"C " A ve

Hi llto p R d.

"M " A ve

Doolittle Ave

W hit e D r.

Ba ll P ar k R d.

6th St.

Po we rh ou se D r.

Int ru de r D r.

Holden Dr.

Vanaman Rd.

1st St.

Arnold St.

SE 74th St

Ai r D ep ot

Patrol Rd.

Reserve Rd.

"A " A ve

Mu nit ion s R d.

"B " A ve

"H " A ve

Al er t R d.

"E "A ve

Sentry Rd.

34th St.

Twining Dr.

Jo ne s

To we r R d.

Vanaman Rd.

Ind us tria l B lvd

So uth

S t.

1st St.

Do oli ttle A ve

Pi cn ic Rd

Ja me s D r.

W olf e D r.

Ai r D ep ot

"D " A ve

Perimeter Rd.

Rapcon Rd.

Reserve Rd

"L " A ve

"F " A ve

1st St.

Br ow n D r.

Ol d A ir D ep ot

Airey Dr.

General Motors Dr

Bradley Dr.

Entrance Road "C"

Entrance Road "A"

"C " A ve

Vandenberg Dr.

Do rm ito ry

Rd

Dormitory Rd.

Chennault Dr.

Mi tch ell A ve

Spaatz Dr.

Co mm od ity

D r.

3rd Ave.

"D " D riv e

Joint STARS Dr.

Ai r D ep ot

Bl vd

Turbine Dr. Turbine Dr.

Central Plant Dr.

6th St.

Falcon Dr.

Blac kbi rd D r.

W ey lan d L oo p

Pegasus Dr.

Thunderbolt D r.

Munitions Rd. Ext.

Codding Rd.

Starlifter Dr.

Chidlaw Ct.

Co rsa ir D r.

Rap tor

Ct.

Ni gh t H aw k C t.

Ph an tom D r.

Fr an kli n

Sk ym as ter

D r.

Spaatz Ct.

La wr en ce

Mu nd ell

Nabors Dr.

Mc Ni ck le

Mi lle r D r.

Ta il F ea the r D r.

Air ey

Ci r.

Smith Ct. Raven Ct.

Air Dep ot

Ai r D ep ot

1st St.

TAXIWAY F

Ra w li ng s A ve

Mitc he ll A ve

Mercury Rd.

Ra ily ar d R d.

He rcu les R d.

Globemaster Dr.

Pr op uls ion

D r.

Stratofortress Dr.TINKER AFB, OK

VICINITY MAP

BASE

OPERATIONS

B240

CONTRACTING

B3

GOTT

GATE

TINKER GATE

PASS & ID B6611

HRUSKOCY

GATE

EAKER GATE

FIRE DEPARTMENT

B117

VANCE

GATE

LIBERATOR GATE

HOPE

GATE

LEGEND

CONTRACTOR

HAUL ROUTE

LANCER

GATE

TRUCK GATE

PIAZZA GATE

BASE CIVIL

ENGINEER

B400

PROJECT

LOCATION

2280 2211

OF

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

CONCEPT

W W

YK

RE

PA

IR

F

AC

ILI

TY

H

VA

C

CO

NT

RO

L S

YS

TE

M, B

XX

X TE

PA

-C

SA

G

S

SE

XT

O

N

M-100

K

FR

EE

M

AN

J W

H

EE

LE

R

En gr

\D es ig n\ s\

\2

9\

0_ Su pp or t\0 _3

_D ra w in gs \M od el

OV

ER

AL

L G

RO

UN

D

FL

OO

R

ME

CH

AN

IC

AL

H

VA

C

LA

YO

UT

02 05

M-100

OVERALL GROUND FLOOR MECHANICAL HVAC LAYOUT

SCALE: 1/32" = 1'-0"

B2122 KEYPLAN

GENERAL NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

A B

C D

E F

G

26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

71 2"

HV

AC

PA

D

HV

AC

PA

D

HV

AC

PA

D

91 2"

HV

AC

PA

D

7"

HV

AC

PA

D

7"

HV

AC

PA

D

7"

HV

AC

PA

D

8"

HV

AC

PA

D

HV

AC

PA

D

1'-

HV

AC

PA

D

EQ

UI

P

PA

D

31 2"

TRANSFORMER

PAD

71 2" 71 2" 7"

71 2"

AI

SL

E

UP

UP UP

TO

OL

C

RI

B

UP

MO

TO

R

CO

NT

RO

L

DR

SINK

SH

OW

ER

SH

OW

ER

SINK

SINK

BE

NC

H

BE

NC

H

BE

NC

H

BE

NC

H

BE

NC

H

BE

NC

H

BE

NC

H

BE

NC

H

BE

NC

H

BE

NC

H BENCH

BENCH

UP

SH

OW

ER

SH

OW

ER

RAMP

SINK

SI

NK

SI

NK

SH

OW

ER

SH

OW

ER

SH

OW

ER

SH

OW

ER

SH

OW

ER

SH

OW

ER

SH

OW

ER

BL

OC

KE

D

DO

OR

SH

OW

ER

SH

OW

ER

BL

OC

KE

D

DO

OR

S

SINK

6" P

AD

SL

OP

E

SL

OP

E

6" C

UR

B

INDUSTRIAL WASTE TRENCH

INDUSTRIAL WASTE TRENCH

INDUSTRIAL WASTE TRENCH

INDUSTRIAL WASTE TRENCH

TA

NK

CO

MP

UT

ER

RO

OM

E.

D

OC

K

EN

TR

AN

CE

ME

CH

AN

IC

AL

R

OO

M

ME

CH

AN

IC

AL

R

OO

M

ME

CH

AN

IC

AL

R

OO

M

ME

CH

AN

IC

AL

R

OO

M

OF

FI

CE

B- 1 P

RO

DU

CT

IO

N

RO

OM

A

TO

OL

C

RI

B

BREAK ROOM

ME

N

WOMEN

CL

OS

ET

EL

EC

TR

IC

AL

VA

UL

T

MECH

EJ

EC

TI

ON

RO

OM

I

ND

I R

EC

EI

VI

NG

B

AY

BR

EA

K

RO

OMEJ

EC

TI

ON

RO

OM

A

EJ

EC

TI

ON

RO

OM

B

B-

E

JE

CT

IO

N

RO

OM

C

EJ

EC

TI

ON

RO

OM

F

SC

HE

DU

LIN

G

OF

FI

CE

OF

FI

CE

ME

N'

S

LO

CK

ER

RO

OM

TO

OL

C

RI

B

TO

OL

C

RI

B

CL

OS

ET

CL

OS

ET

UN

DE

R

CO

NS

TR

UC

TI

ON

TOOL CRIB

B-1 PRODUCTION

ROOM B

DI

SA

SS

EM

BL

Y

CL

EA

NI

NGCA

FE

TE

RI

A

SA

ND

BL

AS

TE

R

ME

N

ME

N

W

OM

EN

CL

OS

ET

CL

OS

ET

B1 LRU STORAGE ROOM

RE

GU

LA

TO

R

RO

OMW

ES

T

DO

CK

OF

FI

CE

MA

TE

RI

AL

R

OO

M

BR

EA

K

RO

OM

CA

GE

W

OM

EN

'S

LO

CK

ER

R

OO

M

B1

LO

CK

ER

R

OO

M

B1 AVIONICS BACK SHOP

AV

IO

NI

CS

CD

DS

R

OO

M

B- 1B

A

IR

CR

AF

T

SH

EE

T

ME

TA

L B

AC

K

SH

OP

VA

UL

T

B1-B LANDING

GEAR SHOP

B-1B MLG

MATERIAL

TAIL BIN

EJ

EC

TI

ON

RO

OM

G

EJ

EC

TI

ON

RO

OM

H

OF

FI

CE

B1 E

JE

CT

IO

N

RO

OM

D

UN

DE

R

CO

NS

TR

UC

TI

ON

UN

DE

R

CO

NS

TR

UC

TI

ON

W

OM

EN

CL

OS

ET

ME

N

CO

MM

R

OO

M

POST DOCK

AVIONICS

POST DOCK

MEETING ROOMCO

MM

R

OO

M

BR

EA

K

RO

OM

OF

FI

CE

BA

CK

SH

OP

OFFICE

CL

OS

ET

CHEM

STORAGE

W

OM

EN

'S

LO

CK

ER

RO

OM

DI

SA

SS

EM

BL

Y

CL

EA

NI

NG

OF

FI

CE

DI

SA

SS

EM

BL

Y

CL

EA

NI

NG

OF

FI

CE

SO

UT

H

EX

PO

SU

RE

RO

OM

NO

RT

H

EX

PO

SU

RE

RO

OM

NDI

PROCESSING NDI VIEWING

CHEMICAL

STORAGE ROOM

B1 PLANNING AREA

WOMEN'S LOCKER ROOM

EQ

UI

PM

EN

T

RO

OM

EQ

UI

PM

EN

T

RO

OM

EQ

UI

PM

EN

T

RO

OM

ME

N

EN

TR

Y

TO

W

ES

T

DO

CK

SE

RV

IC

IN

G

SE

CT

IO

N

B1-B MIC

HA

ZM

AT

DI

SP

OS

AL

NV

NV

NV

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

EAI

SL

E

6" C

UR

B

DOCK BOX 1

DOCK BOX 2

DOCK BOX 3 DOCK BOX 4

UT

ILI

TY

T

UN

NE

L

UT

ILI

TY

T

UN

NE

L

UT

ILI

TY

T

UN

NE

L

UT

ILI

TY

T

UN

NE

L

SA

ND

BL

AS

TE

R

SE

LF

C

LE

AN

ER

NV

CO

/O

2 S

EN

SO

RS

CO

/O

2 S

EN

SO

RS

CO

/O

2 S

EN

SO

RS

CO

/O

2 S

EN

SO

RS

ELEV

BAY 1 BAY 2 BAY 4BAY 3

WEST

DOCK

CENTER

DOCK

EAST

DOCK

32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 5026 27 28 29 30 31

INDUSTRIAL WASTE TRENCH

INDUSTRIAL WASTE TRENCH

Au toc lav e

Eq uip

W ate rje t S ys tem

Eq uip

Au toc lav e

Eq uip

UH-N01UH-N02UH-N03

UH

-N

UH-N05

UH

-N

UH-N07

UH

-N

UH-N09UH-N10UH

-N

UH

-N

UH-N13 UH-N14

UH-N15

UH-N17

UH

-N

UH-N19

UH

-N

UH-N20 UH-N21 UH-N23

UH

-N

UH-N24 UH-N25

UH

-N

UH

-N

BFRP-3

PLS-3

BFRP-1

PLS-4

PLS-1

MAU-9

BFRP-4

CU-25

EF-25 EF-24

EF-7

CU-M11

EF-6EF-5

UH-N28

PSFS-5 PSFS-6

PSFS-8 PSFS-9 PSFS-10

CH-1

EF-13

EF-26

BFRP-6

WH-2WH-1

WS-1

PC

W

-3

PC

W -4

PHW-2

PHW-1

PCHW-1

PCHW-2

BLR-1

AHU-15

AHU-18

EF-30

PKG-1

DSFD-31

CU-19

AHU-19

DSFD-17

DSFD-16

AHU-22

MAU-13DSFD-1

BFRP-8

EF-29

EF-28

UH-3

DSFD-30

DSFD-10 DSFD-11

DSFD-12

UH-2

EF-14

DSFD-13

DSFD-23 DSFD-29

EF-22

DSFD-7

DSFD-8

UH-1

DSFD-22

AHU-23

AHU-20

MAU-16

MA

U-

DSFD-5DSFD-6

DSFD-3

DSFD-2

DSFD-4

DSFD-19

DSFD-18

EF-23

WH-3

WH-4

WH-5

PSFS-1

PSFS-2 PSFS-3

DSFD-20

DSFD-21

AH

U-

BFRP-5

EF-`1 EF-2 EF-3 EF-4 EF-8 EF-9 EF-10

AHU-26AHU-27

CU-26

CU-27

2122-OWS-1

PSCW-1PSCH-1

PSHW-1

MAU-12

AHU-21

MA

U-

PSFS-4

BS

TR

-1

BS

TR

-2

CNTR-C1

CNTR-B1

DSFD-15

DSFD-24

EF-15

AH

U-

WH-6

ACF-1

ACF-3

ACF-5

ACF-2

ACF-4

ACF-6

MAU-11

CNTR-M11

AHU-3

CNTR-3

AHU-25

MA

U-

MAU-5MAU-3 MAU-8

CNTR-M08

BFRP-2EF-27

DSFD-9

MAU-17

DSFD-32

DSFD-33

DSFD-14

EF-31

BL

R-

HW

CNTR-BLR-HW01

CNTR-BLR-HW02

BL

R-

HW

PHW-3

PHW-4

TNK-12

EF-33EF-32

PLS-2

BLR-1

PSHW-2

PSHW-1

VFD-PHWS01

VFD-PHWSO2UH-B01

CNTR-BLR-1

LAV-1-W1

LAV-1-M3

LA

V-

1- M4

LAV-1-W2

LAV-1-M2

LA

V-

1- W

SHR-1-M4 SHR-1-W3

SHR-1-W1

SH

R-

1-

ML

RS SH

R-

1- W

SNK-1

SNK-1-1

SNK-2

SNK-3

SNK-4

SNK-6

SNK-7

SNK-8

TNK-1

TNK-2

TNK-3

URN-1-M2

WC-1-M2

WC-1-W1

URN-1-M3

WC-1-M3

WC-1-W2

UR

N-

1- M4

W C-

1- M4

W C-

1- W

WU-01

WU-02WU-03

WU-04 W

U-05

WU-06

WU-07

WU-08 WU-09

WU-12WU-13WU-14WU-15

VF

D-

1.1

VF

D-

1.2

VF

D-

1.3

VF

D-

1.4

VF

D-

2.1

VF

D-

2.2

VF

D-

2.3

VF

D-

2.4

MAU-4 MAU-7

CNTR-M07

MAU-6

CNTR-M06

AHU-9

CNTR-9

CNTR-11

AHU-11 CNTR-12

AHU-12 CNTR-13

AHU-13

AHU-16

CNTR-16

CNTR-5

AHU-5

CNTR-14

AHU-14

26 27 28 29

37 38 39 40 41 42 43 44 45 46 47 48 49 50

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

CONCEPT

W W

YK

RE

PA

IR

F

AC

ILI

TY

H

VA

C

CO

NT

RO

L S

YS

TE

M, B

XX

X TE

PA

-C

SA

G

S

SE

XT

O

N

M-101

K

FR

EE

M

AN

J W

H

EE

LE

R

En gr

\D es ig n\ s\

\2

9\

0_ Su pp or t\0 _3

_D ra w in gs \M od el

PA

RT

IA

L

GR

OU

ND

F

LO

OR

ME

CH

AN

IC

AL

H

VA

C

LA

YO

UT

03 05

M-101

PARTIAL GROUND FLOOR MECHANICAL HVAC WEST LAYOUT

SCALE: 1/16" = 1'-0"

M-101

PARTIAL GROUND FLOOR MECHANICAL HVAC EAST LAYOUT

SCALE: 1/16" = 1'-0"

B2122 KEYPLAN

GENERAL NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

UP

UP UP

TO

OL

C

RI

B

UP

MO

TO

R

CO

NT

RO

L

DR

SINK

SH

OW

ER

SH

OW

ER

SINK

SINK

SI

NK

SH

OW

ER

SH

OW

ER

SH

OW

ER

SH

OW

ER

SH

OW

ER

SH

OW

ER

SH

OW

ER

BL

OC

KE

D

DO

OR

S

SL

OP

E

6" C

UR

B

NV

NV

INDUSTRIAL WASTE TRENCHINDUSTRIAL WASTE TRENCH

TA

NK

E.

D

OC

K

EN

TR

AN

CE

B- 1 P

RO

DU

CT

IO

N

RO

OM

A

TO

OL

C

RI

B

BREAK ROOM

ME

N

WOMEN

CL

OS

ET

EL

EC

TR

IC

AL

VA

UL

T

MECH

EJ

EC

TI

ON

RO

OM

I

ND

I R

EC

EI

VI

NG

B

AY

BR

EA

K

RO

OMEJ

EC

TI

ON

RO

OM

A

EJ

EC

TI

ON

RO

OM

B

B-

E

JE

CT

IO

N

RO

OM

C

EJ

EC

TI

ON

RO

OM

F

SC

HE

DU

LIN

G

OF

FI

CE

OF

FI

CE

ME

N'

S

LO

CK

ER

RO

OM

TO

OL

C

RI

B

TO

OL

C

RI

B

CL

OS

ET

CL

OS

ET

UN

DE

R

CO

NS

TR

UC

TI

ON

TOOL CRIB

B-1 PRODUCTION

ROOM B

CA

GE

EJ

EC

TI

ON

RO

OM

G

EJ

EC

TI

ON

RO

OM

H

OF

FI

CE

B1 E

JE

CT

IO

N

RO

OM

D

UN

DE

R

CO

NS

TR

UC

TI

ON

UN

DE

R

CO

NS

TR

UC

TI

ON

CHEM

STORAGE

SO

UT

H

EX

PO

SU

RE

RO

OM

NO

RT

H

EX

PO

SU

RE

RO

OM

NDI

PROCESSING NDI VIEWING

CHEMICAL

STORAGE ROOM

B1 PLANNING AREA

WOMEN'S LOCKER ROOM

EQ

UI

PM

EN

T

RO

OM

EQ

UI

PM

EN

T

RO

OM

EQ

UI

PM

EN

T

RO

OM

ME

N

HA

ZM

AT

DI

SP

OS

AL

NV

NV

AI

SL

EAI

SL

E

6" C

UR

B

DOCK BOX 3 DOCK BOX 4

NV

NV

ELEV

UH-N01UH-N02UH-N03

CH-1

EF-13

EF-26

BFRP-6

WS-1

PC

W

-3

PC

W

-4

PCHW-1

PCHW-2

BLR-1

DSFD-17

DSFD-16

BFRP-8

EF-29

EF-28

UH-3

DSFD-30

DSFD-10 DSFD-11

DSFD-12

UH-2

EF-14

DSFD-13

DSFD-23 DSFD-29

EF-22

DSFD-7

DSFD-8

UH-1

DSFD-22

AHU-23

AHU-20

MAU-16

MA

U-

DSFD-5DSFD-6

DSFD-4

DSFD-19

DSFD-18

EF-23

WH-3

WH-4

PSFS-3

DSFD-20

DSFD-21

AH

U-

BFRP-5

AHU-26AHU-27

CU-26

CU-27

PSCW-1

PSCH-1

PSHW-1

MA

U-

PSFS-4

BS

TR

-1

BS

TR

-2

CNTR-C1

CNTR-B1

DSFD-15

AH

U-

BFRP-2

DSFD-9

DSFD-14

EF-31LAV-1-M3

LAV-1-W2

SH

R-

1-

ML

RS SH

R-

1- W

SNK-3

SNK-4

SNK-6

SNK-7

TNK-1

TNK-2

TNK-3

URN-1-M3

WC-1-M3

WC-1-W2

WU-08 WU-09

WU-12WU-13

CNTR-11

AHU-11 CNTR-12

AHU-12 CNTR-13

AHU-13

AHU-16

CNTR-16

CNTR-5

AHU-5

CNTR-14

AHU-14

B C

D E

F

EGD-12

EGD-15

EGD-16

LDR-1

OD-14

(IN HD)

(IN HD)

EGD-13

EGD-14

FD-5

FD-6

OD-15

OD-12

MCC

EL

FACU FACU

CP

CP-188

OHMIC-173

PNL-151MTS-150

PNL-149

PNL-143

FA-135FA-134

EL-50

PNL-124 XFMR-125

PNL-7060

PNL-7059

XFMR-7058

PNL-7056 XFMR-7057

XFMR-7044

PNL-7045

XFMR-68

PNL-67

PNL-7042

PNL-7043

PNL-105PNL-104PNL-103PNL-102PNL-101

SWG-118 XFMR-7009

SWS-7008

PNL-119

PNL-120

SWG-121

PNL-122

XFMR-7037 XFMR-49

PNL-48

XFMR-47XFMR-45

PNL-44

PNL-7036 XFMR-7035

MCC-46

PNL-43PNL-42PNL-41

SWG-40

PNL-39XFMR-38PNL-37PNL-36XFMR-35

PNL-32

XFMR-30XFMR-27XFMR-26

PNL-29 PNL-31PNL-25 PNL-28

SWG-66

B C

D E

F

UP

RAMP

SI

NK

BL

OC

KE

D

DO

OR

6" P

AD

MA

TE

RI

AL

R

OO

M

CO

MM

R

OO

M

POST DOCK

AVIONICS

POST DOCK

MEETING ROOMCO

MM

R

OO

M

BR

EA

K

RO

OM

OF

FI

CE

BA

CK

SH

OP

OFFICE

SE

RV

IC

IN

G

SE

CT

IO

N

B1-B MIC

EF-30

PKG-1

CU-19

AHU-19

PSFS-1

SNK-1

WU-03

26 27 28 29

EGD-1

OD-2

EGD-26

(IN HD)

OD-1

LDR-7

FACU FACU

CP

CP

CP-196

CP-197

MTS-145PNL-144 XFMR-90PNL-7055

XFMR-7051PNL-7052

PNL-8

XFMR-9

XFMR-7XFMR-6

PNL-5

XFMR-2FA-3 PNL-4FA-1

SWS-7013SWS-7012

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

CONCEPT

W W

YK

RE

PA

IR

F

AC

ILI

TY

H

VA

C

CO

NT

RO

L S

YS

TE

M, B

XX

X TE

PA

-C

SA

G

S

SE

XT

O

N

M-102

K

FR

EE

M

AN

J W

H

EE

LE

R

En gr

\D es ig n\ s\

\2

9\

0_ Su pp or t\0 _3

_D ra w in gs \M od el

PA

RT

IA

L

SE

CO

ND

F

LO

OR

ME

CH

AN

IC

AL

H

VA

C

LA

YO

UT

04 05

GENERAL NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

M-102

PARTIAL SECOND FLOOR MECHANICAL HVAC WEST LAYOUT

SCALE: 1/16" = 1'-0"

M-102

PARTIAL SECOND FLOOR MECHANICAL HVAC EAST LAYOUT

SCALE: 1/16" = 1'-0"

B2122 KEYPLAN

EGD-32

LDR-1A

AHU-24

DSFD-26

DSVAV-5-06

AHU-7

CNTR-7

AHU-6

CNTR-6

DSVAV-5-05

DSVAV-5-04

DSVAV-5-03 DSVAV-5-02 DSVAV-5-01

DSVAV-5-07

DSVAV-5-08

DSVAV-5-09

DSVAV-5-10

DSVAV-5-11

DSVAV-5-12

DSVAV-5-13

DSVAV-5-15

DSFD-25

DSVAV-5-14

DSFD-34

DSFD-35

CNTR-24

PNL-58

PNL-54

PNL-55

XFMR-53

PNL-52

PNL-51

PNL-56

PNL-57

XFMR-73 XFMR-74

PNL-75

XFMR-76

PNL-77

PNL-78

PNL-79

PNL-80

PNL-85

PNL-86

PNL-81

PNL-87

25'-0"

25'-0"

25'-0"

457'-4"

25'-0"

SHELVES/DOORS/LOCKS

C

AB

IN

ET

S/ D

O O

R S/

LO

C

KS

CABINETS/DOORS/LOCKS

SH

EL

VE

S/

D O

O R

S/

LO

C

KS

SHELVES

SHELVES

SH

EL

VE

S

CABINETS/DOORS/LOCKS

EGD-33

EGD-34

LDR-7A

AHU-10

CNTR-10

AHU-8

CNTR-8

WU-11

PNL-61

PNL-89

PNL-88

PNL-62

PNL-63

25'-0"

25'-0"

25'-0"

25'-0"

457'-4"

B

C

D

E

F

RAMP UP RISE= 1'-0" PER 10'-0"

DOWN

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

CONCEPT

W W

YK

RE

PA

IR

F

AC

ILI

TY

H

VA

C

CO

NT

RO

L S

YS

TE

M, B

XX

X TE

PA

-C

SA

G

S

SE

XT

O

N

M-103

K

FR

EE

M

AN

J W

H

EE

LE

R

En gr

\D es ig n\ s\

\2

9\

0_ Su pp or t\0 _3

_D ra w in gs \M od el

PA

RT

IA

L

RO

OF

LE

VE

L

ME

CH

AN

IC

AL

H

VA

C

LA

YO

UT

05 05

M-103

PARTIAL ROOF LEVEL MECHANICAL HVAC EAST LAYOUT

SCALE: 1/16" = 1'-0"

B2122 KEYPLAN

GENERAL NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

M-103

PARTIAL ROOF LEVEL MECHANICAL HVAC WEST LAYOUT

SCALE: 1/16" = 1'-0"

OHMIC-100a

OHMIC-100

CU-24

EF-16

CU-23

MAU-2.5MAU-2.4MAU-2.3 MAU-1

CNTR-M01

MAUFLT-1

MAU-19MAU-18 CT-1

PKG-4

CNTR-P4

B

C

D

E

F

CU-21

MAU-1.1 MAU-1.2 MAU-1.3

Sheets and Views
01-210129-G101-G101
02-210129-M100-M100
03-210129-M101-M101
04-210129-M102-M102
05-210129-M103-M103

File details come from the government source that posted it. Updated .