SECTION B
SUPPLIES OR SERVICES AND PRICES
BIDDING SCHEDULE
SPENCE SUBSTATION, STAGE 02
CLIN Work or Material Estimated Quantity Unit Unit Price Amount
0001 Mobilization and preparatory work (Not to exceed 5% of TOTAL. See Section H and M.)
LS $ _
0002 Demolition (see note#1 below) 40 CY $ _
0003 Concrete foundations 43 CY $ $ _
0004 Cable trenches LS $ _
0005 Grounding system LS $ _
0006 Existing outdoor electrical equipment and material
LS $ _
TOTAL $ _
ABBREVIATIONS
Note#1:
CLIN = Contract Line Item Number
CY = cubic yards LS = for the lump sum of LB = pounds
Demolition includes the removal and disposal of concrete foundations, propane tank, the generator building and the generator building contents.
NOTE: the Buy American Act applies to this solicitation. Refer to FAR Clause 52.225-9 (Section I) and FAR Provision 52.225-10 (Section L) if any non-domestic material will be proposed. Bidders must identify any non-domestic materials (not manufactured in United States) included in their bid. Please check with your suppliers and subcontractors to verify whether or not their quotes include non-domestic material.