Attachment A

Spence Substation Stage 02 Specifications

AMD 0002

89503221BWA000039

23 February 2021

Spec. No. 999

WYOMING

SECTION C

DESCRIPTION/SPECIFICATIONS

SPENCE SUBSTATION

STAGE 02

SECTION C

DESCRIPTION/SPECIFICATIONS

SPENCE SUBSTATION STAGE 02

DIVISION 1 – GENERAL REQUIREMENTS

A. CONTRACT REQUIREMENT

B. DESCRIPTION OF WORK

1. THE PRINCIPAL COMPONENTS OF WORK include the following

C. DESCRIPTION OF BIDDING SCHEDULE ITEM

1. Bidding Schedule item “Mobilization and preparatory work”

D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

1. SUBMITTAL APPROVAL TIME

2. CONSTRUCTION SCHEDULE AND OUTAGE RESTRICTIONS

3. PROTECTIVE GROUND LEADS

4. MAXIMUM AVAILABLE FAULT CURRENT

E. CONSTRUCTION SCHEDULE

1. SUBMITTAL TIME

F. RIGHTS-OF-WAY

1. GENERAL

G. GEOLOGIC INVESTIGATIONS

H. ELECTRIC POWER FOR CONSTRUCTION PURPOSES

I. WATER FOR CONSTRUCTION PURPOSES

J. EXPLOSIVES AND BLASTING

K. BURIED UTILITIES

L. EMPLOYEE REQUIREMENTS

M. ELECTRICAL MINIMUM APPROACH DISTANCES

N. SUBMITTALS AND CORRESPONDENCE

1. GENERAL

2. TRANSMITTAL

3. SUBMITTAL RESPONSE

4. PHYSICAL SAMPLE SUBMITTALS

5. PROJECT PROTOCOL

DIVISION 2 – SITEWORK

A. DESCRIPTION OF BIDDING SCHEDULE ITEMS

1. Bidding Schedule item “Miscellaneous sitework”

2. Bidding Schedule item “Demolition”

3. Bidding Schedule does not contain separate items

DIVISION 3 – CONCRETE

A. GENERAL

1. MATERIAL

2. TEST FOR POTENTIAL REACTIVITY OF SAND AND COARSE AGGREGATE

3. REBAR DEVELOPMENT (LD) AND LAP LENGTH

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS

1. Bidding Schedule item “Concrete foundations”

2. Bidding Schedule items “Cable trenches”

DIVISION 9 – SUBSTATION ELECTRICAL

A. GENERAL

1. Bidding Schedule for Government-furnished items

2. Bidding Schedule for items not furnished by the Government

3. Associated support structures provided for each electrical equipment rated above 7-kV

4. Installation and painting of electrical equipment and material

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS

1. Bidding Schedule item “Grounding system”

2. Bidding Schedule item “Existing outdoor electrical equipment and material”

DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION 16

A. DESCRIPTION OF BID ITEMS:

1. Bidding Schedule does not contain a separate item for “Environmental Quality Protection”

B. SPECIAL REQUIREMENTS:

DIVISION 1 – GENERAL REQUIREMENTS

A. CONTRACT REQUIREMENT:

Construct and complete Spence Substation, Stage 02, in accordance with the Construction Contract (Standard Form 1442); the Contract Clauses; WAPA’s Construction Standards, including Standard 1 – General Requirements (September 2016), Standard 2 – Sitework (September 2016), Standard 3 – Concrete (September 2016), Standard 4 – Substation Metalwork and Transmission Line Lattice Structures (September 2016), Standard 5 – Transmission Line Steel Pole Structures (September 2016), Standard 6 – Light Duty Steel Pole Structures (September 2016), Standard 7 – Wood Poles (September 2016), Standard 8 – Glued Laminated Structures (September 2016), Standard 9 – Substation – Electrical (September 2016), Standard 10 – Transmission Line – Electrical (September 2016), Standard 11 – Service Building (September 2016), Standard 12 – Painting (September 2016), Standard 13 – Environmental Quality Protection (September 2016), Standard 14 – Communication Facilities (September 2016), Standard 15 – Drawings (September 2016); Standard Drawings; and these Project Specifications and Drawings.

If a conflict occurs between the Project Specifications and the Construction Standards, the Project Specifications shall govern. The Project Specifications and the drawings are used to take exceptions or provide additions to the Construction Standards. Some paragraphs in the Construction Standards will not apply to this job.

WAPA’s Construction Standards, Standard Drawings, and Electrical Equipment Standards are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx.

WAPA Project Specifications and Construction Standards are explained in Standard 1 – General Requirements, Section 1.1.1, “Standards and Project Specifications”.

B. DESCRIPTION OF WORK:

1. THE PRINCIPAL COMPONENTS OF WORK include the following:

a. Providing new concrete foundations shown on drawings.

b. Removing and disposing of existing foundations shown on drawings.

c. Removing and disposing of existing outdoor electrical equipment as shown on the Drawings.

d. Removing and disposing of propane tank and building as shown on the drawings.

Paragraphs “Description of Bidding Schedule Items” in Divisions – 1, 2, 3, 9 and 13 describe the work to be performed.

The work is located near Alcova, Wyoming, as shown on Drawing SCE 0015.

C. DESCRIPTION OF BIDDING SCHEDULE ITEM:

1. Bidding Schedule item “Mobilization and preparatory work” includes the following:

a. Performing mobilization and preparatory work in accordance with Section H of the contract clauses.

b. Prepare and submit a Construction Schedule and furnish a Safety and Health Program.

c. Providing and maintaining toilet facilities inside the substation fence.

D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: See FAR 52.211-10 in

Section F of the solicitation/contract.

1. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, WAPA will require 21-calendar days for review of drawings or data submitted for approval.

2. CONSTRUCTION SCHEDULE AND OUTAGE RESTRICTIONS: In addition to the restrictions listed in Construction Standard 1, the following outage restrictions shall apply: The following Construction Schedule restrictions shall apply:

a. No project related activities shall occur between the hours of 6:00 pm and 8:00 am from

March 1 to June 30.

b. Foundations 2STA1 (and associated cable trench), 2SSA1, 2SSVT1, 2SA1, 2SS5 and 2DP1 need to be placed by May 18, 2021.

c. Contractor to begin removing switch and breaker equipment and existing foundations on or after May 19, 2021 and be completed by June 10, 2021.

d. WAPA forces shall be given 20-calendar days after foundation 2STA1 is completed before removing the DWA cable trench, cover, control panel and foundation (SSE1).

e. Contractor shall not work more than 60-hours in one (1) calendar work week without prior approval from the Contracting Officer’s Representative (COR).

f. Dependent upon time of year, if ambient temperatures are less than 32-degrees Fahrenheit during power circuit breaker commissioning, the Contractor shall create an environment to bring local ambient temperatures above 32-degrees Fahrenheit.

g. Make all outage requests in writing to the onsite WAPA representative a minimum of 30-days in advance. Meeting the minimum advance notice requirement of 30-days does not guarantee an outage will be approved. To improve the changes of an outage being approved, all outages should be submitted with as much advance notice as practicable.

Weather conditions and other system conditions such as other scheduled and nonscheduled (forced) outages must be evaluated against an outage request before approval can be granted. At any time because of transmission system electrical loads, system configurations, weather conditions or any condition which may cause an adverse effect on the transmission system operation or reliability, WAPA may deny an outage request or direct the Contractor to return facilities to operating conditions and release the applicable Special Work Permit.

3. PROTECTIVE GROUND LEADS: See WAPA Construction Standards, Standard 1 “General

Requirements”, Section 1.4.14.3(1).

4. MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized as defined below and shall meet the requirements of Standard 1 – General Requirements, Section 1.4 “Safety and Health” and the following:

a. The maximum available fault current in the 230-kV area is 4,845-amps and the X/R ratio is

9.5 prior to and after completing construction.

b. A minimum of one (1) 1/0 AWG grounds shall be used in the 230-kV area.

E. CONSTRUCTION SCHEDULE:

1. SUBMITTAL TIME: Prepare and Submit a Construction Schedule to the Contracting Officer (CO) within 30-calendar days after date of Notice to Proceed.

F. RIGHTS-OF-WAY:

1. GENERAL: Orient construction methods and equipment to utilize Government-furnished rights-of-way or obtain additional temporary access without additional cost to WAPA. Any additional temporary access acquired by the Contractor shall have prior COR approval. During the contract period, WAPA reserves the right to use Contractor-obtained access.

G. GEOLOGIC INVESTIGATIONS:

The 8000-series geologic logs of subsurface explorations included in the “Drawings” Division constitute the information and records of geologic investigations for the work. Locations of subsurface investigations are shown on the Drawings.

Samples and cores of recovered material were not retained. Bidders shall obtain their own samples and perform tests on the material to evaluate properties, which they believe to be significant. WAPA does not guarantee that the geologic information and records show the conditions that will be encountered in performing the work, but only that the geologic information and records show conditions encountered at the particular point and time the information and records were obtained.

The geologic information may not indicate variations, such as those caused by seasonal fluctuations in rainfall and other factors, which may affect the water level. The Contractor shall determine the nature of material to be excavated, the difficulties of making and maintaining required excavations, and doing other work affected by geology and ground water elevations at the worksite.

Geologic information has not been obtained for this project, and none is known to exist. The Contractor shall determine the nature of the material to be excavated, the difficulties of making and maintaining required excavations and doing other work affected by geology and ground water elevations at the worksite.

H. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:

Make arrangements and provide all electric power for construction purposes.

I. WATER FOR CONSTRUCTION PURPOSES:

Furnish water for construction purposes. Make arrangements for obtaining the water and provide for conveying the water to the points of use.

J. EXPLOSIVES AND BLASTING:

Explosives shall not be used.

K. BURIED UTILITIES:

Prior to excavation, examine the area and determine the location of buried utilities. Utilities shall be identified with a marker denoting the type of service.

L. EMPLOYEE REQUIREMENTS:

In addition to the requirements listed in WAPA Construction Standard 1.4.3 all employees are restricted from wearing a headset, headphone, or other listening device, other than a hearing aid or instrument for the improvement of defective human hearing, hearing protection worn as the hazard exists, or for communication purposes while on a WAPA jobsite.

M. ELECTRICAL MINIMUM APPROACH DISTANCES:

In addition to the requirements listed in WAPA Construction Standard 1.4.9 equipment other than cranes and derricks, conductive objects, or personnel, shall not be brought closer to energized facilities than the electrical minimum approach distances established by OSHA 1926.958(b), “Materials, Handling, and Storage”. The less stringent equipment clearance distances established by OSHA 1926.960, “Working On or Near Exposed Energized Parts”, Table V-5 and Table V-6, may only be used after the Contractor has completed and submitted WAPA’s Electrical Clearance Variance form and has received the signed form in return from the COR.

N. SUBMITTALS AND CORRESPONDENCE:

1. GENERAL: The Contractor shall furnish submittals via email as specified in the Construction Standards and this Project Specification to the email address listed under the Transmittal section below and with the following requirements:

a. Submittals shall be in standard PDF, Microsoft Word (.doc/.docx), Microsoft Excel

(.xls/.xlsx), Electronic CAD (.dwg) (AutoCAD 2013 or earlier formats. All submittals in .dwg format shall also be submitted in .pdf format.

b. All submittals shall include the WAPA Contract number (895032-21C-WA0000XX), WAPA project title, Bidding Schedule Contract Line Item Number (CLIN) and applicable division number.

c. Multiple CLIN’s on a single submittal are not permitted.

d. A cover transmittal letter in Microsoft Word or PDF format shall be included with each email submittal.

2. TRANSMITTAL: The Contractor shall submit all correspondence (Request for Information, Submittals, etc.) to the following email addresses care of the COR.

Rocky Mountain Region

ATTN: J5600

Email: RMR-J5600-CS@wapa.gov

3. SUBMITTAL RESPONSE: WAPA will provide a response to all submittals in accordance with

Division 1.D.2 of these specifications with an “Acceptable for Use” or “Not Acceptable” status, with comments as appropriate to the email address where the submittals originated.

4. PHYSICAL SAMPLE SUBMITTALS: When physical specimens or digital media are required to be submitted for approval, (i.e., brick samples, roofing material samples, carpeting, CDs, DVDs, etc.) the Contractor shall provide a Submittal-digital cover letter outlining the physical sample submittal prior to sending the sample (including tracking data when applicable), and shall deliver such physical specimens to:

Western Area Power Administration

ATTN: A7900

12155 W. Alameda Parkway Lakewood, CO 80228-2802

5. PROJECT PROTOCOL:

a. Electronic Correspondence:

EMAIL SUBMITTAL FORMAT:

Subject Line in Email

Submittal number, Subject, CLIN, Project Name/Number Example: Submittal 017, Steel Compression Dead Heads-CLIN 0010, Spence Substation

Stage No 02, 895032-21C-WA0000XX

b. Payment Requests:

EMAIL PAYMENT REQUEST FORMAT:

Invoice number and Project Name/Number and Contract Number Example: Invoice 01, Spence Substation Stage 02, 895032-21C-WA0000XX

c. Certified Payrolls-Prime and Subcontractors:

EMAIL CERTIFIED PAYROLL FORMAT:

Certified Payroll (CP), Week ending (WE), and Project Name/Number, Contract Number Example: CP, WE 05/08/21 & 05/15/21, Spence Substation Stage 02, 895032-21C-

WA0000XX

d. Request for Information:

EMAIL (REQUEST FOR INFORMATION) FORMAT:

Request for Information (RFI), Project Name/Number, Contract Number Example: RFI-003, Labeling Info, Spence Substation Stage 02, 895032-21C-WA0000XX

DIVISION 2 – SITEWORK

A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule item “Miscellaneous sitework” includes the following:

a. Repair and Replacement of gravel surfacing where disturbed.

2. Bidding Schedule item “Demolition” includes the following:

a. Completely removing and disposing of six SS3 foundations and eight CB3 foundations as shown on Existing Installation Drawing SCE 2005D(EI) and on Photo No.5. The outline and reinforcement information for the SS3 foundations is shown on the Existing Installation structural Drawing SCE 2010C(EI). Outline and reinforcement drawings are not available for the CB3 foundations. A total of 12 cy shall be demolished and removed. No other information or drawings about these foundations is available.

b. Completely removing and disposing of the Cable Trench, Cover and Foundation as shown in Photo No. 1 and Photo No. 4. The Existing foundation “SSE1” is shown on Existing Installation Drawing: 2012B (EI). Existing cable trench is shown on Section A-A of Existing Installation Drawing SCE 2013B (EI). A total of 2 cy shall be demolished and removed. No other information or drawings about this foundation is available.

c. Completely removing and disposing of the Generator Building, everything inside the building, and Foundations as shown in Photo No. 2 and Photo No. 4. The Generator Building is fiberglass and has approximate dimensions of 8-feet wide by 16-feet long by 9-feet tall. The Existing foundation is shown on Existing Installation Drawing SCE 2006B (EI).

For bidding purposes: A total of 20 cy shall be demolished and removed. No other information or drawings about this foundation is available.

d. Completely removing and disposing of the, Propane Tank and Foundations as shown in

Photo No. 3 and Photo No. 4. This propane tank is 37.5-inches diameter and holds 499 gallons. The Existing foundation is shown on Existing Installation Drawing SCE 2006B (EI). For bidding purposes: A total of 6 cy shall be demolished and removed. No other information or drawings about this foundation is available.

Photo No. 1: Cable Trench, Cover and Foundation to Be Removed.

Photo No. 2: Generator Building and Foundation to Be Removed.

Photo No. 3: Propane Tank and Foundation to Be Removed.

Photo No. 4: Area Photo.

Photo No. 5: Indicates Some of the Foundation to Be Removed (Circled in Red).

e. Completely removing and disposing of the foundations which are circled in red in Photo No.

5 (above). This photo does not show all the foundations to be removed. See Existing Installation Drawing SCE 2005D(EI) for all the foundations to be removed. Some of the foundations to be removed on the foundation plan have already been partially removed and covered up. Contractor is responsible for removing all these partially demolished, and buried foundations shown on Existing Installation Drawing SCE 2005D(EI) even though some are not visible from the surface. Quantities for removal are included in the bidding schedule, but no drawings exist for them.

f. The Contractor shall include any credit to the Government for salvage of the equipment and/or materials in this bidding schedule item.

3. Bidding Schedule does not contain separate items for the following. Include these items in applicable Bidding Schedule items.

a. Excavations for foundations, structures and trenches.

b. Placing and compacting earth material and backfill.

c. Providing gravel fill under concrete foundations as shown on the Drawings.

d. Disposing of Excavated Material: Material from excavations not suitable or required for earthwork shall be removed from the substation and access road right-of-way. The Contractor shall make arrangements required for disposal of waste material in an approved landfill.

e. Expansion anchors and adhesive anchors.

DIVISION 3 – CONCRETE

A. GENERAL:

1. MATERIAL:

a. Cement: Type IIA cement Types are according to ASTM C 150.

b. Compressive Strength: 4500-psi minimum at 28-days.

c. Water-Cement Ratio: Net water-cement ratio, exclusive of water absorbed by the aggregates, shall not exceed 0.45 by weight.

d. Type A and D water-reducing and retarding admixtures may be used if approved by the

COR.

e. Class F fly ash is required to neutralize severe alkali or ASR reaction in accordance with ASTM C 311 (regarding test data), ASTM C 618 (regarding material) and Standard 3 – Concrete (regarding WAPA-specific requirements). Proposed concrete mix designs shall incorporate fly ash up to a maximum of 20-percent; minimum 28-day compressive strength shall be maintained in mix design.

2. TEST FOR POTENTIAL REACTIVITY OF SAND AND COARSE AGGREGATE: Perform test for each source used. Perform tests for potential reactivity for the sand and coarse aggregate to be used by the Contractor. If the tests determine the aggregate(s) to be unsuitable as a concrete aggregate, a suitable source will be obtained by the Contractor.

3. REBAR DEVELOPMENT (LD) AND LAP LENGTH:

a. Class B lap splices apply unless noted otherwise; refer to Table 3 on Standard Drawing

01 2004-1 General Outline and Reinforcement Notes.

b. Typical closed circular tie lap splice lengths for drilled piers and columns, 4,000 – 4,500-psi normal weight concrete, unless noted otherwise, are 18-inches for No. 3 ties, 24-inches for No. 4 ties and 30-inches for No. 5 ties.

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule item “Concrete foundations” includes the following:

a. Earthwork, formwork, reinforcement, material used in concrete, galvanized anchor bolts, curing, finishing, joints and other related work and material needed to complete the concrete construction.

b. Concrete foundations for electrical equipment. This also includes the aluminum checker plate lids, and epoxy anchors for attaching equipment for the foundation designation 2STA1 Station Service Foundation on drawing sce 2032.

c. Casing auger excavations, if required.

d. Trial augering, if required.

e. Measurement for quantities for concrete foundations will be made on the basis of concrete quantities shown on Drawing SCE 2003.

2. Bidding Schedule items “Cable trenches” includes providing precast concrete cable trench, complete with sand fill, aluminum checker plate lids and other accessories, as shown on Drawing SCE 2500, as equal to Trenwa.

DIVISION 9 – SUBSTATION ELECTRICAL

A. GENERAL:

Electrical equipment and material shall be as specified in WAPA’s “WAPA ES” standard equipment specifications, as shown on project drawings and in accordance with NEMA, ANSI, IEEE, ICEA, ASTM, NEC, NESC, UL and Federal specifications and standards as applicable. Applicable requirements shall be met under the following service conditions:

Ambient Temperatures:

Maximum ......................................................................................... +40°C Maximum 24-Hour Average ............................................................. +30°C Minimum .......................................................................................... -50°C

Elevation:

Above Mean Sea Level ................................................................... 6,150-Feet

*ASCE-7 Wind Load:

Minimum Basic Wind Speed ............................................................ 90-MPH Importance Factor............................................................................ 1.15

*IEEE 693 Seismic Qualification:

Performance Level........................................................................... Low

*May include support structure in accordance with STANDARD 9.1.1.2. Wind and seismic loads are non-simultaneous.

1. Bidding Schedule for Government-furnished items including associated supporting structures when furnished require the Contractor to provide:

a. Unless otherwise indicated, unloading and inspecting Government-furnished items.

b. Installing Government-furnished items as shown on drawings.

c. Furnishing equipment and material not furnished by WAPA.

2. Bidding Schedule for items not furnished by the Government shall be furnished by the

Contractor and shall include the following:

a. Providing (furnishing and installing) bidding schedule items.

b. Furnishing equipment and material not furnished by WAPA.

c. Installing bidding schedule items as shown on drawings.

3. Unless otherwise specified, associated support structures provided for each electrical equipment rated above 7-kV shall be 102-inches in height and hot-dip galvanized, if made of steel.

Instrument transformers that are seismically qualified shall be 96-inches in height. If tubular steel supports are furnished, they shall be galvanized internally and externally.

4. Installation and painting of electrical equipment and material shall be provided in accordance with

Standards 9 and 12 respectively.

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule item “Grounding system” includes furnishing and installing the following substation installation as shown on the Drawings:

a. Grounding System: Complete the substation grounding system as shown on the

Drawings. Ground wire risers shall be brought to foundations as shown on the Drawings and 6-feet of cable shall be left above finished grade for future connection to electrical equipment and steel structures by WAPA personnel. Ground cable risers shall be 7 conductor No. 4 copper-clad steel cable. Unless otherwise specified on the Drawings, splices, crosses, tees and other fittings used on the grounding system may be compression type (DMC Power Swage system or equal).

2. Bidding Schedule item “Existing outdoor electrical equipment and material” includes removing and disposing of existing outdoor electrical equipment and material.

a. Material to be removed and disposed:

(1) One (1) 230-kV power circuit breaker designated JV1B.

(2) One (1) 230-kV disconnecting switch designated YV1A.

(3) One (1) station service distribution panel designated DW1A.

b. The Contractor shall include any credit to the Government for salvage of the equipment and/or materials in this bidding schedule item.

DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION

A. DESCRIPTION OF BID ITEMS:

1. Bidding Schedule does not contain a separate item for “Environmental Quality Protection”. The cost of compliance with requirements of Division 13 shall be included in the applicable bidding schedule items. The Contractor shall review the latest version of WAPA’s Construction Standard 13 –Environmental Quality Protection and comply with all requirements.

B. SPECIAL REQUIREMENTS: None

Message from the Administrator

At Western Area Power Administration (WAPA), we show our commitment to safety every day through the actions we take, the training we offer and the work conditions we provide. We expect the same commitment to safety from each of our contractors who provide products or services to WAPA. In performing work for WAPA, all contractors must make the right decisions to ensure that the work environment is as safe as possible.

Our safety program is based on four points:

Safety procedures or common sense must be applied by each Federal and contract employee. Safety should not be set aside to meet a project schedule or for personal convenience.

Employees and contractors must believe that they have the right and the responsibility to identify and take action to reduce, if not eliminate, hazardous work environments and hazardous work practices.

Managers and supervisors must lead by example and execute their responsibility to ensure each job is accomplished in a safe and healthy way.

Safety is a personal responsibility. Each individual makes the decision on what action to take to accomplish a task.

By integrating these principles into every task we take, together we can ensure WAPA is a safe place to work.

Mark A. Gabriel Administrator and CEO

DIVISION 1 – GENERAL REQUIREMENTS
A. CONTRACT REQUIREMENT:
B. DESCRIPTION OF WORK:
1. THE PRINCIPAL COMPONENTS OF WORK include the following:
C. DESCRIPTION OF BIDDING SCHEDULE ITEM:
1. Bidding Schedule item “Mobilization and preparatory work” includes the following:
D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: See FAR 52.211-10 in Section F of the solicitation/contract.
1. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, WAPA will require 21-calendar days for review of drawings or data submitted for approval.
2. CONSTRUCTION SCHEDULE AND OUTAGE RESTRICTIONS: In addition to the restrictions listed in Construction Standard 1, the following outage restrictions shall apply: The following Construction Schedule restrictions shall apply:
3. PROTECTIVE GROUND LEADS: See WAPA Construction Standards, Standard 1 “General Requirements”, Section 1.4.14.3(1).
4. MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized as defined below and shall meet the requirements of Standard 1 – General Requirements, Section 1.4 “Safety and Health” and the f...
E. CONSTRUCTION SCHEDULE:
1. SUBMITTAL TIME: Prepare and Submit a Construction Schedule to the Contracting Officer (CO) within 30-calendar days after date of Notice to Proceed.
F. RIGHTS-OF-WAY:
1. GENERAL: Orient construction methods and equipment to utilize Government-furnished rights-of-way or obtain additional temporary access without additional cost to WAPA. Any additional temporary access acquired by the Contractor shall have prior CO...
G. GEOLOGIC INVESTIGATIONS:
H. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:
I. WATER FOR CONSTRUCTION PURPOSES:
J. EXPLOSIVES AND BLASTING:
K. BURIED UTILITIES:
L. EMPLOYEE REQUIREMENTS:
M. ELECTRICAL MINIMUM APPROACH DISTANCES:
N. SUBMITTALS AND CORRESPONDENCE:
1. GENERAL: The Contractor shall furnish submittals via email as specified in the Construction Standards and this Project Specification to the email address listed under the Transmittal section below and with the following requirements:
2. TRANSMITTAL: The Contractor shall submit all correspondence (Request for Information, Submittals, etc.) to the following email addresses care of the COR.
3. SUBMITTAL RESPONSE: WAPA will provide a response to all submittals in accordance with Division 1.D.2 of these specifications with an “Acceptable for Use” or “Not Acceptable” status, with comments as appropriate to the email address where the submi...
4. PHYSICAL SAMPLE SUBMITTALS: When physical specimens or digital media are required to be submitted for approval, (i.e., brick samples, roofing material samples, carpeting, CDs, DVDs, etc.) the Contractor shall provide a Submittal-digital cover lett...
5. PROJECT PROTOCOL:
DIVISION 2 – SITEWORK
A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule item “Miscellaneous sitework” includes the following:
2. Bidding Schedule item “Demolition” includes the following:
3. Bidding Schedule does not contain separate items for the following. Include these items in applicable Bidding Schedule items.
DIVISION 3 – CONCRETE
A. GENERAL:
1. MATERIAL:
2. TEST FOR POTENTIAL REACTIVITY OF SAND AND COARSE AGGREGATE: Perform test for each source used. Perform tests for potential reactivity for the sand and coarse aggregate to be used by the Contractor. If the tests determine the aggregate(s) to be u...
3. REBAR DEVELOPMENT (LD) AND LAP LENGTH:
B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule item “Concrete foundations” includes the following:
2. Bidding Schedule items “Cable trenches” includes providing precast concrete cable trench, complete with sand fill, aluminum checker plate lids and other accessories, as shown on Drawing SCE 2500, as equal to Trenwa.
DIVISION 9 – SUBSTATION ELECTRICAL
A. GENERAL:
1. Bidding Schedule for Government-furnished items including associated supporting structures when furnished require the Contractor to provide:
2. Bidding Schedule for items not furnished by the Government shall be furnished by the Contractor and shall include the following:
3. Unless otherwise specified, associated support structures provided for each electrical equipment rated above 7-kV shall be 102-inches in height and hot-dip galvanized, if made of steel. Instrument transformers that are seismically qualified shall ...
4. Installation and painting of electrical equipment and material shall be provided in accordance with Standards 9 and 12 respectively.
B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule item “Grounding system” includes furnishing and installing the following substation installation as shown on the Drawings:
2. Bidding Schedule item “Existing outdoor electrical equipment and material” includes removing and disposing of existing outdoor electrical equipment and material.
DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION
A. DESCRIPTION OF BID ITEMS:
1. Bidding Schedule does not contain a separate item for “Environmental Quality Protection”. The cost of compliance with requirements of Division 13 shall be included in the applicable bidding schedule items. The Contractor shall review the latest v...

B. SPECIAL REQUIREMENTS: None