Attachment B – Project Drawings

ARCHER SUBSTATION BREAKER

1862 AND 1962 REPLACEMENT

DATED 05/14/2020

895032-20B-WA000030

PROJECT DRAWINGS

ARCHER SUBSTATION

BREAKER 1862 AND 1962 REPLACEMENT

STATE

SECTION C

DESCRIPTION/SPECIFICATIONS

Spec. No. 978

WYOMING

BREAKER 1862 AND 1962 REPLACEMENT

GENERAL:

CONSTRUCTION DRAWINGS: Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.

PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale.

Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.

STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from construction or project drawings or text, the details of construction or project drawings or text shall govern. A complete set of standard drawings are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx.

INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed.

EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.

REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.

CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise Western of any errors or omissions.

A. LIST OF DRAWINGS:

LOCATION MAPS:

1. ARH 0015 Rev. D – Location and Vicinity Map

ELECTRICAL:

2. ARH 0001-1 Rev. A EI – Switching Diagram (Sheet 1 of 2) (Existing Installation)

3. ARH 0001-1 Rev. B – Switching Diagram (Sheet 1 of 2)

4. ARH 0001-2 Rev. A EI – Switching Diagram Tables (Sheet 2 of 2) (Existing Installation)

5. ARH 0001-2 Rev. B – Switching Diagram Tables (Sheet 2 of 2)

6. ARH 1000 Rev. L EI – General Arrangement Plan (Existing Installation)

7. ARH 1000 Rev. M – General Arrangement Plan

8. ARH 1017 Rev. H EI – Transformer KV1A Area Plan (Existing Installation)

9. ARH 1017 Rev. I – Transformer KV1A Area Plan

10. ARH 1019 Rev. I EI – Transformer KV1A Area Sections (Existing Installation)

11. ARH 1019 Rev. J – Transformer KV1A Area Sections

12. ARH 1025 Rev. D EI – 115KV Bays Y3, Y4 & Y9 Plan (Existing Installation)

13. ARH 1025 Rev. E – 115KV Bays Y3, Y4 & Y9 Plan

14. ARH 1102 Rev. G – Equipment and Material Index

15. ARH 1112 Rev. B EI – 115KV Bay Y3 Section A-A (Existing Installation)

16. ARH 1112 Rev. C – 115KV Bay Y3 Section A-A

17. ARH 1113 Rev. B EI – 115KV Bay Y4 Section B-B (Existing Installation)

18. ARH 1113 Rev. C – 115KV Bay Y4 Section B-B

19. ARH 1511 Rev. C EI – 115KV Bays Y3, Y4 & Y9 Grounding Plan (Existing Installation)

20. ARH 1511 Rev. D – 115KV Bays Y3, Y4 & Y9 Grounding Plan

21. ARH 1516 Rev. B FIO – Transformer KV1A Area Grounding Plan (For Information Only)

22. ARH 1611 Rev. G EI – Station Service Panel DW3A 115KV Yard Wiring Diagram (Existing Installation)

23. ARH 1611 Rev. H – Station Service Panel DW3A 115KV Yard Wiring Diagram

24. ARH 1700 FIO – Conduit Plan (For Information Only)

25. ARH 1711 EI – 115KV Bays Y3, Y4 & Y9 Conduit and Buried Cable Plan (Existing Installation)

26. ARH 1711 Rev. A – 115KV Bays Y3, Y4 & Y9 Conduit and Buried Cable Plan

27. ARH 1716 Rev. C FIO – Transformer KV1A Area Conduit and Buried Cable Plan (For Information Only)

28. ARH 7200 Rev. D FIO – Communication Site Plan and Layout (For Information Only)

CIVIL & SITE DRAWINGS:

29. ARH 2000 Rev. B FIO – Grading and Plot Plan (For Information Only)

FOUNDATION AND STRUCTURAL DRAWING INDEX:

30. ARH 2072-1 Rev. E – Foundation/Structural Data and Drawings Index (Sheet 1 of 2)

CONCRETE:

31. ARH 2001 Rev. J EI – Foundation General Plan (Existing Installation)

32. ARH 2001 Rev. K – Foundation General Plan

33. ARH 2002-1 Rev. B FIO – Foundation Plan Transformer/Reactor Area (Sheet 1 of 3) (For Information Only)

34. ARH 2003-1 EI – Foundation Plan 115kV Area (Sheet 1 of 2) (Existing Installation)

35. ARH 2003-1 Rev. A – Foundation Plan 115kV Area (Sheet 1 of 2)

36. ARH 2026 Rev. E – Foundations Outline & Reinforcement

37. ARH 2303 Rev. C – Foundations Outline & Reinforcement https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx

BREAKER 1862 AND 1962 REPLACEMENT

38. ARH 2550 Rev. C – Anchor Bolts

STEEL STRUCTURES:

39. ARH 2047 Rev. C – Steel Structures 15kV Fuse & Bus Support

40. ARH 2926 Rev. B – Equipment Cabinet Platforms Steel Design and Details

41. ARH 2927 – Switch Operating Platforms Steel Design and Details

CONTROLS:

42. ARH 4000-1 Rev. D FIO – Service Building Layout and Grounding (Sheet 1 of 2) (For Information Only)

43. ARH T600 – Control Cable List

GEOLOGY:

44. ARH 8000 Rev. A FIO – Logs of Exploration (For Information Only)

S

U

I T

A

B

L

E

F

O

R

C

N

S

T

R

U

C

T

I

N

A

M a y p m

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I a

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

FOR INFORMATION ONLY

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p m

S

U

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p m

S

U

I T

A

B

N

S

T

R

U

C

T

I p

DESIGNED

A

C

APPROVED

UNITED STATES DEPARTMENT OF ENERGY

WESTERN AREA POWER ADMINISTRATION

CIVIL ENGINEERING MANAGER

CORPORATE SERVICES OFFICE - LAKEWOOD, COLORADO

ARCHER SUBSTATION

WYOMING

ANCHOR BOLTS

MARK WASINGER DOUG HANSON

MAY 29, 2013 ARH 2550L:\\02-Pr ojects In

Progress \\02-Draf ting Proje cts\\LV_R ader\\190

6ARH-SR

AH\\arh_ 2550c.dw g Last Sa ved By: R ader, Sus an (CON

TR) on 6 /18/2019

2:59 PM

{\C1;ANCHOR BOLT \H0.625x;\C7;TYPE I}

{\C0;ASTM F 1554 GRADE 36}

\C0;HEAVY HEX NUT (TYP)

\C0;STANDARD WASHER

{\C0;HEAVY HEX HEAD}

\A1;THREAD LENGTH

Do OF

THREADS

ANCHOR BOLTS TYPE I

{\C2;MARK NO.} {\C256;DIA

(D)} {\C256;LENGTH (L)} {\C256;THREAD (T)}

2550-A \A1;1 3/4" 4'-5" 10"

2550-C 3'-1" 7"

2550-D 1" 2'-2" 5"

{\C1;ANCHOR BOLT \H0.625x;\C7;TYPE II}

{\C0;ASTM F 1554 GRADE 36}

\C0;HEAVY HEX NUT (TYP)

\C0;STANDARD WASHER

{\C0;HEAVY HEX HEAD}

\A1;THREAD LENGTH

Do OF

THREADS

ANCHOR BOLTS TYPE II

{\C2;MARK NO.} {\C256;DIA

(D)} {\C256;LENGTH (L)} {\C256;THREAD (T)}

2550-B \A1;1 1/8" 18"4"

C 6-6-19

J5-AH AS-BUILT.B 8-8-16

A7-CD ADDED ANCHOR BOLT TYPE I 2550-D.A 12-3-15

A7-CD

REVISED FOR KV2A XFMR REPLACEMENT

I T

A

B

N

S

T

R

U

C

T

I p

\A1;1 3/16"\

1;

/1 6"

(6) 3/8"o HOLES @ 1", NS & FS FOR 5/16"o BOLT{\Fsp90;MK PL1}\A1;1"\A1;1"3/16

DETAIL B

{\C1;GROUNDING CONNECTION 1}

{\C1;GROUNDING CONNECTION 2}

3/16

DETAIL A

\A ;2

\A1;2 '-0"

\A 1;

4' -0

A

A

1/2"

GAP

\A1;3'-0" \A1;3'-0" \A1;6'-0"

1/2"

GAP

\A1 ;9"

MK PL1\A

;9

\A

1;

1'

-6

" MK C3

\A ;9

MK PL1

MK T2 1

MK C2

MK PL2

MK PL3

SIM DETAIL A

TYP MK B4

MK B5

MK T3

MK T3

DETAIL B

MK T2

SECTION C-C

SECTION C-C SIM

\A 1;

4' -0

\A1;4'-0" \A1;8'-0"

\A1;4'-0"\A1;1'-0 3/16"\A ;2

\A 1;

2' -0

MK B5 MK B5

MK C3

\A1;c EQUIPMENT CABINET

GROUNDING CONNECTION 2MK B

MK B

4 MK B2

MK B3MK B

MK B6\A1;7'-11 1/2"

MK C2

MK A

1MK T2

MK PL1

MK C2

MK T2MK C3

MK PL1

MK B2

TYP

TYP

MK B3

MK B6MK T3MK T3

\A1;2" \A

1;

5'

-0

\A1;3'-0" \A1;6'-0"

\A1;3'-0"

\A1;1'-0 3/16"\A ;2

\A 1;

2' -6

MK B5 MK B5

MK C5

\A1;c EQUIPMENT CABINET

MK B10MK B

7 MK B8

MK B10MK B7

MK B9\A1;5'-11 1/2"

MK C4 MK PL1\A

;9

\A

1;

1'

-6

" MK C5

\A ;9

MK PL1

MK T2 1

MK C4

MK PL2

MK PL3

SIM DETAIL A

TYP MK B7

MK B5

MK T3

MK T3

DETAIL B

MK T2

SECTION E-E

SECTION E-E SIM

MK A2

MK T2

MK PL1

MK C4

MK T2MK C5

MK PL1

MK B8

TYP

TYP

MK B10

MK B9MK T3MK T3

GROUNDING CONNECTION 2

BILL OF MATERIAL

EQUIPMENT CABINET PLATFORM - TYPE IIA

MARK NO. DESCRIPTION LENGTH NO. REQUIRED

FR2 FRAME

T2 HSS 2 1/2x2 1/2x3/16 1'-4 1/8" 4

T3 HSS 2x2x1/4 0'-7" 4

A1 L 2x2x1/4 7'-11" 4

B2 L 2 1/2x2x1/4 3'-11" 1

B3 L 3x3x1/4 8'-0" 2

B4 L 2 1/2x2x1/4 4'-0" 2

B5 L 2 1/2x2x1/4 1'-0 3/16" 2

B6 L 2 1/2x2x1/4 7'-11 1/2" 2

PL1 PL 6x6x1/4 4

PL2 PL 2x12x1/4 4

PL3 PL 2x14x1/4 2

C2 SERRATED GRATING 1 1/2"x3/16" BARS, 1 3/16" C TO C, 2'-0" WIDE 8'-0" 2

C3 SERRATED GRATING 1 1/2"x3/16" BARS, 1 3/16" C TO C, 12 3/16" WIDE 7'-11 1/2" 1

SELF-TAPPING CLIPS FOR GRATING 25

\A1;5/16"ox3 1/2" BOLT 4

APPROXIMATE TOTAL WEIGHT ONE PLATFORM - 869

BILL OF MATERIAL

EQUIPMENT CABINET PLATFORM - TYPE I

MARK NO. DESCRIPTION LENGTH NO. REQUIRED

FR1 FRAME

T1 HSS 2 1/2x2 1/2x3/16 0'-7 1/8" 4

T3 HSS 2x2x1/4 0'-7" 4

B1 L 2x2x1/4 4'-0" 2

PL1 PL 6x6x1/4 4

PL4 \A1;PL 2x2 5/8x3/16 1

C1 SERRATED GRATING 1 1/2"x3/16" BARS, 1 3/16" C TO C, 2'-0" WIDE 5'-11" 2

SELF-TAPPING CLIPS FOR GRATING 10

\A1;5/16"ox3 1/2" BOLT 4

APPROXIMATE TOTAL WEIGHT ONE PLATFORM - 325

WESTERN AREA POWER ADMINISTRATION

UNITED STATES DEPARTMENT OF ENERGY

APPROVED

E A

C

DESIGNED

HEADQUARTERS - LAKEWOOD, COLORADO

ARCHER SUBSTATION

EQUIPMENT CABINET PLATFORMS

STEEL DESIGN AND DETAILS

COURTNEY DEFOOR DOUG HANSON

DECEMBER 3, 2015 ARH 2926

CIVIL ENGINEERING MANAGER

L:\\02-Pr ojects In

Progress \\02-Draf ting Proje cts\\LV_R ader\\190

6ARH-SR

AH\\arh_ 2926b.dw g Last Sa ved By: R ader, Sus an (CON

TR) on 6 /19/2019

8:18 AM

BILL OF MATERIAL

EQUIPMENT CABINET PLATFORM - TYPE IIB

MARK NO. DESCRIPTION LENGTH NO. REQUIRED

FR3 FRAME

T2 HSS 2 1/2x2 1/2x3/16 1'-4 1/8" 4

T3 HSS 2x2x1/4 0'-7" 4

A2 L 2x2x1/4 6'-1 1/2" 4

B5 L 2 1/2x2x1/4 1'-0 3/16" 2

B7 L 2 1/2x2x1/4 5'-0" 2

B8 L 2 1/2x2x1/4 4'-11" 1

B9 L 2 1/2x2x1/4 5'-11 1/2" 2

B10 L 3x3x1/4 6'-0" 2

PL1 PL 6x6x1/4 4

PL2 PL 2x12x1/4 4

PL3 PL 2x14x1/4 2

C4 SERRATED GRATING 1 1/2"x3/16" BARS, 1 3/16" C TO C, 2'-6" WIDE 6'-0" 2

C5 SERRATED GRATING 1 1/2"x3/16" BARS, 1 3/16" C TO C, 12 3/16" WIDE 5'-11 1/2" 1

SELF-TAPPING CLIPS FOR GRATING 25

\A1;5/16"ox3 1/2" BOLT 4

APPROXIMATE TOTAL WEIGHT ONE PLATFORM - 758

A 2-23-18

A7-CD

REVISED FOR 2017 CIRCUIT BREAKER AND

DISCONNECT SWITCH REPLACEMENT.

B 6-6-19

J5-AH

AS-BUILT.

I T

A

B

N

S

T

R

U

C

T

I a

I T

A

B

N

S

T

R

U

C

T

I p

I T

A

B

N

S

T

R

U

C

T

I p

FOR INFORMATION ONLY

AULT 08_Drawings_FINAL_REV01.pdf
Cover Page
Drawing List
au_0015c
au_0001_1c_ei
au_0001_1d
au_0001_2d_ei
au_0001_2e
au_1000o_ei
au_1000p
au_1006d_ei
au_1006e
au_1007f_ei
au_1007g
au_1009c_ei
au_1009d
au_1011i_ei
au_1011k
au_1012i_ei
au_1012j
au_1017j_ei
au_1017k
au_1018l_ei
au_1018m
au_1019i_ei
au_1019j
au_1026d_ei
au_1026e
au_1031g_ei
au_1031h
au_1032h_ei
au_1032i
au_1038c_ei
au_1038d
au_1040f_ei
au_1040g
au_1042d_ei
au_1042e
au_1048e_ei
au_1048f
au_1057e_ei
au_1057f
au_1100l
au_1109a
au_1110d_ei
au_1110e
au_1111b_ei
au_1111c
au_1113e_ei
au_1113f
au_1116e_ei
au_1116f
au_1122c_ei
au_1122d
au_1023f_ei
au_1501
au_1511f_ei
au_1511g
au_1515g_ei
au_1515h
au_1024i_ei
au_1517b
au_1025h_ei
au_1518
au_1047h_ei
au_1520
au_1610c_ei
au_1610d
au_1611b_ei
au_1611c
au_1612a_ei
au_1612b
au_1620a_ei
au_1620b
au_1621a_ei
au_1621b
au_1711
au_1715
au_1717
au_1718
au_1720
au_2002_1b_ei
au_2002_2c_ei
au_2002_3h_ei
au_2002_4b
au_2003p_ei
au_2003q
au_2004h_ei
au_2005m_ei
au_2005_1
au_2005_2
au_2005_3
au_2005_4
au_2006l_ei
au_2006_4
au_2007c
au_2008l
au_2009f
au_2010b
au_2011c
au_2013e
au_2014d
au_2015d
au_2017e
au_2042b
au_2079b
au_2307a
au_2313
au_2314
au_2315
au_2316
au_2317
au_2115f
au_2112_1b
au_2112_3
au_2021c
au_2033c_fio
au_2043a_fio
au_2044a_fio
au_2046a_fio
au_2623a
au_2625a
au_2626
au_2032b
au_2054b
au_2628b
au_2630
au_2631
au_2632
au_2633
au_2634
au_2635
au_2636
au_2637
au_2926
au_2928
au_4000m_ei
au_4000n
au_t610
au_8000
au_8001
au_8002
au_8003
au_8004
au_8005
au_8006
au_8007
au_8008
au_8009
au_8010
au_8011
au_8012
au_t100
au_t101
au_t102
au_t103
ProjectDrawings.pdf
A. GENERAL:
05. AULT 08_Drawings_FINAL_REV02.pdf
Cover Page
Drawing List
au_0015c
au_0001_1c_ei
au_0001_1d
au_0001_2d_ei
au_0001_2e
au_1000o_ei
au_1000p
au_1006d_ei
au_1006e
au_1007f_ei
au_1007g
au_1009c_ei
au_1009d
au_1011i_ei
au_1011k
au_1012i_ei
au_1012j
au_1017j_ei
au_1017k
au_1018l_ei
au_1018m
au_1019i_ei
au_1019j
au_1026d_ei
au_1026e
au_1031g_ei
au_1031h
au_1032h_ei
au_1032i
au_1038c_ei
au_1038d
au_1040f_ei
au_1040g
au_1042d_ei
au_1042e
au_1048e_ei
au_1048f
au_1057e_ei
au_1057f
au_1100l
au_1109a
au_1110d_ei
au_1110e
au_1111b_ei
au_1111c
au_1113e_ei
au_1113f
au_1116e_ei
au_1116f
au_1122c_ei
au_1122d
au_1023f_ei
au_1501
au_1511f_ei
au_1511g
au_1515g_ei
au_1515h
au_1024i_ei
au_1517b
au_1025h_ei
au_1518
au_1047h_ei
au_1520
au_1610c_ei
au_1610d
au_1611b_ei
au_1611c
au_1612a_ei
au_1612b
au_1620a_ei
au_1620b
au_1621a_ei
au_1621b
au_1711
au_1715
au_1717
au_1718
au_1720
au_2002_1b_ei
au_2002_2c_ei
au_2002_3h_ei
au_2002_4b
au_2003p_ei
au_2003q
au_2004h_ei
au_2005m_ei
au_2005_1
au_2005_2
au_2005_3
au_2005_4
au_2006l_ei
au_2006_4
au_2007c
au_2008l
au_2009f
au_2010b
au_2011c
au_2013e
au_2014d
au_2015d
au_2017e
au_2042b
au_2079b
au_2307a
au_2313
au_2314
au_2315
au_2316
au_2317
au_2115f
au_2112_1b
au_2112_3
au_2021c
au_2033c_fio
au_2043a_fio
au_2044a_fio
au_2046a_fio
au_2623a
au_2625a
au_2626
au_2032b
au_2054b
au_2628b
au_2630
au_2631
au_2632
au_2633
au_2634
au_2635
au_2636
au_2637
au_2926
au_2928
au_4000m_ei
au_4000n
au_t610
au_8000
au_8001
au_8002
au_8003
au_8004
au_8005
au_8006
au_8007
au_8008
au_8009
au_8010
au_8011
au_8012
au_t100
au_t101
au_t102
au_t103
ProjectDrawings.pdf
A. GENERAL:
05 AU Ault Substation Control Building Roof_Drawings.pdf
au_0015c-Plot Tab
au_3031-Plot Tab
au_3031 demo-T-001
au_3031 jacob- 3031a
au_3032a-Plot Tab
au_3033a-Plot Tab
au_3034a-Plot Tab
au_3009a
au_3010a
au_3011a
au_3017a
au_3011-1-2.pdf
Sheets and Views
au_3011b_1-Plot Tab
au_3011b_2-Plot Tab
REVS.pdf
Sheets and Views
au_3031a-Plot Tab
au_3033b-Plot Tab
au_3034b-Plot Tab
FINALS.pdf
Sheets and Views
au_3011b_1-Plot Tab
au_3011b_2-Plot Tab
au_3031a-Plot Tab
au_3033b-Plot Tab
au_3034b-Plot Tab
05. Drawings vnl.03_final_05_22_19.pdf
Vernal 03
Project Drawings
vnl_0015c
vnl_0001m_ei
vnl_0001n
vnl_1000f_ei
vnl_1000g
vnl_1001g_fio
vnl_1100
vnl_1101
vnl_1110
vnl_1005f_ei
vnl_1005g
vnl_6850d_ei
vnl_6850e
vnl_6854_1c_fio
vnl_6854_2a_ei
vnl_6854_2b
vnl_2006b
vnl_2300
vnl_2301
vnl_2302
vnl_2004a_ei
vnl_2004b
vnl_2008a_ei
vnl_2008b
vnl_2550
vnl_2003a_ei
vnl_2003b
vnl_2600
vnl_2009a_ei
vnl_2009b
vnl_2010a_ei
vnl_2925
vnl_2926
vnl_4500f_fio
vnl_t600
vnl_8000
05.c. au_bdw_nc.final.01_24_20pdf.pdf
AULT_BADWATER_NORTH CODY_PROJECT DRAWINGS
au_0015c
au_0001_1c_ei
au_0001_1e
au_0001_2d_ei
au_0001_2f
au_1000o_ei
au_1000q
au_1009c_ei
au_1009d
au_1032h_ei
au_1032j
au_1100l
au_1109b
au_1111b_ei
au_1111c
au_1113e_ei
au_1113f
au_1116e_ei
au_1116g
au_1501a
au_1511f_ei
au_1511g
au_1610c_ei
au_1610d
au_1611b_ei
au_1611c
au_1620a_ei
au_1620b
au_1621a_ei
au_1621c
au_1711
au_2002_1b_ei
au_2002_2c_ei
au_2002_3h_ei
au_2002_4d
au_2003p_ei
au_2003s
au_2004h_ei
au_2005m_ei
au_2006l_ei
au_2006_4b
au_2008n
au_2009f
au_2010c
au_2315c
au_2316c
au_2317
au_2115h
au_2033c_fio
au_2043a_fio
au_2046a_fio
au_2038a_fio
31_1075k_fio
au_2054b
au_2628b
au_2630b
au_2631b
au_2632
au_2926
au_2928
au_t611
au_8000
au_8001
au_8002
au_8003
au_8004
au_8005
au_8006
au_8007
au_8008
au_8009
au_8010
au_8011
au_8012
bdw_0016a
bdw_0001l_ei
bdw_0001m
bdw_1000h_ei
bdw_1000i
bdw_1010g_ei
bdw_1010h
bdw_1100e
bdw_1114a_ei
bdw_1114b
bdw_1510g_ei
bdw_1510h
bdw_1601j_ei
bdw_1601k
bdw_2000h_fio
bdw_2007j
bdw_2002j_ei
bdw_2002k
bdw_2004g_ei
bdw_2004h
bdw_2302a
bdw_t601
bdw_8000a
bdw_8001
bdw_8002
bdw_8003
bdw_8004
bdw_8005
bdw_8006
nc_0015b
nc_0001n_ei
nc_0001o
nc_1000j_ei
nc_1000k
nc_1011k_ei
nc_1011l
nc_1100g_ei
nc_1100h
nc_1118a_ei
nc_1118b
nc_1120a_ei
nc_1120b
nc_1121c_ei
nc_1121d
nc_1500h_ei
nc_1500i
nc_1511h_ei
nc_1511i
nc_1612a_ei
nc_1612b
nc_1711c_ei
nc_1711d
nc_2014b_fio
nc_2020j
nc_2016g_ei
nc_2016h
nc_2019i_ei
nc_2019j
nc_2300a
nc_2301c
nc_2550b
nc_4001d_fio
nc_t601
nc_8000
nc_8001
nc_8002
nc_8003
nc_8004
nc_8005
05b. arh_final_updated_05_14_20.pdf
Cover Page
Project Drawings
arh_0015d
arh_0001_1a_ei
arh_0001_1b
arh_0001_2a_ei
arh_0001_2b
arh_1000l_ei
arh_1000m
arh_1017h_ei
arh_1017i
arh_1019i_ei
arh_1019j
arh_1025d_ei
arh_1025e
arh_1102g
arh_1112b_ei
arh_1112c
arh_1113b_ei
arh_1113c
arh_1511c_ei
arh_1511d
arh_1516b_fio
arh_1611g_ei
arh_1611h
arh_1700_fio
arh_1711_ei
arh_1711a
arh_1716c_fio
arh_7200d_fio
arh_2000b_fio
arh_2072_1e
arh_2001j_ei
arh_2001k
arh_2002_1b_fio
arh_2003_1_ei
arh_2003_1a
arh_2026e
arh_2303c
arh_2550c
arh_2047c
arh_2926b
arh_2927
arh_4000_1d_fio
arh_t600
arh_8000a_fio
ARH_ProjectDrawings.pdf
GENERAL:
A. LIST OF DRAWINGS: