Text version
19 May 2020
Attachment B
Shiprock Substation 345-kV Breaker Replacement - Drawings
89503220BWA000031
PROJECT DRAWINGS
SHIPROCK SUBSTATION
345KV BREAKER REPLACEMENT
STATE
SECTION C
DESCRIPTION/SPECIFICATIONS
Spec. No. 977
NEW MEXICO
345KV BREAKER REPLACEMENT
PROJECT DRAWINGS
A. GENERAL:
CONSTRUCTION DRAWINGS: Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.
PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale.
Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.
STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from construction or project drawings or text, the details of construction or project drawings or text shall govern. A complete set of standard drawings are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx.
INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed.
EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.
REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.
CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise Western of any errors or omissions.
B. LIST OF DRAWINGS:
LOCATION MAP:
1. SHR 0015 Rev. D – Location and Vicinity Map
ELECTRICAL:
2. SHR 0001-1 Rev. H EI – 345KV Area Switching Diagram (Sheet 1 of 2) (Existing Installation)
3. SHR 0001-1 Rev. I – 345KV Area Switching Diagram (Sheet 1 of 2)
4. SHR 0010 Rev. N EI – General Plot Plan (Existing Installation)
5. SHR 0010 Rev. O – General Plot Plan
6. SHR 1010 Rev. I EI – 345KV Bays U1 and U2 Plan (Existing Installation)
7. SHR 1010 Rev. J – 345KV Bays U1 and U2 Plan
8. SHR 1012 Rev. E EI – 345KV Bus Sections A-A & B-B (Existing Installation)
9. SHR 1012 Rev. F – 345KV Area Sections A-A, A1-A1 & B-B
10. SHR 1014 Rev. C EI – 345KV Bus Section E-E (Existing Installation)
11. SHR 1014 Rev. D – 345KV Area Sections E-E & E1-E1
12. SHR 1015 EI – 345KV Bus Section F-F (Existing Installation)
13. SHR 1015 Rev. A – 345KV Area Section F-F
14. SHR 1027 Rev. C FIO – 345, 230 & 13.8KV Bill of Material (For Information Only)
15. SHR 1101 Rev. A – Equipment and Material Index
16. SHR 1513 EI – 345KV Bays U1 and U2 Grounding Plan (Existing Installation)
17. SHR 1513 Rev. A – 345KV Bays U1 and U2 Grounding Plan
18. SHR 1610-2 Rev.B EI – 13.8/24.0/230/345KV Station Service Wiring Diagram (SH 2 of 3) (Existing Installation)
19. SHR 1610-2 Rev. C – 13.8/24.0/230/345KV Station Service Wiring Diagram (SH 2 of 3)
20. SHR 1610-3 EI – 13.8/230/345KV Station Service Wiring Diagram (SH 3 of 3) (Existing Installation)
21. SHR 1610-3 Rev. A – 13.8/230/345KV Station Service Wiring Diagram (SH 3 of 3)
22. SHR 1712 EI – 345KV Bays U1 and U2 Conduit and Buried Cable Plan (Existing Installation)
23. SHR 1712 Rev. A – 345KV Bays U1 and U2 Conduit and Buried Cable Plan
CIVIL & SITE DRAWINGS:
24. SHR 2045 Rev. G FIO – Grading and Plot Plan 345KV Area (For Information Only)
FOUNDATION AND STRUCTURAL DRAWING INDEX:
25. SHR 2051 Rev. N – Foundation/Structural Data and Drawing Index (Sheet 1 of 2)
26. SHR 2052 Rev. K – Foundation/Structural Data and Drawing Index (Sheet 2of 2)
CONCRETE:
27. SHR 2008 Rev. R EI – Foundation General Plan (Existing Installation)
28. SHR 2008 Rev. S – Foundation General Plan
29. SHR 2049 Rev. E EI – Foundation Plan 345KV Area (Existing Installation)
30. SHR 2049 Rev. F – Foundation Plan 345KV Area
31. SHR 2050 Rev F EI – Foundation Plan 345KV Area (Existing Installation)
32. SHR 2050 Rev G – Foundation Plan 345KV Area
33. SHR 2076 Rev A – Foundations Outline and Reinforcement
34. SHR 2302 – Foundations Outline and Reinforcement
STEEL STRUCTURES:
35. SHR 2551 – Anchor Bolts https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx
345KV BREAKER REPLACEMENT
PROJECT DRAWINGS
36. SHR 2926 – Equipment Cabinet Platforms Steel Design and Details
CONTROLS:
37. SHR T601 – 345kV Control Cable List
38. SHR 4500 Rev N – Service Building Arrangement and Grounding
39. SHR 4530 – Control Cable Termination Cabinet CHM3 Arrangement
GEOLOGY:
40. SHR 8000 – Vicinity of Shiprock Substation Logs of Exploration (For Information Only)
41. SHR 8001 – Subsurface Exploration – Penetration Resistance and Log (For Information Only)
42. SHR 8002 – Subsurface Exploration – Penetration Resistance and Log (For Information Only)
43. SHR 8003 – Subsurface Exploration – Penetration Resistance and Log (For Information Only)
44. SHR 8004 – Subsurface Exploration – Penetration Resistance and Log (For Information Only)
45. SHR 8005 – Subsurface Exploration – Penetration Resistance and Log (For Information Only)
46. SHR 8006 – Subsurface Exploration – Penetration Resistance and Log (For Information Only)
47. SHR 8007 – Subsurface Exploration – Penetration Resistance and Log (For Information Only)
48. SHR 8008 – Subsurface Exploration – Penetration Resistance and Log (For Information Only)
CHM3
CHM3
| Cover Page |
| Project Drawings |
| shr_0015d |
| shr_0001_1h_ei |
| shr_0001_1i |
| shr_0010n_ei |
| shr_0010o |
| shr_1010i_ei |
| shr_1010j |
| shr_1012e_ei |
| shr_1012f |
| shr_1014c_ei |
| shr_1014d |
| shr_1015_ei |
| shr_1015a |
| shr_1027c_fio |
| shr_1101a |
| shr_1513_ei |
| shr_1513a |
| shr_1610_2b_ei |
| shr_1610_2c |
| shr_1610_3_ei |
| shr_1610_3a |
| shr_1712_ei |
| shr_1712a |
| shr_2045g_fio |
| shr_2051n |
| shr_2052k |
| shr_2008r_ei |
| shr_2008s |
| shr_2049e_ei |
| shr_2049f |
| shr_2050f_ei |
| shr_2050g |
| shr_2076a |
| shr_2302 |
| shr_2551 |
| shr_2926 |
| shr_t601 |
| shr_4500n |
| shr_4530 |
| shr_8000a |
| shr_8001 |
| shr_8002 |
| shr_8003 |
| shr_8004 |
| shr_8005 |
| shr_8006 |
| shr_8007 |
| shr_8008 |
| Cover Page.pdf |
| Cheyenne Substation Gate Replacement_Specs_Cover Page |
| Cheyenne Substation Gate Replacement_Specs_Table of Contents |
| Cheyenne Substation Gate Replacement_Specs_Div 1 |
| A. PROJECT REQUIREMENTS |
| C. DESCRIPTION OF BID ITEM “Mobilization and Preparatory Work”: |
| 1. GENERAL: The Contractor shall furnish submittals as specified in the Construction Standards and this Project Specification via the email address listed below. |
| 2. TRANSMITTAL: The Contractor shall submit all correspondence (Request For Information, Submittals, etc.) to the following email address care of the COR. |
| 3. SUBMITTAL RESPONSE: WAPA will provide a response to all submittals in accordance with Division 1. D.2 of these Specifications with an “Acceptable for Use” or “Not Acceptable” status, with comments as appropriate, to the email address where the sub... |
| 4. PROJECT PROTOCOL: Electronic Correspondence |
| Cheyenne Substation Gate Replacement_Specs_Div 2 |
| A. General |
| The Contractor shall provide all labor, equipment, and materials to complete the work as defined in this section. |
| B. DESCRIPTION OF BIDDING SCHEDULE ITEMS |
| 1. Bidding schedule item “Demolition”: |
| a. The Contractor shall remove and dispose of the following as shown on drawing CH T-001. Refer to Standard 13 for disposal information and regulations. |
| 1. Saw-cutting asphalt driveway |
| 2. Concrete driveway |
| 3. Chain link fencing and associated fence posts |
| 4. Chain link gate and associated materials and posts (Gates to be saved on site) |
| 5. Electrical wire and associated equipment that runs from the communications box, along the north fence running to the east, runs along the east fence to the south, and enters the garage to connect to panel. This wire is only buried at the driveway a... |
| b. SUBSTATION AND CONTROL EQUIPMENT PROTECTION: The substation and control equipment shall remain energized for the duration of this project. The Contractor shall protect all equipment inside the control building from weather exposure, dust, and any... |
| 2. Bidding schedule item “EXCAVATION”: |
| a. Excavations for foundations and slabs as shown on drawing CH 3032 and T-001. |
| 1. Contractor shall take extra care to note locations of underground conduit as shown on drawing CH 1716, when excvating. |
| b. Trenching for conduits, detector loops, and cables as necessary to install new gate as shown on drawings CH 3032 and T-001. |
| 1. Contractor shall take extra care to note locations of grounding grid as shown on drawing CH 1503, when trenching. Contractor shall repair at their own cost, any grounding grid damage that occurs during trenching in accordance with Standard 9, secti... |
| 3. Bidding schedule item “BACKFILL”: |
| a. Disturbed soil between finished driveway and undisturbed soil shall be finished to match existing. |
| b. Placing and compacting earth material under foundations and all other concrete placements. |
| c. Providing 12” of gravel fill under pivot gate concrete foundation slab (not under pilings). See foundation on Sheet 3. |
| d. Providing sand fills and earthen material as necessary to backfill conduit trenches. |
| 1. Buried conduit shall be bedded in a minimum of 6 inch sand fill. Sand material shall meet ASTM C33 for fine aggregate. Conduit shall be spaced with a minimum of 1 inch clear distance between each conduit and sand fill placed between conduits. |
| 4. Bidding schedule item “FENCING”: |
| Cheyenne Substation Gate Replacement_Specs_Div 3 |
| A. GENERAL: |
| The Contractor shall provide all labor, equipment, and materials to complete the work as defined in this section. |
| B. DESCRIPTION OF BIDDING SCHEDULE ITEMS: |
| Cheyenne Substation Gate Replacement_Specs_Div 11 |
| Cheyenne Substation Gate Replacement_Specs_Div 13 NOT FROM ENVIRO |
| DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION |
| A. DESCRIPTION OF REQUIREMENTS: Bidding Schedule does not contain a separate item for “Environmental Quality Protection”. The cost of compliance with requirements of Construction Standard 13 – Environmental Quality Protection shall be included in th... |