21 CS Spectrum Monitoring Sailent Characteristics.docx

DOCX document 32 KB Posted

Attached to
21 CS Spectrum Monitoring Nodes
Solicitation number
FA255024Q0023
Issued by

About this file

This document is a Performance Work Statement (PWS) for spectrum monitoring nodes required at Schriever SFB and Peterson SFB. The key requirements include:

  • 4 RFEye nodes with a frequency range of 9 kHz - 40 GHz and 100 MHz instantaneous bandwidth
  • 2-D and 3-D Time Difference of Arrival (TDOA) capability
  • Ability to translate Pub 7 data
  • GPS holdover module for GPS denied environments
  • Required software and antennas

The related federal contract opportunity is a pre-solicitation with Solicitation Number FA255024Q0023, issued by the Department of the Air Force Space Command for the 21 CS Spectrum Monitoring Nodes requirement. The PWS document provides additional details on the required products and services.

View the file

Other files

File Type Posted
21 CS Spectrum Monitoring PWS.docx DOCX document
21 CS Spectrum Monitoring sources sought SAM.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) For Schriever SFB and Peterson SFB Spectrum Monitoring

Salient Characteristics

· 4 RFEye Nodes 100-40

· Frequency Range: 9 kHz – 40 GHz; Instantaneous Bandwidth: 100 MHz

· 2-D and 3-D Time Difference of Arrival (TDOA) capable

· Able to translate Pub 7 data

· GPS holdover module to continue operating in a GPS denied environment

· Software

· Antennas

See attached PWS for a full list of requirements and characteristics.

File details come from the government source that posted it. Updated .