This document consists of supplemental specifications for the Apollo Beach Wastewater Utilities Rehabilitation project issued by Hillsborough County Water Resources Department in Florida. The project encompasses repair and rehabilitation of existing underground wastewater infrastructure across multiple sewer sheds in Apollo Beach, with an estimated total contract value of $12,129,020.00. The scope of work includes lift station cleaning and inspection, sanitary sewer pipeline cleaning with closed-circuit television (CCTV) inspection, pipeline rehabilitation through pipe lining, service lateral reinstatement and grouting, manhole structural rehabilitation with coating systems, inflow and infiltration prevention, bench and invert restoration, cleanout installation, and site restoration including sodding. The contract may be awarded to one or more contractors at the County's discretion. Work authorization occurs exclusively through written Work Orders issued by the Water Resources Department Director or designee, with verbal authorization permitted for emergency work at night or weekends followed by written confirmation within 24 to 48 hours. Standard work hours are 7:00 A.M. to 4:00 P.M., Monday through Friday, excluding County-observed holidays and weekends, though extended hours require 24-hour notice and written Project Manager approval. Emergency work requires contractor mobilization within four hours of verbal notification, including weekends and holidays.
The contract includes an allowance of $576,000.00 for reimbursement of non-priced items such as testing, with payment based on actual contractor-paid invoices without markup. Contractors must secure an independent laboratory for all required testing and inspection services at their own expense. All materials and products, including coating and lining systems, must be listed on the Hillsborough County Public Utilities Approved Product List and carry a minimum 10-year manufacturer's warranty. Contractors must demonstrate at least five years of active experience and a minimum of 100 successful rehabilitations in Florida. All work must comply with Hillsborough County Standard Specifications, County Technical Specifications and Technical Manual, applicable ASTM standards, and other referenced regulatory requirements. Contractors are responsible for all costs associated with public notification, site safety, cleanup, debris disposal, hydrant meter fees and deposits, wastewater spill containment and cleanup, and traffic control. The County has established a 0% Small Business Enterprise (SBE) subcontractor participation goal for this solicitation.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Supplemental Specifications for Apollo Beach Wastewater Utilities Rehab SS-1
SUPPLEMENTAL SPECIFICATIONS
SECTION 1 - GENERAL
1.01 Scope
These specifications modify or supplement the General Conditions and other provisions of the Contract Documents. To the extent such provisions are not modified or supplemented herein; all provisions remain in full force and effect.
1.02 Number of Contracts (s)
The County reserves the right to award this Contract to one (1) or more Contractor’s.
1.03 Public Awareness and Outreach
In the event any activity under this Contract is determined to affect residents, the Contractor will be required to notify the affected residents using door hangers, letters, or flyers. All residents shall be notified at least seventy-two (72) hours in advance of mobilization. The geographical area of notification shall be determined by the County.
The County will not provide the Contractor with the door hangers, letters, or flyers. All costs associated with this item shall be included in the Contractor's overhead.
1.04 Testing / Laboratory Services
A. All materials used in the construction of the project shall be subject to adequate inspection and testing in accordance with accepted standards. The Contractor shall select an independent laboratory or inspection agency for making all tests required by the specifications, and shall pay for this laboratory service direct, as a requirement of this Contract. Density testing of trenches and structure backfill (generally of soils, sub-grade, fill, pavement base and sub-base materials), shall be taken at intervals as specified in the Contract Documents, or as directed by the Project Manager. The Contractor shall provide advance notice to the Project Manager of required density tests. Reports of these tests shall be submitted for review to the Project Manager within ninety-six hours. The Contractor shall bear the sole responsibility to confirm that all densities meet the County Standards.
The Contractor shall pay for any additional tests resulting from the Contractor's failure to provide work that passes the required tests initially.
B. Materials of construction, particularly those upon which the strength and durability of the structure may depend, shall be subject to inspection and testing to establish conformance with specifications and suitability for uses intended.
Supplemental Specifications for Apollo Beach Wastewater Utilities Rehab SS-2
C. Where specific performance or quality is referenced, it is Contractor's responsibility to have the necessary tests performed by qualified persons to show that the contractual requirements are being met. Where no reference is made, tests shall be performed in accordance with the methods prescribed by the American Society for Testing and Materials (ASTM), or such other organizations as would be applicable.
D. If these Contract Documents, or laws, ordinances, rules, regulations or orders of any public authority having jurisdiction to the Work, require any work to specifically be inspected, tested, or approved by someone other than Contractor, the Contractor shall give the Project Manager timely notice of readiness thereof.
Contractor shall furnish the Project Manager the required certificates of inspection, testing results or approvals. All such tests shall be in accordance with the methods prescribed by the American Society for Testing and Materials or such other applicable organization as may be required by law or these Contract Documents.
E. Any Work that fails any required test, inspection or approval, or any work that passes any required tests initially but does not meet the requirements of the Contract Documents, shall be considered Defective Work. It is the Contractor's sole responsibility to correct the Defective Work at no additional cost to the County. The cost of additional inspections and testing due to the defective work shall be borne by the Contractor at no additional cost to the County.
F. An allowance of $576,000.00 has been included in the Bid Proposal section to reimburse the Contractor for non-priced items. Reimbursement to the Contractor for testing shall be based on the actual amount paid by the Contractor without any mark-up and shall be made upon presentation of an invoice evidencing the Contractor’s payment of the same.
1.05 Inspections
A. The Project Manager may appoint Inspectors to observe both materials and work.
Such observation may extend to any or all parts of the work and to the preparation and manufacture of the materials to be used. The Inspector shall not be authorized to alter, revoke, enlarge, or relax the provisions of the work, nor will they be authorized to approve or accept any portion of the completed work, nor to issue instructions contrary to the Contract. An Inspector is assigned to keep the Project Manager informed on the progress of the work and the way it is being done. He shall call to the attention of the Contractor any deviation from the Contract Documents. Without approval from the Project Manager, the Inspector will not have the authority to reject defective materials or to suspend any Work that is being improperly performed.
Supplemental Specifications for Apollo Beach Wastewater Utilities Rehab SS-3
B. Neither observations by the Project Manager or Inspector, nor inspections, tests or approvals by persons other than the Contractor shall relieve Contractor from their obligations to perform the work in accordance with the requirements of the Contract Documents.
1.06 Project Signs
One (1) project identification sign shall be placed at each location where work is being performed for the duration of that work. Because there may be more than one site, the County shall provide four (4) mobile signs to the Contractor. The Contractor shall ensure that the sign(s) are displayed at a prominent location at each site before beginning the work. The Contractor shall move the sign(s) as necessary and dispose of the signs when directed by the Project Manager.
1.07 Schedule of Reinstatement of Service Laterals
A requirement of this Contract shall be that once a segment of pipe has been lined, each service lateral within that segment shall be completely reinstated (i.e., cut out to 100 percent and grouted) within fourteen (14) calendar days following the installation of the liner in that segment.
Additionally, each service lateral shall be reinstated to a minimum of eighty percent (80%) of the original lateral opening immediately after a new liner has been cooled.
SECTION 2 - SPECIFICATIONS FOR DIVISION 2 OF THE TECHNICAL
SPECIFICATIONS
2.01 Description of Work
A. The following is a brief description of the work items included in this contract. The rehabilitation work includes, but is not limited to, the following items:
a. Lift Station cleaning and inspection
b. Establishing and maintaining contract with customers that have county assets on property (ex. backyards).
c. Relocate customers’ structures over county assets to comply with county standards (ex. Toolsheds)
d. Sanitary sewer pipeline cleaning and inspection (CCTV) and the removal of protruding taps.
e. Pipeline rehabilitation of individual line segments.
f. Immediate partial reinstatement (80%) after liner curing.
g. Complete reinstatement (100%) and grouting of each service lateral within
14 calendar days of liner installation.
h. Grouting/sealing the liner at each manhole.
i. Testing (upon request) in accordance with the ASTM standards.
j. Final CCTV inspection.
k. Lateral lining, cleaning and cleanouts: The county anticipates that there
Supplemental Specifications for Apollo Beach Wastewater Utilities Rehab SS-4 may be a need for lateral lining. Project Manager or designee shall determine which laterals to be rehabilitated.
l. Submission of reports, DVDs, and testing results.
m. Some line segments and manholes may be in rear yard easements and have no direct street access. The Contractor should include costs associated with rehabilitation of these lines in their bid.
n. Grout sealing of leaking service laterals on existing sewer lines previously lined under other contracts.
o. Pipeline repairs
p. Disposal of grease and debris generated from cleaning operations.
Hillsborough County Solid Waste does not accept these types of debris;
therefore, the Contractor is responsible for disposal costs.
q. Manhole initial inspection.
r. Replacement of manhole frame and cover (F&C).
s. Rebuild the manhole invert (flow channel).
t. Clean manhole in preparation for coating.
u. Remove existing liners and/or coatings.
v. Repair minor and severe inflow/infiltration.
w. Repair inside surface of the manhole to restore structural integrity of the manhole prior to coating.
x. Grouting and/or coating of manhole interior.
y. Repair sidewalks, curbs, gutters, irrigation systems and roadways as related to the manhole rehabilitation.
z. Dispose of all waste materials, construction rubble, manhole liners, and any other waste from the rehabilitation of the manholes in accordance with all applicable laws, rules and regulations.
aa. Maintain traffic flow as required by Hillsborough County Public Works Department Right-of-Way Management Office during manhole rehabilitation.
bb. Final inspection of manhole(s) prior to acceptance by the County.
cc. Return customer property (i.e. backyards, fence, sod, etc.) to conditions as close to possible before any work requiring removal was performed while maintain county access to assets
B. The Contractor shall submit to the Project Manager a weekly progress report including digital photographs of the work.
C. The Contractor shall furnish all labor, materials, and equipment to complete the work as described in the Technical Specifications, as shown on the Plans, and as directed by the Project Manager in accordance with the expressed or obvious intent of this Contract.
2.02 Reference Standards
Supplemental Specifications for Apollo Beach Wastewater Utilities Rehab SS-5
A. All work shall be performed in strict accordance with the Hillsborough County Standard Specifications For Construction (latest edition), the Hillsborough County Public Utilities, Water Resources Department Water, Wastewater, and Reclaimed Water Technical Specifications (latest edition including Appendix B, Approved Products), the Hillsborough County Public Utilities, Water Resources Department Water, Wastewater and Reclaimed Water Technical Manual (latest edition), and the Hillsborough County Public Works' Utility Accommodation Guide and Rights of Way Use Procedure Manual (latest edition). The documents may be found on Hillsborough County’s webpage at:
http://www.hillsboroughcounty.org/en/businesses/land-development/technical-publications.
In all circumstances, the most stringent requirement, as determined or modified by the Project Manager, shall apply to the work. It is the Contractor’s responsibility to obtain and maintain the specifications and technical material necessary to perform the work.
B. The American Society for Testing and Materials (ASTM) standard specifications and installation standard practices are made part hereof by reference and shall be the latest edition and revision thereof. All rehabilitation shall be in accordance to these standards:
C78 Standard Test Method for Flexural Strength of Concrete
C109 Standard Test Method for Compressive Strength of
Hydraulic Cement Mortars
C157 Standard Test Method for Length Change of Hardened Hydraulic-Cement Mortar and Concrete
C307 Standard Test Method for Tensile Strength of Chemical-
Resistant Mortar, Grouts, and Monolithic Surfacings
C580 Standard Test Method for Flexural Strength and Modulus of Elasticity of Chemical-Resistant Mortars, Grouts, Monolithic Surfacing, and Polymer Concretes
C596 Standard Test Method for Drying Shrinkage of Mortar
Containing Hydraulic Cement
C882 Standard Test Method for Bond Strength of Epoxy-Resin Systems Used with Concrete by Slant Shear
D638 Standard Test Method for Tensile Properties of Plastics
D792 Standard Test Methods for Density and Specific Gravity http://www.hillsboroughcounty.org/en/businesses/land-development/technical-
Supplemental Specifications for Apollo Beach Wastewater Utilities Rehab SS-6
(Relative Density) of Plastics by Displacement
D4787 Standard Practice for Continuity Verification of Liquid or Sheet Linings Applied to Concrete Substrates
D4833 Standard Test Method for Index Puncture Resistance of
Geomembranes and Related Products
C. Standard Practice for Sealing Sewer Manholes Using Chemical Grouting For Chemical Grouting the following Standards shall apply:
ASTM F-2304 Standard Practices for Rehabilitation of Sewers Using
Chemical Grouting
ASTM F-2414 Standard Practices for Rehabilitation of Sewers Manholes Using Chemical Grouting
ASTM F-2454 Standard Practices for Sealing Lateral Connections and Lines from Mainline Sewer Systems by Lateral Packer Method, Using Chemical Grouting
ASTM C1244 Concrete Sewer Manholes by the Vacuum Test Method
NASSCO Suggested Standard Specification for manhole inspection and assessment
D. The American Society for Testing and Materials (ASTM) standard specifications and installation standard practices are made part hereof by reference and shall be the latest edition and revision thereof. All rehabilitation (lining) shall be in accordance to these standards for folded polyvinyl chloride {PVC} pipe liner shall be made from virgin PVC compound meeting all the requirements of the following standards:
ASTM F-1504 Standard Specification for Folded {Poly Vinyl Chloride) {PVC) Pipe in Existing Sewer and Conduit Rehabilitation
ASTM F-1871 Standard Specification for Folded {Poly Vinyl Chloride)
{PVC) Pipe Type A for Existing Sewer and Conduit Rehabilitation
ASTM F-1947 Standard Practice for Installation of Folded {Poly Vinyl Chloride) {PVC) Pipe into Existing Sewers and Conduits
E. Deformed polyethylene {PE) pipe liner shall be made from PE 3408 polyethylene resins complying with the following standards:
ASTM F-1533 Standard Specification for Deformed Polyethylene {PE) Liner
Supplemental Specifications for Apollo Beach Wastewater Utilities Rehab SS-7
ASTM D-3350 Standard Specification for Polyethylene Plastics Pipe and Fitting Materials
ASTM F-1606 Standard Practice for Rehabilitation of Existing Sewers and
Conduits with Deformed Polyethylene {PE) Liner
F. For Lateral Liners, there are two types in this solicitation.
Type 1:
ASTM F-2561-20 Standard Practice for Rehabilitation of a Sewer Service Lateral and Its Connection to the Main Using a One-Piece Main and Lateral Cured-In-Place Liner
ASTM F-3240-19 Standard Practice for Installation of Seamless Molded Hydrophilic
Gaskets (SMHG) for Long-Term Watertightness of Cured-In-Place Rehabilitation of Main and Lateral Pipelines*
Note: hydrophilic paste will not be allowed as an equivalent for the Hydrophilic Gasket required in Product 1
Type 2:
ASTM F-1216 Standard Practice for Rehabilitation of Existing Pipelines and
Conduits by the Inversion and Curing of a Resin Impregnated Tube
2.03 Measurement and Payment Supplement
Replace Section 01312 of the Public Works Standard Specification for Construction with the attached Water Resources Section 01025 - Measurement and Payment which is included as an attachment.
2.04 Authorization of Work
No work may be performed under this term contract except as authorized by a Work Order issued by the Water Resources Department Director, or designee and a Purchase Order. The Work Order will establish the Notice to Proceed date. The Contractor shall not proceed with, and shall not be compensated for, any work that is not authorized by written Work Order. Verbal authorization may be given when immediate response conditions occur at night and/or on weekends and followed-up with a written authorization within 24 to 48 hours of the occurrence.
2.05 Work Order Assignment Procedure
In the event the County awards this contract to more than one Contractor, Work Orders will be issued on a determination of the best overall value for the County.
Supplemental Specifications for Apollo Beach Wastewater Utilities Rehab SS-8
Value shall be determined by the PROJECT MANAGER based on the following factors;
Scope, Schedule, and Cost.
The Project Manager shall develop a preliminary scope, schedule, and cost estimate for each task order and determine the best value for the County. If it is determined to be in the best interest of the County, a Work Order may be awarded to the Contractor with the lowest time estimate (schedule) for the completion of the work. The Project Manager shall continue the Work Order Assignment Procedure described herein for the duration of the Contract, including all subsequent renewal periods.
2.10 Incidental Items
Miscellaneous or incidental items such as dewatering, cutting, patching, saw-cutting, concrete, electrical hardware, bolts, nuts, fittings, etc., or other items may be required to complete the construction as indicated on the plans. If no specific bid item is shown, such miscellaneous or incidental items are to be included in the unit price for the item with which they are associated. SEPARATE PAYMENT FOR MISCELLANEOUS INCIDENTAL ITEMS SHALL NOT BE MADE BY THE COUNTY. All components shown and described on the bid documents are to be included in the bid items shown on the bid form.
2.11 Sewage Spills
All wastewater or other spills resulting from Contractor operations hereunder shall be contained, removed, and cleaned up immediately by the Contractor at no additional cost to the County. The Contractor shall disinfect spills using a disinfectant method approved by the Project Manager. The Contractor shall report all spills immediately to the Project Manager. All required regulatory agencies shall be notified as soon as possible, but in no case later than twenty-four hours from the time of the spill. The Contractor shall provide the regulatory agencies and the Project Manager a detailed written report of the spill, describing the occurrence and all actions taken.
Disposal of Washwater – The Contractor may be allowed to decant excess washwater from a Jet-VAC truck or other pumping truck by directing the flow of the washwater into a sanitary sewer manhole whose location is approved by the Project Manager. Solids shall not be dumped into a manhole but shall be disposed of in an appropriate and permitted location at the Contractor’s expense. The Contractor shall not dispose of discharge washwater containing waste and debris into any streets, ditches, canals, rivers, or lakes.
2.12 Site Safety and Clean-Up
Supplemental Specifications for Apollo Beach Wastewater Utilities Rehab SS-9
A. The Contractor shall be responsible for site safety and clean-up. The Contractor will be responsible for keeping the site safe for pedestrians and traffic. The Contractor shall dispose of all debris on a daily basis and be responsible for hauling all debris to an appropriate and permitted disposal site. The Contractor will not be allowed to accumulate excess debris on the site, unless approved by the Project Manager.
B. All costs associated with the safety, clean-up, and disposal of debris shall be included in the Contractor's overhead.
2.13 Emergency Work
In the event of emergency manhole and/or gravity main rehabilitation work, as identified by the Project Manager, the Contractor will be required to respond to the request of the Project Manager and mobilize within four (4) hours of verbal notification, including weekends and holidays. Failure to meet this Contract requirement may result in termination of this Contract and/or the filing of a claim by the County against the Performance Bond.
2.14 Standard Work Hours
The standard work hours shall be 7:00 A.M. to 4:00 P.M., Monday through Friday, excluding County-observed holidays and weekends. Work outside these hours shall require twenty-four hours notice to and written approval from the Project Manager. Standard work hours may be impacted by the requirements of Right-of-Way or MOT permits.
2.15 Pricing of Work Orders
Pricing of Work Orders shall be accomplished by multiplying the appropriate unit prices times the quantities of each line item required for the work order, to arrive at a Pay Quantity for that line item, then adding all such line item Pay Quantities to arrive at the Work Order Cost. It shall be the Contractor's responsibility to advise the County and obtain prior approval for any additional quantities to be utilized beyond those specified in the Work Order. The Contractor will not be compensated for any materials or work without written authorization from the Project Manager. The Contractor will be compensated for authorized additional quantities on the Revised Work Order after Final Completion of the Work Order
2.16 Digital Photography
A. Contractor shall take pre-construction and post-construction photos and submit the photos to the Project Manager in an electronic format. The photos shall include all features in the vicinity of the work that might be impacted by the construction. The
Supplemental Specifications for Apollo Beach Wastewater Utilities Rehab SS-10
Project Manager reserves the right to select the views to be photographed. Photos shall be named and labeled with the date the photo was taken, work package number, location (street address), and a brief description of times and activity covered in the photo.
B. If Contractor fails to submit post-construction photos to the Project Manager within ten days of completion of the work, the County reserves the right to have the post-construction photos taken by an independent photographer. All costs incurred by the County associated with the production of the post-construction photos will be deducted from the pay application.
C. In areas near surface waters, the photos shall include an upstream and downstream view of each bank at the nearest point to the work and, if applicable, point of crossing. Also, a view of the line route shall be taken from each bank of the crossing and elsewhere as the Project Manager may direct.
2.17 Hydrant Meter Fees and Deposits
Hillsborough County discloses that the deposits and fees listed below are the responsibility of the Contractor.
ITEM COST
Applications fee/account setup $25.00 Hydrant Meter deposit $650.00 Hydrant Meter install/remove fee $170.00 (each) Hydrant Meter Relocation Fee $75.00 (each)
The process for obtaining a Hillsborough County hydrant meter can be found at the following website at:
https://hcfl.gov/businesses/land-development/site-and-subdivision/hydrant-meters-for-temporary-construction
The contractor might also need to acquire a City of Tampa Hydrant Meter. The contractor is responsible for the City of Tampa deposits and fees for the Hydrant Meter.
SECTION 3 – Product Acceptability
3.01 Product/Contractor Pre-Qualification
A. The County encourages competition on the Apollo Beach Wastewater Utilities
Rehab project. However, the County must assure that all products installed in the County’s system are of good quality, the manufacturers of such products are reputable, their prices are fair and reasonable, and the installers of such products are competent and experienced.
Supplemental Specifications for Apollo Beach Wastewater Utilities Rehab SS-11
B. The coating/lining materials (Products) must have a 10-year manufacturer’s warranty and be on the Hillsborough County Public Utilities Approved Product List (Appendix B), http://www.hillsboroughcounty.org/en/businesses/land-development/technical-publications. To be acceptable, a minimum of 100 successful manhole and sliplining rehabilitations of the Products that meet all the referenced specifications in the State of Florida must be documented to assure commercial viability. In addition, the rehabbed manholes and gravity mains shall have been in service within the wastewater collection system in the State of Florida for a minimum of five (5) years. The Contractor must have had at least five (5) years of active experience in the manhole and gravity main rehabilitation of the County’s approved products and must have rehabbed a minimum of 100 manholes and gravity mains in the State of Florida.
3.02 Additional Requirements
A. The Contractor shall submit all ASTM Standards for installation, material properties, and testing the Product. Foreign standards will not be acceptable.
B. The Contractor shall submit an engineering design guide and quality control procedures from the Product manufacturer and for Product installation, including detailed inspection, testing of physical properties, retention of product samples, and taking of and testing of field samples. The design guide and procedures shall include values for design criteria and be submitted with the bid package.
C. The Contractor shall submit evidence of training, testing and/or certification of being trained to install the Product by the Vendor. Such evidence shall be submitted upon request by the County.
D. The Contractor shall submit detailed procedures of repairing its own Product in the event of failure. The procedures shall be submitted prior to award of bid.
SECTION 4 – Work Sequencing and Notification of Work Location
4.01 Work Sequencing
The area/locations of all underground wastewater utilities to be rehabbed will be under one work order with a list, budget and schedule provided based on previous risk-assessment work used to determine which sewersheds are the priority.
4.02 Structural Rehabilitations of Interior Wall of Manholes
A. Apply geopolymer coating system approved by the Hillsborough County to the barrel sections over any existing coating. Coating material may be manually http://www.hillsboroughcounty.org/en/businesses/land-
Supplemental Specifications for Apollo Beach Wastewater Utilities Rehab SS-12 sprayed, or hand troweled by the local certified installer. The minimum thickness of the geopolymer coat system must be one inch (1”) and must be finished such that when the liner sets, the total wall thickness is homogeneous and monolithic.
The minimum compressive strength of the coating system must be 8,000 psi at 28 days and it must exhibit sufficient chemical resistance to sulfuric acid at a pH of
1.0 such that material loss is a maximum of 2% at 8 weeks in accordance with ASTM C267. Substrate preparation and liner application must be in accordance with manufacturer’s instructions. Contractor shall obtain a 10- year warranties for the County both from the supplier for materials and the local certified installer for the installation.
B. The Contractor shall install the coating system in accordance with the manufacturers recommendations to insure compatibility between the structural repair mortar and coating system.
C. Concrete surfaces requiring repair with cementitious materials shall be compatible with the corrosion resistant coating system. Available in both horizontal and vertical grades, cementitious structural repair mortar with corrosion inhibitors shall be used to patch or overlay existing deteriorated concrete surfaces.
4.03 Composition
A. For areas in need of repair up to 1½ inches thick, repairs shall be accomplished using a cementitious structural repair mortar with an integral corrosion inhibitor which is capable of application thickness up to 1½ inches in a single application.
B. For areas in need of repair greater than 1½ inches, but less than 3 inches thick, repairs shall be accomplished using a cementitious structural repair mortar, with an integral corrosion inhibitor and capable of an application thickness up to 3 inches in a single application.
C. For areas in need of repair greater than 3 inches thick, repairs shall be accomplished using a non-sag, cementitious structural repair mortar with a corrosion inhibitor and capable of vertical surface application thickness greater than 3 inches in a single application.
D. For older manholes, constructed out of brick, cementitious structural repair mortar shall be replaced in joints where it is missing so as to restore the structural integrity of the brick manhole.
E. The Contractor shall follow the manufacturer’s recommendation for bonding agent and wire mesh reinforcing to be installed within the repair, if needed.
Supplemental Specifications for Apollo Beach Wastewater Utilities Rehab SS-13
F. The Contractor shall consult the manufacturer for recommendations to insure compatibility between each structural repair mortar and the coating system.
G. The Contractor shall obtain coating system manufacturer’s approval for the structural repair mortar prior to its use.
H. One hundred percent epoxy grout may be used for minor repairs. Prior approval from the coating system manufacturer will be required to ensure product compatibility.
4.04 Bench / Invert Restoration
“Major” rehab is defined as restoration of the bench/invert area and/or rebuilding of the bench slope. Invert rehab shall be carried out on all inverts with visible damage or infiltration. After blocking flow through the manhole and thoroughly cleaning the invert, a quick setting patching material shall be applied to the invert in an expeditious manner.
The mix shall be troweled uniformly onto the invert at a minimum thickness of ½ inch, extending out onto the bench sufficiently to tie into the coating that will be spray applied.
The finished invert shall be smooth and free of ridges. The flow may be re-established in the manhole within 45 minutes to 1 hour after placement of the material only if performing bench work without manhole coating.
4.05 Inflow and Infiltration Prevention
A. Inflow and Infiltration (I&I) shall be classified as “Minor” or “Severe”. (1) “Minor” I&I consists of water penetration of the manhole structure at a single localized area, appearing as a wet stain less than one square foot of area or a minute flow (trickle) of water on the interior surface of the manhole. (2) “Severe” I&I consists of multiple leaks penetrating an area greater than one square foot of interior manhole surface or of single leaks that spray into the interior of the manhole.
B. If “Minor” I&I is observed within the structure after surface preparation is complete, the area shall be prepared and a rapid setting crystalline enhanced hydraulic cement product, specifically formulated for infiltration control, shall be used to stop the Minor infiltration flows in accordance with the manufacturer's recommendations. The material shall be ThoRocTM Plug, OctocreteTM, Burke Plug, or approved equal.
C. Where infiltration flows are “Severe”, surface preparation, manhole drilling and pressure grouting are required. The material for pressure grouting shall be Avanti grout, DeNeef grout, or approved equal, installed in accordance with the manufacturer's written instructions.
4.06 Schedule for Reinstatement of Manholes
Supplemental Specifications for Apollo Beach Wastewater Utilities Rehab SS-14
A requirement of this Contract shall be that once a manhole has been coated/lined, each manhole shall be completely reinstated (i.e. returned to 100 percent flow) following the curing of the coating/liner within the manhole.
4.07 Manhole Final Inspection and Acceptancy
Following final inspection and acceptance of the rehab work by the County, all identified warranty work will be at no cost to the County.
4.08 Notification of Location of Work
It is critical that the County has access to the job site at any time during the rehabilitation process. Therefore, the Contractor shall be responsible for planning and communicating the precise location of work being accomplished on a daily basis. In order to accomplish this, the Contractor shall notify the Project Manager by email of the location(s) of work to be performed the following business day (Monday – Friday). Notification shall be accomplished by 12:30 PM the business day before the work is to be performed.
END OF SECTION
SECTION 5 – ATTACHMENTS
The following attachments are included as part of these supplemental specifications:
1) Section 01025 Measurement and Payment
2) Appendix B: Approved Products and Materials
- END OF SECTION –
01025-1 Measurement and Payment
1. PIPELINE REHABILITATION (PIPE LINING)
The unit price bid shall include the following: mobilization, all necessary and required traffic control, blocking or plugging incoming lines, bypass pumping, conventional cleaning operations, hydrant meters and accounts, testing; chemical sealing, pipe lining, materials testing; excess grout removal, cleanup, all labor, materials, and equipment required to provide a complete and acceptable liner installation, including all appurtenances, removal, transportation, and disposal of waste materials generated by cleaning, line preparation, and finishing operations, CCTV surveys, all video and recording equipment, all equipment, training, and personnel necessary to clean the sewer segments and produce a complete CCTV inspection (e.g. a vac-truck, certifications, etc.), all materials; and preparation of all reports and logs in accordance with the Contract Documents, the manufacturer’s specifications and compliance with all applicable regulatory requirements. A separate unit price bid item has been included for the cleaning of tuberculated iron pipe if required. The location of these line segments are to be determined (TBD) and can be anywhere in Hillsborough County.
This item will be measured and paid based on the diameter and the unit price bid per linear foot as described as “Fold-and-Form Pipe Lining (Location TBD)”
Measurement shall be made based on the horizontal projection of the centerline of the permanently installed liner between manholes measured to the nearest foot from the center of the upstream manhole to the center of the downstream manhole for each section lined.
For those segments constructed of PVC or those segments which have been previously lined, only cleaning and the initial CCTV inspection shall be authorized (See Item 2, below).
2. SEPARATE CLEANING AND CCTV INSPECTION
01025-2
The unit bid price shall include, mobilization, hydrant meters and accounts, blocking or plugging incoming lines, bypass pumping, conventional sewer cleaning and initial CCTV inspection, the removal, transportation, and disposal of waste materials generated by the cleaning operations, television surveys, all video and recording equipment, all equipment necessary to clean the sewer segments and produce a complete CCTV inspection (e.g. vac-truck, certifications, etc.), all personnel training, materials, the preparation and submission of all reports and logs, and all consumables.
These items will be measured and paid for at the unit price per linear foot of “Separate Cleaning and CCTV Inspection” as delineated by the size specified in the Proposal Bid Form.
Measurement shall be made based on the horizontal projection of the centerline of the line segment, measured to the nearest foot from the center of the upstream manhole to the center of the downstream manhole for each section cleaned and inspected.
3. MECHANICAL CLEANING OF TUBERCULATED IRON PIPE SEWERS
The unit bid price shall include: mobilization. Hydrant meters and accounts. Blocking or plugging incoming lines, bypass pumping, sewer line cleaning pf tuberculated iron pipe and post-CCTV inspection, removal, transportation, and disposal of waste materials generated by the cleaning operations, television surveys, all video and recording equipment, all equipment necessary to clean the sewer segments, prepare the sewer for lining and produce a complete CCTV inspection (e.g. vac-truck, certifications, etc.), all personnel training, materials, the preparation and submission of all reports and logs, and all consumables.
These items will be measured and paid for at the unit price per linear foot of “Mechanical Cleaning of Tuberculated Iron Pipe Sewers” as delineated by the size specified in the Proposal Bid Form.
Measurement shall be made based on the horizontal projection of the centerline of the line segment, measured to the nearest foot from the center of the upstream manhole to the center of the downstream manhole for each section cleaned and inspected.
4. CLEANING OF LIFT STATION WET WELLS
The unit bid price shall include all labor, materials, equipment, fuel, and incidentals, including mobilization, hydrant meters and accounts, blocking or plugging incoming lines, bypass pumping, and the removal, transportation, and proper disposal of materials generated by the wet well cleaning operations.
This item shall be measured and paid for at the unit price per lift/pump station cleaned in accordance with “Cleaning of Lift Station Wet Wells” as specified in the Proposal Bid Form.
Measurement shall be one (1) and includes both the pre and post cleaning of lift station wet well specified by the County.
5. REINSTATEMENT AND GROUTING OF SERVICE LATERALS
This item is for reconnecting sanitary sewer service laterals, any size, to the new liner and
01025-3 shall include, but not be limited to, blocking or plugging incoming line; removal, transportation and disposal of material generated by the cleaning and preparation; television surveys; furnishing the equipment necessary to internally cut out and removing the liner to at least 100 percent, minimum, of the circumference of the lateral, cutting out the coupon;
recovering all waste material from the sewer; service pipe cleaning; sealing the lateral connection to the liner; grouting; testing; locating and exposing cleanouts when necessary;
using the cleanout to locate the sewer connection.
The contractor shall grout seal and air test all service connections.
6. GROUT SEAL LEAKING SERVICE LATERALS ON LINE SEGMENTS
PREVIOUSLY LINED UNDER OTHER CONTRACTS
This item is for sealing leaking service laterals throughout Hillsborough County. These sewer laterals were discovered leaking after previous lining programs were complete and no longer under warrantee.
7. FULL CIRCLE CIP LATERAL REPAIR
Full Circle Lateral Repairs Liner (FCLRL), in various-sized main with 4-inch to 6-inch laterals
This item of work will be measured and paid for at the unit price per each and shall include up to 25 feet of lateral. Each unit price bid shall include, but not be limited to, all necessary or required labor, equipment, tools, and materials for traffic control, sewer pipe cleaning and preparation of the existing sewer, including blocking or plugging incoming lines, bypass pumping; removal, transportation and disposal of material generated by cleaning and preparation; television surveys; pipe liner cleaning; chemical sealing, testing; cleanup;
documentation and reporting; and all labor, materials and equipment required to provide a complete and acceptable liner installation, in accordance with the technical specifications.
This item will be measured and paid for at the unit price per linear foot of sewer laterals lined beyond 25 feet of lateral, in addition to the corresponding item with Bid Form units of “EA”.
This item will be full compensation for all additional costs associated with work of installing liner beyond 25 feet.
8. SEWER LATERAL CLEANING AND TV INSPECTION
This item of work will be measured and paid at the unit price per each lateral cleaned and televised. Payment of the unit price per each will provide for the complete compensation for furnishing all labor, equipment, tools, and materials for preparatory cleaning and televising of sanitary sewer service laterals, including all incidentals such as traffic control and sewer plugging, in accordance with the technical specifications. If a cleanout does not exist, then cleaning will be done from the main line. This item will not be measured for payment when the lateral is repaired under different pay items.
9. CLEANOUT INSTALLATION (up to 4-feet deep)
This item will be measured and paid for at the unit price per each cleanout installed as directed by the County Representative. Payment of the unit price per each cleanout will
01025-4 provide complete compensation for furnishing materials and all labor, tools, equipment and incidentals, to location utilities; locate lateral; excavate; install a cleanout riser with cover and plug at the property line; backfill; compact; and restore surface in grass, asphalt, or concrete as applicable, complete in place, in accordance with the technical specifications.
The Cleanout shall be VAC-A-TEE or equal.
10. BENCH AND INVERT RESTORATION
This item provides for the restoration of bench and invert. The quantity to be paid for under this item is the number of manhole benches acceptably rehabilitated as shown on the drawings or where directed by the Project Representative.
The work includes the removal of all deteriorated concrete and loose bricks from the existing bench, restoration bench with hydraulic cement, applying coating system to the restored bench surfaces, protection of adjacent facilities, restoring all disturbed areas to reconstruction condition or better, and appurtenant work.
Payment will constitute full compensation for all costs for rebuilding the invert and bench including, but not limited to, bypass, labor, equipment, transportation, tools, and all other related procedures and materials.
11. SPRAY APPLIED STRUCTURAL COATING
This bid item describes measurement and payment for the installation of spray applied structural coatings in existing in-service manholes. This is an all-inclusive bid item which includes the structural coating and all interior work, cleaning, grouting, leak sealing and materials necessary to install a spray applied structural coatings.
The Contractor shall furnish all labor, materials and equipment to coat the existing manhole with an approved coating, according to manufacture recommendation and Hillsborough County Public Utilities Technical Specification and the Supplemental Specification.
The work comprises installing an approved coating system as specified including bypass (flow thru plugs), surface preparation, cleaning (sand or water blasting), application of hydraulic cement or other means to fill voids and stop infiltration, curing, visually inspecting finished coating; testing, removal/disposal of solids and all appurtenant work.
If “Minor” I&I is observed, a rapid setting crystalline enhanced hydraulic cement product, specifically formulated for infiltration control, shall be used to stop the Minor infiltration flows in accordance with the manufacturer's recommendations. The material shall be ThoRocTM Plug, OctocreteTM, Burke Plug, or approved equal. Where infiltration flows are “Severe”, surface preparation, manhole drilling and pressure grouting are required. The material for pressure grouting shall be Avanti grout, DeNeef grout, or approved equal, installed in accordance with the manufacturer's written instructions.
01025-5
The Contractor shall furnish all labor, materials and equipment to transport all debris removed including but not limited to manhole frame and cover from the existing manholes to an approved disposal site.
STRUCTURAL SPRAY COATING: The minimum thickness of the geopolymer liner system must be one inch (1”) and must be finished such that when the liner sets, the total wall thickness is homogeneous and monolithic.
Payment for spray applied manhole coatings and associated work (cleaning, grouting, leak sealing) will be made using the “per vertical foot” unit price listed in the bid proposal. Measurement shall be per vertical foot of coating applied to the manhole measured from the bottom of the manhole frame to the top of the invert or bench.
Separate payment will be made for the manhole frame and cover (if replaced) and exterior restoration work such as asphalt, concrete sidewalk and sod.
Contractor will be responsible for coordinating access and work with homeowners for backyard manholes, including the removal of structures for access. County will be paying for restoration of impacted backyard area, including fences, covered under NPI.
12. SODDING
This bid item describes measurement and payment for grassing of completed construction areas by planting sod.
Sodding: Measurement of sodding will be on a square yard basis for the area of sod installed where required at worksite to replace disturbed sod. Sod will be paid for on the basis of type, and area installed, to replace disturbed backyard sod after completion of work. The unit bid price for sodding includes soil preparation, furnishing and installing sod, rolling, mowing, watering at least 30 days, and any other measure necessary to establish and maintain a healthy stand of grass until the work is accepted by the Owner.
END OF SECTION
| SECTION 1 - GENERAL |
| 1.01 Scope |
| 1.02 Number of Contracts (s) |
| 1.03 Public Awareness and Outreach |
| 1.04 Testing / Laboratory Services |
| 1.05 Inspections |
| 1.06 Project Signs |
| 1.07 Schedule of Reinstatement of Service Laterals |
| SECTION 2 - SPECIFICATIONS FOR DIVISION 2 OF THE TECHNICAL SPECIFICATIONS |
| 2.01 Description of Work |
| 2.02 Reference Standards |
| Type 1: |
| Type 2: |
| 2.01 |
| 2.01 |
| 2.01 |
| 2.01 |
| 2.01 |
| 2.01 |
| 2.01 |
| 2.01 |
| 2.03 Measurement and Payment Supplement |
| 2.04 Authorization of Work |
| 2.05 Work Order Assignment Procedure |
| 2.10 |
| 2.10 |
| 2.10 |
| 2.10 |
| 2.10 |
| 2.10 |
| 2.10 |
| 2.10 |
| 2.10 |
| 2.10 |
| 2.10 |
| 2.10 |
| 2.10 |
| 2.10 |
| 2.10 |
| 2.10 |
| 2.10 |
| 2.10 |
| 2.10 |
| 2.10 |
| 2.10 |
| 2.10 |
| 2.10 Incidental Items |
| 2.11 Sewage Spills |
| 2.12 Site Safety and Clean-Up |
| 2.13 Emergency Work |
| 2.14 Standard Work Hours |
| 2.15 Pricing of Work Orders |
| 2.16 Digital Photography |
| 2.17 Hydrant Meter Fees and Deposits |
| ITEM COST |
| 3.01 Product/Contractor Pre-Qualification |
| 3.02 Additional Requirements |
| 4.01 Work Sequencing |
| 4.02 Structural Rehabilitations of Interior Wall of Manholes |
| 4.03 Composition |
| 4.04 Bench / Invert Restoration |
| 4.06 Schedule for Reinstatement of Manholes |
| 4.07 Manhole Final Inspection and Acceptancy |
| 4.08 Notification of Location of Work |
| END OF SECTION |
| 1. PIPELINE REHABILITATION (PIPE LINING) |
| 2. SEPARATE CLEANING AND CCTV INSPECTION |
| 3. MECHANICAL CLEANING OF TUBERCULATED IRON PIPE SEWERS |
| 4. CLEANING OF LIFT STATION WET WELLS |
| 5. REINSTATEMENT AND GROUTING OF SERVICE LATERALS |
| 6. GROUT SEAL LEAKING SERVICE LATERALS ON LINE SEGMENTS PREVIOUSLY LINED UNDER OTHER CONTRACTS |
| 7. FULL CIRCLE CIP LATERAL REPAIR |
| 8. SEWER LATERAL CLEANING AND TV INSPECTION |
| 9. CLEANOUT INSTALLATION (up to 4-feet deep) |
| 10. BENCH AND INVERT RESTORATION |
| 11. SPRAY APPLIED STRUCTURAL COATING |
| 12. SODDING |