19-Attachment B Technical Specifications.pdf

PDF 379 KB Posted

Attached to
Apollo Beach Underground Wastewater Utilities Rehab
Solicitation number
IFB-27-00025
Issued by
Hillsborough County, Florida

About this file

Summary

This is a Technical Specifications document prepared by Hillsborough County Water Resources Department for the Apollo Beach Underground Wastewater Utilities Rehabilitation project, estimated at $12,129,020.00. The specifications detail comprehensive requirements for the repair and rehabilitation of existing underground sanitary sewer infrastructure across multiple sewer sheds in Apollo Beach, Florida. The work encompasses preparatory cleaning and root removal, closed-circuit television (CCTV) inspection, wastewater flow control, sealing and testing, cured-in-place sectional connection seals and lateral liners, and pipeline rehabilitation by lining. All work must comply with Hillsborough County Standard Specifications for Construction, Water Resources Department Technical Manuals, and applicable ASTM standards. The project requires both pre-rehabilitation and post-rehabilitation CCTV inspections, with video documentation submitted on hard drives to become the property of the County. The contractor must furnish all necessary materials, labor, equipment, and services, including bypass pumping systems, traffic control, and proper disposal of materials removed during cleaning operations.

The specifications establish stringent quality and design standards for all liner materials and installation methods. Contractors must submit design calculations signed and sealed by Florida-registered Professional Engineers, demonstrating that proposed liners meet structural performance requirements including a 50-year design life, minimum safety factor of 2.0 for buckling, and resistance to corrosive sewage environments. The County has established a 0% Small Business Enterprise (SBE) subcontractor participation goal for this solicitation. The contractor is required to provide a two-year warranty covering both materials and workmanship, with warranty work to be performed at the contractor's expense. All submittals including video inspectors' certifications, equipment specifications, installation plans, and testing laboratory qualifications require approval prior to work commencement. The contractor bears full responsibility for any damages to the sewer system during installation, overflow prevention, and compliance with all environmental regulations and notification requirements for any sewage spills.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL SPECIFICATIONS

TABLE OF CONTENTS

All work regardless of the scope, shall be performed in strict accordance with the Hillsborough

County Standard Specifications For Construction (latest edition) and/or Hillsborough County Water, Wastewater, and Reclaimed Water Technical Manual and/or Technical Specifications (latest editions) and/or Hillsborough County Standard Pump Station Drawings, and/or Utility Accommodation Guide

(latest edition), and/or Hillsborough County Stormwater Technical Manual (latest edition), The

Hillsborough County Standard Pump Station Drawings, Technical Manual, and Technical

Specifications may be located on the Water Resources Department Website:

Public Utilities Technical Specifications

Public Works Standard Specifications for Construction (2021)

DIVISION 1 - SITE WORK

02760 Preparatory Cleaning and Root Removal

02761 Television Survey/Closed Circuit Television (CCTV)

02762 Wastewater Flow Control

02763 Sealing and Testing

02766 Cured-In-Place Sectional Connection Seal And Lateral Liner

02767 Pipeline Rehabilitation by Lining

TS - 1

Measurement and Payment Page 01025-2 Pipeline Rehabilitation and Repair

Preparatory Cleaning and Root

Removal

02760-1

Section 02760, Preparatory Cleaning and Root Removal

PART 1 GENERAL

1.01 Scope

This Section covers the preparatory cleaning and root removal from sanitary sewer mains prior to the internal inspection of the sewer lines by closed-circuit television and rehabilitation. This section also addresses the cleaning of the receiving lift station wet well prior to the start of cleaning operations and again after all liner installations served by that lift station have been installed and trimmed out. The Contractor shall furnish all necessary materials, labor, equipment, and services required for cleaning the sanitary mains and lift stations, including the removal of roots and debris.

1.02 General

A. Sewer Line Cleaning – The intent of sewer line cleaning is to remove dirt, grease, rocks, tuberculation, sand, and other foreign materials from the lines and restore the sewer to a minimum of 95% of the original carrying capacity. Since the success of other phases of work depends on the cleanliness of the lines, the importance of this phase of the operation is emphasized. It is recognized that there are some conditions such as broken pipe and major blockages that prevent cleaning from being accomplished or where additional damage would result if cleaning were attempted or continued. Should such conditions be encountered, the

Contractor will not be required to clean those specific segments of the sewer line.

If, in the course of normal cleaning operations, damage does result from pre-existing and unforeseen conditions such as broken pipe, the Contractor will not be held responsible. However, the Contractor is required to provide flow transfer and may be directed to assist the County in the repair.

B. Lift Station Cleaning – The purpose of cleaning the lift station wet well(s) prior to the start of line cleaning operations is to ensure the wet well is free of debris and other objects which may be dislodged by the additional flows entering the wet well(s) as a result of the cleaning and lining operations. The lift station wet wells shall be cleaned as work in the area served by the lift station is finished and prior to starting work in another area.

1.03 Hydraulic Cleaning Equipment

A. Hydraulically Propelled Equipment – The equipment used shall be of a removable dam type and be constructed in such a way that a portion of the dam may be collapsed at any time during the cleaning operation to protect against flooding in the sewer. The moveable dam shall be equal in diameter to the pipe being cleaned and shall provide a flexible scraper around the outer periphery to insure removal of the grease. If sewer cleaning balls or other equipment, which cannot be collapsed, are

02760-2 used, special precautions to prevent flooding of the sewers and public or private property shall be taken.

B. High-Velocity Jet (Hydro-Cleaning) Equipment – All high-velocity sewer cleaning equipment shall be constructed for ease and safety of operation. The equipment shall have a selection of two or more high-velocity nozzles. The nozzles shall be capable of producing a scouring action from 15 to 45 degrees in all line sizes designated to be cleaned. The equipment shall carry its own water tank, auxiliary engines, pumps and hydraulically driven hose reel.

C. The wet well shall be pumped down by County personnel. The equipment used for cleaning lift station wet wells shall not damage the wet well and shall carry its own water tank, auxiliary engines, pumps, hoses, and nozzles. The vac-truck shall be used to remove any materials and debris from the wet wells. County personnel shall be present during all phases of the wet well cleaning to manage/operate the lift station pumps. All wet well cleaning operations shall be completed and the lift station returned to normal operation prior to 3:30 PM. The Contractor shall coordinate the cleaning operations with the County five (5) business days in advance.

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION

3.01 General

The cleaning equipment shall be capable of removing dirt, grease, rocks, tuberculation, sand, and other materials and obstructions from the sewer lines and lift stations.

When cleaning the sanitary mains, if an entire segment of the main cannot be successfully performed from one manhole, the equipment shall be set up in the opposing manhole and cleaning attempted again. If after reversing the setup, successful cleaning cannot be performed or the equipment fails to traverse the entire length of the main segment, it will be assumed that a major blockage exists and the cleaning effort shall be abandoned. The

Contractor shall document the cause of the blockage if possible.

3.02 Cleaning Precautions

During the cleaning and preparation operations all necessary precautions shall be taken to protect the sanitary system from damage. During these operations, precautions shall also be taken to insure that no damage is caused to the lift station or to public or private property adjacent to, or served by, the sewer or its branches.

Satisfactory precautions shall be taken in the use of cleaning equipment. When hydraulically propelled cleaning tools (which depend upon water pressure to provide their cleaning force) or tools which retard the flow of the sewer line are used, precautions shall

02760-3 be taken to insure that the water pressure created does not damage or cause flooding of public or private property being served by the sewer. When possible, the flow of sewage in the sewer shall be utilized to provide the necessary pressure for hydraulic cleaning devices. When additional water from fire hydrants is necessary to avoid delay in normal work procedures, the water shall be conserved and not used unnecessarily. No fire hydrant shall be obstructed in case of a fire in the area served by the hydrant.

If a source of water is needed, the Contractor shall obtain one or more hydrant water meter(s) from the County. A refundable deposit and service charge is required for each meter. The most current information and fee schedule may be obtained by contacting the

Customer Service Department at (813) 272-5977.

3.03 Material Removal

All sludge, dirt, sand, rocks, grease, roots and other solid or semisolid material shall be removed from the wet wells prior to and after the cleaning and lining operations.

Additionally, all sludge, dirt, sand, rocks, grease, roots and other solid or semisolid material resulting from the cleaning operation shall be removed at the downstream manhole of the segment being cleaned. Passing material from segment to segment (or into the wet wells) which could cause line stoppages, accumulations of sand in wet wells, or damage pumping equipment, shall not be permitted.

Under no circumstances shall sludge or other debris removed during these operations be dumped or spilled into the streets, ditches, storm drains or other sanitary sewers.

3.04 Disposal of Materials

All solids or semisolids resulting from the cleaning operations shall be removed from the site and disposed of by the Contractor in a legal and sanitary manner as approved by appropriate authorities, at the Contractor’s cost.

At the pre-construction conference, the Contractor shall identify the facility which will be accepting the materials removed from the sanitary system. The Contractor shall submit a letter to the Project Manager identifying the facility, the cost per unit, and the method for quantifying the amount disposed of (e.g. cost/ton, cost/cubic yard, etc.). The Contractor’s letter shall be accompanied by a letter from the facility which will accept the materials removed from the sanitary sewers, acknowledging the material will be originating in

Hillsborough County and will be removed by the Contractor under contract with the

County. The facility letter shall be on company letterhead and bear the signature and title of an authorized facility representative.

3.05 Root Removal

Special attention should be used during the cleaning operation to assure complete removal of roots from the joints. Any roots which could prevent the proper application of

02760-4 chemical sealant, or could prevent the proper seating and application of the liners shall be removed. All roots shall be captured and removed from the line segments.

3.06 Protruding Service Taps

Protruding taps shall be trimmed to allow the insertion of the liner and the restoration of the full capacity of the line segment.

3.07 Acceptance of Cleaning Operations

Acceptance of sewer line cleaning shall be made upon the successful completion of the

CCTV inspection. If the CCTV inspection shows the cleaning to be unsatisfactory, the

Contractor shall be required to re-clean and re-inspect the sewer line until the cleaning is shown to be satisfactory. If the Contractor proceeds with lining a segment which is determined to be unsatisfactorily cleaned, the liner shall be removed and replaced at no additional cost to the County.

In addition, for those lines which have sags or dips, to an extent that the television camera lens becomes submerged for three (3) or more feet during the television inspection, the

Contractor shall pull a double squeegee and/or sponge through the line in order to remove the water from the dips or sags. Water removal through squeegees and/or sponges shall be performed until the television camera lens is no longer submerged. This requirement may be waived by the Project Manager/Inspector if the water in which the camera lens is submerged, is clear enough to allow the identification of pipe defects, cracks, holes and location of service taps.

- END OF SECTION -

Television Survey / Closed 02761-1 Circuit Television (CCTV)

Section 02761, Television Survey / Closed Circuit Television (CCTV)

The Work consists of furnishing all labor, materials, accessories, equipment, tools, transportation, services, and technical competence for performing all operations required to execute the internal closed circuit television inspection of sewers up to twenty-four (24) inches in diameter. This contract requires a pre and a post rehabilitation CCTV inspection for each line segment.

After cleaning, as specified in Section 02760, “Preparatory Cleaning and Root Removal”, and before and after rehabilitation work, each line segment shall be visually inspected by means of closed-circuit television (CCTV) in the presence of the Project Manager or

Inspector. The inspection shall be performed one line segment at a time. The flow in the segment being inspected shall be suitably controlled as described in Section 02762, “Wastewater Flow Control”.

The video inspection of each line segment shall be complete and continuous from beginning to end (manhole to manhole, etc.) with no breaks, skips, or blackouts in the video except as provided for failure of the closed circuit television camera to pass through the line. Each video inspection shall be recorded and submitted on a Hard Drive. Video inspections of multiple line segments may be on a single Hard Drive; provided all the video inspections for those line segments are recorded on the same Hard Drive (e.g. When the camera cannot pass through the line segment, the video inspection from the initial set up and the video inspection from the reverse set up shall be recorded and submitted on the same Hard Drive.)

Incomplete video inspections or video inspections that are blurry, cloudy, out of focus or with blackouts, insufficient lighting, breaks in the video, skips in the footage counter, or other defects will not be accepted and the Contractor shall be required to perform and submit another inspection of the line segment in question at no additional cost to the

County.

1.03 Equipment

The television camera used for the inspections shall be one specifically designed and constructed for conducting CCTV inspections. Picture quality and definition shall be to the satisfaction of the Project Manager/Inspector. Minimum requirements include 470H-line resolution color video, pan range of 270 degrees, and rotation range of 360 degrees. If inspecting laterals, the camera shall be capable of viewing up to 70 feet from the mainline.

If the equipment is found to be unsatisfactory, it shall be removed and replaced with adequate equipment at the Contractor’s expense.

Television Survey / Closed 02761-2 Circuit Television (CCTV)

The video camera shall include a title feature capable of showing the following information at the beginning of each video playback:

A. County Name

B. Time and Date

C. Contractor’s Name

D. Line Diameter

E. Beginning Manhole ID and Ending Manhole ID

F. Footage Counter (The footage counter shall be visible at all times during video playback.)

G. Technician’s Name

H. Written Comments (if entered)

1.04 Submittals

A. Video Inspector – Prior to performing any CCTV work, the Contractor shall submit for approval a list of the video inspectors who will be performing the work along with copies of their respective current NASSCO PACP and/or LACP certificates.

B. Equipment and Materials – The Contractor shall submit for approval a complete list of equipment and materials that is proposed for use in performing the CCTV inspection of the sewer lines.

C. Logs – The Contractor shall submit for approval a copy of the reporting logs that are proposed for use when inspecting the sanitary sewer system. The documentation shall be in accordance with the NASSCO PACP and LACP guidelines.

PART 2 PRODUCTS

2.01 Video Format

All CCTV inspections shall be recorded in a Hard Drive storage format. File format shall be acceptable to the County PM and generally viewable on common desk top personal computers. All Hard Drives shall be submitted to the Project Manager and will become the property of the County. Each drive shall have the following included in the label printed on the drive:

A. Date and County Name

B. Contractor Name

C. Line Segment Identifiers (Upstream manhole and downstream manhole IDs)

D. Pre or Post Rehabilitation

3.01 Preconstruction Inspection

Television Survey / Closed 02761-3 Circuit Television (CCTV)

A. Procedure

1. Prior to any repair work, the entire sanitary line shall be inspected. The

County may have a representative present during the inspection.

2. The camera shall be moved through the line in either direction at a moderate rate, stopping when necessary to permit proper documentation of the sewer condition. In no case shall the television camera be pulled at a speed greater than 30 feet per minute. If, during the inspection, the television camera will not pass through the entire line segment, the Contractor shall set up the equipment so that the inspection can be performed from the opposite manhole or access point. The Contractor shall document the cause for the failure of the camera to pass through the line.

3. Movement of the television camera shall be temporarily halted, approximately

10 seconds minimum, at each visible point source of infiltration and/or inflow until the leakage rate from that source is quantified and at each service lateral so the entire circumference of the connection seal can be observed for potential leakage.

B. Documentation

1. Inspection Logs – Digital location records shall be kept by the Contractor and will clearly show the location in relation to an adjacent manhole of each defect observed during the inspection. Inspection logs shall be in accordance with the

NASSCO PACP and LACP guidelines. In addition, other points of significance such as locations of service laterals, unusual conditions, roots, storm sewer connections, broken pipe, presence of scale and corrosion, and other discernible features will be recorded and a copy of such records will be supplied to the Project Manager. The logs shall also denote the clock position or range of positions of any service connections, cracks in the pipe, water infiltration from the joints, root growth from joints, and other defects in the sewer noted during the inspection.

2. Video – The purpose of recording the pre-construction inspection video shall be to supply a visual and audio record of problem areas of the lines and documentation of proper cleaning prior to the liner installation. Hard Drive playback shall be at the same speed that it was recorded. Slow motion or stop motion playback features shall be enabled. Once recorded, the Hard Drives become the property of the County. The Contractor shall have all the necessary playback equipment readily accessible to facilitate the review of any segment by the County during the Project.

3.02 Post Construction Inspection

A. Procedure

Television Survey / Closed 02761-4 Circuit Television (CCTV)

1. Upon completion of the sewer line rehabilitation, the entire sewer line segment shall be inspected. The County may have a representative present during the inspection. No post construction video inspection shall be accepted for lines which have not been completely rehabilitated. In order to consider a line completely rehabilitated, the liner shall have been inserted and properly cured, all service laterals reestablished (cut out to 100%), the ends of the liner have been trimmed and grouted, and all service laterals have been grouted. Note, no partial or final payment will be made for line segments which have not been completely rehabilitated and post construction video inspections submitted for verification.

2. The camera shall be moved through the line in either direction at a moderate rate, stopping when necessary to permit proper documentation of the sewer rehabilitation and the re-establishment of the service laterals. In no case shall the television camera be pulled at a speed greater than 30 feet per minute. If, during the post-inspection, the television camera will not pass through the entire line segment, the Contractor shall set up his equipment so that the inspection can be performed from the opposite manhole. The Contractor shall document the cause of the failure of the closed circuit television camera to pass through the line. Any additional work required to correct a defect in the liner shall be accomplished at no additional cost to the County.

3. Movement of the television camera shall be temporarily halted at any defect and service lateral. The camera shall also be stopped at any unnoticed or non-repaired point source of infiltration and/or inflow until the leakage rate from that source is quantified.

B. Documentation

1. Inspection Logs – Digital records shall be made by the Contractor clearly showing the location, in relation to an adjacent manhole, of each defect and repair observed during inspections. Inspection logs shall be in accordance with the NASSCO PACP and LACP guidelines. In addition, other points of significance such as locations of service laterals, unusual conditions, and other discernible features and defects will be recorded and a copy of such records will be submitted to the Project Manager when that segment is invoiced.

2. Hard Drive Video and Audio – The purpose of the recordings shall be to supply a visual and audio record of the rehabilitated line segments. Hard Drive playback shall be at the same speed that was recorded. Slow motion or stop motion playback features shall be enabled. Once recorded, the Hard Drives become the property of the County. The Contractor shall have all Hard Drives and necessary playback equipment readily accessible for review by the

County’s representative during the Project.

Wastewater Flow Control 02762-1

Section 02762, Wastewater Flow Control

1.01 Scope of Work

The Work specified in this section includes all labor, materials, accessories, equipment, and tools for performing all operations required to bypass pump sewage around a manhole or sewer line in which work is to be performed. The Contractor shall be prepared to bypass pump sewage as a part of normal operations.

The Contractor shall provide all pumps, piping, and other equipment to accomplish this task; perform all construction; obtain all permits; pay all costs; and perform complete restoration of all existing facilities to equal or better condition to the satisfaction of the

Engineer.

When sewage flows at the upstream manhole of the sewer line segment being rehabilitated are above the maximum allowable requirements for the CCTV inspection, or do not allow the proper sewer or manhole repair, the flows shall be reduced to the appropriate levels specified in the table below by one of the following methods: manual operation of pumping stations by County forces, by the Contractor plugging/blocking of the flows, or by the Contractor pumping/bypassing of the flows as acceptable to the Engineer.

In some applications, the wastewater flow may be plugged and contained within the capacity of the collection system. This shall only be done when it has been determined the system can accommodate the surcharging without any adverse impact.

For Liner Insertion – The sewer line shall be completely plugged. No flow, except infiltration/inflow, will be allowed.

For CCTV Inspections – Including warranty inspections, and joint testing and sealing, the depth of flow within the sewer shall not exceed that shown below for the respective pipe sizes as measured at the manhole.

Television Inspection

Pipeline Diameter Depth of Flow Within the Pipeline 6” – 10” 20% of pipe diameter

12” – 24” 25% of pipe diameter

24” and larger 30% of pipe diameter

Joint Testing/Sealing

Pipeline Diameter Depth of Flow Within the Pipeline

6” – 12” 25% of pipe diameter 15” – 24” 30% of pipe diameter

24” and larger 35% of pipe diameter

Wastewater Flow Control 02762-2

When sewage flows at the upstream manhole of the line segment being repaired are too excessive to plug while the rehabilitation is being performed, the Contractor shall submit a bypass pumping plan to the Project Manager prior to beginning the rehabilitation of the sanitary sewer line segment.

PART 2 PRODUCTS (Not Used)

Part 3 EXECUTION

3.01 Plugging and Blocking

A sewer line plug shall be inserted into the line at a manhole upstream from the segment being inspected or repaired. The plug shall be so designed that all or any portion of the flows can be released. During the CCTV inspections, flows shall be shut off or reduced to within the maximum flow limits specified. During lining operations the flows shall be shut off or pumped/bypassed. After the Work has been completed, flows shall be restored to normal.

3.02 Pumping and Bypassing

Whenever lines are blocked off and the possibility of sewage backups causing harm to public or private property is foreseen, it shall be the Contractor’s responsibility to bypass pump from manhole to manhole. All bypassed flow must be discharged into a sanitary sewer. Bypassed flow shall not be allowed to enter any storm line, drainage ditch, or street gutter. The Contractor shall maintain the pump and bypass equipment, and shall be responsible for any damages to public or private property due to malfunction.

When pumping/bypassing is required, the Contractor will supply the necessary pumps, conduits, and other equipment to divert the flow of sewage around the line segments in which work is to be performed. The bypass system shall be of sufficient capacity to handle existing flows plus any additional flows that may occur during periods of rain storms. The Contractor shall be responsible for furnishing the necessary labor and supervision to set up and operate the pumping and bypassing system.

Pumps and equipment shall be continuously monitored by the Contractor’s maintenance personnel. The Contractor’s maintenance personnel shall be capable of starting, stopping, refueling, and maintaining the pumps. If pumping is required on a 24-hour basis, the engines and pumps shall be equipped in a manner to keep noise at a minimum. The

Contractor shall have a standby pump of sufficient capacity available at all times during the pumping and bypass operations.

3.03 Flow Control Precautions

Wastewater Flow Control 02762-3

A. Surcharging Sewers – Where the raw sewage flow is blocked or plugged, sufficient precautions must be taken to protect the public health. The sewer lines shall also be protected from damage. The following occurrences shall not be allowed:

1. No sewage shall be allowed to back-up into any homes or buildings.

2. No sewage shall overflow any manholes, cleanouts, or other access points to the sewers.

3. Users upstream of the repair area shall be able to use all their water and sewer utilities without interruption. If any of the above occur, or are expected to occur, the Contractor shall bypass pump to alleviate all of the conditions.

Additionally, the Contractor is required to observe the conditions upstream of the plug and be prepared to immediately start bypass pumping if needed.

B. Pumps – Any sump pumps, bypass pumps, trash pumps or any other type pump which pulls sewage, water, or any type of material out of a manhole or sewer shall discharge the same material into another sanitary sewer manhole, or appropriate vehicle or container. Under no circumstances shall this material be discharged, stored, or deposited on the ground, swale, road, or open environment.

C. Traffic Control – The Contractor shall take appropriate steps to ensure that all pumps, piping and hoses that carry raw sewage are protected from traffic. Traffic control shall be performed in accordance with Traffic Regulation and Maintenance of Traffic and the General Conditions.

D. Sewage Spills – If any form of raw sewage is spilled, discharged, leaked, or otherwise deposited in the open environment due to the Contractor’s work during any form of Wastewater Flow Control, the Contractor is responsible for any cleanup of solids and disinfection of the area affected. This work shall be performed at the Contractor’s expense with no additional cost to the Owner. The

Contractor is also responsible for notifying the sewer system maintenance personnel and complying with any and all regulatory requirements and/or fines at no additional cost to the Owner (County). The Contractor shall complete the attached “Contractor’s SSO” form (pages 02762/4 and 02762/5) and contact the

Project Manager concerning any spills within 24 hours.

Wastewater Flow Control 02762-4

CONTRACTOR SSO REPORT

Date:

To: DEP/EPC From:

1. Date of event:

Time of event:

2. Type of collection:

Separate systems

3. Facility number and location: 4. Method used to contain

5. WWTP Name: 6. Method used to remove:

7. Permit No:

9. Time taken to repair:

10. Description of Source/Cause (check one):

Pump station failure

Line break or blockage Failure on plant site Manhole failure

Description (check one):

Raw WW Leachate

Partially treated effluent

Reclaim Sludge

11. Property damage, if any:

12. Ultimate Destination of the Overflow (check one):

Into a storm drain Surface water(s)

Into a ditch Contained on site

On the street only On adjacent property with no flow to Other (describe) ditch or surface water(s)

13. Steps Taken to Minimize Property Damage:

14. Cause of Discharge:

15. Corrective Action or Plans to Eliminate Future Discharges:

16. Duration and Volume of Overflow/Discharge:

(If unknown, estimate)

18. Investigated by: Name:

Phone number:

20. Problem reported to County (check one)?

Yes No Date: Time:

21. Problem Corrected (check one)?

Yes No Date: Time:

22. Were the Regulatory Agencies Notified (check one)?

744-6100 ext 309 Yes No DEP Date: Time:

627-2600 Yes No EPC Date: Time:

1-800-320-0519 Yes No STATE (Spills over 1,000 gal) Date: Time:

23. If overflow was caused by Contractor, please complete the following:

Contractor’s Name:

Address:

Contact Name: Telephone No.:

Wastewater Flow Control 02762-5

STATE WARNING POINT QUESTIONS

All unauthorized releases or spills of untreated wastewater in excess of 1,000 gallons per incident, or where public health or the environment may be endangered, shall be reported to the STATE WARNING POINT TOLL FREE NUMBER (800) 320-0519, as soon as practical, but no later than 24 HOURS from the time the permittee becomes aware of the discharge. The following information, to the extent known, shall be provided to the State

Warning Point:

1. Name, address, and telephone number of person reporting.

2. Name, address, and telephone number of permittee or responsible person for the discharge.

3. Date and time of the discharge and status of discharge (ongoing or ceased).

4. Characteristics of the wastewater spilled or released (untreated or treated, industrial or domestic wastewater).

5. Estimated amount of the discharge.

6. Location and address of the discharge.

7. Source and cause of the discharge.

8. Whether the discharge was contained on-site, and cleanup actions taken to date.

9. Description of area affected by the discharge, including name of water body affected, if any.

10. Other persons or agencies contacted.

Sealing and Testing 02763-1

Section 02763, Sealing and Testing

A. The work specified in this Section includes all labor, materials, accessories, equipment, and tools necessary for chemical grouting, sealing, and testing of sources of infiltration which may interfere with the proper installation of the liner, sanitary sewer service connections after the installation of the pipe liner, and the liner at the manholes.

A. Service Lateral Sealing and Testing – Each service lateral connection shall be sealed and inspected for leaks after installation of the liner. The intent of the inspection is to identify and correct defective connections, and to ensure an effective seal or repair has been accomplished.

B. Watertight seal at manhole - A watertight seal is required at the manhole. Each end of the liner shall be cut and trimmed to allow for a watertight connection to the manhole and to insure that water cannot seep between the original pipe and the new liner. The liner ends shall be sealed with a resin mixture specified by the manufacturer. Cementitious grout shall be added to form smooth transitions between edges of new liner and existing benches or channels.

C. Infiltration Sealing – Sources of infiltration within the sewer system which may interfere with the proper installation of the liner are to be sealed. All leaks where it is apparent that sand has entered the pipe since it was cleaned, shall be grout sealed. Such sealing shall be included in the unit price for installation of the liner and shall be considered part of preparing the line segment for liner installation.

PART 2 PRODUCTS

2.01 Sealing Materials

A. All chemical joint-sealing materials, including any activators, initiators, and inhibitors, used on this project shall be as recommended by the liner manufacturer. Prior to installation, the Contractor shall submit to the Project

Manager for approval, product and MSDS information for all material to be used.

3.01 Leak Testing Equipment

A. The basic equipment used shall consist of a CCTV camera, a testing device (such as a packer), and test monitoring equipment. In combination, the equipment shall

Sealing and Testing 02763-2 be constructed in such a way as to provide the means for introducing air under pressure into a void area created by the expanding ends of the testing device. The testing equipment shall have the means for regulating the flow rate of air into the void area created by the testing device.

B. The testing device shall be fitted with a means for continuously measuring the actual static pressure within the void area. The static pressure readings within the void shall be transmitted electrically and without the use of the test medium or hoses. All test monitoring shall be above ground and in a location to allow for simultaneous, continual observation of the television monitor and test monitoring equipment by the Contractor. The Project Manager or Inspector may observe the testing operations.

3.02 Test Records

A. During the testing procedure, complete records shall be kept, of the location of the line segment in which the testing is being done, the location of each service connection, the test pressures used, and the test results. If a service connection is not tested the reason shall be documented in the records. A specific statement for each connection shall be included in the field report(s) to indicate if the referenced connection passed or failed the test.

3.03 Sealing Procedure

A. The application of sealing material for the mainline and service connections shall be from within the pipe and shall be by means of remote-controlled equipment specifically designed for such application. The material shall be injected under sufficient pressure to allow the material to pass through the opening and fill voids outside the pipe as well as the opening of the pipe wall. The method of sealing used shall not damage the pipe, change pipe alignment, or permanently reduce or change the original cross-sectional area of the pipe. Manufacturer use and application recommendations for the sealing materials shall be followed.

B. The Contractor shall operate all equipment with care and shall be responsible for any damage to the sewer system or other facilities caused by the operations, and shall repair such damage without delay at no additional cost to the County.

C. Service lateral connections which fail the leak test shall be resealed and retested at no additional cost to the County.

3.04 Television Inspection

A. All CCTV inspections shall be performed as outlined in Section 02761, Television

Survey/(CCTV) Closed Circuit Television.

- END OF SECTION –

02766-1

SECTION 02766

CURED-IN-PLACE SECTIONAL CONNECTION SEAL AND LATERAL LINER

1.1 REQUIREMENTS

A. The Work of this Section includes providing a cured-in-place (CIPP), integral, sectional and lateral liner to stabilize structural defects and constructional inadequacies in sanitary sewer laterals, without excavation, while providing a one piece, leak free connection at the interface of the mainline and lateral pipelines.

The liner shall be smooth, hard, strong and chemically inert. Additionally, the interior surface shall closely follow the contours of the host pipe.

B. The interface connection seal shall be used to provide a seal between the mainline liner and the lateral. This system is defined as the combination of a sectional connection seal and a lateral liner, where the latter extends into the lateral a maximum length of 25 feet.

C. Based upon the results of the preliminary lateral TV inspection the ENGINEER shall determine which laterals will be rehabilitated and how far the liner shall extend up the lateral. The CONTRACTOR shall not perform any rehabilitation work until written approval is provided from ENGINEER depicting how the laterals will be rehabilitated and will not be paid for any rehabilitation lateral work commencing before written approval is received from ENGINEER. The scope of work requires the CONTRACTOR to provide all materials, labor, equipment, and services necessary for bypass pumping and/or diversion of sewage flows, pre-installation procedures including root removal cleaning, grouting and rehab of existing sanitary sewer services by lining the existing pipe, re-establishing connections to the existing sewer main, initial and final CCTV inspection, and final testing of the CIPP system.

D. Measurement for rehabilitation shall be the actual distance measured from the connection between the mainline and the lateral, to the end of each lateral pipe lined.

1. The basis of payment for work under this specification shall be made at the contract unit bid price as follows:

a. per each connection seal installed including the first 25 feet of lateral liner

b. per linear foot of liner installed for lateral liners beyond the connection seal and the first 25 feet of lateral liner

2. The unit prices shall include all labor, materials, equipment and all incidentals such as bypass pumping and/or diversion of sewage flows, traffic control, re-establishing connections to the existing sewer main, pipe pre-conditioning, chemical grouting of connection between the lateral and the mainline, initial and final cleaning, post CCTV inspection, and all testing of the CIPP system.

1.2 SUBMITTALS

A. Submit Prior to Mobilization:

1. The CONTRACTOR shall submit to the ENGINEER for review, complete

02766-2 design calculations for the liner thickness per ASTM F1216. The design shall be signed and sealed by a professional engineer, registered in the State of

Florida and certified by the manufacturer as to the compliance of his material to the values used in the calculation. Approval of the calculations shall not relieve the CONTRACTOR of any contractual obligations.

2. The CONTRACTOR shall include a typical schedule for “wet out” of the connection seal and lateral liner in the method statement together with a typical insertion and curing schedule/plan at the outset of the Contract. The wet out schedule, insertion plan and curing plan shall provide the appropriate information as described under Section 3.5 of this specification, GENERAL

INSTALLATION PROCEDURES

3. Certified copies of test reports for the resin material used for this project.

4. Proposed testing laboratory with qualifications, experience history and references.

5. Installation Plan/Diversion Pumping Plan (including Emergency Plans) as required.

B. After Completion of Each Service:

1. The CONTRACTOR shall submit the installation and curing process control sheets including information as described under Section 3.5, GENERAL INSTALLATION PROCEDURES of this specification.

2. Pre and Post CCTV inspection tapes.

3. Manufacturer’s certification of proper installation.

4. Physical samples: for every ten laterals lined, two flat plate samples shall be processed and tested. The flat plate sample preparations shall be as described under Section 3.7-A.1 of this specification. Samples removed for testing shall be individually labeled and logged to record the following:

a. OWNER’s project number and title.

b. Sample number

c. Segment number of line as noted on supplements.

d. Date and time of sample

e. Name of CONTRACTOR

f. Location and by whom tested

g. Street name and address

h. Results of test. Samples shall be numbered as follows:

1) Sample No. 1: Flat plate sample.

1.3 QUALIFICATIONS OF CONTRACTOR

A. The CONTRACTOR or subcontractor performing the work of this section shall be employees of the company manufacturing the CIPP system components, or shall be licensed by the system manufacturer. Notwithstanding these requirements, every individual installing the repair material shall be licensed by the lining system manufacturer.

1.4 RESPONSIBILITY FOR OVERFLOWS OR SPILLS

02766-3

A. It shall be the responsibility of the CONTRACTOR to schedule and perform his work in a manner that does not cause or contribute to incidence of overflows or spills of sewage from the sewer system.

B. In the event that the CONTRACTOR’s work activities contribute to overflows or spills, the CONTRACTOR shall immediately take appropriate action to contain and stop the overflow, clean up the spillage, disinfect the area affected by the spill and notify the designated OWNER in a timely manner.

C. CONTRACTOR will indemnify and hold harmless the OWNER and ENGINEER for any fines or third-party claims for personal or property damage arising out of a spill or overflow that is fully or partially the responsibility of the CONTRACTOR, including the legal, engineering and administrative expenses of the OWNER and ENGINEER in defending such fines and claims.

1.5 WARRANTY

A. A written guarantee of 2 year in length shall be provided by the CONTRACTOR to the OWNER against any breakdown of the liner material, inadequate structural strength or any shortcoming in workmanship. During the warranty period, any defects which affect the integrity or strength of the pipe and liner shall be repaired at the CONTRACTOR’s expense in a manner mutually agreed to by the OWNER and the CONTRACTOR.

PART 2 PRODUCTS

2.1 MATERIALS

A. CIPP Sectional Liner and Lateral Lining Tube:

1. The lateral tube and the mainline liner section will consist of one or more layers of flexible needled felt or an equivalent non-woven material. The tube will be continuous in length and wall thickness shall be uniform. Thickness design shall be based on ASTM F1216 Appendix X1. No overlapping sections shall be allowed in the circumference or the length of the lateral liner. If an overlap is required at the connection between the sectional liner and the lateral liner, the overlap shall be 4 pipe diameters and the two components shall be installed concurrently. The tube will be capable of conforming to offset joints, bells, 45 degree bends, 90 degree bends and disfigured pipe sections.

2. The CIPP lateral liner installation will be accomplished remotely using air or water for inversion and curing. The cured-in-place pipe shall provide a smooth interior surface and shall conform to the existing pipe and eliminate any groundwater infiltration or connection to the outside of the host pipe/service. The lateral tube design shall assume no bonding to the original pipe, in accordance with ASTM F 1216.

3. The CIPP lateral liner/interface seal shall be installed from the mainline sewer and shall extend a minimum of 3 feet and up to 25 feet inside the lateral. No clean out is, or should be, required for the installation of the connection seal and the lateral liner system.

4. If necessary, the CIPP lateral liner shall be installed utilizing existing 4 inch diameter clean outs installed at the property line or launched from the sewer main. It is the intent of these contract documents that all lateral lining / work be accomplished utilizing existing clean outs. If a lateral has been identified to be repaired by means of a lateral liner installation, and no clean outs exist

02766-4 at the property line, the CONTRACTOR shall obtain authorization from the ENGINEER / OWNER to install a new clean-out.

5. Design Criteria:

a. Tube Design – ASTM F 1216

b. Hydrostatic Buckling – ASTM F 2561

c. Fabrication and Installation – ASTM F2561

B. Resin:

1. The resin used to impregnate the tube and the connection seal shall produce a cured tube that shall be resistant to shrinkage, shall not corrode or oxidize, and shall also be resistant to abrasion from solids, grit, and sand in wastewater. The resin shall have proven resistance to the municipal wastewater environment that includes, as a minimum, all of the following factors:

a. Immersion in septic sewage at temperatures up to 75 degrees F.

b. Exposure to hydrogen sulfide gas from septic sewage at temperatures up to 75 degrees F.

2. The resin shall have proven resistance to ultra-violet light (sunlight) at any stage prior to installation.

3. The resin shall be a polyester, vinyl or epoxy resin, with catalysts designed for the specific application as required, and shall be solvent free.

4. The resin system proposed shall not contain silicones, sterates, and/or natural waxes that would adversely affect the adhesives properties or any other chemical or physical properties of the CIPP liner.

5. The internal wall color of the cured liner shall be a light reflective color so that a clear detail CCTV inspection can be accomplished.

6. The chemical resistance of the resin system selected shall have been tested by the resin manufacturer in accordance with ASTM D543. Exposure to the chemical solutions listed in Table 1 shall be conducted at temperature of up to 75 degrees F. This test shall be conducted for a minimum period of one month and shall result in a loss of not more than 20 percent of the initial structural properties.

Table 1. Minimum Chemical Resistance Requirements for Typical

Municipal Sewer Applications. ASTM D543.

Chemical Solution Concentration, %

Tap Water (pH 6-9) 100

Nitric Acid 5

Phosphoric Acid 10

Sulfuric Acid 10

Gasoline 100

Vegetable Oil 100

Detergent or Soap 0.1

7. The resin system shall be manufactured by a company selected by the CIPP

02766-5 supplier. Resins complying with the requirements in Table 2 shall be used.

C. CIPP Properties:

1. The CIPP after curing shall meet the minimum structural properties listed below:

Table 2. CIPP Initial Structural Properties - ASTM F1216

Property ASTM Method Minimum Value Tensile Strength D638 3,000 psi Flexural Strength D790 4,500 psi Short Term Flexural Modulus of Elasticity D790 250,000 psi Long Term Modulus Creep Reduction 50%

D. CIPP Thickness:

1. The minimum thickness for the CIPP, after curing, shall be calculated based on the following design conditions in accordance with ASTM 1216:

a. Fully deteriorated pipe condition.

b. The CIPP is subjected to a full soil load of 120 pounds per cubic foot and an HS-20 live load.

c. The modulus of soil reaction for pipe zone backfill material is 700 psi.

d. The CIPP is subject to a groundwater elevation at ground surface.

e. The long-term flexural strength and long-term flexural modulus of elasticity for CIPP shall be equivalent to 50 percent of the initial flexural strength and initial flexural modulus of elasticity, respectively, as measure in accordance with ASTM D790.

f. The minimum overall factor of safety is 2.0.

g. The design life of the CIPP repair shall be 50 years.

E. Interface Seal

1. The interface seal shall have structural properties in accordance with ASTM

F1216 and as referenced in Table 1 - CIPP Initial Structural Properties. The interface seal shall meet the 50 year design life of the CIPP lateral liner. The interface seal shall meet the conditions above and shall be a full-circle, 16 inch long (min), sectional CIPP mainline liner integrally manufactured to the lateral liner providing a seamless connection between the mainline liner and the lateral liner. Fabrication of the interface seal shall be in accordance with

ASTM F2561.

2. Interface seals shall be designed for either a “T” or “Y” fitting and / or shall be able to accommodate either condition without wrinkles or folds when installed.

3. The interface seal shall provide a watertight connection between the service connection and the mainline.

4. The interface seal between the lateral liner and the mainline sewer pipe shall be compatible with the mainline liner.

5. The CONTRACTOR shall base his / her bid on one of the named manufacturers in this specification for the lateral liner or the connection seal.

02766-6

F. Manufacturers:

1. T-Liner of LMK Enterprises, BLD Service LLC, Trelleborg, or equal

3.1 DELIVERY, STORAGE AND HANDLING

A. If the flexible tube is impregnated with resin at the factory, it shall be transported, installed, and cured before expiration of the shelf life.

B. Impregnated tube shall be stored and transported under refrigerated, ultraviolet light-free conditions.

C. Each liner shall be accompanied with the appropriate documentation indicating time and date of liner manufacturing, felt thickness, number of layers, length of liner, resin type and name, hardener type and name, batch numbers, mixing ratios, etc.

D. No cuts, tears, or abrasions shall occur during handling. The CONTRACTOR shall not place the tube into the host pipe before the OWNER inspects the tube.

3.2 PLUGGING, TEMPORARY FLOW BYPASS AND DIVERSION PUMPING

A. After coordination with the home or building owner or confirmation of their absence, the upstream side of the lateral shall be plugged during insertion and curing of the liner assembly. The upstream level shall be monitored constantly and the plug deflated in order to avoid any backups or overflows.

B. In cases where the rehabilitation or repairs take longer than several hours or the flow magnitude is too great for a successful installation with use of only plugs, the CONTRACTOR shall provide for the transfer of flow, through or around section or sections of pipe that are to be rehabilitated or repaired. The proposed bypassing system shall be approved in advance by the ENGINEER. The acceptance of the bypassing system in advance by the ENGINEER shall in no way relieve the CONTRACTOR of responsibility and/or public liability. Temporary flow bypass and diversion pumping shall be carried out in accordance with Section 02762, Waste Water Flow Control.

3.3 SEWER CLEANING

A. The CONTRACTOR shall be responsible for the removal of internal deposits in the pipelines in accordance with the provisions of Section 02760, Preparatory Cleaning.

Both mainline sections and the lateral to be lined shall be cleaned.

B. The liner must be compatible with the existing pipe or linings and provided for adhesion of the liner to the pipe or lateral surface. CONTRACTOR shall provide for pipeline/liner compatibility utilizing one of two methods:

02766-7

1. Provide hydrophilic o-rings on both sides of the sectional liner and at the end of the lateral liner or at any overlap of component systems not installed concurrently.

2. Grind the interior surfaces of the main and lateral to remove any existing coatings and apply a detergent solution to remove any grease accumulation following the initial cleaning. Repeat the detergent application if the lateral liner is not installed within 24 hours of the first application.

C. The CONTRACTOR will be responsible for clearing the sewer main and lateral of all obstructions. If inspection reveals an obstruction that cannot be removed by conventional cleaning, the OWNER shall be advised.

This is the start of the file's text. The full file is on GovTribe.