Summary
This is a construction document set and invitation to bid for the Autrey Mill Park Restroom Facility and Pavilion project issued by the City of Johns Creek, Georgia. The project encompasses the construction of a new restroom facility and pavilion structure within the Autrey Mill Nature Preserve and Heritage Center, located at 9770 Autrey Mill Road, Johns Creek, Georgia 30022. The scope of work includes construction of a new restroom with an integrated septic system for wastewater treatment, a new pavilion structure, and new sidewalks to connect the facilities. The construction documents were issued for bidding on July 8, 2021, with sealed bids due no later than 2:00 PM on September 30, 2021. The deadline for submitting questions through the BidNet bidding system was September 17, 2021 at 5:00 PM. The project site encompasses 46.21 acres across two parcels (Land Lots 110110 and 110139) in Fulton County, with zoning classifications of R-4A and AG-1.
The restroom facility is a one-story, 635 square foot building designed to utility occupancy standards with an occupant load of 1 person, constructed under IBC 2018 Type VB non-sprinklered construction. The design includes two restroom spaces (100 and 101), each 18 feet 8.5 inches by approximately 9 feet, with concrete slab-on-grade foundations, CMU walls with stone veneer and fiber cement siding finishes, pre-engineered glulam framing, and asphalt shingle roofing. The pavilion structure measures 27 feet by 30 feet with a 4-foot 4-inch height, featuring built-in bench seating with a cast stone cap and pre-engineered glulam columns. The project includes 136 cubic yards of cut and 24 cubic yards of fill (net 112 cubic yards). The design team includes Pond & Company (project management, architecture, and MEP engineering), Westside Engineering (civil engineering), and MH Structures (structural engineering). The City of Johns Creek reserves the right to reject any or all bids and will affirmatively ensure that disadvantaged business enterprises receive full opportunity to submit bids without discrimination based on race, color, national origin, or sex.
Text of this file
Copyright © 2021 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
1 2
D
SHEET NUMBER
SUBMITTED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DATE:
SHEET TITLE
DRAWING ISSUE
EOR/AOR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
24" X 36"
PROJECT NAME
CONSULTANT
3 4 5
C
B
A
CITY OF JOHNS CREEK
/8
/2
:3
:0
A M
C R e v it L o c a l\
\1
A u tr e y M ill L it to n B
.r v t
PROJECT SUBMITTAL STAGE
G-001
COVER
SHEET
RTJ
RTJ
MBL
MBD
7/8/2021
PROJECT # - 1210185
AUTREY MILL
PARK
RESTROOM
FACILITY
9770 AUTREY MILL
ROAD, JOHNS
CREEK, GA 30022
SHEET INDEX
SHEET
NUMBER SHEET NAME
GENERAL
G-001 COVER SHEET
G-101 LIFE SAFETY PLAN & BUILDING CODE
SUMMARY
CIVIL
CD-101 DEMOLITION PLAN
CS-101 CIVIL SITEPLAN
CG-001 CIVIL GRADING PLAN
C-501 CONSTRUCTION DETAILS
C-502 CONSTRUCTION DETAILS
C-503 CONSTRUCTION DETAILS
STRUCTURAL
S001 GENERAL NOTES
S101 FOUNDATION PLAN
S201 TYPICAL FOUNDATION DETAILS
S202 TYPICAL FOUNDATION DETAILS
S301 TYPICAL MASONRY DETAILS
ARCHITECTURAL
A-001 GENERAL NOTES, SYMBOLS, AND
MATERIALS
A-101 FLOOR PLAN
A-201 EXTERIOR ELEVATIONS
A-202 INTERIOR ELEVATIONS
A-301 BUILDING SECTIONS
A-501 ARCHITECTURAL DETAILS & DOOR
SCHEDULE
A-571 ADA MOUNTING HEIGHTS & DETAILS
A-701 SPECIFICATIONS
A-702 SPECIFICATIONS
A-703 SPECIFICATIONS
A-704 SPECIFICATIONS
PLUMBING
P0-01 LEGEND, NOTES, DETAILS & SCHEDULES
P0-02 SPECIFICATIONS
P1-01 FLOOR PLANS
MECHANICAL
M-001 NOTES, LEGEND, & SCHEDULES
M-101 MECHANICAL PLAN
ELECTRICAL
E-000 NOTES, DETAILS, AND LEGEND
E-100 ELECTRICAL PLANS
E-200 SPECIFICATIONS
AUTREY MILL PARK RESTROOM FACILITY
9770 AUTREY MILL ROAD
JOHNS CREEK, GA 30022
OWNER
CITY OF JOHNS CREEK
CONTACT: ERICA MADSEN
11360 LASKEFIELD DRIVE, JOHNS CREEK, GA
30097
PHONE: 678-512-3264
EMAIL: ERICA.MADSEN@JOHNSCREEKGA.GOV
PROJECT MANAGER
POND & COMPANY
CONTACT: MITCHELL DAVIS
3500 PARKWAY LANE, SUITE 500
PEACHTREE CORNERS, GA 30092
PHONE: 404-748-4926
EMAIL: DAVISM@PONDCO.COM
ARCHITECTURE
POND & COMPANY
CONTACT: RYAN JENNINGS
3500 PARKWAY LANE, SUITE 500
PEACHTREE CORNERS, GA 30092
PHONE: 678-454-2526
EMAIL: RJENNINGS@PONDCO.COM
MEP ENGINEERING
CONSTRUCTION DOCUMENTS
BID & PERMIT SET
07/08/2021
CIVIL ENGINEERING
POND & COMPANY
CONTACT: JASON BACH
3500 PARKWAY LANE, SUITE 500
PEACHTREE CORNERS, GA 30092
PHONE: 678-459-2564
EMAIL: BACHJ@PONDCO.COM
WESTSIDE ENGINEERING
CONTACT: CHRIS ESSLINGER
5525 INTERSTATE NORTH PARKWAY
SUITE 200 ATLANTA, GA 30328
PHONE: 4049651287
EMAIL: CESSLINGER@WESTSIDE-
ENGINEERING.COM
STRUCTURAL ENGINEERING
MH STRUCTURES
CONTACT: MATT HAMMOND
5077 DALLAS HWY, SUITE 201 POWDER
SPRINGS, GA 30127
PHONE: 404-495-4889
EMAIL: MATT@MHSTRUCTURES.COM
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET NOTES:
1. DEVICES HAVE BEEN SHOWN; BUT THE CONTRACTOR SHALL
ENSURE THE INSTALLATION OF ALL LIFE SAFETY DEVICES
INDICATED ON THE ENGINEERING DRAWINGS.
2. CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ANY
EXISTING FIRE RATED WALLS. ANY WORK DONE AROUND EXISTING
FIRE RATED WALLS SHALL BE DONE WITH CARE SO AS NOT TO
COMPROMISE THE RATING'S INTEGRITY. ANY DAMAGE SHALL BE
REPAIRED IMMEDIATELY.
3. THESE DRAWINGS SHALL BE INDICATED AS “FOR REFERENCE
ONLY.”
4. CONTRACTORS SHALL FOLLOW EM-385-1-1 AND NFPA 241, ALONG
WITH THE INSTALLATION’S FIRE REGULATIONS.
5. FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE BARRIERS
AND SMOKE PARTITIONS OR ANY OTHER WALL REQUIRED TO HAVE
PROTECTED OPENINGS OR PENETRATIONS SHALL BE EFFECTIVELY
AND PERMANENTLY IDENTIFIED WITH SIGNS OR STENCILING. SUCH
IDENTIFICATION SHALL:
A. BE LOCATED WITHIN 15 FEET OF THE END OF EACH WALL AND
AT INTERVALS NOT EXCEEDING 30 FEET MEASURED
HORIZONTALLY ALONG WITH WALL OR PARTITION.
B. INCLUDE LETTERING NOT LESS THAN 3 INCHES IN HEIGHT WITH
A MINIMUM 3/8-INCH STROKE IN A CONTRASTING COLOR
INCORPORATING THE SUGGESTED WORDING, “FIRE AND/OR
SMOKE BARRIER – PROTECT ALL OPENINGS,” OR OTHER
WORDING
SHEET LEGEND
45'-0"
TRAVEL DISTANCE
EGRESS CLEAR WIDTH
CAPACITY/NO. OF OCCUPANTS
FULL HEIGHT WALLS (NO RATING)
STARTING POINT FOR TRAVEL DISTANCE
36" 100/100
TRAVEL DISTANCE IDENTIFIER (IN FEET)TD___
F
G
3 4 5
36" 180/1
TD: 14'-0"
RESTROOM
RESTROOM
BUILDING CODE SUMMARY:
PROJECT NAME: JOHNS CREEK - RESTROOM FACILITY
FACILITY DESCRIPTION: THIS PROJECT IS A ONE-STORY
BUILDING FUNCTIONING AS A RESTROOM FACILITY FOR
THE PARK.
BUILDING CODE STANDARD:
INTERNATIONAL BUILDING CODE, 2018 EDITION W/
GEORGIA AMMENDMENTS (2020)
INTERNATIONAL FIRE CODE, 2018 EDITION W/ GEORGIA
AMMENDMENTS (2020)
INTERNATIONAL PLUMBING CODE, 2018 EDITION W/
GEORGIA AMMENDMENTS (2020)
INTERNATIONAL MECHANICAL CODE, 2018 EDITION W/
GEORGIA AMMENDMENTS (2020)
NATIONAL ELECTRIC CODE, 2017 EDITION
INTERNATIONAL ENERGY CONSERVATION CODE, 2015
EDITION W/ GEORGIA SUPPLEMENTS & AMMENDMENTS
(2020)
NFPA 101 - LIFE SAFETY CODE W/ GEORGIA STATE
AMENDMENTS
OCCUPANY CLASSIFICATION (LSC):
UTILITY OCCUPANCY
OCCUPANY CLASSIFICATION (IBC):
SINGLE USE OCCUPANCY: UTILITY
MINIMUM REQUIRED EGRESS WIDTH (LSC)
LIFE SAFETY CODE TABLE 7.3.3.1
EGRESS COMPONENTS OTHER THAN STAIRS = 0.20" PER
OCCUPANT SERVED
MINIMUM EGRESS REQUIRED: 0.20" x 1 OCCUPANTS = 0.20"
MAXIMUM TRAVEL DISTANCE:
200' - 0" REQUIRED = 9' - 6" PROVIDED
MAXIMUM DEAD END CORRIDOR:
50' - 0" REQUIRED WHERE OCCURS = NOT APPLICABLE
COMMON PATH OF TRAVEL:
50 ' - 0" REQUIRED WHERE OCCURS = NOT APPLICABLE
PLUMBING FIXTURE COUNT:
PLUMBING FIXTURE COUNT PROVIDED PER OWNER DIRECTIVE,
AND WILL BE SERVICING A PARK AREA.
CONSTRUCTION TYPE (IBC):
IBC CHAPTER 6
TYPE VB, UN-PROTECTED, COMBUSTIBLE, NON-
SPRINKLERED
GENERAL BUILDING HEIGHT / AREA LIMITATIONS (IBC):
TABLE 504.3
ALLOWABLE HEIGHT = 40' - 0"
ACTUAL HEIGHT = 15' - 6 1/4"
ALLOWABLE AREA = 13,500 S.F.
ACTUAL AREA: 635 S.F. (GROSS)
ALLOWABLE STORIES = 2 STORIES
ACTUAL STORIES = 1 STORY WITH UTILITY BASEMENT
FIRE ALARM SYSTEM (LSC)
LIFE SAFETY CODE CHAPTER 42.3.4
FIRE ALARM SYSTEM NOT REQUIRED
FIRE EXTINGUISHERS (IFC)
FIRE EXTINGUISHERS SHALL BE LOCATED PER
REQUIREMENTS OF IFC SECTION 906 AND NFPA 10.
FIRE SPINKLER SYSTEM (LSC)
LIFE SAFETY CODE CHAPTER 42.3.5
FIRE SPRINKLER SYSTEM NOT REQUIRED
OCCUPANT LOAD (LSC):
UTILITY OCCUPANCY:
1 OCCUPANT PER 500 GROSS
- RESTROOMS
@ 144SF / 500 GROSS
= 0.29 OR 1 OCCUPANT
TOTAL OCCUPANT LOAD = 1 OCCUPANT
TRU
E N
PLAN
NORTH
Copyright © 2021 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
1 2
D
SHEET NUMBER
SUBMITTED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DATE:
SHEET TITLE
DRAWING ISSUE
EOR/AOR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
24" X 36"
PROJECT NAME
CONSULTANT
3 4 5
C
B
A
CITY OF JOHNS CREEK
/7
/2
:2 :5
A
M C
R e v it L o c a l\
\1
A u tr e y M ill L it to n B
.r v t
PROJECT SUBMITTAL STAGE
G-101
LIFE SAFETY
PLAN &
BUILDING
CODE
SUMMARY
RTJ
RTJ
MBL
MBD
7/8/2021
PROJECT # - 1210185
AUTREY MILL
PARK
RESTROOM
FACILITY
9770 AUTREY MILL
ROAD, JOHNS
CREEK, GA 30022
SCALE: 1/4" = 1'-0"A1
LIFE SAFETY PLAN
SCALE: = 1'-0"
0 4 84
1/4"
M A
R K
D E
S C
R
IP
T
IO
N D
A
S O
L I C
I T
A T
I O
N
N
O
F I L
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
SHEET
IDENTIFICATION
NUMBER
D A
T E
F I
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
D A
T E
SEAL
C O
N T
R A
C
P O
D
P
R O
J E o a r k w a y
L a n e
P e a c h t r e e
C o r n e r s
G
A
S
U I T
E
P h o n e
F x
F I
T
H
S
W I T
C H
B L A
D E
P
R O
J E
C T
S F
Y C
B
I M
C
A D
G
D
W G
O
T T
Y
R
U T
T E
M
A R
C U
S
P L O
T
D
A Y
P
M
C H
A P
S
T R
O O
M
A
N D
P A
V I L
I O
N
F
A C
I L
I T
Y
J U
- - 1 x
C I T
Y
O
F
J O
H N
S
C
R E
K
J O
H N
S
C R
E E
K
G
A
A
U S
T R
M
L
L
P A
R K
A
N E
W
C
H A
P E
L
R
E S
T R
O O
M
G001
C O
V E
H E
E T
PLAN
NORTH
SCALE: NTS
VICINITY MAP
PROJECT SITE
SITE DESIGN TEAM
POND AND COMPANY
3500 PARKWAY LANE SUITE 500
PEACHTREE CORNERS, GA 30092
PHONE (678) 336-7740
FAX (678) 336-7744
WEB: www.pondco.com
PROJECT MANAGER:
RYAN, JENNINGS, AIA
OWNER/DEVELOPER
CITY OF JOHNS CREEK
11360 LAKEFIELD DRIVE
JOHNS CREEK, GA 30097
PLANNING & DEVELOPMENT
PHONE (678) 512-3200
OWNER CONTACT (24-HR):
IT IS THE OWNER'S/DEVELOPER'S RESPONSIBILITY TO BE IN COMPLIANCE
WITH APPLICABLE NATIONAL POLLUTION DISCHARGE ELIMNATION SYSTEM
(NPDES) PERMIT AND CLEAN WATER ACT REQUIREMENTS.
CHAPEL RESTROOM AND
PAVILION FACILITY
SITE CONSTRUCTION DOCUMENTS FOR
JULY 08, 2021
LAND LOTS 110110 & 110139, CITY OF JOHNS CREEK,
FULTON COUNTY, GEORGIA
Know what'sbelow.
before you dig.Call Dial 811
Or Call 800-282-7411
PROJECT DESCRIPTION:
THE PURPOSE OF THIS PROJECT IS THE ADDITION OF A NEW
RESTROOM AND A PAVILION FACILITY WITHIN THE AUTREY
MILL NATURE PRESERVE AND HERITAGE CENTER.
THIS PROJECT WILL INCLUDE OF A CONSTRUCTION OF A NEW
RESTROOM THAT WILL INCLUDE A SEPTIC SYSTEM AS
WASTEWATER TREATMENT. NEW SIDEWALKS WILL BE ADDED
TO CONNECT THE NEW RESTROOM WITH THE PROPOSED
PAVILION AND THE EXISTING FACILITY.
PROJECT INFORMATION:
PROJECT ADDRESS:
AUTREY MILL RD , CITY OF JOHNS CREEK, FULTON GA. 30022
PARCEL ID'S # 11 031001090135
11 041001390070
TOTAL SITE AREA: 46.21 ACRES
ZONING CLASSIFICATION: R-4A
AG-1
BUILDING SETBACKS: (ID 11 031001090135)
FRONT YARD: 35'
SIDE YARD: 7' INTERIOR , 20' STREET
REAR YARD: 25'
BUILDING SETBACKS: (ID 11 041001390070)
FRONT YARD: 60'
SIDE YARD: 25' INTERIOR , 40' STREET
REAR YARD: 50'
100% CONSTRUCTION DOCUMENT SET
CIVIL SITE PROJECT MANAGER:
JASON BACH, PE
Sheet List Table
Sheet Number Sheet Title
G001 COVERT SHEET
CD 101 DEMOLITION PLAN
CS-101 CIVIL SITE PLAN
CG-001 CIVIL GRADING PLAN
C-501 CONSTRUCTION DETAILS
C-502 CONSTRUCTION DETAILS
C-503 CONSTRUCTION DETAILS
-2
-2
C
O
U
N
R
E
F
F
E
R
C
O
U
N
S
O
R
P
T
I
F
F
E
R
S O
L I C
I T
A T
I O
N
N
O
F I
M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
SHEET
IDENTIFICATION
NUMBER
D A
T E
F I
M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
D A
T E
SEAL
C O
N T
R A
P O
O
J E
P a r k w a y
L a n e
P e a c h t r e e
C o r n e r s
G
A
S
U I T
E
P h o n e
F
F I
T
H
X
F
Y C
M
C
A D
C
D D
O
T T
B
A C
H
J A
S O
N
P L O
T
D
A Y
A
M
C H
A P
S
T R
O O
M
A
N D
P A
V I L
I O
N
F
A C
I L
I T
Y
J U
- - 1 x
C I T
Y
O
F
J O
H N
S
C
R E
O
H N
S
C R
E E
K
G
A
A
U S
T R
L L
P A
R K
A
N E
W
C
H A
P E
L
R
E S
T R
O O
M
SURFACE IMPROVEMENTS (WALLS,
SLABS, , CURBING, ETC.) TO BE
DEMOLISHED UNLESS OTHERWISE
NOTED
LIMITS OF DISTURBANCE
LEGEND:
CD 101
D E
M O
L I T
I O
N
P
L A
N
SCALE: 1" = 10'
0 5' 30'20'10'
A1
DEMOLITION PLAN
Know what'sbelow.
before you dig.Call Dial 811
Or Call 800-282-7411
1. "DEMOLISH" SHALL MEAN TO REMOVE AN OBJECT IN ITS
ENTIRETY. RESTORE GRADES AND SURFACE
IMPROVEMENTS TO MATCH EXISTING CONDITIONS OR
PER REQUIREMENTS OF NEW WORK, WHICHEVER IS
APPLICABLE.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF
CONSTRUCTION PLANS AND SHALL BE READ WITH THE
FULL SET TO BEST ENSURE PROPER INTERPRETATION.
3. SEE TREE REMOVAL AND REPLACEMENT PLANS FOR
INFORMATION ON DEMOLITION OF EXISTING TREES.
4. CONTRACTOR SHALL HAVE ALL UTILITIES FIELD
LOCATED PRIOR TO START OF CONSTRUCTION. WATER
LINE ADJACENT TO EXISTING FENCE SHALL BE
POTHOLED TO CONFIRM DEPTH AND EXACT LOCATION
PRIOR TO BEGINNING CONSTRUCTION. ANY DEVIATION
FROM PLANS SHALL BE REPORTED TO THE PROJECT
MANAGER AND ENGINEER PRIOR TO BEGINNING
CONSTRUCTION.
5. CONTRACTOR TO PROVIDE ALL NECESSARY
BARRICADES AND SIGNAGE TO CLOSE SIDEWALK IN
ACCORDANCE WITH CITY OF JOHNS CREEK
REGULATIONS AND REQUIREMENTS.
GENERAL SHEET NOTES
SHEET KEYNOTES
1. APPROXIMATE AREA OF LEVEL 3 SOIL SURVEY. ALL
TREES TO BE REMOVED WITHIN THESE LIMITS. DEPTH
OF SOIL TO BE CUT BASED ON THE INFILTRATION
SYSTEM SPECIFICATION.
2. APPROXIMATE AREA OF IMPROVEMENTS FOR
PROPOSED PAVILION, RESTROOM, AND SIDEWALK.
3. EXISTING SIDEWALK TO BE DEMOLISHED FOR
INSTALLATION OF PROPOSED SEPTIC SYSTEM.
4. DEMOLISH EXISTING WOOD AT TRAIL ENTRANCE
5. REMOVE EXISTING TRAIL SIGN. CONTRACTOR TO
STORE FOR FUTURE REINSTALLATION.
6. DEMOLISH EXISTING CONCRETE BARRIER
7. DEMOLISH 6"X6" WOOD BOLLARDS
8. FENCE TO BE DEMOLISHED
9. EXISTING WATER LINE TO REMAIN. CONTRACTOR TO
PROTECT DURING ALL PHASES OF CONSTRUCTION
10. LONGITUDINAL FENCE TO REMAIN. CONTRACTOR TO
PROTECT DURING ALL PHASES OF CONSTRUCTION
11. EXISTING PAVEMENT AND STRIPING TO REMAIN
12. APPROXIMATELY STUDY AREA OF LEVEL 3 SOIL
TALLAPOOSA 6-20%. SEE REPORT ON SHEET C503
-2
-2
C
O
U
N
R
E
F
F
E
R
C
O
U
N
S
O
R
P
T
I
F
F
4"
V
5'
5'
S T
R E
A M
B U
F F
E R
APPROXIMATELY
STUDY AREA OF LEVEL 3 SOIL
- TALLAPOOSA 6-20%
SEE REPORT ON SHEET C503
A B
S O
R P
T
IO
N
F
IE
L D
B U
F F
E R
NEW SIDEWALK TO
TIE TO EXISTING
EXISTING FENCE
STREAM
NEW SIDEWALK
TO TIE TO EXISTING
SCALE: 1" = 10'
0 5' 30'20'10'
A1
CIVIL SITE PLAN
CS-101
C I V
T
E
P
L A
N
LEGEND
STUDY AREA OF SOIL 3 - TALLAPOOSA 6-20%
Know what'sbelow.
before you dig.Call Dial 811
Or Call 800-282-7411
PROPERTY LINE
FENCE
SHEET KEYNOTES
1. NEW CONCRETE WALKWAY WITH MEDIUM
BROOMED FINISH (DETAIL C1-502)
2. SEPTIC TANK (DETAIL B1-501)
3. INFILTRATION CHAMBER SYSTEMS
(INFILTRATOR -Q4) OR APPROVED
ALTERNATIVE (DETAILS C-501)
4. NEW 1" COPPER WATER LINE TO CONNECT TO
EXISTING LATERAL - COORDINATE WITH OWNER
5. SEAT WALL L=59.0' H=1.5' (SEE ARCHITECTURAL
PLANS)
6. RELOCATED TRAIL SIGN
7. APPROX. EXISTING WATER LINE LOCATION PER
GIS. CONTRACTOR MUST VERIFY LOCATION
PRIOR TO CONSTRUCTION
8. NEW CONCRETE WALKWAY WITH HEAVY
BROOMED FINISH (DETAIL C1-C502)
NOTE:
THE PROPOSED SEPTIC SYSTEM IS
ASSUMED TO SERVE THE NEW
RESTROOM FACILITY.
THE CONTRACTOR IS RESPONSIBLE
FOR INSTALLING THE SEPTIC SYSTEM
IN ACCORDANCE WITH ALL
APPLICABLE REGULATIONS AND
SEPTIC SYSTEM SPECIFICATIONS.
S O
L I C
I T
A T
I O
N
N
O
F I
M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
SHEET
IDENTIFICATION
NUMBER
D A
T E
F I
M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
D A
T E
SEAL
C O
N T
R A
P O
O
J E
P a r k w a y
L a n e
P e a c h t r e e
C o r n e r s
G
A
S
U I T
E
P h o n e
F
F I
T
H
S
W I T
C H
B L A
D E
P
R O
J E
C T
S F
Y C
M
C
A D
C
S D
O
T T
R
U T
T E
M
A R
C U
S
P L O
T
D
A Y
P
M
C H
A P
S
T R
O O
M
A
N D
P A
V I L
I O
N
F
A C
I L
I T
Y
J U
- - 1 x
C I T
Y
O
F
J O
H N
S
C
R E
O
H N
S
C R
E E
K
G
A
A
U S
T R
L L
P A
R K
A
N E
W
C
H A
P E
L
R
E S
T R
O O
M
1. REFER TO SHEET G-001 FOR GENERAL CIVIL NOTES,
LEGENDS, AND ABBREVIATIONS.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF
CONSTRUCTION PLANS AND SHALL BE READ WITH THE
FULL SET TO BEST ENSURE PROPER INTERPRETATION.
3. REFER TO DEMOLITION PLAN, FOR SOIL REMOVAL
LOCATIONS.
4. CONTRACTOR WILL BE PROVIDED DIGITAL FILE TO
STAKE OUT WALKWAY. COORDINATES PROVIDED ON
THIS SHEET FOR CURVE CENTER POINTS.
5. CONTRACTOR SHALL PREPARE ALL SITE AREAS (I.E.
DRAINAGE, GRADING, TREE REMOVAL, ETC. ) PRIOR TO
SUBCONTRACTOR COMMENCING WORK.
GENERAL SHEET NOTES
-2
-2
C
O
U
N
R
E
F
F
E
R
C
O
U
N
S
O
R
P
T
I
F
F
E
R
S
TW=1042.0
TW
=1042.0
S
S
BW=1040.0
BW=1040.0
1041.25
S
4"
V
STREAM
CG-001
C I V
A
D I N
G
P
L A
N
SCALE: 1" = 10'
0 5' 30'20'10'
Know what'sbelow.
before you dig.Call Dial 811
Or Call 800-282-7411 A1
CIVIL GRADING PLAN
NOTE:
THE CONTRACTOR SHALL REVIEW
THE SOIL INVESTIGATION REPORT
PRIOR TO BIDDING.
GENERAL SHEET NOTES
SHEET KEYNOTES
1. SEAT WALL, L=59.0' H=1.5' (SEE ARCHITECTURAL
PLANS).
2. SEPTIC TANK (DETAIL B1-501)
3. INFILTRATION CHAMBER SYSTEMS OR
ALTERNATIVE APPROVED (DETAIL A/B/C-501)
4. RAILROAD TIE LEVEL SPREADER (DETAIL A1/C-502)
DIRT STATEMENT
CUT: 136 CUBIC YARDS*
FILL: 24 CUBIC YARDS*
NET: 112 CUBIC YARDS*
*ALL QUANTITIES ARE UNADJUSTED
ESTIMATES FOR PERMITTING PURPOSES
ONLY. THE CONTRACTOR IS RESPONSIBLE
FOR VERIFICATION OF ALL MATERIAL
QUANTITIES.
S O
L I C
I T
A T
I O
N
N
O
F I
M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
SHEET
IDENTIFICATION
NUMBER
D A
T E
F I
M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
D A
T E
SEAL
C O
N T
R A
P O
O
J E
P a r k w a y
L a n e
P e a c h t r e e
C o r n e r s
G
A
S
U I T
E
P h o n e
F
F I
T
H
S
W I T
C H
B L A
D E
P
R O
J E
C T
S F
Y C
M
C
A D
C
G D
O
T T
R
U T
T E
M
A R
C U
S
P L O
T
D
A Y
P
M
C H
A P
S
T R
O O
M
A
N D
P A
V I L
I O
N
F
A C
I L
I T
Y
J U
- - 1 x
C I T
Y
O
F
J O
H N
S
C
R E
O
H N
S
C R
E E
K
G
A
A
U S
T R
L L
P A
R K
A
N E
W
C
H A
P E
L
R
E S
T R
O O
M
1. REFER TO SHEET G-001 FOR GENERAL
NOTES, LEGEND, AND ABBREVIATIONS.
2. CONTRACTOR TO ENSURE POSITIVE
DRAINAGE AWAY FROM BUILDING AND
TOWARD DRAINAGE STRUCTURES.
3. THIS SHEET IS PART OF A MULTI-SHEET
SET OF CONSTRUCTION PLANS AND SHALL
BE READ WITH THE FULL SET TO BEST
ENSURE PROPER INTERPRETATION.
4. SEE PLANS FOR RETAINING WALL DETAILS.
(C2-502)
5. NO GRADED SLOPE SHALL EXCEED 2H: 1V.
6. SIDEWALK BETWEEN PAVILION AND
RESTROOM MUST COMPLY WITH ADA
REQUIREMENT
-2
-2
NOT TO SCALE
08/05/2013EMB
1 of 1DFH
Drawn by:
INFILTRATOR WATER TECHNOLOGIES
4 Business Park Rd. Old Saybrook, CT 06475
(800) 221-4436
Scale: Checked by: Sheet:
Date:
INFILTRATOR
tanks
INFILTRATOR IM-1060 TANK
1-COMPARTMENT CONFIGURATION
TOP VIEW
RISER CONNECTION (TYP.)
Ø 4 [102]
PVC OR ABS
INLET TEE
Ø 24.0 [610] ACCESS OPENING
WITH LOCKING LID (2)
2 [51] X 2 [51]
FIBERGLASS
SUPPORT
(TYP.)
SECTION A- A'
INLET
OUTLET
A A'
B
B'
LIFTING LUG
(TYP.)
LIFTING STRAP
(TYP.)
P
Ø 4 [102]
PVC OR ABS
OUTLET TEE
S
SEAM CLIP
(TYP.)
LIFTING STRAP
(TYP.)
FIBER-
GLASS
SUPPORT
ISOMETRIC
VIEW
END VIEW SECTION B - B'
SIDE INLET/
OUTLET (TYP.)
ALIGNMENT
DOWEL (34)
CONTINUOUS
ELASTOMETRIC
GASKET
SEAM CLIP
(64)
TANK BOTTOM
HALF
TANK TOP
HALF
S MID-HEIGHT SEAM
SECTION DETAIL
END OUTLET
Q :T ec hn ic al
R es ou rc es N ew /0
2-
-IS
I_ Pr od uc ts /T an ks
/In je ct io n- M ol d ed T an k/
IM
-1
G en er ic
_D ra w in gs
/IM
-1
A N
D
C O
M P.
S
PE
C -0
NOTES:
1. ALL DRAWING DIMENSIONS IN INCHES [MILLIMETERS] OR AS NOTED.
2. EXTERIOR OF ACCESS OPENING LID INCLUDES THE FOLLOWING WARNING IN
ENGLISH, FRENCH & SPANISH: "DANGER DO NOT ENTER: POISON GASES."
3. TANK MARKINGS WILL INCLUDE: MANUFACTURER NAME, MODEL NUMBER,LIQUID
CAPACITY, DATE OF MANUFACTURE, MAXIMUM BURIAL DEPTH, INLET, AND OUTLET.
4. THE TANK MAY BE BACKFILLED WITH SUITABLE NATIVE SOIL. SEE INSTALLATION INSTRUCTIONS FOR GUIDANCE. IF
THE NATIVE SOIL DOES NOT MEET THE INSTALLATION INSTRUCTIONS GUIDANCE THEN BACKFILLING WITH SELECT
MATERIAL WILL BE REQUIRED.
5. MAXIMUM BURIAL DEPTH IS 48 in [1,219 mm].
6. MINIMUM BURIAL DEPTH IS 6 in [152 mm].
7. MAXIMUM VEHICLE LOAD IS 4,500-lb [20-kN] AXLE LOAD.
8. TANK IS FOR NON-TRAFFIC APPLICATIONS.
9. AIRSPACE IS 16.5%.
10. OUTLET TEE IS COMPATIBLE WITH EFFLUENT FILTER.
11. INTERIOR LENGTH TO WIDTH RATIO IS 2.3:1 (118.8-INCH INTERIOR LENGTH /
51.7-INCH INTERIOR WIDTH = 2.3).
INLET/
OUTLET
TEE
LID
ACCESS PORT RIM
FLEXIBLE RUBBER
GASKET (TYP.)
P PIPE PENETRATION
SECTION DETAIL
NOTES:
*LENGTH, NUMBER OF TRENCHES, AND INSTALLATION DEPTH BY DESIGN.
*SEE INSTALLATION INSTRUCTIONS
NATIVE BACKFILL
TOPSOIL
(CHAMBER SECTION) (END CAP VIEW)
PRESSURIZED PIPE DRILL
POINTS LOCATIONS
(2 PLACES)
(EFFECTIVE LENGTH)
TOP VIEW
SIDE VIEW END VIEW
QUICK4 PLUS ALL-IN-ONE 12 END CAP
INSPECTION PORT
2" diam.
INFILTRATOR WATER TECHNOLOGIES
QUICK4 PLUS STANDARD CHAMBER
PRODUCT SPECIFICATIONS
(NOT TO SCALE)
INSPECTION PORT
4" diam.
ESTABLISH VEGETATIVE COVER
FROM SEPTIC
TANK
TO NEXT
TRENCH
NATIVE BACKFILL (TYP.)
S O
L I C
I T
A T
I O
N
N
O
F I
M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
SHEET
IDENTIFICATION
NUMBER
D A
T E
F I
M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
D A
T E
SEAL
C O
N T
R A
P O
O
J E
P a r k w a y
L a n e
P e a c h t r e e
C o r n e r s
G
A
S
U I T
E
P h o n e
F
F I
T
H
S
W I T
C H
B L A
D E
P
R O
J E
C T
S F
Y C
M
C
A D
C
D
O
T T
R
U T
T E
M
A R
C U
S
P L O
T
D
A Y
P
M
C H
A P
S
T R
O O
M
A
N D
P A
V I L
I O
N
F
A C
I L
I T
Y
J U
- - 1 x
C I T
Y
O
F
J O
H N
S
C
R E
O
H N
S
C R
E E
K
G
A
A
U S
T R
L L
P A
R K
A
N E
W
C
H A
P E
L
R
E S
T R
O O
M
C-501
C O
N S
T R
U C
T I O
N
D
E T
A I L
S
NO SCALE
B1
1-COMPORTMENT CONFIGURATION TANK
NO SCALE
B4
TYPICAL TRENCH DETAIL
A4
TYPICAL SLOPING TRENCH SECTION DETAIL
C4
STANDARD CHAMBER DETAILS
NO SCALE
NO SCALE
SUMMARY OF SEPTIC SYSTEM REQUIRED
NO SCALE
A1
FIELD SUMMARY
-2
-2
L I C
I T
A T
I O
N
N
O
F I
M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
SHEET
IDENTIFICATION
NUMBER
D A
T E
F I
M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
D A
T E
SEAL
C O
N T
R A
P O
O
J E
P a r k w a y
L a n e
P e a c h t r e e
C o r n e r s
G
A
S
U I T
E
P h o n e
F
F I
T
H
S
W I T
C H
B L A
D E
P
R O
J E
C T
S F
Y C
M
C
A D
C
D
O
T T
R
U T
T E
M
A R
C U
S
P L O
T
D
A Y
P
M
C H
A P
S
T R
O O
M
A
N D
P A
V I L
I O
N
F
A C
I L
I T
Y
J U
- - 1 x
C I T
Y
O
F
J O
H N
S
C
R E
O
H N
S
C R
E E
K
G
A
A
U S
T R
L L
P A
R K
A
N E
W
C
H A
P E
L
R
E S
T R
O O
M
C-502
C O
N S
T R
U C
T I O
N
D
E T
A I L
S
C1
SIDEWALK
SCALE: N.T.S.
VARIES
1/2" EXPANSION JOINT BETWEEN WALK AND
ADJACENT STRUCTURE OR CURB
NOTE:
PROVIDE 0.5 INCH THICK
TRANSVERSE EXPANSION JOINTS
AT CHANGES IN DIRECTION
WHERE SIDEWALK ABUTS CURB,
STEPS, RIGID PAVEMENT, OR
OTHER SIMILAR STRUCTURES;
SPACE EXPANSION JOINTS EVERY
30 FEET MINIMUM.
EXPANSION JOINT
4" THICK CONCRETE - CLASS "B", 2,200 PSI AT 28 DAYS
NOTE:
PROVIDE CONTRACTION JOINTS
SPACED EVERY 5 LINEAR FEET
UNLESS OTHERWISE
INDICATED. CUT CONTRACTION
JOINTS ONE INCH DEEP WITH A
JOINTING TOOL AFTER THE
SURFACE HAS BEEN FINISHED.
CONTRACTION JOINT
1/4" RADIUS
FINISH
1/8"
1/2"
PREMOLDED JOINT FILLER
EXTENDING TO BOTTOM
SURFACE OF CONCRETE.
PROVIDE SEALANT ABOVE
FILLER IN ACCORDANCE
WITH SPECIFICATIONS.
12" COMPACTED
SUBGRADE
STRUCTURE, PAVEMENT, OR
CURB EDGE (IF APPLICABLE)
M
I N
GRASSED AREA
(FINISHED GRADE)
A1
RAILROAD TIE LEVEL SPREADER
SCALE: N.T.S.
CL SWALE
CL SWALE
00.25'00.25'
00.00'
00.00'
HALF TIE, RAISED AT END
WHOLE TIE SET LEVEL
EXISTING UNDISTURBED SOIL
-2
-2
L I C
I T
A T
I O
N
N
O
F I
M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
SHEET
IDENTIFICATION
NUMBER
D A
T E
F I
M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
D A
T E
SEAL
C O
N T
R A
P O
O
J E
P a r k w a y
L a n e
P e a c h t r e e
C o r n e r s
G
A
S
U I T
E
P h o n e
F
F I
T
H
S
W I T
C H
B L A
D E
P
R O
J E
C T
S F
Y C
M
C
A D
C
D
O
T T
R
U T
T E
M
A R
C U
S
P L O
T
D
A Y
P
M
C H
A P
S
T R
O O
M
A
N D
P A
V I L
I O
N
F
A C
I L
I T
Y
J U
- - 1 x
C I T
Y
O
F
J O
H N
S
C
R E
O
H N
S
C R
E E
K
G
A
A
U S
T R
L L
P A
R K
A
N E
W
C
H A
P E
L
R
E S
T R
O O
M
C-503
C O
N S
T R
U C
T I O
N
D
E T
A I L
S
SUMMARY OF SOIL INVESTIGATION REPORT
-2
-2
GENERAL NOTES
1. These notes complement the drawings and should not be considered inclusive of all items.
2. Where a detail is shown for one condition, it shall apply for all like or similar conditions, even though not specifically shown on the drawings.
3. The contractor is responsible for means, methods, and sequences of construction to meet the requirements of the construction documents.
4. It is the contractor's responsibility to be in compliance with all applicable OSHA regulations.
5. Contractor is responsible for all temporary shoring and erection bracing required during construction.
6. All retaining walls relying on top slab for lateral support shall be braced until the slab has cured for a minimum of three days.
7. Contractor shall verify all dimensions and conditions before executing work. Notify the architect and engineer in writing of any discrepancy.
8. Coordinate structural contract documents with architectural, mechanical, electrical, plumbing, and civil documents. Notify the architect and engineer in writing of any conflict and/or omission.
9. Coordinate and verify floor and roof opening sizes and locations with architectural, mechanical, electrical, and plumbing documents. For additional openings, inserts, sleeves, curbs, and pads not shown in the structural documents, see architectural, mechanical, electrical, and plumbing documents.
10. Shop drawings shall be independently developed. Reproduction of structural design drawings for use as shop drawings is prohibited.
SUBMITTALS
1. All submittals shall be submitted to the architect for approval prior to work.
2. The contractor shall review all shop drawings prior to submittal to the architect and/or engineer for review of general compliance, dimensions, and quantity. Shop drawings submitted to the architect shall be stamped by the contractor to indicate completion of review.
3. Contractor is not relieved of any requirements of the contract documents by virtue of the structural engineer's review of shop drawings, product data, etc., unless the contractor has clearly and explicitly informed the structural engineer in writing of any deviations or substitutions at time of submission, and the structural engineer has given written approval for the specific deviations or substitutions.
4. The review of shop drawings by the structural engineer is to make sure the main structural intent is correct. Review will exclude dimensions and quantities.
5. Each submittal will be reviewed and returned within 10 business days. Expedited review may be requested but may not be possible.
6. Submit concrete mix designs for approval prior to pouring concrete. Refer to concrete notes, plans, and details for mix design requirements.
7. Submit rebar drawings for approval prior to rebar placement. Drawing shall include the following at a minimum: rebar size, quantity, steel grade, bend schedule & diagram, lap slices, layout drawing for placement, and details as required for placement.
8. Submit steel decking drawings showing layout, decking type, attachment details, and all other information required to convey the design intent to the contractor for use as erection drawings.
9. Submit steel joists drawings showing layout, joist designation, type, number, and spacing. Also, include anchorage details, bracing, bridging, details, and all other information required to convey the design intent to the contractor for use as erection drawings.
10. Submit structural steel shop drawings showing fabrication of structural-steel components. Drawings should include details and an erection plan.
11. Submit wood truss shop drawings for approval prior to fabrication. Drawings shall include the following as a minimum: engineer's stamp, design loads, detailed truss layout, truss/wall connection loads, truss bracing requirements, and field erection requirements. The truss submittal package shall meet the requirements of section 2303.4 of the 2018 IBC. Shear and uplift anchorage requirements shall be clearly noted on the shop drawings so that these designed connections can be verified.
12. Submit precast concrete shop drawings for approval prior to fabrication. Shop drawings shall include design loads, layout plans, and all necessary details. Shop drawings shall be stamped by a professional engineer.
APPLICABLE CODES FOR DESIGN:
1. International Building Code: 2018 IBC with Ga. Amendments (2020)
RISK CATEGORY:
1. Risk category: II
STRUCTURAL LOAD CRITERIA:
1. DEAD LOADS:
A. Self Weight
2. SUPERIMPOSED DEAD LOAD: 10 PSF
3. LIVE LOADS:
A. Roof 20 PSF (reducible per IBC)
4. SNOW LOAD CRITERIA:
A. Snow Load Importance Factor; Is: 1.0 B. Ground Snow Load, Pg: 5 PSF
5. WIND LOADS PER IBC 2018, ASCE 7-16
A. Basic Wind Speed (3 second gust)
a. Vult: 105 MPH
b. Vasd: 82 MPH
B. Wind Exposure: B C. Internal Pressure Coefficients: Per Manuf. Design D. Components & Cladding Pressures: Per Manuf. Design
6. SEISMIC DESIGN DATA
A. Seismic Importance factor; Ie: 1.0 B. Seismic Site Class: D
C. SS: 0.204
D. S1: 0.088
E. SDS: 0.218
F. SD1: 0.142
G. Seismic Design Category: C H. Basic Seismic Force Resisting System (Based on ASCE 7-16 Table 12.2-1)
a. Timber Frames (Section G.6)
• Response Modification Coefficient, R: 1.5
• System Overstrength Factor, Ωo: 1.5
• Deflection Amplification Factor, Cd: 1.5
I. Seismic Response Coefficients, CS: Per Manuf. Design J. Seismic Base Shear:
a. Plan North / South: Per Manuf. Design
b. Plan East / West: Per Manuf. Design
K. Seismic Forces Analysis per Equivalent Lateral Force Procedure L. FUTURE EXPANSION: Not Applicable
M. DEFLECTION CRITERIA:
a. Purlins and Rafters: Vertical deflection: D+Lr = L/120, Lr = L/180.
b. Girts: Horizontal deflection: E or W = L/120 (10 yr wind.)
c. Roof Panels: Vertical deflection: D+Lr = L/120, Lr = L/180.
d. Wall Panels: Horizontal deflection: E or W = L/120 (10 yr wind.)
e. Frame Drift: Horizontal deflection: E or W = H/100 (10 yr wind.)
PRE-ENGINEERED BUILDING NOTES:
DESIGN:
1. The building shall be designed by the manufacturer as a complete system. All components of the system shall be supplied or specified by the Timber manufacturer.
2. Use rigid frames, and x-bracing for building stability unless otherwise noted on the plans. Fixed-base columns are not allowed.
3. All columns, x-bracing locations shall be coordinated with the architectural plans to avoid interference with doors, windows, etc. Approval from the architect must be obtained for any additional columns required that are not shown on the plan.
4. Design members to meet the deflection criteria shown in the "Design Loads" section of the "General Notes." The 10 year wind load may be used for the calculation of wind deflection.
SUBMITTALS:
1. Shop drawings shall be provided to the architect for approval prior to fabrication. The drawings must be signed and sealed by a qualified professional engineer licensed in the state of the project location.
2. The shop drawings shall contain column reactions to coordinate foundation design, anchor bolt layout, framing layout, framing member sizes, building sections, elevations, details, timber species and grade, and any additional information relevant to the understanding of the building layout.
3. The anchor bolt layout must be submitted with column reactions prior to foundation work beginning, and it is recommended to submit anchor bolt plans prior to the framing submittal for approval of column locations.
4. Framing drawings shall show all primary and secondary framing members, roof and/or wall panel layout, trim, flashing, ridge vents, equipment supports, joint conditions, installation details. Provide typical details for pipe supports, pipe penetrations through roof and wall, doors, windows, trim, gutters, downspouts, and other relevant details to the project.
5. Manufacturer's samples shall be provided to the architect for color selection.
FOUNDATIONS:
1. All foundations to be supported on suitable bearing material as determined by the owner's on-site geotechnical representative. Notify the architect / engineer immediately if suitable bearing material cannot be obtained, prior to installing foundations.
2. Sub-grade shall be compacted to 98% of standard proctor (ASTM 695,) unless a site-specific geotechnical report recommends otherwise.
3. If after excavation, the condition of the soil indicates a safe bearing capacity of less than 2000 psf, the architect / engineer shall be notified prior to placement of any foundation.
4. Plumbing lines that run parallel with wall footings shall be at least 2'-0" from the edge of the footing.
5. Plumbing lines that cross wall footings shall either cross below the footing with at least 12" of compacted fill between the top of the pipe and the bottom of the footing, or cross above the footing and through the wall. All pipes that cross footings, either above or below, shall be sleeved. Coordinate sleeve requirements with plumbing plans.
6. Piping (including conduit) shall not be embedded in or pass through foundations without written consent of the structural engineer.
CONCRETE & REINFORCING:
1. Construction of control joints shall be provided in floor slabs on grade such that the maximum span between joints is 16.0 ft., or as shown on the drawings.
2. Interior slabs-on-grade shall have a 10-mil polyethylene vapor retarder placed between the bottom of slab and sub-base. The vapor retarder joints shall be lapped at least 6 inches and taped. Provide a 4” subbase layer of compacted graded aggregate beneath the vapor barrier.
3. Provide (2) #4 bars x 3'-0" long at the mid-depth of slab at all re-entrant corners and at all discontinuous control joints in a slab-on-grade.
4. All bar splices shall be at a minimum the following lengths (unless noted otherwise on the drawings): 36" for #6 bars, 30" for #5 bars, and 24" for #4 bars. Welded lap splices are not allowed. Mechanical couplers can be used instead of lap slices; mechanical coupler product data must be submitted to SEOR for approval.
5. Corner bars are to be provided at all corners and intersections of reinforcement.
6. Extend wall footing reinforcing bars continuously through column footings.
7. Isolate columns from the slab with a diamond or circular box-out. The size should be adequate to allow for the column base plate and leveling. Isolation pockets shall be cleaned of debris and base plates shall be packed with a non-shrink grout (4000 psi minimum) prior to filling with concrete.
8. All concrete shall meet the following requirements:
A. General concrete requirements:
1. All concrete, unless noted otherwise, shall be normal weight and have the following minimum 28-day compressive strength.
A. Foundations: 3,000 psi B. Slab-on-grade: 3,000 psi
2. Portland cement: ASTM C 150. Type I
3. Fly ash, if used: ASTM C 618, class F or C, maximum 25%, by weight, of total cementitious material.
4. Ground granulated blast-furnace slag (GGBFS), if used: ASTM C 989, grade 100 or 120, maximum 25%, by weight, of total cementitious material.
5. Combined fly ash and GGBFS shall not exceed 33%, by weight, of total cementitious material.
6. Do not use admixtures containing calcium chloride.
7. Air-entraining admixture: ASTM C 260 (as needed; follow manufacturing dosage)
8. Water-reducing admixture: ASTM C 494/C 494M, type A (as needed; follow manufacturing dosage.)
9. Normal weight aggregates shall meet ASTM C 33 with a maximum size of 1" unless noted otherwise on plans
10. Welded wire reinforcement shall meet ASTM A 1064
11. Reinforcing bars shall meet ASTM A615, grade 60, deformed
12. All concrete exposed to weather shall be air-entrained with air content at point of placement of 3 - 6%
13. Do not air-entrain slab concrete (entrapped air content not to exceed 3%)
14. Slump limit: 5 inches
15. Maximum water / cement ratio:
1. Slabs-on-ground: 0.50
CONSTRUCTION TESTING:
1. It is the responsibility of the contractor to schedule the required testing with a third-party testing agency.
2. Concrete:
A. Test composite samples of fresh concrete obtained according to ASTM C172:
a. Testing frequency: one composite sample for each 100 cu yd or fraction thereof of each concrete mixture placed each day.
b. Slump: ASTM C143; one test at point of placement for each composite sample, but not less than one test for each day's pour of each concrete mixture.
c. Air content: ASTM C231 pressure method, for normal-weight concrete; ASTM C173 volumetric method, for lightweight concrete; one test for each composite sample, but not less than one test for each day's pour of each concrete mixture.
d. Concrete temperature: ASTM C1064; one test hourly when air temperature is 40 degrees f and below or 80 degrees f and above, and one test for each composite sample.
e. Cast and laboratory cure two sets of two standard cylinder specimens for each composite sample.
f. Compressive-strength tests: ASTM C39; test one set of two laboratory-cured specimens at 7 days and one set of two specimens at 28 days. A compressive-strength test shall be the average compressive strength from a set of two specimens obtained from the same composite sample and tested at age indicated.
g. Strength of each concrete mixture will be satisfactory if every average of and three consecutive compressive-strength tests equals or exceeds specified compressive-strength and no compressive-strength test value falls below specified compressive strength by more than 500 psi.
h. Test results shall be reported in writing to the EOR, concrete manufacturer, and contractor within 48 hours of testing.
i. Refer to the schedule of special inspections for additional requirements.
3. Soils:
A. Compaction tests for soils shall be according to ASTM D1556, ASTM D2167, ASTM D2937, and ASTM D6938, as applicable.
a. Paved and building slab areas: at subgrade and at each compacted fill and backfill layer, at least one test for every 2000 sq. ft. But in no case shall be fewer than three tests.
b. Foundation wall backfill: at each compacted backfill layer, at least one test for every 100 ft or less of wall length but no less than two tests.
c. Refer to the schedule of special inspections for additional requirements.
d. For areas not meeting project compaction and bearing pressure requirements, follow the third-party testing agency's recommendations for meeting project requirements.
SPECIAL INSPECTIONS:
1. Special inspection reports and a final report in accordance with Section 1704.2.4 shall be submitted to the building official prior to the time that phase of the work is approved for occupancy. Special inspection reports and a final report in accordance with Section
1704.2.4 shall be submitted to the building official prior to the time that phase of the work is approved for occupancy.
2. Refer to separate documentation for the statement of special inspections and the schedule of special inspections.
ABBREVIATIONS
ADD'L
ADJ.
A/E A.F.F.
ALT
ARCH.
BC
BLDG
BOTT.
B/
CANT.
CFMF
C.J.
CL
CLR
CMU
COL.
CONC.
CONT.
DBA
DIM.
DWL
EA.
E.E.
E.F.
E.S.
E.W.
EIFS
ELEV.
EMBED.
EOR
EQ.
E.W.T.
EX.
EXP. JT.
FFE
FFL
F.M.
FT
FTG
FDN
GALV.
GA.
G.C.
GR.
HK
HORIZ.
HVAC
ID
INSUL.
INFO.
INT.
JT
K
KSF
LDT
LLH
LLV
MANUF.
MAX.
MECH.
MEP
MEZZ.
MIN.
MISC.
MHS
N/A
NIC
NTS
o/c
OD
OFS
O.H.
OPP.
PAF
PL.
PREFAB.
PT
REINF.
REQ'D
RTU
SCHED.
SIM.
SOG
SP
SPEC.
STIFF.
STRUCT.
T&B
TBD
TC
T.D.
TEMP.
T/
TYP.
U.N.O.
VAR.
VERT.
WF
W.P.
WWF
W/
ADDITIONAL
ADJUSTABLE
ARCHITECT/ENGINEER
ABOVE FINISHED FLOOR
ALTERNATE
ARCHITECT
BOTTOM CHORD
BUILDING
BOTTOM
BOTTOM OF
CANTILEVER
COLD FORMED METAL FRAMING
CONTRACTION JOINT
CENTER LINE
CLEAR
CONCRETE MASONRY UNIT
COLUMN
CONCRETE
CONTINUOUS
DEFORMED BAR ANCHOR
DIMENSION
DOWEL
EACH
EACH END
EACH FACE
EACH SIDE
EACH WAY
EXTERIOR INSULATION & FINISHING SYSTEM
ELEVATION
EMBEDMENT
ENGINEER OF RECORD
EQUAL
END WALL TRUSS
EXISTING
EXPANSION JOINT
FINISHED FLOOR ELEVATION
FINISHED FLOOR LINE
FIELD MEASURE
FOOT/FEET
FOOTING
FOUNDATION
GALVANIZED
GAUGE
GENERAL CONTRACTOR
GRADE
HOOK
HORIZONTAL
HEATING, VENTILATION & AIR CONDITIONING
INSIDE DIAMETER
INSULATION
INFORMATION
INTERIOR
JOINT
KIPS
KIPS PER SQUARE FOOT
LARGE DIAMETER TAPCON
LONG LEG HORIZONTAL
LONG LEG VERTICAL
MANUFACTURER
MAXIMUM
MECHANICAL
MECHANICAL, ELECTRICAL, PLUMBING
MEZZANINE
MINIMUM
MISCELLANEOUS
MH STRUCTURES
NOT APPLICABLE
NOT IN CONTRACT
NOT TO SCALE
ON CENTER
OUTSIDE DIAMETER
OUTSIDE FACE OF STUD
OPPOSITE HAND
OPPOSITE
POWER ACTUATED FASTENER
PLATE
PREFABRICATED
PRESSURE TREATED
REINFORCE (D) (ING) (MENT)
REQUIRED
ROOF TOP UNIT
SCHEDULE
SIMILAR
SLAB-ON-GROUND
SOUTHERN PINE
SPECIFICATION
STIFFENER
STRUCTURAL
TOP AND BOTTOM
TO BE DETERMINED
TOP CHORD
TURN DOWN
TEMPERATURE
TOP OF
TYPICAL
UNLESS NOTED OTHERWISE
VARIES
VERTICAL
WIDE FLANGE
WORK POINT
WELDED WIRE FABRIC
WITH
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
R
S
T
U
V
W
MATERIALS LEGEND
STEEL
EARTH
ROCK
CONCRETE
GRAVEL
CMU
Sheet Number:
Project Number:
No. PE038341
PROFESSIONAL
G
E O R G
I
A
M A
T T
H EW B . H A M
M O
N D
E
NG I N E E
R
R
EG
ISTERED
5077 Dallas Hwy Suite 201 Powder Springs, GA 30127
(404) 495-4889 www.mhstructures.com
Integrity is our foundation.
Sheet Name:
0632102
S001
J O
H N
S C
H R
E E
K G
A
A U
T R
E Y
M
IL
L P
A R
K
O W
N E
R
C
IT
Y O
F J
O H
N S
C R
E E
K
C H
A P
E L R
E S
T R
O O
M A
N D
P A
V
IL
IO
N
F A
C
IL
IT
Y
ISSUED DATE: 07/08/2021
GENERAL NOTES
N O
Is s u a n c e D e s c ri p ti o n
D a te
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
/0
/ 2
11 5/8" 8'-4 3/4" 9'-0 1/8" 4"
/4
/8
/8
C.J.
C .J
C
.J
NOTE 2
8 #5@48
W.C.J
3 4 5
F
G
18'-8 1/2"
T.D.
T.D.
T .D
S202
S202
S202
S202
S202
S202
S202
T/WALL
+2'-0"
S201
TYP.
S202
P-2
P-2
TYP.
8"
S201
FOUNDATION PLAN NOTES:
1. TOP OF SLAB ELEVATION IS 0'-0" WITH RESPECT TO GROUND FLOOR REFERENCE ELEVATION, U.N.O. SEE CIVIL DRAWINGS FOR DATUM ELEVATION. ELEVATIONS NOTED ON PLAN ARE RELATIVE TO GROUND FLOOR REFERENCE ELEVATION, U.N.O.
2. SLAB ON GROUND IS 4" THICK, U.N.O. REINFORCE CONCRETE SLAB W/ 6x6-W2.1xW2.1 W.W.F. SEE GENERAL NOTES FOR
ADDITIONAL INFORMATION.
3. TOP OF FOOTING ELEVATION IS -1'-0" FROM TOP OF SLAB ELEVATION, U.N.O.
4. 'C.J.' INDICATES CONTRACTION JOINT PER DETAIL . CONTRACTION JOINTS SHALL ONLY BE CUT IN SLAB ON GROUND
& TOPPING SLABS. DO NOT CUT IN STRUCTURED SLABS. SEE FOR CONSTRUCTION JOINT DETAIL.
5. INDICATES REINFORCING AT CONTRACTION JOINT ENDS, SEE DETAIL FOR ADDITIONAL INFORMATION.
6. ALL EXPOSED CORNERS OF CONCRETE PEDASTALS/PIERS AND CONCRETE WALLS SHALL RECIEVE A 3/4" CHAMFER.
7. REFER TO MANUFACTURER FOR COLUMN BASE CONNECTION.
8. EXTERIOR CMU WALLS SHALL BE SUPPORTED AT THE TOP BY A PEMB GIRT DESIGNED TO RESIST OUT-OF-PLANE LATERAL
LOADS (WIND & SEISMIC) WITH A DEFLECTION LIMIT OF L/240 FOR 10 YEAR WIND.
1/S201 2/S201
6/S201
NOTE:
FOUNDATIONS (FOOTINGS AND PIERS) HAVE BEEN SIZED BASED ON
ASSUMED COLUMN SIZES AND COLUMN REACTIONS. ACTUAL COLUMN
SIZES, BASE CONNECTIONS, AND COLUMN REACTIONS MUST BE SUBMITTED
FOR APPROVAL PRIOR TO POURING
FOUNDATIONS AND SLAB CONCRETE. FOUNDATIONS MAY REQUIRE
ADJUSTMENTS BASED ON ACTUAL COLUMN SIZES AND COLUMN REACTIONS.
NOTE:
FOUNDATIONS (FOOTINGS AND PIERS) HAVE BEEN SIZED BASED ON
ASSUMED COLUMN SIZES AND COLUMN REACTIONS. ACTUAL COLUMN
SIZES, BASE CONNECTIONS, AND COLUMN REACTIONS MUST BE SUBMITTED
FOR APPROVAL PRIOR TO POURING
FOUNDATIONS AND SLAB CONCRETE. FOUNDATIONS MAY REQUIRE
ADJUSTMENTS BASED ON ACTUAL COLUMN SIZES AND COLUMN REACTIONS.
FOUNDATION LEGEND
W.C.J. WALL CONTROL JOINT; REFER TO DETAIL
T.D. TURN-DOWN SLAB; REFER TO DETAIL
F-# FOOTING MARK; REFER TO FOOTING SCHEDULE ON
P-# CONCRETE PIER MARK, REFER TO PIER SCHEDULE ON
T/ SPOT ELEVATION
X'-X"
2/S301
4/S201
S101
S202
1'-6" 27'-0" 1'-6"
1 2
A
B
C
D
E
C.J. C.J.
C .J
C
.J
T.D.
T.D.
T .D
T .D
NOTE 2
X -B
R A
C
IN
S U
P P
LI
E
R T
.D
X -B
R A
C
S U
P P
LI
E
R
X -B
R A
C
S U
P P
LI
E
R X
-B R
A C
S
U P
P
LI
E R
T .D
S201
S202
S202
S201
T/ PIER
+4'-4", TYP.
F4.0
P-1
F4.0
P-1
F4.0
P-1
F4.0
P-1
F4.0
P-1 F4.0
P-1
F4.0
P-1
F4.0
P-1
F4.0
P-1
F4.0
P-1
Sheet Number:
Project Number:
No. PE038341
PROFESSIONAL
G
E O R G
I
A
M A
T T
H EW B . H A M
M O
N D
E
NG I N E E
R
R
EG
ISTERED
5077 Dallas Hwy Suite 201 Powder Springs, GA 30127
(404) 495-4889 www.mhstructures.com
Integrity is our foundation.
Sheet Name:
0632102
S101
J O
H N
S C
H R
E E
K G
A
A U
T R
E Y
M
IL
L P
A R
K
O W
N E
R
C
IT
Y O
F J
O H
N S
C R
E E
K
C H
A P
E L R
E S
T R
O O
M A
N D
P A
V
IL
IO
N
F A
C
IL
IT
Y
ISSUED DATE: 07/08/2021
FOUNDATION PLAN
S101 SCALE: 1/4" = 1'-0"
2 RESTROOM FOUNDATION PLAN
S101
3 FOOTING SCHEDULE
FOOTING SCHEDULE
Type Width Length Thickness Top Reinf. Bott Reinf. Count Volume
F4.0 4' - 0" 4' - 0" 1' - 4" NONE 4 #5, E.W. 10 213.33 CF
Grand total: 10 10 213.33 CF
GROUND FLOOR REFERENCE ELEVATION = +0'-0"
S101 SCALE: 1/4" = 1'-0"
1 PAVILLION FOUNDATION PLAN GROUND FLOOR REFERENCE ELEVATION = +0'-0"
N O
Is s u a n c e D e s c ri p ti o n
D a te
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
/0
/ 2
W.W.F.
KEYED JOINT
t2
VAPOR BARRIER
2t
OVERLAP VAPOR BARRIER
TAPE VAPOR
BARRIER
SEAM
1/2" DIA. x 12" LONG SMOOTH (A36) DOWEL @ 24" o/c
• 6" EMBEDMENT IN EACH
SIDE OF SLAB
• GREASE DOWEL ONE SIDE
OF JOINT
W.W.F.
6" t2
W.W.F.SAWN JOINT
WIDTH: 1/8"
DEPTH: 1/4 OF "t" t
W.W.F.
2-#5 CONT. (TOP & BOTT.)
GRADE
t2
8"
M
IN
M A
X
M
A X
D
IA
M
IN
36 DIA.
2'-0" MIN.
HORIZ. REINF.
BEND OR LAP OUTSIDE
BARS OR PROVIDE
CORNER BARS AS
SHOWN (LARGER BAR
SIZE GOVERNS LAP)
36 DIA.
2'-0" MIN.
@ FOOTING CONERS @ FOOTING INTERSECTION
2#4 1" CLEAR FROM TOP OF SLAB.
3#4 T&B FOR SLABS ≥ 6".
DO NOT ADD BARS AT JOINTS, UNLESS
SHOWN OTHERWISE.
2"
1" C
LR
1' -6
1' -6
1'-6"1'-6"
C.J.
C .J
C.J.
AT DISCONTINUOUS JOINTSAT RE-ENTRANT CORNERS
Sheet Number:
Project Number:
No. PE038341
PROFESSIONAL
G
E O R G
I
A
M A
T T
H EW B . H A M
M O
N D
E
NG I N E E
R
R
EG
ISTERED
5077 Dallas Hwy Suite 201 Powder Springs, GA 30127
(404) 495-4889 www.mhstructures.com
Integrity is our foundation.
Sheet Name:
0632102
S201
J O
H N
S C
H R
E E
K G
A
A U
T R
E Y
M
IL
L P
A R
K
O W
N E
R
C
IT
Y O
F J
O H
N S
C R
E E
K
C H
A P
E L R
E S
T R
O O
M A
N D
P A
V
IL
IO
N
F A
C
IL
IT
Y
ISSUED DATE: 07/08/2021
TYPICAL FOUNDATION
DETAILS
S201
3 TYPICAL DEPRESSED SLAB-ON-GRADE
S201
2 TYPICAL SLAB CONSTRUCTION JOINT
S201
1 TYPICAL SLAB CONTROL JOINT
S201
4 TYPICAL TURN-DOWN SLAB
S201
5 TYPICAL CORNER REINFORCING
S201
6 TYPICAL SLAB-ON-GROUND ADDITIONAL REINFORCING
N O
Is s u a n c e D e s c ri p ti o n
D a te
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
/0
/ 2
8" CMU - FILL W/
GROUT @ BARS
DOWEL
• MATCH WALL REBAR SIZE & SPACING
• SKEW HOOK TO MAINTAIN 3" CLEAR COVER
• ALTERNATE HOOK SIDE EVERY OTHER BARSLAB
• SEE PLAN
2'-0"
HORIZ. JOINT
REINF. @ 16" o/c
REBAR
• SEE FDN. PLAN FOR
SIZE & SPACING
(3) #4 CONT.
12"
24"
8"
#4 CONT.
8" CMU-FILL W/
GROUT @ BARS
OPTIONAL
COLD JOINT
(3) #5 CONT.
#4 BENT @ 18" o/c
• IF COLD JOINT IS USED
2'-0"
C L
R
HORIZ. JOINT
REINF. @ 16" o/c
DOWEL W/ STD HOOK
• MATCH WALL REBAR SIZE &
SPACING
• SKEW HOOK TO MAINTAIN 3"
CLEAR COVER
• ALTERNATE HOOK SIDE
EVERY OTHER BAR
RUN TURNDOWN
BARS THRU FOOTING
W.W.F.
PRE-ENGINEERED
GLULAM COLUMN
BY OTHERSBASE CONNECTION
PER SUPPLIER
12"
24"
8"
#4 CONT.
OPTIONAL
COLD JOINT
(3) #5 CONT.
#4 BENT @ 18" o/c
• IF COLD JOINT IS USED
2'-0"
C L
R
(4) #6 VERTS
#4 TIES
• 2@2"
• REST AT 12"
PRE-ENGINEERED
GLULAM COLUMN,
• BASE CONNECTION
BY SUPPLIER
PIER SCHEDULE
P-1 TOP OF PIER = 4'-4"
1'-6"
TYP.
2" CLR.
(5) #4 VERTS
#4 WALL REINF.
AT 8" o/c
PRE-ENGINEERED
GLULAM COLUMN,
• BASE CONNECTION
BY SUPPLIER
P-2 TOP OF PIER = 2'-0"
8"
C.L.
FTG.
3/4" CHAMFER
(TYP.)
SLAB-ON-GROUND,
SEE PLAN
SEE PIER SCHEDULE
FOR SIZE & REINF.
PRE-ENGINEERED.
GLULAM COL. BY OTHERS
• BASE CONNECTION
PER SUPPLIER.
SEE FTG. SCHEDULE FOR SIZE & REINF.
EQ EQ
CLR.
2"
TURNDOWN SLAB BEYOND
T/ SLAB
SEE PLAN
T/ FOOTING
SEE PLAN
T/ PIER
SEE PLAN
C L
R
CLR.
3"
SEE PLAN
SLAB
• SEE PLAN
REBAR
• SEE FDN. PLAN FOR
SIZE & SPACING
(3) #5 CONT.
T/MASONRY
SEE PLAN
T/SLAB
SEE PLAN
1'-6"
SLAB
• SEE PLAN
#4@8" o/c
(3) #5 CONT.
T/PIER
SEE SCHED.
T/SLAB
SEE PLAN
1'-6"
HOOK BARS INTO
WALL STEM
Sheet Number:
Project Number:
No. PE038341
PROFESSIONAL
G
E O R G
I
A
M A
T T
H EW B . H A M
M O
N D
E
NG I N E E
R
R
EG
ISTERED
5077 Dallas Hwy Suite 201 Powder Springs, GA 30127
(404) 495-4889 www.mhstructures.com
Integrity is our foundation.
Sheet Name:
0632102
S202
J O
H N
S C
H R
E E
K G
A
A U
T R
E Y
M
IL
L P
A R
K
O W
N E
R
C
IT
Y O
F J
O H
N S
C R
E E
K
C H
A P
E L R
E S
T R
O O
M A
N D
P A
V
IL
IO
N
F A
C
IL
IT
Y
ISSUED DATE: 07/08/2021
TYPICAL FOUNDATION
DETAILS
S202 SCALE: 3/4" = 1'-0"
2 INTERIOR WALL FOOTING
S202 SCALE: 3/4" = 1'-0"
1 TURNDOWN SLAB FOOTING W/ COLD JOINT
S202 SCALE: 3/4" = 1'-0"
4 PRE-ENGINEER COLUMN FOOTING
S202 SCALE: 1" = 1'-0"
6 PIER SCHEDULE
S202 SCALE: 3/4" = 1'-0"
5 COLUMN PIER
S202 SCALE: 3/4" = 1'-0"
3 INTERIOR WALL FOOTING
S202 SCALE: 3/4" = 1'-0"
7 PIER FOOTING
N O
Is s u a n c e D e s c ri p ti o n
D a te
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
/0
/ 2
(S
EE
S C
H
ED
LA
P
SP
LI
C E
(S
EE
S C
H
ED
LA
P
SL
IC
E
CMU
• SEE PLAN
REINF.
• SEE FDN. PLAN
FOR SIZE & REINF.
BOND BEAM
• REINF. W/ #5 BAR (U.N.O.)
• FILL W/ GROUT
* USE APPROVED MECHANICAL
COUPLER.
LAP SPLICE LENGTHS(in.)
#4 #5 #6 #7 #8
N/A N/A
6" CMU 8" CMU 12" CMU
C
LR
3"
CLR.
3"
DOWEL
• MATCH WALL BAR SIZE & SPACING
• HOOK INTO FOOTING (8" @ #4, 10" @ #5, 12" @ #6)
• ALTERNATE HOOK EVERY OTHER DOWEL
M
A X
G R
O U
T L
IF
T
S
DIFFERENT HATCHING
TYPE SHOWN INDICATE
CHANGE IN GROUT LIFTS
HORIZ. JOINT
REINF. @ 16" o/c
CROOK IN BAR IS GRAPHICAL
REPRESENTATION FOR LAP SPLICE AND
IS NOT BENT TO BE AN ACTUAL BEND IN
THE BAR, TYP. @ SIMILAR
CMU
HORIZ. JT. REINF. @
16" o/c
-TRUSS OR LADDER
TYPE
- WIRE SIZE: 9 GA
(W1.7)
(1) VERT. (BAR FULL
HEIGHT) SIZE TO
MATCH ADJACENT
WALL VERT. REINF.
(EA. SIDE OF JOINT)
CAULK JOINT
EA. FACE
RUBBER STRIP IN
SASH BLOCK
CMU BOND BEAM
RAKE JOINT &
CAULK EA. FACE
CONT. HORIZ. REINF.
NOTES:
a. MAXIMUM CONTROL JOINT SPACING: 25' - 0" (UNLESS SHOWN OTHERWISE ON PLANS.)
b. CONTROL JOINTS MUST BE LOCATED A MINIMUM OF 1' - 4" FROM EDGES OF OPENINGS
PROVIDE REINFORCING BAR IN
CORNER CELL AND FILL SOLID W/
GROUT (ONLY REQ'D. IN
REINFORCED WALLS)
HORIZONTAL JOINT
REINFORCEMENT @ 16"o/c
- TRUSS OR LADDER TYPE
- WIRE SIZE: 9 GA (W1.7)
PROVIDE
PREFABRICATED 32"
CORNER SECTION
NOTE:
a. WHERE BOND BEAMS ARE IN WALLS, PROVIDE CORNER BARS TO LAP WITH BOND BEAM BARS.
HORIZONTAL JOINT
REINFORCEMENT @ 16"o/c
- TRUSS OR LADDER TYPE
- WIRE SIZE: 9 GA (W1.7)
PROVIDE
PREFABRICATED 32"
TEE SECTION
PROVIDE REINFORCING BAR IN
END CELL AND FILL SOLID W/
GROUT (ONLY REQ'D. IN
REINFORCED WALLS)
SEE PLAN FOR SIZE
AND SPACING OF
REINFORCING
NOTE:
a. WHERE BOND BEAMS ARE IN WALLS, PROVIDE CORNER BARS TO LAP WITH BOND BEAM BARS.
FULL MORTAR BED AT FOOTING
FACE SHELL BEDDING
WEB BEDDING AT GROUTED CELLS
FILL REINFORCED CELLS WITH 2000
PSI GROUT (MORTAR IS NOT
ACCEPTABLE)
VERTICAL REINFORCING
CONCRETE FOOTING
DOWEL MAY BE
BENT UP TO 1"
LATERALLY PER 6"
VERTICALLY
2'-0"
HORIZONTAL JOINT
REINFORCEMENT @ 16" o/c
BOND BEAM W/ #4
BAR (UNLESS
OTHERWISE
DETAILED) IN TOP
COURSE
VERTICAL BAR IN 1ST
CELL AT ENDS OF
WALL & ON EACH
SIDE OF OPENINGS
VERTICAL BAR ABOVE OPENINGS
WHERE OPENING WIDTH
EXCEEDS SPACING OF BARS AS
SHOWN ON PLANS
VERTICAL BARS (SIZE
@ SPACING AS SHOWN
ON PLANS)
2'-0"
U-BLOCK LINTEL (SIZE &
REINFORCING PER U-BLOCK
LINTEL SCHEDULE) EXTEND REINF.
PAST OPENING A MIN. OF 24" CONTROL JOINT @ 25'-0"
o/c MAX. (STEEL COLUMNS
WITHIN WALL ACT AS A
CONTROL JOINT)
WHERE MULTIPLE BARS
ARE REQUIRED AT
ENDS OF SHEAR
WALLS, WHERE SHOWN
ON THE PLANS, ONLY
ONE BAR SHALL BE
PLACED PER CELL
INTERIOR CONCRETE MASONRY PARTITION WALLS: GENERAL REQUIREMENTS
NOTE: THE FOLLOWING ONLY APPLIES TO INTERIOR, NON-STRUCTURAL CONCRETE MASONRY PARTITION WALLS.
1. ALL WALLS MUST HAVE HORIZONTAL 9 GAUGE (W1.7) JOINT REINFORCEMENT @ 16" o/c {TRUSS OR LADDER TYPE.}
2. WALLS MUST SPAN EITHER HORIZONTALLY OR VERTICALLY BETWEEN SUPPORTS.
3. UNREINFORCED CMU WALLS MAY SPAN A MAXIMUM DISTANCE AS SHOWN IN THE CHART BELOW.
4. FOR A HORIZONTAL SPAN, THE CMU MUST BE TIED/ANCHORED INTO AN ADJACENT WALL OR COLUMN AT BOTH ENDS.
5. FOR A VERTICAL SPAN, THE CMU MUST BE BRACED AT THE TOP TO THE FLOOR OR ROOF STRUCTURE ABOVE (SEE TYPICAL DETAILS
BELOW.)
NOMINAL
CMU SIZE
4" 6" 8" 12"
MAXIMUM
SPAN (FT.)
(S E
E C
H A
R T
M A
X
IM
U M
S P
A N
METAL STUDS @ 48" o/c
(ALTERNATE SIDES OF
WALL)
8" METAL STUDS, CONT.
ATTACH TO DECK W/ #10 SELF-
DRILLING SCREW @ 24" o/c
SLAB
CMU WALL
CEILING
VERTICAL SPAN BRACE OPTION "A"
CONT. STUD
TRACK
STUD
3-5/8", 20 GA.
6", 20 GA.
MAX. LENGTH
(FT.)
VERTICAL SPAN BRACE OPTION "B"
CEILING
SLAB
CMU WALL
TIE WALL TO ADJACENT
WALL WITH PRE-
FABRICATED TEE OR "L"
JOINT REINFORCEMENT
TIE WALL TO COLUMNS
WITH TRIANGULAR
COLUMN TIES
HORIZONTAL SPAN SUPPORT
MAXIMUM SPAN
WIRE-BOND #1700 CONTROL
JOINT ANCHOR
• BEND 90 DEGREES
• ATTACH TO EXISTING WALL
W/ (2) 3/16" x 1-1/4"
TAPCONS
HORIZONTAL SPAN SUPPORT AT EXISTING
NEW CMU WALL
EXISTING CMU WALL
NOTE: PROVIDE WIRE-BOND #1700 ANCHOR WHERE
NEW WALLS ABUT EXISTING WALLS AND WHERE
TEE OR "L" JOINT REINFORCEMENT HAS BEEN
MISSED IN NEW CONSTRUCTION.
M A X. L
E N G
TH
MAX.
SPAN
4'-0" 6'-0" 8'-0" 10'-0" 12'-0"
L
IN
T E
L
D E
E P
LINTEL
DEPTH
8" 8" 8" 16" 16"
BOTT.
REINF.
1 - #4 1 - #4 1 - #6 1 - #6 1 - #6
8" NORMAL
WEIGHT BLOCK
BOTT. REINF.
(PER SCHED.)
1 - #5 BAR
NOTES:
a. U-BLOCK LINTEL SCHEDULE SHALL BE USED FOR
ALL CMU BLOCK OPENINGS UNLESS OTHERWISE
NOTED ON THE PLANS.
b. 8" MINIMUM BEARING IS REQUIRED.
c. BLOCK SHALL BE LAID IN RUNNING BOND.
d. CONCRETE BLOCK UNITS MUST COMPLY WITH
ASTM C 90, NORMAL WEIGHT. UNIT
COMPRESSIVE STRENGTH SHALL BE 1900 PSI
MINIMUM.
e. FILL BEARING CELLS OF BLOCK W/ GROUT DOWN
TO FOOTING.
f. LINTEL SHALL BE FILLED SOLID W/ 2000 PSI
GROUT.
g. REINFORCING BARS SHALL BE ASTM 615 GRADE 60.
h. MORTAR SHALL BE TYPE "S".
i. WHERE VERTICAL CONTROL JOINT OR
EXPANSION JOINT IS CLOSER THAN 16" TO
EITHER SIDE OF OPENING, NOTIFY ENGINEER.
U-BLOCK LINTEL SCHEDULE
L
IN
T E
L
D E
E P
Sheet Number:
Project Number:
No. PE038341
PROFESSIONAL
G
E O R G
I
A
M A
T T
H EW B . H A M
M O
N D
E
NG I N E E
R
R
EG
ISTERED
5077 Dallas Hwy Suite 201 Powder Springs, GA 30127
(404) 495-4889 www.mhstructures.com
Integrity is our foundation.
Sheet Name:
0632102
S301
J O
H N
S C
H R
E E
K G
A
A U
T R
E Y
M
IL
L P
A R
K
O W
N E
R
C
IT
Y O
F J
O H
N S
C R
E E
K
C H
A P
E L R
E S
T R
O O
M A
N D
P A
V
IL
IO
N
F A
C
IL
IT
Y
ISSUED DATE: 07/08/2021
TYPICAL MASONRY
DETAILS
S301
1 TYPICAL REINFORCED MASONRY WALL SECTION
S301
2 TYPICAL CMU CONTROL JOINT
S301
3 TYPICAL MASONRY WALL CORNER
S301
4 TYPICAL WALL INTERSECTION
S301
5 TYPICAL WALL MORTAR REQUIREMENTS
S301
6 DOWEL BEND LIMIT IN CMU
S301
7 TYPICAL REINFORCED MASONRY WALL
S301
8 TYPICAL INTERIOR CMU DETAILS
S301 SCALE: 1 1/2" = 1'-0"
9 8" U-BLOCK LINTEL SCHEDULE
N O
Is s u a n c e D e s c ri p ti o n
D a te
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
/0
/ 2
GENERAL ARCHITECTURE NOTES:
1. THE DRAWINGS INDICATE THE GENERAL EXTENT OF
WORK. THE DRAWINGS ARE NOT INTENDED TO
INDICATE OR DESCRIBE ALL WORK REQUIRED FOR
THE FULL PERFORMANCE AND COMPLETION OF THE
REQUIREMENTS OF THE CONTRACT DOCUMENTS.
2. THE ENUMERATION OF PARTICULAR…
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| 21-276RP Bid Packet | — | |
| 21-273RP Addendum 1 | — | |
| 21-273RP Bids Received | — | |
| 21-273RP Communication 1 | — | |
| Award Information | — | |
| 21-273RP Sample Contract | — | |
| 21-273RP Addendum 2 | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .