21-0701 NH100 Install Zone Valves E148 - SOW.pdf
PDF 119 KB Posted
- Attached to
- Install NH100 Medical Gas Valves Zone E148
- Solicitation number
- N4008521R2540
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 21-0701 NH100 Install Zone Valves E148 - SUBMITTAL REGISTER.pdf | ||
| PWD DIV 01 SPECS 042016 (002).pdf | ||
| RFP 210701 NH100.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTALL NH100 MEDICAL GAS VALVES ZONE E148
AT NAVAL MEDICAL CENTER,
CAMP LEJEUNE, NORTH CAROLINA
1. GENERAL INTENTION. It is the declared and acknowledged intention of this solicitation to obtain the supervision, expertise, labor, materials, and equipment for installing new medical gas zone valves and replace existing gas outlets in E148.
2. LOCATION. The work location is NH100, Camp Lejeune, NC.
3. DETAILED REQUIREMENTS. The Contractor shall:
a. Make a site visit and take such other steps as may be reasonably necessary to ascertain the nature and location of the work and general local conditions that could affect the work or the cost thereof and should perform an inspection of each item, taking their own measurements and developing their own material requirements in accordance with the detailed requirements. Failure to do so will not relieve the contractor from the responsibility of estimating properly the difficulty or cost of successfully performing the work. Adhere to all specified information within these pages.
b. All work will be coordinated with the building occupants.
c. Complete the attached Pre-Construction Risk Assessment (ICRA/PCRA)
d. Government approval is required for submittals with a “G” designation.
i. SD-03 Product Data
1. Piping/tubing systems; G
2. Valves and station outlets; G
e. Install new zone valves for E148 (medical air, dental air, vacuum and oxygen).
i. Extending piping as needed to reach the new zone valves from the existing service valves located above ceiling in E100C.
ii. Install new zone valves in the wall shared with E148 and E100C.
f. Remove and replace existing medical gas outlets inside of E148 (medical air, dental air, vacuum and oxygen).
g. Be provided required field utilities (electricity, toilets, drinking water, elevator service, etc.) without charge.
h. Provide a one year warranty on all materials and equipment installed for a period of one year from the date of installation.
i. The following codes will be adhered to:
i. NFPA 70 National Electrical Code (2017)
ii. NFPA 99 Heath Care Facilities Code (2012)
iii. NFPA 101 Life Safety Code
iv. ASHRAE 170-2017 Ventilation of Health Care Facilities
v. 2012 International Building Code
vi. UFC 1-200-01 General Building Requirements
vii. UFC 1-200-02 High Performance and Sustainable Building
Requirements
viii. FC 1-300-09N Navy and Marine Corps Design Procedures, with
Change 2
ix. UFC 3-301-01 Structural Engineering
x. UFC 3-310-04 Seismic Design of Building
xi. UFC 3-401-01 Mechanical Engineering, with Change 1
xii. UFC 3-410-01 Heating, Ventilating, and Air Condition Systems, with
Change 4
xiii. UFC 3-430-01FA Heating and Cooling Distribution Systems
xiv. UFC 3-501-01 Electrical Engineering
xv. UFC 3-575-01 Lightning and Static Electricity Protection Systems
xvi. UFC 4-510-01 Design: Military Medical Facilities, with Change 2
xvii. UFC 4-010-06 Cybersecurity of Facility-Related Control Systems
xviii. ASCE 7-10 Minimum Design Loads for Buildings and Other
Structures
xix. ACI 318-14 Building Code Requirements for Structural Concrete
4. Special Requirements. The Contractor shall be required to:
a. Commence work under this project within forty-five (45) calendar days after award notification or any communication authorizing the Contractor to proceed.
b. Notify all parties 14 days prior to commencement of work.
c. North Carolina State Building Code, Fuel Gas Code, National Electrical
Code, Army Corps of Engineers EM 385 and OSHA Safety Codes shall be strictly enforced.
d. Make adjustments to work scheduling and execution as a result of working with an active medical facility and conduct the specific work as described to individual area of the building as to help reduce inconvenience to patrons and employees of the medical facility. The contractor shall be required to work weekend and/or holidays to complete all work.
e. Execute the work diligently.
f. All material associated with the replacement or removal is the property of the contractor and shall be removed from the base and discarded in an approved landfill.
g. Ensure daily thorough cleaning of work site each workday and at the end of the project.
h. The use of tobacco products (electronic cigarette, vaping, smoking and smokeless tobacco) is NOT authorized on the premises.