21-04-08 HPMPTA Drawings_RTA (UNLOCKED).pdf
PDF 7 MB Posted
- Attached to
- TA-00039-19 Human Performance Multipurpose Training Area, Fort Bragg, NC Federal contract opportunity
- Solicitation number
- W912PM21B0009
About this file
This solicitation is for the construction of a new outdoor artificial turf field training area for the 1st Special Warfare Training Group at Fort Bragg, NC. The project includes installing an artificial turf field, concrete pad with pre-engineered metal shade structure, site lighting, and optional items such as a rope climbing structure, artificial turf pullup/sit-up area, concrete foundation for future equipment, and a yard hydrant. The estimated value of construction is between $1 million and $5 million. This acquisition is being offered as a certified HUBZone small business set-aside. Bids are due in accordance with the solicitation number provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912PM21B0009-0002 TA 39-19 1st SWTG HPMTA.pdf | ||
| W912PM21B0009-0002 TA 39-19 1st SWTG HPMTA(cc).pdf | ||
| AMDT0002_TA-00039-19_TechSumofChanges_wSPECS (1).pdf | ||
| Site Visit Sign sheet.pdf | ||
| W912PM21B0009-0001 TA 39-19 1st SWTG HPMTA.pdf | ||
| TA-00039-19 Site Visit Map.pdf | ||
| W912PM21B0009-0001 TA 39-19 1st SWTG HPMTA (Conformed Copy).pdf | ||
| W912PM21B0009 TA 39-19 1st SWTG HPMTA.pdf | ||
| W912PM21B0009_TA-00039-19_Multipurpose-Trng-Field-RTASpecs-21.04.08.pdf | ||
| SC-00001-21_Bldg site map.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F I L
E
N
A M
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S U
B M
I T
T E
D
B
Y
D A
T E
C H
E C
K E
D
B
Y
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
S I Z
E x
U S
A
R M
Y
C
O R
P S
O
E
N G
I N
E E
R S
W I L
M I N
G T
N
D
S
T R
I C
T
A R
L I N
G T
V E
N U
E
W I L
M I N
G T
O N
N
O R
T H
C
R
O L
I N
A
G-000
C O
V E
R
S
H E
E T
US Army Corps of Engineers
Wilmington District
S
S
U R
R A
T T
S
S
U R
R A
T T
J
M
A N
N I N
G
A w d
C o v e r d w g
C O
N T
R A
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
C O
N T
R O
L L E
D
U
N C
L A
S S
I F
I E
D
I N
F O
R M
A T
I O
N
C
U I
D R
A W
I N
G
C
O D
E
S O
L I C
I T
A T
I O
N
N
W
P M
B
A W
A R
D
D
A T
E
R
W
P M
C X
X X
X
A
F
E L I C
I A
N O
G
R A
N D
A
TA-00039-19
HUMAN PERFORMANCE
MULTIPURPOSE TRAINING AREA, SWCS
FORT BRAGG, NORTH CAROLINA
SOLICITATION NO: W912PM21B0009
CONTRACT NO: W912PM21CXXXX
AWARD DATE: 08 APR 2021
T A
H U
M A
N
P
E R
F O
R M
A N
C E
M U
L T
I P
U R
P O
E
A
I N
I N
G
A
R E
A
S
W C
S
F O
B
A
G G
N
O R
R
O L I N
A
R T
A
S
E T
R T
A
S
E T
A
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
PROJECT LOCATION
PROJECT LOCATION
A L L A
M E
R
IC
Y
ALL AMERICAN VISITOR
CONTROL CENTER
KNOX STREET
TRUCK PLAZA
YADKIN ROAD ACP
R E
IL
L Y
R D
GRUBER RD ACP #8
PROJECT
LOCATION
ARDENNES ST
M E
R
IL
L S
T
GRUBER RD
Z A
B
IT
O S
K Y
R D
C E
M S
P ro je c t
N o
P ro je c t M a n a g e r:
P h o n e
N o
E N
G
IN
E E
R
IN
G A
R C
H
IT
E C
T U
R E
S u m m e rv ill e
S C
W ilm in g to n
N C
-1
A
A D a v e Y e n s a n
.8
.3
Summerville, SC
ENGINEERING | ARCHITECTURE
Wilmington, NC
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
US Army Corps of Engineers ®
ISSUE DATE:
WILMINGTON DISTRICT
W
IL
M
IN
G T
O N
D
IS
T R
IC
T
D
A R
L
IN
G T
O N
A V
E W
IL
M
IN
G
T O
N N
C
SHEET ID
US Army Corps of Engineers ®
D
C
B
A
E
F
G
2 3 4 5 6 7 8 9 10
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
C O
N T
R O
L L
E D
U N
C L
A S
S
IF
IE
D
I N
F O
R M
A T
IO
N
C
U I)
BIM 360://20152AA-Human Performance Training Area/20152AA_A_R20.rvt
4/8/2021 1:33:40 PM
C O
V E
R S
H E
E T
T A
-0 -1
P
H
A R
R
IS
P H
A R
R
IS
C E
M S
E N
G
IN
E E
R
IN
G
D V
O N
T E
R S
C H
A
P R
W P
M B
C A
T E
G O
R Y
C O
D E
F
IL
E N
A M
E
H U
M A
N P
E R
F O
R M
A N
C E
M U
L T
IP
U
R P
O S
E T
R A
IN
IN
G A
R E
A S
W C
S
G -0
.D
W G
08 APR 2021
TA-00039-19
HUMAN PERFORMANCE
FORT BRAGG, NC
MULTIPURPOSE TRAINING AREA, SWCS
F O
R T
B R
A G
G N
C
G-001
INDEX OF DRAWINGS
SHEET
NO. SHEET TITLE
GENERAL
G-001 COVER SHEET
G-002 CANTONMENT MAP
G-003 GENERAL CONSTRUCTION NOTES
CIVIL
C-001 NOTES AND LEGEND
VF101 EXISTING TOPOGRAPHIC SURVEY
CD101 SITE DEMOLITION PLAN
CS101 SITE PLAN
CG101 SEDIMENT AND EROSION CONTROL PLAN
CG102 GRADING AND STORM DRAINAGE PLAN
CG102A SITE GRADING AND STORM DRAINAGE PLAN - OBI 3
C-501 SITE DETAILS
C-502 SITE DETAILS
C-503 SITE DETAILS
C-504 SITE DETAILS
C-505 SITE DETAILS
C-506 STORMWATER MANAGEMEMT DETAILS
C-507 STORMWATER MANAGEMENT DETAILS
STRUCTURAL
S-001 GENERAL NOTES AND DESIGN LOADS
S-101 CANOPY FOUNDATION PLAN
S-102 SORINEX FOUNDATION PLAN - OBI 4
ARCHITECTURAL
A-001 ABBREVIATIONS
A-002 SYMBOLS, LEGENDS AND NOTES
AD101 CANOPY DEMOLITION PLAN
AD201 DEMOLITION EXTERIOR ELEVATIONS
A-101 CANOPY FLOOR PLAN
A-102 CANOPY REFLECTED CEILING PLAN
A-103 CANOPY ROOF PLAN
A-201 EXTERIOR ELEVATIONS
A-501 ROOF DETAILS
A-502 ROPE CLIMB DETAILS - OBI 2
ELECTRICAL
E-001 LEGEND, GENERAL NOTES AND DETAILS
ES101 SITE DEMOLITION PLAN
ES102 SITE PLAN
E-501 LIGHTING SCHEDULE AND DETAILS
TOTAL: 34
SCALE: NOT TO SCALEC1
BASE MAP
SCALE: NOT TO SCALEC4
TRAINING AREA LOCATION
SCALE: NOT TO SCALEA5
TRAINING AREA
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
P
SA
T R
I CK K. H
A
R R I
N
AO
RT
H CAROLIN
R
DEG
ISTERE
SEAL
15282
ARCHITECT
DIRECTORATE OF PUBLIC WORKS
BUILDING NO. 3-1631
ACP #1
ACP #2A
WOMACK ARMY
MEDICAL CENTER
A 24 M B
A 24 M B
C 2 5
AC
BUTNER RD
LONGSTREET RD
GRUBER RD A
L L A
M E
R
IC
A N
F R
E E
W A
Y
YADKIN RD
G R U
BER
R D
LONGSTREET RD
BUTNER RD
HONEYCUTT RD
HONEYCUTT RD
B R
A G
G B
L V
D
B R
A G
G B
L V
D
GRUBER RD
M U
R C
H S O
N R
D
RANDOLPH ST
K N
O X
S T
K N
O X S
T
SIMMONS AIRFIELD
R E
IL
L Y
R D
R E
IL
L Y
R D
R E
IL
L Y
R D
L A
M O
N T R
D
CHIC
KEN R
OAD
CHICKEN ROAD
PLANK R
O
AD
M
IL
IT
ARY R
ESERVATIO
N B
O
UNDARY
MILITARY RESERVATION BOUNDARY
BASTOGNE D
RIVE
M c R
ID
G
E R
O A
D
M c R
ID
G
E R
O A
D
NORMANDY DR
A R
D E
N N
E S
R D
S P
O O
N E
R S
T
MAIN ENTRANCE
A R
M
IS
T E
A D
POPE ARMY AIRFIELD
B R
A G
G B
L V
D
J A
C K
S O
N
MCKELLERS RD.
C O
O L Y
CONCH RD
B R
A G
G B
L V
D
MANCHESTER RD
LI
L
LI
N G
T O
N H
W Y
WOODRUFF
MILITARY R
ESERVATIO
N BOUNDARY
ACP #13
ACP #10
ACP #11
ACP #5 ALL AMERICAN VISITOR
CONTROL CENTER
ACP #2
USACE SOCOM RESIDENT OFFICE
BLDG. NO. 2-2414 WOODRUFF ST.
FT. BRAGG, NC 28310 (910)-432-8121
SOLID WASTE
TRANSFER STATION
ACP #3
ACP #4
ACP #8
ACP #8A
ACP #16 TRUCK PLAZA AND
VISITOR CONTROL CENTER
ACP #18
ACP #12
LAMONT ROAD
BORROW PIT
LAMONT RD SOLID
WASTE AND RECYCLING
LANDFILL FACILITY
PROJECT SITE - HUMAN
PERFORMANCE TRAINING
AREA
THE FORT BRAGG LAMONT CONSTRUCTION AND DEMOLITION (C&D)
LANDFILL IS CLOSED AND WILL NOT BE ACCEPTING ANY C&D WASTE
AND, ASBESTOS WASTE. THE MUNICIPAL SOLID WASTE (MSW)
TRANSFER STATION AT THE LAMONT LANDFILL FACILITY IS CLOSED
AND WILL NOT ACCEPT MSW AT THE FACILITY.
ALL CONTRACTORS SHALL USE A STATE CERTIFIED C&D LANDFILL OR
SUB TITLE “D” LANDFILL OFF FORT BRAGG FOR THE DISPOSAL OF
C&D, ASBESTOS WASTE, AND MSW.
ALL CONTRACTORS SHALL USE A STATE CERTIFIED C&D LANDFILL OR
SUB TITLE “D” LANDFILL OFF FORT BRAGG FOR THE DISPOSAL OF
C&D, ASBESTOS WASTE, MSW, AND ALL OTHER FORMS OF
HAZARDOUS OR HARMFUL MATERIALS INCLUDING BUT NOT LIMITED
TO SLURRY FROM HORIZONTAL DIRECTIONAL DRILLING.
THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN DATA OF ALL
WASTE DISPOSED AND MATERIALS RECYCLED OFF FORT BRAGG.
THE DEPARTMENT OF THE ARMY (DA) AND THE NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY (NC DEQ) REQUIRES
MONTHLY AND ANNUAL REPORTING OF ALL MATERIALS (WASTE AND
RECYCLABLES) MANAGED BY FORT BRAGG. THE FORT BRAGG
ENVIRONMENTAL COMPLIANCE BRANCH, SOLID WASTE/RECYCLING
OFFICE IS RESPONSIBLE FOR COMPILING DATA INTO MONTHLY
DIRECTORATE REPORTS TO BE CONSOLIDATED INTO REPORTS FOR
THE DA AND THE NC DEQ. A PROVIDED FORM FROM THE SOLID
WASTE/RECYCLING OFFICE OR A CONTRACTOR FORM SHALL BE
FILLED OUT WITH THE TYPE OF WASTE OR RECYCLED MATERIAL, THE
WEIGHT OF THE WASTE/MATERIAL (TONS OR POUNDS) AND THE
FACILITY THE WASTE OR RECYCLABLES WERE DELIVERED. THIS
INFORMATION IS REQUIRED TO BE SENT TO THE FORT BRAGG SOLID
WASTE/RECYCLING OFFICE BY THE SECOND FRIDAY OF EACH
MONTH. EMAIL TO JEFF SLOOP AT JEFFERY.W.SLOOP.CTR@MAIL.MIL
OR FAX TO (910)396-4188, ATTN: SOLID WASTE OFFICE.
THE LAMONT LANDFILL FACILITY WILL ACCEPT RECYCLABLES ITEMS.
1)CONCRETE, BRICK AND BLOCK
- SHALL BE TESTED AND FREE OF ASBESTOS AND LEAD BASED
PAINT TO BE RECYCLED
- SHALL BE NO LARGER THAN 2' BY 2' PIECES OR EQUIVALENT
- SHALL BE MINIMAL AMOUNT OF DIRT IN LOAD
- SHALL HAVE NO REBAR PROTRUDING OUT OF THE CONCRETE
2)TREES, LIMBS AND STUMPS
- SHALL BE CUT TO 6 FEET OR LESS IN LENGTH
- IF THE TREE HAS A LARGE DIAMETER (EXAMPLE 3 FT. DIA.) IT
SHALL BE CUT TO LENGTHS OF 3 FEET OR LESS
- SHALL BE MINIMAL AMOUNT OF DIRT IN LOAD OR IN STUMP
ROOTS
- WILL EXCEPT GROUND WOOD CHIPS
- LOADS SHALL BE FREE OF TRASH
3)PALLETS
- SERVICEABLE AND NON-SERVICEABLE PALLETS
4)SCRAP STEEL
- NO ITEMS REQUIRING DEMILITARIZED ACCEPTED
- NO ITEMS WITH LIQUIDS IN THEM
5)SCRAP ALUMINUM
- NO ITEMS REQUIRING DEMILITARIZED ACCEPTED
- NO ITEMS WITH LIQUIDS IN THEM
6)CARDBOARD TO BE RECYCLED
- A 40 YARD DUMPSTER IS AVAILABLE FOR CARDBOARD
- ALSO CARDBOARD CAN BE TAKEN TO THE FORT BRAGG
RECYCLING CENTER AT BLDG 3-1240, BUTNER AND REILLY
ROAD
- SHALL BE CLEAN OF PLASTICS, STYROFOAM, WOOD, METAL,
TRASH, ETC.
7)ALL RECYCLABLE MATERIALS FROM A CONSTRUCTION OR
DEMOLITION JOB IS PROPERTY OF THE GOVERNMENT UNLESS
THE CONTRACT SPECIFIES THAT THE CONTRACTOR CAN OBTAIN
THE MATERIALS. ITEMS SUCH AS HVAC UNITS (FREON REMOVED),
AIR HANDLERS, PIPING, METAL BEAMS, MOTORS, VALVES, COPPER
WIRE, ETC. THESE TYPES OF ITEMS SHALL BE TRANSPORTED TO
DPW RECYCLING CENTER OR THE RECYCLING AREA AT THE
LAMONT LANDFILL FACILITY.
A LANDFILL USAGE PERMIT, FOR CONTRACTORS, SHALL BE
OBTAINED FROM THE DIRECTORATE OF PUBLIC WORKS,
ENVIRONMENTAL COMPLIANCE BRANCH, SOLID WASTE/RECYCLING
PROGRAM AT BLDG 3-1137, (910) 432-6412.
STATE LAW AND FORT BRAGG REGULATIONS REQUIRES COVERING
OF LOADS OF WASTE OR RECYCLABLES TO PREVENT LITTER.
ALL WASTE OR RECYCLABLE MATERIAL LOADS ARE SUBJECT TO BE
INSPECTED OF THEIR CONTENTS WHILE BEING PRESENT ON FORT
BRAGG.
ACCESS CONTROL POINT
MAJOR ROADS
STREETS
RAILROADS
INSTALLATION BOUNDARIES
INTERSTATE ROUTE
U.S.. ROUTE
STATE ROUTE
LAKES
ACCESS/HAUL ROUTE
ROAD CLOSED WITH GATES
OR BARRIERS
ACP
C E
M S
P ro je c t
N o
P ro je c t M a n a g e r:
P h o n e
N o
E N
G
IN
E E
R
IN
G A
R C
H
IT
E C
T U
R E
S u m m e rv ill e
S C
W ilm in g to n
N C
-1
A
A D a v e Y e n s a n
.8
.3
SOLID WASTE AND RECYCLING
LEGEND
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
W
IL
M
IN
G T
O N
D
IS
T R
IC
T
D
A R
L
IN
G T
O N
A V
E W
IL
M
IN
G
T O
N N
C
SHEET ID
US Army Corps of Engineers ®
D
C
B
A
E
F
G
2 3 4 5 6 7 8 9 10
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
C O
N T
R O
L L
E D
U N
C L
A S
S
IF
IE
D
I N
F O
R M
A T
IO
N
C
U I)
BIM 360://20152AA-Human Performance Training Area/20152AA_A_R20.rvt
4/8/2021 1:33:41 PM
C A
N T
O N
M E
N T
M A
P
T A
-0 -1
P
H
A R
R
IS
P H
A R
R
IS
C E
M S
E N
G
IN
E E
R
IN
G
D V
O N
T E
R S
C H
A
P R
W P
M B
C A
T E
G O
R Y
C O
D E
F
IL
E N
A M
E
H U
M A
N P
E R
F O
R M
A N
C E
M U
L T
IP
U
R P
O S
E T
R A
IN
IN
G A
R E
A S
W C
S
G -0
.D
W G
F O
R T
B R
A G
G N
C
G-002
SCALE: NOT TO SCALEA1
CANTONMENT MAP
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
P
SA
T R
I CK K. H
A
R R I
N
AO
RT
H CAROLIN
R
DEG
ISTERE
SEAL
1. CONSTRUCTION METHODS AND PROCEDURES AND CONTRACTOR ACCESS
A. THE WORK FOR THIS PROJECT CONSISTS OF FURNISHING ALL LABOR, EQUIPMENT,
TRANSPORTATION, AND MATERIALS NECESSARY TO PERFORM ALL WORK IN STRICT
ACCORDANCE WITH THE PROJECT SPECIFICATIONS, APPLICABLE UNITED STATES ARMY
CORPS OF ENGINEERS (USACE) DRAWINGS, UNIFIED FACILITIES CRITERIA (UFC), SECURITY
OPERATIONS TRAINING FACILITY (SOTF) STANDARDS, FORT BRAGG INSTALLATION DESIGN
GUIDELINES (IDG), ABA, INTERNATION BUILDING CODE (IBC), NFPA AND OTHER CONTRACT
DOCUMENTS. SEE DISCIPLINE SHEETS FOR ADDITIONAL CODE REQUIREMENTS AND
STANDARDS. THE SCOPE OF WORK OF THIS CONTRACT IS REFERENCED IN PROJECT
SPECIFICATIONS SECTION 01 00 05.
B. THE CONTRACTOR SHALL REFER TO THE PROJECT SPECIFICATIONS IN ALL SITUATIONS. THE
CONTRACTOR SHALL BRING CONFLICTS BETWEEN PROJECT SPECIFICATIONS AND PLANS TO
THE ATTENTION OF THE CONTRACTING OFFICER REPRESENTATIVE (COR) FOR RESOLUTION.
ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE PROJECT SPECIFICATIONS.
C. ALL DIMENSIONS AND CONDITIONS TIED TO OR OTHERWISE RELATED TO EXISTING
CONSTRUCTION WILL BE FIELD VERIFIED BY THE CONTRACTOR. VERIFICATION SHALL BE
MADE PRIOR TO ORDERING, FABRICATING, OR CONSTRUCTING ANY RELATED STRUCTURAL
COMPONENTS. WHERE DISCREPANCIES OCCUR, THE CONTRACTOR SHALL ADVISE THE COR
IMMEDIATELY AND PROVIDE THE COR WITH THE CORRECT DIMENSIONS AND CONDITIONS.
D. THE CONTRACTOR SHALL PROVIDE ONSITE SANITARY FACILITIES FOR HIS WORKERS DURING
THE ENTIRE CONSTRUCTION PHASE. COORDINATE LOCATION WITH COR.
E. THE CONTRACTOR SHALL ADEQUATELY PROTECT ALL EXISTING SITE FEATURES AND
FACILITIES DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL COORDINATE
EXACT PROJECT LIMITS WITH CONTRACTING OFFICER'S REPRESENTATIVE (COR).
F. PRIOR TO ANY DEMOLITION OR NEW WORK COMMENCING THE ELECTRICAL CONTRACTOR
SHALL ARRANGE A MEETING WITH THE CONTRACTING OFFICER AND SOTF REPRESENTATIVE
TO DISCUSS ALL ELECTRICAL OUTAGE PROCEDURES FOR SHUTDOWN OF ANY ELECTRICAL
PANELS. THE ELECTRICAL CONTRACTOR MUST NOTIFY THE CONTRACTING OFFICER, IN
WRITING, AT LEAST 7 DAYS PRIOR TO ANY ELECTRICAL SHUTDOWN DURING DEMOLITION OR
NEW CONSTRUCTION.
G. CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE BEST AVAILABLE HAUL ROUTE TO THE
FORT BRAGG LAMONT RECYCLING FACILITY AND SHALL COORDINATE WITH THE COR AS
NEEDED.
2. CONSTRUCTION PHASING AND PROJECT SCHEDULES
A. THE CONTRACTOR SHALL ENSURE THAT HIS ACTIVITIES SHALL NOT INTERFERE WITH THE
OPERATIONS CONDUCTED AT SURROUNDING BUILDINGS AND WORK AREAS.
B. CONTRACTOR SHALL NOT BLOCK ACCESS TO EXISTING BUILDINGS, ROADS AND/OR
FACILITIES.
C. CONTRACTOR SHALL PROVIDE A PROJECT SCHEDULE TO THE COR PRIOR TO CONSTRUCTION
AND MOBILIZATION. CONTRACTOR SHALL PROVIDE WEEKLY UPDATES ON THE PROJECT
SCHEDULE FOR FULL DURATION OF PROJECT. THE WEEKLY UPDATES SHALL BE PROVIDED
SHOWING THE SCHEDULE FOR THE UPCOMING 2 WEEKS INCLUDE UPDATES REGARDING THE
PHASING OF CONSTRUCTION.
D. ADJACENT AREAS WILL BE OCCUPIED BY GOVERNMENT PERSONNEL THROUGHOUT THE
CONSTRUCTION PERIOD. CONTRACTOR SHALL NOT ALLOW CONSTRUCTION ACTIVITIES TO
DISRUPT ON-GOING GOVERNMENT OPERATIONS.
3. CONTRACTOR STAGING AREA
A. CONTRACTOR SHALL INSTALL TEMPORARY FENCING AROUND THE GENERAL PROJECT SITE.
THE TYPE, MATERIAL, HEIGHT, AND LOCATION OF THE FENCE SHALL BE IN ACCORDANCE WITH
SPECIFICATIONS AND APPROVED BY THE GOVERNMENT PRIOR TO INSTALLATION.
B. ALL WORK ACTIVITIES AND STORAGE SHALL BE CONFINED WITHIN THE ESTABLISHED
PROJECT LIMITS UNLESS SPECIFICALLY AUTHORIZED BY THE COR FOR SPECIFIED PERIODS
OF TIME. CONTRACTOR SHALL COORDINATE EXACT PROJECT LIMITS WITH THE COR.
C. THE CONTRACTOR MUST HAVE AT LEAST ONE EMPLOYEE ONSITE TO RECEIVE AND DIRECT
PLACEMENT OF DELIVERED MATERIALS AND SUPPLIES.
4. LAMONT ROAD BORROW PIT
A. THE LAMONT ROAD BORROW PIT IS ANTICIPATED TO BE CLOSED DURING THE ENTIRE
CONSTRUCTION PHASE OF THIS PROJECT.
5. EROSION AND SEDIMENT CONTROL
A. SEE SEDIMENT AND EROSION CONTROL PLAN AND NOTES
6. STANDARDS
A. CONTRACTOR SHALL COMPLY WITH CURRENT NORTH CAROLINA DEPARTMENT OF
ENVIRONMENTAL QUALITY (DEQ) EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN
MANUAL' AND FORT BRAGG WATER MANAGEMENT BRANCH (WMB) STANDARDS FOR EROSION
CONTROL WORK, IF APPLICABLE.
B. ALL NCDOT STANDARDS REFERENCES WILL BE THE LATEST EDITION. CONTRACTOR MAY
REFER TO HTTPS://CONNECT.NCDOT.GOV, IF APPLICABLE.
C. CONTRACTOR SHALL COMPLY WITH CURRENT UFC, NC BUILDING CODE AND OTHER
APPLICABLE REQUIREMENTS AS INDICATED ON THESE CONTRACT DOCUMENTS.
7. DEMOLITION
A. UNLESS SPECIFICALLY NOTED TO BE REMOVED, ALL EXISTING BUILDING COMPONENTS AND
OTHER SITE ITEMS SHALL REMAIN INTACT AND BE PROTECTED AGAINST DAMAGE DURING THE
CONSTRUCTION PERIOD.
B. THE CONTRACTOR SHALL EXERCISE CAUTION DURING DEMOLITION OPERATIONS. THE
CONTRACTOR SHALL REPAIR AND RESTORE ALL EXISTING CONSTRUCTION TO REMAIN THAT IS
DAMAGED DURING DEMOLITION OPERATIONS. REPAIRS TO DAMAGED WORK AREAS SHALL
MATCH EXISTING ADJACENT FINISHED SURFACES OR THE CONTRACTOR SHALL REPLACE
DAMAGED CONSTRUCTION WITH NEW WORK.
C. NO KNOWN ASBESTOS EXISTS WITHIN THIS PROJECT AREA. IF CONTRACTOR SUSPECTS
ASBESTOS OR OTHER HAZARDOUS MATERIALS ARE PRESENT HE SHALL NOTIFY THE
CONTRACTING OFFICER'S REPRESENTATION IMMEDIATELY.
8. TRAFFIC CONTROL
A. ALL CONSTRUCTION AFFECTING TRAFFIC SHALL COMPLY WITH THE FORT BRAGG TRAFFIC
CONTROL IDC, MUTCD, AND NCDOT STANDARD DRAWINGS AND SPECIFICATIONS - LATEST
EDITION. AN ALTERNATE EMERGENCY TRAFFIC CONTROL DETOUR MAY BE REQUIRED.
9. EXISTING UTILITY INTERRUPTIONS
A. EXISTING UTILITIES MAY BE INTERRUPTED FOR A MAXIMUM OF 12 HOURS AT A TIME.
CONTRACTOR IS REQUIRED TO CONTACT THE CONTRACTING OFFICER AND OBTAIN APPROVAL
PRIOR TO ANTICIPATED INTERRUPTION.
B. ALL UTILITY INTERRUPTIONS AND DURATIONS SHALL BE INDICATED ON THE CONTRACTOR'S
SCHEDULE AND COORDINATED WITH THE COR.
C. FIRE ALARM INTERRUPTIONS SHALL BE SCHEDULED IN WRITING WITH THE COR A MINIMUM OF
14 DAYS IN ADVANCE.
10. EXTERIOR UTILITY WORK
A. ANY EXTERIOR ELECTRICAL WORK PERFORMED BY THE CONTRACTOR SHALL BE
COORDINATED WITH SANDHILLS UTILITY SERVICE (SUS). CONTACT MR. BILL CANNON AT (910) 818-3204.
B. ANY EXTERIOR WATER OR SANITARY SEWER WORK PERFORMED BY THE CONTRACTOR SHALL
BE COORDINATED WITH AMERICAN STATES UTILITY SERVICES (ASUS). CONTACT ALLEN
FORRESTER AT (910) 495-1311.
C. ANY EXTERIOR GAS WORK PERFORMED BY THE CONTRACTOR SHALL BE COORDINATED WITH
PIEDMONT NATURAL GAS (PNG).
11. SECURITY POLICIES AND PROCEDURES
A. CONTRACTOR SHALL FOLLOW SECURITY OPERATIONS TRAINING FACILITY (SOTF) SECURITY
REQUIREMENTS AT ALL TIMES. REFER TO SPECIFICATION SECTION 01 00 60 FOR ADDITIONAL
INFORMATION.
B. ACCESS TO “FOR OFFICIAL USE ONLY” (FOUO) INFORMATION ON SOTF PROJECTS WILL BE
LIMITED TO U.S. CITIZENS WHO HAVE A VALID "NEED TO KNOW". IN THE EVENT THAT ACCESS
TO CLASSIFIED INFORMATION IS REQUIRED, AN ADDITIONAL SECURITY PROCEDURES GUIDE
WILL BE FURNISHED.
C. TO GAIN ACCESS TO THE SOTF SITE AND/OR PROJECT INFORMATION, A WRITTEN, EMAIL, OR
FAX REQUEST MUST BE MADE TO THE SOTF PROJECT MANAGER AT LEAST 5 BUSINESS DAYS
IN ADVANCE (SEE SPECIFICATIONS FOR REQUIRED FORM). A SEPARATE REQUEST MUST BE
MADE FOR EACH SITE VISIT. REFER TO SPECIFICATIONS FOR REQUIRED INFORMATION.
D. ONCE ACCESS HAS BEEN GRANTED, NO SOTF INFORMATION OR SITE ACCESS WILL BE GIVEN
TO THE INDIVIDUAL UNTIL HE OR SHE HAS SIGNED A SECURITY BRIEFING FORM. UPON
SUCCESSFUL COMPLETION, THE CONTRACTOR WILL BE GIVEN FULL ACCESS TO THE PROJECT
SITE AS SHOWN ON THE PLANS, HOWEVER, PERIODS MAY BE ENCOUNTERED WHEN NO
CONTRACTOR OR SUBCONTRACTOR PERSONNEL WILL BE ALLOWED ON THE CONSTRUCTION
SITE. WORK STOPPAGES DUE TO THOSE EVENTS WILL BE HELD TO AN ABSOLUTE MINIMUM,
AND THE CONTRACTOR WILL BE GIVEN AS MUCH ADVANCED NOTICE AS POSSIBLE. NOTICE OF
THE WORK STOPPAGE AND RESUMPTION WILL BE RELAYED THROUGH THE SOTF
ENGINEERING TO THE COR WHO WILL COMMUNICATE THIS INFORMATION TO CONTRACTOR.
SUCH WORK STOPPAGE WILL NOT BE THE BASIS FOR A CLAIM AGAINST THE GOVERNMENT.
THE GOVERNMENT HAS THE RIGHT TO INSTRUCT THE CONTRACTOR TO EVACUATE THE SITE
WITHOUT PRIOR NOTIFICATION AT ANY TIME AND MAY REFUSE ENTRY OF ANY OR ALL
CONTRACTOR PERSONNEL.
E. PERSONNEL ENTERING SOTF WILL BE ESCORTED BY A FACILITY MEMBER OR BY A SECURITY
GUARD. USE OF ESCORTS WITHIN THE FACILITY IS DONE ROUTINELY FOR CONTRACTED AND
OTHER VISITING PERSONNEL REGARDLESS OF THEIR SECURITY CLEARANCE LEVEL.
F. THE CONTRACTOR'S PERSONNEL MUST WEAR IDENTIFICATION IN ACCORDANCE WITH SOTF
SECURITY POLICIES AT ALL TIMES.
G. CONTRACTOR/VISITOR SHALL NOTIFY (BY EMAIL OR PHONE) THE GOVERNMENT'S
CONTRACTING OFFICER'S REPRESENTATIVE (COR), PROJECT MANAGER (PM), OR DESIGNATED
QA PERSONNEL OF THEIR ANTICIPATED ARRIVAL TIME ON SOTF EACH DAY OF CONTRACT
PERFORMANCE. IF THE CONTRACTOR DOES NOT ARRIVE AT SOTF WITHIN 90 MINUTES OF
THEIR SCHEDULED ARRIVAL TIME, AND DOES NOT COORDINATE DIRECTLY WITH THE COR, PM,
OR QA FOR ANY SUCH LATE ARRIVAL, THE DESIGNATED ESCORT FOR THE DAY WILL BE
RELEASED FOR OTHER DUTIES AND WILL NO LONGER BE AVAILABLE TO THE CONTRACTOR ON
THAT DAY. NO SUCH INSTANCES MAY BE USED BY THE CONTRACTOR AS GOVERNMENT
CAUSED DELAY AND THE GOVERNMENT WILL NOT EXTEND THE PERIOD OF PERFORMANCE.
H. ACCESS TO THE PROJECT AREA IS LIMITED TO NORMAL WORK HOURS (0730 TO 1600), MONDAY
THROUGH FRIDAY, EXCLUDES FEDERAL HOLIDAYS. CONTRACTOR PERSONNEL SHALL REPORT
TO THE SOTF LAMONT ROAD VISITOR CENTER AT 0730 TO EXCHANGE VALID PICTURE
IDENTIFICATION FOR A SOTF VISITOR BADGE. ALL CONTRACTOR VEHICLES WILL BE
SEARCHED EACH DAY STARTING AT 0730. ONCE THE BADGE EXCHANGE AND VEHICLE SEARCH
IS COMPLETE, THE CONTRACTOR SHALL CONVOY WITH THE ESCORT TO THE JOB SITE. THE
CONTRACTOR MUST EXIT THE SOTF COMPOUND BY 1600 EACH DAY. EXCEPTIONS, IF
APPROVED BY THE PROJECT MANAGER, MUST BE COORDINATED TWO WORK DAYS IN
ADVANCE.
I. IT IS A CRIME UNDER 18 USC 795 TO PHOTOGRAPH DEFENSE INSTALLATIONS WITHOUT FIRST
OBTAINING THE PERMISSION OF THE COMMANDING OFFICER OF THE MILITARY INSTALLATION.
IT IS ALSO A CRIME UNDER 18 USC 797 TO REPRODUCE, PUBLISH SELL OR GIVE AWAY ANY
PHOTOGRAPH, PICTURE OR GRAPHIC REPRESENTATION OF A DEFENSE INSTALLATION
WITHOUT FIRST OBTAINING THE PERMISSION OF THE COMMANDING OFFICER OF THE MILITARY
INSTALLATION AND SOTF.
J. FT. BRAGG AND SOTF ARE DESIGNATED AS RESTRICTED AREAS. IMAGERY SURVEILLANCE,
PHOTOGRAPHY AND VIDEO RECORDING ARE PROHIBITED WITHOUT THE INSTALLATION
COMMANDER'S AND SOTF CONSENT.
K. THE INTRODUCTION OF WEAPONS, AMMUNITION, EXPLOSIVES OR OTHER PROHIBITED ITEMS
AND PHOTOGRAPHY OF THE FACILITIES IS PROHIBITED WITHOUT SPECIFIC AUTHORIZATION
FROM THE SOTF COMMANDER AND FT. BRAGG COMMANDER.
12. PERMITS
A. CONTRACTOR SHALL SECURE ALL PERMITS NECESSARY FOR CONSTRUCTION OF THE
PROJECT. DETERMINE FEE BASIS AND PAY ALL FILING FEES AT NO ADDITIONAL COST TO THE
GOVERNMENT. CONSTRUCTION SHALL NOT BEGIN ON ANY PHASE WITHOUT APPROPRIATE
PERMITS.
B. PERMITS ARE TO BE MAINTAINED IN THE CONTRACTOR'S ONSITE CONSTRUCTION OFFICE,
ORGANIZED IN A 3 RING BINDER, TABBED AND WITH A TABLE OF CONTENTS FOR INSPECTION
BY THE GOVERNMENT.
C. THE FOLLOWING PERMITS MAY BE REQUIRED FOR PROJECTS AT FT. BRAGG:INSTALLATION:
a. BOILERS AND GENERATORS PERMIT - DPW-ECB AIR QUALITY - MIKE FISHER, REM
b. BORROW PIT PERMIT - DPW - ENVIRONMENTAL BRANCH (SUBMIT 14 CALENDAR DAYS PRIOR
TO WORK)
c. CONSTRUCTION AND DEMOLITION (C&D) WASTE PERMIT - FOR FORT BRAGG LAMONT ROAD
CONSTRUCTION AND DEMOLITION LANDFILL FACILITY - DPW - ENVIRONMENTAL BRANCH.
SEE DPW'S SOLID WASTE AND RECYCLING REQUIREMENTS, DATED 6 OCT 2016, OR
CONTACT JEFF SLOOP AT JEFFERY.W.SLOOP.CTR@MAIL.MIL OR FAX TO (910)396-4188,
ATTN: SOLID WASTE OFFICE.
d. DIGGING/EXCAVATION PERMIT (FB FORM 1605-E) - DPW - FACILITIES ENGINEER (SUBMIT 15
CALENDAR DAYS PRIOR TO WORK)
e. ENVIRONMENTAL PERMITS (POSSIBLE 180 DAY PROCESS). SEE SPEC SECTION 01 57 19.
• REGULATORY PERMITS
• GENERAL USE PERMITTED EQUIPMENT (SEE FAR 52.236-7.)
• TRANSPORTER AND DISPOSAL FACILITIES PERMITS
f. IRRIGATION PERMIT - DPW WATER QUALITY PROGRAM MANAGER, SHANNON WESTON, 910-907-3214.
g. LANDFILL DISPOSAL PERMIT - DPW-ENVIRONMENTAL SUSTAINMENT DIVISION (ESD), 910-396-3372.
h. PHOTOGRAPHY - INSTALLATION PERMIT - DIRECTOR OPERATIONS DIRECTORATE DCS
G3/5/7 - POC IS MR. DREDDRICK BROWN, DSN 225-8469 OR COM (703) 695-8469.
i. TRAFFIC CONTROL PERMIT - DPW TRANSPORTATION ENGINEER, RAY GOFF, 910-907-1759
j. UTILITY OUTAGE REQUESTS - FT BRAGG DPW
D. FEDERAL
a. NOTICE OF PROPOSED CONSTRUCTION OR ALTERATION - FAA FORM 7460-1
E. NC STATE:
a. DEMOLITION
b. EROSION AND SEDIMENT CONTROL (E&SC) CERTIFICATE OF APPROVAL/PERMIT - DEQ
(FORMALLY NCDENR) DEPT OF WATER QUALITY (DWQ)
c. GENERAL STORMWATER DISCHARGE
d. STORMWATER MANAGEMENT - NCDEQ AND FT BRAGG WATER MANAGEMENT BRANCH
e. WATER SYSTEM SERVICE (FIRE PROTECTION AND DOMESTIC WATER SERVICE) - NCDEQ.
F. ASUS :
a. WATER AND SANITARY SEWER
G. COE SAFETY:
a. ENERGIZED WORK PERMIT - MUST BE SUBMITTED TO THE COR IN ADVANCE FOR
ACCEPTANCE. (SEE EM 385-1-1 DATED 30 NOV 14, PARAGRAPH 11.A.02C.)
b. HOT WORK PERMIT - DEFINED AS HOT RIVETING, WELDING, BURNING, ABRASIVE BLASTING, OR OTHER FIRE- OR SPARK-PRODUCING OPERATIONS. (SEE EM 385-1-1, DATED 30 NOV
2014, PARA 09.A.04 (PAGE 9-1 AND 2) AND PAGE Q-29. THE FORT BRAGG FIRE DEPARTMENT
REQUIRES NOTICE 14 CALENDAR DAYS PRIOR TO WORK, FOR:
• WELDING
• CUTTING
• HEATING
H. PERMITS, AS LISTED ABOVE, ARE NOT INTENDED TO BE A COMPLETE LIST. CONTRACTORS ARE
TO ADD ADDITIONAL PERMITS, AS THEY BECOME KNOWN. PERMIT SUBMITTALS ARE TO BE
SUBMITTED TO THE GOVERNMENT FOR REVIEW AND APPROVAL. AVOID OMISSIONS.
GENERAL CONSTRUCTION NOTES
C E
M S
P ro je c t
N o
P ro je c t M a n a g e r:
P h o n e
N o
E N
G
IN
E E
R
IN
G A
R C
H
IT
E C
T U
R E
S u m m e rv ill e
S C
W ilm in g to n
N C
-1
A
A D a v e Y e n s a n
.8
.3
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
W
IL
M
IN
G T
O N
D
IS
T R
IC
T
D
A R
L
IN
G T
O N
A V
E W
IL
M
IN
G
T O
N N
C
SHEET ID
US Army Corps of Engineers ®
D
C
B
A
E
F
G
2 3 4 5 6 7 8 9 10
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
C O
N T
R O
L L
E D
U N
C L
A S
S
IF
IE
D
I N
F O
R M
A T
IO
N
C
U I)
BIM 360://20152AA-Human Performance Training Area/20152AA_A_R20.rvt
4/8/2021 1:33:42 PM
G E
N E
R A
L C
O N
S T
R U
C T
IO
N
N O
T E
S
T A
-0 -1
P
H
A R
R
IS
P H
A R
R
IS
C E
M S
E N
G
IN
E E
R
IN
G
D V
O N
T E
R S
C H
A
P R
W P
M B
C A
T E
G O
R Y
C O
D E
F
IL
E N
A M
E
H U
M A
N P
E R
F O
R M
A N
C E
M U
L T
IP
U
R P
O S
E T
R A
IN
IN
G A
R E
A S
W C
S
G -0
.D
W G
F O
R T
B R
A G
G N
C
G-003
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
P
SA
T R
I CK K. H
A
R R I
N
AO
RT
H CAROLIN
R
DEG
ISTERE
SEAL
C-001
O
TE
S
A N
D L
E G
E N
D
C E
M S
P ro je ct
N o.
P ro je ct M an ag er
P ho ne N o.
EN
G
IN
EE
RI
NG
AR
CH
IT
EC
TU
RE
S um m er vi lle , S
C W ilm in gt on
, N C
-1
A
A D av e
Y en sa n
3.
5.
FI
LE
N A
M E
C A
TE
G
O R
Y C
O D
E
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S W
IL
M
IN
G
TO
N
D
IS
TR
IC
T
TA
-0
-1
H
U M
A N
P E
R
FO
R M
A N
C E
M U
LT
IP
U R
P O
S E
T R
A
IN
IN
G
A R
E A
, S W
C S
FO
R
T B
R A
G G
, N C
D
A R
LI
N
G
TO
N A
V E
W
IL
M
IN
G
TO
N , N
O R
TH
C
A R
O
LI
N A
SHEET ID
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
TE
D B
Y
S
IZ
E
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
D
C
B
A
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
C O
N
TR
O
LL
E D
U N
C
LA
S S
IF
IE
D
IN
FO
R
M A
TI
O
N (C
U I)
C E
M S
E N
G
IN
E E
R
IN
G
A
P R
M A
R K
D E
S C
R
IP
TI
O
N D
A
TE
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
W
2P M
B
LEGEND
SANITARY SEWER = SS
STORM DRAINAGE = SD
POTABLE WATER = W
FIRE PROTECTION = F
POLYVINYL CHLORIDE PIPE = PVC
DUCTILE IRON PIPE = DIP
DUCTILE IRON = DI
POST INDICATOR VALVE = PIV
HIGH DENSITY POLYETHYLENE = HDPE
UNKNOWN UTILITY = UNKN
ABBREVIATIONS:
1. CONTRACTOR RESPONSIBLE FOR COORDINATING WITH CONTRACTING OFFICE (COR) AND
BASE FOR SITE ACCESS AND STORAGE LAYDOWN AREA (IF NECESSARY).
2. THE CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH THE EXISTING CONDITIONS AND
BE PREPARED TO ADEQUATELY CARE FOR AND SAFEGUARD HIMSELF AND THE
GOVERNMENT FROM DAMAGE.
3. THE LOCATION, SIZES, AND DEPTHS OF EXISTING UTILITIES, INCLUDING SERVICE LATERALS, AND DRAINAGE STRUCTURES SHOWN ON THE PLANS ARE APPROXIMATE ONLY. THE
CONTRACTOR SHALL VERIFY THE EXACT LOCATION, SIZES, AND DEPTHS OF UNDERGROUND
UTILITIES AT LEAST 48 HOURS PRIOR TO CONSTRUCTION WHETHER SHOWN ON PLANS OR
NOT, AND PROTECT THE SAME DURING CONSTRUCTION. CONTRACTOR SHALL BE
RESPONSIBLE FOR COORDINATING WITH "811" UTILITY LOCATE SERVICES PIEDMONT
NATURAL GAS, SANDHILLS UTILITY SERVICES (SUS), AND AMERICAN STATE UTILITY SERVICES
(SUS) TO VERIFY UTILITIES WITHIN PROJECT AREA.
4. THE CONTRACTOR IS HEREBY CAUTIONED THAT ALL SITE FEATURES SHOWN HEREON ARE
BASED ON FIELD OBSERVATIONS BY THE SURVEYOR AND BY INFORMATION PROVIDED BY
OTHERS. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE.
5. CONTRACTOR TO VERIFY EXISTING UTILITY (STORM DRAIN, WATER LINE, ETC...) LINE SIZES
AND NOTIFY THE ENGINEER OF RECORD OF ANY DISCREPANCIES BEFORE ORDERING
MATERIALS.
6. CONTRACTOR WILL BE RESPONSIBLE FOR ADDITIONAL REMOVAL AND REPLACEMENT OF
ASPHALT/ CONCRETE PAVEMENT (PARKING, CURB, SIDEWALK, ETC.) AS NECESSARY TO
CONSTRUCT THE PROJECT. PAVEMENT REMOVAL AND REPLACEMENT SHOWN IS THE
MINIMUM AMOUNT REQUIRED TO CONSTRUCT THE PROJECT.
7. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE REPAIR OF ANY DAMAGE DONE TO
ANY NEW AND EXISTING SITE ITEMS IN THE EXECUTION OF HIS WORK UNDER THIS SECTION.
CONTRACTOR SHALL DOCUMENT EXISTING CONDITIONS PRIOR TO BEGINNING WORK.
8. ALL DEMOLITION DEBRIS SHALL BE HAULED OFFSITE AND DISPOSED OF IN A PROPER
MANNER.
9. SEE SHEET C-501 THROUGH C-507 FOR CIVIL DETAILS.
GENERAL NOTES:
1. THE TOTAL PROJECT AREA / DISTURBED AREA IS APPROXIMATELY 0.95 ACRES, OF WHICH
0.54 AC OF NEW BUILT UPON AREA (BUA) WILL BE CONSTRUCTED. CONTRACTOR SHALL
CONFINE THE CONSTRUCTION EFFORTS /OPERATIONS TO WITH THE LIMITS OF DISTURBANCE
(LOD) SHOWN.
2. THE LOD IS LESS THAN 1.0 AC AND IS EXEMPT FROM THE REQUIREMENTS OF THE NORTH
CAROLINA SEDIMENTATION CONTROL LAW AND THE CURRENT STORMWATER RULES (15A
NCAC 02H .1017(2)).
3. THE PROPERTY IS LOCATED WITHIN CUMBERLAND COUNTY, NORTH CAROLINA AND A PART
OF THE CAPE FEAR RIVER BASIN AND IS LOCATED ON THE FORT BRAGG USGS QUAD SHEET.
4. THIS DEVELOPED PROPERTY LIES IN ZONE X PER FEMA FIRM PANEL NO. 3710959000J,
EFFECTIVE 1/5/2007.
5. TREES MARKED FOR DEMOLITION WILL BE HARVESTED PRIOR TO CONTRACTOR'S NOTICE TO
PROCEED. THE CONTRACTOR WILL BE RESPONSIBLE FOR STUMP REMOVAL AND CLEARING
OF ANY OTHER SITE VEGETATION WITHIN THE LOD. THE STUMPS SHALL BE FULLY REMOVED
FROM THE GROUND AND THE RESULTING HOLE BACKFILLED WITH STRUCTURAL OR
GENERAL FILL, DEPENDING ON THE LOCATION ON THE SITE, PER THE PROJECT
SPECIFICATIONS AND GEOTECHNICAL REPORT. TREES TO REMAIN SHALL BE DELINEATED BY
TREE PROTECTION FENCE AS SHOWN ON CG101.
6. (3) 15-25 GALLON EASTERN RED CEDARS (JUNIPERUS VIRGINIANA) SHALL BE PLANTED
ONSITE AS MITIGATION FOR THE TREES TO BE REMOVED. THE REMAINING REPLACEMENT
TREES SHALL BE PROVIDED WITHIN THE SWCS CAMPUS OR AS DIRECTED BY COR AND DPW.
7. THE CONTRACTOR SHALL ACCESS THE SITE THROUGH THE 16-FOOT WIDE CONCRETE FIRE
ACCESS DRIVE FROM MERILL STREET. THE CONTRACTOR SHALL PROVIDE PHOTO
DOCUMENTATION OF THE EXISTING CONDITION OF THE CURB CUT AND CONCRETE ACCESS
DRIVE AND IS RESPONSIBLE FOR ANY DAMAGE RESULTING FROM THE CONSTRUCTION
ACTIVITIES.
8. ALL AREAS DISTURBED BY CONSTRUCTION OPERATIONS AND NOT PAVED AFTER GRADING
ACTIVITY HAS BEEN COMPLETED OR STOPPED, SHALL BE SEEDED. SEE SHEET C-501.
9. PROVIDE TEMPORARY AND PERMANENT SEEDING IN ACCORDANCE WITH FORT BRAGG AND
NCDEQ COVERAGE REQUIREMENTS, SEE SHEET C-501.
10. ALL DISTURBED AREAS TO BE GRADED FOR POSITIVE DRAINAGE TO EXISTING STORM INLETS
AND CONVEYANCES.
LAND DISTURBANCE NOTES:
1. THE CONTRACTOR SHALL COORDINATE INSTALLATION WITH CONTRACTING OFFICE
REPRESENTATIVE (COR) PRIOR TO ANY DISTURBANCE ACTIVITIES ON THE SITES, AT LEAST
48 HOURS PRIOR TO ANY DISTURBANCE.
2. INSTALL SEDIMENT TRAP, SILT FENCE, AND TEMPORARY GRAVEL CONSTRUCTION ENTRANCE
WHERE INDICATED ON THE PLANS OR AS NECESSARY.
3. REMOVE ALL TREE STUMPS, VEGETATIVE DEBRIS AND ANY OTHER SITE FEATURES WHERE
INDICATED ON THE PLANS.
4. ESTABLISH MATERIAL STORAGE AND STOCKPILE LOCATION.
5. INSTALL SITE IMPROVEMENTS INCLUDING CANOPY STRUCTURE, SYNTHETIC TURF FIELD AND
SORINEX CONCRETE FOUNDATION.
6. TEMPORARILY SEED ALL DISTURBED AREAS IN COMPLIANCE WITH GROUND COVER
REQUIREMENTS IN NCDEQ EROSION CONTROL DESIGN MANUAL (SEE SHEET C-501).
7. FINE GRADE SITE.
8. INSTALL NECESSARY SLOPE PROTECTION MEASURES AND OUTFALL MEASURES AS
INDICATED ON PLANS.
9. ONCE SITE IMPROVEMENTS ARE COMPLETE, PERMANENTLY SEED ALL DISTURBED AREAS IN
COMPLIANCE WITH GROUND COVER REQUIREMENTS IN NCDEQ EROSION CONTROL DESIGN
MANUAL (SEE SHEET C-501).
10. MAINTAIN REMAINING SEDIMENT TRAPPING DEVICES UNTIL SITE HAS BEEN PERMANENTLY
STABILIZED. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE INSPECTIONS OF
ALL CONTROL MEASURES ON A WEEKLY BASIS AND AFTER PERIODS OF RAINFALL.
CONTRACTOR RESPONSIBLE FOR REPAIRING CONTROL MEASURES IMMEDIATELY UPON
DISCOVERY.
11. REMOVE SEDIMENT TRAP, GRADE INFILTRATION BASIN, AND INSTALL RIP RAP SPILLWAY
ONCE ALL UPSTREAM DISTURBED AREAS HAVE BEEN PERMANENTLY STABILIZED.
12. ESTABLISH PATHWAYS AND PROVIDE PROTECTION OF NEW CONSTRUCTION FOR DELIVERY
OF SORINEX PERFORMANCE EQUIPMENT.
13. WHEN CONSTRUCTION IS COMPLETE AND THE GROUND COVER IS
ESTABLISHED, CALL FOR INSPECTION BY CONTRACTING OFFICER (COR).
14. WHEN SITE IS APPROVED BY CONTRACTING OFFICER (COR) REMOVE
SILT FENCE PER THE SILT FENCE MAINTENANCE NOTES ON DETAILS
SHEET C-502.
CONSTRUCTION SEQUENCE:
EXISTING
Ex Ex
Wx Wx Wx
SSx SSx
CUx
EUx
NEW
BUILDING OUTLINE
BUILDING OVERHANG
EDGE OF PAVEMENT
PERFORATED HDPE SUB-DRAIN
CONTOUR
WATER LINE
SANITARY SEWER
UNDERGROUND COMMUNICATIONS
UNDERGROUND ELECTRICAL
SD SD SD
CONSTRUCTION ENTRANCE
SILT FENCESF SF
DIVERSION DITCH
X X X X X CHAINLINK FENCE
OVERHEAD ELECTRICAL
TO BE DEMOLISHED
SHRUB LINE
RIP RAP
CONCRETE
SD SD SD HDPE STORM DRAINAGE PIPE
SITE STRUCTURE
TURF MATTING
INFILTRATION BASIN PONDING AREA
SYNTHETIC TURF
PEA GRAVEL
PERMANENT SEEDING
TREE PROTECTION FENCE
LIMITS OF CONSTRUCTION
INLET PROTECTION
RIP RAP OUTLET PROTECTION
TREETR PINE OAK
TREE TO BE REMOVED
TR PINE OAK
TREE TO BE PLANTED
X X X
SEDIMENT TUBE
SIGN
BOLLARD
UTILITY POLE
CONTROL POINTCONTROL PT. #2
CONSTRUCTION STAGING AND MATERIAL STORAGE
TOPSOIL STOCKPILE
REFERENCE STANDARDS:
IBC 2018 INTERNATIONAL BUILDING CODE, 2018
UFC 3-202-01 CIVIL ENGINEERING, WITH CHANGE 4, SEPTEMBER 28, 2020
UFC 3-210-10 LOW IMPACT DEVELOPMENT, WITH CHANGE 3, MARCH 1, 2020
FORT BRAGG INSTALLATION DESIGN GUIDE, MARCH 2009
UFC 4-010-01 DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDING,
WITH CHANGE 1, AUGUST 19, 2020
SAVANNAH DISTRICT DESIGN MANUAL FOR MILITARY
CONSTRUCTION (SDDM), JULY 2020
ABA ACCESSIBILITY STANDARDS AS AMENDED THROUGH
MAY 7, 2014
ARMY COMBAT FITNESS TEST INITIAL OPERATION CAPABILITY,
TECHNICAL GUIDANCE ON IMPLEMENTING THE STORMWATER
RUNOFF REQUIREMENTS FOR FEDERAL PROJECTS UNDER
SECTION 438 OF THE ENERGY INDEPENDENCE AND SECURITY
ACT, DECEMBER 2009
LEED V4 BUILDING DESIGN AND CONSTRUCTION: NEW
CONSTRUCTION
NORTH CAROLINA STORMWATER DESIGN MANUAL, NOVEMBER
REPORTS AND STUDIES:
GEOTECHNICAL ENGINEERING REPORT FOR FT. BRAGG - 1ST SWTG
MULTIPURPOSE TRAINING FIELD PERFORMED BY TERRACON CONSULTANTS,
INC., TERRACON PROJECT NO. 70205107, DATED NOVEMBER 5, 2020
DESIGN REFERENCES:
N . L
A U
R E
TT
A
J.
C
A R
R O
LL
C . M
O O
R
IN
G C -0
.D
W G
035107
N
O
RT
H CAROL IN
A
P
RO
FESS I ONA
L
SEAL
E
N G
I N E E
R
L A U
R
E T
T
AN
I C
H
O L
A J.S
08-APR-2021
A
L
E
CONC WALK
C O
L K
W
ORK OUT
AREA
WORK OUT
AREA
W O
R K
O U
T
A R
E A
WORK OUT
AREA
C O
L K
METAL
SHED
C O
L K
C O
L K
STAKE B-4
STAKE B-1
STAKE B-2
BBALL
GOAL
R
C
P
D
I P
D
I P
DI 1007
RIM:321.07
INV IN 803:314.10
INV OUT:313.35
DI 803
RIM:317.90
INV IN:314.90
INV OUT 1007:314.70
DI 587
RIM:317.70
INV OBSCURED
BY DEBRIS/SOIL
DI 567
RIM:315.44
INV IN 587:310.53
SSMH 809
RIM:321.38
INV CL:313.10
SHIPPING
CONTAINERS
R
C P
CONC DRIVE
CONC DRIVE
C O
L K
CONTROL POINT 1
LOCALIZED COORDINATES
N:500355.37
E:1999259.47
Z:321.05
CONTROL POINT 2
NC GRID COORDINATES
N:500274.95
E:1999679.87
Z:318.00
CGF:0.999864943
DATUM:
HORIZ:NAD83(2011)
VERT:NAVD88
GEOID:12B
UNITS:US FEET
SSMH 832
RIM:320.44
INV IN FROM BLD:313.35
INV CL:312.59
SSMH 566
RIM:318.72
INV IN FROM BLD:311.62
INV CL:310.92
L A
N D
S C
A P
E
T
I M
B E
R S
W O
K
U
E
A
B O
L L A
R D
S
B O
L L A
R D
S
12OAK
15OAK
16TR
12TR
10TR
10TR
12TR
10TR
10TR
6TR
21PINE
16PINE
14PINE
9PINE
20PINE
15PINE
12TR
13PINE
12PINE
6PINE
12PINE
10PINE
18PINE
20PINE
18PINE
12PINE
17PINE
12PINE
24PINE
16PINE
12PINE
13PINE
14PINE
28PINE
15OAK
10OAK
12OAK
12PINE
14PINE
12PINE
12PINE
11PINE
10PINE
12PINE
12PINE
7PINE
10PINE
20PINE
16PINE
16OAK
5PINE
8PINE
22PINE
8PINE
4PINE
6PINE
17PINE
15PINE
14PINE
12PINE
20PINE
20PINE
12PINE
26PINE
14TR
12MAGNOLIA
DI 628
RIM:315.83
INV CL:313.47
8"X8" WOOD COLUMNS (TYP)
COVERED
CONC SLAB
GRAVEL
LANDSCAPE TIMBERS
21OAK
GRATE
HVAC
HVAC
DI 1195
RIM:320.42
INV IN:318.42
INV OUT:316.57
DI 1342
RIM:314.25
INV IN 803:311.30
INV OUT:311.15
L A
N D
S C
A P
E
T I M
B E
R S
WV(x2)
TELECOMM
MANHOLE
TELECOMM
MANHOLE
CONC WALK
C O
L K
TELECOMM
MANHOLE
A P
P A
R E
I L L E
R
L I N
E S
GRATE
L
A
N
D
S
C
A
P
E
T
I
M
B
E
R
S
P
A
T
H
M
U
L
C
H
E
D
BBALL
GOAL
METAL
SHED
STAKE B-3
D2419
D2723
D2719
D2517
Vicinity Map - Not to Scale
C E
M r o j e c t
N o
P r o j e c t
M a n a g e r
P h o n e
N o
EN
G
IN
EE
RI
NG
AR
CH
IT
EC
TU
RE
S u m m e r v i l l e
S
C W i l m i n g t o n
N
C
O
R a n d y
A l v a r
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
US Army Corps of Engineers ®
C E
G
I N
E E
R I N
G
100% SUBMITTAL
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
W P
M F
W P
M D
F O
B
A
G G
N
O R
R
O L
I N
A
W I L
M I N
G T
S
T R
I C
T
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
L I N
G T
V E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
S
T
S
W T
G
H
U M
R
F O
R M
A N
U L
T I P
U R
P O
S E
T R
A I N
I N
G
F
I E
L
O
J
W
P
M
D
T O
P O
G R
A P
H I C
S U
R V
E Y
VF101
HORIZONTAL SCALE:1"=20'
TA
-0
-1
H U
M A
N P
E R
FO
R
M A
N C
E M
U
LT
IP
U
R P
O S
E T
R A
IN
IN
G A
R E
A , S
W C
S
FO
R T
B R
A G
G , N
LANDSCAPE
TIMBERS
WORK OUT
AREA
WORK OUT
AREA
WORK OUT
AREA
WORK OUT
AREA
BBALL
GOAL
BBALL
GOAL
MULCHED
PATH
W O
R K
O U
T A
R E
A
10TR
10TR
6TR
21PINE
16PINE
14PINE
9PINE
20PINE
15PINE
12TR
13PINE
12PINE
6PINE12PINE10PINE
18PINE
20PINE
18PINE
12PINE17PINE
12PINE
24PINE
16PINE
12PINE
13PINE
14PINE
28PINE
15OAK
10OAK
12OAK
12PINE 14PINE
12PINE
12PINE
11PINE
10PINE
12PINE
12PINE
7PINE
10PINE
20PINE
16PINE
14PINE
12PINE
8"X8" WOOD COLUMNS (TYP)
COVERED
CONC SLAB
GRAVEL
LANDSCAPE TIMBERS
21OAK
LA
N
D S
C A
P E
TIM
B
E R
S
METAL
SHED
METAL
SHED
12" R C
P
30" DIP
30" DIP
DI 1007
RIM:321.07
INV IN 803:314.10
INV OUT:313.35
DI 803
RIM:317.90
INV IN:314.90
INV OUT 1007:314.70
DI 587
RIM:317.70
INV OBSCURED
BY DEBRIS/SOIL
DI 567
RIM:315.44
INV IN 587:310.53
SSMH 809
RIM:321.38
INV CL:313.10
SHIPPING
CONTAINERS
12" R C
P
CONTROL POINT 1
LOCALIZED COORDINATES
N:500355.37 E:1999259.47
Z:321.05
CONTROL POINT 2
NC GRID COORDINATES
N:500274.95 E:1999679.87 Z:318.00
CGF:0.999864943
DATUM:
HORIZ:NAD83(2011)
VERT:NAVD88
GEOID:12B
UNITS:US FEET
SSMH 832
RIM:320.44
INV IN FROM BLD:313.35
INV CL:312.59
SSMH 566
RIM:318.72
INV IN FROM BLD:311.62
INV CL:310.92
W O
R K
O U
T A
R E
A
12OAK
15OAK
16TR12TR
10TR10TR
12TR
5PINE
8PINE
22PINE
8PINE
4PINE
6PINE
17PINE
15PINE
20PINE
20PINE
12PINE
26PINE
14TR
12MAGNOLIA
DI 628
RIM:315.83
INV CL:313.47
GRAVEL
DI 1195
RIM:320.42
INV IN:318.42
INV OUT:316.57
LA
N
D S
C A
P E
TIM
B
E R
S
WV(x2)
TELECOMM
MANHOLE
TELECOMM
MANHOLE
TELECOMM
MANHOLE
A P
P A
R E
N T
C H
IL
LE
R L
IN
E
S
D2723 D2517
D2719
D2419
W D
A
TU
R
W D
A
TU
R W
D A
TU
R
W D
A
TU
R W
D A
TU
R
W D
AT
U
R W
D A
TU
R
W D
A
TU
R W
D A
TU
R
W D
A
TU
R W
D A
TU
R
W D
A
TU
R W
D
AT
U R
W D
AT
U
R W
D
AT
U R
W D
ATUR
W D
ATUR
W D
ATUR
W DATUR W DATUR W DATUR
16OAK
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP TP
TP
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)X
X XX
XXXX X
XXX
XXX X X
X
X XX XXX
X X
XX
XX XX X X
XXX XXXX
XX
DC1
DC2
DC6
DC5
DC7
DC12
DC2
DC13
DC8
DC14
DC4
DC6
DC2
DC12
DC4
DC4
DC14
DC4
DC8
DC9
DC11
DC1
DC1
DC1 DC16
DC16
DC16
DC16
DC16
DC16
DC16
DC16
DC16
DC17
DC15
DC10
DC3
OBI-1
SITE DEMOLITION PLAN
SCALE: 1" = 20'-0"A1
GRAPHIC SCALE
20'
SCALE: 1" = 20'
0 20' 40'
N
CD101
S
IT
E D
E M
O
LI
TI
O
N P
LA
N
C E
M S
P ro je ct
N o.
P ro je ct M an ag er
P ho ne N o.
EN
G
IN
EE
RI
NG
AR
CH
IT
EC
TU
RE
S um m er vi lle , S
C W ilm in gt on
, N C
-1
A
A D av e
Y en sa n
3.
5.
FI
LE
N A
M E
C A
TE
G
O R
Y C
O D
E
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S W
IL
M
IN
G
TO
N
D
IS
TR
IC
T
TA
-0
-1
H
U M
A N
P E
R
FO
R M
A N
C E
M U
LT
IP
U R
P O
S E
T R
A
IN
IN
G
A R
E A
, S W
C S
FO
R
T B
R A
G G
, N C
D
A R
LI
N
G
TO
N A
V E
W
IL
M
IN
G
TO
N , N
O R
TH
C
A R
O
LI
N A
SHEET ID
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
TE
D B
Y
S
IZ
E
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
D
C
B
A
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
C O
N
TR
O
LL
E D
U N
C
LA
S S
IF
IE
D
IN
FO
R
M A
TI
O
N (C
U I)
C E
M S
E N
G
IN
E E
R
IN
G
A
P R
M A
R K
D E
S C
R
IP
TI
O
N D
A
TE
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
W
2P M
B
GENERAL NOTES:
1. REFER TO ELECTRICAL, STRUCTURAL AND
ARCHITECTURAL DRAWINGS FOR ADDITIONAL
INFORMATION.
2. REFER TO CG101 FOR SEDIMENT AND EROSION
CONTROL MEASURES, SITE CONSTRUCTION ACCESS
AND MATERIAL STORAGE LOCATION.
3. REFER TO G-002 CANTONMENT MAP AND G-003
GENERAL CONSTRUCTION NOTES FOR ADDITIONAL
INFORMATION.
4. ALL TREES WITHIN THE LIMITS OF DISTURBANCE (LOD)
WILL BE HARVESTED PRIOR TO CONTRACTOR'S
NOTICE TO PROCEED. THE CONTRACTOR WILL BE
RESPONSIBLE FOR STUMP REMOVAL AND CLEARING
OF ANY OTHER SITE VEGETATION WITHIN THE LOD.
SHEET KEYNOTES
LIMITS OF DISTURBANCE.
REMOVE LANDSCAPE TIMBERS.
REMOVE 8"X8" WOOD COLUMN.
REMOVE WORKOUT EQUIPMENT STRUCTURE AND
RETURN TO GOVERNMENT.
REMOVE POWER POLE. SEE ELECTRICAL FOR
DETAILS.
REMOVE OVERHEAD ELECTRICAL LINE. SEE
ELECTRICAL FOR DETAILS.
REMOVE UNDERGROUND ELECTRICAL LINE. SEE
ELECTRICAL FOR DETAILS.
REMOVE LIGHT POLE. SEE ELECTRICAL FOR DETAILS.
REMOVE HARD SURFACE WORK OUT AREA.
REMOVE CONCRETE PAD.
REMOVE GRAVEL AREA.
REMOVE BASKETBALL GOAL AND RETURN TO
GOVERNMENT.
REMOVE COURT SIGNAGE AND RETURN TO
GOVERNMENT.
REMOVE TREE STUMPS WITHIN LIMITS OF
DISTURBANCE AS INDICATED. SEE GENERAL NOTE 2
ABOVE.
REMOVE EXISTING SHRUBS
PROTECT IN PLACE EXISTING UTILITY.
TREES TO REMAIN (TYP. OF 3).
DC1
DC2
DC3
DC4
DC5
DC6
DC7
DC8
DC9
DC10
DC11
DC12
DC13
DC14
DC15
DC16
DC17
N . L
A U
R E
TT
A
J.
C
A R
R O
LL
C . M
O O
R
IN
G C D
1.
D W
G
035107
N
O
RT
H CAROL IN
A
P
RO
FESS I ONA
L
SEAL
E
N G
I N E E
R
L A U
R
E T
T
AN
I C
H
O L
A
14PINE
12PINE
METAL
SHED
METAL
SHED
12" R C
P
30" DIP
30" DIP
DI 1007
RIM:321.07
INV IN 803:314.10
INV OUT:313.35
DI 803
RIM:317.90
INV IN:314.90
INV OUT 1007:314.70
DI 587
RIM:317.70
INV OBSCURED
BY DEBRIS/SOIL
DI 567
RIM:315.44
INV IN 587:310.53
SSMH 809
RIM:321.38
INV CL:313.10
SHIPPING
CONTAINERS
12" R C
P
CONTROL POINT 1
LOCALIZED COORDINATES
N:500355.37 E:1999259.47
Z:321.05
CONTROL POINT 2
NC GRID COORDINATES
N:500274.95 E:1999679.87 Z:318.00
CGF:0.999864943
DATUM:
HORIZ:NAD83(2011)
VERT:NAVD88
GEOID:12B
UNITS:US FEET
SSMH 832
RIM:320.44
INV IN FROM BLD:313.35
INV CL:312.59
SSMH 566
RIM:318.72
INV IN FROM BLD:311.62
INV CL:310.92
12OAK
15OAK
16TR12TR
10TR10TR
12TR
5PINE
8PINE
22PINE
8PINE
4PINE
6PINE
17PINE
15PINE
20PINE
20PINE
12PINE
26PINE
14TR
12MAGNOLIA
DI 628
RIM:315.83
INV CL:313.47
DI 1195
RIM:320.42
INV IN:318.42
INV OUT:316.57
WV(x2)
TELECOMM
MANHOLE
TELECOMM
MANHOLE
TELECOMM
MANHOLE
A P
P A
R E
N T
C H
IL
LE
R L
IN
E
S
D2723 D2517
D2719
D2419
W D
A
TU
R
W D
A
TU
R W
D A
TU
R
W D
A
TU
R W
D A
TU
R
W D
A
TU
R W
D A
TU
R
W D
AT
U
R
W D
A
TU
R W
D A
TU
R
W D
A
TU
R W
D A
TU
R
W D
A
TU
R W
D A
TU
R
W D
A
TU
R W
D A
TU
R
W D
A
TU
R W
D
AT
U R
W D
AT
U
R W
D
AT
U R
W D
AT
U
R
W D
ATUR
W D
ATUR
W D
ATUR
W DATUR W DATUR W DATUR
FIELD PT. #1
N: 500345.4697 E: 1999510.7439
FIELD PT. #2
N: 500369.8032
E: 1999348.5187
FIELD PT. #5 OBI-3
N: 500490.8688
E: 1999366.6784
FIELD PT. #6 OBI-3
N: 500476.6223 E: 1999461.6559
FIELD PT. #7 OBI-3
N: 500452.8879 E: 1999458.0957
FIELD PT. #4
N: 500442.8008 E: 1999525.3434
C2
C3
C1
C8
C4
C5
C9
C7 C12
C5
C5
C5
C6
C14
C15
C11
C10
C13
C16
C17
FIELD PT. #3
N: 500467.7030
E: 1999362.6980
SITE PLAN
SCALE: 1" = 20'-0"A1
GRAPHIC SCALE
20'
SCALE: 1" = 20'
0 20' 40'
N
CS101
S
IT
E P
LA
N
C E
M S
P ro je ct
N o.
P ro je ct M an ag er
P ho ne N o.
EN
G
IN
EE
RI
NG
AR
CH
IT
EC
TU
RE
S um m er vi lle , S
C W ilm in gt on
, N C
-1
A
A D av e
Y en sa n
3.
5.
FI
LE
N A
M E
C A
TE
G
O R
Y C
O D
E
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S W
IL
M
IN
G
TO
N
D
IS
TR
IC
T
TA
-0
-1
H
U M
A N
P E
R
FO
R M
A N
C E
M U
LT
IP
U R
P O
S E
T R
A
IN
IN
G
A R
E A
, S W
C S
FO
R
T B
R A
G G
, N C
D
A R
LI
N
G
TO
N A
V E
W
IL
M
IN
G
TO
N , N
O R
TH
C
A R
O
LI
N A
SHEET ID
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
TE
D B
Y
S
IZ
E
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
D
C
B
A
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
C O
N
TR
O
LL
E D
U N
C
LA
S S
IF
IE
D
IN
FO
R
M A
TI
O
N (C
U I)
C E
M S
E N
G
IN
E E
R
IN
G
A
P R
M A
R K
D E
S C
R
IP
TI
O
N D
A
TE
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
W
2P M
B
LIMITS OF DISTURBANCE.
6' CONCRETE SIDEWALK AT MAXIMUM 5% SLOPE. SEE
DETAILS G7 AND E8/C-504.
CONCRETE BLEACHER PAD AND CANOPY. SEE
STRUCTURAL AND ARCHITECTURAL FOR DETAILS.
SYNTHETIC TURF FIELD. SEE DETAILS F6/C-505.
6" CONCRETE RIBBON CURB. SEE DETAILS C5/C-505.
STORAGE CONTAINER ON GRADE (BY OTHERS).
SORINEX EQUIPMENT CONCRETE PAD. SEE
STRUCTURAL FOR DETAILS. (SORINEX EQUIPMENT,
LOCATION ON PAD AND INSTALLATION BY OTHERS).
OBI-4
SYNTHETIC TURF SIT UP/PUSH UP AREA. SEE DETAILS
F6/C-505. OBI-3
GRASSED INFILTRATION AREA. SEE DETAILS D1/C-507.
PT AREA ROPE CLIMB. SEE ARCHITECTURAL FOR
DETAILS. OBI-2
12" PEA GRAVEL SURFACE. SEE ARCHITECTURAL FOR
DETAILS. OBI-2
FREE STANDING WATER STATION WITH LOCKING
HOSE BIB. SEE DETAIL D4/C-504. OBI-1
3'x3'x6" THICK CONCRETE PAD ON GRADE. OBI-1
LANE MARKINGS. SEE DETAIL C2/C-505.
INSTALL THREE (3) 15-20 GALLON EASTERN RED
CEDAR (JUNIPERUS VIRGINIANA).
ELECTRICAL EQUIPMENT RACK CONCRETE PAD. SEE
E-501 FOR DETAILS.
6" CONCRETE RIBBON CURB. SEE DETAILS C5/C-505.
OBI-3
GENERAL NOTES:
1. REFER TO ELECTRICAL, STRUCTURAL AND
ARCHITECTURAL DRAWINGS FOR ADDITIONAL
INFORMATION.
LAND USE NOTES
EXISTING BUILT-UPON-AREA (BUA) 8,543 SF
BUILDINGS 2,199 SF
CONCRETE 5,983 SF
OTHER 361 SF
PROPOSED BUILT-UPON-AREA (BUA) 23,654 SF (0.54)
BUILDINGS 1,452 SF
CONCRETE 3,592 SF
TURF FIELD 18,450 SF
SHEET KEYNOTES
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
C11
C12
24.0'
98.4'
164.0'
55.0' 96.0'
6.0'
32.0'
12.0'
9.8' (TYP. OF 16)
82.0' (TYP. OF 16)
8.2'
40.0'
85.0'
8.2'
24.0'
14.3'
26.2'
8.3'
58.8'
31.7'
C13
15.6'
26.5'
5.7' 45.1'
C14
C15
C16
C17
OPTIONAL BID ITEMS:
OPTIONAL BID ITEM NO. 01 (OBI-1)
DRINKING FOUNTAIN
CONSTRUCTION OF PUBLIC DRINKING FOUNTAIN
INCLUDING PLUMBING FIXTURE AND
INFRASTRUCTURE FOR CONNECTION TO EXISTING
PLUMBING SYSTEM AT BUILDING 2517
OPTIONAL BID ITEM NO. 02 (OBI-2)
CLIMBING TOWER
CONSTRUCTION OF ROPE CLIMBING TOWER
INCLUDING FOUNDATIONS, MATERIALS AND SITE
IMPROVEMENTS.
OPTIONAL BID ITEM NO. 03 (OBI-3)
SIT-UP / PUSH-UP AREA
CONSTRUCTION OF SITE WORK FOR NEW SIT-UP /
PUSH-UP AREA INCLUDING SYNTHETIC GRASS AREA
AND SITE IMPROVEMENTS
OPTIONAL BID ITEM NO. 04 (OBI-4)
EQUIPMENT FOUNDATION
CONSTRUCTION OF MONOLITHIC
CONCRETE SLAB AND FOUNDATION
TO SUPPORT FITNESS TESTING
AND TRAINING EQUIPMENT
OBI LEGEND:
CONCRETE (OBI-4)
SITE STRUCTURE (OBI-2)
PEA GRAVEL (OBI-2)
BOTTLE FILLING STATION (OBI-1)
N . L
A U
R E
TT
A
J.
C
A R
R O
LL
C . M
O O
R
IN
G C S
1.
D W
G
035107
N
O
RT
H CAROL IN
A
P
RO
FESS I ONA
L
SEAL
E
N G
I N E E
R
L A U
R
E T
T
AN
I C
H
O L
A
LANDSCAPE
TIMBERS
WORK OUT
AREA
WORK OUT
AREA
WORK OUT
AREA
WORK OUT
AREA
BBALL
GOAL
BBALL
GOAL
MULCHED
PATH
W O
R K
O U
T A
R E
A
10TR
10TR
6TR
21PINE
16PINE
14PINE
9PINE
20PINE
15PINE
12TR
13PINE
12PINE
6PINE12PINE10PINE
18PINE
20PINE
18PINE
12PINE17PINE
12PINE
24PINE
16PINE
12PINE
13PINE
14PINE
28PINE
15OAK
10OAK
12OAK
12PINE 14PINE
12PINE
12PINE
11PINE
10PINE
12PINE
12PINE
7PINE
10PINE
20PINE
16PINE
14PINE
12PINE
8"X8" WOOD COLUMNS (TYP)
COVERED
CONC SLAB
GRAVEL
LANDSCAPE TIMBERS
21OAK
LA
N
D S
C A
P E
TIM
B
E R
S
METAL
SHED
METAL
SHED
12" R C
P
30" DIP
30" DIP
DI 1007
RIM:321.07
INV IN 803:314.10
INV OUT:313.35
DI 803
RIM:317.90
INV IN:314.90
INV OUT 1007:314.70
DI 587
RIM:317.70
INV OBSCURED
BY DEBRIS/SOIL
DI 567
RIM:315.44
INV IN 587:310.53
SSMH 809
RIM:321.38
INV CL:313.10
SHIPPING
CONTAINERS
12" R C
P
CONTROL POINT 1
LOCALIZED COORDINATES
N:500355.37 E:1999259.47
Z:321.05
CONTROL POINT 2
NC GRID COORDINATES
N:500274.95 E:1999679.87 Z:318.00
CGF:0.999864943
DATUM:
HORIZ:NAD83(2011)
VERT:NAVD88
GEOID:12B
UNITS:US FEET
SSMH 832
RIM:320.44
INV IN FROM BLD:313.35
INV CL:312.59
SSMH 566
RIM:318.72
INV IN FROM BLD:311.62
INV CL:310.92
W O
R K
O U
T A
R E
A
12OAK
15OAK
16TR12TR
10TR10TR
12TR
5PINE
8PINE
22PINE
8PINE
4PINE
6PINE
17PINE
15PINE
20PINE
20PINE
12PINE
26PINE
14TR
12MAGNOLIA
DI 628
RIM:315.83
INV CL:313.47
GRAVEL
DI 1195
RIM:320.42
INV IN:318.42
INV OUT:316.57
LA
N
D S
C A
P E
TIM
B
E R
S
WV(x2)
TELECOMM
MANHOLE
TELECOMM
MANHOLE
TELECOMM
MANHOLE
A P
P A
R E
N T
C H
IL
LE
R L
IN
E
S
D2723 D2517
D2719
D2419
W D
A
TU
R
W D
A
TU
R W
D A
TU
R
W D
A
TU
R W
D A
TU
R
W D
AT
U
R W
D A
TU
R
W D
A
TU
R W
D A
TU
R
W D
A
TU
R W
D A
TU
R
W D
A
TU
R W
D
AT
U R
W D
AT
U
R W
D
AT
U R
W D
ATUR
W D
ATUR
W D
ATUR
W DATUR W DATUR W DATUR
16OAK
317 316 315 314
319 318
C3
C1
C4
C6
C1
C8
C13
C5
C8
C7
C11
C9
C9
C14
C10
C1 C2 C12
OBI-1
SEDIMENT AND EROSION CONTROL PLAN
SCALE: 1" = 20'-0"A1
GRAPHIC SCALE
20'
SCALE: 1" = 20'
0 20' 40'
N
CG101
S E
D
IM
E N
T A
N D
E R
O S
IO
N
C O
N
TR
O L
P
LA
N C
E M
S P ro je ct N o.
P ro je ct
M an ag er
P ho ne
N o.
EN
G
IN
EE
RI
NG
AR
CH
IT
EC
TU
RE
S um m er vi lle , S
C W ilm in gt on
, N C
-1
A
A D av e
Y en sa n
3.
5.
FI
LE
N A
M E
C A
TE
G
O R
Y C
O D
E
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S W
IL
M
IN
G
TO
N
D
IS
TR
IC
T
TA
-0
-1
H
U M
A N
P E
R
FO
R M
A N
C E
M U
LT
IP
U R
P O
S E
T R
A
IN
IN
G
A R
E A
, S W
C S
FO
R
T B
R A
G G
, N C
D
A R
LI
N
G
TO
N A
V E
W
IL
M
IN
G
TO
N , N
O R
TH
C
A R
O
LI
N A
SHEET ID
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
TE
D B
Y
S
IZ
E
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
D
C
B
A
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
C O
N
TR
O
LL
E D
U N
C
LA
S S
IF
IE
D
IN
FO
R
M A
TI
O
N (C
U I)
C E
M S
E N
G
IN
E E
R
IN
G
A
P R
M A
R K
D E
S C
R
IP
TI
O
N D
A
TE
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
W
2P M
B
GENERAL NOTES:
1. REFER TO ELECTRICAL, STRUCTURAL AND
ARCHITECTURAL DRAWINGS FOR ADDITIONAL
INFORMATION.
2. ALL TREES WITHIN THE LIMITS OF DISTURBANCE (LOD)
WILL BE HARVESTED PRIOR TO CONTRACTOR'S
NOTICE TO PROCEED. THE CONTRACTOR WILL BE
RESPONSIBLE FOR STUMP REMOVAL AND CLEARING
OF ANY OTHER SITE VEGETATION WITHIN THE LOD.
SHEET KEYNOTES
LIMITS OF DISTURBANCE.
GRAVEL CONSTRUCTION ENTRANCE. SEE DETAIL
F2/C-502.
218 LF OF SILT FENCE. SEE DETAIL C2/C-502.
80 LF OF SILT FENCE. SEE DETAIL C2/C-502.
12 LF OF SILT FENCE. SEE DETAIL C2/C-502.
15 LF OF SILT FENCE. SEE DETAIL C2/C-502.
144 LF OF SILT FENCE. SEE DETAIL C2/C-502.
SEDIMENT TRAP WITH 4' CLASS B RIP RAP SPILLWAY.
SEE DETAIL D6/C-503
DIVERSION BERM. SEE DETAIL B6/C-503
18" SEDIMENT TUBE. SEE DETAIL F5/C-502.
TOPSOIL STOCKPILE (+/- 300 CY)
CONSTRUCTION STAGING AND MATERIAL STORAGE.
EXISTING CONDITIONS DRAINAGE AREA BOUNDARY.
TREE PROTECTION FENCE. SEE DETAIL F3/C-503
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
C11
C12
C13
C14
.0
134.0
TEMPORARY SEDIMENT TRAP
0.87 DISTURBED AREA (ACRES)
4.00 PEAK FLOW FROM 25-YEAR STORM (CFS)
3,132 REQUIRED VOLUME (FT^3)
1,742 REQUIRED SURFACE AREA (FT^2)
14 TOP WIDTH AT SPILLWAY INVERT (FT)
134 TOP LENGTH AT SPILLWAY INVERT (FT)
2.0 SIDE SLOPE RATIO Z:1
3.5 STORAGE DEPTH (FT)
0 BOTTOM WIDTH (FT)
120 BOTTOM LENGTH (FT)
0 BOTTOM AREA (FT^2)
3,169 PROVIDED VOLUME AT SPILLWAY INVERT (FT^3)
1,876 PROVIDED SURFACE AREA AT SPILLWAY INVERT
(FT^2)
N . L
A U
R E
TT
A
J.
C
A R
R O
LL
C . M
O O
R
IN
G C G
1.
D W
G
035107
N
O
RT
H CAROL IN
A
P
RO
FESS I ONA
L
SEAL
E
N G
I N E E
R
L A U
R
E T
T
AN
I C
H
O L
A
METAL
SHED
METAL
SHED
12" R C
P
30" DIP
30" DIP
DI 1007
RIM:321.07
INV IN 803:314.10
INV OUT:313.35
DI 803
RIM:317.90
INV IN:314.90
INV OUT 1007:314.70
DI 587
RIM:317.70
INV OBSCURED
BY DEBRIS/SOIL
DI 567
RIM:315.44
INV IN 587:310.53
SSMH 809
RIM:321.38
INV CL:313.10
SHIPPING
CONTAINERS
12" R C
P
CONTROL POINT 1
LOCALIZED COORDINATES
N:500355.37 E:1999259.47
Z:321.05
CONTROL POINT 2
NC GRID COORDINATES
N:500274.95 E:1999679.87 Z:318.00
CGF:0.999864943
DATUM:
HORIZ:NAD83(2011)
VERT:NAVD88
GEOID:12B
UNITS:US FEET
SSMH 832
RIM:320.44
INV IN FROM BLD:313.35
INV CL:312.59
SSMH 566
RIM:318.72
INV IN FROM BLD:311.62
INV CL:310.92
12OAK
15OAK
16TR12TR
10TR10TR
12TR
5PINE
8PINE
22PINE
8PINE
4PINE
6PINE
17PINE
15PINE
20PINE
20PINE
12PINE
26PINE
14TR
12MAGNOLIA
DI 628
RIM:315.83
INV CL:313.47
DI 1195
RIM:320.42
INV IN:318.42
INV OUT:316.57
WV(x2)
TELECOMM
MANHOLE
TELECOMM
MANHOLE
TELECOMM
MANHOLE
A P
P A
R E
N T
C H
IL
LE
R L
IN
E
S
D2723 D2517
D2719
D2419
W D
A
TU
R W
D A
TU
R
W D
A
TU
R W
D A
TU
R
W D
AT
U
R W
D A
TU
R
W D
A
TU
R W
D A
TU
R
W D
A
TU
R W
D A
TU
R
W D
AT
U
R W
D
AT
U R
W D
ATUR
W D
ATUR
W D
ATUR
W DATUR W DATUR W DATUR
BLEACHER PAD
STORAGE
TURF FIELD
316314
SORINEX
LP
LP
LP
LP
LP
LP LP
LP
LP
LP
S
LPLP
319.83
319.92
320.04
320.04
319.92
319.92 320.04
320.04
318.95 318.95
318.95
320.04 320.04
319.92
319.93
319.20
319.20319.83
318.83
318.95
319.90
319.25
316.10
318.95
LP
318.92
318.63
316.31317.93
316.49
317.93
317.93
318.63
318.63
318.66
318.95
318.95
317.93
SITE GRADING AND STORM DRAINAGE PLAN
SCALE: 1" = 20'-0"A1 GRAPHIC SCALE
20'
SCALE: 1" = 20'
0 20' 40'
N
CG102
S
IT
E G
R A
D
IN
G A
N D
S
TO
R M
D R
A
IN
A G
E P
LA
N
N . L
A U
R E
TT
A
J.
C
A R
R O
LL
C . M
O O
R
IN
G
C E
M S
P ro je ct
N o.
P ro je ct M an ag er
P ho ne N o.
EN
G
IN
EE
RI
NG
AR
CH
IT
EC
TU
RE
S um m er vi lle , S
C W ilm in gt on
, N C
-1
A
A D av e
Y en sa n
3.
5.
FI
LE
N A
M E
C A
TE
G
O R
Y C
O D
E
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S W
IL
M
IN
G
TO
N
D
IS
TR
IC
T
TA
-0
-1
H
U M
A N
P E
R
FO
R M
A N
C E
M U
LT
IP
U R
P O
S E
T R
A
IN
IN
G
A R
E A
, S W
C S
FO
R
T B
R A
G G
, N C
D
A R
LI
N
G
TO
N A
V E
W
IL
M
IN
G
TO
N , N
O R
TH
C
A R
O
LI
N A
SHEET ID
D R
A W
N B
Y
D E
S
IG
N B
Y
S U
B M
IT
TE
D B
Y
S
IZ
E
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
D
C
B
A
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
C O
N
TR
O
LL
E D
U N
C
LA
S S
IF
IE
D
IN
FO
R
M A
TI
O
N (C
U I)
C E
M S
E N
G
IN
E E
R
IN
G
A
P R
M A
R K
D E
S C
R
IP
TI
O
N D
A
TE
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
W
2P M
B
SHEET KEYNOTES
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
C11
C12
C13
C14
C15
C16
LIMITS OF DISTURBANCE.
GRASSED INFILTRATION BASIN.
SEE DETAIL D1/C-507.
8' WIDE RIP RAP SPILLWAY. SEE DETAIL B7/C-507.
INV. = 316.10.
12" PERFORATED HDPE SUB-DRAIN PIPE. SEE
DETAIL D7/C-505.
6" CORRUGATED HDPE DOWNSPOUT DRAIN PIPE @
1.0% SLOPE. SEE DETAIL F3/C-506.
8" CORRUGATED HDPE DOWNSPOUT DRAIN PIPE @
1.0% SLOPE WITH STEEL END SECTION AND 8"
FINGER TYPE ANIMAL GUARD.
STORM DRAIN CLEANOUT. SEE DETAIL B1/C-506.
CLASS B RIP RAP OUTLET PROTECTION.
SEE DETAIL C3/C-503:
DEPTH (d) = 9"
LENGTH (L) = 8'
WIDTH (W) AT PIPE OUTLET = 3.75'
WIDTH (W) AT APRON END = 9.25'
CLASS B RIP RAP OUTLET PROTECTION.
SEE DETAIL C3/C-503:
DEPTH (d) = 9"
LENGTH (L) = 6'
WIDTH (W) AT PIPE OUTLET = 1.5'
WIDTH (W) AT APRON END = 6.5'
SEEDING AREA. SEE SHEET C-501.
INLET PROTECTION. SEE DETAIL B6/C-502.
CONCRETE ENCASEMENT OF 45 LF OF EXISTING
COMM. LINE. SEE DETAIL B5/C-504.
REMOVE EXISTING SPIGOT, INSTALL TEE AND RUN
3/8 INCH WATERLINE TO SHUTOFF VALVE. REPAIR
BRICK WALL TO MATCH EXISTING. OBI-1
INSTALL 3/8 INCH SHUT OFF VALVE, VALVE BOX AND
COVER. INSTALL 3/8 INCH O.D. PLATTED COPPER
WATER SERVICE TO WATER STATION. OBI-1
ADJUST TELECOMMUNICATIONS MANHOLE RIM TO
ELEVATION 319.74.
LIGHT POLE (BY OTHERS).
2.
0%
M A
X .5.0%
MAX.
B8
CG102
5.
0%
M A
X
0%
0%
5.0%
MAX.
SCALE: 1" = 10'
A1
CG102 B8…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .