This is a Request for Information (RFI) document for federal contract opportunity 2032H326R00007, which involves painting and carpet work at the Main Treasury Building, a National Historic Landmark.
The seed project scope includes interior painting in Rooms 1316, 1320, 2409, 2413, and 2417, with work performed during evening hours (6:00 PM to 6:00 AM), representing 80-100% of anticipated task orders. The contractor must furnish carpet specified as Mind Over Matter collection, Forward Vision GT135 style, Color 678 Expertise, Duracolor Premium Nylon fiber with EcoFlex backing, in 24"x24" tiles. Paint specifications require Benjamin Moore Aura Interior or Low/No VOC equivalent: Walls HC-93 Carrington Beige (Flat); Trim, Door, Window Surrounds, Cornice, Ceiling OC-17 White Dove (Flat); and FCU wood covers HC-179 Platinum Gray (Semi-Gloss). The scope includes only previously painted doors and window frames, casings, moldings, and sills; unpainted wooden elements remain untouched. Contractors must cover furniture with polyethylene before painting rather than remove and reinstall it. Equipment and materials must be removed daily from work areas, with limited government-provided storage available. Multiple contractors will be awarded under this IDIQ contract. RSMeans pricing allows for overhead and profit markup. Bonds are not required. Historic preservation review is not required. An air scrubber must operate during all working hours, and all task orders require Low/No VOC paint compliance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WD.pdf | ||
| Site Visit.docx | DOCX document | |
| APU No. 26-01 - Attachments 1 & 2.docx | DOCX document | |
| Sketch 2 dated 12.2.25.pdf | ||
| Sketch 1 dated 12.2.25.pdf | ||
| Attachment 3_APU 26-01.pdf | ||
| 2032H326R00007.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information
2032H326R00007
1. Please confirm whether the carpet material will be provided by the owner or if it is to be furnished by the contractor? Carpet is to be furnished by the contractor.
2. If the contractor is responsible for supplying the carper, has a specific carpet specification been selected for this project?
Collection - Mind Over Matter
Style Name/ Style – Forward Vision GT135
Color 678 Expertise
Fiber Type – Duracolor Premium Nylon
Construction Tufted
Backing Material – EcoFlex TM One
Size 24”x24”
3. Will this project be awarded to a single contractor, or is it the intent to award multiple contractors? Multiple contractors.
4. For items listed as “Price TBD by RS Means” will the contractor be permitted to apply overhead and profit/markup or must pricing strictly follow the RSMeans values as stated? RSMeans allows for overhead and profit.
1. Proposal section 6.2, Volume II, Past Performance; if a PPQ was previously provided in a different format from personnel that are no longer employed by the client, will that be acceptable? Yes.
2. Will equipment and materials need to be removed from the working area at the end of each workday? Yes.
3. Will the government provide storage area for materials/equipment? Yes. Limited storage.
4. Contract states 7:30 am – 3:00 pm working hours in multiple places and evening work from 6:00 pm to 6:00 am in other parts. Please clarify working hours for the seed project and procedures for accessing building during off hours. Evening work as outlined in Section C2 of the solicitation.
5. For the seed project, are their any requirements for attic stock for the paint? No.
6. Please confirm bonds are not required for the proposal. Yes.
7. Proposal section 6.1.2, on attachment 1 for the seed project, are personnel addresses, phone, email required since this information should be redacted for the seed project? No.
8. Would company information and number of personnel be sufficient? Yes.
9. In regard to the proposal, Volume 1, can the QC Plan be excluded from the page limit in this section? No.
10. If the QC Plan cannot be excluded from the page count, does the government want a full QC Plan or a summary of the plan addressing the proposal requirements in section 6.1.4? Summary of the plan.
“The contractor’s response shall consist of one Cover Letter addressed to Ms. Arlene Davis and Mr.
Christian Fowler with the company’s contact information followed by three (3) separate volumes as detailed below. Volume I – Technical; Volume II – Past Performance; Volume III – Price; IV – Clauses and Provisions. Redacted volumes must have all names (i.e., company, key personnel names, points of contact, logos, etc.,) and any other identifiable text redacted. Volume III – Past Performance, will be redacted once received by the CO. There is no need to redact Volume III or IV.”
1. Can you please confirm the redaction requirement? In the second sentence it states Volume II is Past Performance. In the fourth sentence, it states that Volume III – Past Performance is not to be redacted upon submission. (Volume 1 Technical/Volume II Past Performance/Volume III Price/Volume IV Clauses and Provisions) Please confirm Volume I – Technical should be submitted in redacted form. YES . Should the Past Performance and the Price Volume be redacted? Yes (REDACT Volume I, II, III) Please confirm that Volume IV – Clauses and Provisions should not be redacted. Correct
2. Are offices 1320Q and 1320R included in the scope of work for the seed project? Yes
11. The seed project is to be done during off hours. Evening work as outlined in Section C2 of the solicitation.
3. What percentage of task orders would Treasury anticipate being performed during off-hours?
80% to 100%
Rooms 1316 and 1320
1 RFQ No.
2032H326R00007 Scenario Project Scope of Work, Rooms 1316 & 1320 Page 40
Please confirm that the existing windows (unpainted wooden rails, grilles, sash, etc.) will remain as-is, and that only window frames, casings, moldings, and sills are to be painted. Correct.
2 RFQ No.
2032H326R00007
Please confirm that the paint brand, type, and colors for Rooms 1316 and 1320 are the same as specified for Rooms 2409, 2413, and 2417 (Benjamin
Scenario Project Scope of Work, Rooms 1316 & 1320 / Paint Colors Page
Moore Aura Interior or Low/No VOC equivalent: Walls HC-93 Carrington Beige (Flat); Trim, Door, Window surrounds, Cornice, Ceiling OC-17 White Dove (Flat); FCU cabinet HC-179 Platinum Gray (Semi-Gloss)). Same for both rooms.
3 RFQ No.
2032H326R00007 Scenario Project Scope of Work, Rooms 1316 & 1320 Page 40
Please confirm that providing access to columns (including moving, storing, and reinstalling cubicle furniture if required) is the client’s responsibility.
Contractor cover the furniture with poly before painting. There is no need to remove and install it.
4 RFQ No.
2032H326R00007 Scenario Project Scope of Work, Rooms 1316 & 1320 Page 40
If the contractor is to move, store, and reinstall cubicle furniture, please provide details on installation conditions, including attachment to carpet, electrical connections, and any other relevant constraints. Not applicable.
5 RFQ No.
2032H326R00007 Scenario Project Scope of Work, Rooms 1316 & 1320 Page 40
Please confirm that the client is responsible for temporarily relocating employees from affected cubicles during the work. The employees will remain in the space during the day. The work will be done at night so before leaving each night the temporary protection is to be removed and the space clean.
6 RFQ No.
2032H326R00007 Scenario Project Scope of Work, Rooms 1316 & 1320 Page 40
Please confirm that the client is responsible for removing, storing, or securing office materials, furniture, and personal belongings to allow clear access to all work areas prior to work commencing. No. the work areas will be covered with poly to protect them.
7 RFQ No.
2032H326R00007 Scenario Project Scope of Work, Rooms 1316 & 1320 Page 40
Please confirm that unpainted wooden doors will remain as-is, and that only previously painted doors will be repainted. Correct.
8 RFQ No.
2032H326R00007 Scenario Project Scope of Work, Rooms 1316 & 1320 Page 40
Please confirm that the scope of work excludes any modifications or replacement of carpet, lighting, fan coil units, fire protection systems, windows, doors, or window blinds. The seed project is painting only.
However, the IDIQ includes carpet removal and replacement.
9 RFQ No.
2032H326R00007 Scenario Project Scope of Work, Rooms 1316 & 1320 Page 40
Please confirm that no work is included on the corridor (main hallway) side of suite entrance elements, including doors, frames, casings, and moldings.
Correct.
Rooms 2409, 2413 and 2417
10 RFQ No.
2032H326R00007 Scenario Project Scope of Work, Rooms 2409, 2413 & 2417 Page 40
Please confirm that the existing windows (unpainted wooden rails, grilles, sash, etc.) will remain as-is, and that only window frames, casings, moldings, and sills are to be painted. Correct.
11 RFQ No.
2032H326R00007 Scenario Project Scope of Work, Rooms 2409, 2413 & 2417 Page 40
Please confirm that the client is responsible for removing, storing, or securing office materials, furniture, and personal belongings to allow clear access to all work areas prior to work commencing. . No. the work areas will be covered with poly to protect them.
12 RFQ No.
2032H326R00007 Scenario Project Scope of Work, Rooms 2409, 2413 & 2417 Page 40
Please confirm that unpainted wooden doors will remain as-is, and that only previously painted doors will be repainted. Correct.
13 RFQ No.
2032H326R00007 Scenario Project Scope of Work, Rooms 2409, 2413 & 2417 Page 40
Please confirm that the scope of work excludes any modifications or replacement of carpet, lighting, fan coil units, fire protection systems, windows, doors, or window blinds. The seed project is painting only.
However, the IDIQ includes carpet removal and replacement.
14 RFQ No.
2032H326R00007 Scenario Project Scope of Work, Rooms 2409, 2413 & 2417 Page 40
Please confirm that no work is included on the corridor (main hallway) side of suite entrance elements, including doors, frames, casings, and moldings.
Correct.
ADMINISTRATIVE RFIs
15 RFQ No.
2032H326R00007 Scenario Project Scope of Work, Background
The SOW identifies the Main Treasury Building as a National Historic Landmark. Please confirm whether any surfaces, trim profiles, or architectural elements within Rooms 1316, 1320, 2409, 2413, or 2417 are subject to historic preservation review or approval before painting commences, and whether the contractor will be required to coordinate with a preservation officer prior to or during the work. Not required.
16 RFQ No.
2032H326R00007 Scenario Project Scope of Work, Rooms 1316 & 1320 / Rooms 2409, 2413 & 2417 Page 40;
The Scenario Project SOW specifies that all work is to be performed off-hours (6 PM to 6 AM), while Section III General Work Hours specifies 7:00 AM to 3:30 PM, Monday through Friday. Please confirm that the off-hours requirement in the Scenario Project SOW governs for task orders of this type, or clarify how the two provisions will be reconciled at the task order
Section III, Work Hours level. This is evening work from 6pm to 6am. 80% to 100% of task orders will be after hours.
17 RFQ No.
2032H326R00007 Scenario Project Scope of Work, Rooms 1316 & 1320 / Rooms 2409, 2413 & 2417 / Paint Colors Page 40
The SOW includes “prep and paint fan coil unit covers” as a scope item and separately lists FCU cabinets as a distinct color (HC-179 Platinum Gray, Semi-Gloss). Please confirm whether “fan coil unit covers” and “FCU cabinets” refer to the same elements, and whether the entire FCU assembly (covers, cabinet, and any other exposed components) is within the scope of work. It is not the metal FCU but the FCU wood cover that lift off that is painted.
18 RFQ No.
2032H326R00007 Section VII, Evaluation Criteria / Basis for Award
Please confirm the anticipated minimum and maximum number of IDIQ contracts the Government intends to award under this solicitation.
Unknown at this time.
19 RFQ No.
2032H326R00007 Scenario Project Scope of Work, Rooms 1316 & 1320 / Rooms 2409, 2413 & 2417 / Paint Colors Page 40
The Scenario Project SOW requires the contractor to operate an air scrubber during working hours and specifies a Low/No VOC paint equivalent. Please confirm whether these requirements apply to all task orders issued under the IDIQ, or whether they are specific to the Scenario Project only. All.
1. As completed PPQs are directly emailed by our customers to the Contract Officer as per section 6.2, do we need to submit the PPQs completed by our customers again as part of the Volume II submission.
Please clarify? Yes.
2. Since Volume II, III and IV responses need not be redacted as per section 4.0. Do we need to follow the below mentioned naming convention for these volumes also. Please clarify. Redact Redact Volume 1 Technical/Volume II Past Performance /Volume III Price
(Alphanumeric Number)Vol II-PPQ
(Alphanumeric Number)Vol III-Pricing (Alphanumeric Number)Vol IV- FFCnP
3. There is a mention of "(FAR) 52.219-1 Small Business Program Representations (SEP 2023)" to be filled as part of the Volume IV response, but we could not find the same in the RFP document. Request you to please share the same . (Attachment 3_APU 26-01)
4. Please clarify if Cover letter (as per section 5.1) will be a separate submission document apart from the 4 volumes or is it a cover sheet which needs to be included as part of all the 4 volumes. Please clarify? Separate