203_-_Enlarged_IDF_Rooms.pdf

PDF 249 KB Posted

Attached to
Cellular Distributed Antenna System for the North County Wellness Center Project
Solicitation number
2026-RFP-00357
Issued by
San Mateo County, San Bernardino City, California

About this file

This is an architectural plan document prepared for the County of San Mateo Department of Public Works regarding the Cellular Distributed Antenna System (DAS) installation at the North County Wellness Center in South San Francisco, California. The plan depicts enlarged floor layouts for Levels 1, 2, and 3 of the facility, detailing the configuration of Information Distribution Frame (IDF) rooms designed to house cellular carrier equipment and infrastructure. The document specifies technical requirements including seven equipment racks allocated across the facility—Racks 1 and 2 for miscellaneous systems, Rack 3 for security, Racks 4 and 5 for IT systems, and Racks 6 and 7 for third-party carriers—along with associated cable management systems, conduit runs, wall sleeves, grounding busbars, and electrical panels. The plan indicates wall space allocation for cellular DAS equipment, door access control panels with conduit connections, fire alarm panel spaces, and provisions for both new and existing underground conduits from on-site vaults. Standard equipment specifications include 20" x 30" x 84" B-LINE 4-post racks, 18" wide cable runways with powder coat finish, vertical wire managers with combination cabling systems, copper cable punchdown blocks, and DAS routing panels, with mounting plates and ground busbars specified as typical throughout the installation.

The technical specifications outlined in the plan establish the physical infrastructure requirements necessary to support the neutral-host, 5G-ready DAS system that will provide coverage for AT&T, Verizon, and T-Mobile/Sprint across all interior spaces of the facility. The plan includes provisions for 120-volt, 20-ampere dedicated quad circuits to be installed below cable trays by the General Contractor, along with Building Management System (BMS) control panels at multiple levels, indicating the integrated nature of the DAS installation within the broader facility infrastructure. All materials and equipment specifications reflect manufacturer standards and compatibility requirements for the specified cellular carriers, supporting the project's goal of achieving minimum 95 percent in-building coverage with signal strength specifications of better than -85 dBm downlink and uplink greater than -95 dBm, while maintaining compliance with National Electrical Code standards and local building code requirements.

View the file

Other files

File Type Posted
Cellular_Distributed_Antenna_System_for_the_North_County_Wellness_Center_Project_(Addendum_#3_Revision).pdf PDF
Cellular_Distributed_Antenna_System_for_the_North_County_Wellness_Center_Project_(Addendum_#3_Revision).pdf PDF
Cellular_Distributed_Antenna_System_for_the_North_County_Wellness_Center_Project_(Addendum_#3_Revision).pdf PDF
Cellular_Distributed_Antenna_System_for_the_North_County_Wellness_Center_Project_(Addendum_#3_Revision).pdf PDF
Cellular_Distributed_Antenna_System_for_the_North_County_Wellness_Center_Project_(Addendum_#1_Revision).pdf PDF
201_-_Reflective_Ceiling_Plans.pdf PDF
203_-_Enlarged_IDF_Rooms.pdf PDF
201_-_Reflective_Ceiling_Plans.pdf PDF
200_-_Archectural_and_Roof_Plans.pdf PDF
201_-_Reflective_Ceiling_Plans.pdf PDF
203_-_Enlarged_IDF_Rooms.pdf PDF
203_-_Enlarged_IDF_Rooms.pdf PDF
200_-_Archectural_and_Roof_Plans.pdf PDF
202_-_Techology_Drawings_with_Reflective_Ceiling_Plans_and_Roof.pdf PDF
202_-_Techology_Drawings_with_Reflective_Ceiling_Plans_and_Roof.pdf PDF
200_-_Archectural_and_Roof_Plans.pdf PDF
201_-_Reflective_Ceiling_Plans.pdf PDF
202_-_Techology_Drawings_with_Reflective_Ceiling_Plans_and_Roof.pdf PDF
202_-_Techology_Drawings_with_Reflective_Ceiling_Plans_and_Roof.pdf PDF
201_-_Reflective_Ceiling_Plans.pdf PDF
200_-_Archectural_and_Roof_Plans.pdf PDF
200_-_Archectural_and_Roof_Plans.pdf PDF
203_-_Enlarged_IDF_Rooms.pdf PDF
202_-_Techology_Drawings_with_Reflective_Ceiling_Plans_and_Roof.pdf PDF
Cellular_Distributed_Antenna_System_for_the_North_County_Wellness_Center_Project.pdf PDF
Standard_Contract_Template_-_Under_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Under_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Over_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Over_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Under_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Under_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Over_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Under_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Over_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Over_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Over_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Under_$200K_DRAFT.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WAITING, CLINIC

TEF/TER

EXAM, OPT.

B21

544 194

13 13

3 3 3 3 3 3

9 9 10 12 12 14 14

MPOE

1/4" = 1'-0"

LEVEL 1 ENLARGED IDF ROOM

MPOE Rack for Cellular Carrier

Equipment

KEYNOTES

20" x 30" x 84" B-LINE 4-POST RACK SB837084-BFB RACK, TYPICAL.

18" WIDE B-LINE UNIVERSAL CABLE RUNWAY, BLACK POWDER COAT, TYPICAL.

VERTICAL WIRE MANAGER - COS COMBINATION CABLING SYSTEM

(6"WX7'HX13"D, DOUBLE SIDED, BLACK PART #30162-703).

DOOR ACCESS CONTROL PANEL WITH 2" CONDUIT TO FLOOR ABOVE.

FIRE ALARM PANEL SPACE. SEE ELECTRICAL PLANS FOR DETAILS.

COPPER CABLE PUNCHDOWN BLOCKS.

DAS "ROU" PANEL.

RACKS 1 & 2: MISCELLANEOUS SYSTEMS.

RACK 3: SECURITY.

4" WALL SLEEVES, TYPICAL.

RACKS 4 & 5: IT SYSTEM.

MOUNTING PLATE, TYPICAL.

RACKS 6 & 7. 3RD PARTY CARRIERS.

4" SLEEVE (DAS).

NOT USED.

NOT USED.

NOT USED.

4" SLEEVE (FA) AT LEVEL 1, 2, AND 3.

GROUND BUSBAR, TYPICAL.

ELECTRICAL PANEL. REFER TO ELECTRICAL DRAWINGS.

(4) 4" AND (3) 4"C UNDERGROUND CONDUITS FROM EXISTING AND NEW VAULT

ON SITE.

WALL SPACE ALLOCATED FOR CELLULAR DAS EQUIPMENT

SP1

SP1

S P

SP1

SP1

S P

B

TR

54 196

3 3 3 3 3 3

9 9 14 16 16

1/4" = 1'-0"

LEVEL 2 ENLARGED PLAN

2nd Floor IDF Rack Space Allocation or

Cellular Carrier Equipment

LEVEL 2 & 3 ENLARGED PLAN

23 BMS Control Panel

23 BMS Control Panel

120v 20 Amp Quad Circuit dedicated just below cable tray by General Contractor

120v 20 Amp Quad Circuit dedicated just below cable tray by General Contractor