Attachment 1 - Statement of Work (SOW).pdf
PDF 321 KB Posted
- Solicitation number
- 2027-LGD-0061
- Issued by
-
Library of Congress
About this file
This is a Statement of Work (SOW) for the Library of Congress mass deacidification program for acidic library materials.
The Library of Congress seeks contractor support to deacidify volumes of library materials found on acidic paper through proven chemical processes. The contractor must select, treat, and return library materials while maintaining rigorous inventory control and quality assurance. Work performed at the Library occurs on Capitol Hill during standard business hours (6:30 a.m. to 6:00 p.m., Monday through Friday, excluding federal holidays) in the Jefferson, Adams, or Madison buildings. The contractor must achieve a minimum 300% extension of paper useful life through treatment, with treated volumes retaining an alkaline reserve concentration of 1.5 percent calcium carbonate equivalents (range 1.0-3.0 percent). Treated paper must achieve an average pH between 6.8 and 9.7 and demonstrate decreased strength loss of at least a factor of 3.0 when tested per ISO 5630-5:2008. Treatment must not expose materials to temperatures exceeding 70°C, with total exposure to 60°C-70°C not exceeding one hour. The contractor must barcode volumes, perform pin and linking in the Library's Integrated Library System, physically mark treated items with white dot spine markers and treatment labels, and accurately reshelve materials within three weeks of return. Quality control includes Library testing of contractor-supplied test volumes for pH, alkaline reserve, and completeness of deacidification, with 15% invoice penalties applied for batches failing to meet alkaline reserve specifications (less than 0.8% or greater than 3.2% calcium carbonate equivalents). Deliverables include bi-monthly shipments of treated materials with supporting documentation, monthly statistics on selection and treatment, weekly quality control data, and reports on chemistry, toxicity, and efficacy testing due within 60 days of contract start. The contractor must provide an on-site program manager available 9:30 a.m. to 3:30 p.m. weekdays with minimum three years ILS and preservation library experience, maintain climate-controlled storage at temperatures not exceeding 80°F and humidity not exceeding 55%, provide 24-hour security via guards or electronic surveillance, and supply all shipping containers, equipment, and consumable supplies. The contractor shall not store deacidification equipment on the Library campus.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 - Sole Source Justification.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Background
The Library of Congress requires contract support to deacidify volumes of library materials found to be on acidic paper.
In the latter half of the 19th century, acidic wood pulp was substituted for cotton rags in the manufacture of paper. The introduction of wood pulp and other chemicals in the manufacturing process resulted in printed volumes that were produced on acidic paper stock. Acidity in paper accelerates its natural deterioration, with the pages of bound volumes becoming so embrittled over time that they break during use.
The objective of deacidification is the neutralization of the acid components of paper. In conjunction with a mass deacidification program an ongoing quality control (QC) program is also necessary to validate appropriate treatment and assure no process related damage in treated volumes and assessment of health and environmental impacts of de-acidification treatment and process.
The Library of Congress has been deacidifying collections on a mass scale for over two decades. Based on a change in US paper industry production reducing acidic levels in newly published materials, the creation of environmentally optimized storage at Ft. Meade and steady progress completing treatment for the most at risk collections, it is expected that now only about 1-5% of materials already held remain vulnerable to inherent acidity, i.e. about 1-5 of every 100 volumes examined will qualify for deacidification treatment.
Scope of Contract
The contractor shall treat volumes of Library materials utilizing proven and tested deacidification processes, and shall create a record of treated items in the Library of Congress Integrated Library System (ILS) by creating or modifying holdings and items records (called “pin and link”). Selection of volumes for treatment will take place in the general collections stacks. All on-site work will be performed in the Library's Capitol Hill buildings (Jefferson, Adams or Madison).
The Contractor shall not be granted clearance to store mass deacidification equipment on site at the Library campus that is related to the treatment of materials. The Contractor shall not be granted space in the Preservation Lab at the Library Congress for equipment, nor any location at the Library.
Requirements
The contractor shall:
1. Select and De-acidify paper-based Library materials to slow the loss of strength in the paper through chemical processes, without damage to the volumes physical structure or the structure of the paper. Through neutralization of acidic paper and uniform incorporation of a suitable permanent alkaline reserve, the rate at which paper loses strength upon accelerated aging as described in paragraphs 4. to 9.2. of ISO 5630-5:2008.) Accelerated Ageing - Part 5, shall be decreased by at least a factor of 3.0, when the logarithm of the folding endurance is plotted against time in days; i.e., the useful life of treated paper shall be extended by a minimum of 300%.
2. De-acidify materials uniformly, add the required alkaline reserve, and cause no damage physically or chemically to these materials, including minimal aesthetic change. After treatment, books will be essentially indistinguishable from their pretreated form and will not carry any loose, powdery residues, while allowing for small differences in the tactile feel of the material due to the addition of alkaline reserve.
3. Accurately barcode volumes, and pin and link treated volumes within the Library’s ILS.
4. Physically label or mark treated items with labels and marks to indicate treated or alkaline status, as described section C.1.1.
5. Perform all work to process the volumes in batches devoted exclusively to the treatment of Library of
Congress materials.
6. Conduct pre-and post-treatment quality assurance and quality control to ensure quality in accordance with Library standards for inventory control and appropriate selection of material.
7. Conduct post-treatment evaluations of processed volumes for completeness and uniformity of deacidification and for any obvious process-related changes or damages. Selected post-treatment materials will also be retrieved by the contractor from completed work before re-shelving as requested for quality control processes performed by Library staff.
8. Provide reports and collect statistics as described in “Deliverables.”
C. 1 Volumes
Contractor personnel, working in Library buildings, shall select, barcode, pin and link through the cataloguing module of the Library's ILS, set status through the ILS, perform quality assurance to ensure compliance with selection standards, and pack volumes for shipment. Contractor personnel shall unpack, perform quality assurance to ensure return of all volumes as well as compliance with Library inventory standards, change status for treated and untreated returned materials, and add treatment information to ILS item record for treated materials. Contractor staff shall insert physical labels and reshelve volumes at the Library after return from the Contractor's plant or otherwise route materials for offsite processing.
C.1.1 Selection of volumes
• Selection labor is the physical act of walking the stacks, choosing a volume to be worked, packing it for shipping, transporting the books to the loading docks, restacking the selected volumes, etc.
• Selection of volumes shall take place on the Library’s Capitol Hill campus.
• Retrospective selection from the general collections stacks may take place during normal working hours.
• Determination of acidity shall be made by lightly marking the top of a volume with a chlorophenol red pH pen. Yellow shall indicate acidic/treatment candidate, purple shall indicate alkaline/untreatable and tan or brown shall be further tested by marking the gutter of the volume’s text block. If the mark at the gutter is tan, brown or yellow the item shall be considered a candidate for treatment.
o Contractor shall mark volumes identified as alkaline during this process with a white 2.0mm
Sakura Pen Touch marker by dotting the spine.
o The number of items marked as alkaline for any given time period will be documented. That is the number of volumes reviewed and marked as alkaline is to be recorded and reported monthly along with the number of items selected within that area for treatment. Records by review and treated will be kept in distinct groups by location or type of items reviewed, ie, new receipts, Law, or by class.
• Contractor staff shall thoroughly examine volumes and exclude the following from selection for treatment:
o Duplicates: Contractor personnel shall select only one copy from multiple copies of a single imprint or book title. The copy selected for treatment will normally be the copy that is in best physical condition; however, the aesthetic properties and values of book covers and other properties described by the COR, a conservator, or a recommending officer may affect individual selection decisions that will be made by Contractor personnel, for example selecting the volume in original cloth binding rather than a rebound volume. Duplicates not selected shall remain on the shelf. Because duplicate materials may not shelve together contractor may be required to review ILS records to ensure selection of appropriate items to treat.
o Items which lack a bibliographic record or items for which the bibliographic record is incorrect or incomplete.
o All volumes containing more than 50% Super-calendared, glossy/coated, or brittle pages will be excluded from selection.
• For volumes that appear and test to be highly acidic and brittle, Contractor personnel shall perform a "fold endurance test." This is accomplished by exposing a small corner of a single leaf within a book to two "half" folds (bending the leaf one direction once and then in the opposite direction once). If the paper does not crack or break off when exposed to these two half folds, the volume may be selected for deacidification. If the paper in a volume does not pass this fold test, Contractor personnel shall, at the discretion of the COR, return the volume to be left on the shelf after screening or flag and remove to designated location.
o Volumes showing physical wear or damage must be reviewed by Library staff (COR or COR designee) prior to treatment, and some damaged volumes may not be treated. Some will be set aside for COR review pending stabilization by the library. Some will be selected into separate treatment batches designated as “Special S”. Contractor staff shall sort items according to criteria for these workflows, which are attached as an appendix. (“Damaged books for Mass De…”)
• Contractor shall not select volumes already marked alkaline via a white dot.
• Library staff will provide volumes for QC testing to be included with selected material for treatment.
• Library staff may QC treatable volumes after selection and preparation but before shipping.
C.1.2 Pin and linking
Contractor shall be responsible for pin and linking items selected for treatment. This includes verifying that a valid bibliographic record exists in the ILS, creating or modifying holdings records when necessary and creating or modifying item records when necessary, as well as affixing a barcode when necessary. If Contract staff discover that a volume does not have an extant, complete bibliographic record, that volume will be considered untreatable. Title and call number of such volumes shall be recorded and sent to COR. Items which Contractor staff remove from stacks or library work areas which are subsequently discovered to be untreatable shall be refiled by contractor. Baseline procedures are given in appendix “Pin and Linking.” The library shall provide a workspace and computers for contractor staff to perform pin and linking.
C.1.3 Preparation for shipment and treatment
Following the selection criteria, Contractor personnel shall perform any and all of the following and related activities required to prepare volumes for treatment and return them accurately to their appropriate storage locations in Library stack areas or to designated distribution points: pulling, transporting within and between Library buildings, barcoding (when necessary) and pinning and linking, charging (using barcode readers, where appropriate), inventorying, updating ILS to designate treated in statistical category, packing, facilitating shipping, receiving, unpacking, verifying and inspecting, and accurately reshelving each and every book to be deacidified under the terms of this contract.
• All volumes are to be selected, prepared, deacidified, and returned in the order in which they are shelved at the Library; rigorous inventory control and quality assurance measures exercised by the Contractor shall assure that no volumes are misplaced or lost.
• Contractor personnel shall move volumes from stack areas or other locations onto lockable, contractor supplied trucks that are used to transport volumes from Library buildings to the Mass Deacidification Program processing area where assigned.
• ILS status shall be set to “in transit” before generating a shipping list. After volumes are returned to the Library status will be changed and volumes may be set to "not charged" by contractor if approved by COR.
• In the unlikely instance in which a computer-assisted shipping list cannot be furnished for volumes due to computer system problems at the Library the contractor may, when permitted by the COR, handlist a shipping list. Copies of the printouts shall be accumulated and transported with the listed volumes to the deacidification plant. Each printout shall be annotated to indicate the inclusive volumes that are contained in each tote or box of each pallet comprising a shipment of volumes to the treatment facility. Such files must be sent to the COR before shipment and requires the COR permission for each use. When computer issues are resolved, volumes noted in the handlist shall have status categories and treatment status updated in the ILS.
• Vendor shall build shipments no later than four business days to allow time for the Library to do QC
C.1.4 Packing
• The Contractor shall prepare materials for shipment from the Library to the Contractor site(s), in shipping containers that are owned and furnished by the Contractor to facilitate safe transmission of volumes, and test materials to and from the Contractor's treatment facility.
• Containers must be clearly marked according to a numbering and tracking scheme approved by the Library.
• The Contractor shall keep the Library supplied with an adequate number of shipping containers, along with any additional components needed to protect the contents in transit, at no cost to the Library, so that no delays in preparing or shipping materials to the Contractor shall result from a lack of shipping containers and related components.
• Contractor may not store materials exclusively used for execution of, packing or shipping for any other contract in the provided workspace for this contract.
• At a minimum, the outer and any interior containers must be designed to deter pilferage in transit and to minimize physical damage to volumes and other materials due to accidents, rough container handling, or exposure to water.
The Contractor design specifications and/or vendor literature for and samples of large over- pack shipping containers and any internal containers or packing materials that are intended to hold and protect volumes and other materials in transit shall be submitted to the Library for approval before any volumes from the Library's permanent collections shall be sent to the Contractor for deacidification.
o Unless or until the Contractor and the Library agree about the use of containers of other design(s), volumes shall be transported under the terms of this contract in the two sizes of rigid plastic totes (which can be configured into pallets using rigid pallet tops and bottoms), to transport such materials to and from their customers facilities. These containers can be stacked and strapped to facilitate physical protection during shipment.
• Library-furnished shipping containers may be utilized when the COR determines that the utilization of such containers shall provide for adequate protection of Library materials of unusual dimensions, such as oversize. Use of such containers requires written approval by the Contractor, who shall accept liability for volumes and other materials packed into, stored in, or returned to the Library in such containers.
• For security and tracking, the Contractor shall normally charge out all of the volumes that will be included in a single shipment setting.
• Volumes will be loaded in shelf list (call number) order, in preservation appropriate manner. If necessary Containers will be stacked on pallet bases in a specific numbered orientation that keeps all of the volumes in a particular pallet in the order in which they were removed from shelves in stack areas.
• Shipment control and freight forms designated by the Library shall be used by Contractor personnel to list, document, control, and provide summary descriptions of all of the volumes sent in a particular shipment from the Library to the deacidification plant.
• Copies of the shipping inventory and control forms shall be placed in the top of the first tote or box of the first pallet of each shipment. Electronic files of the shipping inventory will be provided to the COR and/or other library staff according to the schedule in “Deliverables”.
C.1.5 Shipping/Transportation, Receipt
• Vendor will stop building the next shipment at least two full business days before the shipment is set to ship.
E.g., if a shipment is scheduled for a Wednesday morning, the cutoff date for adding fully prepared and inventoried items is COB the Friday before. This is to allow sufficient time for the library and vendor to perform quality control, paperwork and make any necessary adjustments before the shipment is sent. Vendor is permitted to perform selection and begin building shipments for dates farther out during this time, however, as they desire.
• Volumes selected for treatment and QC test items shall be shipped to the Contractor site at Contractor expense.
The Contractor will be responsible for all administrative contacts and all paperwork required by any freight company that transports Library materials for deacidification to and from the vendor site. The vendor will also administer the payment of all invoices associated with transporting Library materials to and from the vendor site and any other designated sites, such as preservation testing or conservation laboratories.
• Contractor shall be responsible for adhering to Library loading dock procedures and operating hours in effect at the time of the period of performance. This includes presenting vehicles and contents for a security inspection in an offsite location before arriving at the dock. Please note: Adams loading dock requires the use of a truck with a lift gate or other method of lifting items into truck. Adams dock will be in use for this contract.
• Materials to be treated shall be shipped to the Contractor site on a regular basis, according to a treatment schedule mutually agreed upon by the Library and the Contractor. The Contractor shall be responsible for unloading the materials and expeditiously moving them into secure and climate-controlled storage away from the dock.
• All shipments will be documented and that documentation will be sent electronically to COR and/or designees at the time of shipment. Documentation defined in “Deliverables.”
C.1.6 Storage while away from the Library
• The Contractor shall treat and store the Library volumes and test materials in climate controlled, secure facilities.
Facility conditions for the treatment and storage of Library materials shall adhere at all times to the following acceptable limits: Temperature NTE 80°F and Relative Humidity not to exceed 55%.
Security for Library materials in storage and on the Contractor plant premises shall be ensured by either 24-hour guard service or constantly monitored electronic surveillance.
• All materials shall be stored and labeled to insure that the identity and the original order of each item is maintained, both before and after processing, and that processed materials from separate treatment batches are not intermingled.
• The Contractor shall move Library volumes and test materials from the acceptable storage environment (which may be within the treatment facility) to the preservation treatment space, prepare the materials for treatment, and load and unload them from the treatment chambers. The Contractor shall return treated materials to storage after volume batches are treated and dried. The Contractor shall select, assemble, package, label, weigh and ship specified materials at agreed upon intervals to the Library, designated testing laboratory, or other indicated location.
C.1.7 Treatment "Turn-around" Time
Unless an exception is authorized in writing by the Library COR, the contractor shall not hold items selected for treatment for more than ten business days on Capitol Hill before shipping for treatment to their deacidification plant due to floor and cart weight limits.
Unless an exception is authorized in writing by the Library COR the contractor shall assure that all volumes, and test materials are de-acidified and re- turned to the Library within thirty (30) working days after they are received by or on behalf of the Contractor at the deacidification plant.
C.1.8 Return, Quality Control
Contractor personnel shall unload each pallet and tote, verifying the existence and proper order of each individual volume against the outgoing shipping list. They shall also examine the shipping form furnished by the Contractor with each pallet of volumes returned to the Library. The Library's and the Contractor's shipping logs will both be found in the first tote or box of each shipment. Contractor personnel shall maintain electronically a file, arranged by shipment number, of all outgoing and incoming shipping lists for each volume shipment.
• Contractor shall mark treated volumes with a white 2.0mm Sakura Pen Touch marker by dotting the spine.
• The Contractor shall apply to each volume deacidified and returned to the Library a label containing, at a minimum, the following elements of information: name and address of the company furnishing deacidification services; the name of the deacidification process; identification of the neutralizing agent employed; and the date (month and year) of treatment.
• Glossy pages within a treated volume and covers shall be carefully wiped to remove excess alkaline material present after treatment.
• Untreated volumes will be noted and reported to COR and/or designee with each shipment and before returning materials to designated locations.
• Contractor personnel shall call to the attention of the COR any book damage that may have resulted from deacidification treatment. Each individual volume shall be handled and carefully inspected. Any possible or apparent treatment-related damage shall be called immediately to the attention of the COR. Test items and/or test papers inserted in return shipments shall be given to a designated Library chemist or laboratory technician, who will coordinate quality control testing for the Library.
• Any untreated items will immediately be brought to the attention of the COR for review, after contractor staff remove the “deacidified” statistical category from the item record.
• Return shipment logs will be sent electronically to COR according to schedule in “Deliverables.”
o Such logs will be used to designate random sampling lists to be pulled by contractor staff for review by COR or designated per-sonnel. Return shipment logs will include information on untreated volumes and volumes with weight/size category different from outgoing shipment data.
o Library staff will perform quality control on returned items before releasing the shipment for reshelving. QC at this stage will include reviewing items for damage, and for correct pin and linking.
Benchmarks are described below.
C.1.9 Reshelving
• After verifying the physical condition, the proper order, and the total number of volumes in each container of each pallet returned to the Library, and once library staff have released the shipment after QC, the unpacked materials shall be loaded again in shelf list order on large, lockable book trucks (contractor supplied) for transport back to designated or stack areas, labeling the trucks with signs, i.e., JEFFERSON BUILDING, ADAMS BUILDING, MADISON BUILDING, or as specified by Library personnel.
• Materials will be accurately reshelved within 3 weeks after return from the treatment plant. The Contractor cannot invoice for a shipment until Library staff have performed quality control of accurately reshelved volumes.
C .2 Comics
Comics shall be treated as volumes, with the following exceptions:
• Contract staff shall make an initial selection for treatment from materials provided for review by the Custodial unit.
Library Custodial staff make the final selection and may include duplicates or items with damage.
o The library will provide flags for damaged volumes which the contractors will retain with the item. Contractor is not liable for damage to these items.
• The library provides special housing for comics, and contract staff will label the housings and ship the comics with but not in these housings. Contractor staff will place the comics in the housing after treatment is complete.
• Contractor shall follow comics inventory manual to prepare for shipment, similar to that provided as appendix “Processing Manual For Preparing Comic Books For Deacidification Revised April 2022.” Slight revisions are possible, which do not significantly alter the time spent by contractor on these materials.
• Contractor staff who engage in preparing these materials on site at the library shall be provided care and handling training by Library staff. Contractor staff who engage in deacdifying these materials at the vendor plant shall have care and handling training provided by the vendor’s preservation program manager.
• Contactor staff who prepare comics access to areas where gold collections such as comics are stored shall have gold level background checks and handle material in accordance with gold level handling procedures.
C.3 Treatment of Test items and/or Papers
Test items furnished by the Library must be treated at specified intervals with actual volumes deacidified from the Library's collections.
• Library staff will furnish test volumes prepared for treatment, along with holding untreated page(s) from these volumes for control comparison. Library will conduct testing for pH and alkaline reserve levels on these treated and untreated items to ensure treatment continually meets contract requirements. Vendor may remove material from these volumes for their own testing regimen, but shall return the treated volumes to the library.
• The Contractor shall take care to gather and maintain information documenting conditions, operations, and procedures utilized by the Contractor to treat Library volumes, test items, and test papers. Any and all deviations shall be recorded, with relevant information being conveyed promptly to the Library's COR or the COR's designee for evaluation and analysis, when requested.
• Test items shall be priced in the same manner as collections treated
C.4 Contract Data Requirements
C.4.1. Chemistry and Toxicity
Chemistry. The contractor shall prepare a report with the most detail possible while protecting trade secrets describing (a) the processing chemistry, and (b) the chemical identity, physical form, concentration, and quantity of all chemical reactants and components retained in treated volumes. This includes carrier, particulate, surfactant and other components to ensure identification of volatiles and particulates in the Library environment in order to maintain a safe working environment. The report shall provide sufficient technical data to allow evaluation of the deacidification chemistry and its chemical and physical effects on the library environment, users, employees, and physical volumes:
• The report shall include actual laboratory or epidemiological data involved in establishing toxicological risk for their process(es), including the submission of toxicological information relating to materials used in each process and their effect on workers in the plant environment as well as chemical residue left in the book which could affect Library workers and persons who handle treated volumes.
• Data shall be supported from appropriate literature studies and shall include, but not be limited to; acute oral toxicity, dermal irritation, and eye irritation, issues involving the inhalation of any particulates or chemicals left in the books and what effect these particulates or chemicals can have on various body functions of humans.
• The report shall provide evidence that they have examined the potential acute and chronic toxicity of chemicals that may be introduced into the Library environment, including an estimate of the potential concentration of off-gassing or measured levels of volatile organic compounds (VOCs) in a confined space under varying conditions of temperature and humidity, and under conditions of minimum ventilation. These estimates shall be based on monitoring and characterization of gases given off under both humid and dry accelerated aging tests.
• The report shall consider chemical and/or solvent interactions of the deacidification system with various materials in the books. These materials include, but are not limited to, cellulose, modified cellulose, as might be found in old papers, lignin (when associated with groundwood unbleached pulp, coatings), sizing materials, inks, plastics that might be used in books, adhesives, bindings, vellum covers and dyes.
Representative materials that would cover most situations must be considered. Statements shall be supported by experimental data and copies of literature references.
C.4.2 Efficacy Testing and Reports
Efficacy/ Reduction of loss of strength of paper. The contractor shall test and provide results to the library on paper samples to ensure the efficacy of the treatment in enhancing paper permanence by decreasing strength loss of paper.
Samples may be subjected to the MIT fold test (modified to 0.5 kg) following intervals of accelerated aging. Paper samples shall be subjected to humid and temperature controlled accelerated aging (ISO 5630-5:2008). At intervals of not more than 6 months, papers shall be tested and MIT fold endurance measured. Accelerated aging shall continue for 30 days or until MIT fold drops to 3 or less
An alkaline reserve is considered permanent if the amount has not decreased more than 0.5% calcium carbonate equivalent, or 10 milliequivalents per 100g paper after aging as described in ISO 5630-5:2008. Initial post- treatment MIT fold endurance values shall not be less than 90% of untreated controls. Testing will be undertaken on standard acidic paper (pH - 5.0) and chemical, physical and optical tests before and after treatment of the standard paper to measure the efficacy of the process; and after accelerated ageing. Tests will include acidity (pH), alkaline reserve (AR), tensile strength or fold endurance or degree of polymerization[l], and optical assessment of distribution of the alkaline reserve component of the treatment. Tests may include degree of polymerization. These tests are to assure the deacidification process meets the intended aim of the deacidification treatment to improve the life expectancy of treated paper materials.
C.4.3 Completeness of De-acidification.
The contractor shall provide technical data to establish completeness of deacidification. Data shall show that after treatment the average pH value is between 6.8 and 9.7. Deacidification shall be demonstrated within each page, each bound volume, and throughout all volumes in a treated batch.
C.4.4 Temperature and Humidity limits
The contractor shall provide data demonstrating that the Library materials being treated are not exposed to temperatures greater than 70°C (158°F) at any time during the process, and that the total time volumes under treatment are exposed to the temperature range of 60°C to 70°C (140°F to 158°F) does not exceed one hour. This data will include disclosure of treatment times and temperatures to which volumes are exposed during each phase of deacidification.
C.5 Quality Control (QC)
Alkaline Reserve, pH and completeness of deacidification treatment:
All volumes and materials shall be treated by the Contractor in accordance with its Quality Assurance and Control Procedure. The Library will analyze a number of treated volumes on a continuing basis. These will include control volumes in selected batches. If the results differ from those performed by the Contractor, a comparison of the test results shall be made to determine the cause. Failure of the Contractor to treat volumes in accordance with its procedures or the Library's specifications, and based on the library’s testing results, will result in a 15% reduction of charges on invoice for the all batches treated in the time period represented by the failed tests, i.e., if there is one test book per week, all batches treated during a week in which the test book fails compliance (alkaline reserve as calcium carbonate equivalents of (less than 0.8% or greater than 3.2%) will be penalized 15% of the cost. The library will have multiple staff perform replicate testing on failed test material to ensure failure before chargeback is made.
The following Technical Association of the Pulp and Paper Industry (TAPPI), International Standard Organization (ISO), and the American Society for Testing and Materials (ASTM) Standards are used to assist in describing the intent of the requirements of this solicitation:
TAPPI T212 - One percent sodium hydroxide solubility of wood and pulp.
TAPPI T402 - Standard conditioning and testing atmospheres for paper, board, pulp handsheets, and related products. TAPPI T403 - Bursting strength of paper.
TAPPI T412 - Moisture in paper and paperboard.
TAPPI T414 - Internal tearing resistance of paper (Elmendorf-type method).
TAPPI T425 - Opacity of paper (1 5% diffuse illuminant A, 89% reflectance backing and paper backing) TAPPI T435 - Hydrogen ion concentration (pH) of paper extracts (hot extraction method).
TAPPI T452 - Brightness of pulp, paper, and paperboard (directional reflectance at 457 nm). TAPPi T453 - Effect of d1y heat on properties of paper.
TAPPI T456 - Wet tensile breaking strength of paper and paperboard (with T494).
TAPPI T494 - Tensile breaking properties of paper and paperboard (using constant rate of elongation apparatus). TAPPI T509 - Hydrogen ion concentration (pH) of paper extracts (cold water extraction method).
TAPPI T511 - Folding endurance of paper (MIT tester) (at 0.5 kg). TAPPI TS29 - Surface pH measurement of paper.
TAPPI T544 - Effect of moist heat on properties of paper and board (for this solicitation, 50% relative humidity, generated in a moist oven, is substituted for 25% relative humidity generated in a 2-bath aging system).
ISO 5630-5:2008-12-15, Paper and board -Accelerated Ageing - Part 5: Exposure to elevated temperature at 100 °C.
ASTM 04988 - Determination of calcium carbonate content of paper.
ASTM G26 - Standard practice for operating light-exposure apparatus (xenon-arc type) with and without water for exposure of non- metallic materials.
C.5.1 Mass Deacidification Quality Control Plan
The vendor will submit a quality assurance/ quality control plan indicating how they will ensure adherence to contract requirements for effectiveness and completeness of deacidification treatment, as well as adherence to requirements for section, inventory, tracking, marking, environmental controls and other requirements as noted in this statement of work.
Library staff may examine:
• Volumes, before treatment, to determine if selection criteria are being followed accurately.
• Volumes, after treatment (contractor staff are responsible for fixing any errors found, save for damage, which will be handled by Library staff).
o To look for damage. The contractor will not be paid for the deacidification or selection for any volume damage found which indicates that a book should not have been treated (as per the damaged books workflow appendix) or which indicates that damage happened as a result of treatment.
o To check for correct pin and linking. More than 5 total volumes returned in any shipment with incorrect pin and linking shall trigger a contractor review of all items pinned and linked in that shipment by the contractor staff responsible for the errors and the library may require retraining on pin and linking procedures for contractor staff.
o To check on weights of treated volumes and confirm them against weights invoiced for.
o To check on reshelving accuracy. More than 3 volumes reshelved incorrectly from any return shipment shall be cause for the contractor to review all reshelved items from that return for accuracy.
o To check for correct labeling.
o To check the accuracy of statistical categories.
Two critical areas of performance will be monitored and reported by the contractor on a designated schedule Alkaline reserve in treated volumes and an average pH commensurate with this alkaline reserve, and Retention of original integrity of treated objects.
The treated volumes shall retain an optimal alkaline reserve concentration of 30 mil li-equivalents per 100 grams of paper, or 1.5 percent calcium carbonate equivalents with a distribution skewed to range from a minimum of 1.0 to a maximum of 3.0 percent, with the understanding that the alkaline reserve levels less than 1.0 percent are not acceptable except for exceptional items for which lower values are unavoidable, such as highly calendered or coated papers.
Additional qualifications regarding alkaline reserve levels within treated volumes and manuscript materials are described below.
Volume treatment: The alkaline reserve shall be monitored via LC-provided test volumes supplied by the Library
Quality control requirements for test items: The Library has the option to introduce any number of blind or unidentified test volumes at a frequency of its own choosing. All test items are to be returned to the Library along with the rest of the shipment in which they were treated. The Library will test a determined number of leaves, one of which is removed from the middle of the book and the others from the first and last quarter thicknesses of the book, along with additional leaves as deemed necessary buy the COR. Contractor will also test a determined number of leaves that are in immediate proximity to the leaves that the Library tests according to a procedure (ASTM-D4988 as modified herein, or similar test mechanism that provides analytically equivalent data). One or more 0.5 to 1.0-gram samples are weighed out and titrated individually in which an excess of hydrochloric acid is added to neutralize the magnesium oxide by boiling the mixture, which after cooling to room temperature is titrated against sodium hydroxide solution to an end point at a pH value of 5.0, with a corresponding correction from a blank titration in which no paper sample is included. This value must be not less than 1.0 percent and not more than 3.0 percent calcium carbonate equivalents, with the understanding that the alkaline reserve levels less than 1.0 percent are not acceptable except for exceptional items for which lower values are unavoidable, such as highly calendered or coated papers.
Note the exception to this requirement: Lower alkaline reserves up to half of these values are permissible for any test papers that are utilized with:
(1) Occasional batches of exceptionally-weak, extremely thin, or non-porous volumes which must be treated with the sprayers turned off to avoid either physical damage or excessive powdery coating to the book structure and the text block, and for (2) reserved.
Except as noted in the two instances described above, for treated in which the alkaline reserve falls below the minimum specified values, the Library will have the right to require contractor to provide a reduction against 15% of the invoice as described above.
Requirement for agreement between quality control test results: Quality control tests performed by the Library and contractor on the same materials shall agree within an experimental error of 0.2% for alkaline reserve. This margin of error is in consideration of the non-uniform nature of paper. Any discrepancy beyond this permissible margin needs to be resolved in an expeditious manner by mutual consultation and careful examination of the experimental techniques used in the two laboratories.
Comparison of test methods between the contractor and the Library laboratories may be undertaken on an annual basis or more frequently to ensure consistency of testing and test methodologies.
C.6 Safety
Contractor shall conform with all applicable Federal Regulations, Library of Congress Regulations, and Library policies, including adherence to OSHA and EPA rules regarding chemical hygiene plans, safety plans, chemical inventories and required trainings relevant to their staff’s tasks. Contractor shall be responsible for providing training in conformance with all regulations. Copies of all documents the contractor produces and a record of training shall be provided to the Library, as in “Deliverables.” Contractors may not store chemicals on site at the Library.
C.7 Training
Employee Training
At the beginning of the period of performance, COR and library staff shall provide one week of training for contractor’s onsite staff, during which major contract tasks such as selection for treatment and pin and linking are not expected to occur. Training on the major tasks of pin and linking, selection, labeling and an orientation to the Library will be provided. After this one week period, if contractor replaces any of their staff, the contractor shall be expected to provide their new staff with this training.
Training on care and handling for comic books shall be provided at the time when that work begins, which may be after kickoff.
Onsite contractor staff are required to complete certain mandatory Library training, including records management, IT security awareness, new cataloging software, and training related to evacuation procedures.
The Contractor shall ensure that each of its employees and/or contract staff assigned to perform services under this contract shall have the proper skill, training, and background that shall enable them to handle Library materials and deacidify them in a competent and professional manner. The Contractor shall ensure that all materials encountered under the contract during book selection, charging, packing, unpacking, processing, labeling, repacking, reshelving, etc. are handled in a professional manner to protect the original condition and arrangement of the materials and to ensure them against damage. Special advice and training may be given by the Library concerning handling and cleaning or repair (if necessary) of Library materials at the contractor's site. Library personnel will train Contractor personnel who perform book selection, charging, packing and reshelving activities in Library facilities in correct handling procedures.
C.8 Deliverables
Shipment required will be determined by COR but will at a minimum include bar code, call number, location and date sent.
Requirements Paragraph reference
Description of Event/Deliverable Due date/Payment schedule
C.1-2 Test, Select, pin and link, pack and ship, treat, return to Library, unpack and return to designated location acidic treated volumes and comics. Show successful treatment through test materials
Bi- Monthly/payment upon acceptance of bi-monthly deliverable (twice monthly)
C1.5 All paperwork for volumes and comics on the shipment list
Initial list Due two days before shipment ships
C.5 Test results on efficacy/ reduction of loss of strength of paper.
on timeline indicated by ISO standard
C.5 Report on toxicity, based on actual testing of VOCs as described in C.5
60 days after POP start
C.5 Report on solvent and chemical interactions of the deacidification systems with books as described in C.5
60 days after POP.
C.5-6. QC data on pH and alkaline reserve and volume batches as described.
Weekly in electronic format
C.1-2 Summaries of the number of retrospective collections reviewed, the number marked as alkaline, the number rejected on the basis of bibliographic record problems, and the number selected for treatment
Monthly, as excel spreadsheet
C.1-2 Summary of volumes treated, by size, and the total number of volumes overall treated
Monthly, as PDF
C.1-2 A summary of the pallets received back from treatment, broken down by pallet # and originating collection workflow(i.e. A-class, etc with the number of volumes in each. Shall also list the disposition (i.e., for reshelving, for offsite processing).
Monthly, as excel spreadsheet
C.1-2 A list of each item in a returned shipment. Must contain barcode, date returned, shipment number, pallet number, tote number, barcode, weight and price for treatment of volume and labor. Must also include untreated returns.
Also must include location and number of test books returned in a pallet and tote.
COB on the day a shipment is received at the library. Typically one to two times per week. Excel spreadsheet
C.1-3 Datalogger information showing the preservation environment for the treatment spaces and collections holdings spaces and at the Contractor’s offsite locations.
Monthly, in format accessible to both library and vendor as agreed upon (likely PDF graph)
C.1-6 Contractor Quality Assurance and Control Plan Within two weeks after start of POP.
C.7-8 Training records for staff on safety, and required library trainings
30 days after start of POP
C.11 Inventory of vendor equipment and supplies on site at the Library
30 days after start of POP and quarterly thereafter, in Excel.
C.9 Place of Performance
The Contractor shall provide the volume treatment plant offsite as well as all production facilities, equipment, operating supplies, personnel, shipping and storage space required to ensure treatment.
Performance at the Library of Congress
Unless otherwise authorized by the Library in writing, all work performed at the Library of Congress shall be between the hours of 6:30 a.m. and 6:00 p.m. p.m. Eastern Standard Time, Monday through Friday, excluding Federal holidays.
No work will be permitted or compensatory credit given, for holidays or other times that the Library buildings are closed due to fiscal or mechanical problems, weather, or acts of God.
All on-site work will be performed in the Library's Capitol Hill buildings (Jefferson, Adams or Madison).
The Contractor is not authorized to store equipment related to mass deacidification on the Library campus.
C.10 Government furnished equipment.
The Library will provide furniture and supplies needed to perform contract work on Library premises, computers; ILS software; printers; bar code readers; desks; telephones; office supplies and filing cabinets; standard wooden Library book trucks (styles LC-1 and LC-2); as well as the use of copying equipment. The Library shall not provide space for large equipment related to mass deacidification on site, nor is the Contractor permitted to do so.
All PTLP staff with access to the Library’s system shall log into their LIB account once every week to maintain active.
The contractor will supply all the following equipment, and all process related consumable supplies: pH testing pens;
opaque white ink permanent marking pens; metal and polyester strapping tape dispensers and related tools such as tensioners and metal cutters. The Contractor shall provide on-site staff with protective gear, gloves or clothing required on the job; with metal, lockable book trucks; with pallet jacks; with shipping containers described above. The vendor shall supply and maintain their own database for tracking work.
Vendor will provide inventory of their tangible on-site equipment and supplies on a schedule described in “Deliverables.”
The Contractors will NOT have a dedicated on-site location to store their deacidification equipment.
C.11 Periodic Review of the Plant, Storage Facilities and onsite work space
The Contractor shall provide Library staff access to the treatment plant and will arrange for access to any owned or leased storage space, subject to normal safety and security procedures, during volume and while any modifications to the physical plant, equipment, or storage space(s) are being planned or made, to enable Library staff to assess current operations and any anticipated changes. Library work space for bound volume processing will be available to library staff at all times.
C.12 Changes to the Facilities and Operations
The Contractor may need to make reasonable and ordinary changes to the facilities, equipment, operating supplies, personnel, and procedures. This work is deemed a normal part of the work under the contract and does not include large scientific equipment. The Contractor shall schedule this work to be completed in a timely manner to meet the objectives of the treatment and testing schedule. All such changes must be documented.
The Contractor shall not, however, undertake any major modifications of the process while it is treating the Library's volumes without obtaining prior written approval from the Library; such approval shall not be unreasonably withheld.
C. 13 Contractor Staff Qualifications
C. 13.1 Program Manager and Alternate
The contractor shall provide an on-site program manager who shall be responsible for the performance of the work. The program manager and the alternate shall be provided with a copy of the contract (excluding pricing if the vendor desires).
The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The program manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The program manager or alternate shall be available at a minimum between 9:30 a.m. to 3:3p.m., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. The supervisor level contract staff will be responsible for oversight of on-site contractor staff. This person shall have the necessary skills to address staffing issues, training, replacement and hiring of new staff, assignment of work and progress reporting to the COR.
On site project manager must be contactable by PTLP provided phone in the stacks if that person is going to be consistently away from the desk longer than 30 minutes.
C. 14 Qualifications for onsite personnel
Program Manager and alternate are required to have a minimum of three years working with ILS records and providing preservation services in a Library.
All contractor staff must be capable of passing background checks required by the Library.
After initial training by Library staff, Contractor personnel are expected to carry out required work under their own in initiative, seeking guidance, clarification, and answers to specific questions from the COR or from his/her designee concerning only unusual, non- routine problems or issues that were not anticipated or addressed in training. At a minimum, contractor staff performing the work on-site at the Library of Congress must have the following knowledge, skills, and abilities:
• Ability to examine and prepare material for processing by arranging , inventorying, counting, and reshelving large quantities of volumes to established alpha-numeric and other filing schemes (keeping volumes in call number order), verifying the identification of all outgoing and incoming volumes against information in detailed shipping lists.
• Skill in performing simple…