Architectural Services: FSCJ Cecil Training Institute/Hub
Solicitation number
RFSQ-17243
Issued by
Duval County, Florida

About this file

Addendum No. 2 to FSCJ RFQ 2027C-10 for Architectural Services at the FSCJ Cecil Training Institute/Hub was issued by Florida State College at Jacksonville on November 12, 2026. This addendum provides clarifications and responses to 36 submitted questions regarding the architectural services solicitation for renovation and remodeling of multiple buildings at the FSCJ Cecil Center North and South campuses in Jacksonville, Duval County, Florida. The scope encompasses Phase 1A interior renovation and remodel work with a base construction budget of $9,470,109, including programming, design, and construction administration services. The project involves four phased components affecting Buildings A, B, and K, with academic program square footage to be reconciled by the selected design team during programming. The bid submission deadline remains November 19, 2026 at 2:00 p.m., with all bidders required to acknowledge receipt of this addendum prior to submission or risk rejection of their offer.

Key clarifications in the addendum address submittal document format requirements, project scope specifics, staffing qualifications, and the design team composition. Proposers must use the original RFQ submittal document format with typed responses, with additional pages labeled and counted toward the 50-page maximum. The design team must include a cost estimator, and site and civil engineering services are anticipated to be minimal given the interior renovation focus. FSCJ will provide as-built documents, hazardous material and asbestos surveys, and existing site drawings as reference materials. The addendum confirms that the $9,470,109 budget excludes traditional furniture, fixtures, and equipment, though academic program equipment coordination is included. Notable contract language revisions were accepted, including revision of Section 6.4(a) of the Sample Agreement to reorder negligent acts, errors, or omissions language. The Plan Holders List as of November 12, 2026 includes over 100 firms and organizations that have accessed the solicitation documents through the GetAll portal.

View the file

Other files

File Type Posted
2027C-10 Invitation.pdf PDF
2027C-10 Addendum 1 signed.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 2

ISSUE DATE: 11/12/2026

FSCJ RFQ NUMBER: 2027C-10

FSCJ RFQ TITLE: Architectural Services: FSCJ Cecil Training Institute/Hub

The above numbered solicitation is amended as follows:

• Attachment “A” Clarifications, Questions and Answers

• Attachment “B” GetAll Solicitation Holders List a.k.a. Plan Holders List (11/12/2026)

The hour and date specified for receipt of bids:

_X_ is not extended, remains: November 19, 2026 at 2:00 p.m.

___ is extended until: __________________________________________________________________ ___ posting date is extended until: ________________________________________________________

Except as provided herein, all terms and conditions of the solicitation, including changes made by all prior addenda (if any), remain unchanged and in full force and effect.

Bidders must acknowledge receipt of this addendum prior to the time set for receipt and opening of bids as specified in the solicitation, or as amended, by one of the following methods:

(a) By signing and returning one copy of this addendum.

(b) By acknowledging receipt on the copy of the bid submitted.

FAILURE TO ACKNOWLEDGE RECEIPT OF THIS ADDENDUM PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If, by virtue of this addendum, you desire to change an offer already submitted, such change may be made by letter, provided such letter makes reference to the solicitation and this addendum and is received prior to the opening hour and date specified.

Randi Brokvist Executive Director of Purchasing

(Complete this portion)

TO BE RESPONSIVE ALL BIDDERS MUST ACKNOWLEDGE RECEIPT OF ADDENDUM #2

COMPANY: __________________________________________

SIGNATURE: __________________________________________

TITLE: _______________________________________________

DATE: _______________________________________________

Randi Brokvist (Nov 12, 2026 11:14:17 EST)

FSCJ RFQ: 2027C-10 Architectutal Servicecs: FSCJ Cecil Training Institute/Hub Attachment A

ADDENDUM NO. 2

CLARIFICATIONS

1. If having technical issues, send an email to support@getall.com and include FSCJ RFQ 2027C-10 with the specific defined discipline in the subject line.

2. The Question Deadline has expired.

QUESTIONS AND ANSWERS

1. Q: Submittal Document: Are we required to use the provided submittal document in its original format, or may we recreate it as long as all required information is included? Some sections may need to be expanded to accommodate our firm’s information.

A: Proposers are not to recreate RFQ Submittal Documents. The RFQ Submittal Document must be submitted and proposers can type their responses into the appropriate space. If response exceeds the space limit, a separate page may be utilized but must be labled with the section number to which you are responding. Each additional page will be counted towards the 50 maximum page limit (excluding those listed in solicitation document Section C.) (2).

2. Q: Section 1.16 – Projected Staffing Data: We understand that SF330 forms are not to be used. May we use our firm’s standard resume format to present the qualifications and experience of each team member?

A: Submittal section 1.16 should address the information requested in section 1.16 which will be considered for evaluation criterion (1).

3. Q: GetAll Portal – Document Uploads: Under “Submit Response,” there are five upload sections: Main

Solicitation Response, Solicitation Submittal(s), Fillable Template, Other Files, and Bond Information. Could you please clarify which documents are expected to be uploaded under “Solicitation Submittal(s)” and “Fillable Template”?

A: All submittal documents may be uploaded as “Main Solicitaion Response.”

4. Q: Section 5 – Projected Workload: Do you want us to include a chart of our firm’s current workload?

A: Section 5 may be completed directly on the submittal document. If necessary, additional pages may be attached. Please ensure any supplemental pages are clearly labeled and appropriately titled.

5. Q: Does the project scope anticipate the need for site/civil engineering services A: If required, scope would most likely be minimal. This is an interior renovation/remodel project as defined by

FDOE guidelines.

6. Q: Does the project scope anticipate the need for landscape architecture services?

A: If required, scope would most likely be minimal. This is an interior renovation/remodel project as defined by

FDOE guidelines.

7. Q: Are we required to include a cost estimator on our design team, or will the Construction Manager provide cost estimating services?

A: Design team should include a cost estimator on the design team.

8. Q: Does $9,470,109 only include scope for Phase 1A (Welding Labs, HVAC/R Labs, Common Areas, Offices, Student Spaces, Restrooms)?

A: Yes

9. Q: What is the square footage for Phase 1A?

A: Academic program square footage was provided with instruction to follow Florida’s State Requirements for

Educational Facilities. See solicitation document section A.) (5) General Project Description.

10. Q: Are Construction Administration services included in Phase 1A?

A: Yes, per solicitation document section A.) (5) General Project Description.

11. Q: Are Programming services included in Phase 1A?

A: Yes, as stated in the solicitation.

12. Q: Please provide scope and square footage for each of the four phases (1A, 1B, 2, and 3) A: Academic program square footage for all four phases was provide with instruction to follow Florida’s State

Requirements for Educational Facilities. Refer to question 9.

13. Q: Is welding/HVAC equipment included in $9.470.109?

A: Per solicitation document section A.) (6) “For general planning and design fee calculation purposes, the current base construction budget for the Phase 1A project is $9,470,109.00. Base construction budget does not include traditional FFE (Furniture, Fixtures, or Equipment).” Building infrastructure and coordination of academic programs equipment is included in this scope of work.

14. Q: Will a detailed list of equipment be provided with cut sheets or will the architects/engineers be responsible for equipment inventory and load verification?

A: Yes, Academic department equipment list with cut sheets will be provided to the design team. Design team wil be responsible for equipment inventory and load verification.

15. Q: Can you outline if there is an exterior scope of work in this project?

A: Penetrations of the building envelope, structural support framing, if required, and site/building access will be the responsibility of the design team.

16. Q: In 4.01 are you asking for "Targeted" Completion vs Actual Completion Date?

A: No, the committee will use section 4.01 to evaluate your demonstrated ability to meet time restraints and budget requirements. This section asks for “Planned Completion” date, which refers to the original schedule commitment, and the Actual Completion date.

17. Q: Attachment E identifies an initial workforce program totaling 46,194 SF, while the renovation areas identified for Buildings A, B, and K total approximately 40,744 NSF. That is a difference of about 5,450 SF.

Please clarify whether the Attachment E program represents a preliminary needs list that the selected architect is expected to reconcile and prioritize within the available buildings, or whether additional area/buildings may be incorporated into the project.

A: Design firm selected is expected to reconcile and prioritize within the available buildings, or whether additional area/buildings may be incorporated into the project.

18. Q: Please identify the current anticipated Phase 1A program by building and approximate area, including which portions of Buildings A, B, and/or K are expected to be included. Please also clarify which program elements currently identified as "TBD" are expected to be resolved during programming.

A: Validation of the academic program areas by location is the responsibility of the design team for all buildings identified. Final Design and CA Services will only incorporate scope of work identified in the Phase 1A program.

19. Q: The RFQ identifies a preferred building sequence of Building B, Building A, then Building K, while Phase 1A is defined primarily by program. Should proposers assume Phase 1A occurs primarily within Building B, or is the selected architect expected to determine the distribution of Phase 1A programs among the three buildings during programming?

A: Yes, as defined by the solicitation and response to questions provided.

20. Q: Attachment D lists the Programming phase as April 13-May 17, 2027, while programming tasks and final program validation continue through June 14, concurrent with Schematic Design. Please clarify whether this overlap is intentional and identify the required program approval milestone before advancement of schematic design.

A: Yes, overlap is intentional to complete academic approval process.

21. Q: What level of existing-condition documentation will FSCJ provide for Buildings A, B, and K? Should the selected architect include comprehensive field verification/measured drawings and documentation of existing architectural, structural, MEP, fire protection, technology, and life-safety systems within its base scope?

A: Construction issue as built documents will be provided for all three buildings.

22. Q: Will FSCJ provide existing hazardous-material/asbestos surveys for Buildings A, B, and K, or should environmental/hazardous-material investigation and testing be included in the consultant team's scope?

A: Yes, FSCJ will provide existing hazardous material/asbestos surveys for Buildings A, B & K.

23. Q: Please clarify which civil, survey, utility, drainage, site permitting, landscape, and site infrastructure services should be included in the architect's base scope versus treated as additional services A: Existing site drawings for Buildings A, B & K should be included as reference, where applicable.

24. Q: Solicitation Document Section H(2)(E) – Would the College consider striking “… as may be selected by the

College …” and adding at the end of the same paragraph: “… that are covered by the Architectural firm’s CGL carrier. Claims covered under Architectural firm’s PL carrier, Architectural firm will pay College’s defense costs proportional to the Architectural firm’s allocated percentage of fault after an adjudication of negligence.”

A: No. The College will retain the solicitation language as currently written.

25. Q: Solicitation Document Section H(2)(H) – Would the College consider add the words “… non-professional …” in front of the words “… operations of the College.”

A: No. The College will retain the solicitation language as currently written.

26. Q: Solicitation Document Section H(2)(L) – Would the College consider striking the words “… or adverse change.”

A: No. The College will retain the solicitation language as currently written.

27. Q: Solicitation Document Section M – Would the College consider editing the first paragraph to read: “… therefrom to the extent caused by the negligent performance of the services under the agreement ….”

Would the College consider editing the second paragraph to read: “… liability to the extent cause by the negligent performance of the services under the agreement ….”

A: No change will be made to the solicitation at this time.

28. Q: Solicitation Document Section N – Would the College consider replacing “occurrence” with the words “… claim and in the aggregate …” in the first paragraph. Would the College consider deleting from the second paragraph the words “… and with reinstated aggregate limits ….”

A: No. The College will retain the insurance requirements as currently written.

29. Q: Sample Agreement Section 6.4(a) – Would the College consider replacing the words “… errors, omissions, negligently acts …” with the words “… negligent acts, errors, or omissions ….”

A: Yes. The College accepts this revision. Section 6.4(a) of the Sample Agreement is revised to replace “errors, omissions, negligently acts” with “negligent acts, errors, or omissions.”

30. Q: Page 22 item #6. Renderings for FSCJ presentation; Fundraising and Marketing Conceptual Package. Please clarify if the short-listed firm will need to provide renderings or conceptual ideas for the interview.

A: Possibly, Design firms short-listed for interviews will be asked to respond to questions presented prior to scheduled interviews during the interview process.

31. Q: Please confirm whether life safety plans, a code summary, and fire protection plans are available for the existing buildings.

A: Yes, refer to question 21 above.

32. Q: The solicitation identifies the project area as 40,744 square feet in one location and 46,194 square feet in another. Please confirm the correct square footage to reference when developing the proposal.

A: Refer to question 17 above.

33. Q: Will existing CAD and Revit files for the buildings and site be made available to the selected design team?

If so, please confirm which files are available.

A: FSCJ only retains PDF copies of all files.

34. Q: RFQ No. 2027C-10 – Clarification Request – Section 3, Client References Would Eglin Air Force Base and

Hurlburt Field be considered two separate client entities for the reference requirement, since they operate under different Air Force commands, or would they be considered one entity under the U.S. Air Force?

A: They may be considered separate entities, as they operate under different commands.

35. Q: Proposal Submission Requirements - Can you please clarify if the Prime Consultant is required to upload the proposal through GetAll, or if a subconsultant can upload it on the Prime’s behalf?

A: The Agreement will be with the Prime Consultant, therefore, the Prime Consultant should submit the response to the solicitation.

36. Q: Do front and back covers count toward the page limit?

A: Yes, as stated in solicitation document Section C.) (2), “Cover letters are neither required nor desired.”

FSCJ RFQ: 2027C-10 Architectutal Servicecs: FSCJ Cecil Training Institute/Hub Attachment B GetAll Solicitation Holders List a.k.a. Plan Holders List (11/12/2026)

Solicitation: 2027C-10 - Architectural Services: FSCJ Cecil Training Institute/Hub

Company Viewed On

Borrelli + Partners, Inc. lzawadzki@borrelliarchitects.com Friday, October 16, 2026

Strollo Architects nmoore@strolloarchitects.com Wednesday, October 21, 2026

IsabellaSammartino thedivineisabella@gmail.com Tuesday, October 20, 2026

Haskell morgan.hooks@haskell.com Monday, October 19, 2026

Glavin Marketing Group denglav@yahoo.com Wednesday, October 21, 2026

DRMP cfaust@drmp.com Wednesday, October 21, 2026

Baker Design Build tpace@bdbjax.com Monday, October 19, 2026

Ambitec Inc govsales@rtstactical.com Thursday, October 29, 2026

AE7 zoe.carr@ae7.com Thursday, October 22, 2026

OCI Associates, LLC dba CMTA kelsey.whalen@cmta.com Monday, October 19, 2026

2AB Design Group, LLC angel@2abdesigngroup.com Saturday, October 31, 2026

Prime Vendor Inc. primevendor124@gmail.com Saturday, October 17, 2026

Matern Professional Engineering marketinginfo@matern.net Sunday, October 18, 2026

Stantec tom.decker@stantec.com Wednesday, October 14, 2026

Akel Logan Shafer PA mbishop@alsarchitects.com Wednesday, October 14, 2026

The BIM Workshop LLC govcontracting@thebimworkshop.com Wednesday, October 14, 2026

H2Engineering, Inc. sphelps@h2engineering.com Wednesday, October 14, 2026

Affiliated Engineers, Inc. tmoran@aeieng.com Wednesday, October 14, 2026

ADG Architecture, llc noelles@alliancedesigngroup.com Wednesday, October 14, 2026

PBK Architects Florida, Inc. marketing_East@pbk.com Wednesday, October 14, 2026

West Point Engineers admin@westpointengineers.com Wednesday, October 14, 2026

Strollo Architects csanta@strolloarchitects.com Wednesday, October 14, 2026

PRIME AE Group Inc. blake.purvis@primeeng.com Wednesday, October 14, 2026

Rowe Architects a.tocci@rowearchitects.com Wednesday, October 14, 2026

LS3P nanetteperissi@ls3p.com Wednesday, October 14, 2026

Ajax Building Company, LLC kasey.diehl@ajaxbuilding.com Friday, October 16, 2026 kasper architects + associates nicole@kasperarch.com Wednesday, October 14, 2026

JN Montenegro Studio LLC jillam@att.net Wednesday, October 14, 2026

DAG Architects marketing@dagarchitects.com Wednesday, October 14, 2026

CPL bfarmer@cplteam.com Wednesday, October 14, 2026

Brame Heck Architects Inc admin@brameheck.com Wednesday, October 14, 2026

Pond and Company elainah.ehrlichman@pondco.com Wednesday, October 14, 2026

LS3P connect@ls3p.com Wednesday, October 14, 2026

BCER Engineering, Inc. marketing@bcer.com Wednesday, October 14, 2026

Enercon eric.west@enercon.com Wednesday, October 14, 2026

Akel Logan Shafer, PA wbishop@alsarchitects.com Wednesday, October 14, 2026

Walker Architects, Inc. acellini@walker-arch.com Wednesday, October 14, 2026

Elitetex LLC program@governmentbuy.com Wednesday, October 14, 2026

SevenOutsource rfpalerts@gmail.com Thursday, October 15, 2026

Group 4 Design krasmus@g4designinc.com Thursday, October 15, 2026

NV5 nick.stone@nv5.com Thursday, October 15, 2026

Fleischman Garcia Maslowski Architecture wendy@fgmfla.com Thursday, October 15, 2026

Castle Bay Design Studio jonathan@castlebaydesignstudio.com Thursday, October 15, 2026

DLZ Indiana LLC hschwartzkopf@dlz.com Thursday, October 15, 2026

H2M Architects and Engineers, Inc. rfp@h2m.com Thursday, October 15, 2026

ConstructConnect ashley.welker@constructconnect.com Thursday, October 15, 2026 contact@envirobidnet.com Thursday, October 15, 2026

Visual visualbidalerts@gmail.com Thursday, October 15, 2026

BDA Architecture emk@bdaarchitects.com Thursday, October 29, 2026

Dodge Construction Network daedri.cavuoto@construction.com Friday, October 16, 2026

Portal Genial Serv TI LTDA licitaja@licitaja.com.br Friday, October 16, 2026

Spiezle Architectural Group, Inc. ctedeschi@spiezle.com Friday, October 16, 2026

McKim and Creed Bizdevelopment@mckimcreed.com Friday, October 16, 2026

Kahler Slater jnelson@kahlerslater.com Friday, October 16, 2026

Zyscovich Architects lellrod@zyscovich.com Friday, October 16, 2026

ASD|SKY marketing@asdnet.com Friday, October 16, 2026 ikon.5 architects kleone@ikon5architects.com Friday, October 16, 2026

BNI Engineers a-hueso@bniengineers.com Friday, October 16, 2026

Corgan terral.carpenter@corgan.com Friday, October 16, 2026

Realm Architecture and Development studio@realmcos.com Friday, October 16, 2026

Catalyst Design Group kcorcoran@catalyst-dg.com Friday, October 16, 2026

TLC Engineering Solutions, Inc. noelle.ward@tlc-eng.com Friday, October 16, 2026 designmex mauricio@designmex.com.mx Sunday, October 18, 2026

Wharton Smith, Inc. churst@whartonsmith.com Monday, October 19, 2026

TLC Engineering Solutions emily.hubbard@tlc-eng.com Monday, October 19, 2026

BBM Structural Engineers, Inc. kpetersen@bbmstructural.com Monday, October 19, 2026

Woodward Design + Build ccortez@woodwarddesignbuild.com Monday, October 19, 2026

Eric Dempsey Architect, LLC ericj@dempsey-design.com Monday, October 19, 2026

Haskell jessica.ligator@haskell.com Monday, October 19, 2026

Sextant Group dba NV5 jessica.truby@gmail.com Monday, October 19, 2026

Fisher-Koppenhafer Architecture Interior Design crein@fkaid.com Monday, October 19, 2026

SCS Floors scsfloors@comporium.net Monday, October 19, 2026

Rider Levett Bucknall jesse.zunke@us.rlb.com Monday, October 19, 2026

Newcomb and Boyd, LLP cstoerker@newcomb-boyd.com Monday, October 19, 2026

G.M. Hill Engineering, Inc. jerrica.russell@gmhillengineering.com Monday, October 19, 2026 erfp@sysoft.com Monday, October 19, 2026

Georgia Time Recorder dba GTR Business Systems andrea@gtrbiz.com Tuesday, October 20, 2026

993 Architecture lindsey@993architecture.com Tuesday, October 20, 2026

Sanctuary Design Group LLC stefan@sanctuarydesigngroup.com Tuesday, October 20, 2026

REI Engineers, Inc. rmcgraw@reiengineers.com Tuesday, October 20, 2026

Pond and Company gina.putthoff@enercon.com Tuesday, October 20, 2026

Sun Coast Resources, LLC contractpricing@suncoastresources.com Tuesday, October 20, 2026

PQH Group Design, Inc. gontnerb@pqh.com Tuesday, October 20, 2026

Bluegrass Educational Technologies, LLC Steve@BluegrassET.com Friday, October 23, 2026

Blackridge Research and consulting venkatesh@blackridgeresearch.com Monday, October 26, 2026

Raymond Hlobsl, traceygallentine@gmail.com Wednesday, October 28, 2026

International Estimating Company doninternationalestimates@gmail.com Tuesday, October 20, 2026

GEOARC STUDIO LLC geoarcstudioproject@gmail.com Wednesday, October 21, 2026

Kimley-Horn and Associates, Inc. florida.marketing@kimley-horn.com Thursday, October 22, 2026

Stratus Team, LLC marketing@stratusteam.com Friday, October 23, 2026

Southern Educational Systems bspencer@seslabs.com Friday, October 23, 2026

SSN Corporation pdulal@ssnbuilders.com Sunday, October 25, 2026

Progressive Trail Design erin@progressivetraildesign.com Monday, October 26, 2026

SGM Engineering, Inc. Marketing@sgmengineering.com Tuesday, October 27, 2026

Passero Associates awitt@passero.com Tuesday, October 27, 2026 sourcemanagement@napc.me Tuesday, October 27, 2026

Duke McGinnis Consulting louisslattery707@gmail.com Wednesday, October 28, 2026

Alfonso Architects, Inc. mmf@alfonsoarchitects.com Wednesday, October 28, 2026

BandA Architectural Group Inc dieter@baarchitecturalgroupinc.com Wednesday, October 28, 2026

Heffernan Holland Morgan Architecture mmoodispaugh@hhma.com Wednesday, October 28, 2026

American Security and Investigations enilsen@americansecurityllc.com Thursday, October 29, 2026

Saltz Michelson Architects, Inc. marketing@saltzmichelson.com Thursday, October 29, 2026

Beach Automotive Group keith@beachautomotive.com Friday, October 30, 2026

Hatch Design Architecture PLLC anja@hatchda.com Monday, November 2, 2026

Foresight Construction Group, Inc. jnash@foresightcgi.com Monday, November 2, 2026 kathy.kimselectric@comcast.net Monday, November 2, 2026

INVISION stevenb@invisionarch.com Thursday, November 5, 2026

Florida State College at Jacksonville is a member of the Florida College System and is not affiliated with any other public or private university or college in Florida or elsewhere.

Florida State College at Jacksonville does not discriminate against any person on the basis of race, disability, color, ethnicity, national origin, religion, gender, age, sex, sexual orientation/expression, marital status, veteran status, pregnancy or genetic information in its programs or activities. Inquiries regarding the non-discrimination policies may be directed to the College’s Civil Rights Compliance Office, 501 West State Street, Jacksonville, Florida 32202 | (904) 632-3221 | CRCO@fscj.edu.

Florida State College at Jacksonville is accredited by the Southern Association of Colleges and Schools Commission on Colleges to award the baccalaureate and associate degree. Contact the Commission on Colleges at 1866 Southern Lane, Decatur, Georgia 30033-4097, or call (404) 679-4500 for questions about the accreditation of Florida State College at Jacksonville. The Commission is to be contacted only if there is evidence that appears to support an institution’s significant non-compliance with a requirement or standard.