2027C-01 Addendum 2 Signed.pdf
PDF 274 KB Posted
- Solicitation number
- RFSQ-16133
- Issued by
- Duval County, Florida
About this file
This is Addendum No. 2 to RFP 2027C-01 issued by Florida State College at Jacksonville (FSCJ) on June 30, 2026, amending the Engineering Consultant Continuing Contracting Services solicitation across six defined engineering disciplines. The addendum clarifies submission procedures, technical requirements, and scope details for civil engineering, electrical/mechanical/energy commissioning engineering, environmental and building envelope moisture engineering, fire protection engineering, geotechnical and material testing engineering, and structural engineering consulting services. Qualification statements are due by July 8, 2026 at 2:00 p.m., with submissions required through discipline-specific online portals at erfp.integratise.com. A non-mandatory pre-proposal conference was held to allow prospective consultants to clarify requirements. The college intends to award one or more continuing contracts on an as-needed basis under Florida's Consultants' Competitive Negotiation Act (CCNA FS 287.055), with contract execution anticipated for October 1, 2026. Active projects under the current contract will continue with existing contractors and will not transition to new awardees. The contract structure provides indefinite quantity, as-needed continuing services with pricing and terms to be negotiated post-award.
Key clarifications in the addendum address technical submission issues, including a maximum file size of 10 megabytes per PDF upload and requirements that files contain no special characters. Subconsultant Florida Professional Registrations and Business Tax Receipts are not required as part of the submission. All reference materials and performance evaluations must be submitted through the designated GetAll weblinks; direct submissions to the purchasing department will not be accepted. The College will focus on contractual documentation completion prior to October 1, 2026, with awarded consultants prepared to engage in as-needed work beginning that date. All bidders must acknowledge receipt of Addendum No. 2 prior to the submission deadline. The plan holders list indicates substantial market interest, with over 130 companies viewing the six discipline-specific solicitations between June 3 and June 25, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2027C-01 Invitation.pdf | ||
| 2027C-01 Addendum 1 Signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 2
ISSUE DATE: 6/30/2026
FSCJ RFP NUMBER: 2027C-01
FSCJ RFP TITLE: Engineering Consultant Continuing Contracting Services (Defined Disciplines)
The above numbered solicitation is amended as follows:
• Attachment “A” Clarifications, Questions and Answers (As of 6/23/2026)
• Attachment “B” GetAll Solicitation Holders List a.k.a. Plan Holders List (6/25/2026)
The hour and date specified for receipt of bids:
_X_ is not extended, remains: July 8, 2026 at 2:00 p.m.
___ is extended until: __________________________________________________________________ ___ posting date is extended until: ________________________________________________________
Except as provided herein, all terms and conditions of the solicitation, including changes made by all prior addenda (if any), remain unchanged and in full force and effect.
Bidders must acknowledge receipt of this addendum prior to the time set for receipt and opening of bids as specified in the solicitation, or as amended, by one of the following methods:
(a) By signing and returning one copy of this addendum.
(b) By acknowledging receipt on the copy of the bid submitted.
FAILURE TO ACKNOWLEDGE RECEIPT OF THIS ADDENDUM PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If, by virtue of this addendum, you desire to change an offer already submitted, such change may be made by letter, provided such letter makes reference to the solicitation and this addendum and is received prior to the opening hour and date specified.
Randi Brokvist Executive Director of Purchasing
(Complete this portion)
TO BE RESPONSIVE ALL BIDDERS MUST ACKNOWLEDGE RECEIPT OF ADDENDUM #2
COMPANY: __________________________________________
SIGNATURE: __________________________________________
TITLE: _______________________________________________
DATE: _______________________________________________
Randi Brokvist (Jun 30, 2026 10:47:24 EDT) Randi Brokvist
FSCJ RFP: 2027C-01 Engineering Consultant Continuing Contracting Services (Defined Disciplines) Attachment A
ADDENDUM NO. 2
CLARIFICATIONS
1. If having technical issues, send an email to support@getall.com and include FSCJ RFQ 2027C-01 with the specific defined discipline in the subject line.
2. The question deadline has expired.
QUESTIONS AND ANSWERS
1. Q: 2027C-01s: Regarding Addendum 1, QandA #15, which notes that large files may generate an error message on the GetAll portal: Can the College specify the maximum allowable file size (in MB) for a single PDF upload so we can optimize our file prior to submission?
A: According to the GetAll website Help “Frequently Asked Questions” Q10 and A10 states:
Q10. I am getting a 500 Error when uploading my files.
A10. Please make sure that your files have NO special characters like but not limited to the #&, etc. Based on your ISP and or firewall restrictions you may not be able to upload files larger than 10MB. Also, do make sure that once your file loads you can see it by clicking on the file link.
2. Q: 2027C-01s: For Section 1.17 (Professional Certifications), does the College require Florida Professional
Registrations and Business Tax Receipts for proposed subconsultants, or only for the Prime submitting firm?
If subconsultant licenses are required, do these pages count toward the 50-page limit
A: No, you do not have to include your subconsultants’ Florida Professional Registrations and Business Tax Receipts as part of Section 1.17.
3. Q: 2027C-01s: We understand per Section 3.01 and Addendum QandA #5 that clients must return Attachment
A-2 to the proposer. However, some government/educational clients have strict internal policies requiring them to send performance evaluations directly to the requesting agency (FSCJ) to maintain confidentiality. If a client insists on this, will the College accept an A-2 form emailed directly to the Purchasing Department by the reference?
A: No, the College cannot accept submittals, or portions thereof, via any method other than the designated weblinks. All responses must be uploaded through the appropriate discipline-specific GetAll weblink.
4. Q: 2027C-01s: Section 5.01 requests a detailed transition timeline assuming an October 1, 2026 start date. Given that this is an indefinite quantity, 'as-needed' continuing contract, should our timeline focus strictly on administrative onboarding (e.g., badging, familiarization with FSCJ design standards, kickoff meetings), or does the College anticipate transitioning active structural projects from the incumbent immediately upon award?
A: The College will focus on negotiation, completion, and execution of all contractual documentation prior to October 1, 2026. Awarded cosultants should be prepared to engage with the College for any as needed scope beginning October 1, 2026. Any active projects currently in progress will continue under their existing contract and will not transition to the new contract.
5. Q: 2027C-01g: Where can we find the scope of services for geotechnical engineering?
A: The scope of work for geotechnical engineering includes directing the geotechnical exploration and provide providing an engineering evaluation of the subsurface conditions encountered at boring locations and document same in a geotechnical engineering report that include the following:
• Observe site conditions, such as topography, surface vegetation, etc. as it relates to anticipated construction
• Field and laboratory test procedures used and the results obtained.
• Report encountered subsurface conditions, including subsurface profiles, measured groundwater levels, and estimated geotechnical engineering properties, as necessary
• Report estimated normal seasonal high groundwater level at all boring locations
• Provide geotechnical engineering evaluation of the site and subsurface conditions with respect to the anticipated construction
• Recommendations for shallow foundation design parameters, including allowable bearing capacity, subgrade modulus, and estimated settlement (total and differential) with the building footprint.
• Recommendations for on-site flexible and rigid pavement design
• Recommendations on the ability to use site soils as structural fill
• Recommendations for pipe bedding and backfill placement for the on-site utility pipelines
• Recommendations for safe trenching methods and potential dewatering requirements within excavation areas
• Recommendations for construction earthwork and Quality Control testing required during site preparation and earthwork construction.
6. Q: 2027C-01en: Where can we find the full scope of services for environmental?
A: As stated in Addendum 1 Question and Answer #32: The scope of services for environmental work includes asbestos consulting, lead consulting, mold assessment and remediation design, indoor air quality and industrial hygiene. Thermal and/or infrared testing for the presence of moisture and/or water intrusion and recommendations how best to remediate is included for Building Envelope.
7. Q: 2027C-01el: For projects requested in section 2, and section 4, are we permitted to use projects on which our
MEP team was a subconsultant?
A: Section 2.01 states “clients that you have managed at least three (3) years,” section 4.01 states “projects you have managed within the last three (3) years,” and section 4.02 states “projects you are currently managing.” These would indicate projects in which the firm was a prime consultant.
8. Q: 2027C-01el: The chart on Section 4.01 requests Completion/Actual Completion. Please confirm which two dates are being requested here and if this was intended to request "planned completion"?
A: The planned completion date and the actual completion date should be entered on the chart.
9. Q: 2027C-01el: Regarding section 4.02's request for current projects, the current projects would not have final contract amounts or actual completion dates. Can you please confirm if expected completion dates will be accepted here?
A: Yes, submitters may include the planned completion and the anticipated completion date.
10. Q: 2027C-01el: Are we permitted to combine sections 2.01 and 2.02 on one page, if necessary to fit the page count?
A: Yes, but should be labeled appropriately to the sections that are being answered. As stated in Addendum 1
Question and Answer #19: “SF 330 Part I is not required or requested, however the applicable sections may be attached and labeled as section 2.01. Submittal Section 2.01 response section can be utilized or you may include a separate attachment labeled as section 2.01.
11. Q: 2027C-01c: Does page 21 (3.01) need to be included in our response? It appears to just be instructions.
A: No. As stated in Addendum 1 Question and Answer #17: “Pages which contain ONLY instructions to the submitter and Section 3 Attachment A-1 form do not have to be returned to the College.”
12. Q: 2027C-01c: Where can we find the scope of services for site/civil engineering?
A: The civil engineering scope of services vary by project. Projects completed with our current continuing contract civil engineering firms include re-mill and paving of existing parking at our campuses and centers, replacement of storm sewer and site utilities and civil related work for new/expanded program offerings such as our new commercial vehicle driving skills pad at Nassau Center and new burn building at Fire Academy of the South.
13. Q: 2027C-01c: In addition to the required insurer's letter referenced in the solicitation, please confirm whether a Bond Letter or Surety Letter is also required as part of the qualifications submission.
A: A bond letter is not required as part of the submittal.
FSCJ RFP: 2027C-01 Engineering Consultant Continuing Contracting Services (Defined Disciplines) Attachment B GetAll Solicitation Holders List a.k.a. Plan Holders List (6/24/2026)
Solicitation: 2027C-01s - Structural Engineering Consultant Continuing Contracting Services
Company Viewed On
R. C. Buencamino, Structural Engineers, LLC rey.buencamino@rcbuencamino.com Wednesday, June 17, 2026
Graef-USA Inc. amy.zimmerman@graef-usa.com Wednesday, June 3, 2026
Tetra Tech mariza.kennedy@tetratech.com Wednesday, June 3, 2026
Tetra Tech mariza.kennedy@tetratech.com Wednesday, June 3, 2026
TriStruct Engineering Consultants LLC vsoni@tristructeng.com Wednesday, June 3, 2026
Kimley-Horn and Associates, Inc. florida.marketing@kimley-horn.com Wednesday, June 3, 2026
Affiliated Engineers, Inc. tmoran@aeieng.com Wednesday, June 3, 2026
Russell Rowland, Inc. prowland@russrow.com Wednesday, June 3, 2026
G.M. Hill Engineering, Inc. jerrica.russell@gmhillengineering.com Wednesday, June 3, 2026
David Mason + Associates rliguori@davidmason.com Thursday, June 4, 2026
PBK Architects Florida, Inc. marketing_East@pbk.com Thursday, June 4, 2026
Bliss and Nyitray, Inc. s-marshall@bniengineers.com Thursday, June 4, 2026
Meskel and Associates Engineering tpringle@meskelengineering.com Friday, June 5, 2026
ReStructure Engineering, LLC info@restructure-engineering.com Friday, June 5, 2026
Prime Vendor Inc. primevendor124@gmail.com Sunday, June 7, 2026
IMEG kate.a.aten@imegcorp.com Monday, June 8, 2026
Walker Consultants, Inc. marketing-south@walkerconsultants.com Monday, June 8, 2026
Portal Genial Serv TI LTDA licitaja@licitaja.com.br Monday, June 8, 2026
IMEG kennedy.r.singleton@imegcorp.com Tuesday, June 9, 2026
WGI, Inc. dina.rhymes@wginc.com Tuesday, June 9, 2026
Baker Design Build tpace@bdbjax.com Tuesday, June 9, 2026
American Bridge Engineering Consultants marketing@abeconsultant.com Wednesday, June 10, 2026
WGI, Inc. yperez4414@gmail.com Thursday, June 11, 2026
H2M Architects and Engineers, Inc. rfp@h2m.com Tuesday, June 16, 2026
ODonnell and Naccarato jdrujak@o-n.com Wednesday, June 17, 2026
Beryl Project Engineering LLC marketing@berylprojectengineering.com Wednesday, June 17, 2026
Cape Design Engineering Co frontdesk@cdeco.com Wednesday, June 17, 2026
AMI Consulting Engineers chase.butts@amiengineers.com Wednesday, June 17, 2026
Iron Grid Elite Solutions info@irongridelitesolutions.com Wednesday, June 17, 2026
IMEG Chad.e.currey@imegcorp.com Thursday, June 18, 2026
Sample Supplier erfp@sysoft.com Thursday, June 18, 2026
CPS-Electrical nathanpagano@cps-electrical.com Sunday, June 21, 2026
Atlantic Engineering Services m.kaufman@aespj.com Monday, June 22, 2026
Russell Rowland, Inc. gnorthcut@russrow.com Monday, June 22, 2026
NOVA Engineering and Environmental maiken@usanova.com Tuesday, June 23, 2026
GM Hill Engineering, Inc. michael.nixon@gmhillengineering.com Tuesday, June 23, 2026
O'Donnell and Naccarato kwyka@o-n.com Tuesday, June 23, 2026 sourcemanagement@napc.me Tuesday, June 23, 2026
Axum Consulting and Enginerring SGibbs@AxumCE.com Wednesday, June 24, 2026
Solicitation: 2027C-01g - GeoTechnical and Material Testing Engineering Consultant Continuing Contracting Services
Company Viewed On
GSE Engineering and Consulting, Inc. khill@gseengineering.com Wednesday, June 3, 2026
Tetra Tech mariza.kennedy@tetratech.com Wednesday, June 3, 2026
CSI Geo, Inc. jrenzi@csi-geo.com Wednesday, June 3, 2026
Cal-Tech Testing, Inc. imarcano@caltechtesting.com Wednesday, June 3, 2026
PSI - Intertek andrea.hall@intertek.com Wednesday, June 3, 2026
Kimley-Horn and Associates, Inc. florida.marketing@kimley-horn.com Wednesday, June 3, 2026
ECS Florida, LLC rferrell@ecslimited.com Wednesday, June 3, 2026
The NDN Companies ashleytgreaves13@gmail.com Wednesday, June 3, 2026
Meskel and Associates Engineering tpringle@meskelengineering.com Friday, June 5, 2026
Terracon emilygrace.studstill@terracon.com Friday, June 5, 2026
Prime Vendor Inc. primevendor124@gmail.com Sunday, June 7, 2026
Portal Genial Serv TI LTDA licitaja@licitaja.com.br Monday, June 8, 2026
Cal-Tech Testing, Inc. astalvey@caltechtesting.com Thursday, June 11, 2026
EGS susan.mcconnell@egs-us.com Tuesday, June 16, 2026
WSB aria.jones@wsbeng.com Tuesday, June 16, 2026
H2M Architects and Engineers, Inc. rfp@h2m.com Tuesday, June 16, 2026
Universal Engineering Sciences bmeikle@universalengineering.com Wednesday, June 17, 2026
Iron Grid Elite Solutions info@irongridelitesolutions.com Wednesday, June 17, 2026
UES Professional Solutions, LLC vcrawford1@teamues.com Thursday, June 18, 2026
Sample Supplier erfp@sysoft.com Thursday, June 18, 2026
Tigerbrain Engineering, Inc. cryoung@tigerbrain.com Monday, June 22, 2026
Langan glorenzo@langan.com Monday, June 22, 2026
NOVA Engineering and Environmental maiken@usanova.com Tuesday, June 23, 2026
Tigerbrain Engineering, Inc. vendor@tigerbrain.com Tuesday, June 23, 2026
Solicitation: 2027C-01f - Fire Protection Engineering Consultant Continuing Contracting Services
Graef-USA Inc. amy.zimmerman@graef-usa.com Wednesday, June 3, 2026
MES Group, Inc victoria.haney@mesgroupinc.com Wednesday, June 3, 2026
SGM Engineering, Inc. Marketing@sgmengineering.com Wednesday, June 3, 2026
OCI Associates, LLC dba CMTA kelsey.whalen@cmta.com Wednesday, June 3, 2026
Kimley-Horn and Associates, Inc. florida.marketing@kimley-horn.com Wednesday, June 3, 2026
PBK Architects Florida, Inc. marketing_East@pbk.com Thursday, June 4, 2026
Rogue Engineering Initiative mknott@rogueengineeringinitiative.com Thursday, June 4, 2026
Prime Vendor Inc. primevendor124@gmail.com Sunday, June 7, 2026
Portal Genial Serv TI LTDA licitaja@licitaja.com.br Monday, June 8, 2026
IMEG kennedy.r.singleton@imegcorp.com Tuesday, June 9, 2026
WGI, Inc. dina.rhymes@wginc.com Tuesday, June 9, 2026
WSB Engineering LLC sheree.keeler@wsbeng.com Wednesday, June 10, 2026
WGI, Inc. yperez4414@gmail.com Thursday, June 11, 2026
TEC-Carolinas sbradford@tec-carolinas.com Monday, June 15, 2026
Wildland Warehouse skidadmin@wildlandwarehouse.com Monday, June 15, 2026
MES Group sarah.mcminn@mesgroupinc.com Tuesday, June 16, 2026
H2M Architects and Engineers, Inc. rfp@h2m.com Tuesday, June 16, 2026
Systech Fire Protection LLC sgidw@aol.com Wednesday, June 17, 2026
Cape Design Engineering Co frontdesk@cdeco.com Wednesday, June 17, 2026
Iron Grid Elite Solutions info@irongridelitesolutions.com Wednesday, June 17, 2026
Sample Supplier erfp@sysoft.com Thursday, June 18, 2026
TLC Engineering Solutions, Inc. monique.mattila@tlc-eng.com Monday, June 22, 2026 sourcemanagement@napc.me Thursday, June 25, 2026
Solicitation: 2027C-01en - Environmental and Bldg. Envelope Moisture Engineering Consultant Continuing Contracting Services
GLE Associates, Inc. marketing@gleassociates.com Wednesday, June 3, 2026
Tetra Tech jaime.mcclung@tetratech.com Wednesday, June 3, 2026
Aptim Environmental and Infrastructure, LLC cory.donoher@aptim.com Wednesday, June 3, 2026
Tetra Tech mariza.kennedy@tetratech.com Wednesday, June 3, 2026
PSI - Intertek andrea.hall@intertek.com Wednesday, June 3, 2026
The NDN Companies ashleytgreaves13@gmail.com Wednesday, June 3, 2026
Kimley-Horn and Associates, Inc. florida.marketing@kimley-horn.com Wednesday, June 3, 2026
ECS Florida, LLC rferrell@ecslimited.com Wednesday, June 3, 2026
Night Owl Proposal Development NightOwlProposals@gmail.com Thursday, June 4, 2026
Terracon emilygrace.studstill@terracon.com Friday, June 5, 2026
Prime Vendor Inc. primevendor124@gmail.com Sunday, June 7, 2026
Blackridge Research and consulting venkatesh@blackridgeresearch.com Tuesday, June 9, 2026
Portal Genial Serv TI LTDA licitaja@licitaja.com.br Monday, June 8, 2026
Gale Associates\Sou jlw@gainc.com Monday, June 8, 2026
Gale Associates\Sou Flinfo@gainc.com Monday, June 8, 2026
WGI, Inc. dina.rhymes@wginc.com Tuesday, June 9, 2026 thorpe landscapes estimating@thorpelandscapes.com Wednesday, June 10, 2026
ECS Florida, LLC kevin.lacey@ecslimited.com Thursday, June 11, 2026
MES Group sarah.mcminn@mesgroupinc.com Friday, June 12, 2026
EGS susan.mcconnell@egs-us.com Tuesday, June 16, 2026
Langan glorenzo@langan.com Tuesday, June 16, 2026
H2M Architects and Engineers, Inc. rfp@h2m.com Tuesday, June 16, 2026
Sample Supplier erfp@sysoft.com Wednesday, June 17, 2026
Universal Engineering Sciences bmeikle@universalengineering.com Wednesday, June 17, 2026
Iron Grid Elite Solutions info@irongridelitesolutions.com Wednesday, June 17, 2026
The NDN Companies jdurkin@thendncompanies.com Thursday, June 18, 2026
UES Professional Solutions, LLC vcrawford1@teamues.com Monday, June 22, 2026
UES Professional Solutions LLC gkinton@teamues.com Monday, June 22, 2026
NOVA Engineering and Environmental maiken@usanova.com Tuesday, June 23, 2026 sourcemanagement@napc.me Thursday, June 25, 2026
Solicitation: 2027C-01el - Electrical, Mechanical and Energy/Commissioning Engineering Consultant Continuing Contracting Services
Abbeville Commissioning, LLC mshedd@abbevillecx.com Thursday, June 4, 2026
McKim and Creed Bizdevelopment@mckimcreed.com Wednesday, June 3, 2026
H2Engineering, Inc. sphelps@h2engineering.com Wednesday, June 3, 2026
Graef-USA Inc. amy.zimmerman@graef-usa.com Wednesday, June 3, 2026
Raymond Global, Inc. scrfqs@raymond.global Wednesday, June 3, 2026
Newcomb Boyd ccostanzo@newcomb-boyd.com Wednesday, June 3, 2026
Pond and Company megan.elliott@pondco.com Wednesday, June 3, 2026
Atom Engineering PLLC accounts@atomengineers.com Wednesday, June 3, 2026
MES Group, Inc victoria.haney@mesgroupinc.com Wednesday, June 3, 2026
Atom Engineering PLLC cduranceau@atomengineers.com Wednesday, June 3, 2026
SGM Engineering, Inc. Marketing@sgmengineering.com Wednesday, June 3, 2026
Dell Consulting, LLC angelique@dellconsultingllc.com Wednesday, June 3, 2026
Affiliated Engineers, Inc. tmoran@aeieng.com Wednesday, June 3, 2026
Kimley-Horn and Associates, Inc. florida.marketing@kimley-horn.com Wednesday, June 3, 2026
OCI Associates, LLC dba CMTA kelsey.whalen@cmta.com Wednesday, June 3, 2026
Generator Source scottw@generatorsource.com Wednesday, June 3, 2026
PBK Architects Florida, Inc. marketing_East@pbk.com Thursday, June 4, 2026
Johnson, Levinson, Ragan, Davila, Inc. bvillafranca@jlrdinc.com Thursday, June 4, 2026
Affiliated Engineers vkovalenko@aeieng.com Thursday, June 4, 2026
MSA Professional Services, Inc. aprochaska@msa-ps.com Thursday, June 4, 2026
Akin Brooks Engineering ca@akinbrooks.com Friday, June 5, 2026
Akin Brooks Engineering aparks@akinbrooks.com Friday, June 5, 2026
Prime Vendor Inc. primevendor124@gmail.com Sunday, June 7, 2026
Portal Genial Serv TI LTDA licitaja@licitaja.com.br Monday, June 8, 2026
SIMES and ROSCH, LLC kearney@simesandrosch.com Monday, June 8, 2026
Jordan and Skala Engineers takintoye@jordanskala.com Monday, June 8, 2026
Progresive Engineering minsua@progresiveeng.com Monday, June 8, 2026
WGI, Inc. dina.rhymes@wginc.com Monday, June 8, 2026
IMEG kennedy.r.singleton@imegcorp.com Tuesday, June 9, 2026
KFI Engineers cmmcnamara@kfi-eng.com Tuesday, June 9, 2026 designONE Inc wdelbusto@d1ce.net Tuesday, June 9, 2026 nMotion Engineering, Inc. Nashwan@nmotioneng.com Tuesday, June 9, 2026
Abbeville Commissioning, LLC jsmith@abbevillecx.com Wednesday, June 10, 2026
WSB Engineering LLC sheree.keeler@wsbeng.com Wednesday, June 10, 2026
MES Group sarah.mcminn@mesgroupinc.com Thursday, June 11, 2026
WGI, Inc. yperez4414@gmail.com Thursday, June 11, 2026
Affiliated Engineers SE Inc bharris@aeieng.com Friday, June 12, 2026
H2M Architects and Engineers, Inc. rfp@h2m.com Tuesday, June 16, 2026
Sample Supplier erfp@sysoft.com Wednesday, June 17, 2026
Cape Design Engineering Co frontdesk@cdeco.com Wednesday, June 17, 2026
Syska Hennessy Group kmanecke@syska.com Wednesday, June 17, 2026
Iron Grid Elite Solutions info@irongridelitesolutions.com Wednesday, June 17, 2026
WGI, Inc. gabriella.nhon@wginc.com Thursday, June 18, 2026
IMEG Chad.e.currey@imegcorp.com Thursday, June 18, 2026
Amburgey and Millirons, LLC tyler@amburgey-millirons.com Friday, June 19, 2026
Williams Engineering Solutions williamsEsolutions904@gmail.com Monday, June 22, 2026
TLC Engineering Solutions, Inc. monique.mattila@tlc-eng.com Monday, June 22, 2026
ECF Fennell Inc. ssherels@ecfconsultants.com Monday, June 22, 2026
Powell and Hinkle Engineering rwood@powellandhinkle.com Tuesday, June 23, 2026
FSM Engineering, LLC rgelhardt@FSMengineering.com Wednesday, June 24, 2026
Kirsten Phelps Creatiev hello@kirstenphelps.com Wednesday, June 24, 2026
Solicitation: 2027C-01c - Civil Engineering Consultant Continuing Contracting Services
Arcadis arthur.bides@arcadis.com Thursday, June 18, 2026
Tetra Tech jaime.mcclung@tetratech.com Wednesday, June 3, 2026
SJD Consultants, Inc. sjrdavis@sjdconsultants.com Wednesday, June 3, 2026
Pond and Company megan.elliott@pondco.com Wednesday, June 3, 2026
Traffic and Mobility Consultants LLC sarahd@trafficmobility.com Wednesday, June 3, 2026
Clymer Farner Barley, Inc tsmith@cfb-inc.com Wednesday, June 3, 2026
CSI Geo, Inc. jrenzi@csi-geo.com Wednesday, June 3, 2026
Tetra Tech mariza.kennedy@tetratech.com Wednesday, June 3, 2026
Sample Supplier erfp@sysoft.com Wednesday, June 3, 2026
Four Waters Engineering cpopoli@4weng.com Wednesday, June 3, 2026
VIKA South ollinger@vika.com Wednesday, June 3, 2026
Kimley-Horn and Associates, Inc. florida.marketing@kimley-horn.com Wednesday, June 3, 2026
GAI Consultants, Inc. b.bonilla@gaiconsultants.com Wednesday, June 3, 2026
Construction and Engineering Services Consultants, Inc. marketing@candesconsults.com Wednesday, June 3, 2026
Menadier Engineering, LLC tiffany@menadier.com Wednesday, June 3, 2026
GOVGUIDE INC rfp@yourgovguide.com Thursday, June 4, 2026
Alliant Engineering Inc. alozanski@alliant-inc.com Thursday, June 4, 2026
David Mason + Associates rliguori@davidmason.com Thursday, June 4, 2026
PBK Architects Florida, Inc. marketing_East@pbk.com Thursday, June 4, 2026
George and Associates, Consulting Engineers, Inc marketing@gaceng.net Friday, June 5, 2026
Meskel and Associates Engineering tpringle@meskelengineering.com Friday, June 5, 2026
Kevin C. Knowles Civil Engineering, Inc. kckcei@juno.com Friday, June 5, 2026
Baxter and Woodman, Inc. marketing@baxterwoodman.com Friday, June 5, 2026 eda consultants, inc. ascannella@edafl.com Friday, June 5, 2026
Visual visualbidalerts@gmail.com Saturday, June 6, 2026
Prime Vendor Inc. primevendor124@gmail.com Sunday, June 7, 2026
DCCM Infrastructure, Inc. mdg.marketing@dccm.com Monday, June 8, 2026
McKim and Creed Bizdevelopment@mckimcreed.com Monday, June 8, 2026
Wright-Pierce, Inc. moshe.dahaman@wright-pierce.com Monday, June 8, 2026
Walker Consultants, Inc. marketing-south@walkerconsultants.com Monday, June 8, 2026
Portal Genial Serv TI LTDA licitaja@licitaja.com.br Monday, June 8, 2026
Langan glorenzo@langan.com Monday, June 8, 2026
Gale Associates\Sou jlw@gainc.com Monday, June 8, 2026
Gale Associates\Sou Flinfo@gainc.com Monday, June 8, 2026
WGI, Inc. dina.rhymes@wginc.com Monday, June 8, 2026
Design Tree Engineering and Land Survey marketing@dte-ls.com Monday, June 8, 2026
NFPS dwenner@nfps.net Tuesday, June 9, 2026
WSB Engineering LLC sheree.keeler@wsbeng.com Tuesday, June 9, 2026
Baker Design Build tpace@bdbjax.com Tuesday, June 9, 2026
Goodwyn Mills Cawood, LLC karalyne.rider@gmcnetwork.com Wednesday, June 10, 2026
JBPro, Inc. john.gilreath@jbpro.com Wednesday, June 10, 2026
Prosser Inc. pszykowny@prosserinc.com Wednesday, June 10, 2026 thorpe landscapes estimating@thorpelandscapes.com Wednesday, June 10, 2026
SolFlexus, LLC sbarson@solflexus.com Thursday, June 11, 2026
WGI, Inc. yperez4414@gmail.com Thursday, June 11, 2026
Wetland Solutions, Inc. sknight@wetlandsolutionsinc.com Monday, June 15, 2026
PRIME AE Group, Inc. lindsey.fonda@primeeng.com Monday, June 15, 2026
WSB aria.jones@wsbeng.com Tuesday, June 16, 2026
Envirobidnet contact@envirobidnet.com Tuesday, June 16, 2026
H2M Architects and Engineers, Inc. rfp@h2m.com Tuesday, June 16, 2026
Gervais Ventures LLC ngervais@gervaisventures.com Wednesday, June 17, 2026
TriStruct Engineering Consultants LLC vsoni@tristructeng.com Wednesday, June 17, 2026
Iron Grid Elite Solutions info@irongridelitesolutions.com Wednesday, June 17, 2026
AMI Consulting Engineers chase.butts@amiengineers.com Wednesday, June 17, 2026
Axum Consulting and Enginerring SGibbs@AxumCE.com Wednesday, June 24, 2026
Florida State College at Jacksonville is a member of the Florida College System and is not affiliated with any other public or private university or college in Florida or elsewhere.
Florida State College at Jacksonville does not discriminate against any person on the basis of race, disability, color, ethnicity, national origin, religion, gender, age, sex, sexual orientation/expression, marital status, veteran status, pregnancy or genetic information in its programs or activities. Inquiries regarding the non-discrimination policies may be directed to the College’s Civil Rights Compliance Office, 501 West State Street, Jacksonville, Florida 32202 | (904) 632-3221 | CRCO@fscj.edu.
Florida State College at Jacksonville is accredited by the Southern Association of Colleges and Schools Commission on Colleges to award the baccalaureate and associate degree. Contact the Commission on Colleges at 1866 Southern Lane, Decatur, Georgia 30033-4097, or call (404) 679-4500 for questions about the accreditation of Florida State College at Jacksonville. The Commission is to be contacted only if there is evidence that appears to support an institution’s significant non-compliance with a requirement or standard.
File details come from the government source that posted it. Updated .