About this file

This file contains the attachments and submission requirements for a Minnesota Department of Natural Resources (DNR) sealed bid solicitation (2027-415) for road construction services at Smoky Hills State Forest near Osage, Minnesota. The project involves preparing approximately 0.5 miles of easement access road and supplying, placing, and compacting 450 cubic yards of MNDOT Class 5 gravel, including final grading and shaping. All responses must be submitted electronically through the SWIFT portal by the specified deadline, with no email or faxed submissions accepted. Prospective bidders may contact Project Supervisor Corey Campbell at 218-616-1124 or corey.campbell@state.mn.us to arrange a site visit. The award will be made to the lowest responsible vendor that meets all specifications and contractual terms and conditions, with the State reserving the right to award items separately, by grouping, or by total as deemed most advantageous.

Bidders must enter unit bid prices directly in SWIFT that include all costs for labor, materials, tools, transportation, equipment, sales tax, use tax, and all other incidentals necessary for project completion. Responders are required to submit a completed Vendor Qualification Form and Equipment Qualification Form along with their bids, certifying they have completed at least one similar project as a prime contractor with substantial completion since January 2022 valued at $7,500 or greater, and that they have not been found in default or terminated for cause within the last 36 months or received willful or repeated OSHA safety citations. Equipment used on site must be thoroughly cleaned to prevent invasive weed spread, and operators must have a minimum of 150 hours of experience with the equipment type being used. The solicitation includes standard certifications regarding non-collusion, organizational conflicts of interest, and accuracy of submitted information, with false or misleading submissions subject to disqualification, suspension, or debarment.

View the file

Other files

File Type Posted
2027-415_Sample_Contract.pdf PDF
DNR_RFB_Smoky_Hills_Easement_Road.pdf PDF
2027-415_Request_for_Bid.pdf PDF
2027-415_Exhibit_F_Location_Maps.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev. April 2025

ATTACHMENT A: RESPONDER DECLARATIONS

The undersigned certifies, to the best of his or her knowledge and belief, that:

A. Response Contents. The information provided is true, correct, and reliable for purposes of evaluation for potential contract award. The submission of inaccurate or misleading information may be grounds for disqualification from the award as well as subject the Responder to suspension or debarment proceedings as well as other remedies available by law

B. Authorized Signature. This Declaration is signed by the appropriate person(s), with the authority to contractually bind the Responder, as required by applicable articles, bylaws, resolutions, minutes, and ordinances.

C. Non-Collusion Certification.

1. The Proposal has been arrived at by the Responder independently and has been submitted without collusion and without any agreement, understanding or planned common course of action with any other vendor designed to limit fair or open competition; and

2. The contents of the Response have not been communicated by the Responder or its employees or agents to any person not an employee or agent of the Responder and will not be communicated to any other individual prior to the due date and time of this Solicitation. Any evidence of collusion among Responders in any form designed to defeat competitive responses will be reported to the Minnesota Attorney General for investigation and appropriate action.

D. Organizational Conflicts of Interest. To the best of Responder’s knowledge and belief, and except as otherwise disclosed, there are no relevant facts or circumstances which could give rise to an organizational conflict of interest.

An organizational conflict of interest exists when, because of existing or planned activities or because of relationships with other persons,

1. a vendor is unable or potentially unable to render impartial assistance or advice to the State;

2. the vendor’s objectivity in performing the contract work is or might be otherwise impaired; or

3. the vendor has an unfair competitive advantage.

If after award, an organizational conflict of interest is discovered, an immediate and full disclosure in writing must be made to the State’s Chief Procurement Officer which must include a description of the action which the contractor has taken or proposes to take to avoid or mitigate such conflicts. If an organizational conflict of interest is determined to exist, the State may, at its discretion, cancel the contract. In the event the Contractor was aware of an organizational conflict of interest prior to the award of the contract and did not disclose the conflict to OSP, the State may terminate the contract for default. Organizational conflicts of interest terms apply to any subcontractors for this work.

E. Copyrighted Material Waiver. By signing its Response, the Responder certifies that it has obtained all necessary approvals for the reproduction and distribution of the contents of its response.

By submitting a response in SWIFT, Responder acknowledges and certifies compliance with all applicable requirements indicated above.

ATTACHMENT B: PRICING

1. Pricing.

A price schedule document will not be used for this solicitation. Responders must enter their bid price(s) in SWIFT at the unit line level. If a responder needs assistance with entering their proposal, they may contact the Vendor Assistance Help Desk at (651) 201-8100, option #1, and then option #1 again.

2. Alterations or Erasures. The State reserves the right to reject a response containing an alteration or erasure of any price used to determine the lowest responsible responder unless the alteration or erasure is done in a manner that is clear and authenticated by an authorized representative of the Responder. An acceptable way to make an alteration or erasure is to cross out the price, print the correction in ink adjacent to it, and have an authorized representative of the Responder initial and date that correction.

ATTACHMENT C: INTENTIONALLY LEFT BLANK

ATTACHMENT D: ADDITIONAL INFORMATION

Complete the following Bid Factors in SWIFT:

1. Contractor’s Contact Information. Provide the contact information for the representative responsible for the management of the contract and the representative receiving purchase orders.

2. Prompt Pay Discount. Enter any prompt pay discounts you are offering.

3. Construction Completion Date. Responder must meet the construction completion dates as stated in the solicitation.

Rev. July 2023

ATTACHMENT E: VENDOR QUALIFICATION FORM

This Prime Contractor Response Qualification Form must be submitted with your solicitation response. A solicitation response received without this form, or with an outdated version, may be rejected. Prime contractors are responsible for checking all addenda for the final version of this form.

Each responder must answer every question and provide all information requested on this form. Failure to meet this requirement may result in the rejection of the entire solicitation response as non-responsive.

The State (or its representative) reserves the right to clarify the required qualification information submitted on this form before an award is made. The solicitation response will be rejected if qualifications are not met.

Qualification Requirements

1. Responding company has completed as a Prime Contractor, not as a subcontractor the work for at least 1 contract which have achieved Substantial Completion since January 2022 of similar scope and activity. The contract must have had a value of $7,500 or greater.

Fill in the required information for your previous projects relating to Qualification Requirement #1:

*Property Owner:

Property Owner Contact Person: Contact Person’s Telephone #:

Dollar Amount of Contract: Substantial Completion Date:

Contract substantially completed under (check one):

☐ Current Company Name ☐ Previous Company Name

*The term “Property Owner” means the person or entity identified as the owner of the property where the work referenced for Qualification Requirement #1 was performed.

The State (or its representative) reserves the right to contact the references listed above for Qualification Requirement #1 or to request the Responder to provide additional reference projects for review. The solicitation response will be rejected if the State, in its sole discretion, receives information that indicates the responder is non-responsible. Information considered includes, but is not limited to: 1) project milestones (meeting substantial and final completion dates); 2) communication with project owner and subcontractors; 3) on-site supervision; 4) coordination of subcontractors; 5) violation of Minnesota prevailing wage law; and 6) nonpayment of subcontractors.

2. List below the required information for individuals who will be responsible for this project:

Years of Experience Type of Work In What Capacity

3. Has your Company been found in default or had a contract terminated for cause in the last 36 months?

It is required that your company has not had this occur.

NOTE: If this question is answered as “yes”, your solicitation response will be rejected.

☐YES ☐NO

4. Has your Company received from OSHA any willful or repeated safety citations for which a final order has been issued within the last 36 months?

It is required that your company has not had this occur.

NOTE: If this question is answered as “yes”, your solicitation response will be rejected.

☐YES ☐NO

Certification

By signing this form, I certify the information provided is complete and accurate.

Authorized Signature: Date:

Printed Name: Telephone:

Company Name: Title:

ATTACHMENT F: EQUIPMENT QUALIFICATION FORM

EQUIPMENT SPECIFICATIONS REQUIRED

Equipment used must be thoroughly cleaned before entering the site to prevent spreading invasive weeds. The contractor must take every precaution to avoid rutting and compaction in the site. Equipment left on site must not impede use, access or other management at the site and is the sole responsibility of the contractor.

PROVIDE A DETAILED LIST OF ALL EQUIPMENT TO BE USED ON THIS PROJECT (leave blank if not applicable)

Truck

Make and Model Type (End, Side, Belly Dump) Capacity (CY LV)

Excavator/Power Shovel

Make and Model Horsepower Rating Bucket Capacity

Grader

Make and Model Horsepower Rating Blade Length (Feet)

Functioning slope meter installed (yes/no)

Loader

Make and Model Horsepower Rating Bucket Capacity Functioning and certified bucket scale installed?

(Yes/No)

Compactor

Make and Model Type (steel wheel or rubber tire)

Width of compacting surface

Skid – Steer

Make and Model Horsepower Rating

OPERATOR EXPERIENCE:

The operator(s) must have a minimum of 150 hours of experience in operating the type of equipment to be used on the project.

NAME OF OPERATOR #1: Estimated hours operating experience:

NAME OF OPERATOR #2: Estimated hours operating experience:

Signature of Contractor Title Date