20261208040proposal.pdf
PDF 2 MB Posted
- Attached to
- C Arcadia, Main Street CTH A to 250’ W of STH 93
- Solicitation number
- 20261208040
- Issued by
- Vilas County, Wisconsin
About this file
This is a Special Provisions document for a Wisconsin Department of Transportation (WisDOT) state and local contract opportunity in Arcadia, Wisconsin, involving the City of Arcadia and Trempealeau County. The project consists of pavement milling, HMA pavement, concrete curb and gutter, concrete sidewalk, sanitary sewer, storm sewer, water main, street lighting, bridge maintenance, erosion control, pavement marking, and permanent signing work on Main Street from CTH A to 250 feet west of STH 93. The work is located on STH 95, a state highway, and involves coordination with multiple utilities including Arcadia Electric & Sewer, Arcadia Water & Wastewater, CenturyLink, Midwest Natural Gas, and Tri-County Communications, as well as Wisconsin Central Ltd railroad. Special provisions address lane and shoulder closure requirements with a minimum of three business days' notice, holiday and special event work restrictions for Memorial Day, Independence Day, Ashley for the Arts, and Labor Day, and extensive utility coordination procedures. Environmental considerations include potential petroleum-contaminated soil at three identified sites requiring coordination with GEI Consultants environmental consultant, aquatic invasive species control procedures, and wetlands protection under Section 404 permit provisions. The contractor must obtain railroad protective liability insurance, coordinate with railroad representatives, provide employee safety training, and manage traffic control and public communications regarding the project schedule.
Pricing terms and funding sources are not specified in this special provisions document. The contract requires contractor coordination with affected businesses including Ashley Furniture and Pilgrams Pride, holding public meetings with at least two weeks' notice prior to traffic staging changes. Additional requirements include compliance with QMP HMA Pavement Nuclear Density testing procedures, provision of Material Transfer Vehicles during paving operations, protection of newly placed concrete with continuous finisher patrol, municipal acceptance of sanitary sewer and water main by the City of Arcadia, removal and salvage of storm sewer components, OSHA hazardous waste operations training for workers in contaminated areas, and compliance with the Wisconsin Pollutant Discharge Elimination System Transportation Construction General Permit. The project involves approximately 20 working days each in April and June for utility work, with specific coordination dates and continuous work requirements in contaminated soil areas.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
"��#�$�� ����"�"�� !$%&�'��%('�'����)**)�+�%,-.����)�/"�"��0�01��2 3121�����2 ���4150�21�5���0��6 ������� 5�760�--'�8��8-% (9 :�9���;��<�=�� �/"�
--'�8��8A% (9 :�9���;��<�=�� �/"�
$B����������<� ;�C"B ���D �"�"B E�"B"B �;F G
�"#�����������)$B � ��B� ;;
��F �#������E��H#��"B �����F "�#"B ��D �" ;���I �"�� �"B �E�"B�"B ;����������J G "��� ;�:� ;�"�� �)���������K ��� "C�J G ;���C��� "��#�$�� ����"�"�� L-&<���)�� 9""��B����������K
��� "C�� ����H��#�"B����9KM)N�;�/
�,O�����$�� ��A<�'�'*%%������:� "���"�:���� ��%-<�'�'-9���D ;�!���;F� "�D ;�N ���M " �K��� �P Q���� �� <�9;;� ��<�:�"C<�/"�" <�R���:�;
$B����� "���"���� S �����F
���DB")$B���
�"B�""B ���D �C�E�� <��� � "B���T "�"�F �#"B ;���F U"B�""B �B�� S��� ��C�� ;"B ��;#���"B
��� �<>�DBE�C���H��������<� ;����;;
;�<� ;B���B �H ;"B ���""� D"B��������������;U� ;"B�""B ����D ����C
�B�F �"B �"�C��� ;�� �"�C< ;� "�� C�D�
;� � C���� ��� <���"B �E�� "�H � C��"�� � �
"�"�F ��;;� D� �� �"�� E�"B"B��������������;)2V�WVX�YZ[W\�WVX]̂Z_̀\�V̂�YabcZX�XdZY��Z[de]f��V̂g��̂VhVY]i�ed̀W�YabcZXXZW[�]W�̀ìjX̂VWZj�bZk�VW�Xd̀��WX̀ Ŵ̀Xl/ ;�� ;��E�� �"��� �"B���;�" �mmmmmmmmmmmmmmm,/�D �" <� �"��C�� ��#������ �� .,��� "����$C�
| � | �� |
| <� | �"��C�� |
�:�������� �MS���
�. ,N�;;
��/�D �" .,��� "����$C� �N�;;
.,N�;;
.3V̂�2̀ h]̂Xc ẀX�7Ỳ��Wif0fh̀�Vn��V̂go �"�� ��#�9E��;�!�" �K ��� "C�J ; �"��C�/
��p��16�0�3���q�22�6���7����1�
J
��F���<�=���� D<�K��;� D<�9DD�
D�" <�9��B��"���F �J B�����"�"�� <�:
���� ;�K E��H<�/"����/ E �<M����� �:� "���<�� "�/�D � D<�$��##���:� "���<���F
"�=��H� D<�O�DB"� D<�/� �"��C<���"
�<�J
PLEASE ATTACH
PROPOSAL GUARANTY HERE
Effective with November 2007 Letting Proposal Requirements
PROPOSAL REQUIREMENTS AND CONDITIONS
The bidder, signing and submitting this proposal, agrees and declares as a condition thereof, to be bound by the following conditions and requirements.
If the bidder has a corporate relationship with the proposal design engineering company, the bidder declares that it did not obtain any facts, data, or other information related to this proposal from the design engineering company that was not available to all bidders.
The bidder declares that they have carefully examined the site of, and the proposal, plans, specifications and contract forms for the work contemplated, and it is assumed that the bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and quantities of work to be performed and materials to be furnished, and as to the requirements of the specifications, special provisions and contract. It is mutually agreed that submission of a proposal shall be considered conclusive evidence that the bidder has made such examination.
The bidder submits herewith a proposal guaranty in proper form and amount payable to the party as designated in the advertisement inviting proposals, to be retained by and become the property of the owner of the work in the event the undersigned shall fail to execute the contract and contract bond and return the same to the office of the engineer within fourteen (14) days after having been notified in writing to do so;
otherwise to be returned.
The bidder declares that they understand that the estimate of quantities in the attached schedule is approximate only and that the attached quantities may be greater or less in accordance with the specifications.
The bidder agrees to perform the said work, for and in consideration of the payment of the amount becoming due on account of work performed, according to the unit prices bid in the following schedule, and to accept such amounts in full payment of said work.
The bidder declares that all of the said work will be performed at their own proper cost and expense, that they will furnish all necessary materials, labor, tools, machinery, apparatus, and other means of construction in the manner provided in the applicable specifications and the approved plans for the work together with all standard and special designs that may be designed on such plans, and the special provisions in the contract of which this proposal will become a part, if and when accepted. The bidder further agrees that the applicable specifications and all plans and working drawings are made a part hereof, as fully and completely as if attached hereto.
The bidder, if awarded the contract, agrees to begin the work not later than ten (10) days after the date of written notification from the engineer to do so, unless otherwise stipulated in the special provisions.
The bidder declares that if they are awarded the contract, they will execute the contract agreement and begin and complete the work within the time named herein, and they will file a good and sufficient surety bond for the amount of the contract for performance and also for the full amount of the contract for payment.
Effective with November 2007 Letting Proposal Requirements
The bidder, if awarded the contract, shall pay all claims as required by Section 779.14, Statutes of Wisconsin, and shall be subject to and discharge all liabilities for injuries pursuant to Chapter 102 of the Statutes of Wisconsin, and all acts amendatory thereto. They shall further be responsible for any damages to property or injury to persons occurring through their own negligence or that of their employees or agents, incident to the performance of work under this contract, pursuant to the Standard Specifications for Road and Bridge Construction applicable to this contract.
In connection with the performance of work under this contract, the contractor agrees to comply with all applicable state and federal statutes relating to non-discrimination in employment. No otherwise qualified person shall be excluded from employment or otherwise be subject to discrimination in employment in any manner on the basis of age, race, religion, color, gender, national origin or ancestry, disability, arrest or conviction record (in keeping with s.111.32), sexual orientation, marital status, membership in the military reserve, honesty testing, genetic testing, and outside use of lawful products. This provision shall include, but not be limited to the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation, and selection for training, including apprenticeship. The contractor further agrees to ensure equal opportunity in employment to all applicants and employees and to take affirmative action to attain a representative workforce.
The contractor agrees to post notices and posters setting forth the provisions of the nondiscrimination clause, in a conspicuous and easily accessible place, available for employees and applicants for employment.
If a state public official (section 19.42, Stats.) or an organization in which a state public official holds at least a 10% interest is a party to this agreement, this contract is voidable by the state unless appropriate disclosure is made to the State of Wisconsin Ethics Board.
Effective with August 2015 Letting Bid Preparation
BID PREPARATION
Preparing the Proposal Schedule of Items A. General
(1) Obtain bidding proposals as specified in section 102 of the standard specifications prior to 11:45 AM of the last business day preceding the letting. Submit bidding proposals using one of the following methods:
1. Electronic bid on the internet.
2. Electronic bid on a printout with accompanying diskette or CD ROM.
3. Paper bid under a waiver of the electronic submittal requirements.
(2) Bids submitted on a printout with accompanying diskette or CD ROM or paper bids submitted under a waiver of the electronic submittal requirements govern over bids submitted on the internet.
(3) The department will provide bidding information through the department’s web site at:
https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx
The contractor is responsible for reviewing this web site for general notices as well as information regarding proposals in each letting. The department will also post special notices of all addenda to each proposal through this web site no later than 4:00 PM local time on the Thursday before the letting. Check the department’s web site after 5:00 PM local time on the Thursday before the letting to ensure all addenda have been accounted for before preparing the bid. When bidding using methods 1 and 2 above, check the Bid ExpressΤΜ on-line bidding exchange at http://www.bidx.com/ after 5:00 PM local time on the Thursday before the letting to ensure that the latest schedule of items Expedite file (*.ebs or *.00x) is used to submit the final bid.
(4) Interested parties can subscribe to the Bid ExpressΤΜ on-line bidding exchange by following the instructions provided at the www.bidx.com web site or by contacting:
Info Tech Inc.
5700 SW 34th Street, Suite 1235 Gainesville, FL 32608-5371 email: mailto:customer.support@bidx.com
(5) The department will address equipment and process failures, if the bidder can demonstrate that those failures were beyond their control.
(6) Contractors are responsible for checking on the issuance of addenda and for obtaining the addenda. Notice of issuance of addenda is posted on the department’s web site at:
https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx or by calling the department at (608) 266-1631. Addenda can ONLY be obtained from the department’s web site listed above or by picking up the addenda at the Bureau of Highway Construction, 4th floor, 4822 Madison Yards Way, Madison, WI, during regular business hours.
(7) Addenda posted after 5:00 PM on the Thursday before the letting will be emailed to the eligible bidders for that proposal. All eligible bidders shall acknowledge receipt of the addenda whether they are bidding on the proposal or not. Not acknowledging receipt may jeopardize the awarding of the project.
https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx http://www.bidx.com/ http://www.bidx.com/ mailto:customer.support@bidx.com
B. Submitting Electronic Bids B.1 On the Internet
(1) Do the following before submitting the bid:
4. Have a properly executed annual bid bond on file with the department.
5. Have a digital ID on file with and enabled by Info Tech Inc. Using this digital ID will constitute the bidder's signature for proper execution of the bidding proposal.
(2) In lieu of preparing, delivering, and submitting the proposal as specified in 102.6 and 102.9 of the standard specifications, submit the proposal on the internet as follows:
1. Download the latest schedule of items reflecting all addenda from the Bid ExpressΤΜ web site.
2. Use ExpediteΤΜ software to enter a unit price for every item in the schedule of items.
3. Submit the bid according to the requirements of ExpediteΤΜ software and the Bid ExpressΤΜ web site. Do not submit a bid on a printout with accompanying diskette or CD ROM or a paper bid. If the bidder does submit a bid on a printout with accompanying diskette or a paper bid in addition to the internet submittal, the department will disregard the internet bid
4. Submit the bid before the hour and date the Notice to Contractors designates
5. Do not sign, notarize, and return the bidding proposal described in 102.2 of the standard specifications.
(3) The department will not consider the bid accepted until the hour and date the Notice to Contractors designates.
B.2 On a Printout with Accompanying Diskette or CD ROM
(1) Download the latest schedule of items from the Wisconsin pages of the Bid Express web site reflecting the latest addenda posted on the department’s web site at:
https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx
Use ExpediteΤΜ software to prepare and print the schedule of items. Provide a valid amount for all price fields. Follow instructions and review the help screens provided on the Bid ExpressΤΜ web site to assure that the schedule of items is prepared properly.
(2) Staple an 8 1/2 by 11 inch printout of the Expedite generated schedule of items to the other proposal documents submitted to the department as a part of the bidder's sealed bid. As a separate submittal, not in the sealed bid envelop but due at the same time and place as the sealed bid, also provide the ExpediteΤΜ generated schedule of items on a 3 1/2 inch computer diskette or CD ROM. Label each diskette or CD ROM with the bidder's name, the 4 character department-assigned bidder identification code from the top of the bidding proposal, and a list of the proposal numbers included on that diskette or CD ROM as indicated in the following example:
Bidder Name
BN00
Proposals: 1, 12, 14, & 22
(3) If bidding on more than one proposal in the letting, the bidder may include all proposals for that letting on one diskette or CD ROM. Include only submitted proposals with no incomplete or other files on the diskette or CD ROM.
(4) The bidder-submitted printout of the Expedite generated schedule of items is the governing contract document and must conform to the requirements of section 102 of the standard specifications. If a printout needs to be altered, cross out the printed information with ink or typewriter and enter the new information and initial it in ink. If there is a discrepancy between the printout and the diskette or CD ROM, the department will analyze the bid using the printout information.
(5) In addition to the reasons specified in section 102 of the standard specifications, proposals are irregular and the department may reject them for one or more of the following:
1. The check code printed on the bottom of the printout of the ExpediteΤΜ generated schedule of items is not the same on each page.
2. The check code printed on the printout of the ExpediteΤΜ generated schedule of items is not the same as the check code for that proposal provided on the diskette or CD ROM.
3. The diskette or CD ROM is not submitted at the time and place the department designates.
B Waiver of Electronic Submittal
(1) The bidder may request a waiver of the electronic submittal requirements. Submit a written request for a waiver in lieu of bids submitted on the internet or on a printout with accompanying diskette or CD ROM. Use the waiver that was included with the paper bid document sent to the bidder or type up a waiver on the bidder’s letterhead. The department will waive the electronic submittal requirements for a bidding entity (individual, partnership, joint venture, corporation, or limited liability company) for up to 4 individual proposals in a calendar year. The department may allow additional waivers for equipment malfunctions.
(2) Submit a schedule of items on paper conforming to section 102 of the standard specifications.
The department charges the bidder a $75 administrative fee per proposal, payable at the time and place the department designates for receiving bids, to cover the costs of data entry. The department will accept a check or money order payable to: "Wisconsin, Dept. of Transportation."
(3) In addition to the reasons specified in section 102 of the standard specifications, proposals are irregular and the department may reject them for one or more of the following:
1. The bidder fails to provide the written request for waiver of the electronic submittal requirements.
2. The bidder fails to pay the $75 administrative fee before the time the department designates for the opening of bids unless the bidder requests on the waiver that they be billed for the $75.
3. The bidder exceeds 4 waivers of electronic submittal requirements within a calendar year.
(4) In addition to the reasons specified in section 102 of the standard specifications, the department may refuse to issue bidding proposals for future contracts to a bidding entity that owes the department administrative fees for a waiver of electronic submittal requirements.
PROPOSAL BID BOND Wisconsin Department of Transportation
DT1303 1/2006
Proposal Number Project Number Letting Date
Name of Principal
Name of Surety State in Which Surety is Organized
We, the above-named Principal and the above-named Surety, are held and firmly bound unto the State of Wisconsin in the sum equal to the Proposal Guaranty for the total bid submitted for the payment to be made; we jointly and severally bind ourselves, our heirs, executors, administrators, successors and assigns. The condition of this obligation is that the Principal has submitted a bid proposal to the State of Wisconsin acting through the Department of Transportation for the improvement designated by the Proposal Number and Letting Date indicated above.
If the Principal is awarded the contract and, within the time and manner required by law after the prescribed forms are presented for signature, enters into a written contract in accordance with the bid, and files the bond with the Department of Transportation to guarantee faithful performance and payment for labor and materials, as required by law, or if the Department of Transportation shall reject all bids for the work described, then this obligation shall be null and void; otherwise, it shall be and remain in full force and effect.
In the event of failure of the Principal to enter into the contract or give the specified bond, the Principal shall pay to the Department of Transportation within 10 business days of demand a total equal to the Proposal Guaranty as liquidated damages; the liability of the Surety continues for the full amount of the obligation as stated until the obligation is paid in full.
The Surety, for value received, agrees that the obligations of it and its bond shall not be impaired or affected by any extension of time within which the Department of Transportation may accept the bid; and the Surety does waive notice of any such extension.
IN WITNESS, the Principal and Surety have agreed and have signed by their proper officers and have caused their corporate seals to be affixed this date: (DATE MUST BE ENTERED)
PRINCIPAL
(Company Name) (Affix Corporate Seal)
(Signature and Title)
(Company Name)
(Signature and Title)
(Company Name)
(Signature and Title)
(Company Name)
(Signature and Title)
NOTARY FOR PRINCIPAL
(Date)
State of Wisconsin ) ) ss.
County )
On the above date, this instrument was acknowledged before me by the named person(s).
(Signature, Notary Public, State of Wisconsin)
(Print or Type Name, Notary Public, State of Wisconsin)
(Date Commission Expires)
Notary Seal
(Name of Surety) (Affix Seal)
(Signature of Attorney-in-Fact)
NOTARY FOR SURETY
(Date)
State of Wisconsin ) ) ss.
County )
On the above date, this instrument was acknowledged before me by the named person(s).
(Signature, Notary Public, State of Wisconsin)
(Print or Type Name, Notary Public, State of Wisconsin)
(Date Commission Expires)
Notary Seal
IMPORTANT: A certified copy of Power of Attorney of the signatory agent must be attached to the bid bond.
CERTIFICATE OF ANNUAL BID BOND Wisconsin Department of Transportation
DT1305 8/2003
Time Period Valid (From/To)
Name of Surety
Name of Contractor
Certificate Holder Wisconsin Department of Transportation
This is to certify that an annual bid bond issued by the above-named Surety is currently on file with the Wisconsin Department of Transportation.
This certificate is issued as a matter of information and conveys no rights upon the certificate holder and does not amend, extend or alter the coverage of the annual bid bond.
Cancellation: Should the above policy be cancelled before the expiration date, the issuing surety will give thirty (30) days written notice to the certificate holder indicated above.
(Signature of Authorized Contractor Representative) (Date)
Effective with March 2010 Letting
LIST OF SUBCONTRACTORS
Section 66.0901(7), Wisconsin Statutes, provides that as a part of the proposal, the bidder also shall submit a list of the subcontractors the bidder proposes to contract with and the class of work to be performed by each. In order to qualify for inclusion in the bidder's list a subcontractor shall first submit a bid in writing, to the general contractor at least 48 hours prior to the time of the bid closing. The list may not be added to or altered without the written consent of the municipality. A proposal of a bidder is not invalid if any subcontractor and the class of work to be performed by the subcontractor has been omitted from a proposal; the omission shall be considered inadvertent or the bidder will perform the work personally.
No subcontract, whether listed herein or later proposed, may be entered into without the written consent of the Engineer as provided in Subsection 108.1 of the Standard Specifications.
Name of Subcontractor Class of Work Estimated Value
Effective with December 2000 Letting Debarment Certification
CERTIFICATION REGARDING DEBARMENT, SUSPENSION, AND OTHER
RESPONSIBILITY MATTERS - PRIMARY COVERED TRANSACTIONS
Instructions for Certification
1. By signing and submitting this proposal, the prospective contractor is providing the certification set out below.
2. The inability of a person to provide the certification required below will not necessarily result in denial of participation in this covered transaction. The prospective contractor shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective contractor to furnish a certification or an explanation shall disqualify such person from participation in this transaction.
3. The certification in this clause is a material representation of fact upon which reliance was placed when the department determined to enter into this transaction. If it is later determined that the contractor knowingly rendered an erroneous certification in addition to other remedies available to the Federal Government the department may terminate this transaction for cause or default.
4. The prospective contractor shall provide immediate written notice to the department to whom this proposal is submitted if at any time the prospective contractor learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.
5. The terms "covered transaction," "debarred," "suspended," "ineligible," "lower tier covered transaction," "participant," "person," "primary covered transaction," "principal," "proposal," and "voluntarily excluded," as used in this clause, have the meanings set out in the Definitions and Coverage sections of the rules implementing Executive Order 12549. You may contact the department to which this proposal is being submitted for assistance in obtaining a copy of those regulations.
6. The prospective contractor agrees by submitting this proposal that, should this contract be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department entering into this transaction.
7. The prospective contractor further agrees by submitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction," which is included as an addendum to PR- 1273 - "Required Contract Provisions Federal Aid Construction Contracts," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions.
8. The contractor may rely upon a certification of a prospective subcontractor/materials supplier that it is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A contractor may decide the method and frequency by which it determines the eligibility of its principals. Each contractor may, but is not required to, check the Disapproval List (telephone # 608/266/1631).
Effective with December 2000 Letting Debarment Certification
9. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a contractor is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.
10. Except for transactions authorized under paragraph 6 of these instructions, if a contractor in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department may terminate this transaction for cause or default.
Certification Regarding Debarment, Suspension, and Other Responsibility Matters - Primary Covered Transactions
1. The prospective contractor certifies to the best of its knowledge and belief, that it and its principals:
(a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency;
(b) Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements or receiving stolen property;
(c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offense enumerated in paragraph (1)(b) of this certification; and
(d) Have not within a three-year period preceding this proposal had one or more public transactions (Federal, State or local) terminated for cause or default.
2. Where the prospective contractor is unable to certify to any of the statements in this certification, such prospective contractor shall attach an explanation to this proposal.
7720-00-71, 7720-00-81 1 of 43
Special Provisions Table of Contents
Article Description Page #
1. General
2. Scope of Work
3. Prosecution and Progress
4. Traffic
5. Holiday and Special Event Work Restrictions
6. Utilities
7. Railroad Insurance and Coordination - Wisconsin Central Ltd (CN)
8. Information to Bidders, U.S. Army Corps of Engineers Section 404 Permit
9. Information to Bidders, WPDES Transportation Construction General Permit (TCGP) for Storm
Water Discharges
10. Environmental Protection, Aquatic Exotic Species Control
11. Construction Over or Adjacent to Navigable Waters
12. Notice to Contractor, Verification of Asbestos Inspection, No Asbestos Found
13. Notice to the Contractor – Inadvertent Discovery of Contaminated Soil
14. Coordination with Businesses and Residents
15. Public Convenience and Safety
16. Municipality Acceptance of Sanitary Sewer and Water Main Construction
17. Referenced Construction Specifications
18. Removing Manholes
19. Removing Catch Basins
20. Removing Bollards, Item 204.9060.S.001
21. Excavation, Hauling, and Disposal of Petroleum Contaminated Soil, Item 205.0501.S
22. Protection of Concrete
23. QMP HMA Pavement Nuclear Density
24. Material Transfer Vehicle, Item 460.9000.S
25. Insulation Board Polystyrene, 2-Inch, Item 612.0902.S.001
26. Temporary Audible Message Devices, Item 644.1900.S
27. Installing and Maintaining Bird Deterrent System Station 114+80, Item 999.2000.S
28. Unsuitable Materials Excavation, Item SPV.0035.100
29. Salvage and Reinstall Light Pole, Item SPV.0060.001
30. Adjusting Water Valves, Item SPV.0060.002
31. Connect to Existing Storm Sewer Structure, Item SPV.0060.100
32. Connect to Existing Sanitary Manhole, Item SPV.0060.101
33. Remove Existing Hydrant, Item SPV.0060.102
34. Hydrant, Item SPV.0060.103
35. Hydrant Control Valve 6-Inch, Item SPV.0060.104
7720-00-71, 7720-00-81 2 of 43
36. Gate Valve and Box 10-Inch, Item SPV.0060.105; Gate Valve and Box 6-Inch, Item
SPV.0060.106
37. Connect to Existing Water Main 10-Inch, Item SPV.0060.107; Connect to Existing Water Main 6- Inch SPV.0060.108
38. Remove Sanitary Manhole, Item SPV.0060.109
39. Connect to Existing Sanitary Sewer Main 8-inch, Item SPV.0060.110; Connect to Existing
Sanitary Sewer Main 12-inch, Item SPV.0060.111
40. Connect to Existing 6-Inch Sanitary Force Main, Item SPV.0060.112
41. Sanitary Manhole with Casting 48-Inch I.D., Item SPV.0060.113
42. Sanitary Manhole Outside Drop Structure, Item SPV.0060.114
43. Connect to Existing Storm Sewer, Item SPV.0060.115
44. Water Main Fittings, Item SPV.0085.100
45. Ductile Iron Hydrant Lead 6-Inch, Item SPV.0090.100
46. Remove Existing Sanitary Sewer, Item SPV.0090.101
47. Sanitary Sewer Main 8-Inch, Item SPV.0090.102; Sanitary Sewer Main 12-Inch, Item
SPV.0090.103
48. Water Main C900 6-inch, Item SPV 0090.104; Water Main C900 10-inch SPV 0090.105
49. Sanitary Force Main 6-inch, Item SPV 0090.106
50. Management of Contaminated Groundwater, Item SPV.0120.001
51. Methacrylate Flood Seal, Item SPV.0180.001
52. Removing Distressed Pavement Milling, Item SPV.0180.002
7720-00-71, 7720-00-81 3 of 43
STSP’S Revised July 1, 2026
SPECIAL PROVISIONS
1. General.
Perform the work under this construction contract for the following projects:
ID 7720-00-71
C Arcadia, Main Street CTH A to 250’ W of STH 93
STH 95
Trempealeau County
ID 7720-00-81
C Arcadia, Main Street CTH A to 250’ W of STH 93
STH 95
Trempealeau County
Perform the work as the plans show and execute the work as specified in the State of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure Construction, 2025 Edition, as published by the department, and these special provisions.
If all or a portion of the plans and special provisions are developed in the SI metric system and the schedule of prices is developed in the US standard measure system, the department will pay for the work as bid in the US standard system.
100-005 (20260701)
2. Scope of Work.
The work under this contract consists of pavement milling, HMA pavement, concrete curb & gutter, concrete sidewalk, sanitary sewer, storm sewer, watermain, street lighting, bridge maintenance, erosion control items, pavement marking, permanent signing and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
104-005 (20090901)
3. Prosecution and Progress.
Begin work within 10 calendar days after the engineer issues a written notice to do so.
Provide the start date to the engineer in writing within a month after executing the contract but at least 14 calendar days before the preconstruction conference. Upon approval, the engineer will issue the notice to proceed within ten calendar days before the approved start date.
To revise the start date, submit a written request to the engineer at least two weeks before the intended start date. The engineer will approve or deny that request based on the conditions cited in the request and its effect on the department’s scheduled resources.
Do not close STH 95 to through traffic prior to 6:00 AM on June 1, 2027. Do not start the following work items until the detour is in place: all work items on B-61-0107, railroad track removal (including installation of base aggregate dense and two lower layers of HMA pavement), median concrete curb and gutter islands near railroad crossing, and all utility work included in ID 7720-00-81.
Green Bay Avenue shall not be closed until the new connection with Grant Street is complete (including concrete curb and gutter and HMA pavement).
Place two lower lifts of HMA pavement in utility trenches by 12:01 PM on May 28th, 2027.
Do not begin mainline milling and HMA paving operations on STH 95 prior to August 9, 2027 without written permission from the engineer.
Place lower lift of HMA pavement the same day as milling operations.
Storm sewer work included in ID 7720-00-71, concrete curb and gutter and concrete sidewalk activities may be completed prior to the detour with the use of shoulder closures and flagging.
Interim Completion and Liquidated Damages – STH 95: August 4, 2027 Complete construction operations on STH 95 to the stage necessary to reopen it to through traffic by August 4, 2027. Do not reopen until completing the following work: all work on Bridge B-61-0107, all work
7720-00-71, 7720-00-81 4 of 43 included in ID 7720-00-81, Grant Street connection, common excavation, railroad track removal (including base aggregate dense and HMA pavement), storm sewer, base aggregate dense, concrete curb & gutter and lower 2 lifts of HMA pavement in utility trench areas.
If the contractor fails to complete the work necessary to reopen STH 95 to traffic by August 4, 2027, the department will assess the contractor $5,000 in interim liquidated damages for each calendar day the contract work remains incomplete beyond 12:01 AM on August 5, 2027. An entire calendar day will be charged for any period of time within a calendar day that the road remains closed beyond 12:01 AM.
If contract time expires prior to completing all work specified in the contract, additional liquidated damages will be affixed according to standard spec 108.11.
Migratory Birds Swallow or other migratory bird nests have been observed on or under the existing structure(s) listed below. All active nests (when eggs or young are present) of migratory birds are protected from purposeful take under the federal Migratory Bird Treaty Act. The nesting season for swallows and other birds is from April 15 to August 31.
Either prevent active nests from becoming established or prevent birds from nesting by installing and/or maintaining one suitable deterrent device on the following structure(s) prior to nesting season under the bid item Installing and Maintaining Bird Deterrent System:
• B-61-0107
Working days will not be assessed for placement of deterrent systems.
Fish Spawning There shall be no instream disturbance of Trempealeau River at Station 113+95 as a result of construction activity under or for this contract, from September 15 to May 15 both dates inclusive, in order to avoid adverse impacts upon the spawning of fish species.
Any change to this limitation will require submitting a written request by the contractor to the engineer, subsequent review and concurrence by the Department of Natural Resources in the request, and final approval by the engineer. The approval will include all conditions to the request as mutually agreed upon by WisDOT and DNR.
Protection of Endangered Bats Federally protected bats have the potential to inhabit the project limits because they roost in trees, bridges, culverts, and other structures. Roosts may not have been observed on this project, but conditions to support the species exist. The species and all active roosts are protected by the federal Endangered Species Act. If an individual bat or active roost is encountered during construction operations, stop work, and notify the engineer and the WisDOT Regional Environmental Coordinator
(REC).
Ensure all operators, employees, and subcontractors working in areas of known or presumed bat habitat are aware of environmental commitments and avoidance and minimization measures (AMMs) to protect both bats and their habitat.
Direct temporary lighting, if used, away from wooded areas during the bat active season April 15 to October 31, both dates inclusive.
Tree Clearing/Trimming:
Contractor means and methods to remove trees/branches will not be allowed. If it is determined that trees with a 3-inch or greater diameter at breast height (dbh), or branches of any size on those sized trees, need to be removed beyond contractor means and methods, notify the engineer to coordinate with the WisDOT REC to determine if consultation with United States Fish and Wildlife Service (USFWS) is required. The contractor must be aware that the WisDOT REC and/or USFWS may not permit modifications.
Branch trimming is incidental to other work if no other tree clearing work is necessary.
Bridge Deck Sealing/Overlay To avoid affecting bats that may be roosting under or within structures, do not allow construction equipment, sealants, polymer overlays, or other materials from reaching the underside off the end of the structure or through any other openings on the structure.
7720-00-71, 7720-00-81 5 of 43
4. Traffic.
STH 95 to be closed to through traffic and detoured for a portion of the construction schedule.
Maintain access through the work zone for local traffic and emergency vehicles. Maintain access to all commercial and private entrances and side streets with the exception of St Joseph Street, Oak Street and Simpson Street intersections which may be closed entirely for 10 working days at each location during the detour period for to allow for installation of sanitary sewer and watermain. If temporary access closures are required to accommodate construction operations, contact property owner 3 business days prior to closing access to any existing entrance.
Flag local traffic within the closed roadway. Do not restrict local traffic to properties from both eastbound and westbound directions at the same time.
Re-open one lane in each direction at the end of each day with a minimum roadway width of 22-feet except for St Joseph Street, Oak Street and Simpson Street.
Maintain one, 11-foot lane in each direction on STH 95 for work activities outside of the roadway closure.
Do not begin railroad track removal until access for emergency services has been coordinated and approved by local officials.
Maintain at least one, 12-foot lane at all times during daylight and two, 11-foot lanes at night during railroad track removal.
Portable Changeable Message Signs (PCMS) Place PCMS boards on STH 95 in the approximate locations shown in the plan, or as approved by the engineer, one week prior to the anticipated start date and one week prior to road closure to notify motorists of upcoming construction activities.
Message is as follows:
ROADWORK HWY 95
STARTING CLOSED
X/XX/XX STARTING
X/XX/XX
Wisconsin Lane Closure System Advance Notification Provide the following advance notification to the engineer for incorporation into the Wisconsin Lane Closure System (LCS).
TABLE 108-1 CLOSURE TYPE AND REQUIRED MINIMUM ADVANCE NOTIFICATION
Closure type with height, weight, or width restrictions (available width, all lanes in one direction < 16 feet)
MINIMUM NOTIFICATION
Lane and shoulder closures 7 calendar days
Full roadway closures 7 calendar days
Ramp closures 7 calendar days
Detours 7 calendar days
Closure type without height, weight, or width restrictions (available width, all lanes in one direction > 16 feet)
MINIMUM NOTIFICATION
Lane and shoulder closures 3 business days
Ramp closures 3 business days
Modifying all closure types 3 business days
Discuss LCS completion dates and provide changes in the schedule to the engineer at weekly project meetings in order to manage closures nearing their completion date.
7720-00-71, 7720-00-81 6 of 43
5. Holiday and Special Event Work Restrictions.
Do not perform work on, nor haul materials of any kind along or across any portion of the highway carrying STH 95 traffic, and entirely clear the traveled way and shoulders of such portions of the highway of equipment, barricades, signs, lights, and any other material that might impede the free flow of traffic during the following holiday and special event periods:
- From noon Friday, May 28 to 6:00 AM Tuesday, June 1, Memorial Day;
- From noon Friday, July 2, to 6:00 AM Tuesday, July 6, Independence Day;
- From noon Thursday, August 5, to 6:00 AM Monday, August 9, Ashley for the Arts;
- From noon Friday, September 3, to 6:00 AM Tuesday, September 7, Labor Day.
stp-107-005 (20210113)
6. Utilities.
This contract comes under the provision of Administrative Rule Trans 220.
The utility work plan includes additional detailed information regarding the location of known discontinued, relocated, or removed utility facilities. These can be requested from the department during the bid preparation process, or from the project engineer after the contract has been awarded and executed.
Some of the utility work described below is dependent on prior work being performed by the contractor at a specific site. In such situations, provide the engineer and the affected utility a good faith notice of when the utility is to start work at the site. Provide this notice 14 to 16 calendar days in advance of when the prior work will be completed and the site will be available to the utility. Follow-up with a confirmation notice to the engineer and the utility not less than 3 working days before the site will be ready for the utility to begin its work.
stp-107-065 (20240703)
Any utility facility locations (stations, offsets, elevations, depths) listed in this article are approximate.
All coordination was done under IDs 7720-00-71 & 7720-00-81.
Arcadia Electric & Sewer Utility (ELCTY) has overhead & underground electric facilities throughout the project.
Arcadia Electric & Water Utility conflicts will be resolved as part of the project activities as shown in the plans below. Work will be completed during construction by the contractor.
Station 101+76 RT light pole base will be relocated to avoid new curb ramp.
Station 116+46 RT pull box will be adjusted to avoid new curb ramp.
Station 120+84 RT light pole base will be relocated to avoid new curb ramp.
Station 123+18 LT light pole base will be relocated to avoid new curb ramp.
Station 123+93 RT light pole base will be relocated to avoid new curb ramp.
Station 130+12 LT light pole base will be relocated to avoid new curb ramp.
Station 144+09 LT light pole base will be relocated to avoid new curb ramp.
Station 172+65 RT light pole base will be relocated to avoid new curb ramp.
Arcadia Water & Wastewater Utility (SEWR) has underground sanitary sewer facilities throughout the project.
Arcadia Water & Wastewater will construct, reconstruct, relocate and remove, as shown in the plans below. Work will be completed during construction. Work is expected to start April 5th with the exception of the sewer work at Station 118+68, Station 120+53, Station 137+25, Station 158+69 and Station 162+23 which will begin in June once the detour is in place. Work is expected to take 20 working days in April and 20 working days in June to complete.
Sanitary sewer manhole casting at Station 102+04, 2.0’ LT will be adjusted.
Sanitary sewer manhole casting at Station 111+31, 4.4’ LT will be adjusted.
Twin 36-inch storm sewer pipes will be installed in the north driving lane from Station 137+25 to Station
7720-00-71, 7720-00-81 7 of 43
145+00.
Storm sewer manhole at Station 158+69, 20.3’ LT will be removed and replaced.
Sanitary sewer manhole at Station 118+68, 12’ LT will be removed and replaced and 180’ of new 8” PVC sanitary sewer main will be installed from Station 118+68 to Station 120+53.4.
Sanitary sewer manhole casting at Station 120+53.4, 1.5’ RT will be adjusted.
Sanitary sewer manhole casting at Station 141+17, CL will be replaced.
Sanitary sewer manhole casting at Station 147+92, CL will be replaced.
Sanitary sewer manhole casting at Station 151+19, CL will be adjusted.
Sanitary sewer manhole casting at Station 155+01, Cl will be adjusted.
Storm sewer manhole at Station 158+69, 20.3’ LT will be removed and replaced.
Sanitary sewer manhole at Station 162+23, CL will be removed and replaced and 35’ of new 8” PVC sanitary sewer main will be installed from Station 162+23, CL to 162+23, 35’ RT.
Sanitary sewer manhole casting at Station 169+49, CL will be replaced.
Sanitary sewer manhole casting at Station 172+94, CL will be replaced.
Sanitary sewer manhole casting at Station 176+39, CL will be replaced.
Arcadia Water & Wastewater Utility has other conflicts, and work items that will be resolved as part of the project activities as shown in the 7720-00-81 ID. Work will be completed during construction, during the detour period by the contractor.
Arcadia Water & Wastewater Utility conflicts will be resolved as part of the project activities as shown in the 7720-00-81 ID. Work will be completed during construction by the contractor.
Arcadia Water & Wastewater Utility (WATR) has underground water facilities throughout the project.
Arcadia Water & Wastewater will construct, reconstruct, relocate and remove, as shown in the plans below. Work will be completed during construction. Work will be completed during construction. Work is expected to start April 5th with the exception of the casing/watermain crossing at the railroad tracks which will begin in June once the detour is in place. Work is expected to take 20 working days in April and 20 working days in June to complete.
Water main valve box and adaptor at Station 98+90.5, 11.0‘ LT will be removed and replaced.
Hydrant and associated lead and valves at Station 100+60, 28.0’ RT will be replaced. Work includes removing and replacing associated concrete curb and gutter and concrete sidewalk.
Water main valve box and adaptor at Station 101+97,15.0’ RT will be removed and replaced.
Water main valve box and adaptor at Station 120+74, 14.6’ RT will be removed and replaced.
Water main from Station 129+68 to Station 131+36 will be removed and replaced. Work will include boring and jacking 16” steel casing under railroad crossing from Station 130+14 to Station 130+64.
Water main from Station 130+10, 12’ RT to Station 130+50, 65’ LT will be removed and replaced.
Water main valve at Station 144+20.5, 14.5’ RT will be removed and replaced.
Water main valve box and adaptor at Station 151+13, 15’ RT will be removed and replaced.
Hydrant and associated lead and valves at Station 162+00, 36’ RT will be removed and replaced. Work includes removing and replacing associated concrete curb and gutter.
Water main valve at Station 175+60, 15’ RT will be added.
Water main valve boxes and adaptors at Station 175+79, 15’ RT will be removed and replaced.
Hydrant and associated lead and valves at Station 166+00, 28’ RT will be removed and replaced. Work includes removing and replacing associated concrete curb and gutter and sidewalk.
Water main valves at Station 166+25, 15’ RT will be removed and replaced.
Water main valves at Station 170+24, 15’ RT will be added.
Hydrant and associated lead and valves at Station 179+69, 28’ RT will be removed and replaced. Work includes removing and replacing associated concrete curb and gutter and sidewalk.
7720-00-71, 7720-00-81 8 of 43
Arcadia Water and Wastewater Utility has other conflicts, and work items that will be resolved as part of the project activities as shown in the 7720-00-81 ID. Work will be completed during construction, during the detour period by the contractor.
CenturyLink (COMLN) has underground facilities throughout the project.
CenturyLink will construct, reconstruct, relocate and remove, as shown in the plans below. Work will be completed prior to construction.
Conflict with Pedestal at Station 166+35 will be moved 2’ North to back of proposed sidewalk prior to construction.
Midwest Natural Gas GSPTR) has underground facilities throughout the project.
Midwest Natural Gas will construct, reconstruct, relocate and remove, as shown in the plans below. Work will be completed prior to construction.
Gas facilities spanning both sides of E Main Street between Station 143+75 and Station 158, all existing facilities will be relocated to run beneath the sidewalk, approximately 2 feet from the edge of the right-of-way.
Underground line at Station 99+50 RT. Depth is approximately 2’8”. Conflicts are not expected.
Underground line at Station 102+20 RT to Station 102+45 RT. Depth is approximately 2’. Conflicts are not expected.
Underground line at Station 104+90 RT. Depth is approximately 2’5”. The line will be re-located 2.5’ west into the boulevard to avoid inlet. It will be relocated prior to construction to resolve conflicts.
Underground line at Station 105+20 LT to Station 105+30 LT. Depth is approximately 2’6”. The line will be relocated 2’ south to avoid inlet. It will be relocated prior to construction to resolve conflicts.
Underground line at Station 115+90. Depth is approximately 3’. Conflicts are not expected.
Underground line at Station 120+35 LT. Depth is approximately 3’8”. Conflicts are not expected.
Underground run parallel with STH 95 from Station 143+75 RT to Station 145+75 RT with a leg north crossing STH 95 at Station 145+70. Line will be relocated to run beneath the sidewalk, approximately 2 feet from the edge of the right-of-way.
Underground line crossing of Elm Street at intersection with STH 95; Station 151+00 to Station 151+35. Line will be relocated to run beneath the sidewalk, approximately 2 feet from the edge of the right-of-way.
Underground line near proposed hydrant at Station 154+80 RT. The line will be relocated to run beneath the sidewalk, approximately 2 feet from the edge of the right-of-way.
Underground line crossing of Oak Street (North side of STH 95, and at southwest corner of Oak Street and STH 95); Station 158+00 to Station 159+00. Depth is approximately 3’. Note – this is the main steel feed into Arcadia. The line will be relocated under existing sidewalk. It will be relocated prior to construction to resolve conflicts.
Underground line parallel to STH 95 and Simpson Street (south) from Station 165+90 RT to Station 166+20 RT. Depth is approximately 3’. The line will be relocated 2’ south. It will be relocated prior to construction to resolve conflicts.
Underground line parallel with STH 95 from Station 161+70 LT to Station 162+75 LT. Conflicts are not expected
Gas line crosses STH 95 at Station 160+60. Depth is approximately 3’. Conflicts are not expected.
Tri-County Communications (COMLN) has facilities within the project limits.
Tri-County Communications will construct, reconstruct, relocate and remove, as shown in the plans below.
Work will be completed prior to and during construction. Work during construction will be 15 working days.
Underground line across STH 95 at…
This is the start of the file's text. The full file is on GovTribe.