20261013010proposal.pdf

PDF 4 MB Posted

Attached to
Various Road Improvements
Solicitation number
20261013010
Issued by
Outagamie County, Wisconsin

About this file

This is a proposal document related to a Wisconsin state and local contract opportunity for Various Road Improvements. The scope of work encompasses a comprehensive range of infrastructure improvements including removals, common excavation, base aggregate dense material and select crushed material installation, HMA pavement and concrete pavement placement, bridge structures and culverts, noise wall construction, FTMS systems, storm sewer installation, marking and signing, traffic control measures, erosion control, and all incidental items necessary to complete the work. The document appears to be a submission in response to the contract opportunity, though specific project details, quantities, timelines, site visit information, and bidder meeting dates are not clearly legible in the provided file content.

The proposal document does not contain clearly legible information regarding pricing terms, set-asides, incumbent contractors, funding sources, or contract award and commencement dates. Additional documentation or a clearer version of the file would be necessary to extract specific financial terms, bonding requirements, contract duration, renewal options, and other material terms and conditions associated with this Wisconsin road improvement project.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"��#�$�� ����"�"�� !$�%�&���'&�&����())(�*��+,-����(�."�"��/�/0��1 2010�����1 ���304/�10�4���/��5 ������� 4�65/���7�8))8,� �9.:��&�&,��� ;��� "� �8�!

<98=��>�� �� <�?���� @8:$?� 9?��=� A "�B��� ��7�8))8,& '; ;��� "� �8�!

<98=��>�� ��

<�:$?� �8�:$?�CD 9?��=� A

"�B��� ��7�8))8,, �9.:��&�&,��& ;��� "� �8�!

<.$?�%%�9 "�EB 9?��=� A

"�B��� ��7�8))8F= �9.:��&�&,��7 ;��� "� �8�!

G�H@ 9?��=� A "�B��� $E����������<� @�G"E ���B �"�"E I�"E"E �@J K

�"#�����������($E � ��E� @@ ��J �#������I��L#��"E �����J "�#"E ��B �" @���D �"�� �"E �I�"E�"E @����������H K "��� @�:� @�"�� �(���������M ��� "G�H K @���G��� "��#�$�� ����"�"�� N�<���<���(�� ;""��E����������M

��� "G�� ����L��#�"E����;MO(P�@�.

�+Q�����$�� -�A�"�� ���7<�&�&)��������:� "���"�:���� B �"���<�&�7�;���B @�!���@J� "�B @�P ���O " �M��� �R S���� �� ��<�:�"G<�."�" <�T���:�@ $E����� "���"����� �D �����J

���BE"($E���

�"E�""E ���B �G�I�� <��� � "E���U "�"�J �#"E @���J V"E�""E �E�� W��� ��G�� @"E ��@#���"E

��� �<?�BEI�G���L��������<� @����@@

@�<� @E���E �L @"E ���""� B"E��������������@V� @"E�""E ����B ����G

�E�J �"E �"�G��� @�� �"�G< @� "�� G�B�

@� � G���� ��� <���"E �I�� "�L � G��"�� � �

"�"�J ��@@� B� �� �"�� I�"E"E��������������@(1X�YXZ�[\]Ŷ�YXZ_̀\ab̂�X̀�[cde\Z�Zf\[��\]fg_h��X̀i��̀XjX[_k�gfbY�[cde\ZZ\Y]�_Y�bkblZ̀XY\l�d\m�XY�Zfb��YZb̀YbZn.

@�� @��I�� �"��� �"E���@�" �ooooooooooooooo+.�B �" <� �"��G�� ��#������ �� -+��� "����$G�

���
<��"��G��

�:�������� �OW���

�- +P�@@ ��.�B �" -+��� "����$G� �P�@@ -+P�@@ -2X̀�1bj_̀ZebYZ�6[b��Ykh/hjb�Xp��X̀iq �"�� ��#�;I��@�!�" �M ��� "G�H @ �"��G�.

��r��05�/�2���s�11�5���6����0�

H

��J���<�>���� B<�M��@� B<�;BB�

B�" ���J "<�;��E��"���J �H �H E�����"�"�� <�:

�J ���� @�M I��L<�."����.

I �<�P ���M ��@<�O����� �:� "���<�� "�.�B � B<�$��##���:� "���<���J

">��L� B<�Q�BE"� B<�9$.<�H

PLEASE ATTACH

PROPOSAL GUARANTY HERE

Effective with November 2007 Letting Proposal Requirements

PROPOSAL REQUIREMENTS AND CONDITIONS

The bidder, signing and submitting this proposal, agrees and declares as a condition thereof, to be bound by the following conditions and requirements.

If the bidder has a corporate relationship with the proposal design engineering company, the bidder declares that it did not obtain any facts, data, or other information related to this proposal from the design engineering company that was not available to all bidders.

The bidder declares that they have carefully examined the site of, and the proposal, plans, specifications and contract forms for the work contemplated, and it is assumed that the bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and quantities of work to be performed and materials to be furnished, and as to the requirements of the specifications, special provisions and contract. It is mutually agreed that submission of a proposal shall be considered conclusive evidence that the bidder has made such examination.

The bidder submits herewith a proposal guaranty in proper form and amount payable to the party as designated in the advertisement inviting proposals, to be retained by and become the property of the owner of the work in the event the undersigned shall fail to execute the contract and contract bond and return the same to the office of the engineer within fourteen (14) days after having been notified in writing to do so;

otherwise to be returned.

The bidder declares that they understand that the estimate of quantities in the attached schedule is approximate only and that the attached quantities may be greater or less in accordance with the specifications.

The bidder agrees to perform the said work, for and in consideration of the payment of the amount becoming due on account of work performed, according to the unit prices bid in the following schedule, and to accept such amounts in full payment of said work.

The bidder declares that all of the said work will be performed at their own proper cost and expense, that they will furnish all necessary materials, labor, tools, machinery, apparatus, and other means of construction in the manner provided in the applicable specifications and the approved plans for the work together with all standard and special designs that may be designed on such plans, and the special provisions in the contract of which this proposal will become a part, if and when accepted. The bidder further agrees that the applicable specifications and all plans and working drawings are made a part hereof, as fully and completely as if attached hereto.

The bidder, if awarded the contract, agrees to begin the work not later than ten (10) days after the date of written notification from the engineer to do so, unless otherwise stipulated in the special provisions.

The bidder declares that if they are awarded the contract, they will execute the contract agreement and begin and complete the work within the time named herein, and they will file a good and sufficient surety bond for the amount of the contract for performance and also for the full amount of the contract for payment.

Effective with November 2007 Letting Proposal Requirements

The bidder, if awarded the contract, shall pay all claims as required by Section 779.14, Statutes of Wisconsin, and shall be subject to and discharge all liabilities for injuries pursuant to Chapter 102 of the Statutes of Wisconsin, and all acts amendatory thereto. They shall further be responsible for any damages to property or injury to persons occurring through their own negligence or that of their employees or agents, incident to the performance of work under this contract, pursuant to the Standard Specifications for Road and Bridge Construction applicable to this contract.

In connection with the performance of work under this contract, the contractor agrees to comply with all applicable state and federal statutes relating to non-discrimination in employment. No otherwise qualified person shall be excluded from employment or otherwise be subject to discrimination in employment in any manner on the basis of age, race, religion, color, gender, national origin or ancestry, disability, arrest or conviction record (in keeping with s.111.32), sexual orientation, marital status, membership in the military reserve, honesty testing, genetic testing, and outside use of lawful products. This provision shall include, but not be limited to the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation, and selection for training, including apprenticeship. The contractor further agrees to ensure equal opportunity in employment to all applicants and employees and to take affirmative action to attain a representative workforce.

The contractor agrees to post notices and posters setting forth the provisions of the nondiscrimination clause, in a conspicuous and easily accessible place, available for employees and applicants for employment.

If a state public official (section 19.42, Stats.) or an organization in which a state public official holds at least a 10% interest is a party to this agreement, this contract is voidable by the state unless appropriate disclosure is made to the State of Wisconsin Ethics Board.

Effective with August 2015 Letting Bid Preparation

BID PREPARATION

Preparing the Proposal Schedule of Items A. General

(1) Obtain bidding proposals as specified in section 102 of the standard specifications prior to 11:45 AM of the last business day preceding the letting. Submit bidding proposals using one of the following methods:

1. Electronic bid on the internet.

2. Electronic bid on a printout with accompanying diskette or CD ROM.

3. Paper bid under a waiver of the electronic submittal requirements.

(2) Bids submitted on a printout with accompanying diskette or CD ROM or paper bids submitted under a waiver of the electronic submittal requirements govern over bids submitted on the internet.

(3) The department will provide bidding information through the department’s web site at:

https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx

The contractor is responsible for reviewing this web site for general notices as well as information regarding proposals in each letting. The department will also post special notices of all addenda to each proposal through this web site no later than 4:00 PM local time on the Thursday before the letting. Check the department’s web site after 5:00 PM local time on the Thursday before the letting to ensure all addenda have been accounted for before preparing the bid. When bidding using methods 1 and 2 above, check the Bid ExpressΤΜ on-line bidding exchange at http://www.bidx.com/ after 5:00 PM local time on the Thursday before the letting to ensure that the latest schedule of items Expedite file (*.ebs or *.00x) is used to submit the final bid.

(4) Interested parties can subscribe to the Bid ExpressΤΜ on-line bidding exchange by following the instructions provided at the www.bidx.com web site or by contacting:

Info Tech Inc.

5700 SW 34th Street, Suite 1235 Gainesville, FL 32608-5371 email: mailto:customer.support@bidx.com

(5) The department will address equipment and process failures, if the bidder can demonstrate that those failures were beyond their control.

(6) Contractors are responsible for checking on the issuance of addenda and for obtaining the addenda. Notice of issuance of addenda is posted on the department’s web site at:

https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx or by calling the department at (608) 266-1631. Addenda can ONLY be obtained from the department’s web site listed above or by picking up the addenda at the Bureau of Highway Construction, 4th floor, 4822 Madison Yards Way, Madison, WI, during regular business hours.

(7) Addenda posted after 5:00 PM on the Thursday before the letting will be emailed to the eligible bidders for that proposal. All eligible bidders shall acknowledge receipt of the addenda whether they are bidding on the proposal or not. Not acknowledging receipt may jeopardize the awarding of the project.

https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx http://www.bidx.com/ http://www.bidx.com/ mailto:customer.support@bidx.com

B. Submitting Electronic Bids B.1 On the Internet

(1) Do the following before submitting the bid:

4. Have a properly executed annual bid bond on file with the department.

5. Have a digital ID on file with and enabled by Info Tech Inc. Using this digital ID will constitute the bidder's signature for proper execution of the bidding proposal.

(2) In lieu of preparing, delivering, and submitting the proposal as specified in 102.6 and 102.9 of the standard specifications, submit the proposal on the internet as follows:

1. Download the latest schedule of items reflecting all addenda from the Bid ExpressΤΜ web site.

2. Use ExpediteΤΜ software to enter a unit price for every item in the schedule of items.

3. Submit the bid according to the requirements of ExpediteΤΜ software and the Bid ExpressΤΜ web site. Do not submit a bid on a printout with accompanying diskette or CD ROM or a paper bid. If the bidder does submit a bid on a printout with accompanying diskette or a paper bid in addition to the internet submittal, the department will disregard the internet bid

4. Submit the bid before the hour and date the Notice to Contractors designates

5. Do not sign, notarize, and return the bidding proposal described in 102.2 of the standard specifications.

(3) The department will not consider the bid accepted until the hour and date the Notice to Contractors designates.

B.2 On a Printout with Accompanying Diskette or CD ROM

(1) Download the latest schedule of items from the Wisconsin pages of the Bid Express web site reflecting the latest addenda posted on the department’s web site at:

https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx

Use ExpediteΤΜ software to prepare and print the schedule of items. Provide a valid amount for all price fields. Follow instructions and review the help screens provided on the Bid ExpressΤΜ web site to assure that the schedule of items is prepared properly.

(2) Staple an 8 1/2 by 11 inch printout of the Expedite generated schedule of items to the other proposal documents submitted to the department as a part of the bidder's sealed bid. As a separate submittal, not in the sealed bid envelop but due at the same time and place as the sealed bid, also provide the ExpediteΤΜ generated schedule of items on a 3 1/2 inch computer diskette or CD ROM. Label each diskette or CD ROM with the bidder's name, the 4 character department-assigned bidder identification code from the top of the bidding proposal, and a list of the proposal numbers included on that diskette or CD ROM as indicated in the following example:

Bidder Name

BN00

Proposals: 1, 12, 14, & 22

(3) If bidding on more than one proposal in the letting, the bidder may include all proposals for that letting on one diskette or CD ROM. Include only submitted proposals with no incomplete or other files on the diskette or CD ROM.

(4) The bidder-submitted printout of the Expedite generated schedule of items is the governing contract document and must conform to the requirements of section 102 of the standard specifications. If a printout needs to be altered, cross out the printed information with ink or typewriter and enter the new information and initial it in ink. If there is a discrepancy between the printout and the diskette or CD ROM, the department will analyze the bid using the printout information.

(5) In addition to the reasons specified in section 102 of the standard specifications, proposals are irregular and the department may reject them for one or more of the following:

1. The check code printed on the bottom of the printout of the ExpediteΤΜ generated schedule of items is not the same on each page.

2. The check code printed on the printout of the ExpediteΤΜ generated schedule of items is not the same as the check code for that proposal provided on the diskette or CD ROM.

3. The diskette or CD ROM is not submitted at the time and place the department designates.

B Waiver of Electronic Submittal

(1) The bidder may request a waiver of the electronic submittal requirements. Submit a written request for a waiver in lieu of bids submitted on the internet or on a printout with accompanying diskette or CD ROM. Use the waiver that was included with the paper bid document sent to the bidder or type up a waiver on the bidder’s letterhead. The department will waive the electronic submittal requirements for a bidding entity (individual, partnership, joint venture, corporation, or limited liability company) for up to 4 individual proposals in a calendar year. The department may allow additional waivers for equipment malfunctions.

(2) Submit a schedule of items on paper conforming to section 102 of the standard specifications.

The department charges the bidder a $75 administrative fee per proposal, payable at the time and place the department designates for receiving bids, to cover the costs of data entry. The department will accept a check or money order payable to: "Wisconsin, Dept. of Transportation."

(3) In addition to the reasons specified in section 102 of the standard specifications, proposals are irregular and the department may reject them for one or more of the following:

1. The bidder fails to provide the written request for waiver of the electronic submittal requirements.

2. The bidder fails to pay the $75 administrative fee before the time the department designates for the opening of bids unless the bidder requests on the waiver that they be billed for the $75.

3. The bidder exceeds 4 waivers of electronic submittal requirements within a calendar year.

(4) In addition to the reasons specified in section 102 of the standard specifications, the department may refuse to issue bidding proposals for future contracts to a bidding entity that owes the department administrative fees for a waiver of electronic submittal requirements.

PROPOSAL BID BOND Wisconsin Department of Transportation

DT1303 1/2006

Proposal Number Project Number Letting Date

Name of Principal

Name of Surety State in Which Surety is Organized

We, the above-named Principal and the above-named Surety, are held and firmly bound unto the State of Wisconsin in the sum equal to the Proposal Guaranty for the total bid submitted for the payment to be made; we jointly and severally bind ourselves, our heirs, executors, administrators, successors and assigns. The condition of this obligation is that the Principal has submitted a bid proposal to the State of Wisconsin acting through the Department of Transportation for the improvement designated by the Proposal Number and Letting Date indicated above.

If the Principal is awarded the contract and, within the time and manner required by law after the prescribed forms are presented for signature, enters into a written contract in accordance with the bid, and files the bond with the Department of Transportation to guarantee faithful performance and payment for labor and materials, as required by law, or if the Department of Transportation shall reject all bids for the work described, then this obligation shall be null and void; otherwise, it shall be and remain in full force and effect.

In the event of failure of the Principal to enter into the contract or give the specified bond, the Principal shall pay to the Department of Transportation within 10 business days of demand a total equal to the Proposal Guaranty as liquidated damages; the liability of the Surety continues for the full amount of the obligation as stated until the obligation is paid in full.

The Surety, for value received, agrees that the obligations of it and its bond shall not be impaired or affected by any extension of time within which the Department of Transportation may accept the bid; and the Surety does waive notice of any such extension.

IN WITNESS, the Principal and Surety have agreed and have signed by their proper officers and have caused their corporate seals to be affixed this date: (DATE MUST BE ENTERED)

PRINCIPAL

(Company Name) (Affix Corporate Seal)

(Signature and Title)

(Company Name)

(Signature and Title)

(Company Name)

(Signature and Title)

(Company Name)

(Signature and Title)

NOTARY FOR PRINCIPAL

(Date)

State of Wisconsin ) ) ss.

County )

On the above date, this instrument was acknowledged before me by the named person(s).

(Signature, Notary Public, State of Wisconsin)

(Print or Type Name, Notary Public, State of Wisconsin)

(Date Commission Expires)

Notary Seal

(Name of Surety) (Affix Seal)

(Signature of Attorney-in-Fact)

NOTARY FOR SURETY

(Date)

State of Wisconsin ) ) ss.

County )

On the above date, this instrument was acknowledged before me by the named person(s).

(Signature, Notary Public, State of Wisconsin)

(Print or Type Name, Notary Public, State of Wisconsin)

(Date Commission Expires)

Notary Seal

IMPORTANT: A certified copy of Power of Attorney of the signatory agent must be attached to the bid bond.

CERTIFICATE OF ANNUAL BID BOND Wisconsin Department of Transportation

DT1305 8/2003

Time Period Valid (From/To)

Name of Surety

Name of Contractor

Certificate Holder Wisconsin Department of Transportation

This is to certify that an annual bid bond issued by the above-named Surety is currently on file with the Wisconsin Department of Transportation.

This certificate is issued as a matter of information and conveys no rights upon the certificate holder and does not amend, extend or alter the coverage of the annual bid bond.

Cancellation: Should the above policy be cancelled before the expiration date, the issuing surety will give thirty (30) days written notice to the certificate holder indicated above.

(Signature of Authorized Contractor Representative) (Date)

Effective with March 2010 Letting

LIST OF SUBCONTRACTORS

Section 66.0901(7), Wisconsin Statutes, provides that as a part of the proposal, the bidder also shall submit a list of the subcontractors the bidder proposes to contract with and the class of work to be performed by each. In order to qualify for inclusion in the bidder's list a subcontractor shall first submit a bid in writing, to the general contractor at least 48 hours prior to the time of the bid closing. The list may not be added to or altered without the written consent of the municipality. A proposal of a bidder is not invalid if any subcontractor and the class of work to be performed by the subcontractor has been omitted from a proposal; the omission shall be considered inadvertent or the bidder will perform the work personally.

No subcontract, whether listed herein or later proposed, may be entered into without the written consent of the Engineer as provided in Subsection 108.1 of the Standard Specifications.

Name of Subcontractor Class of Work Estimated Value

Effective with December 2000 Letting Debarment Certification

CERTIFICATION REGARDING DEBARMENT, SUSPENSION, AND OTHER

RESPONSIBILITY MATTERS - PRIMARY COVERED TRANSACTIONS

Instructions for Certification

1. By signing and submitting this proposal, the prospective contractor is providing the certification set out below.

2. The inability of a person to provide the certification required below will not necessarily result in denial of participation in this covered transaction. The prospective contractor shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective contractor to furnish a certification or an explanation shall disqualify such person from participation in this transaction.

3. The certification in this clause is a material representation of fact upon which reliance was placed when the department determined to enter into this transaction. If it is later determined that the contractor knowingly rendered an erroneous certification in addition to other remedies available to the Federal Government the department may terminate this transaction for cause or default.

4. The prospective contractor shall provide immediate written notice to the department to whom this proposal is submitted if at any time the prospective contractor learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.

5. The terms "covered transaction," "debarred," "suspended," "ineligible," "lower tier covered transaction," "participant," "person," "primary covered transaction," "principal," "proposal," and "voluntarily excluded," as used in this clause, have the meanings set out in the Definitions and Coverage sections of the rules implementing Executive Order 12549. You may contact the department to which this proposal is being submitted for assistance in obtaining a copy of those regulations.

6. The prospective contractor agrees by submitting this proposal that, should this contract be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department entering into this transaction.

7. The prospective contractor further agrees by submitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction," which is included as an addendum to PR- 1273 - "Required Contract Provisions Federal Aid Construction Contracts," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions.

8. The contractor may rely upon a certification of a prospective subcontractor/materials supplier that it is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A contractor may decide the method and frequency by which it determines the eligibility of its principals. Each contractor may, but is not required to, check the Disapproval List (telephone # 608/266/1631).

Effective with December 2000 Letting Debarment Certification

9. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a contractor is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.

10. Except for transactions authorized under paragraph 6 of these instructions, if a contractor in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department may terminate this transaction for cause or default.

Certification Regarding Debarment, Suspension, and Other Responsibility Matters - Primary Covered Transactions

1. The prospective contractor certifies to the best of its knowledge and belief, that it and its principals:

(a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency;

(b) Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements or receiving stolen property;

(c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offense enumerated in paragraph (1)(b) of this certification; and

(d) Have not within a three-year period preceding this proposal had one or more public transactions (Federal, State or local) terminated for cause or default.

2. Where the prospective contractor is unable to certify to any of the statements in this certification, such prospective contractor shall attach an explanation to this proposal.

1130-66-71, 1130-66-72, 1130-66-77, 1130-66-84 1 of 150

Special Provisions Table of Contents

Article Description Page #

1. Administrative

1.1 General

1.2 Scope of Work

1.3 Other Contracts

1.4 Notice to Contractor – Project Storage and Staging Areas

1.5 Notice to Contractor – Geotechnical Exploration Information

1.6 Notice to Contractor – Containment System

1.7 Notice to Contractor – Safety and Personnel Identification Program

1.8 Notice to Contractor, Right-of-Way Fencing

1.9 Notice to Contractor Contractor – Electronic Load Tickets

1.10 Work By Others

1.11 Field Facilities

2. Prosecution and Progress

2.1 Prosecution and Progress

2.2 Notice to Contractor, New or Revised Ingress/Egress Access

2.3 Notice to Contractor, New or Revised Temporary Construction Access

2.4 Notice to Contractor, Roadway Maintenance During Construction

2.5 Notice to Contractor, Kaukauna Pump at Box Culvert C-44-150

2.6 Notice to Contractor, Parcel 33 Coordination

2.7 Lane Rental Fee Assessment

2.8 Baseline CPM Progress Schedule, Item SPV.0060.0105; CPM Progress Schedule and

Accepted Revisions, Item SPV.0060.0110

3. Meetings

3.1 Non-Mandatory Pre-Bid Meeting

3.2 Partnering Meetings Monthly

3.3 Coordination with Businesses and Residents

3.4 Traffic Meetings and Traffic Control Scheduling

4. Traffic and Restrictions to Work

4.1 Traffic

4.2 Holiday and Special Event Work Restrictions

4.3 Public Convenience and Safety

4.4 Temporary Regulatory Speed Limit Reduction - IH 41

4.5 Traffic Control

4.6 Notice to Contractor – Coordination with Contract 1130-63-72

4.7 Traffic Impact Response Time

4.8 Temporary Emergency Pullouts, Item 205.3000.S

4.9 Nighttime Work Lighting-Stationary

4.10 Digital Speed Reduction System (DSRS), Item 643.0370.S

1130-66-71, 1130-66-72, 1130-66-77, 1130-66-84 2 of 150

4.11 Temporary Audible Message Devices, Item 644.1900.S

4.12 Animal Carcass Removal, Item SPV.0075.0105

4.13 Roadway Debris Removal, Item SPV.0075.0106

5. Utilities

5.1 Utilities

5.2 Adjusting Sanitary Manhole Covers, Item SPV.0060.0106

6. Railroad

6.1 Notice to Contractor Adjacent Railroad Right-of-Way

7. Environmental

7.1 Information to Bidders, U.S. Army Corps of Engineers Section 404 Permit

7.2 Information to Bidders, WPDES Transportation Construction General Permit (TCGP) for

Storm Water Discharges

7.3 Environmental Protection, Aquatic Exotic Species Control

7.4 Environmental Protection, By-Pass Pumping

7.5 Environmental Protection, Dewatering

7.6 Environmental Protection, Northern Long Eared Bat

7.7 Environmental Protection, Phragmites

7.8 Construction Over or Adjacent to Navigable Waters

8. Clear, Demolition and Removal

8.1 Notice to Contractor, Asbestos Containing Materials on Structure

8.2 Notice to Contractor, Notification of Demolition and/or Renovation No Asbestos Found

8.3 Clearing and Grubbing

8.4 Removing Business Sign and Base, Item 204.9060.S.0002

8.5 Removing Inlet Covers, Item 204.9060.S.0003

8.6 Removing Cover Plates, Item SPV.0060.0297

9. Earthwork

9.1 Embankment Construction - Benching

9.2 Excavation, Hauling, and Disposal of Petroleum Contaminated Soil, Item 205.0501.S

9.3 Roadway Embankment, Item SPV.0035.0100

9.4 Preparing the Foundation

10. Bases, Subbases and Pavements

10.1 Notice to Contractor – Concrete Material Placement

10.2 Backfill Coarse Aggregate Size No. 1, Item 209.0300.S

10.3 Cold Patch, Item 495.1000.S

10.4 Incentive IRI Ride PCC Surfaces, Item SPV.0055.0100

10.5 HMA Longitudinal Joint Repair, Item SPV.0090.0100

10.6 Concrete Pavement 10 1/2-Inch Special, Item SPV.0180.0100

11. Bridges

11.1 Ice Hot Weather Concreting, Item 501.1000.S

11.2 Bar Steel Reinforcement HS Stainless Structures, Item 505.8000.S

11.3 Polymer Overlay Item 509.5100.S

1130-66-71, 1130-66-72, 1130-66-77, 1130-66-84 3 of 150

11.4 Concrete Staining B-44-334, Item 517.1010.S.0001; Concrete Staining B-44-335, Item 517.1010.S.0002; Concrete Staining B-44-336, Item 517.1010.S.0003; Concrete Staining B-44-337, Item 517.1010.S.0004

11.5 HPC Masonry Structures, Item SPV.0035.0800

11.6 Temporary Bridge Widening B-44-0041, Item SPV.0060.0041; Temporary Bridge Widening

B-44-0043, Item SPV.0060.0043

11.7 Removing Existing Timber Piling, Item SPV.0090.0800

11.8 Longitudinal Grooving Bridge Deck, Item SPV.0165.0800

12. Retaining Walls, Ground Support

12.1 Noise Barriers Double-Sided Sound Absorptive N-44-18, Item 541.0300.S

13. Drainage and Erosion Control

13.1 Erosion Control

13.2 Abandoning Sewer, Item 204.0291.S

13.3 Removing Drain Slotted Vane, Item 204.9090.S.0001

13.4 Storm Sewer

13.5 Catch Basins, Manholes, and Inlets

13.6 Inlet Covers Type VV-B

13.7 Cover Plates Temporary, Item 611.8120.S

13.8 Drain Slotted Vane, Item 611.9900.S

13.9 Temporary Ditch Checks

13.10 Silt Fence Heavy Duty, Item 628.1530.S; Silt Fence Heavy Duty Maintenance, Item

628.1535.S

13.11 Pond Liner Clay, Item 640.1303.S

13.12 Geogrid Type SR-2, Item 645.0145.S

13.13 Temporary Water Diversion C-44-148, Item SPV.0060.0155

13.14 STH 55 Ramp A Pond Outlet Storm Sewer Structure, Item SPV.0060.0201; CTH J Ramp D

Pond Outlet Storm Sewer Structure, Item SPV.0060.0202; 66-1218-RT Pond Outlet Storm Sewer Structure, Item SPV.0060.0203

13.15 Pond In-situ Clay Liner, STH 55 Ramp A, Item SPV.0060.0204

13.16 Storm Sewer Tap, Item SPV.0060.0211

13.17 Median Inlet Cover Type Y, Item SPV.0060.0230

13.18 Installing Inlet Covers, Item SPV.0060.0296

13.19 Street Sweeping, Item SPV.0075.0100

13.20 Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE-IV 38x60-Inch, Item

SPV.0090.0001

13.21 Pipe Underdrain (6-Inch) with Geotextile Fabric and Aggregate, Item SPV.0090.0002

13.22 Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE-V 14x23-Inch, Item

SPV.0090.0004

14. Miscellaneous Concrete

14.1 Protection of Concrete

14.2 Concrete Curb and Gutter 4-Inch Sloped 36-Inch Type R, Item SPV.0090.0003

15. Signing and Marking

15.1 Blue Specific Service Signs

15.2 Removing Pavement Marking

1130-66-71, 1130-66-72, 1130-66-77, 1130-66-84 4 of 150

15.3 Inlet Marker, Item SPV.0060.0295

15.4 Fixed Message Sign Portable Support, Item SPV.0060.0400

16. Lighting - Electrical

16.1 General Requirements for Electrical Work

16.2 Electrical Meetings

16.3 Removing Street Light Assembly, Item 204.9060.S.0501

16.4 Removing Lighting Control, Item 204.9060.S.0502

16.5 Removing Luminaires, Item 204.9060.S.0503

16.6 Removing Temporary Wood Poles, Item 204.9060.S.0504

16.7 Removing Electrical Conductors from Existing Conduit, Item 204.9090.S.0501; Removing or Abandoning Existing Conduit, Item 204.9090.S.0502

16.8 Conduit Rigid Nonmetallic Schedule 40 2-Inch, Item 652.0225; Conduit Rigid Nonmetallic

Schedule 40 3-Inch, Item 652.0235; Conduit Rigid Nonmetallic Schedule 80 3-Inch, Item 652.0335

16.9 Install Conduit Into Existing Item, Item 652.0700.S

16.10 Poles (Type) Aluminum

16.11 Luminaires Utility LED B, Item 659.1120; Luminaires Utility LED C, Item 659.1125

16.12 Lamp, Ballast, LED, Switch Disposal by Contactor, Item 659.5000.S

16.13 Concrete Bases Type 7 Tall, Item SPV.0060.0501

16.14 Transport and Install State Furnished 277/480 Lighting Control Cabinet, Item

SPV.0060.0502

16.15 Anchor Bolt Cover Shroud, Item SPV.0060.0503

16.16 Lighting Control Cabinets 277/480 30-Inch 3-Phase, Item SPV.0060.0504

16.17 Electrical Service Main Lugs Only Meter Pedestal 3-Phase 600V, Item SPV.0060.0505. 127

16.18 Concrete Transformer Pad, Item SPV.0060.0506

16.19 Temporary Street Lighting System, Item SPV.0060.0507

16.20 Temporary Wood Poles 40–Foot, Item SPV.0060.0508

16.21 Concrete Bases Type 5 Tall, Item SPV.0060.0509

16.22 Transport and Install State Furnished Main Lugs Only Meter Pedestal, Item

SPV.0060.0510

16.23 Concrete Control Cabinet Bases Type 10 NE Region Special, Item SPV.0060.0511

16.24 Electrical Service Meter Breaker Pedestal Special, Item SPV.0060.0512

16.25 Temporary Overhead Cable Triplex 6 AWG, Item SPV.0090.0501

17. Intelligent Transportation Systems (ITS)

17.1 Intelligent Transportation Systems (ITS) – Control of Materials

17.2 Intelligent Transportation Systems – General Requirements

17.3 Temporary Intelligent Transportation System

17.4 Removing Communication Vault, Item 204.9060.S.0701

17.5 Install Pole Mounted Cabinet, Item 673.1225.S

17.6 Removing 50-Foot Camera Pole, Item 677.9051.S

17.7 Install Overhead Freeway DMS Full Matrix, Item 678.0100.S

17.8 Removing Ground Mount Dynamic Message Sign, Item SPV.0060.0701

17.9 Install Ethernet Extender, Item SPV.0060.0702

1130-66-71, 1130-66-72, 1130-66-77, 1130-66-84 5 of 150

17.10 Remove Poles Wood, Item SPV.0060.0703

17.11 Remove and Reinstall ITS Equipment, Item SPV.0060.0704

17.12 Wood Pole, 50-FT, Item SPV.0060.0705

17.13 Traffic Signal Standards Aluminum 6-FT, Item SPV.0060.0706

17.14 Salvaging Wireless Antennas, Item SPV.0060.0707

17.15 Adjusting Communication Vaults, Item SPV.0060.0708

18. Miscellaneous and Incidental Construction

18.1 Midwest Guardrail System (MGS)

18.2 Fence Safety, Item 616.0700.S

18.3 Construction Staking Survey Project 1130-66-71, Item SPV.0060.0100; Construction

Staking Survey Project 1130-66-72, Item SPV.0060.0101; Construction Staking Survey Project 1130-66-77, Item SPV.0060.0102 Construction Staking Survey Project 1130-66-84, Item SPV.0060.0103

18.4 Emergency Response to Traffic Involving Concrete Barrier Temporary, Item

SPV.0060.0305

18.5 Emergency Response to Traffic Involving Crash Cushion Temporary, Item SPV.0060.0310.

18.6 Temporary Concrete Barrier Gate, 24-FT, Item SPV.0060.0320

18.7 Concrete Barrier Type S42 Special, Item SPV.0090.0115; Concrete Barrier Type S56

Special, Item SPV.0090.0120

18.8 Glare Screens Temporary, Item SPV.0090.0305

1130-66-71, 1130-66-72, 1130-66-77, 1130-66-84 6 of 150

STSP’S Revised April 1, 2026

SPECIAL PROVISIONS

1. Administrative.

1.1 General.

Perform the work under this construction contract for the following projects:

1130-66-71 Appleton-DePere IH 41 Mainline Holland Road-CTH N

IH 41

Outagamie County

1130-66-84 Appleton-DePere Maloney Road

IH 41

Outagamie County

1130-66-72 Appleton-DePere I-41 Mainline, CTH N-CTH JJ

IH 41

Outagamie County

1130-66-77 Appleton-DePere STH 55 Intchg

IH 41

Outagamie County

Perform the work as the plans show and execute the work as specified in the State of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure Construction, 2025 Edition, as published by the department, and these special provisions.

If all or a portion of the plans and special provisions are developed in the SI metric system and the schedule of prices is developed in the US standard measure system, the department will pay for the work as bid in the US standard system.

100-005 (20260401)

1.2 Scope of Work.

The work under this contract shall consist of removals, common excavation, base aggregate dense, select crushed material, HMA pavement, concrete pavement, bridge structures, culverts, noise wall, FTMS, storm sewer, marking, signing, traffic control, erosion control, finishing items and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.

1130-66-71 1130-66-72 1130-66-77

Box Culverts Temporary Structures Box Culverts Sign Structures

C-44-0148 B-44-0041 C-44-0150 S-44-0389

C-44-0149 B-44-0043

Structures

Structures

B-44-0330

Sign Structures

S-44-0335

B-44-0333

B-44-0334

B-44-0331

B-44-0332

S-44-0336

S-44-0387

B-44-0335

B-44-0336

Sign Structures

S-44-0381

S-44-0382

S-44-0385

S-44-0386

S-44-0404

S-44-0388

S-44-0390

S-44-0391

S-44-0392

S-44-0393

S-44-0394

S-44-0395

B-44-0337

B-44-0338

B-44-0341

B-44-0342

Noise Walls

N-44-0018

104-005 (20090901)

1130-66-71, 1130-66-72, 1130-66-77, 1130-66-84 7 of 150

1.3 Other Contracts.

Modifications to the traffic control plan may be required by the engineer to be safe and consistent with the adjacent work by others. Routine maintenance by town and county personnel may be required at various times concurrently with the work activities specified in this contract. The following contracts are anticipated to be under construction within the time period of this contract:

The following projects will be under construction concurrently with the work under this contract.

Coordinate trucking activities, detours, work zone traffic control, roadway and lane closures, and other work items as required with other contracts.

IH 41, Project 1130-63-72: Appleton – De Pere, IH 41 Corridor Smart Work Zone in Outagamie County.

Proposed work includes installation and maintenance of Smart Work Zone equipment on IH 41, IH 41 exit ramps, STH 441 NB south of IH 41, and STH 441 ramps between the Southern IH 41/US 10/STH 441 Interchange and the STH 172 interchange in Green Bay. Work under this contract is anticipated to begin in April 2025. Coordinate activities with Project ID 1130-63-72.

IH 41, Project 1130-64-73/77: Appleton – De Pere, Lynndale - Meade in Outagamie County. Proposed work includes reconstruction of IH 41 from Lynndale Drive/CTH A to Meade Street. Work under this contract is anticipated to begin in April 2026, with completion anticipated in June 2028. IH 41 will have limited night closures with detour routes utilizing STH 441 for regional traffic and STH 96 to STH 47 for local traffic. Gillett Street will have a full closure in 2027. No detour will be signed. There is no anticipated impact to this contract.

1130-65-71/72/73/74/78: Appleton – De Pere, IH-41 Mainline, Meade Street to Holland Road, STH 441 Interchange, STH 441 Mainline Northland to IH-41. Proposed work includes mainline reconstruction of IH-41 and STH 441, and reconstruction of the IH-41/STH 441 interchange. Work under this contract is anticipated to begin September 2026, with completion anticipated in August 2029. Overlapping crossover, traffic control, and detour routes may occur. This project intends to use the CTH N interchange northbound exit and southbound entrance ramps as a detour route from June 2027 to mid-May 2028.

This project will also need the IH 41 southbound crossover shown in project 1130-66-71 Stage 2B to be constructed and open to traffic by September 1, 2028. This project will also need the IH 41 northbound crossover shown in project 1130-66-71 Stage 3 to be constructed and open to traffic by July 12, 2029.

Coordinate activities and all closures at CTH N with Project 1130-65-71/72/73/74/78.

IH 41, Project 1130-67-72/76/86: Appleton – De Pere, IH-41 Mainline, Miners Way – Little Rapids Road, S County Line Rd (CTH U) Intchg and CTH U Frontage Roads in Outagamie and Brown Counties.

Proposed work includes reconstruction of IH-41, the IH 41/S County Line Road (CTH U) interchange and adjacent frontage roads. Work under this contract is anticipated to begin in August 2025, with completion anticipated in November 2027. Coordinate activities with Project 1130-67-72/76/86.

IH 41, Project 1130-68-71: Appleton – De Pere, IH-41 Mainline, Miners Way – CTH F in Brown County.

Proposed work includes reconstruction of IH 41 from Miner’s Way to CTH F. Work under this contract is expected to begin in June 2027, with completion anticipated in April 2030. There is no anticipated impact to this contract.

IH 41, Project 1130-68-72: Appleton – De Pere, IH-41 Mainline, Little Rapids Road– CTH F in Brown County. Proposed work includes reconstruction of the IH 41/Freedom Road (CTH S interchange. Work under this contract is expected to begin in June 2027, with completion anticipated in June 2028. There is no anticipated impact to this contract.

IH 41, Project 1130-68-76: Appleton – De Pere, Freedom Road (CTH S Interchage in Brown County.

Proposed work includes reconstruction of IH 41 from Little Rapids Road to CTH F. There is no anticipated impact to this contract.

ner41-105 (06102025)

1.4 Notice to Contractor – Project Storage and Staging Areas.

Supplement sections 106.4(2) and 107.9 of the standard spec with the following:

To accommodate staged construction of the department planned contracts for the IH 41 corridor expansion project, the department will implement a review and approval process for use of storage and staging areas within the right-of-way and adjacent to the project.

Equipment and materials can be stored within the slope intercepts shown on the plan and within the footprint of the roadway or structures within the project limits. Storage of equipment and materials will not be allowed in areas which are restricted by traffic and other requirements provided in the special provisions.

1130-66-71, 1130-66-72, 1130-66-77, 1130-66-84 8 of 150

Make any requests for storage and staging areas located outside of the slope intercepts or outside of the proposed roadway and structure footprints to the engineer. Include in the request the anticipated date for occupying the area, the anticipated date for vacating the area, and a proposed restoration plan for the area. The planned project storage and staging areas shall be submitted to the engineer for review and approval a minimum of 14 calendar days prior to the anticipated implementation. Review by the engineer does not constitute approval.

ner41-106 (12112025)

1.5 Notice to Contractor – Geotechnical Exploration Information.

Information relative to subsurface exploration, borings, soundings, water levels, elevations, or profiles is available for review at the department's Region office. Contact Scott Ebel at 920-360-2225, scott.ebel@dot.wi.gov, to request this information.

• Geotechnical Site Investigation Report: B-44-0334 & 0335, Mach 2, 2026.

• Geotechnical Site Investigation Report: B-44-0336 & 0337, March 2, 2026.

• Geotechnical Site Investigation Report: C-44-0150, September 19, 2025.

• Geotechnical Site Investigation Report: N-44-0018, January 14, 2025.

• Geotechnical Site Investigation Report: 66-1203 Pond (CTH J Ramp D Pond) June 23, 2025.

• Geotechnical Site Investigation Report: 66-1126 Pond (STH 55 Ramp A Pond), October 14, 2025.

• Geotechnical Site Investigation Report: 66-1128 RT Pond, October 17, 2025.

• Geotechnical Site Investigation Report: STH 55 (Delaglade Street) DGD Ramp, March 4, 2025.

Review the available information to determine if it is of use. Whether or not the listed geotechnical information is used, the work shall still be carried out in accordance with the plans and specifications.

ner41-106 (20240917)

1.6 Notice to Contractor – Containment System.

Provide a rigid containment system throughout bridge construction over live traffic lanes and pedestrian facilities capable of protecting underlying facilities and vehicles from falling construction debris. Design, detail, install, and maintain the containment system to catch construction debris between exterior girders without extending below the bottom of the girders at the containment system’s maximum deflection. The containment system is not intended to be a secondary falsework/formwork system. Put the containment system in place before beginning construction operations that may generate debris over live traffic or active pedestrian facilities. Operations may include, but are not limited to: full or partial deck removals, falsework installation, deck repairs, and deck pours. This containment system is not required if construction operations are performed when the facilities below are under full closure. This containment system does not replace any requirements under standard spec 203. Include details of the proposed containment system in the falsework submittal per standard spec 502.3.2. The containment system is incidental to the bridge construction items.

stp-502-015 (20250701)

1.7 Notice to Contractor – Safety and Personnel Identification Program.

All workers shall wear OSHA and ANSI compliant safety head protection, safety glasses, safety-toe protective footwear, and safety vest at all times while within the project footprint. All workers shall wear OSHA and ANSI compliant safety pants within the right of way of a roadway with a posted speed limit of 50 mph or greater unless separated from traffic by positive protection (e.g., temporary concrete barrier).

From dusk to dawn, all workers shall wear OSHA and ANSI compliant safety pants.

The prime contractor shall provide a copy of their current Company Safety Plans to the department 7 days prior to the preconstruction meeting. All workers shall comply with the Safety Plans of their employer.

All contractor personnel will be required to register in the program prior to performing work. Valid photo identification which includes unexpired driver’s license, government issued identification cards, military identification, passport, or other identification approved by the department will be required to register. All

1130-66-71, 1130-66-72, 1130-66-77, 1130-66-84 9 of 150 personnel registered will be issued a hard hat sticker with an identification number by the department.

Stickers shall be placed in a visible location on the hard hat. Register at the IH 41 corridor field office during normal business hours.

Noncompliance with this contract provision may result in removal of contractor personnel from the project or suspension of work according to standard spec 108.6 applicable under the contract.

ner41-108 (05072024)

1.8 Notice to Contractor, Right-of-Way Fencing.

Maintain existing right-of-way fencing, as shown in plans, until construction operations require removal, or as directed by the engineer. Notify the department 7 calendar days in advance of existing fence removal.

Do not remove any existing fence without prior approval from the engineer.

Provide temporary connections between existing and proposed fencing as needed to maintain continuous right-of-way fencing at all times. Fencing quantities have been included in the contract for this purpose.

Submit a fence staging plan to the engineer detailing existing fence removal, proposed fence placement, and temporary fence use. Temporary fencing use to be kept to a minimum. Staging of installation shall provide adequate measures to protect the general public.

Maintain all existing freeway right-of-way fencing or temporary fencing disturbed by operations.

ner41-616 (07092024)

1.9 Notice to Contractor Contractor – Electronic Load Tickets.

Replace standard spec 109.1.4.3 (1) with the following:

(1) Submit an electronic ticket for each load of material for the following bid items:

• 415.0090 Concrete Pavement 9-Inch SY

• 415.0095 Concrete Pavement 9 1/2-Inch SY

• 415.0410 Concrete Pavement Approach Slab SY

• 415.2010 Concrete Truck Apron 12-Inch SY

• 460.5223 HMA Pavement 3 LT 58-28 S

• 460.5224 HMA Pavement 4 LT 58-28 S

• 460.6223 HMA Pavement 3 MT 58-28 S

• 460.6224 HMA Pavement 4 MT 58-28 S

• 465.0125 Asphaltic Surface Temporary

• 502.0100 Concrete Masonry Bridges

• 504.0100 Concrete Masonry Culverts

• 531.1100 Concrete Masonry Ancillary Structures Type NS

• SPV.0035 Special 0800. HPC Masonry Structures

• SPV.0180 Special 0100. Concrete Pavement 10 1/2-Inch Special

Include the information as specified in 109.1.4.2 on each electronic ticket. If there is a failure in the electronic ticket system, provide a printed ticket for each load of material as a substitute for electronic tickets.

stp-107-230 (20250108)

1.10 Work By Others.

At the CTH N Park and Ride, the Wisconsin Department of Transportation Northeast Region Electrical Unit, (920) 360-4749, will perform the following work:

• Provide and install the lighting control cabinet

• Terminate all electrical wire in the lighting control cabinet

1130-66-71 Little Chute Municipal Water Dept (COMLN) has underground communication lines crossing IH-41 at Station 1043’NB’+48. Little Chute Municipal Water Dept does not anticipate any conflicts with these facilities.

1130-66-72 Bug Tussel (COMLN) has underground communication lines crossing IH-41 at Station 1083’NB’+10 installed under WisDOT permit 2025543. Bug Tussel does not anticipate any conflicts with these facilities.

1130-66-71, 1130-66-72, 1130-66-77, 1130-66-84 10 of 150

1.11 Field Facilities.

The department will provide primary field…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .