About this file

This is an Addendum 1 to the sealed bid solicitation issued by the Melbourne Airport Authority (MLB) for gutter repair services at multiple locations. The solicitation requests qualified bidders to submit sealed bids for gutter repairs per specifications outlined in Appendix A. The original bid due date has been extended to Tuesday, June 30, 2026, at 3:00 PM EST. The scope of work includes materials and labor for gutter repairs at two primary locations: Aerospace Location and Tower Access Road, with bidders required to specify whether they will use 0.032-inch or 0.040-inch thickness materials. Bidders must complete and submit all required forms including the Bidder Response Sheet, Bid Submission Form, Notice of ITB Exemptions/Deviations, Conflict of Interest declaration, Public Entity Crimes certification, Non-Collusive Affidavit, Certification of Debarment, and E-Verify Form. Bids are valid for ninety (90) calendar days following the bid closing time.

The pricing structure requires bidders to submit separate line items for materials and labor at each location, as well as optional pricing for additional out-of-scope repairs including 7-inch commercial gutter boxes, 4-inch by 5-inch aluminum downspouts for one-story and two-story applications, additional material markup percentages, and hourly labor rates for additional repairs. Bidders must also provide guaranteed materials receipt and project completion dates. The Airport Authority will sponsor badging fees and recommends at least two onsite individuals obtain badged access for airfield-connected areas; unbadged workers must remain under direct escort. Site access requires coordination with Airport Operations for gated areas, and Airport staff approval is necessary for dumpster placement to avoid disrupting tenant operations. The Airport requests at least 48 hours' advance notice for work within tenant leaseholds. The Airport reserves the right to award in any combination of options or none.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MELBOURNE ORLANDO INTERNATIONAL AIRPORT• MLB

One Air Terminal Parkway Suite 220

Melbourne, FL 32901, USA MLBair.com

1TB 2026-0604: Gutter Repairs Tuesday, June 22, 2026

Addendum 1

This is an Addendum to and shall be considered as part of the original solicitation package for the above-mentioned solicitation. Submission of a response to this solicitation acknowledges receipt and understanding of this addendum.

ADDITIONAL INFORMATION

The bid due date has changed, and has been extended to:

• Tuesday, June 30, 2026 at 3:00 PM EST

RESPONSES TO QUESTIONS RECEIVED

1. Question: "Any restrictions on LIFT or work vehicle access to work areas, specifically gated areas behind STS and Firehouse (less important)."

Response: The south side of the STS facility is restricted. There are 2 manual vehicle gates located along the secure perimeter that will require access from Airport Operations to reach this side of the facility. Additionally, the Airport would like to provide our tenants with at least 48 hours of advance notice when work is expected to take place within the limits of their leaseholds.

2. Question: "Where can dumpster(s) be placed near the work area?"

Response: Dumpsters may be placed in parking/paved areas near the work site, as designated by Airport staff. It is very important that airport staff is involved in coordinating placement so as to not impede tenant operations.

3. Question: "If badging is deemed necessary, should the contractor account for any cost beyond time for badging with airport team?"

Response: A portion of both buildings are connected to the airfield, therefore, having someone on site with badged access is necessary. The Airport recommends at least two (2) onsite individuals to be badged. Anyone working without a badge will have to remain under direct escort (all escorts must be seen and heard) at all times by those with badges. The Airport will sponsor badging fees for this project.

Page 1/3 - ITB 2026-0604: Gutter Repairs, Addendum 1

ADDENDUM 1: REVISED BIDDER RESPONSE SHEET

This sheet must be signed and returned with your bid response

ACKNOWLEDGEMENT OF ITB NO: ITB # 2026-0604 – Gutter Repairs

FORMAT CHECKLIST (refer to section VI)

Required Forms

Bidder Response Sheet Bid Submission Form Notice of ITB Exemptions/Deviations Conflict of Interest Public Entity Crimes (two pages) Non-Collusive Affidavit Certification of Debarment E-Verify Form

The undersigned hereby acknowledge the receipt of the following documents:

Addenda Acknowledgement (if provided) Addendum No:___________ Dated:____________

Addendum No:___________ Dated:____________

Addendum No:___________ Dated:____________

Addendum No:___________ Dated:____________

BIDDER’S CERTIFICATION:

The signed Bidder certifies that he/she has read and thoroughly understands the terms, conditions, and specifications contained in this ITB, and that the items of material or services offered in its bid meets the required minimum specifications. It is understood that any item offered as an alternate not meeting specifications might be rejected.

Bidder further certifies that all information contained in this bid is truthful to the best of Bidder’s knowledge and belief and that he/she is duly authorized to submit the bid on behalf of the vendor/contractor and that the vendor/contractor is ready, willing, and able to perform if awarded a contract.

Bidder offers and agrees to furnish services specified in the ITB at the prices or rates quoted in its bid, including the following:

The Bidder certifies, by submission and signature of this bid that the Bidder complies fully with the drug-free workplace certificate. Please indicate below, whether Bidder’s company meets the drug-free workplace certification:

[ ] Does meet Drug-free Workplace Certification [ ] Does not meet Drug-free Workplace Certification

Taxpayer ID, Federal Employer ID, or SSN

Phone

Company Name Authorized Officer Signature

Mailing Address

Typed/Printed Name

City-State-Zip

Title

Email Address

Date

ITB # 2026-0604: Gutter Repairs, Addendum 1 Revised Price Sheet; Page 2/4

ADDENDUM 1: REVISED BID SUBMISSION FORM (Three Pages)

Bidders are requested to complete this form, sign it and return it as part of their bid submission. The bidder shall fill in this form in accordance with the instructions indicated. No alterations to its format shall be permitted and no substitutions shall be accepted.

Date: _______________________ Subject: ITB # 2026-0604 We, the undersigned, declare and certify that:

We offer to supply in conformity with the bidding documents, including the Melbourne Airport Authority’s

General and Special Conditions, and in accordance with all bid specifications and requirements.

Work Description

Numeric Price Written Price

Example

$1.00 One Dollar and Zero Cents

100 Aerospace Location: Materials Per Scope

Write Thickness Bid: 0.032 inch or 0.040 inch

100 Aerospace Location: Labor Per Scope

901 Tower Access Road: Materials Per Scope

901 Tower Access Road: Labor Per Scope

Total Cost for Both Locations

Bid Submission Form Price Sheet Continues on following page

ITB # 2026-0604: Gutter Repairs, Addendum 1 Revised Price Sheet; Page 3/4

Additional Repairs Out of Scope

7-inch Commercial Gutter Box (price by foot)

Write Thickness Bid:

4-inch by 5-inch aluminum one-story downspouts with long returns (price by single per unit cost)

4-inch by 5-inch aluminum two-story downspouts with long returns (price by single per unit cost)

Additional Material % Markup $

Additional Repair Labor Cost Per Hour $

Bid Submission Form Price Sheet Continues on following page

Sum and Total Bid Total Material Cost and Total Labor Cost: $__________________________________

ITB # 2026-0604: Gutter Repairs, Addendum 1 Revised Price Sheet; Page 4/4

Additional Equipment Required? If so, provide itemized costs and additional line item breakdown attached and list these costs in sum here.

Total Additional Equipment: $ _________________________________

Guaranteed Materials Receipt Date:___________________

Guaranteed Project Completion Date:__________________

The total price of our bid is as outlined in above detail. The Airport reserves the right to award in any combination of options or none. Bidder agrees that bid shall be good and may not be withdrawn for a period of ninety (90) calendar days after the scheduled closing time for receiving bids.

SIGNATURE COMPANY NAME

PRINT NAME OF CERTIFYING OFFICIAL BUSINESS ADDRESS

CITY, STATE, ZIP CODE