About this file
This is an award letter issued by Central Florida Electric Cooperative, Inc. (CFEC) for Bid 2026-01 related to 2026-2027 storm response services and line maintenance. The RFP solicited general storm response services including damage assessment and restoration of distribution circuits, poles, structures, conductors, connecting hardware, guying systems, transformers, and associated hardware; restoration of damaged distribution infrastructure through transportation of materials, installation of poles and structures, conductor repair, and installation of line hardware; damage assessment and restoration of power to substations and switching stations; and site cleanup including removal of damaged facilities. The proposal submission deadline was February 27, 2026 at 3:00 p.m., with questions accepted until February 11, 2026. The contract award was anticipated on April 3, 2026, with rates remaining in effect through December 31, 2027. The award was made to seven contractors: F & H Electrical Contractors, Inc.; Freedom Powerline; Irby Construction Company; Pike Electric LLC; River City Construction, Inc.; SPE Utility Constructors FD LLC; and The State Group Industrial Limited. Notably, CFEC clarified that since this was not a public bid opening and CFEC does not meet the definition of a "state and local government agency," bid tabulations would not be shared publicly.
Contractors were required to submit labor pricing for crew foreman, JL/Class A lineman, apprentice lineman, operator, and groundman positions at both straight time and premium time rates, as well as equipment pricing for specified equipment including 55-foot buckets, digger derricks, service buckets, and foreman pickups. Proposals were evaluated on a 100-point scale with a minimum threshold of 70 points, with scoring based on cost/price (0-30 points), prior experience (0-20 points), references (0-20 points), technical merit (0-15 points), and responsiveness to proposal (0-15 points). Insurance requirements included minimum coverage of $1,000,000 per occurrence for comprehensive general liability, $2,000,000 per occurrence for excess liability, $1,000,000 per occurrence for business automobile liability, statutory workers' compensation, and $500,000 employer's liability. Contractors were required to provide three letters of reference, OSHA 300A summaries and incident rates for 2022-2024, Experience Modification Rates, and disclosure of any defaults, terminations, litigation, or debarment in the past five years. No specific set-asides or restrictions on organization types were identified, and no specific budget or award values were disclosed in the available documentation. CFEC reserves the right to award the contract to the respondent submitting the best overall responsive proposal rather than the lowest-priced bidder and requested that all contractors sign the contract as presented without modifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2026-01_Award_Letter.pdf | ||
| 2026-2027_Line_Maintenance_Storm_RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Central Florida Electric Cooperative, Inc.
PO Box 9, Chiefland, FL 32644
11491 NW 50th Ave, Chiefland, FL 32626
May 5, 2026
Bid 2026-01
Has been awarded to:
This list is limited to contractors who are not affiliated with the MSA list through FECA.
F & H Electrical Contractors, Inc.
Freedom Powerline Irby Construction Company Pike Electric LLC River City Construction, Inc.
SPE Utility Constructors FD LLC The State Group Industrial Limited
Since this was not a public bid opening and Central Florida Electric Cooperative, Inc. (CFEC) does not meet the definition of “state and local government agency,” we do not share the bid tabulations. CFEC reserves the right to protect our privacy and business information of our bidders and vendors.
Contract(s) for all storm RFP’s will be emailed starting May 4, 2026.
Please note that we are asking all contractors to sign the contract as is.