2026-S1138_Roofing (Greene County)_Addendum 2_2026_8_31.pdf
PDF 629 KB Posted
- Solicitation number
- 2137881
- Issued by
- Greene County, New York
About this file
This is Addendum 02 to Invitation for Bid #2026-S1138 for roofing products and services, waterproofing, and related products and services issued by Greene County, New York in coordination with OMNIA Partners for distribution to participating public agencies throughout New York State and nationally. The addendum, issued on August 31, 2026, amends the original bid documents dated August 6, 2026, by inserting two missing line items into Attachment A—the Bid Form. The additions include: (1) Item 24.01.022 for 1 Ply Modified Base Sheet with ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III (550 lbf/in tensile), priced per square foot; and (2) Item 24.03.02 for 1 Ply High Performance Cap Sheet with Polyurethane Resin Modified coating, ASTM D 6163 Fiberglass Reinforced Asphalt-Based Membrane (215 lbf/in tensile), also priced per square foot. The addendum specifies prevailing wage rate multipliers for roofers, masons, and sheet metal workers ranging from $10.00 to $120.00 per hour, referencing the New York Department of Labor prevailing wage database for current rates. Sealed bids were originally due September 8, 2026, at 3:00 P.M. local time at Greene County's office in Catskill, New York.
The bid form encompasses an extensive scope of work organized into multiple sections covering professional services, tear-off and debris disposal, deck replacement, insulation recovery options, roofing system coatings, built-up and modified roofing configurations, metal roofing systems, restoration and recoating services, single-ply roof installations, waterproofing membrane systems, and wall coatings. Pricing is requested on a per-square-foot, per-unit, per-day, per-mile, per-linear-foot, or percentage basis depending on the line item. All labor must comply with New York prevailing wage requirements, with rates subject to periodic updates through the state labor department website. The Master Agreement extends for an initial three-year term with two optional one-year renewal periods not to exceed five years total, with pricing fixed for the first twelve months and subject to reasonable adjustments thereafter based on documented market conditions with thirty days' notice.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2026-S1138_Roofing (Greene County)_Addendum 1_2026_8_17.pdf | ||
| 2026-S1138_IFB_Roofing Products Services Waterproofing_final.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM 02
For
Invitation for Bid # 2026-S1138
Roofing Products and Services, Waterproofing, and Related Products and Services
Addendum 02 Issue Date: August 31, 2026
Purpose: The purpose of the addendum is to make changes, additions, deletions, revisions, and clarifications to the first submission documents dated August 6, 2026, for the above referenced project. Details of this addendum are to be incorporated into the first submission. All other terms and provisions of initial project submission shall remain in full force and effect.
Changes:
1. Update to Attachment A – Bid Form to insert 2 missing items, as shown below. Bidder should utilize the attached revised Attachment A – Bid Form when completing and submitting their bid:
END OF ADDENDUM 02
Additional Roofing Configurations UNIT $ per Unit
24.01.022 1 Ply Modified Base Sheet BASE PLY OPTION: ASTM D 6162 SBS. Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - 550 lbf/in tensile SF
24.03.02
1 Ply High Performance Cap Sheet Polyurethane Resin Modified, Adhered and with Finished Surfacing ROOFING MEMBRANE: ASTM D 6163 Fiberglass Reinforced Asphalt-Based Membrane Modified with a Specially-Designed Polyurethane Resin Mineral-Surfaced Modified Bituminous Sheet Material Type III - 215 lbf/in tensile SF
Journeyman
Prevailing
Wage
Rate Roofer Mason Sheet Metal
$10.00
$12.50
$15.00
$17.50
$20.00
$22.50
$25.00
$27.50
$30.00
$32.50
$35.00
$37.50
$40.00
$42.50
$45.00
$47.50
$50.00
$52.50
$55.00
$57.50
$60.00
$62.50
$65.00
$67.50
$70.00
$72.50
$75.00
$77.50
$80.00
$82.50
$85.00
$87.50
$90.00
$92.50
$95.00
$97.50
$100.00
$102.50
$105.00
$107.50
$110.00
$112.50
$115.00
$117.50
$120.00
Line Item Multiplier to Adjust Labor Costs Based Upon the Prevailing Wage Rate. Prevailing wage found at https://apps.labor.ny.gov/wpp/publicViewPWChanges.do?method=showIt
Multiplier for Prevailing
Wage Rates
ATTACHMENT A
BID FORM
Line Item Unit $ per Unit
1.00 Roof Management, Design Assistant and/or Professional Services
1.01 Full-time Quality Assurance monitoring DAY
1.02 Asbestos core testing and analysis (testing only, excludes labor for sampling and repair) EA
1.03 Analysis and evaluation (14” x 14” roof core) (Lab testing only, repairs charged at roof repair rates for appropriate system type) EA
1.04 Aerial Roof Survey - Roof Pictures & Drawings Including Geometries, Slope, Calculated Area and Perimeter Measurements EA
1.05 Aerial Wall Survey - Wall Pictures & Drawings Including Geometries, Calculated Area and Perimeter Measurements EA
1.06 Manufacturer Standing Seam Material Quantity Estimating EA
1.07 Nuclear Moisture Survey, Non destructive roof scan
1.07.01 Non destructive roof scan, up to 20 000 SF EA
1.07.02 Non destructive roof scan, over 20,000 SF SF
1.08 Infrared Moisture Scanning
1.08.01 Non destructive infrared roof scan, up to 20 000 SF EA
1.08.02 Non destructive infrared roof scan, over 20,000 SF SF
1.08.03 Aerial infrared roof scan at night TRIP
1.09 Infrared scanning equipment rental DAY
1.10 Roof investigation (visual roof survey)
1.10.01 Roof Investigation (Roof by Roof), per hour HOUR
1.10.02 Visual Roof Survey (Roof by Roof) up to 20,000 SF EA
1.10.03 Visual Roof Survey (Roof by Roof) over 20,000 SF SF
1.10.04 Visual Roof Survey (Single Campus - All Roof Sections) SF
1.10.05 Visual Roof Survey (Multiple Campuses City-/County-wide - All Roof Sections) SF
1.10.06 Visual Roof Survey (Multiple Campuses State-wide - All Roof Sections) SF
1.10.07 Roof core cut (roof by roof) EA
1.10.08 Roof core cut per roof section (all roof sections on campus(s)) EA
1.11 Comprehensive reporting
1.11.01 Comprehensive report for visual survey (Roof by Roof) EA
1.11.02 Comprehensive report for visual survey(All Roof Sections on Campus(es) EA
1.11.03 Comprehensive report for each roof section(s) surveyed (Item 1.07) or scanned (Item 1.08) EA
1.11.04 Comprehensive report enertered into on-line data base for dynamic reporting and tracking all roofing sections on Campus(s) EA
1.12 Manufacturer's Technical Representative Contractor Training Session at Job Start-Up DAILY
1.13 Wind Uplift Testing – Mobilize and provide wind uplift testing per Factory Mutual System Roof Design Manual FM 1-52 EA
1.14 Roof drawings to scale with all rooftop equipment and penetrations
1.14.01 Roof drawings (Roof by Roof) EA
1.14.02 Roof drawings (All Roof Sections on Campus(es) EA
1.15 Project Building Code Review EA
1.16 Additional and Occasional Services
1.16.01 Project Architect for Design Professional Services HOUR
1.16.02 Principle Architect for Design Professional Services HOUR
1.16.03 Project Engineer for Engineering Reviews HOUR
1.16.04 Principle Architect for Engineering Reviews HOUR
1.16.06 Roof Consultant HOUR
1.16.07 Full-Time Job Site Superintendent DAY
1.16.08 CAD Draftsman HOUR
1.17 Laboratory Analysis
1.17.01 Laboratory Fungal Analysis: Cultured Fungi Identification & Enumeration (Not including engineering time for sampling) EA
1.17.02 Laboratory Fungal Analysis: Total Fungi Spore Count (Not including engineering time for sampling) EA
1.17.03 Laboratory Mold Analysis: Viable Airborne Mold Analysis (Not including engineering time for sampling) EA
1.17.04 Laboratory Analysis: Viable Surface Swab or Bulk Substrate Analysis (Not including engineering time for sampling) EA
1.17.05 Laboratory Analysis: Non-Viable Surface Swab or Bulk Substrate Analysis (Not including engineering time for sampling) EA
1.17.06
Destructive Roof Sample Analysis:
Comprehensive laboratory testing of a core sample from an existing roof to include tensile/tear strength, scrim type, interply bitumen weight and roof composition; Repair the roof core area with similar materials. EA
1.18 Travel Expenses
1.18.01 Per Diem – Meals and Incidentals DAY
IFB #2026-S1138 - Roofing Products and Services, Waterproofing, and Related Products and Services Attachment C - Bid Form
1.18.02 Lodging DAY
1.18.03 Mileage on Company / Personal Vehicle MILE
1.18.04 Airfare (Economy) JOB
1.18.05 Vehicle Rental DAY
1.19 Seamer Rental Charges DAY
1.20 Set-up Charges for Metal In-Shop Fabrication EA
1.21 Set-up On-Site Roll Forming EA
1.22 Roof Fastener Pull Tests (As Many as Required per Roof Section) EA
1.23 Wind Uplift Design Calculations EA
1.24 Roof Drainage Capacity Calculations EA
1.25 Roof Edge Metal Calculations - ANSI/SPRI ES-1 Standards EA
1.26 Dew Point Calculations EA
1.27 Energy Payback Calculations EA
1.28 Project Life-Cycle Cost Calculation EA
1.29 Substantial Completion Walkthrough with Report and Punchlist
1.30 Final Walkthrough with Report EA
1.31 On-Site Quality Control Inspections with Report from Manufacturer's Rep - 3 Days per Week WEEK
1.32 "As-Built" Drawings Upon Project Completion EA
1.33 R.A. or P.E. Reviewed and Stamped Shop Drawings EA
1.34 R.A. or P.E. Reviewed and Stamped Specifications EA
1.35 Non-R.A./P.E. Reviewed Shop Drawings EA
1.36 Project Design Assistance - Hourly Rate for Consultations with Architect of Record EA
1.37 Project Design Assistance - Development of a recommended specification for a roofing or waterproofing project EA
1.38 Roof Asset Management Report with recommended options for future course of actions and associated budgets for capital expense and maintenance planning. EA
1.39 Five year capital expense and maintenance plan ( All roof section on for campus(es)) EA
1.40 Additional Professional Services
1.40.01
Option 1: Professional Services (Third party architectural design, engineering or consulting services quote on corporate letterhead) Cost plus added to quote %
1.40.02
Option 2: R.S. Means or Gordian Group Catalog (Used when professional services line item pricing is not available) Cost plus added to catalog pricing %
2.00 Tear-off & Dispose of Debris
2.01 SF
2.02 SF
2.03 SF
2.04 SF
2.05 SF
2.06 SF
2.07 SF
2.08 SF
2.09 SF
2.10 SF
2.11 SF
2.12 SF
2.13 SF
2.14 SF
2.15 SF
SYSTEM TYPE
BUR W/ Insulation and Gravel Surfacing - Metal Deck
SYSTEM TYPE
BUR W/ Insulation and Gravel Surfacing - Wood / Tectum Deck
SYSTEM TYPE
BUR W/ Insulation and Gravel Surfacing - Lightweight / Gyp Deck
SYSTEM TYPE
BUR W/ Insulation and Gravel Surfacing - Concrete Deck
SYSTEM TYPE
BUR W/ Insulation and Mineral Surfacing - Metal Deck
SYSTEM TYPE
BUR W/ Insulation and Mineral Surfacing - Wood / Tectum Deck
SYSTEM TYPE
BUR W/ Insulation and Mineral Surfacing - Lightweight / Gyp Deck
SYSTEM TYPE
BUR W/ Insulation and Mineral Surfacing - Concrete Deck
SYSTEM TYPE
Single-Ply W/ Insulation - Metal Deck
SYSTEM TYPE
Single-Ply W/ Insulation - Wood / Tectum Deck
SYSTEM TYPE
Single-Ply W/ Insulation - Lightweight / Gyp Deck
SYSTEM TYPE
Single-Ply W/ Insulation - Concrete Deck
SYSTEM TYPE
Ballasted Single-Ply W/ Insulation - Metal Deck
SYSTEM TYPE
Ballasted Single-Ply W/ Insulation - Wood / Tectum Deck
SYSTEM TYPE
Ballasted Single-Ply W/ Insulation - Lightweight / Gyp Deck
2.16 SF
2.17 SF
2.18 SF
2.19 SF
2.20 SF
2.21 SF
2.22 SF
2.23 SF
2.24 SF
2.25 SF
2.26 SF
2.27 SF
2.28 SF
2.29 SF
2.30 SF
2.31 SF
2.32 SF
2.33 SF
2.34 SF
2.35 SF
2.36 SF
2.37 SF
2.38 SF
2.39 SF
2.40 SF
2.41 SF
2.42 SF
2.43 SF
2.44 SF
2.45 SF
2.46 SF
SYSTEM TYPE
Coal Tar BUR W/ Insulation and Mineral Surfacing - Metal Deck
SYSTEM TYPE
Coal Tar BUR W/ Insulation and Mineral Surfacing - Wood / Tectum Deck
SYSTEM TYPE
Coal Tar BUR W/ Insulation and Mineral Surfacing - Lightweight / Gyp Deck
SYSTEM TYPE
Ballasted Single-Ply W/ Insulation - Concrete Deck
SYSTEM TYPE
Coal Tar BUR W/ Insulation and Gravel Surfacing - Metal Deck
SYSTEM TYPE
Coal Tar BUR W/ Insulation and Gravel Surfacing - Wood / Tectum Deck
SYSTEM TYPE
Coal Tar BUR W/ Insulation and Gravel Surfacing - Lightweight / Gyp Deck
SYSTEM TYPE
Coal Tar BUR W/ Insulation and Gravel Surfacing - Concrete Deck
SYSTEM TYPE
BUR w/ Mineral Surfacing to the Existing Insulation (Insulation to be Re-Used)
SYSTEM TYPE
Single-Ply to the Existing Insulation (Insulation to be Re-Used
SYSTEM TYPE
Coal Tar BUR W/ Insulation and Mineral Surfacing - Concrete Deck
SYSTEM TYPE
Metal Roofing System - Metal Deck
SYSTEM TYPE
Metal Roofing System - Wood / Tectum Deck
SYSTEM TYPE
Metal Roofing System - Lightweight / Gypsum Deck
SYSTEM TYPE
Metal Roofing System - Concrete Deck
SYSTEM TYPE
Dimensional/Architectural Shingle Roof - Wood Deck
SYSTEM TYPE
3-Tab Shingle Roof - Wood Deck
SYSTEM TYPE
Clay Tile Shingle Roof - Wood Deck
SYSTEM TYPE
Concrete Tile Shingle Roof - Wood Deck
SYSTEM TYPE
Slate Tile Shingle Roof - Wood Deck
SYSTEM TYPE
Cedar / Wood Shake Shingle Roof - Wood Deck
SYSTEM TYPE
Add to save good Clay Tile Shingles for reuse
SYSTEM TYPE
Add to save good Concrete Tile Shingles for reuse
SYSTEM TYPE
Add to save good Slate Tile Shingles for reuse
SYSTEM TYPE
Add to save good Cedar / Wood Shake Shingles for reuse
SYSTEM TYPE
Polyurethane Foam (PUF) Roof (Average of 2" thick) W/ Underlying Insulation and UV-Resistant Coating - Metal Deck
SYSTEM TYPE
Polyurethane Foam (PUF) Roof (Average of 2" thick) W/ Underlying Insulation and UV-Resistant Coating - Wood / Tectum Deck
SYSTEM TYPE
Polyurethane Foam (PUF) Roof (Average of 2" thick) W/ Underlying Insulation and UV-Resistant Coating - Lightweight / Gyp Deck
SYSTEM TYPE
Polyurethane Foam (PUF) Roof (Average of 2" thick) W/ Underlying Insulation and UV-Resistant Coating - Concrete Deck
SYSTEM TYPE
Add of Each Additional Average Depth 1" of Polyurethane Foam (PUF) Roofing
SYSTEM TYPE
BUR w/ Gravel Surfacing to the Existing Insulation (Insulation to be Re-Used)
2.47 SF
2.48 SF
2.49 SF
2.99 %
3.00 Removal & Replacement of Roof Deck
3.01 SF
3.02 SF
3.03 SF
3.04 SF
3.05 SF
3.06 SF
3.07 SF
3.08 SF
3.09 SF
3.10 SF
3.11 SF
3.12 SF
4.00 Insulation Recovery Board & Insulations Options
4.01 SF
4.02 SF
4.03 SF
4.04 SF
4.05 SF
4.06 SF
4.07 SF
4.08 SF
4.09 SF
4.10 SF
SYSTEM TYPE
Ballasted Single-Ply to the Existing Insulation (Insulation to be Re-Used
RECOVERY BOARD TYPE
1/2" Treated Gypsum Insulation Board with Glass-Mat (e.g. DensDeck / Securock / Equal) Installed Over an Existing Roof Adhered in Hot ASTM D 312 Type III or IV Asphalt; Mopped
RECOVERY BOARD TYPE
1/2" Treated Gypsum Insulation Board with Glass-Mat (e.g. DensDeck / Securock / Equal) Installed Over an Existing Roof Adhered with Insulation Adhesive
RECOVERY BOARD TYPE
1/2" Treated Gypsum Insulation Board with Glass-Mat (e.g. DensDeck / Securock / Equal) Installed Over an Existing Roof Mechanically Fastened to Roof Deck - Metal Deck
SYSTEM TYPE
Coal Tar BUR with Gravel Surfacing to the Existing Insulation (Insulation to be Re-Used)
SYSTEM TYPE
Coal Tar BUR with Mineral Surfacing to the Existing Insulation (Insulation to be Re-Used)
MULTIPLIER - TEAR-OFF & DISPOSE OF DEBRIS
Each Additional Roof System
DECK TYPE
Spot Metal Deck Replacement (Multiple areas under 1 square)
DECK TYPE
Spot Wood Deck Replacement (Multiple areas under 1 square)
DECK TYPE
Spot Gypsum Deck Replacement (Multiple areas under 1 square)
DECK TYPE
Spot Concrete Deck Replacement (Multiple areas under 1 square)
DECK TYPE
Spot Lightweight Deck Replacement (Multiple areas under 1 square)
DECK TYPE
Spot Tectum Deck Replacement (Multiple areas under 1 square)
DECK TYPE
Large Areas of Metal Deck Replacement (Replacement areas averaging greater than 1 square)
DECK TYPE
Large Areas of Wood Deck Replacement (Replacement areas averaging greater than 1 square)
DECK TYPE
Large Areas of Gypsum Deck Replacement (Replacement areas averaging greater than 1 square)
DECK TYPE
Large Areas of Concrete Deck Replacement (Replacement areas averaging greater than 1 square)
DECK TYPE
Large Areas of Lightweight Deck Replacement (Replacement areas averaging greater than 1 square)
DECK TYPE
Large Areas of Tectum Deck Replacement (Replacement areas averaging greater than 1 square)
RECOVERY BOARD TYPE
1/2" Wood Fiber or Perlite Board Installed Over an Existing Roof Adhered in Hot ASTM D 312 Type III or IV Asphalt;
Mopped
RECOVERY BOARD TYPE
1/2" Wood Fiber or Perlite Board Installed Over an Existing Roof Adhered with Insulation Adhesive
RECOVERY BOARD TYPE
1/2" Wood Fiber or Perlite Board Installed Over an Existing Roof Mechanically Fastened to Roof Deck - Metal Deck
RECOVERY BOARD TYPE
1/2" Wood Fiber or Perlite Board Installed Over an Existing Roof Mechanically Fastened to Roof Deck - Wood / Tectum Deck
RECOVERY BOARD TYPE
1/2" Wood Fiber or Perlite Board Installed Over an Existing Roof Mechanically Fastened to Roof Deck - Lightweight / Gypsum Deck
RECOVERY BOARD TYPE
1/2" Wood Fiber or Perlite Board Installed Over an Existing Roof Mechanically Fastened to Roof Deck - Concrete Deck
RECOVERY BOARD TYPE
1/2" Treated Gypsum Insulation Board with Glass-Mat (e.g. DensDeck / Securock / Equal) Installed Over an Existing Roof Mechanically Fastened to Roof Deck - Wood / Tectum Deck
4.11 SF
4.12 SF
4.13 SF
4.14 SF
4.15 SF
4.16 SF
4.17 SF
4.18 SF
4.19 SF
4.20 SF
4.21 SF
4.22 SF
4.23 SF
4.24 SF
4.25 SF
4.26 SF
4.27 SF
4.28 SF
4.29 SF
4.30 SF
4.31 SF
4.32 SF
5.00 Coat New Roofing With Elastomeric Coating
INSULATION ATTACHMENT OPTION:
Provide Attachment Pattern in Compliance with FM 1-60 Wind Uplift Instead of FM 1-90
INSULATION ATTACHMENT OPTION:
Provide Attachment Pattern in Compliance with FM 1-120 Wind Uplift Instead of FM 1-90
RECOVERY BOARD TYPE
1/2" Treated Gypsum Insulation Board with Glass-Mat (e.g. DensDeck / Securock / Equal) Installed Over an Existing Roof Mechanically Fastened to Roof Deck - Lightweight / Gypsum Deck
RECOVERY BOARD TYPE
1/2" Treated Gypsum Insulation Board with Glass-Mat (e.g. DensDeck / Securock / Equal) Installed Over an Existing Roof Mechanically Fastened to Roof Deck - Concrete Deck
ADDITIONAL INSULATION OPTION (OVER AN EXISTING ROOF)
Install 1.0" of Polyisocyanurate Insulation Over an Existing Roof. All Wet Insulation Must be Replaced Prior to Installation of New Course of Insulation
ADDITIONAL INSULATION OPTION (OVER AN EXISTING ROOF)
Install 1.5" of Polyisocyanurate Insulation Over an Existing Roof. All Wet Insulation Must be Replaced Prior to Installation of New Course of Insulation
ADDITIONAL INSULATION OPTION (OVER AN EXISTING ROOF)
Install 2.0" of Polyisocyanurate Insulation Over an Existing Roof. All Wet Insulation Must be Replaced Prior to Installation of New Course of Insulation
ADDITIONAL INSULATION OPTION (OVER AN EXISTING ROOF)
Install 2.5" of Polyisocyanurate Insulation Over an Existing Roof. All Wet Insulation Must be Replaced Prior to Installation of New Course of Insulation
ADDITIONAL INSULATION OPTION (OVER AN EXISTING ROOF)
Add for Cutting New Insulation to Match the Profile of an Existing Metal Roof.
INSULATION SUBSTITUTION OPTION
Deduct for Providing an R-Value of greater than or equal to 10, but less than 15; instead of the Standard R-Value of 20 (Should be Negatively Priced) - All Applications Other Than Metal Roof Systems
INSULATION SUBSTITUTION OPTION
Deduct for Providing an R-Value of greater than or equal to 15, but less than 18; instead of the Standard R-Value of 20 (Should be Negatively Priced) - All Applications Other Than Metal Roof Systems
INSULATION SUBSTITUTION OPTION:
Deduct for Providing an R-Value of greater than or equal to 18, but less than 20 instead of the Standard R-Value of 20 (Should be Negatively Priced) - All Applications Other Than Metal Roof Systems
INSULATION SUBSTITUTION OPTION:
Add for Providing an R-Value of 25 Instead of the Standard R-Value of 20 - All Applications Other Than Metal Roof Systems
INSULATION SUBSTITUTION OPTION:
Add for Providing an R-Value of 30 Instead of the Standard R-Value of 20 - All Applications Other Than Metal Roof Systems
INSULATION SUBSTITUTION OPTION
Substitute 1/2" Treated Gypsum Insulation Board with Glass-Mat (e.g. DensDeck / Securock / Equal) in Place of the Wood Fiber or Perlite - Adhered in Hot ASTM D 312 Type III or IV Asphalt; Mopped
INSULATION SUBSTITUTION OPTION
Substitute 1/2" Treated Gypsum Insulation Board with Glass-Mat (e.g. DensDeck / Securock / Equal) in Place of the Wood Fiber or Perlite - Adhered with Insulation Adhesive
INSULATION SLOPE OPTION
Provide a 1/4" Tapered Polyisocyanurate Insulation System while Maintaining the Average R-Value Including Tapered Crickets; Adhered in ASTM D 312 Type III or IV Hot Asphalt; Mopped
INSULATION SLOPE OPTION
Provide a 1/8" Tapered Polyisocyanurate Insulation System while Maintaining the Average R-Value; Adhered in ASTM D 312 Type III or IV Hot Asphalt; Mopped
INSULATION SLOPE OPTION
Provide a 1/4" Tapered Polyisocyanurate Insulation System while Maintaining the Average R-Value Including Tapered Crickets; Adhered with Insulation Adhesive
INSULATION SLOPE OPTION
Provide a 1/8" Tapered Polyisocyanurate Insulation System while Maintaining the Average R-Value; Adhered with Insulation Adhesive
INSULATION SUBSTITUTION OPTION
Provide a 1/4" Tapered Insulating Lightweight Concrete System while Maintaining Average R-Value
INSULATION SUBSTITUTION OPTION
Provide a 1/8" Tapered Insulating Lightweight Concrete System while Maintaining Average R-Value
5.01 SF
5.02 SF
5.03 SF
5.04 SF
5.05 SF
5.06 SF
5.07 SF
5.08 SF
5.09 SF
5.10 SF
5.11 SF
6.00 Roof Deck and Insulation Option
6.01
6.01.01 INSULATION OPTION:
Mechanically Fasten Polyisocyanurate / Hot Mop Wood Fiber or Perlite to Provide an Average R-Value of 20 In Compliance with FM 1-90 Requirements SF
6.02
6.02.01 INSULATION OPTION:
Mechanically Fasten Polyisocyanurate / Hot Mop Wood Fiber or Perlite to Provide an Average R-Value of 20 SF
6.02.02 INSULATION OPTION:
Without Insulation - Must Include Rosin & Mechanically Fasten Glass Base Sheet SF
6.03
6.03.01 INSULATION OPTION:
Mechanically Attach Base Sheet Utilizing FM 1-90 Attachment Patterns & Hot Mop Polyisocyanurate / Hot Mop Wood Fiber or Perlite to Provide an Average R-Value of 20 SF
6.03.02 INSULATION OPTION:
Without Insulation - Must Include Rosin & Mechanically Fasten Glass Base Sheet SF
6.04
6.04.01 INSULATION OPTION:
Must Mechanically Attach a Base Sheet;
Hot Mop Polyisocyanurate / Hot Mop Wood Fiber or Perlite to Provide an Average R-Value of 20 In Compliance FM 1-90 Requirements SF
6.04.02 INSULATION OPTION:
Without Insulation - Must at Least Mechanically Fasten a Base Sheet to the Roof Deck Prior to Installation Installed with FM 1-90 Attachment Patterns SF
6.05
ROOF SYSTEM TYPE
Apply an Acrylic Coating per Specifications (1.5 Gallons per Square per Coat - 2 Coats Required) - Mineral-Surfaced Modified Roof
ROOF SYSTEM TYPE
Apply an Acrylic Coating per Specifications (1.0 Gallon per Square per Coat - 2 Coats Required) - Smooth-Surfaced Modified Roof
ROOF SYSTEM TYPE
Apply a bright white, water-based, acrylic-urethane hybrid roof coating per Specifications (1.5 Gallons per Square per Coat
- 2 Coats Required) - Mineral-Surfaced Modified Roof
ROOF SYSTEM TYPE
Apply a bright white, water-based, acrylic-urethane hybrid roof coating per Specifications (1.0 Gallon per Square per Coat - 2 Coats Required) - Smooth-Surfaced Modified Roof
ROOF SYSTEM TYPE
Apply an Acrylic base coat and a PVDF top coat per Specifications (1.5 Gallons per Square Base Coat - 1/2 Gallon per Square Top Coat) - Mineral-Surfaced Modified Roof
ROOF SYSTEM TYPE
Apply an Acrylic base coat and a PVDF top coat per Specifications (1 Gallon per Square Base Coat - 1/2 Gallon per Square Top Coat) -Smooth-Surfaced Modified Roof
ROOF SYSTEM TYPE
Apply an Urethane Coating per Specifications (1 Gallon per Square per Coat - 2 Coats Required) - Smooth or Mineral Surfaced Modified; With Reinforced Seams (Base Coat Seam with 1.5 Gallons per Square & Reinforcement)
ROOF SYSTEM TYPE
Apply a single-component, aliphatic, polyurea liquid adhesive per Specifications (Apply 1.0 gallon per Square on Seams & wait 24 Hours / Apply base coat at 1.0 gallon per Square / broadcast mineral at 35 lbs. per Square or white gravel at 200 lbs. per Square / wait 24 hours and apply top coat at 1.0 gallon per Square - Mineral-Surfaced Modified
ROOF SYSTEM TYPE
Apply a single-component, aliphatic, polyurea liquid adhesive per Specifications (apply base coat at 1.0 gallon per Square / broadcast mineral at 35 lbs. per Square or white gravel at 200 lbs. per Square / wait 24 hours and apply top coat at 1.0 gallon per Square - Smooth-Surfaced Modified
ROOF SYSTEM TYPE
Apply an Aluminum Coating per Specifications (3/4 Gallon per Square per Coat - 2 Coats Required) - Smooth or Mineral Surfaced Modified
ROOF SYSTEM TYPE
Apply a Fibered Aluminum Coating per Specifications (2 Gallons per Square per Coat - 1 Coat Required) - Smooth or Mineral Surfaced Modified
METAL ROOF DECK - HOT APPLICATION - ASTM D 312 TYPE III OR IV ASPHALT
WOOD ROOF DECK - HOT APPLICATION - ASTM D 312 TYPE III OR IV ASPHALT
TECTUM ROOF DECK - HOT APPLICATION - ASTM D 312 TYPE III OR IV ASPHALT
LIGHTWEIGHT CONCRETE / GYPSUM ROOF DECK - HOT APPLICATION - ASTM D 312 TYPE III OR IV ASPHALT
CONCRETE ROOF DECK - HOT APPLICATION - ASTM D 312 TYPE III OR IV ASPHALT
6.05.01 INSULATION OPTION:
Prime Roof Deck; Hot Mop Polyisocyanurate / Hot Mop Wood Fiber or Perlite to Provide an Average R-Value of 20 In Compliance FM 1-90 Requirements SF
6.05.02 INSULATION OPTION:
Without Insulation - Prime Roof Deck;
Must at Least 1/2" Wood Fiber or Perlite Hot Mopped to Deck In Compliance FM 1-90 Requirements SF
6.06 METAL ROOF DECK - COLD PROCESS APPLICATION
6.06.01 INSULATION OPTION:
Mechanically Fasten Polyisocyanurate / Adhere High Density Asphalt Coated Wood Fiber with Insulation Adhesive to Provide an Average R-Value of 20 In Compliance FM 1-90 Requirements SF
6.07 WOOD ROOF DECK - COLD PROCESS APPLICATION
6.07.01 INSULATION OPTION:
Mechanically Fasten Polyisocyanurate / Adhere High Density Asphalt Coated Wood Fiber with Insulation Adhesive to Provide an Average R-Value of 20 SF
6.07.02 INSULATION OPTION:
Without Insulation - Must Include Rosin & Mechanically Fasten Glass Base Sheet SF
6.08 TECTUM ROOF DECK - COLD PROCESS APPLICATION
6.08.01 INSULATION OPTION:
Mechanically Attach Base Sheet & Adhere Polyisocyanurate in Insulation Adhesive / Adhere High Density Asphalt Coated Wood Fiber with Insulation Adhesive to Provide an Average R-Value of 20 SF
6.08.02 INSULATION OPTION:
Without Insulation - Must Include Rosin & Mechanically Fasten Glass Base Sheet SF
6.09
6.09.01 INSULATION OPTION:
Must Mechanically Attach a Base Sheet;
Adhere Polyisocyanurate in Insulation Adhesive / Adhere High Density Asphalt Coated Wood Fiber with Insulation Adhesive to Provide an Average R-Value of 20 In Compliance FM 1-90 Requirements SF
6.09.02 INSULATION OPTION:
Without Insulation - Must at Least Mechanically Fasten a Base Sheet to the Roof Deck Installed with FM 1-90 Attachment Patterns SF
6.10 CONCRETE ROOF DECK - COLD PROCESS APPLICATION
6.10.01 INSULATION OPTION:
Adhere Polyisocyanurate in Insulation Adhesive / Adhere High Density Asphalt Coated Wood Fiber with Insulation Adhesive to Provide an Average R-Value of 20 In Compliance FM 1-90 Requirements SF
6.10.02 INSULATION OPTION:
Without Insulation - Must at Least 1/2" High Density Asphalt Coated Wood Fiber Adhered with Insulation Adhesive to Deck In Compliance FM 1-90 Requirements SF
6.11 METAL ROOF DECK - TORCH APPLIED / SELF-ADHERING APPLICATION
6.11.01 INSULATION OPTION:
Mechanically Fasten Polyisocyanurate / Adhere Treated Gypsum Insulation Board with Glass-Mat (e.g. DensDeck / Securock / Equal) with Insulation Adhesive to Provide an Average R-Value of 20 In Compliance FM 1-90 Requirements SF
6.12 WOOD ROOF DECK - TORCH APPLIED / SELF-ADHERING APPLICATION
LIGHTWEIGHT CONCRETE / GYPSUM ROOF DECK - COLD PROCESS APPLICATION
6.12.01 INSULATION OPTION:
Mechanically Fasten Polyisocyanurate / Adhere Treated Gypsum Insulation Board with Glass-Mat (e.g. DensDeck / Securock / Equal) with Insulation Adhesive to Provide an Average R-Value of 20 SF
6.12.02 INSULATION OPTION:
Without Insulation - Must Mechanically Attach 1/2" Treated Gypsum Insulation Board with Glass-Mat (e.g. DensDeck / Securock / Equal) SF
6.13
6.13.01 INSULATION OPTION:
Mechanically Attach Base Sheet & Adhere Polyisocyanurate in Insulation Adhesive / Adhere Treated Gypsum Insulation Board with Glass-Mat (e.g.
DensDeck / Securock / Equal) with Insulation Adhesive to Provide an Average R-Value of 20 SF
6.13.02 INSULATION OPTION:
Without Insulation - Must Mechanically Attach 1/2" Treated Gypsum Insulation Board with Glass-Mat (e.g. DensDeck / Securock / Equal) SF
6.14
6.14.01 INSULATION OPTION:
Must Mechanically Attach a Base Sheet;
Adhere Polyisocyanurate in Insulation Adhesive / Adhere Treated Gypsum Insulation Board with Glass-Mat (e.g.
DensDeck / Securock / Equal) with Insulation Adhesive to Provide an Average R-Value of 20 In Compliance FM 1-90 Requirements SF
6.14.02 INSULATION OPTION:
Without Insulation - Must at Least Mechanically Fasten a Base Sheet to the Roof Deck Prior to Installation Installed with FM 1-90 Attachment Patterns SF
6.15
6.15.01 INSULATION OPTION:
Adhere Polyisocyanurate in Insulation Adhesive / Adhere Treated Gypsum Insulation Board with Glass-Mat (e.g.
DensDeck / Securock / Equal) with Insulation Adhesive to Provide an Average R-Value of 20 In Compliance FM 1-90 Requirements SF
6.15.02 INSULATION OPTION:
Without Insulation - Must Adhere 1/2" Treated Gypsum Insulation Board with Glass-Mat (e.g. DensDeck / Securock / Equal) in Insulation Adhesive In Compliance FM 1-90 Requirements SF
6.16
6.16.01 VAPOR BARRIER OPTION:
HOT ASPHALT-APPLIED VAPOR
BARRIER ON METAL DECK:
Mechanically-Fasten Treated Gypsum Insulation Board with Glass-Mat (e.g.
DensDeck / Securock / Equal), Apply 2 Plies of Glass Felt in Hot ASTM D 312 Type III OR IV Asphalt In Compliance with FM 1-90 Requirements SF
6.16.02 VAPOR BARRIER OPTION:
HOT ASPHALT-APPLIED VAPOR
BARRIER ON WOOD, TECTUM,
LIGHTWEIHT CONCRETE OR
GYPSUM DECK: Mechanically Fasten Glass Base Sheet, Apply 2 Plies of Glass Felt in Hot ASTM D 312 Type III OR IV Asphalt In Compliance with FM 1-90 Requirements SF
6.16.03 VAPOR BARRIER OPTION:
HOT ASPHALT-APPLIED VAPOR
BARRIER ON CONCRETE DECK:
Prime Deck Prior to Applying 2 Plies of Glass Felt in Hot ASTM D 312 Type III OR IV Asphalt SF
TECTUM ROOF DECK - TORCH APPLIED / SELF-ADHERING APPLICATION
LIGHTWEIGHT CONCRETE / GYPSUM ROOF DECK - TORCH APPLIED / SELF-ADHERING APPLICATION
CONCRETE ROOF DECK - TORCH APPLIED / SELF-ADHERING APPLICATION
INSTALL PRIOR TO ROOF SYSTEM INSULATION:
6.16.04 VAPOR BARRIER OPTION:
COLD ASPHALT-APPLIED VAPOR
BARRIER ON METAL DECK:
Mechanically-Fasten Treated Gypsum Insulation Board with Glass-Mat (e.g.
DensDeck / Securock / Equal); Apply 2 Plies of Glass Base in Cold Process Modified Asphalt In Compliance with FM 1-90 Requirements SF
6.16.05 VAPOR BARRIER OPTION:
COLD ASPHALT-APPLIED VAPOR
BARRIER ON WOOD, TECTUM,
LIGHTWEIHT CONCRETE OR
GYPSUM DECK: Mechanically Fasten Glass Base Sheet, Apply 2 Plies of Glass Base in Cold Process Modified Asphalt In Compliance with FM 1-90 Requirements SF
6.16.06 VAPOR BARRIER OPTION:
COLD ASPHALT-APPLIED VAPOR
BARRIER ON CONCRETE DECK:
Prime Deck Prior to Applying 2 Plies of Glass Base in Cold Process Modified Asphalt SF
6.16.07 VAPOR BARRIER OPTION:
TORCH-APPLIED VAPOR BARRIER
ON METAL DECK:
Mechanically-Fasten Treated Gypsum Insulation Board with Glass-Mat (e.g.
DensDeck / Securock / Equal); Heat Weld with Torch 1 Ply of SBS Modified Asphalt-Based, Fiberglass Reinforced Torch Base Sheet - Minimum of 80 lbf/in tensile Torch-Applied Base Sheet (ASTM D 5147) In Compliance with FM 1-90 Requirements SF
6.16.08 VAPOR BARRIER OPTION:
TORCH-APPLIED VAPOR BARRIER
ON WOOD, TECTUM, LIGHTWEIHT
CONCRETE OR GYPSUM DECK:
Mechanically Fasten Glass Base Sheet, Heat Weld with Torch 1 Ply of SBS Modified Asphalt-Based, Fiberglass Reinforced Torch Base Sheet - Minimum of 80 lbf/in tensile Torch-Applied Base Sheet (ASTM D 5147) In Compliance with FM 1-90 Requirements SF
6.16.09 VAPOR BARRIER OPTION:
TORCH-APPLIED VAPOR BARRIER
ON CONCRETE DECK:
Prime Deck Prior to Heat Welding with Torch 1 Ply of SBS Modified Asphalt- Based, Fiberglass Reinforced Torch Base Sheet - Minimum of 80 lbf/in tensile Torch-Applied Base Sheet (ASTM D
5147) SF
6.16.10 VAPOR BARRIER OPTION:
HOT ASPHALT-APPLIED VAPOR
BARRIER ON METAL DECK:
Mechanically-Fasten Treated Gypsum Insulation Board with Glass-Mat (e.g.
DensDeck / Securock / Equal), ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type I - 70 lbf/in tensile in Hot ASTM D 312 Type III OR IV Asphalt In Compliance with FM 1-90 Requirements SF
6.16.11 VAPOR BARRIER OPTION:
HOT ASPHALT-APPLIED VAPOR
BARRIER ON WOOD, TECTUM,
LIGHTWEIHT CONCRETE OR
GYPSUM DECK: Mechanically Fasten Glass Base Sheet, ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type I - 70 lbf/in tensile in Hot ASTM D 312 Type III OR IV Asphalt In Compliance with FM 1-90 Requirements SF
6.16.12 VAPOR BARRIER OPTION:
HOT ASPHALT-APPLIED VAPOR
BARRIER ON CONCRETE DECK:
Prime Deck Prior to ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type I - 70 lbf/in tensile in Hot ASTM D 312 Type III OR IV Asphalt SF
6.16.13 VAPOR BARRIER OPTION:
COLD ASPHALT-APPLIED VAPOR
BARRIER ON METAL DECK:
Mechanically-Fasten Treated Gypsum Insulation Board with Glass-Mat (e.g.
DensDeck / Securock / Equal); ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type I - 70 lbf/in tensile in Cold Process Modified Asphalt In Compliance with FM 1-90 Requirements SF
6.16.14 VAPOR BARRIER OPTION:
COLD ASPHALT-APPLIED VAPOR
BARRIER ON WOOD, TECTUM,
LIGHTWEIHT CONCRETE OR
GYPSUM DECK: Mechanically Fasten Glass Base Sheet, ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type I - 70 lbf/in tensile in Cold Process Modified Asphalt In Compliance with FM 1-90 Requirements SF
6.16.15 VAPOR BARRIER OPTION:
COLD ASPHALT-APPLIED VAPOR
BARRIER ON CONCRETE DECK:
Prime Deck Prior to ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type I - 70 lbf/in tensile in Cold Process Modified Asphalt SF
7.00
BUILT-UP MODIFIED ROOF WITH FLOOD COAT AND AGGREGATE IN
HOT ASTM D 312 TYPE III OR IV ASPHALT
7.01
7.01.01 ROOFING MEMBRANE OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type I - Minimum of 70 lbf/in tensile SF
7.01.02 ROOFING MEMBRANE OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type III - Minimum of 220 lbf/in tensile SF
7.01.03 ROOFING MEMBRANE OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 310 lbf/in tensile SF
7.01.04 ROOFING MEMBRANE OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 500 lbf/in tensile SF
7.01.05 ROOFING MEMBRANE OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 600 lbf/in tensile SF
ROOF CONFIGURATION
2 Plies of Glass Felt, Cap Sheet, Flood Coat and Aggregate All in Hot ASTM D 312 Type III OR IV Asphalt
7.02 WARRANTY CHARGE:
Cost to Provide 20 Year - Labor & Material Warranty with No Dollar Limitations as a Standard Warranty for All Applications in this Section 7.00 Must includes coverage for roof uplift pressures up to 90 MPH SF
7.03 WARRANTY UPCHARGE:
Add to provide coverage for a 25 Year Labor & Material Warranty with No Dollar Limitations SF
7.04 WARRANTY UPCHARGE:
Add to provide coverage for a 30 Year Labor & Material Warranty with No Dollar Limitations SF
7.05 WARRANTY UPCHARGE:
Add to provide coverage for roof uplift pressures up to 120 MPH SF
7.06
DEDUCT TO SQUARE FOOT COST - Hot Applied Modified BUR Substitute Additional Glass Felt (Hot Applications) in Place of ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type I - Minimum of 70 lbf/in tensile (i.e. 3 Ply BUR) SF
7.07 ADD TO PER SQUARE FOOT COST - Hot Applied Modified BUR Each Additional Glass Felt (Hot Applications) Inter-ply Installed SF
8.00
BUILT-UP MODIFIED ROOF WITH FLOOD COAT AND AGGREGATE IN
COLD PROCESS ASPHALT
8.01
8.01.01 ROOFING MEMBRANE OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type I - Minimum of 70 lbf/in tensile SF
8.01.02 ROOFING MEMBRANE OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type III - Minimum of 220 lbf/in tensile SF
8.01.03 ROOFING MEMBRANE OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 310 lbf/in tensile SF
8.01.04 ROOFING MEMBRANE OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 500 lbf/in tensile SF
8.01.05 ROOFING MEMBRANE OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 600 lbf/in tensile SF
8.02 WARRANTY CHARGE:
Cost to Provide 20 Year - Labor & Material Warranty with No Dollar Limitations as a Standard Warranty for All Applications in this Section 8.00 Must includes coverage for roof uplift pressures up to 90 MPH SF
8.03 WARRANTY UPCHARGE:
Add to provide coverage for a 25 Year Labor & Material Warranty with No Dollar Limitations SF
8.04 WARRANTY UPCHARGE:
Add to provide coverage for a 30 Year Labor & Material Warranty with No Dollar Limitations SF
8.05 WARRANTY UPCHARGE:
Add to provide coverage for roof uplift pressures up to 120 MPH SF
8.06
DEDUCT TO SQUARE FOOT COST - Cold Applied Modified BUR Substitute Additional Glass Base Sheet in Place of ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type I - Minimum of 70 lbf/in tensile (i.e. 3 Ply BUR) SF
8.07 ADD TO PER SQUARE FOOT COST - Cold Applied Modified BUR Each Additional Glass Base (Cold Applications) Inter-ply Installed SF
9.00
BUILT-UP MODIFIED ROOF ADHERED IN HOT ASTM D 312 TYPE III OR IV
ASPHALT - FLOOD COAT & AGGREGATE IN MODIFIED COAL TAR PITCH
9.01
9.01.01 ROOFING MEMBRANE & COATING OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type I - Minimum of 70 lbf/in tensile, Flood Coat in Modified Hot Coal Tar Pitch With 2000% Elongation SF
ROOF CONFIGURATION
2 Plies of Glass Base, Cap Sheet, Flood Coat and Aggregate All in Cold Process Modified Asphalt
ROOF CONFIGURATION
2 ply of Glass Felt, Cap Sheet, Set in Hot Asphalt, Flood Coat in Modified Coal Tar Pitch and Aggregate
9.01.02 ROOFING MEMBRANE & COATING OPTION
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 220 lbf/in tensile, Flood Coat in Modified Hot Coal Tar Pitch With 2000% Elongation SF
9.01.03 ROOFING MEMBRANE & COATING OPTION
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 310 lbf/in tensile, Flood Coat in Modified Hot Coal Tar Pitch With 2000% Elongation SF
9.01.04 ROOFING MEMBRANE & COATING OPTION
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 500 lbf/in tensile, Flood Coat in Modified Hot Coal Tar Pitch With 2000% Elongation SF
9.01.05 ROOFING MEMBRANE & COATING OPTION
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - 600 lbf/in tensile, Flood Coat in Modified Hot Coal Tar Pitch With 2000% Elongation SF
9.02 WARRANTY CHARGE:
Cost to Provide 20 Year - Labor & Material Warranty with No Dollar Limitations as a Standard Warranty for All Applications in this Section 9.00 Must includes coverage for roof uplift pressures up to 90 MPH SF
9.03 WARRANTY UPCHARGE:
Add to provide coverage for a 25 Year Labor & Material Warranty with No Dollar Limitations SF
9.04 WARRANTY UPCHARGE:
Add to provide coverage for a 30 Year Labor & Material Warranty with No Dollar Limitations SF
9.05 WARRANTY UPCHARGE:
Add to provide coverage for roof uplift pressures up to 120 MPH SF
9.06 COATING OPTION:
Add/Deduct for Installing Flood Coat in Cold Process Coal Tar Pitch SF
10.00
BUILT-UP MODIFIED ROOF WITH MINERAL CAP SHEET ADHERED IN
HOT ASTM D 312 TYPE III OR IV ASPHALT
10.01
10.01.01 ROOFING MEMBRANE OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type I - Minimum of 70 lbf/in tensile SF
10.01.02 ROOFING MEMBRANE OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type III - Minimum of 220 lbf/in tensile SF
10.01.03 ROOFING MEMBRANE OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 310 lbf/in tensile SF
10.01.04 ROOFING MEMBRANE OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 500 lbf/in tensile SF
10.01.05 ROOFING MEMBRANE OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 600 lbf/in tensile SF
10.02 WARRANTY CHARGE:
Cost to Provide 20 Year - Labor & Material Warranty with No Dollar Limitations as a Standard Warranty for All Applications in this Section 10.00 Must includes coverage for roof uplift pressures up to 90 MPH SF
10.03 WARRANTY UPCHARGE:
Labor & Material Warranty with No Dollar Limitations SF
ROOF CONFIGURATION
2 ply of Glass Felt, Mineral Surfaced Cap Sheet, Set in Hot ASTM D 312 Type III or IV Asphalt
10.04 WARRANTY UPCHARGE:
10.05 WARRANTY UPCHARGE:
Add to provide coverage for roof uplift pressures up to 120 MPH SF
11.00
BUILT-UP MODIFIED ROOF WITH MINERAL CAP SHEET ADHERED IN
COLD PROCESS ASPHALT
11.01
11.01.01 ROOFING MEMBRANE OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type I - Minimum of 70 lbf/in tensile SF
11.01.02 ROOFING MEMBRANE OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type III - Minimum of 220 lbf/in tensile SF
11.01.03 ROOFING MEMBRANE OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 310 lbf/in tensile SF
11.01.04 ROOFING MEMBRANE OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 500 lbf/in tensile SF
11.01.05 ROOFING MEMBRANE OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 600 lbf/in tensile SF
11.02 WARRANTY CHARGE:
Cost to Provide 20 Year - Labor & Material Warranty with No Dollar Limitations as a Standard Warranty for All Applications in this Section 11.00 Must includes coverage for roof uplift
11.03 WARRANTY UPCHARGE:
11.04 WARRANTY UPCHARGE:
11.05 WARRANTY UPCHARGE:
Add to provide coverage for roof uplift pressures up to 120 MPH SF
12.00
2-PLY ROOF SYSTEMS - COMBINATIONS OF A BASE PLY & A CAP
SHEET (TOP PLY)
PLEASE NOTE: BASE PLY & CAP SHEET COMBINATIONS MUST BE
APPROVED BY THE MANUFACTURER
12.01
12.01.01 BASE PLY OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type I - 70 lbf/in tensile SF
12.01.02 BASE PLY OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type III - 220 lbf/in tensile SF
12.01.03 BASE PLY OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - 310 lbf/in tensile SF
12.01.04 SF
12.02
12.02.01 BASE PLY OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type I - 70 lbf/in tensile SF
12.02.02 BASE PLY OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type III - 220 lbf/in tensile SF
12.02.03 BASE PLY OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - 310 lbf/in tensile SF
ROOF CONFIGURATION
2 ply Glass Base, Mineral Cap Sheet, Set in Cold Process Modified Asphalt
ROOF CONFIGURATION
1 Ply Modified Base Sheet Adhered in Hot ASTM D 312 Type III or IV Asphalt
ADD/DEDUCT TO PER SQUARE FOOT COST - Hot Applied Modified Multi-ply Systems Each Additional Modified Base Sheet (All Hot Applications) Installed. To be combined with line items above for a labor cost reduction to installed price of two plies of the same modified base sheet vs. the installation of a single base sheet (i.e.
12.01.02 + 12.01.02 + 12.01.04 = Two Plies Installed)
ROOF CONFIGURATION
1 Ply Modified Base Sheet Adhered in Cold Process Modified Asphalt
12.02.04 SF
12.02.05 INTERPLY ADHESIVE OPTION:
Add/Deduct for Cold Applied Modified Multi-ply Systems Substitute Cold Process Adhesive with Alternative Solvent Free Adhesive SF
12.03
12.03.01 BASE PLY OPTION:
SBS Modified Asphalt-Based, Fiberglass Reinforced Torch Base Sheet - Minimum of 80 lbf/in tensile Torch-Applied Base Sheet (ASTM D 5147) SF
12.03.02 BASE PLY OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type III - 210 lbf/in tensile SF
12.03.03 SF
12.04
12.04.01 BASE PLY OPTION:
SBS Modified Asphalt-Based, Polyester OR Fiberglass/Polyester OR Fiberglass Reinforced Self-Adhering Base Sheet - Minimum of 50 lbf/in tensile SF
12.04.02 SF
12.05
12.05.01 ROOFING MEMBRANE OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type I - Minimum of 70 lbf/in tensile SF
12.05.02 ROOFING MEMBRANE OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type III - Minimum of 220 lbf/in tensile SF
12.05.03 ROOFING MEMBRANE OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 310 lbf/in tensile SF
12.05.06 WARRANTY CHARGE:
Cost to Provide 20 Year - Labor & Material Warranty with No Dollar Limitations as a Standard Warranty for All Applications in this Section 12.05 Must includes coverage for roof uplift pressures up to 90 MPH SF
12.05.07 WARRANTY UPCHARGE:
Add to provide coverage for a 25 Year Labor & Material Warranty with No Dollar Limitations SF
12.05.08 WARRANTY UPCHARGE:
Add to provide coverage for a 30 Year Labor & Material Warranty with No Dollar Limitations SF
12.05.09 WARRANTY UPCHARGE:
Add to provide coverage for roof uplift pressures up to 120 MPH SF
12.06
12.06.01 ROOFING MEMBRANE OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type I - Minimum of 70 lbf/in tensile SF
12.06.02 ROOFING MEMBRANE OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type III - Minimum of 220 lbf/in tensile SF
ADD/DEDUCT TO PER SQUARE FOOT COST - Cold Applied Modified Multi-ply Systems Each Additional Modified Base Sheet (All Cold Applications) Installed. To be combined with line items above for a labor cost reduction to installed price of two plies of the same modified base sheet vs. the installation of a single base sheet (i.e.
12.02.02 + 12.02.02 + 12.02.04 = Two Plies Installed)
ROOF CONFIGURATION
1 Ply of Torch Base Sheet Installed with Torch Application
ADD/DEDUCT TO PER SQUARE FOOT COST - Torch-Applied Modified Multi-ply Systems Each Additional Modified Base Sheet (All Torch-Applied Applications) Installed. To be combined with line items above for a labor cost reduction to installed price of two plies of the same modified base sheet vs. the installation of a single base sheet (i.e. 12.03.02 + 12.03.02 + 12.03.03 = Two Plies Installed)
ROOF CONFIGURATION
1 Ply of Self-Adhering Base Installed Using Self-Adhering Backing
ADD/DEDUCT TO PER SQUARE FOOT COST - Torch-Applied Modified Multi-ply Systems Each Additional Modified Base Sheet (All Torch-Applied Applications) Installed. To be combined with line items above for a labor cost reduction to installed price of two plies of the same modified base sheet vs. the installation of a single base sheet (i.e. 12.04.01 + 12.04.01 + 12.04.02 = Two Plies Installed)
ROOF CONFIGURATION
1 Ply Cap Sheet, Flood Coat and Aggregate Adhered in Hot ASTM D 312 Type III OR IV Asphalt
ROOF CONFIGURATION
1 Ply Mineral Surfaced Cap Sheet Adhered in Hot ASTM D 312 Type III or IV Asphalt
12.06.03 ROOFING MEMBRANE OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 310 lbf/in tensile SF
12.06.04 ROOFING MEMBRANE OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 500 lbf/in tensile SF
12.06.05 ROOFING MEMBRANE OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 600 lbf/in tensile SF
12.06.06 WARRANTY CHARGE:
Cost to Provide 20 Year - Labor & Material Warranty with No Dollar Limitations as a Standard Warranty for All Applications in this Section 12.06 Must includes coverage for roof uplift pressures up to 90 MPH SF
12.06.07 WARRANTY UPCHARGE:
Add to provide coverage for a 25 Year Labor & Material Warranty with No Dollar Limitations SF
12.06.08 WARRANTY UPCHARGE:
Add to provide coverage for a 30 Year Labor & Material Warranty with No Dollar Limitations SF
12.06.09 WARRANTY UPCHARGE:
Add to provide coverage for roof uplift pressures up to 120 MPH SF
12.07
12.07.01 ROOFING MEMBRANE & COATING OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type I - Minimum of 70 lbf/in tensile, Flood Coat in Modified Hot Coal Tar Pitch With 2000% Elongation SF
12.07.02 ROOFING MEMBRANE & COATING OPTION
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 220 lbf/in tensile, Flood Coat in Modified Hot Coal Tar Pitch With 2000% Elongation SF
12.07.03 ROOFING MEMBRANE & COATING OPTION
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 310 lbf/in tensile, Flood Coat in Modified Hot Coal Tar Pitch With 2000% Elongation SF
12.07.04 ROOFING MEMBRANE & COATING OPTION
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 500 lbf/in tensile, Flood Coat in Modified Hot Coal Tar Pitch With 2000% Elongation SF
12.07.05 ROOFING MEMBRANE & COATING OPTION
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum 600 lbf/in tensile, Flood Coat in Modified Hot Coal Tar Pitch With 2000% Elongation SF
12.07.06 COATING OPTION:
Add/Deduct for Installing Flood Coat in Cold Process Coal Tar Pitch SF
12.07.07 WARRANTY CHARGE:
Cost to Provide 20 Year - Labor & Material Warranty with No Dollar Limitations as a Standard Warranty for All Applications in this Section 12.07 Must includes coverage for roof uplift pressures up to 90 MPH SF
12.07.08 WARRANTY UPCHARGE:
Add to provide coverage for a 25 Year Labor & Material Warranty with No Dollar Limitations SF
ROOF CONFIGURATION
1 Ply Cap Sheet, Set in Hot ASTM D 312 Type III or IV Asphalt, Flood Coat & Aggregate in Hot Modified Coal Tar Pitch
12.07.09 WARRANTY UPCHARGE:
Add to provide coverage for a 30 Year Labor & Material Warranty with No Dollar Limitations SF
12.07.10 WARRANTY UPCHARGE:
Add to provide coverage for roof uplift pressures up to 120 MPH SF
12.08
12.08.01 ROOFING MEMBRANE OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type I - Minimum of 70 lbf/in tensile SF
12.08.02 ROOFING MEMBRANE OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type III - Minimum of 220 lbf/in tensile SF
12.08.03 ROOFING MEMBRANE OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 310 lbf/in tensile SF
12.08.04 ROOFING MEMBRANE OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 500 lbf/in tensile SF
12.08.05 ROOFING MEMBRANE OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 600 lbf/in tensile SF
12.08.06 MEMBRANE ADHESIVE & COATING OPTION:
Add/Deduct for Cold Applied Modified
BUR
Substitute Cold Process Adhesive with Alternative Solvent Free Adhesive SF
12.08.07 WARRANTY CHARGE:
Cost to Provide 20 Year - Labor & Material Warranty with No Dollar Limitations as a Standard Warranty for All Applications in this Section 12.08 Must includes coverage for roof uplift pressures up to 90 MPH SF
12.08.08 WARRANTY UPCHARGE:
Add to provide coverage for a 25 Year Labor & Material Warranty with No Dollar Limitations SF
12.08.09 WARRANTY UPCHARGE:
Add to provide coverage for a 30 Year Labor & Material Warranty with No Dollar Limitations SF
12.08.10 WARRANTY UPCHARGE:
Add to provide coverage for roof uplift pressures up to 120 MPH SF
12.09
12.09.01 ROOFING MEMBRANE OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type I - Minimum of 70 lbf/in tensile SF
12.09.02 ROOFING MEMBRANE OPTION:
ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type III - Minimum of 220 lbf/in tensile SF
12.09.03 ROOFING MEMBRANE OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 310 lbf/in tensile SF
12.09.04 ROOFING MEMBRANE OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 500 lbf/in tensile SF
12.09.05 ROOFING MEMBRANE OPTION:
ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III - Minimum of 600 lbf/in tensile…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .